KR20170035741A - Construction method of retaining wall - Google Patents
Construction method of retaining wall Download PDFInfo
- Publication number
- KR20170035741A KR20170035741A KR1020150135005A KR20150135005A KR20170035741A KR 20170035741 A KR20170035741 A KR 20170035741A KR 1020150135005 A KR1020150135005 A KR 1020150135005A KR 20150135005 A KR20150135005 A KR 20150135005A KR 20170035741 A KR20170035741 A KR 20170035741A
- Authority
- KR
- South Korea
- Prior art keywords
- retaining wall
- steel plate
- hole
- steel
- earth retaining
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
- E02D5/08—Locking forms; Edge joints; Pile crossings; Branch pieces
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/10—Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
- E02D5/12—Locking forms; Edge joints; Pile crossings; Branch pieces
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Environmental & Geological Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
The present invention relates to a construction method of an underground continuous earth retaining wall, which can be used as a permanent structure as well as being able to be coupled between files without using H-shaped steel. Therefore, And the construction method of the underground continuous earth retaining wall which can increase the convenience of constructing the underground space while reducing the construction cost.
Recently, the depth and scale of underground structures are getting bigger due to high land prices and parking spaces. As a result, the importance of large-scale ground excavation and retaining structures has increased.
The retaining structure is a hypothetical structure that resist the side pressure of earth pressure and water pressure while preventing the entrance of soil or groundwater around the construction site when excavating the ground. This structure can be classified into thumb pile and soil plate, sheet pile, main heating type wall, and underground continuous wall type piling method according to the material constituting the wall and the type of pylon.
In this method, Cast-In-Place Concrete Pile (CIP) method is used to form a heat-conducting wall by using H-beams and reinforcing bars as reinforcement of concrete. The wall formed by the CIP method has a small impact on the surrounding ground because the displacement generated in the wall is not large due to the rigidity against the side pressure due to the use of the reinforcing material.
Therefore, it is one of the construction methods that can be constructed close to the adjacent site, does not require any special equipment, is suitable for downtown area due to small noise and vibration.
However, as shown in the plan view of FIG. 1, in the case of the underground continuous wall type earth retaining wall constructed by the conventional CIP method, there is a disadvantage that the H-
In order to solve such a problem, Korean Patent No. 10-1045625 (Registered on June 24, 2011, entitled "Underground Continuous Retaining Wall Construction Method Using CIP Method", hereinafter referred to as "Prior Art") has been developed.
(A) inserting a plurality of perforation hole holding outer casings after perforating the ground along the installation position of the earth retaining wall; (b) alternately inserting the structural steel pipe and the reinforcing steel assembly into the inserted plurality of perforated hole holding outer casings; (c) pouring concrete into the outer casing for holding the perforated holes and then pulling out the outer casing for holding the perforated holes; (e) drawing the structural steel pipe after the construction of the underground structure and filling the space where the structural steel pipe is pulled out, thereby transferring the earth pressure to the constructed underground structure, wherein the structural steel pipe is coated with lubricating oil on the outer peripheral surface And is provided inside a spiral tube in which a plurality of protrusions and protrusions are protruded from the outer circumferential surface.
However, the prior art has the advantage of removing the H-beams from the files of the CIP method, but only focuses on the removal of the H-beams. It does not serve as a bond between the files by the CIP method or as a stress bearing material of the permanent wall, So that waste of materials and environmental pollution are caused. That is, despite the above-mentioned advantages, the earth retaining wall according to the prior art has a problem that it must return to the CBS method or the CWS method, which has been already developed, in order to be used as a permanent structure.
In this case, the CBS (Composite Basement Wall System) method is a method that considers the H-beam for retaining walls as a permanent structure, which has been used only as a construction material in the construction of the outer underground wall in the basement layer. The H- It is a synthetic method to resist side pressure such as earth pressure and water pressure.
