KR20150128267A - Apparatus for data integration of heterogeneous system - Google Patents

Apparatus for data integration of heterogeneous system Download PDF

Info

Publication number
KR20150128267A
KR20150128267A KR1020140055367A KR20140055367A KR20150128267A KR 20150128267 A KR20150128267 A KR 20150128267A KR 1020140055367 A KR1020140055367 A KR 1020140055367A KR 20140055367 A KR20140055367 A KR 20140055367A KR 20150128267 A KR20150128267 A KR 20150128267A
Authority
KR
South Korea
Prior art keywords
data
information
storage unit
power
power generation
Prior art date
Application number
KR1020140055367A
Other languages
Korean (ko)
Other versions
KR101860598B1 (en
Inventor
이용익
곽종갑
방순정
명진희
김태섭
김태호
박종호
Original Assignee
엘에스산전 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 엘에스산전 주식회사 filed Critical 엘에스산전 주식회사
Priority to KR1020140055367A priority Critical patent/KR101860598B1/en
Publication of KR20150128267A publication Critical patent/KR20150128267A/en
Application granted granted Critical
Publication of KR101860598B1 publication Critical patent/KR101860598B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The present invention relates to an apparatus for data integration of a heterogeneous system. According to the embodiment of the present invention, an apparatus for data integration of the heterogeneous system which includes an energy management system and a market operation system comprises: a data collection part which receives static data applied to the energy management system and the market operation system; an integration data storage part which sorts static data inputted by the data collection part in accordance to data type and stores it; and a control part which calculates data applied to the energy management system and the market operation system, sorts it or outputs it based on data stored in the integration data storage part.

Description

이기종 시스템의 데이터 통합 장치{Apparatus for data integration of heterogeneous system}[0001] Apparatus for data integration of heterogeneous systems [

본 발명은 이기종 시스템의 데이터 통합을 위한 장치에 관한 것이다.The present invention relates to an apparatus for data integration of heterogeneous systems.

전력 시장 및 전력계통 운영에 필수적인 MOS(Market Operation System)와 EMS(Energy Management System)은 각각 전력계통을 모델링한 데이터를 보유하고 있다. EMS는 효율적이고 안정적인 계통 운영을 위한 여러 응용프로그램을 구동하기 위해 필요하며, MOS는 전력계통의 안정성과 함께 전체 비용을 최소화할 수 있는 경제적인 급전계획을 수립하고 이를 통한 실시간 시장 운영을 할 수 있는 기초자료로 사용된다. MOS (Market Operation System) and EMS (Energy Management System), which are essential for power market and power system operation, each have data modeling power system. EMS is needed to run various application programs for efficient and stable system operation. MOS is required to establish a power supply plan that can minimize the total cost as well as stability of the power system, It is used as basic data.

전력계통(전력망)은 전체가 하나의 망으로 끊김 없이 연결됨에 따라 전력계통을 모델링한 데이터 하나하나의 정확성은 계통해석 등의 모드 응용프로그램의 품질을 결정하는 중요한 요소이다. Since the entire power system is connected seamlessly to a single network, the accuracy of each data modeling the power system is an important factor in determining the quality of mode application programs such as system analysis.

전력계통 모델 데이터를 EMS와 MOS시스템에 별도로 구축함으로 인해 입력준비, 입력, 검증, 시스템 반영 등에 두 배의 시간 및 노력이 요구된다.Power system model data is separately installed in EMS and MOS system, which requires twice as much time and effort as input preparation, input, verification and system reflection.

즉, 현실보다 두 배의 데이터가 존재해야만 하고 이는 오류 데이터의 발생 가능성을 두 배로 늘리는 결과를 초래한다. 또한 시스템의 특성이 완전히 다르기 때문에 EMS와 MOS를 담당하는 별도의 인력이 필요하게 된다. 전력계통 데이터 입력을 위한 제반 작업을 하기 위해서는 해당 시스템의 계통데이터를 입력하는 각각의 별도 툴을 가지고 EMS 및 MOS 각각에 구동을 위한 데이터베이스를 생성 및 관리해야 할 필요가 있다. That is, there must be twice as much data as the reality, which results in doubling the probability of error data. In addition, because the characteristics of the system are completely different, a separate manpower for EMS and MOS is needed. It is necessary to create and manage a database for driving each of the EMS and the MOS with respective separate tools for inputting the system data of the system in order to perform all the operations for inputting the power system data.

이와 같이 EMS와 MOS간의 데이터가 통합적으로 관리되지 않으며 각각의 데이터 입력을 통한 비용 및 시간적 손실이 발생할 수 있다. 또한 독립적인 데이터 관리에 따른 상호 연계 구동 시의 데이터 오류 및 그에 따른 시스템 동작에 따른 데이터 산출치가 상이하게 나타날 수 있다.In this way, data between EMS and MOS is not integratedly managed, and cost and time loss may occur through input of data. In addition, data errors due to data errors during interconnection operation due to independent data management and corresponding system operation values may appear differently.

본 발명은 상기한 바와 같이 EMS 및 MOS의 모델링을 위한 데이터를 통합으로 관리하도록 하기 위한 이기종 시스템의 데이터 통합 장치를 제공한다.The present invention provides a data integration device of a heterogeneous system for integrating and managing data for modeling EMS and MOS as described above.

본 발명의 실시 예에 따른 에너지 관리 시스템과 시장 운영 시스템을 포함하는 이기종 시스템의 통합 데이터 처리 장치에 있어서, 상기 에너지 관리 시스템 및 시장 운영 시스템에 적용되는 정적 데이터를 입력 받는 데이터 수집부; 상기 데이터 수집부를 통하여 입력되는 정적 데이터를 데이터 종류에 따라 분류하여 저장하는 통합 데이터 저장부; 상기 통합 데이터 저장부에 저장된 데이터를 기초하여 상기 에너지 관리 시스템 및 시장 운영 시스템에 적용할 데이터를 산출하거나 분류하여 출력하는 제어부;를 포함한다.An integrated data processing apparatus of a heterogeneous system including an energy management system and a market operation system according to an embodiment of the present invention includes a data collector for receiving static data applied to the energy management system and the market operation system; An integrated data storage unit for storing static data inputted through the data collecting unit according to data types; And a controller for calculating or outputting data to be applied to the energy management system and the market operating system based on the data stored in the integrated data storage unit.

본 발명에 따르면, 이기종 시스템의 데이터를 통합 처리 및 관리함으로써, 연계되는 시스템의 구동 및 데이터 처리에 대한 오류를 최소화하고 그에 따른 시간 적 비용적 손실을 절감할 수 있도록 하는 효과를 가지고 있다.The present invention has the effect of minimizing errors in the operation and data processing of the associated system and reducing the time and cost loss by integrating and managing the data of the heterogeneous system.

도 1은 본 발명의 실시 예에 따른 이기종 시스템의 데이터 통합 장치를 나타낸 블록 구성도이다.
도 2는 본 발명의 실시 예에 따른 데이터 통합 장치에 포함되는 통합 데이터 저장부의 구성을 설명하기 위한 구성도이다.
도 3은 본 발명의 실시 예에 따른 통합 데이터 처리를 위한 동작을 설명하기 위한 흐름도이다.
1 is a block diagram showing a data integration apparatus of a heterogeneous system according to an embodiment of the present invention.
2 is a block diagram illustrating a configuration of an integrated data storage unit included in a data integration apparatus according to an embodiment of the present invention.
3 is a flowchart illustrating an operation for integrated data processing according to an embodiment of the present invention.

이하 도면을 참조하여 본 발명의 실시 예를 상세히 설명한다.
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

도 1은 본 발명의 실시 예에 따른 이기종 시스템의 데이터 통합 장치를 나타낸 블록 구성도이고, 도 2는 본 발명의 실시 예에 따른 데이터 통합 장치에 포함되는 통합 데이터 저장부의 구성을 설명하기 위한 구성도이다. FIG. 1 is a block diagram illustrating a data integration apparatus of a heterogeneous system according to an embodiment of the present invention. FIG. 2 is a block diagram illustrating a configuration of an integrated data storage unit included in a data integration apparatus according to an embodiment of the present invention. to be.

도 1 내지 도 2를 참조하면, 본 발명의 실시 에에 따른 데이터 통합 장치(1)는 데이터 수집부(10), 통합 데이터 저장부(20), 데이터 분류부(30), 데이터 출력부(40) 및 제어부(50)로 구성될 수 있다.1 and 2, a data integration apparatus 1 according to an embodiment of the present invention includes a data collecting unit 10, an integrated data storing unit 20, a data classifying unit 30, a data output unit 40, And a control unit 50.

데이터 수집부(10)는 사용자 인터페이스(미도시)를 통하여 입력되는 EMS 및 MOS 모델링 데이터를 입력 및 수집할 수 있다. 데이터 수집부(10)는 EMS(2) 및 MOS(3)에 적용될 기초 데이터(정적 데이터)를 입력 받을 수 있다.The data collecting unit 10 may input and collect EMS and MOS modeling data input through a user interface (not shown). The data collecting unit 10 may receive basic data (static data) to be applied to the EMS 2 and the MOS 3.

통합 데이터 저장부(20)는 데이터 수집부(10)를 통하여 수집되는 EMS 및 MOS에 적용되어 동적 데이터를 산출하기 위한 정적 데이터를 저장할 수 있다. The integrated data storage unit 20 may store static data to be applied to EMS and MOS collected through the data collecting unit 10 to calculate dynamic data.

통합 데이터 저장부(20)는 본 발명의 실시 예에 따라 도 2에 도시된 바와 같이 전력 계통 데이터 저장부(21), 발전기 정보 저장부(22), 입찰 정보 저장부(23), 발전계획 정보 저장부(24) 및 예비전력 정보 저장부(25)를 포함하여 구성될 수 있다.2, the integrated data storage unit 20 includes a power system data storage unit 21, a generator information storage unit 22, a bid information storage unit 23, A storage unit 24, and a spare power information storage unit 25.

전력 계통 데이터 저장부(21)는 각 설비 별로 연결 지점을 나타내는 노드 정보를 포함할 수 있다. 노드 정보는 스테이션 별, 전압 레벨 별로 구분되어 저장될 수 있다. 또한 전력 계통 데이터 저장부(21)에 저장되는 데이터는 계통을 구성하는 설비(차단기, 단로기, 변압기, 부하 등)에 대한 필요 입력 데이터 명 및 그에 따른 설치 정보를 포함할 수 있다.The power system data storage unit 21 may include node information indicating connection points for each facility. The node information can be stored separately for each station and voltage level. Also, the data stored in the power system data storage unit 21 may include necessary input data names for equipment (circuit breakers, disconnectors, transformers, loads, and the like) constituting the system and installation information corresponding thereto.

발전기 정보 저장부(22)는 전력 계통에 포함되는 발전기들에 대한 독립적 정보를 저장할 수 있다. 발전기 정보 저장부(22)는 각 발전기의 식별자 정보 및 유효전력, 무효전력, 계통 주파수 등에 대한 발전기 구동 정보를 포함할 수 있다.The generator information storage unit 22 may store independent information on the generators included in the power system. The generator information storage unit 22 may include generator drive information on the identifier information and the active power, the reactive power, the system frequency, and the like of each generator.

입찰 정보 저장부(23)는 발전기별 전력 생산량 및 그에 따른 가격 정보를 기초하여 시장 참여 및 거래를 위한 계획 정보를 저장할 수 있다. 또한 입찰 정보 저장부(23)는 과거 입찰 이력에 대한 정보를 저장하고 그에 따라 수립되는 입찰 계획 정보를 저장할 수 있다.The bidding information storage unit 23 may store planning information for market participation and transactions based on the electric power generation amount per generator and the price information corresponding thereto. Also, the bid information storage unit 23 may store information on the past bid history and store the bid plan information established according to the past bid history.

발전계획 정보 저장부(24)는 발전기별 전력 생산량 및 수요량에 대한 정보를 저장하고, 그에 따른 발전 계획 데이터를 저장할 수 있다. 즉, 발전 계획 정보 저장부(24)는 발전기별 전력 생산량 및 수요량에 따른 발전 예측량을 제어부(50)에서 산출하여 저장할 수 있다.The power generation plan information storage unit 24 may store information on the power generation amount and the demand amount for each generator, and may store the power generation planning data corresponding thereto. That is, the power generation plan information storage unit 24 can calculate and store the power generation estimated amount according to the power generation amount and the demand amount for each generator by the controller 50 and store it.

예비전력 정보 저장부(25)는 발전 계획 정보를 포함하는 공급 전력 정보와 수요 전력에 대한 정보를 저장 할 수 있다. 또한, 수요 전력에 대한 공급 전력의 예비 전력 정보가 저장될 수 있다. 예비전력 정보 저장부(25)는 제어부의 연산 동작에 의하여 공급 및 수요 전력에 대한 정보를 기초하여 산출될 수 있다.The reserve power information storage unit 25 may store information on the supply power information including the power generation planning information and the demanded power. Further, the preliminary power information of the power supply to the demanded power can be stored. The spare power information storage unit 25 can be calculated on the basis of the information on the supply and demand power by the calculation operation of the control unit.

데이터 분류부(30)는 통합 데이터 저장부(20)에 저장되는 EMS 및 MOS 통합 데이터는 실제 시스템 구동에 요구되는 데이터로, 제공되는 시스템에 따라 분류할 수 있다. 데이터 분류부(30)는 제어부(50)의 제어에 기초하여 통합 데이터 각각에 대한 식별자 또는 데이터 종류에 기초하여 해당 시스템으로 출력하기 위한 데이터만을 추출할 수 있다.The data classifying unit 30 classifies the EMS and MOS integrated data stored in the integrated data storing unit 20 into data required for actual system operation according to the provided system. Based on the control of the control unit 50, the data classification unit 30 can extract only data for output to the system based on the identifier or the data type for each integrated data.

데이터 출력부(40)는 제어부(50)의 제어에 기초하여 데이터 분류부(30)에서 분류되어, 통합 데이터 저장부(20)에 저장되는 데이터를 해당 시스템으로 출력하기 위한 통신 모듈을 포함할 수 있다.The data output unit 40 may include a communication module for outputting the data classified in the data classification unit 30 and stored in the integrated data storage unit 20 to the corresponding system under the control of the control unit 50 have.

제어부(50)는 본 발명의 실시 예에 따라 전반적인 데이터 통합 장치의 제어를 실행할 수 있다. 제어부(50)는 본 발명의 실시 예에 따라 통합 데이터 저장부(20)에 저장되는 EMS(2) 및 MOS(3)의 동작에 요구되는 데이터를 추출하거나 산출할 수 있다. 제어부(50)는 데이터 수집부(10)를 통하여 입력되어 통합 데이터 저장부(20)에 저장되는 EMS(2) 및 MOS(3) 데이터에 대하여 상호 매칭하고, 매칭된 결과 데이터를 EMS(2) 및 MOS(3)에 각각 출력할 수 있다. 예를 들어, 제어부(50)는 전력 계통 데이터 및 발전기 정보 데이터를 기초하여 전력계통 또는 발전기에서 취득되는 데이터에 대하여 취득 데이터의 위치 및 그에 따른 발전계획 정보 등을 산출하고, 그에 따른 입찰 정보를 매칭할 수 있다.
The control unit 50 can perform control of the overall data integration apparatus according to an embodiment of the present invention. The control unit 50 may extract or calculate data required for operations of the EMS 2 and the MOS 3 stored in the integrated data storage unit 20 according to an embodiment of the present invention. The control unit 50 matches the EMS 2 and MOS 3 data input through the data collecting unit 10 and stored in the integrated data storage unit 20 and outputs the matched result data to the EMS 2, And the MOS 3, respectively. For example, the control unit 50 calculates the position of the acquired data, the generated power generation plan information and the like with respect to the data acquired from the power system or the generator based on the power system data and the generator information data, can do.

상기와 같은 구성과 같이 본 발명의 실시 예에 따른 데이터 통합 장치(1)는 EMS(2) 및 MOS(3)의 운용에 요구되는 데이터 및 운용에 따라 산출(생성)되는 동적 데이터를 위한 정적 데이터를 통합적으로 저장할 수 있다.
The data integration apparatus 1 according to the embodiment of the present invention has the same configuration as that of the above-described configuration, and the data integration apparatus 1 according to the embodiment of the present invention can store static data for dynamic data that is calculated (generated) in accordance with data required for operation of the EMS 2 and the MOS 3, Can be stored integrally.

이하 도 3을 참조하여 본 발명의 실시 예에 따라 데이터 통합 장치(1)의 통합 데이터 저장 및 산출 동작에 대해 설명한다.
The integrated data storage and calculation operation of the data integration apparatus 1 will be described below with reference to FIG. 3 according to an embodiment of the present invention.

도 3은 본 발명의 실시 예에 따른 통합 데이터 처리를 위한 동작을 설명하기 위한 흐름도이다.3 is a flowchart illustrating an operation for integrated data processing according to an embodiment of the present invention.

도 3을 참조하면 본 발명의 실시 예에 따른 통합 데이터 처리 장치(1)의 제어부(50)는 데이터 수집부(10)를 통하여 입력되는 전력 계통 데이터 및 발전기 정보를 수집할 수 있다. 이외에도 상기 데이터 수집부(10)를 통하여 다양하게 EMS(2) 및 MOS(3)에 적용될 데이터를 수집될 수 있다.(S310)Referring to FIG. 3, the controller 50 of the integrated data processing apparatus 1 according to the embodiment of the present invention can collect power system data and generator information input through the data collecting unit 10. In addition, data to be applied to various EMS (2) and MOS (3) may be collected through the data collector 10 (S310)

제어부(50)는 상기 수집되는 전력 계통 데이터 및 발전기 정보를 기초하여 발전 계획 정보를 수립할 수 있다.(S320)The control unit 50 can establish the power generation planning information based on the collected power system data and the generator information (S320)

발전 계획 정보는 전력 계통 데이터와 발전기 정보에 기초하여 생산 가능 에너지를 예측하고 상기 예측되는 에너지량에 기초하여 입찰 정보 및 예비전력 정보를 산출할 수 있다. The power generation planning information can predict the producible energy based on the power system data and the generator information and calculate the bid information and the reserve power information based on the predicted energy amount.

제어부(50)는 상기 확인되는 발전 계획 정보 또는 예비전력 정보 또는 입찰 정보에 대하여 기 저장된 해당 정보들과 비교하고 비교 결과 기 저장된 정보 와 상이한 정보가 존재하는지 판단할 수 있다.(S330)The control unit 50 compares the generated power generation plan information, the reserve power information, or the bid information with previously stored corresponding information, and determines whether there is information different from the previously stored information.

제어부(50)는 기 저장된 통합 데이터 정보와 상기 수집 및 수립된 데이터 및 정보가 상이한 경우 신규로 수집 및 수립된 통합 데이터를 저장할 수 있다.(S340)The control unit 50 may store the newly collected and established integrated data when the previously stored integrated data information and the collected and established data and information are different (S340)

제어부(50)는 상기 통합 데이터 저장부(20)에 저장되는 데이터들에 대하여 EMS(2) 또는 MOS(3)로 출력되어 시스템에 적용되도록 할 수 있다.(S350)
The control unit 50 may output the data stored in the integrated data storage unit 20 to the EMS 2 or the MOS 3 so as to be applied to the system.

상기한 바와 같이 본 발명의 실시 예에 따른 데이터 통합 시스템은 이기종의 시스템(EMS 및 MOS)에 대에서 동적 데이터를 산출하기 위한 정정 데이터를 통합 관리하고 그에 따른 데이터의 오차 및 시스템 적용에 따른 오류를 최소화 할 수 있다.
As described above, the data integration system according to the embodiment of the present invention integrates and manages correction data for calculating dynamic data in a heterogeneous system (EMS and MOS), and accordingly, Can be minimized.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. The foregoing description is merely illustrative of the technical idea of the present invention, and various changes and modifications may be made by those skilled in the art without departing from the essential characteristics of the present invention.

따라서, 본 발명에 개시된 실시 예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시 예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. Therefore, the embodiments disclosed in the present invention are intended to illustrate rather than limit the scope of the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments.

본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다. The scope of protection of the present invention should be construed according to the following claims, and all technical ideas within the scope of equivalents should be construed as falling within the scope of the present invention.

1: 통합 데이터 장치
10: 데이터 수집부
20: 통합 데이터 저장부
21: 전력 계통 데이터 저장부 22: 발전기 정보 저장부
23: 입찰 정보 저장부 24: 발전 계획 정보 저장부
25: 예비전력 정보 저장부
30: 데이터 분류부 40: 데이터 출력부
50: 제어부
2: EMS
3: MOS
1: Integrated data device
10: Data collecting unit
20: Integrated data storage unit
21: Power system data storage unit 22: Generator information storage unit
23: auction information storage unit 24: development plan information storage unit
25: spare power information storage unit
30: data classification unit 40: data output unit
50:
2: EMS
3: MOS

Claims (6)

에너지 관리 시스템과 시장 운영 시스템을 포함하는 이기종 시스템의 통합 데이터 처리 장치에 있어서,
상기 에너지 관리 시스템 및 시장 운영 시스템에 적용되는 정적 데이터를 입력 받는 데이터 수집부;
상기 데이터 수집부를 통하여 입력되는 정적 데이터를 데이터 종류에 따라 분류하여 저장하는 통합 데이터 저장부;
상기 통합 데이터 저장부에 저장된 데이터를 기초하여 상기 에너지 관리 시스템 및 시장 운영 시스템에 적용할 데이터를 산출하거나 분류하여 출력하는 제어부;를 포함하는
데이터 통합 장치.
An integrated data processing apparatus of a heterogeneous system including an energy management system and a market operating system,
A data collector for receiving static data applied to the energy management system and the market operating system;
An integrated data storage unit for storing static data inputted through the data collecting unit according to data types;
And a controller for calculating or classifying data to be applied to the energy management system and the market operating system based on the data stored in the integrated data storage unit
Data integration device.
제1항에 있어서,
상기 통합 데이터 저장부는
각 설비 별 연결 정보 및 레벨 정보를 저장하는 전력 계통 데이터 저장부;
전력 계통을 구성하는 발전기의 정보를 저장하는 발전기 정보 저장부;
발전기 별 전력 생산량 및 그에 따른 가격 정보를 기초하여 입찰 정보를 저장하는 입찰 정보 저장부;
발전기별 전력 생산량 및 수요량에 기초하는 발전 계획 데이터를 저장하는 발전 계획 정보 저장부;
발전 전력에 대한 수요 전력 정보에 기초하는 예비전력 정보를 저장하는 예비전력 정보 저장부; 를 포함하는
데이터 통합 장치.
The method according to claim 1,
The integrated data storage unit
A power system data storage unit for storing connection information and level information for each facility;
A generator information storage unit for storing information of a generator constituting a power system;
A bidding information storage unit for storing bidding information on the basis of the electric power generation amount per generator and the price information thereof;
A power generation plan information storage unit for storing power generation plan data based on power generation amount and demand amount for each generator;
A spare power information storage unit for storing spare power information based on demanded power information about generated power; Containing
Data integration device.
제2항에 있어서,
상기 전력 계통 데이터 저장부는
계통을 구성하는 설비에 대한 연결 정보 및 설치 정보를 저장하는
데이터 통합 장치.
3. The method of claim 2,
The power system data storage unit
It stores the connection information and the installation information for the equipment constituting the system.
Data integration device.
제2항에 있어서,
상기 발전 계획 정보 저장부는
상기 제어부의 제어에 기초하여 발전기별 전력 생산량 및 수요량에 따른 발전 예측량을 산출하여 저장하는
데이터 통합 장치.
3. The method of claim 2,
The power generation plan information storage unit
Based on the control of the control unit, calculates and stores the generated power generation predicted amount according to the power generation amount and the demanded amount for each generator
Data integration device.
제2항에 있어서,
상기 예비전력 정보 저장부는
상기 발전계획 정보를 포함하는 공급 전력 정보와 수요 전력에 대한 정보를 기초하여 제어부에서 연산되는 데이터를 저장하는
데이터 통합 장치.
3. The method of claim 2,
The preliminary power information storage unit
And stores data calculated by the control unit based on the power supply information including the power generation planning information and the information about the demanded power
Data integration device.
제1항에 있어서,
상기 통합 데이터 저장부에 저장된 데이터를 각 시스템에 출력하기 위해 데이터를 분류하는 데이터 분류부를 더 포함하는
데이터 통합 장치.
The method according to claim 1,
And a data classifying unit for classifying data to output data stored in the integrated data storing unit to each system
Data integration device.
KR1020140055367A 2014-05-09 2014-05-09 Apparatus for data integration of heterogeneous system KR101860598B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140055367A KR101860598B1 (en) 2014-05-09 2014-05-09 Apparatus for data integration of heterogeneous system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140055367A KR101860598B1 (en) 2014-05-09 2014-05-09 Apparatus for data integration of heterogeneous system

Publications (2)

Publication Number Publication Date
KR20150128267A true KR20150128267A (en) 2015-11-18
KR101860598B1 KR101860598B1 (en) 2018-05-23

Family

ID=54838897

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140055367A KR101860598B1 (en) 2014-05-09 2014-05-09 Apparatus for data integration of heterogeneous system

Country Status (1)

Country Link
KR (1) KR101860598B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102048408B1 (en) * 2018-08-31 2020-01-22 주식회사 넥스트코어테크놀로지 Method for integrating and managing energy data in a power facility and system for monitoring of energy
US10567501B2 (en) 2016-03-29 2020-02-18 Lsis Co., Ltd. Energy management server, energy management system and the method for operating the same

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100964296B1 (en) * 2009-12-15 2010-06-16 한국전력거래소 A data acquisition and supervisory control system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10567501B2 (en) 2016-03-29 2020-02-18 Lsis Co., Ltd. Energy management server, energy management system and the method for operating the same
KR102048408B1 (en) * 2018-08-31 2020-01-22 주식회사 넥스트코어테크놀로지 Method for integrating and managing energy data in a power facility and system for monitoring of energy

Also Published As

Publication number Publication date
KR101860598B1 (en) 2018-05-23

Similar Documents

Publication Publication Date Title
US9118219B2 (en) Methods and systems for determining an association between nodes and phases via a smart grid
RU2518178C2 (en) System and method for control of electric power system
Atanackovic et al. Deployment of real-time state estimator and load flow in BC Hydro DMS-challenges and opportunities
AU2011250809A1 (en) Methods and systems involving power system grid management
CN105119282A (en) On-line calculation system and method for theoretical line loss of power grid
CN111509706A (en) Power supply topology information correction method, system, device and storage medium
Ji et al. Forecasting real-time locational marginal price: A state space approach
Kardoš et al. BELTISTOS: A robust interior point method for large-scale optimal power flow problems
KR101860598B1 (en) Apparatus for data integration of heterogeneous system
KR102193439B1 (en) Apparatus and method for calculating connection possible capacity of distributed generator
US9979191B2 (en) Power control method, device and system for instigating a power control based on the examined allocation
CN112435001A (en) Multi-source data checking method and device for power distribution network
CN105676013A (en) System and method for testing unit running status monitoring function of wide-area measurement system
CN108921448B (en) Electric energy transaction method, device, equipment and storage medium
US20230410229A1 (en) Dynamic pricing of energy consumed from a shared battery using real-time consumption data
Ng et al. Intelligent distributed smart grid network—Reconfiguration
CN110011348A (en) A kind of large capacity VSC converter station phase modifier configuration method and device
US10598708B2 (en) Identifying and prioritizing errors in connectivity models of distribution networks for efficient field inspections
CN104793167A (en) Automatic tracking and analyzing method and automatic tracking and analyzing system for metering automation terminal
CN111342554B (en) Automatic identification system and method for topology of transformer area
RU2611259C1 (en) Automated device for determining limit modes of electrical systems
KR20190111203A (en) Profitability forecasting system and method for virtual power plant using modeling
CN109946562A (en) A kind of electrical power distribution network fault location method and system
KR102645327B1 (en) Apparatus for estimating constraint cost based on causes and evaluation system for appropriate constraint
CN117610980B (en) Auxiliary analysis method and device for measurement quality of electric power system

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant