KR20160003370A - nnaceis - Google Patents

nnaceis Download PDF

Info

Publication number
KR20160003370A
KR20160003370A KR1020140081547A KR20140081547A KR20160003370A KR 20160003370 A KR20160003370 A KR 20160003370A KR 1020140081547 A KR1020140081547 A KR 1020140081547A KR 20140081547 A KR20140081547 A KR 20140081547A KR 20160003370 A KR20160003370 A KR 20160003370A
Authority
KR
South Korea
Prior art keywords
management
nnaceis
information
construction
project
Prior art date
Application number
KR1020140081547A
Other languages
Korean (ko)
Inventor
홍순봉
Original Assignee
홍순봉
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍순봉 filed Critical 홍순봉
Priority to KR1020140081547A priority Critical patent/KR20160003370A/en
Publication of KR20160003370A publication Critical patent/KR20160003370A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Abstract

(A) Technology: Software
(B) Challenges to be solved: All personnel share technical information in two separate industries, namely design and construction, R & D and production, interior and exterior work. Increase the likelihood of project success and reduce risk to failure.
(C) Solution to the problem:
first. The information input to the PC is transmitted in real time on the mobile, and all the personnel who access the nnaceis system of the project share the technical information and the management chart value.
second. It manages the detail management field of one activity or work process in the first 9 areas (construction, official, quality, safety, material, process, cost, labor, subcontract) Making infinite management field arbitrary.
Third, if the correctness of the input information is entered as no, an alert beep will be generated to all PCs or mobiles connected to this nnaceis system and all processes of the project will be stopped until the problem is solved in nnaceis.
Fourth, by providing the search function to the manager management platform,
(D) Effect: Significantly lowering the risk of failure in all industries or projects, seeking the diffusion and universality of technology, and sharing information on new technologies

Figure pat00010

Description

System management information system {nnaceis}

software

Software crm, erp, html5, cloud

The information provided by the PC is simultaneously output from the PC and the mobile through the Internet. In the mobile where mobility is required, the information provided is classified as yes or no, and the degree of management of the degree of classification is checked again on the PC Systems

At least 9 management areas such as technical requirements, process, quality, safety required in the field office, and system management to minimize the gap between the actual work occurring in the external field and the PC in the field and the field mobile Implementing Software to Troubleshoot

first. The information input to the PC is transmitted in real time on the mobile, but it is not outputted simply. Instead, it checks in real time the correct and correct information, yes and no in the field in real time, The corresponding control chart values (calculated based on the frequencies of yes and no) are calculated on pc and displayed.

second. It manages the detail management field of one activity or work process in the first 9 areas (construction, official, quality, safety, materials, process, cost, labor, subcontract) If you need it, you can create infinite management areas.

Third, if the correctness of the input information is entered as no, an alert beep will be generated to all PCs or mobiles connected to this nnaceis system and all processes of the project will be stopped until the problem is solved in nnaceis.

Fourth, by giving search function to manager management platform, it is possible to check past information data and its management results,

Eliminate the gap between actual work in the field and the office, design and construction, as well as in the home and abroad to create high-quality products and a safe work environment

<Figure 1> The main page that is logged in as nnaceis called Seoul Project (example)
After logging in as nnaceis,
A sub-page divided into the manager management platform
<Fig. 3> Engineering system management information data input platform
<Fig. 4> Manager management platform. Current, or past
nnaceis system management information data management result output, verification platform
<Fig. 5> Logged into the mobile web of the nnaceis system called the Seoul project (example)
The main page
<Fig. 6> nnaceis platform for fields implemented in mobile

< 1>. Administrator's PC : www.seoulproject.com (example)

Figure pat00001

       <Figure 1-1> Main page to login to nnaceis system of Seoul project

<2> Manager classification

1. General manager: A person who distinguishes an intermediate manager from an advanced manager ( the person who manages the input of the engineering description and management of management)

2. Advanced Managers: people who manage engineering input and management

3. Intermediate Manager: An intermediate descriptor for security and safety personnel entering values in the fields field, in the output of the smartphone m.seoulproject.com, in binary of yes, no.

4. General Members: Anyone who can see only "Management Management" and who is a member of Korea .

Figure pat00002

<Figure 1-2> Subpage after logging in nnaceis of Seoul project

< 3> Below, click on the Engineering button in the above picture <1-2> ---- The screen which the advanced manager deals professionally -

Figure pat00003

 <Figure 1-3> Engineering System Management Information Data Entry Platform

<4> Management chart management platform

Figure pat00004

<Figure 1-4> Management chart management PC Web platform

<5> PC web platform to input engineering information contents to NNACEIS

The following figure shows the NNACEIS construction technology information system, which is a dedicated technology input platform to input the construction technology to the PC by the engineers in the field office. It is used by technicians in charge of the field or safety technicians, , NO as result values, and folder, TXT file, JPG file and AVI file are created on the homepage server.

Figure pat00005

<Figure 1-5, Entering NNACEIS Technical Information PC Web Platform>

The person in charge of the field office, the technician or supervisor, and the client can enter the PC web platform to review and take action on site and check the results. You can check and check the process rate for milestones or critical paths that must be completed on the milestones.

 The site code must be agreed between the site, the head office, and nna.

 The name of the site and the type of work shall be used as the name of the process control chart.

 The work type ID is used as the work type ID in the process management table. It is to align the data of process management and NNACEIS with the milestones.

 Load button: Loads the checklist itself that was previously entered on the server

 It is possible to import by inputting site name and work ID

The field name and the work type name are input only once at the time of inputting the site code and the work type ID, so that even if only the current code and the work type ID are inputted afterwards, they are outputted.

<6> Management diagram Click the management button to configure as below screen ------- Search function included

Figure pat00006

<Figure 1-6, Management chart management PC Web platform>

The important thing is that the values of management such as construction, public works, quality, safety, process, cost, materials,

In other words,

Construction: Construction completion

Public affairs: Public affairs planning, plan

Quality: Quality control

Safety: Safety management chart

Process: Process progress

Cost: Cost fairness

Material: Material quality

Hado: Subcontract control chart

Labor: Labor management

Etc. are also generated by day, week, month, quarter, year.

Checklists written by technicians are in txt format and are stored on the server as Internet files as described in the app above.

In other words,

Number / time date / contact person name / work id / name of work type. txt

In this way, day "2015.4.15" is the big folder, and the following small folders are regenerated.

 For example, "Number / Time Date / Contact Name / Work ID / Work Name" ---> "2015.4.15.11.45 / Hong Gil-dong / ad14504 /

Once saved, the following files can be retrieved from the field office.

 If checked in the checklist, an alert will be generated and a beep will sound, marked with red and asterisks.

Also, jpg files and avi movie files taken in the photo should be saved in the folder.

Daily safety management chart .txt files are also automatically generated

================================================== ===========

In the "2015.04.15" folder, the following small folders are created

1. 2015.4.15.11.45 / Hong Gil-dong / ad14504 /

2. Welding of electric arc welding

3. 2015.4.15.13.45 / Kang, Chan-chan / bc 2457 / Reinforcement assembly

4. 2015.4.15 / daily settlement / construction safety alert

5. 2015.4.15 Daily construction management chart

6. 2015.4.15 Daily Safety Management Chart

7. 2015.4.15 Daily Quality Control Chart

........................... The same folders are created indefinitely.

For example, in the smartphone application, open folder 1, 2015.4.15.11.45 / Hong Gil-dong / ad14504 / search term, type yes or no in the check list, Clicking on this will automatically create the above small folders.

================================================== =============

In addition,

In "2015.4.15.11.45 / Hong Gil-dong / ad14504 / trash folder" folder

1. 2015.4.15.11.45 / Hong Gil-dong / ad14504 / Construction / Construction

2. 2015.4.15.11.45 / Hong Gil-dong / ad 14504 / Terror / public service

3. 2015.4.15.09.45 / Hong Gil-dong / ad14504 // Detector / Quality

4. 2015.4.15.09.45 / Hong Gil-dong / ad14504 // Detection / Safety

5. 2015.4.15.09.45 / Hong Gil-dong / ad14504 // Detector / Material

There are smaller folders.

Here you can click on the smaller folder "2015.4.15.09.45 / Hong Gil-dong / ad14504 // Search / Quality"

2014.4.15.09.45 / Hong Gil-dong / ad14504 // Turf / Quality .txt

(1).

/ / Ad14504 // Terrapy / quality .avi

As above, files input or recorded by smart phone in the field can be transmitted to the server and can be viewed via internet.

.................................................. .................................................. ...................

Checked lists on the same smart phone are saved as text files, and the pictures and videos are saved in the same folder with the same name

================================================== =============

In addition, if you click the red folder 2 "2015.4.15.09.45 / Ejido Moon / ad 15478 / electric weld" which is checked as no,

Inside the folder

Electric welding .avi.

2015.4.15.09.45 / Eun Jung Moon / ad 15478 / Electric welding .jpg

2015.4.15.09.45 / Ejim Moonok / ad 15478 / electric welding .txt etc.

If you click on the txt file, the contents of the checklist

a. Did the electric welders wear the safety equipment thoroughly? yes

b. Is electric wire or electric capacity adequate for electric welding? no ★ (Confirmation of occurrence of smoke in the wire - Completion of check of wire exchange measures)

c. Is the worker aware of the ventilation installation and emergency evacuation exit in the room electrical welding? yes

 Is displayed, and the red character among the above contents is confirmed as "no" to indicate that an alert has occurred

================================================== =============

It is possible to collect only the items written in red among the files in the whole day, so that the printer output function and the file can be separately created.

 2015.4.15 / daily settlement / construction safety alert folder

 2015.4.15 / daily settlement / construction safety alert.txt file exists and clicks it

 1.1515.4.15.09.45 / EJ Jung-duk / ad15478 / Electric Welding / Is electric wire enough for electric welding? No ★

 Is the bond enough to bind? no ★

In the same day as the day, the item "no" in the checklist is collected and made into a txt file.

================================================== ===========

Also, if no is checked in the field, it will be displayed in red on the computer monitor as below. Press OK button to disappear.

1.1515.4.15.13.45 / EJ JungDoo / ad15478 / Electric Welding / Is electric wire enough for electric welding? No ★

================================================== =============

<7> Calculation method of control chart

Within the "daily safety management chart" folder

"Daily safety management chart .txt"

a. : Total number of total safety management check items: 300 (If there are 15 items in one check list and 20 items in total during the day, the number is 300, which means the total number of items in the check list)

a-1: Number of safety check items for each item:

a-1-1: Detector: 35

a-1-2: Welding: 50

a-1-3: Electrical works: 45

....................

Here, the total of the total number of checks for each item should be the same as the total number of daily checks.

b. : Number of checks checked as no: 12

b-1: Number of times each item is checked as no

b-1-1: Detector: 0

b-1-2: Welding: 6

b-1-3: Electrical works: 3

....................

The total number of times checked for each item should be equal to the number of checks checked in item no.

c. : Daily total safety management chart (250-12) /250=0.952=95.2%

c-1: Safety management chart for each day of each event

c-1-1 (tester): (35-0) / 35 = 1 = 100%

c-1-2 (welding): (50-6) / 50 = 0.88 = 88%

c-1-3 (electrical work): (45-3) / 45 = 0.933 = 93.3%

          It is automatically calculated as above and saved automatically as txt file.

-------------------------------------------------- -------------

 "Main Account Safety Management Chart" is automatically generated every week - starting from 0 am on Mondays to 24 pm on Sundays.

"2015.4.12 ~ 2015.4.19 Main Safety Management Folder" is automatically created, and "2015.1.12 ~ 2015.4.19 Main Safety Management .txt" is automatically created in this folder.

The format is the same as the daily safety check above. However, since it is weekly rather than daily, the number and the number of items increase.

-------------------------------------------------- -------------

"Monthly closing safety management chart" is automatically generated every month. Total entries from 2015.4.1 through 2015.4.30 are calculated

"2015.4 Monthly Safety Management Folder" is automatically created and "2015.4 Monthly Monthly Safety Management" is automatically created. The contents are the same as the above daily safety check, The number of items increases.

-------------------------------------------------- -------------

&Lt; 8 >. Management web platform configuration of management.

Figure pat00007

<Figure 1-7, Management chart management PC Web platform>

The important thing is that you can not randomly delete folders or text files on web pages. It is only possible to auto create and view files and folders.

Left to right 2015.04.15 Folder Click,

2015.04.15 / Hong-dong / ad14504 / Folder folder

2015.04.15 / Kang, Chan-chan / bc24578 / Electric welding etc. April 15, 2015 Various inspection work folders are created.

If you click here again 2015.04.15 / Hongdong / ad14504 / search folder,

Nine management items are listed, such as construction / dismantling, public works, quality, safety, etc. Here, when a user clicks an item desired,

Finally, txt files and jpg, avi. And other daily settlement files of the uploaded drawing file.

Based on the ID of each individual work in the process control chart or the name of the work type (preferably, it should be searched by the work type ID) - Because the work type name is often overlapped, the work type position is often confused, .

Produce NNACEIS for construction, public works, quality, safety, materials, process, budget, labor, equipment, subcontracting and other management fields according to each process ID

In other words, in the same process, the technicians can decide on site management chart by the binary method of YES and NO on the field of construction technology on the spot by smartphone or tablet on the hour, every 2 hours, have.

It is possible to quantify the degree of construction, public works, quality, safety, materials, process, budget, etc. of the process item so that the control chart value can be monitored.

YES, NO items on smartphone are displayed on the computer monitor of the office in real time (ie, internet web site is installed in real time that is linked with smartphone application)

When the technician checks YES, it goes through the office computer without any signal. When it checks NO, it notifies the website that the problem occurred on the website. being.

When several technicians manage different processes, the office can monitor all of them.

If NO is checked, texts and notifications are also displayed on the smartphone or tablet where the application is installed. - In other words, the technician who is in the field can also be monitored in real time.

In addition, the entire drawing, drawing, photographing, video, and sound recorder functions are taken on the spot and recorded in real time in the office PC.

In the office PC Internet, the management value of the degree of technical management should be indicated.

Therefore, if you sign up for the website of the site and print out the homepage on the computer screen, the president, owner, supervisor, contractor, and resident customer of the construction company in Seoul can monitor the degree of construction technology management at the local construction site.

<9> Field technician smartphone mobile web: m.seoulproject.com

Figure pat00008

<Figure 1-8, nnaceis login mobile web page of middle manager, field technician>

<10> Mobile platform

Figure pat00009

<Figure 1-9, Mobile platform after login at m.seoulproject.com>

Smartphone m.seoulproject.com drive screen ---- Therefore, you need a separate mobile web that requires NNACEIS content or id input as shown below. You can use it by connecting to the site of the site. It can be used by anyone but it can be used before it is approved in the field office, construction company, supervisor, client, and nna headquarters.

 In the above picture, most of the construction technical matters are selected by the construction company, civil engineer, architectural engineer, construction safety technician, and quality management technician in the management field of their own and upload technical information to the PC engineering platform. Come to the mobile platform above

Lean information is output as it is. The check list file of photos, videos, sound recorders, and drawings of function boxes is automatically saved in the server folder and also saved on the smartphone. Drawing files acad and DWG files can be imported from smartphone.

 On-site technicians, subcontractors, supervisors, contractors, etc. can confirm real-time construction and process goals for their respective tasks. Check the risk of the process in real time, and if necessary,

1 . Requirements for management technology such as construction, public works, safety, quality, materials, person, subcontracting, drawings, process, budget

2. Engineering technological issues such as engineering design (design), art design, algorithms, PROCEDURE, feasibility, VE, ANALISYS,

On-site information is provided on smartphones and tablets. The worker experiences smart engineering and has the advantage of checking all information in real time if he / she has only smart phone without heavy drawings or difficult figures.

It is likely to be applied in industries that are divided into two areas: design and construction, R & D and production, as well as technology-intensive industries and construction. Because nnaceis can implement and transfer 3d, specifications, know-how, etc. in the design drawing, all personnel involved in the project share technical information. And the risk to them.

How to calculate the control chart values
For example, if the frequency of yes is 200, and the frequency of no is 23, that is, the number of times of survey is 223 times,
The construction management value of the trenching process is ((223-23) / 223) * 100 = 89.68%.
In addition, based on this, nine management items are basically provided,
Construction: Construction management degree: 89.68%
Public affairs: Public affairs plan: 85%
Quality: Quality control: 88%
..........
If nine management chart values are obtained in this way, the success rate and failure rate of the terrain process can be confirmed by the average of the nine management chart values. Also, if the lowest value among these nine control chart values is found, it is possible to numerically confirm and cope with what is the problem management field in the terrain process.

Claims (4)

The information input to the PC is transmitted in real time on the mobile, but it is not outputted simply, but it checks and transmits the inputted information right and wrong, yes and no to the mobile in the field, , Mean, and standard deviation are calculated and calculated based on the frequency of yes and no. It manages the detailed management field of one activity or work process in the first 9 areas (construction, official, quality, safety, materials, process, cost, labor, subcontract) In addition, if you need it, you can create infinite management areas. If the correct value of the input information is entered as no, an alert beep will be issued to all connected PCs or mobile with this nnaceis system, and all processes of the project will be stopped until the problem is solved in nnaceis The management management platform is given a search function to check past information and its management results, and all the personnel who are logged into nnaceis of the project share all the data of the project
KR1020140081547A 2014-07-01 2014-07-01 nnaceis KR20160003370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140081547A KR20160003370A (en) 2014-07-01 2014-07-01 nnaceis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140081547A KR20160003370A (en) 2014-07-01 2014-07-01 nnaceis

Publications (1)

Publication Number Publication Date
KR20160003370A true KR20160003370A (en) 2016-01-11

Family

ID=55169529

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140081547A KR20160003370A (en) 2014-07-01 2014-07-01 nnaceis

Country Status (1)

Country Link
KR (1) KR20160003370A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017171219A1 (en) * 2016-04-01 2017-10-05 연세대학교 원주산학협력단 Device for treating tinnitus and hearing loss and method for driving device for treating tinnitus and hearing loss

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017171219A1 (en) * 2016-04-01 2017-10-05 연세대학교 원주산학협력단 Device for treating tinnitus and hearing loss and method for driving device for treating tinnitus and hearing loss

Similar Documents

Publication Publication Date Title
US10021138B2 (en) Policy/rule engine, multi-compliance framework and risk remediation
US10019677B2 (en) Active policy enforcement
US8769412B2 (en) Method and apparatus for risk visualization and remediation
Lu et al. Next big thing in big data: the security of the ICT supply chain
US20160307286A1 (en) Safety Communication Hub for Organizations
CN105493121A (en) System and method for controlling electronic communications
US11526825B2 (en) Cloud-based multi-tenancy computing systems and methods for providing response control and analytics
US11227246B2 (en) Systems and methods for identifying, profiling and generating a graphical user interface displaying cyber, operational, and geographic risk
US20150186896A1 (en) System and method of relatime inpsection of remote facility
US20200296163A1 (en) System and method for dynamically generating a site survey
KR20160003370A (en) nnaceis
Way et al. Transitioning from dynamic decision support to context-aware multi-party coordination: A case for emergency response
KR101512735B1 (en) Quality management apparatus and method
Voss et al. Interoperability of real-time public safety data: Challenges and possible future states
Petrenj et al. Cross-border Information Sharing for Critical Infrastructure Resilience: Requirements and Platform Architecture.
de Fátima Silva Piedade et al. Crisis and Communications Management in the Airports Sector: The Effective Use of Social Media
Tankard How secure is your building?
Daher From Lone Workers to Connected Workers–How Technology is Transforming Safety
Bhamidipati A Holistic Approach to Ensure Security and Compliance while using Robotic Process Automation
Saleem et al. Facility risk profile: a methodology of putting various risk assessment information to work
Shehhi et al. Eyes on Air
Azevedo The Crisis Communication Plan and Strategy Development
Susanti et al. AGIR: One-Stop Application for Asset Integrity Risk Management
Holloway Conflict Between State Economic DevelopmentPolicy and Federal Communications PolicyRegarding NG9-1-1 and PSAPs
Landaeta Rivas et al. Managing Drilling Real-Time Center Remotely Amid Covid-19 Pandemic in Compliance to 100% HSE

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application