Also, CWS (continuous wall system) method, like CIP method or SCW method, uses a H-shaped steel as a reinforcing material of concrete and installs a buried steel wedge which is supported by a steel frame instead of a conventional reinforced concrete frame beam It is a method to pour an underground outer wall all together.
In addition, LW for injecting grouting solution for order to prevent water leaking through the file, which is a weak point of CIP method. Grouting work will be carried out. For this construction, additional holes are drilled in the back of the pile and the manhattan tube is inserted and the grouting injection fluid is injected. Therefore, if the construction cost is increased and the construction skill is lowered, it is difficult to perform precise construction, and it is impossible to confirm whether the ManJ tube is correctly positioned in the correct position.
Meanwhile, in the prior art, an additional structure such as an L-shaped support is required to support the formwork when the permanent wall made of reinforced concrete is installed after the earthworks. In other words, since the formwork can not be connected to the pile, it is attached to the formwork like the L-shaped support so that the formwork can withstand the expansion due to the concrete pouring.
However, even if the form is supported through such a configuration as the L-shaped support or the like, it is difficult to support the form perfectly and safely, and the burden is imposed on the installation and disassembly of such a support. In addition, the conventional permanent wall is constructed independently of the CIP file and does not have a coupling relationship with the CIP file.
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and it is an object of the present invention to provide an underground continuous earth retaining wall which can be used as a permanent structure, And to provide a construction method.
Another object of the present invention is to provide a construction method of an underground continuous earth retaining wall in which a back-fill material is not required to be inserted between a file and a steel wale when a steel wale is installed in a file.
It is still another object of the present invention to provide a construction method of an underground continuous earth retaining wall capable of firmly securing a steel wale to a pile with simple bolting.
It is still another object of the present invention to provide a construction method of an underground continuous earth retaining wall capable of easily and reliably injecting a grouting injection liquid for order between files.
It is still another object of the present invention to provide a method of constructing an underground continuous earth retaining wall capable of supporting a form conveniently and completely by integrating a file and a permanent wall together with fixing a form for a permanent wall to a file.
According to an aspect of the present invention, there is provided a method of constructing an underground continuous earth retaining wall, the method comprising: forming a perforation hole by drilling a ground according to an installation position of the earth retaining wall; Joining a steel plate assembly corresponding to an inner periphery of the perforation hole at regular intervals along a height direction to a steel bar assembly to be inserted into the perforation hole; Inserting the reinforcing bar assembly coupled with the joint reinforcing bars into the perforation hole; Curing the concrete by pouring the concrete into the perforation hole; And binding the exposed steel sheet portion while exposing the soil surrounded by the cured earth retaining wall.
The joint metal plate is provided with a fastening hole penetrating the inside of the earth retaining wall. The fastening hole is provided with a bolt having a bolt head coupled to a body without a thread and a hypothetical member composed of an insert part into which the body is inserted, In the bonding step between the bonded steel plate portions, after the curing, the steel wale band is bolted to the space from which the punched member is removed.
Further, the fastening holes may be formed in the shape of a slot for correcting the vertical error between the fastening holes when the steel band segments are engaged, and the temporary members may have a cross section corresponding to the fastening holes of the long hole type.
A thread may be formed on the body of the bolt.
In the present invention, in order to install a permanent wall made of reinforced concrete on the earth retaining wall, the steel wale band is removed, and one end of a connecting rod having threads formed at both ends is inserted into the inserted portion exposed by the removed steel wale band, ; Binding the reinforcing bar and the connecting rod while arranging the reinforcing bars for the permanent wall; Providing a die with a through hole to allow the other end of the connecting rod to pass through; Fixing the mold to the earth retaining wall by fastening a fastener to the other end of the connecting rod exposed to the outside of the mold; And curing the concrete by pouring the concrete between the earth retaining wall and the mold, thereby forming a permanent wall.
Further, in the bonding step between the bonded steel plate portions, the adjacent bonded steel plate portions can be welded and welded through the connecting steel plate.
In addition, in the step of joining the bonded steel plate, the steel pipe assembly may be further coupled with a manhattan tube having a perforated hole at a predetermined interval, and the hole may be broken by the grouting filler injected into the manhattan tube And the manifold tube is coupled to the reinforcing bar assembly.
According to the construction method of the underground continuous earth retaining wall according to the present invention, not only H-shaped steel can be used but also can be used as a permanent structure. Therefore, in the underfloor wall through the CIP method, There is an advantage that it is possible to increase the convenience of constructing the underground space while reducing the construction cost.
According to the present invention, there is no need to insert a back-fill material between a file and a steel wale when a steel wale is installed in a file, and the file and the steel wale band are directly contacted with each other so that the steel wale can be more stably and firmly coupled There is an effect.
In addition, according to the present invention, since the steel wristband can be firmly coupled to the file only by simple bolting, there is an advantage that the joining process of the steel band can be performed more quickly and conveniently.
In addition, according to the present invention, it is possible to easily and reliably inject the grouting injection liquid for the order of the files, thereby reducing the time and cost required for the construction for the order, as well as remarkably improving the order performance .
In addition, according to the present invention, by integrating a file and a permanent wall, a file and a permanent wall can work together with respect to an external force to increase an internal strength, and a mold for a permanent wall can be fixed to a file, So that it is possible to omit an additional construction for supporting the formwork, thereby saving time and cost.
1 is a plan view showing an underground continuous earth retaining wall constructed according to the prior art,
2 is a view for explaining a construction method of a construction method of an underground continuous earth retaining wall according to a first embodiment of the present invention,
3 is a view showing a state in which a steel wale band is mounted on a earth retaining wall according to the first embodiment,
4 is a perspective view showing a modified example of the first embodiment,
FIG. 5 is a view showing a grouting injection state with respect to a file back surface in the modification of FIG. 4;
6 is a view showing a construction method of an underground continuous earth retaining wall according to a second embodiment of the present invention,
FIG. 7 is a cross-sectional view taken along the line A-A 'in FIG. 6 (d)
8 is an exploded perspective view showing a state where a steel wristband is coupled to a file produced according to the second embodiment,
9 is a perspective view showing a modified example of the fastening hole of the bonded steel plate according to the second embodiment,
10 is an exploded perspective view showing a structure of a through hole of a steel band strip for correcting a vertical error of the fastening hole according to the second embodiment,
11 is a view for explaining a structure for installing a permanent wall in the earth retaining wall according to the present invention.
Hereinafter, a construction method of an underground continuous earth retaining wall according to the present invention will be described in detail with reference to the accompanying drawings.
FIG. 2 is a view for explaining a construction method of a construction method for an underground continuous earth retaining wall according to a first embodiment of the present invention, and FIG. 3 is a view showing a state where a steel wale is installed on an earth retaining wall according to the first embodiment .
As shown, the earth retaining wall according to the first embodiment starts from the step of forming the
The
Also, the bonded
The bonded
4, the
In addition, in the conventional method, it is impossible to confirm from the outside whether the manhattan tube is fully inserted by the depth of the hole. However, in the present invention, the
In order to block the entry of foreign matter into the
When the bonded
When the
When the grouting is injected and solidified, the bonded
The bonded steel plate portions are exposed from the
Since the bonded
Since the bonded
≪ Embodiment 2 >
Next, the construction method of the underground continuous earth retaining wall according to the second embodiment of the present invention will be described. In the present embodiment, the same reference numerals are used for the components corresponding to the first embodiment.
FIG. 6 is a view showing a construction method of an underground continuous earth retaining wall according to a second embodiment of the present invention, FIG. 7 is a sectional view taken along the line A-A 'in FIG. 6 (d) FIG. 6 is an exploded perspective view showing a state in which a steel wristband is coupled to a file produced according to an embodiment. FIG.
As shown in the drawing, the second embodiment is different from the first embodiment in the structure of the bonded
Further, the temporary fixing
The
7A, the bolt head of the
The
In addition, when the
On the other hand, the
Even when the joining
9, the fastening holes 36 of the bonded
10, the through
Meanwhile, when the
11 (a), first, the
Then, as shown in Fig. 11 (b), the
In this state, the
When the mold installation is completed, concrete can be placed between the earth retaining wall and the mold and cured. Thus, the permanent wall can be easily integrated into the pile while using the pile according to the present invention.
When the concrete is cured, the
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined by the appended claims. It is obvious that you can do it.
10: perforation hole 20: reinforcing assembly
30: Bonded steel plate 31: Manhattan tube
33: hole 34: engaging means
35: connecting iron plate 36: fastening hole
40: file 50: steel wale
60: steel frame 70:
80: connecting rod 81: binding wire
83: fasteners 90: reinforcing bars
91: Form
100: earth retaining wall
Claims (7)
(30) corresponding to the inner periphery of the perforation hole (10) at regular intervals along the height direction on the reinforcing bar assembly (20) to be inserted into the perforation hole (10);
Inserting the reinforcing bar assembly (20) having the joined reinforcing bars into the perforation hole (10);
Pouring concrete into the perforation hole (10); And
And bonding the bonded steel plate portions (30) exposed while crawling the soil surrounded by the cured retaining wall (100).
A bolt (71) having a bolt head coupled to a body without a thread is formed in the fastening hole (36), and a bolt A hypothetical member 70 composed of an insertion portion 73 into which a body is inserted is mounted,
Characterized in that, in the bonding step between the bonded steel plate portions (30), the steel wale band (50) is bolted to the space from which the above described padding member (70) is removed after curing to bond the bonded steel plate portions (30) Construction method of earth retaining walls.
The fastening holes 36 are formed in the shape of a slot to correct the vertical error between the fastening holes 36 when the steel wale 50 is engaged,
Wherein the padding member (70) has a cross section corresponding to the long hole type fastening hole (36).
And a thread is formed on the body of the bolt (71).
In order to install a permanent wall made of reinforced concrete on the earth retaining wall 100, the steel wale 50 is removed, and an insertion portion 73 exposed by the removed steel wale 50 is provided with a connecting rod And inserting one end of the bolt (80) into a bolt;
Binding the reinforcing bar (90) and the connecting rod (80) while arranging the reinforcing bars (90) for the permanent wall;
Providing a die (91) having a through hole (91a) and passing the other end of the connecting rod (80);
Fixing the mold (91) to the earth retaining wall (100) by fastening a fastening (83) to the other end of the connecting rod (80) exposed to the outside of the mold (91); And
Further comprising the step of pouring concrete between the earth retaining wall (100) and the mold (91) to cure the concrete.
Wherein the joining steel plate portions are welded to each other through the joining steel plate (35) during the joining step between the adjacent joining steel plate portions (30).
In the step of joining the bonded steel plate portions, a Manhattan tube 31 in which holes 33 are perforated is further joined to the steel bar assembly 20 to which the bonded steel plate portion 30 is bonded at regular intervals,
Wherein the hole (33) is sealed by a coupling means that can be broken by a grouting injection fluid injected into the manhattan tube (31), and the manhattan tube is coupled to the rebar assembly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150135005A KR101842208B1 (en) | 2015-09-23 | 2015-09-23 | Construction method of retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150135005A KR101842208B1 (en) | 2015-09-23 | 2015-09-23 | Construction method of retaining wall |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20170035741A true KR20170035741A (en) | 2017-03-31 |
KR101842208B1 KR101842208B1 (en) | 2018-05-14 |
Family
ID=58500847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150135005A KR101842208B1 (en) | 2015-09-23 | 2015-09-23 | Construction method of retaining wall |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101842208B1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797637A (en) * | 2017-04-26 | 2018-11-13 | 杭州南联土木工程科技有限公司 | Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground |
KR20190109890A (en) * | 2018-03-19 | 2019-09-27 | 대림씨엔에스(주) | Composite phc pile for soil retaining wall |
CN113235549A (en) * | 2021-04-08 | 2021-08-10 | 中南大学 | A silo formula bearing structure for building high terrace |
US20220282443A1 (en) * | 2019-11-29 | 2022-09-08 | Pirkan Laatupalvelu Oy | Method for forming a pile wall in ground and a corresponding pile wall |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158649B (en) * | 2019-06-05 | 2020-10-23 | 浙江交工集团股份有限公司 | Construction method for adjacent underground pipeline during open caisson sinking construction |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100938394B1 (en) * | 2009-04-17 | 2010-01-22 | (주)서현컨스텍 | Phc pile with imbeded steel pipe |
KR101210368B1 (en) * | 2011-04-28 | 2012-12-11 | 이창남 | Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts. |
-
2015
- 2015-09-23 KR KR1020150135005A patent/KR101842208B1/en active IP Right Grant
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797637A (en) * | 2017-04-26 | 2018-11-13 | 杭州南联土木工程科技有限公司 | Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground |
KR20190109890A (en) * | 2018-03-19 | 2019-09-27 | 대림씨엔에스(주) | Composite phc pile for soil retaining wall |
US20220282443A1 (en) * | 2019-11-29 | 2022-09-08 | Pirkan Laatupalvelu Oy | Method for forming a pile wall in ground and a corresponding pile wall |
CN113235549A (en) * | 2021-04-08 | 2021-08-10 | 中南大学 | A silo formula bearing structure for building high terrace |
CN113235549B (en) * | 2021-04-08 | 2022-06-17 | 中南大学 | A silo formula bearing structure for building high terrace |
Also Published As
Publication number | Publication date |
---|---|
KR101842208B1 (en) | 2018-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101842208B1 (en) | Construction method of retaining wall | |
KR101928054B1 (en) | Construction method of retaining wall for underground structures with narrow edge space | |
KR100910576B1 (en) | Embed anchor and construction method of composite basement wall using the same | |
KR101676814B1 (en) | CFT pile Construction Method and the Shoring Method using the same file | |
KR101973565B1 (en) | Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate | |
KR100752397B1 (en) | Construction method for underground watertight wall and subsidiary casing used in the same | |
KR20140055639A (en) | A execution method of architecture beam | |
JP6186267B2 (en) | How to build an underground tunnel | |
KR101167511B1 (en) | Underpass using precast concrete pile and method for constructing the same | |
KR101066612B1 (en) | Composite shell pile having waterstop and waterproof method for secant pile wall using the same | |
KR101078080B1 (en) | Earth retaining wall and it's construction method using the precast pile and ground reinforcement | |
KR102239089B1 (en) | Underaround continued wall structure using casing and pile continuous connection and method therefor | |
KR101974826B1 (en) | The Precast Pile Having Interlocking Secant and The Earth Retaining Wall Method Constructed by It's Continuous Pile | |
JP2009180035A (en) | Method of connecting caisson | |
JP4958044B2 (en) | Installation structure and installation method for shield tunnel approach | |
KR101275468B1 (en) | The structure assembly for building a tunnel and building method thereof | |
KR101153313B1 (en) | Subsidiary casing and construction method for underground watertight wall using the same | |
KR101153314B1 (en) | Construction method for underground watertight wall | |
KR20180079676A (en) | The core for Cast In Place pile and the continuous wall using thereof and the construction apparatus thereof | |
KR101219451B1 (en) | Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same | |
JP6019690B2 (en) | Tunnel widening method | |
KR100969778B1 (en) | Composite Wall Using Angled Channel and Constructing Method thereof | |
KR20120040780A (en) | Structural joint system for temporary cip retaining wall used a part of underground outer composite wall | |
JP3082054B2 (en) | Large-scale, deep steel continuous basement wall and method of constructing the same | |
KR102551842B1 (en) | Wall structure construction method with top-down construction using cast in place piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |