KR20160098851A - Repairing method of pot hole - Google Patents
Repairing method of pot hole Download PDFInfo
- Publication number
- KR20160098851A KR20160098851A KR1020150020990A KR20150020990A KR20160098851A KR 20160098851 A KR20160098851 A KR 20160098851A KR 1020150020990 A KR1020150020990 A KR 1020150020990A KR 20150020990 A KR20150020990 A KR 20150020990A KR 20160098851 A KR20160098851 A KR 20160098851A
- Authority
- KR
- South Korea
- Prior art keywords
- porthole
- repairing
- road
- repair
- space
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/005—Methods or materials for repairing pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
- E01C23/10—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure
Abstract
The present invention relates to a method of repairing a porthole, and it is an object of the present invention to reduce the time and cost required for repairing cracks, breakage, and potholes generated in an asphalt or concrete pavement.
The method for repairing a porthole according to the present invention includes a first step of manufacturing a plurality of repair parts in block form having different heights and areas, a first step of piercing the first porthole and its periphery generated on a road or a road surface, A step of selecting a repairing part having a height and an area corresponding to the depth and area of the expanded space and inserting the repairing part into the expanded space; And a third step.
Description
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of repairing a porthole on a road or a road made of asphalt or concrete.
Generally, pavement asphalt and concrete are aged with time and gradually become damaged or damaged, resulting in a porthole. Another cause is a porthole caused by friction between a vehicle and a tire of a motorcycle.
Cracks or cracks formed on the asphalt and concrete pavement thus shorten the life of the road, and damage to roads affects the running stability of the vehicle, so rapid repair is required immediately after the breakage.
The existing method of repairing damaged roads is as follows. First, the area of the portholes inside the porthole is enlarged to a size larger than the area and depth of the portholes generated on the road or the road surface, and then asphalt or concrete is poured into the porthole .
After that, compaction is carried out by repetitively reciprocating the furthest point through a large compaction device such as a pressure rolling device, and then the vehicle is blocked until the asphalt or concrete is completely cured.
Therefore, it takes a long time to repair a conventional porthole and requires a lot of equipment to be used.
In addition, as the time required for repairing the port hole is prolonged, the passage of the vehicle is disturbed, resulting in severe vehicle stagnation.
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems of the prior art, and it is an object of the present invention to provide a porthole repairing method that can reduce the time and cost required for repairing cracks, breakage, and portholes generated in asphalt or concrete pavement roads It has its purpose.
A method for repairing a porthole according to the present invention includes a first step of fabricating a plurality of repair parts in a block shape having different heights and areas, a first step of piercing the first portholes generated in the road or road surface and the periphery thereof, A step of selecting a repairing part having a height and an area corresponding to the depth and area of the expanded space and inserting the repairing part into the expanded space, And a third step.
The method further includes the step of applying an adhesive to the extended space between the second step and the third step.
The method further includes curing the adhesive applied to the expanded space.
In the method for repairing a phosphorus hole according to the present invention, when the expanded space is formed by enlarging the area of the porthole in the repair process of the porthole, And then the repair part of the corresponding size is inserted into the extended space to be fixed on the road. Accordingly, the resin-like asphalt or concrete is filled in the porthole in the conventional repair process of the porthole, and a separate large compaction device is further mobilized There is no need to go through a process of climbing a branch, and the time and cost required for maintenance can be remarkably shortened.
In addition, since the time required for maintenance can be shortened, the vehicle stagnation phenomenon can be alleviated.
In addition, since it is possible to repair the portholes by piling them according to the repair parts of a specific dimension in the course of widening the area of the initial portholes, it is possible to repair the portholes by inserting repair parts corresponding to the sizes, The maintenance can be performed quickly and the cost due to maintenance can be remarkably reduced.
1 is a block diagram showing a construction procedure of a porthole repairing method according to the present invention;
BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a porthole repair method, and more particularly,
3 to 5 are views showing a construction procedure of a porthole repairing method according to the present invention;
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily carry out the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Like parts are designated with like reference numerals throughout the specification.
FIG. 1 is a block diagram showing a construction procedure of a porthole repairing method according to the present invention, FIG. 2 is a perspective view showing a repair part applied to a porthole repairing method according to the present invention, Fig. 3 is a view showing a construction procedure of a porthole repairing method according to the present invention;
First, a plurality of
The
At this time, a plurality of molds or dies are used, and they are formed to have different heights and areas.
As a result, as shown in FIGS. 2 (a) to 2 (f), the
Thereafter, the
Since the
At this time, the
That is, the expanded
For example, when the
Thereafter, the foreign matter is removed in the expanded
Then, the
As described above, the expanded
Before the
At this time, if the road adhesive is protruded to the surface of the
The curing method of the road adhesive may be a curing method through a device capable of spraying warm air or cold air, a natural curing method, a curing method using a curing agent capable of promoting curing while improving the hardness of the road adhesive have.
The above-described method for repairing a porthole is a method for repairing a
In addition, since the time required for maintenance can be significantly shortened, the vehicle stagnation phenomenon can be quickly resolved.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, Of the right.
1: road or road surface 2: porthole
3: Extended space 10:
Claims (3)
A second step of grasping the first porthole and the periphery thereof generated on the road or the road surface and forming a space expanded in the folding line corresponding to the area and the height of any one of the built-
Selecting a repairing part having a height and an area corresponding to the depth and area of the expanded space and inserting the repairing part into the expanded space;
Wherein the method comprises the steps of:
And applying an adhesive to the expanded space between the second step and the third step
The method further comprising:
Curing the adhesive applied to the expanded space
Further comprising the steps of:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150020990A KR20160098851A (en) | 2015-02-11 | 2015-02-11 | Repairing method of pot hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150020990A KR20160098851A (en) | 2015-02-11 | 2015-02-11 | Repairing method of pot hole |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20160098851A true KR20160098851A (en) | 2016-08-19 |
Family
ID=56874914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150020990A KR20160098851A (en) | 2015-02-11 | 2015-02-11 | Repairing method of pot hole |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20160098851A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120511A (en) * | 2016-08-31 | 2016-11-16 | 黄亮光 | Rear hybrid road surface pit restorative procedure |
CN106368110A (en) * | 2016-08-31 | 2017-02-01 | 黄亮光 | Method for repairing pit slots on road surface |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101392477B1 (en) | 2013-11-20 | 2014-05-07 | 주식회사 삼송마그마 | Repacking of asphalt concrete pavement method |
-
2015
- 2015-02-11 KR KR1020150020990A patent/KR20160098851A/en not_active Application Discontinuation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101392477B1 (en) | 2013-11-20 | 2014-05-07 | 주식회사 삼송마그마 | Repacking of asphalt concrete pavement method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120511A (en) * | 2016-08-31 | 2016-11-16 | 黄亮光 | Rear hybrid road surface pit restorative procedure |
CN106368110A (en) * | 2016-08-31 | 2017-02-01 | 黄亮光 | Method for repairing pit slots on road surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104275978B (en) | Manufacturing method of simulation tree mould | |
KR20160098851A (en) | Repairing method of pot hole | |
CN106079049A (en) | The pouring mould and pour using method of a kind of board-like concrete reinforcement locating piece | |
BR112019013791A2 (en) | structural reinforcement and method for forming a structural reinforcement | |
RU168527U1 (en) | CROSSING FORMWORK | |
CN105799055B (en) | A kind of sand aerating armored concrete casting mold | |
US20140284847A1 (en) | Device and method for manufacturing tire tread features | |
CN102392404B (en) | Local build-in precast repair slab for concrete road | |
KR101595896B1 (en) | Precast ascon block, making method and construction method therefor | |
GB2482315A (en) | Pothole repair method | |
JP6367270B2 (en) | Method for manufacturing positioning block body of separator for formwork | |
KR20210055061A (en) | Concrete block manufacturing device | |
KR101761774B1 (en) | Molder for block molding | |
US20120040042A1 (en) | Composite Mold with Expandable Boot | |
CN202169707U (en) | Tread joint line structure of pneumatic tyre die | |
KR101626383B1 (en) | Casting production method for sidewalk and roadway installation slip prevention and Casting products | |
KR101344072B1 (en) | Method to construct joints of the concrete road | |
CN207405863U (en) | New prefabricated panel | |
KR20150093374A (en) | Shim for horizontally adjusting wall panel | |
KR100499579B1 (en) | construction method of concrete post | |
CN211947858U (en) | Maintenance construction structure for asphalt pavement | |
KR100970857B1 (en) | The braille brick for the blind and manufacturing method | |
KR102106674B1 (en) | Manhole cover | |
KR101796466B1 (en) | A bladder for tire vulcanization | |
KR101859287B1 (en) | Removing method of concrete mold form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |