KR20150126091A - Project Diary - Google Patents

Project Diary Download PDF

Info

Publication number
KR20150126091A
KR20150126091A KR1020140053075A KR20140053075A KR20150126091A KR 20150126091 A KR20150126091 A KR 20150126091A KR 1020140053075 A KR1020140053075 A KR 1020140053075A KR 20140053075 A KR20140053075 A KR 20140053075A KR 20150126091 A KR20150126091 A KR 20150126091A
Authority
KR
South Korea
Prior art keywords
project
management
diary
risk
describe
Prior art date
Application number
KR1020140053075A
Other languages
Korean (ko)
Inventor
강창욱
곽동일
최광호
김지현
Original Assignee
강창욱
김지현
곽동일
최광호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 강창욱, 김지현, 곽동일, 최광호 filed Critical 강창욱
Priority to KR1020140053075A priority Critical patent/KR20150126091A/en
Publication of KR20150126091A publication Critical patent/KR20150126091A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B42BOOKBINDING; ALBUMS; FILES; SPECIAL PRINTED MATTER
    • B42DBOOKS; BOOK COVERS; LOOSE LEAVES; PRINTED MATTER CHARACTERISED BY IDENTIFICATION OR SECURITY FEATURES; PRINTED MATTER OF SPECIAL FORMAT OR STYLE NOT OTHERWISE PROVIDED FOR; DEVICES FOR USE THEREWITH AND NOT OTHERWISE PROVIDED FOR; MOVABLE-STRIP WRITING OR READING APPARATUS
    • B42D11/00Carrying forward or transferring entries from one page to another, e.g. for book-keeping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B42BOOKBINDING; ALBUMS; FILES; SPECIAL PRINTED MATTER
    • B42DBOOKS; BOOK COVERS; LOOSE LEAVES; PRINTED MATTER CHARACTERISED BY IDENTIFICATION OR SECURITY FEATURES; PRINTED MATTER OF SPECIAL FORMAT OR STYLE NOT OTHERWISE PROVIDED FOR; DEVICES FOR USE THEREWITH AND NOT OTHERWISE PROVIDED FOR; MOVABLE-STRIP WRITING OR READING APPARATUS
    • B42D15/00Printed matter of special format or style not otherwise provided for

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The purpose of the present invention is to extend a concept of a diary where regular people including companies, who uses mainly to manage schedules to manage project managements, wherein the project diary comprises: a specialized format, content, and various types of forms. As such, the project diary assists in performing not only projects associated with a company′s business, management of sales of the company′s sales staff, and a project management of a public institution; but also an individual′s project management in an efficient manner. Moreover, the project diary has an improved feature of enabling the user to use the diary, regardless of time, for a project based on a concept of extending a limitation of an existing diary which is that of a schedule management based on the purpose of managing project managements.

Description

프로젝트 다이어리 {Project Diary}Project Diary {Project Diary}

본 발명은 일반인과 기업에서 현재까지 사용하고 있는 각종 다이어리(수첩)의 내용 구성과 활용성을 프로젝트관리라는 지식관리분야의 목적과 결합시켜서 완전히 새로운 형식의 다이어리를 구성하였다. 이를 통해 모든 사업분야와 정부과제가 프로젝트화 되어가는 현대의 비즈니스를 원활하게 수행할 수 있도록 보조하는 것을 목적으로 한다.The present invention combines the contents composition and usability of various diaries (notebooks) currently used by the general public and corporations with the purpose of the knowledge management field, such as project management, to construct a completely new diary. Through this, it is aimed to assist all business fields and government tasks to smoothly carry out modern business which is being projected.

현재까지 프로젝트관리 분야는 미국 PMI사의 PMBOK의 영향을 가장 많이 받아왔다. PMBOK는 프로젝트 관리를 위한 어떠한 방법론이 아닌 Guide Book 의 역할을 잘 담당해 왔으나, 최근 ISO에서 제정한 ISO21500을 통해 비로소 이 프로젝트관리 분야의 표준이 제정되고 있다고 볼 수 있다. 본 발명은 이 ISO21500 의 내용을 기반으로 프로젝트관리의 각 지식영역을 활용하여 관리하기 위한 다이어리의 양식을 작성하였으며, 이를 통해 본 프로젝트 다이어리는 국제적으로 표준화 된 지식과 기술을 내포하고 있다.To date, project management has been dominated by PMI's PMBOK. PMBOK has played a role as a guide book rather than a methodology for project management. However, it can be said that the standard of project management has been established through ISO21500 recently enacted by ISO. The present invention is based on the contents of this ISO 21500, and forms a diary for managing by using each knowledge area of project management. Thus, this project diary has internationally standardized knowledge and technology.

기존의 다이어리는 대부분 시간의 흐름을 기반으로 구성되어 있다. 이는 프로젝트관리의 일정관리라는 지식영역에 해당하는 부분이라고 볼 수 있는데, 각종 다이어리는 연간일정, 월간일정, 주간일정, 일간일정등의 일정관리분야를 근간으로 그 형식과 내용이 구성되어져 왔다. 여기에 더하여, 각 일정을 기반으로 우선순위를 관리할 수 있는 정도가 좀 더 진보된 다이어리 관리개념으로 볼 수 있으며 이는 Planner 라는 이름으로 변형되어 사용되어져 왔다. 이는 다이어리 자체를 시간과 일정의 기록이라는 한계를 만들고 있으며, 어떠한 해결하고자 하는 사건에 대한 이력을 기록하고 활용하기가 어려운 것이 사실이다. 비즈니스 혹은 일반인의 자기관리 측면에서 어떠한 문제가 발생했을 때 그것을 해결하는 시점은 항상 동일하지 않다. 그러나 기존과 같이 일정관리만을 제공하는 다이어리의 양식으로써는 이 사건에 대한 일목요연한 기록을 남길 수 없으며, 후에 찾아보기도 어려운 문제가 내포되어 있다. 이는 비단 기록과 조회의 문제 뿐 아니라 기록해야 할 내용이 많은 경우 다이어리 양식의 공간적인 문제로 인하여 특정 일자에 많은 내용을 모두 기록하기 어려운 문제를 발생시킨다. 이렇게 되면, 인간은 무엇인가 기록해야만 하는 중요한 시점에서 해당 양식을 무시하고 다음 일정을 기록해야 하는 공간에 기록을 하게 됨으로써, 해당 다이어리 양식의 본래 목적을 잃어버리게 만든다.Most existing diaries are based on the flow of time. This can be regarded as a part of the knowledge area called the schedule management of the project management. Various diaries have been formed in the form and contents based on the schedule management field such as annual schedule, monthly schedule, weekly schedule, and daily schedule. In addition, the ability to manage priorities based on each schedule can be seen as a more advanced diary management concept, which has been transformed into the name Planner. This makes the diary itself a limitation of time and schedule recording, and it is a fact that it is difficult to record and utilize the history of any event to solve. When a problem arises in the business or public self-management, the point at which it is solved is not always the same. However, it is impossible to leave a clear record of this event in the form of a diary which provides only the schedule management as in the past, and there is a problem that is difficult to be found later. This is because it is difficult to record many contents on a certain date due to the spatial problem of the diary style in the case of many records to be recorded as well as the problems of the recording and inquiry. In this way, humans lose the original purpose of the diary form by ignoring the form at a critical point where something must be recorded and recording it in a space where the next schedule should be recorded.

프로젝트 관리의 기반 지식을 살펴보면 이러한 일정관리 뿐만 아니라, 원가관리, 품질관리, 범위관리, 구매관리, 의사소통관리, 인적자원관리, 위험관리, 통합관리등을 포함하고 있으며, 최근에는 여기에 이해관계자관리라는 영역도 추가되고 있다. In addition to these schedule management, we also include cost management, quality management, scope management, procurement management, communication management, human resource management, risk management, and integrated management. Management is also being added.

최근, 공공기관을 포함한 모든 기업의 업무와 과제는 '프로젝트' 라는 이름으로 변형되어 추진되고 있으며 이전과는 그 관리방법을 달리하고 있다. 비단 기업체 뿐만 아니라, 일반인들도 인생의 어떠한 목적을 이루기 위한 수단으로 프로젝트라는 용어를 사용하고 있는 현실이며, 이러한 모든 기록관리의 수단으로 다이어리는 광범위하게 사용되고 있다. 그러나, 기존의 일정관리 기반의 다이어리로는 이러한 요구사항을 충족시키기가 매우 어려운 것이 현실이다.In recent years, the tasks and tasks of all companies, including public institutions, have been transformed into 'projects' and are being managed differently from the past. Diary is widely used as a means of managing all of these records. It is a reality that not only companies but also ordinary people use the term project as a means of achieving any purpose of life. However, it is a reality that it is very difficult to meet these requirements with the existing schedule management based diary.

개인과 기업내 대부분의 업무가 프로젝트화 되어감에 따라, 다이어리도 프로젝트관리의 지식영역에 기반한 관리양식으로 변경할 필요가 있다. 즉, 단순한 시간관리라는 측면에서 해당 프로젝트의 목적을 이루기 위한 다양한 지식 관리라는 측면으로 패러다임을 변경해야 한다. As most of the work in the individual and the enterprise is projected, it is necessary to change the diary to the management form based on the knowledge area of project management. In other words, the paradigm must be changed in terms of various knowledge management in order to achieve the purpose of the project in terms of simple time management.

본 발명은 문제를 해결하기 위한 수단으로써, ISO21500에서 제시한 프로젝트 관리 지침에 따라 기존의 시간(일정)관리뿐만 아니라 프로젝트 개요관리, 의사결정관리, 프로젝트 타당성분석, 프로젝트 산출물관리, 조직관리, 위험관리, 계약관리, 문제해결관리 등의 각종 제반 양식을 고안하였다. 또한, 이를 기존의 다이어리에 일반인이 쉽게 접근하고 사용하기 용이한 형식으로 구성하였으며 이를 프로젝트 다이어리라고 칭한다.In accordance with the project management guidelines set out in ISO21500, the present invention can be applied not only to the existing time (schedule) management but also to the management of project outline, decision management, project feasibility analysis, project output management, , Contract management, problem solving management, and so on. In addition, the existing diary is easily accessible and easy to use, and is called a project diary.

본 발명의 효과는 다음과 같다. The effects of the present invention are as follows.

첫째, 매년 연말이 되더라도 다이어리를 교체할 필요가 없다. 이는 일정에 기반한 다이어리가 아니라 특수한 목적을 달성하기 위한 프로젝트를 관리하는 개념으로써 해가 바뀌어도 다이어리를 교체할 필요가 없으므로 기업의 원가절감에 도움이 되며 다이어리 제작업체는 연말에 집중되는 매출을 전 기간에 걸쳐 분산시킬 수 있는 효과를 가져온다. 또 사용자들에게는 기존 일정관리 다이어리의 활용 측면에서 단점으로 부각되어 온 이른바, '작심삼일'에서 벗어나 필요할 때 언제든지 부담없이 사용할 수 있다는 인식으로 변화를 줄 수 있을 것이다. First, there is no need to change the diary even at the end of each year. This is not a diary based on a schedule but a project to manage a project to achieve a specific purpose. It does not need to change the diary even if the sun goes down, which helps to reduce company costs. So that it can be dispersed throughout. In addition, users will be able to change from the so-called "three-day trio," which has been pointed out as a disadvantage in terms of utilization of the existing schedule diary, to recognize that they can use it freely whenever they need it.

둘째, 프로젝트 수행시에 해당 프로젝트에 대한 기본적인 정보를 언제든지 찾아볼 수 있다. 비즈니스 수행중 고객사, 발주사, 여러 협력업체등 수 많은 의사소통시에 긴급하게 필요한 프로젝트의 기본적이 정보를 포함하여 의사결정 우선순위, 비즈니스 타당성분석, 주요 산출물, 주요일정, 조직도 및 이해관계자 관리, 개선효과 관리, 제약사항 관리, 위험관리 그리고 계약사항등을 언제든지 기록하고 찾아 볼 수 있도록 함으로써, 의사소통관리에 명확성을 기할 수 있다. Second, at the time of project execution, basic information about the project can be found at any time. During the course of business, it includes basic information on projects that are urgently required in communication with a large number of clients such as customers, contractors, and several suppliers. It includes decision priorities, business feasibility analysis, key deliverables, key schedules, organizational charts, Improvement management, constraint management, risk management, and contractual matters can be recorded and found at any time, making communication management clearer.

셋째, 프로젝트 수행시 예상되는 어떠한 위험요인과 이미 발생한 문제에 대한 해결 이력을 각 사건마다 순차적으로 기록하게 하여, 해당 문제의 원인 및 해결이력을 신속하게 찾고 기록할 수 있다. 이는 일정관리에 기반한 기존의 다이어리로는 해결하기 매우 어려운 부분이라 할 수 있겠다.Third, the cause of the problem and the history of the problem can be quickly retrieved and recorded by recording the anticipated risk factors in the project execution and the history of the problems already occurred in each case sequentially. This is a very difficult part to solve with the existing diary based on the schedule management.

넷째, 다중 프로젝트 관리이다. 한 사람이 여러개의 프로젝트를 수행시 본 프로젝트 다이어리의 양식 구성 세트를 프로젝트 수만큼 다이어리에 바인딩하여 사용이 가능하다. Fourth, multi-project management. When one person executes several projects, it is possible to use the form composition set of the project diary by binding to the diary as many times as the number of the project.

다섯째, 자주 사용하는 정보의 신속한 조회가 가능하다. 프로젝트 양식 구성 세트내의 다이어리 내지 규격을 다중화 하여 포켓스티커를 부착함으로써, 이곳에 해당 프로젝트에서 빈번히 조회해야 할 Dash-Board의 내용을 끼워넣고 조회할 수 있다.Fifth, it is possible to promptly search frequently used information. By inserting a pie sticker in the form of a project diary or specification in a set of the form of the project form, it is possible to insert the contents of the dash-board frequently to be inquired in the project.

여섯째, 기존 다이어리 기능의 승계. 본 프로젝트 다이어리는 새롭게 고안한 프로젝트관리를 위한 기법과 양식외에, 기존 다이어리의 모든 기능을 그대로 활용할 수 있다. 연간일정관리, 월간관리, 일간관리를 포함하여 자유롭게 메모를 기록할 수 있는 기능도 마찬가지로 승계하여 그 활용성을 높였다.Sixth, the succession of existing diary functions. This project diary can utilize all the functions of existing diaries in addition to the newly designed project management techniques and forms. The ability to record memos freely, including annual schedule management, monthly management, and daily management, was likewise succeeded to enhance its usability.

도 1은 본 프로젝트다이어리 개요부 탭에 대한 표지이다.
도 2는 프로젝트 관리 지식부에 대한 표지이다. 이는 ISO21500 을 참고하고 있으며 내용은 일반인들이 알기쉽게 설명된다.
도 3은 본 프로젝트다이어리의 사용법을 담고 있는 가이드부의 표지이다.
도 4는 Calendar 표지로써, 기존의 일반적인 다이어리와 같이 일정관리를 하기 위한 구성 부분의 표지이다.
도 5는 연간관리를 위한 양식(51)으로 기존 다이어리의 구성과 대동소이하다.
도 6는 월간관리를 위한 양식으로 기존 다이어리의 구성과 대동소이하며, 왼편에는 해당월의 달력(61)을, 오른편에는 자유롭게 특정일자를 기입하고 해당일의 일정을 기록(62)하게 되어있다. 이는 기존 달력 양식의 기재부가 협소하여 많은 내용을 기록하지 못하는 단점을 보완한다.
도 7은 자유롭게 메모를 기록할 수 있는 Free Note 의 표지이다.
도 8은 Free Note의 양식이다.
도 9는 본 발명의 요지인 프로젝트다이어리의 표지로써, 실제 한 프로젝트를 관리하는 양식들의 묶음인 한 세트의 표지부이며 프로젝트명을 기록(91)할 수 있다.
도 10의 좌측부(101)는 프로젝트의 기본적인 정보(프로젝트명, 고객 또는 스폰서, 기간, 관리자, 목표)를 기록할 수 있는 기재부(103)를 포함한다. 또한, 좌측 하단 기재부(104)는 프로젝트의 의사결정 우선순위에 대한 내용을 기재할 수 있는 영역이며 쉽게 표기할 수 있는 표로 구성되어 있다. 또한, 이 양식에 대한 간단한 설명(102)을 포함한다.
우측 기재부(105)는 해당 프로젝트에 대한 타당성 분석에 대한 내용을 기재할 수 있는 양식이며 실제 내용은 기재할 수 있는 기록부(107)이 포함되어있다. 이를 'Why'라는 단어로 표기함으로써, 사용자가 왜 이 프로젝트를 해야하는지에 대한 사항을 기록하는 공간이라는 것을 쉽게 인지할 수 있도록 하였고, 이 양식에 대한 간단한 설명(106)을 포함하고 있다.
도 11은 해당 프로젝트의 결과로 도출될 수 있는 산출물을 기록하는 양식(113)이다. 이를 'What'이라는 단어로 표기(111)하여 쉽게 인지할 수 있도록 하였으며 양식에 대한 설명(112)도 명시되어 있다. 우측 영역(114)은 주요 일정을 간단히 표시할 수 있는 양식(116)에 대한 제목이고, 이를 'When'이라는 단어로 알기쉽게 표시하였으며, 이에 대한 설명(115)을 담고 있다.
도 12의 좌측 영역(121)은 프로젝트팀의 조직도를 그려넣을 수 있는 영역(123)을 'Who'라는 단어의 제목으로 표기하여 사용자가 쉽게 인지할 수 있도록 하였으며 이에 대한 간단한 설명(122)을 담고 있다. 우측 영역(124,125)은 프로젝트내의 각종 이해관계자를 기록하는 기재부 및 연락처를 기록할 수 있는 영역(127)에 대한 양식의 제목이다. 이를 'With Whom'이라는 단어로 쉽게 사용자가 인식할 수 있도록 하였다. 126에는 이해관계자의 영향도 및 관리정도를 표시하는 기준을 담고 있다.
도 13은 프로젝트의 핵심 성공요인을 기록할 수 있는 영역(133)을 포함한 양식이다. 이에 대한 제목(131)을 'HOW'라는 단어로 쉽게 사용자가 인지할 수 있도록 하였으며, 간단한 설명(132)을 포함하고 있다.
도 14의 좌측에는 'As-Is'(141) 즉, 개선전 사항을 기록할 수 있도록 한 양식부(143) 및 이에 대한 설명(142)을 담고 있다. 우측(146)은 'To-Be'(144) 라는 제목 즉, 프로젝트 수행 후 개선 사항을 기록할 수 있는 양식(146)이 간단한 설명(145)과 함께 구성되었다.
도 15는 프로젝트 계획상의 주요 가정 및 제약사항과 프로젝트에 수반되는 위험요인을 'But 1'(151)이라는 타이틀로 쉽게 인지하여 기록할 수 있도록 구성한 공간(153)이며, 우측은 'But 2'(154)이라는 타이틀로 해당 프로젝트의 주요 리스크를 기록할 수 있는 영역(156)을 담고 있다. 또한, 이에 대한 간단한 설명(152,155)들을 담고 있다.
도 16은 프로젝트 주요 계약사항을 기록해 둘 수 있는 공간이며, 알기쉬운 제목부(161)와 설명부(162) 및 기재부(163)으로 구성되어 있다.
도 17은 프로젝트 수행중 예상되는 Risk 및 Issue 사항을 기록하고 관리하는 프로젝트다이어리의 핵심 기재부이다. 본 영역은 도 1 ~ 16까지의 다이어리 속지보다 작은 사이즈의 속지 규격을 가진 양식묶음을 내지(177)로 포함한다. 이 속지규격의 차이에 따라 생기는 영역(171)에는 프로젝트 수행중 자주 조회해야하는 정보를 쉽게 조회할 수 있도록 포켓스티커가 부착되어 있으며 이 포켓스티커 안에 다양한 양식을 끼워 활용할 수 있다. 좌측 표지부는 Risk/Issue 관리에 대한 간단한 가이드(172)를 포함하고 있다. 우측 하단부는 Risk/Issue관리를 할 수 있는 양식묶음이 있는 영역이며 별도의 상단탭(173,174,175,176)들로 구성되어 있다. 가장 앞장(177)은 Risk 목록을 일련번호와 함께 관리할 수 있는 목록부로써, Risk 발견일과 제목 및 발견자를 기록할 수 있다. 또한 이 Risk 들을 Risk등급에 따라 High Risk(H), Mid Risk(M), Low Risk(L)로 분류할 수 있는 탭(174)을 활용하여 쉽게 관리할 수 있다. Issue 관리부(175,176)은 Risk관리부와 대동소이하다.
도 18은 도 17에서 부터 시작되는 Risk 목록을 관리하는 연장된 양식부(181)이다.
도 19는 하나의 Risk 나 Issue 에 대한 기본 정보를 Risk Card라는 제목(191)으로 표시한 양식을 포함한다. 또한 192는 하나의 Risk에 대한 자유로운 메모를 기록하는 Risk Card의 마지막 기재부이다.
도 20은 발견된 위험(Risk)이나 발생한 문제(Issue)에 대한 예방 및 조치이력을 관리할 수 있는 기록부 (201,202)이며, 이를 정량적으로 표시할 수 있는 양식을 포함한다.
Fig. 1 is a cover for this project diary outline subtab.
Figure 2 is a cover for the project management knowledge department. It refers to ISO21500 and the contents are explained in plain language.
Fig. 3 is a cover of the guide section which shows how to use this project diary.
FIG. 4 is a cover of a configuration part for calendar management such as a conventional diary.
FIG. 5 is a diagram for the annual management (51), which is similar to that of the existing diary.
FIG. 6 is a diagram for the monthly management. The calendar 61 of the corresponding month is written on the left side, and a specific day is freely written on the right side and the schedule of the corresponding day is recorded (62). This complements the disadvantage that the description of the existing calendar form can not record a lot of contents in a narrow space.
7 is a cover of the Free Note which can freely record a memo.
Figure 8 is a form of Free Note.
FIG. 9 is a cover of a project diary that is a gist of the present invention, and it is a set of a cover part which is a bundle of forms for managing an actual project, and a project name can be recorded (91).
The left part 101 in FIG. 10 includes a description part 103 that can record basic information (project name, customer or sponsor, period, manager, goal) of the project. In addition, the lower left base portion 104 is an area for describing the decision priority of the project, and is composed of a table that can be easily indicated. It also includes a brief description 102 of this form.
The right-side recording unit 105 includes a recording unit 107 for describing a feasibility analysis for the corresponding project, and can record actual contents. By marking this with the word "Why", it is easy to recognize that the user is a space for recording what should be done with the project, and includes a brief description 106 of this form.
11 is a form 113 for recording an output that can be derived as a result of the project. This is represented by the word 'What' (111), so that it can be easily recognized, and a description (112) of the form is also specified. The right area 114 is a title for a form 116 that can be used to simply display a main schedule, which is clearly displayed with the word 'When' and contains a description 115 thereof.
In the left area 121 of FIG. 12, the area 123 in which the organization chart of the project team can be drawn is indicated by the title of the word 'Who' so that the user can easily recognize the area 123. have. The right regions 124 and 125 are titles of a form for recording various stakeholders in the project and an area 127 for recording contacts. This is easily recognized by the word 'With Whom'. 126 contains standards that indicate the extent of influence and management of stakeholders.
FIG. 13 shows a form including a region 133 in which a core success factor of the project can be recorded. The title 131 is easily recognized by the user with the word 'HOW', and includes a brief description 132.
On the left side of FIG. 14, there is shown an 'As-Is' 141, that is, a form part 143 for recording an improvement item and an explanation 142 thereof. The right side 146 is configured with a brief description 145 of the form titled 'To-Be' 144, ie, a form 146 for recording improvements after project execution.
FIG. 15 is a space 153 configured to easily recognize and record key assumptions and constraints in the project plan and the risk factors accompanying the project with a title of 'But 1' (151), and 'But 2' (right) 154), which contains an area 156 for recording the main risk of the project. It also contains a brief description (152,155).
16 is a space in which project main contract matters can be recorded, and is composed of an easy-to-understand title section 161, a description section 162, and a description section 163.
Figure 17 is a core part of the project diary that records and manages expected risks and issues during project execution. This area includes a form bundle (177) having an inlay specification size smaller than the diary inlengths shown in Figs. 1-16. A pocket sticker is attached to the area (171) according to the difference of the inlay standard so that information to be frequently searched during project execution can be easily retrieved. Various forms can be used in the pocket sticker. The left cover contains a simple guide to risk / issue management (172). The lower right part is a form bundle area for risk / issue management and consists of separate upper tabs (173, 174, 175, 176). The Leading Edge (177) is a list portion that can manage the risk list along with the serial number, and can record the date of risk discovery, the title, and the discoverer. In addition, these risks can be easily managed using the tab 174, which can be classified as High Risk (H), Mid Risk (M), or Low Risk (L) according to the risk level. The issue management units 175 and 176 are in close proximity to the risk management unit.
18 is an extended form section 181 for managing the risk list starting from Fig.
FIG. 19 includes a form in which basic information about one risk or issue is indicated by a title (191) of a risk card. Also, 192 is the last part of the Risk Card that records free notes about one risk.
20 is a recording unit 201 and 202 that can manage a preventive and action history of a detected risk or an issue, and includes a form capable of quantitatively displaying it.

Claims (3)

단순히 연간, 월간, 주간, 일간등의 일정을 기록하고 관리할 수 있도록 구성된 양식만을 가진 다이어리가 아닌 프로젝트 관리에 해당 하는 지식영역을 기반으로 하는 제반 양식들과;
시간의 흐름이 아닌 하나의 프로젝트 단위로 각종 제반 양식이 하나의 세트로 구성된 개념과;
프로젝트 관리에 대한 지식영역에 대한 설명과 그에 기반한 다이어리 활용 방법을 설명서로 포함하고 있는 안내부와;
복잡하고 어려운 프로젝트관리의 10가지 지식영역의 일부를 육하원칙에 의해 알기쉽게 표현한 각 양식의 제목부와;
위험(Risk)관리 분야에서 위험요소를 예방하기 위한 기록과 발생한 문제요소를 해결하기 위한 기록을 관리할 수 있는 양식부와;
프로젝트에 대하여 자주 조회하는 프로젝트관련 기본 정보를 항상 볼 수 있도록 다이어리 내지 규격을 다중으로 구성하여 프로젝트 단위의 앞면과 뒷면표지에 투명한 포켓 스티커를 볼 수 있도록 구성한 프로젝트다이어리.
A variety of forms based on a knowledge area corresponding to project management rather than a diary having only a form configured to record and manage a schedule such as a year, month, week, and day;
A concept consisting of a set of various forms in one project unit rather than a time flow;
A guide section that includes a description of a knowledge area for project management and a method of using the diary based on the guide as a manual;
A title part of each form which is partly expressed by the three-way or five-way rule in a part of the ten knowledge areas of complex and difficult project management;
A form section for managing records to prevent risk elements in the area of risk management and records for resolving the problem elements that have occurred;
A project diary that consists of multiple diaries and specifications so that you can always see the basic information about the project frequently viewed about the project, so that you can see transparent pocket stickers on the front and back sides of the project unit.
제 1 항에 있어서,
기존 다이어리 방식과 같은 연간일정, 월간일정을 포함한 CALENDAR (일정관리) 양식부 외에 프로젝트 관리를 위해 별도의 양식을 구성한 특징과;
하나의 프로젝트에 대한 관리를 위해 여러개의 다중 양식을 구성하고 이를 한 프로젝트에 대한 세트로 구성하여 여러 프로젝트를 관리할 수 있는 특징과;
일정관리, 원가관리, 조달관리, 범위관리, 품질관리, 인적자원관리, 통합관리, 의사소통관리, 위험관리, 이해관계자관리등의 프로젝트 관리에 대한 10가지 지식영역을 육하원칙에 따라 알기 쉽게 제목으로 표기한 특징과;
한 프로젝트에서 발생하는 위험요인(Risk)와 문제사항(Issue)에 대한 예방 및 조치이력을 기록할 수 있도록 구성된 양식부와;
각 프로젝트관리를 위한 양식부의 내지중에서 Risk 관리와 Issue 관리 부분에 대한 내지 규격을 다른 내지보다 작게 구성함으로써, 두 내지 규격의 차이에 의해 발생하는 여백에 자주 조회하고 싶은 프로젝트의 기본적인 사항을 양쪽 표지에 부착하여 쉽고 빠르게 조회할 수 있도록 구성된 프로젝트다이어리.
The method according to claim 1,
It has features such as CALENDAR (schedule) form including annual schedule and monthly schedule like existing diary style, and separate form for project management;
Features that can manage multiple projects by organizing multiple forms for managing one project and organizing them into a set for one project;
10 knowledge areas on project management such as schedule management, cost management, procurement management, scope management, quality management, human resource management, integrated management, communication management, risk management and stakeholder management A marked feature;
A form section configured to record a history of prevention and action on a risk and an issue occurring in a project;
By arranging different or smaller standards for risk management and issue management in the form section for each project management, the basic items of the project that you want to frequently check in the margin caused by the difference of the two standards are displayed on both sides of the cover A project diary that is structured so that it can be attached and displayed easily and quickly.
제 2 항에 있어서,
'Why'라는 제목으로 프로젝트의 타당성 분석을 기재할 수 있도록 구성하고 무엇을 기재해야 하는지 간단한 설명을 포함한 양식부와;
'What'이라는 제목으로 프로젝트의 주요 산출물을 기재할 수 있도록 구성하고 무엇을 기재해야 하는지 간단한 설명을 포함한 양식부와;
'When'이라는 제목으로 프로젝트의 주요 일정을 기재할 수 있도록 구성하고 무엇을 기재해야 하는지 간단한 설명을 포함한 양식부와;
'Who'라는 제목으로 프로젝트 관련 조직에 대한 조직도를 도식화하여 넣을 수 있도록 구성하고 간단한 설명을 포함한 양식부와;
'With Whom'이라는 제목으로 프로젝트관련 이해관계자를 관리할 수 있도록 구성한 양식을 통해 연락처 관리기능 뿐만 아니라 각 이해관계자별 프로젝트에 대한 영향도를 평가하여 기재할 수 있도록 구성한 양식부와;
'How'라는 제목으로 프로젝트의 핵심 성공요인을 기재할 수 있도록 구성하고 무엇을 기재해야 하는지 간단한 설명을 포함한 양식부와;
'As-Is'라는 제목으로 프로젝트 수행 전의 현재 상황을 기재할 수 있도록 구성하고 무엇을 기재해야 하는지 간단한 설명을 포함한 양식부와;
'To-Be'라는 제목으로 프로젝트 수행 후의 기대 효과를 기재할 수 있도록 구성하고 무엇을 기재해야 하는지 간단한 설명을 포함한 양식부와;
'But 1'이라는 제목으로 프로젝트 수행시의 가정 및 제약 조건등을 기재할 수 있도록 구성하고 무엇을 기재해야 하는지 간단한 설명을 포함한 양식부와;
'But 2'라는 제목으로 프로젝트 수행시의 위험요인을 기재할 수 있도록 구성하고 무엇을 기재해야 하는지 간단한 설명을 포함한 양식부와;
각 위험요인(Risk)에 일련번호를 부여하고 목록을 관리할 수 있으며, 각 위험요인마다 발생할 수 있는 가능성과 영향도 및 점수 그리고 예방조치 이력등의 세부이력을 기재하고 조회할 수 있는 양식으로 구성된 양식부와;
각 문제사항(Issue)에 일련번호를 부여하고 목록을 관리할 수 있으며, 해당 발생 문제에 대한 세부이력을 기재하고 조회할 수 있는 양식으로 구성된 프로젝트다이어리.
3. The method of claim 2,
A form section with a title of 'Why' that can be used to describe the feasibility of the project and a brief description of what to write;
A form section containing a brief description of what the project's main output should be, with a title of 'What';
A form section with a title of 'When' and a brief description of what the project should be written in;
A form section containing a brief description and structured so that an organization chart for a project-related organization can be diagrammed and titled as 'Who';
A form unit configured to evaluate and describe the influence of each stakeholder's project, as well as the contact management function, through a form configured to manage project-related stakeholders with the title "With Whom";
A form section with a title of 'How' to describe the key success factors of the project and a brief description of what to write;
'As-Is', a formatting section containing a brief description of what is to be done and what is to be done to describe the current situation before the project is carried out;
To-Be ', a formatting section that includes a description of what to expect after project execution and a brief description of what to describe;
'But 1' should be structured so that it can describe the assumptions and constraints at the time of project execution and includes a brief description of what to describe;
'But 2' should be structured in such a way as to be able to describe the risk factors of the project and include a brief description of what to describe;
Each risk can be serialized and managed in a list, and each risk has a form that can be used to list and view detailed information such as likelihood, impact, score, and preventive history of each risk. A form part;
A project diary consisting of a form in which each issue can be assigned a serial number, a list can be managed, and a detailed history of the incident can be recorded and viewed.
KR1020140053075A 2014-05-01 2014-05-01 Project Diary KR20150126091A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140053075A KR20150126091A (en) 2014-05-01 2014-05-01 Project Diary

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140053075A KR20150126091A (en) 2014-05-01 2014-05-01 Project Diary

Publications (1)

Publication Number Publication Date
KR20150126091A true KR20150126091A (en) 2015-11-11

Family

ID=54605591

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140053075A KR20150126091A (en) 2014-05-01 2014-05-01 Project Diary

Country Status (1)

Country Link
KR (1) KR20150126091A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102227767B1 (en) * 2019-12-12 2021-03-12 신덕문 Diary platform providing system for maximizing motivation by paying dividends according to the difficulty level of the goal
WO2021118073A1 (en) * 2019-12-12 2021-06-17 신덕문 Game-linked diary platform provision system for providing sustainable motivation
KR20230025731A (en) * 2021-08-16 2023-02-23 홍석준 A metal-sheet and attachment set of planner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102227767B1 (en) * 2019-12-12 2021-03-12 신덕문 Diary platform providing system for maximizing motivation by paying dividends according to the difficulty level of the goal
WO2021118073A1 (en) * 2019-12-12 2021-06-17 신덕문 Game-linked diary platform provision system for providing sustainable motivation
WO2021118074A1 (en) * 2019-12-12 2021-06-17 신덕문 System for providing diary platform that maximizes motivation by paying dividend to which dividend rate according to difficulty level of goal is applied when goal is achieved
KR20230025731A (en) * 2021-08-16 2023-02-23 홍석준 A metal-sheet and attachment set of planner

Similar Documents

Publication Publication Date Title
Wright et al. Why recruit temporary sponsored skilled migrants? A human capital theory analysis of employer motivations in Australia
Palpacuer Competence-Based Strategies and Global Production Networks a Discussion of Current Changes and Their Implications for Employment
Alsharari Institutional logics and ERP implementation in public sector agency
Yli-Kauhaluoma et al. Mundane materials at work: paper in practice
KR20150126091A (en) Project Diary
Carter Time tactics: Project managing policy implementation in a network
Del Bono et al. Call centres’ employment practices in global value networks: A view from Argentina as a receiving economy
Carter Accounting for Time in Nineteenth-Century Manuscript Diaries and Photographs
Larsson et al. Customer-oriented services and information: experiences from Sweden
KR101439649B1 (en) Recording medium recorded with the program for schedule management and the method for schedule management using the same
US20150023723A1 (en) Systems and methods for managing and organizing documents
Figart et al. Contesting the Gig Economy:# SchedulesThatWork
Boccalatte The growth of unproductive labour and the new crisis of management: the case of Australia
Stack Productivity Strategies for Executives: Time Management Issues Facing C (x) o Leaders
Sufi Management Research Post-Covid-19 Pandemic
KR200411452Y1 (en) Diary
Wich The Siren Call of Complacency
Lee Recap: Creating a History Program for Your Organization
Kahrau Knowledge Workers' Time Management As Sociomaterial Practice
Howard Microsoft Project 2013 Plain & Simple
Benn Something in the City (RLE Banking & Finance)
Martin Structuring Information Work: Ferranti and Martins Bank, 1952-1968
McCorry Organize your work day in no time
KR200446984Y1 (en) Planner and Organizer Contents Sheet
Atkinson The economics of culture change.

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application
E601 Decision to refuse application