KR20150118727A - Debris Barrier for Preserving the Ecological Environmnet - Google Patents

Debris Barrier for Preserving the Ecological Environmnet Download PDF

Info

Publication number
KR20150118727A
KR20150118727A KR1020140044627A KR20140044627A KR20150118727A KR 20150118727 A KR20150118727 A KR 20150118727A KR 1020140044627 A KR1020140044627 A KR 1020140044627A KR 20140044627 A KR20140044627 A KR 20140044627A KR 20150118727 A KR20150118727 A KR 20150118727A
Authority
KR
South Korea
Prior art keywords
passage
dam
animal
soil
main body
Prior art date
Application number
KR1020140044627A
Other languages
Korean (ko)
Inventor
윤현섭
Original Assignee
윤현섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤현섭 filed Critical 윤현섭
Priority to KR1020140044627A priority Critical patent/KR20150118727A/en
Publication of KR20150118727A publication Critical patent/KR20150118727A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like

Abstract

The present invention relates to a debris barrier for preserving the ecological environment. The debris barrier for preserving the ecological environment according to an embodiment of the present invention includes: a dam main body blocking a rock and driftwood; and an animal path formed to pass through the dam main body to be adjacent to the base part of the dam main body; and a soil passing path formed to pass through the dam main body above the animal path.

Description

생태환경 보전 사방댐{Debris Barrier for Preserving the Ecological Environmnet}Debris Barrier for Preserving the Ecological Environment

본 발명의 실시예는 생태환경 보전 사방댐에 관한 것으로, 더욱 상세하게는 암석 및 토사를 선택적으로 차단 또는 투과시켜 집중호우시 산사태로 인한 암석 및 토사의 급격한 유입을 효과적으로 저지하고 하천 하류 생태 환경을 보전할 뿐만 아니라 댐으로 인한 하천의 상하류 생태 환경 단절을 억제한 생태환경 보전 사방댐에 관한 것이다.An embodiment of the present invention relates to an eco-friendly conservation dam, more specifically, to selectively block or permeate rocks and gravels to effectively prevent the rapid inflow of rocks and gravels due to landslides during heavy rains, And the ecological environment conservation zebang dam which suppressed the cutoff of the ecological environment of the upstream and downstream of the river due to the dam.

일반적으로, 사방댐은 하상구배가 큰 계곡에서 급류가 강바닥을 파고 양쪽 산기슭을 깎아서 산사태를 일으키므로 집중호우시 산사태의 우려가 있는 산의 계곡이나 암석, 토사, 및 유목 등의 유실이 심한 강의 상류 임야 내에 설치하여 암석, 토사, 및 유목을 차단하여 산사태나 급격한 토석류의 하류 유실을 방지함은 물론, 홍수기 나뭇가지 등이 부유물이 하류로 떠내려와 교량에 걸려 물길을 방해함으로써 하천의 범람을 발생시키는 것을 방지하기 위하여 설치되고 있다.Generally, Sambang Dam is located upstream of a river with severe loss of mountain valleys, rocks, soil, and driftwood, which are likely to cause landslides during heavy rainfall, because the rapids dig a riverbed in a valley with a large slope and cause landslides To prevent the landslide and sudden destruction of the downstream of the landslide by blocking the rocks, soil, and driftwood, as well as to flood the floodgates in the downstream and flood the waterway by obstructing the waterway. .

사방댐은 그 역할에 따라 모래 및 토석류를 막는 저사댐과, 물을 가두는 저수댐, 그리고 유목을 막아주는 스크린댐(Screen dam), 슬릿트댐(Slit dam), 버트러스댐(Butterss dam) 등의 유목방지댐으로 구분될 수 있다.Depending on its role, the Sambang Dam is divided into a small dam that blocks sand and soil, a low water dam that blocks water, a screen dam that blocks driftwood, a Slit dam, and a Butterss dam. It can be divided into the Nomadic Dam.

이중 버트레스 사방댐은 계곡이나 강의 바닥으로부터 그 양측 언저리까지 가로질러 길게 타설되는 콘크리트 구조물과, 콘크리트 구조물의 상부에 강재로 이루어져 길게 매설되고 강재의 결합구조에 의해 통수구가 일정 간격으로 가로로 형성된 지지체로 구성된 구조를 가지며, 콘크리트구조물과 지지체의 버팀력에 의해 계곡이나 강의 상류에 있는 암석 및 토사가 계곡이나 강의 하류로 유실되는 것을 미연에 방지할 수 있다.The double buttress dam is composed of a concrete structure which is longly laid across from the bottom of the valley or river to the both sides of the river and a support which is made of steel and is embedded in the upper part of the concrete structure, And it is possible to prevent the rock and the gravel upstream of the valley or the river from being lost to the downstream of the valley or the river due to the compressive force of the concrete structure and the support.

이러한 버트레스 사방댐은 콘크리트 구조물에 토사량 조절을 위한 별도의 배수유로가 형성되어 있지 않은 관계로, 콘크리트 구조물의 설치 높이를 넘는 경우에만 물과 토사가 흐르도록 설계되면서 평상시에 발생되는 산간 계곡의 유기 물질이 침전 퇴적되어 계곡물의 수질이 저하되고 계곡물의 수량 증가에 따른 선택적인 투수 또는 유기물 토사의 투과는 불가능하여 토사의 조절과 하천생태계 건전성을 유지하는 데는 한계가 있다.Since the Bertrath Sambang Dam does not have a separate drainage channel for controlling the amount of concrete in the concrete structure, it is designed to flow water and soil only when the height of the concrete structure exceeds the height of the concrete structure, This precipitation accumulates so that the water quality of the valley water is lowered and the permeability of the selective water or organic soil is not possible due to the increase in the water content of the valley water, so there is a limit to maintain the soil and the ecosystem integrity of the river.

또한, 사방댐은 어류를 포함한 수생물의 이동을 막아 하천의 상하류 생태 환경를 단절시키는 문제점이 있다.In addition, there is a problem that the four-way dam cuts off the movement of aquatic organisms including fishes, thereby cutting off the upstream and downstream ecological environment of the river.

본 발명의 실시예는 암석 및 토사를 선택적으로 차단 또는 투과시켜 암석 및 토사의 급격한 유입을 효과적으로 저지하고 하천 하류 생태 환경을 보전할 뿐만 아니라 하천의 상하류 생태 환경 단절을 억제한 생태환경 보전 사방댐을 제공한다.The embodiment of the present invention provides an ecological environment conservation dam which effectively blocks the inflow of rocks and gravels by selectively blocking or transmitting rocks and gypsum and preserves the downstream ecological environment of the river and suppresses the ecological environment of upstream and downstream of the river do.

본 발명의 실시예에 따르면, 생태환경 보전 사방댐은 암석, 토사, 및 유목을 차단하는 댐본체와, 상기 댐본체의 기저부에 인접하게 상기 댐본체를 관통하도록 형성된 동물 통과로, 그리고 상기 동물 통과로보다 상부에서 상기 댐본체를 관통하도록 형성된 토사 투과로를 포함한다.According to the embodiment of the present invention, the eco environment preservation dam has a dam main body for blocking rocks, sand, and driftwood, an animal passage formed to penetrate the dam main body adjacent to the base portion of the dam main body, And a soil-permeation path formed to pass through the dam body at a higher level.

또한, 상기 생태환경 보전 사방댐은 상기 동물 통과로의 상류측 입구를 둘러싸도록 형성된 통과로 폐색 방지벽을 더 포함할 수 있다.In addition, the eco environment preservation dam may further include a passage blocking wall formed to surround the upstream entrance of the animal passage.

상기 통과로 폐색 방지벽의 일영역에는 상기 동물 통과로의 상류측 입구에서 멀어질수록 높이가 높아지는 탈출 경사부가 형성될 수 있다.An escape slope portion having a height higher as the distance from the upstream entrance of the animal passage is increased, may be formed in one region of the passage blocking wall.

상기 통과로 폐색 방지벽의 일영역에는 물이 흐르는 배수틈이 형성될 수 있다.A drainage gap through which water flows can be formed in one area of the passage blocking wall.

상기 토사 투과로는 복수개가 마련되어 상기 댐본체의 기저부로부터 서로 다른 높이를 갖는 다단 구조로 형성될 수 있다.The plurality of gravel-permeation passages may be formed in a multistage structure having different heights from the bottom of the dam body.

상기 토사 투과로는 상기 댐본체의 기저부에서 상부로 갈수록 단면적이 작아질 수 있다.The cross-sectional area of the soil-permeation passage may become smaller toward the upper portion from the bottom of the dam main body.

또한, 상기 생태환경 보전 사방댐은 상기 동물 통과로와 상기 토사 투과로를 둘러싸도록 상기 댐본체에 삽입 설치된 보강 철근을 더 포함할 수 있다.In addition, the eco environment preservation dam may further include a reinforcing bar inserted in the dam main body so as to surround the animal passage and the soil-permeation passage.

또한, 상기 생태환경 보전 사방댐은 상기 댐본체의 하류측 바닥에 형성된 물받이부와, 상기 물받이부의 양측에 세워진 날개벽을 더 포함할 수 있다.In addition, the eco-friendly environment preservation dam may further include a water receiving part formed on the bottom of the downstream side of the dam body, and a wing wall standing on both sides of the water receiving part.

또한, 상기한 생태환경 보전 사방댐은 상기 댐본체의 하류측 일면에서 기저부에 인접하게 형성되며 양측면이 경사진 사다리꼴 형상을 갖는 동물 진입 경사부와, 상기 동물 진입 경사부의 상부면에서 상기 댐본체를 관통하도록 형성된 보조 동물 통과로를 더 포함할 수 있다. 그리고 상기 동물 통과로는 상기 댐본체와 상기 동물 진입 경사부를 관통하도록 형성될 수 있다.In addition, the ecological conservation square dam described above includes an animal entering slope portion formed on the downstream side of the dam body adjacent to the base portion and having a trapezoidal shape with both sides inclined, and an animal entering slope portion penetrating the dam main body from the upper surface of the animal entering slope portion The auxiliary animal passageway may be further configured to form a secondary animal passageway. The animal passage may be formed to penetrate the dam main body and the animal entering slope part.

또한, 상기 동물 진입 경사부 및 상기 보조 동물 통과로가 상하 2단으로 구성될 수 있다.In addition, the animal entering slope and the auxiliary animal passage may be composed of two upper and lower stages.

본 발명의 실시예에 따르면, 생태환경 보전 사방댐은 암석 및 토사를 선택적으로 차단 또는 투과시켜 암석 및 토사의 급격한 유입을 효과적으로 저지하고 하천 하류 생태 환경을 보전할 뿐만 아니라 하천의 상하류 생태 환경 단절을 억제할 수 있다.According to the embodiment of the present invention, the eco-environmental preservation dam selectively blocks or permeates rocks and gravels to effectively prevent the rapid inflow of rocks and gravels, to preserve the ecological environment downstream of the river, and to suppress the disconnection of upstream and downstream ecological environments can do.

도 1은 본 발명의 제1 실시예에 따른 생태환경 보전 사방댐의 사시도이다.
도 2는 도 1의 생태환경 보전 사방댐의 정면도이다.
도 3은 도 1의 생태환경 보전 사방댐의 평면도이다.
도 4는 도 1의 생태환경 보전 사방댐의 측단면도이다.
도 5는 도 3의 통과로 폐색 방지벽을 확대 도시한 평면도이다.
도 6은 도 5의 통과로 폐색 방지벽을 IV-IV 선에 따라 도시한 단면도이다.
도 7 내지 도 9는 본 발명의 제1 실시예의 변형례들을 각각 도시한 평면도들이다.
도 10은 본 발명의 제2 실시예에 따른 생태환경 보전 사방댐의 사시도이다.
도 11은 도 10의 생태환경 보전 사방댐의 정면도이다.
1 is a perspective view of an ecological conservation square dam according to a first embodiment of the present invention.
Fig. 2 is a front view of the ecological environment preservation dam in Fig. 1;
Fig. 3 is a plan view of the ecological conservation square dam of Fig. 1;
Fig. 4 is a side cross-sectional view of the ecological conservation square dam of Fig. 1;
Fig. 5 is an enlarged plan view of the passage blocking wall shown in Fig. 3. Fig.
FIG. 6 is a cross-sectional view of the passage blocking wall of FIG. 5 taken along line IV-IV.
Figs. 7 to 9 are plan views respectively showing modifications of the first embodiment of the present invention.
10 is a perspective view of an ecological conservation square dam according to a second embodiment of the present invention.
Fig. 11 is a front view of the ecological environment preservation dam in Fig. 10; Fig.

이하, 첨부한 도면을 참고로 하여 본 발명의 실시예들에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예들에 한정되지 않는다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art to which the present invention pertains. The present invention may be embodied in many different forms and is not limited to the embodiments described herein.

또한, 여러 실시예들에 있어서, 동일한 구성을 가지는 구성요소에 대해서는 동일한 부호를 사용하여 대표적으로 제1 실시예에서 설명하고, 그 외의 제2 실시예에서는 제1 실시예와 다른 구성에 대해서만 설명하기로 한다.In addition, in the various embodiments, elements having the same configuration are represented by the same reference symbols in the first embodiment, and in the other second embodiment, only the configurations different from those of the first embodiment are described .

도면들은 개략적이고 축적에 맞게 도시되지 않았다는 것을 일러둔다. 도면에 있는 부분들의 상대적인 치수 및 비율은 도면에서의 명확성 및 편의를 위해 그 크기에 있어 과장되거나 감소되어 도시되었으며 임의의 치수는 단지 예시적인 것이지 한정적인 것은 아니다. 그리고 둘 이상의 도면에 나타나는 동일한 구조물, 요소 또는 부품에는 동일한 참조 부호가 유사한 특징을 나타내기 위해 사용된다.The drawings are schematic and illustrate that they are not drawn to scale. The relative dimensions and ratios of the parts in the figures are exaggerated or reduced in size for clarity and convenience in the figures, and any dimensions are merely illustrative and not restrictive. And to the same structure, element or component appearing in more than one drawing, the same reference numerals are used to denote similar features.

본 발명의 실시예는 본 발명의 이상적인 실시예를 구체적으로 나타낸다. 그 결과, 도해의 다양한 변형이 예상된다. 따라서 실시예는 도시한 영역의 특정 형태에 국한되지 않으며, 예를 들면 제조에 의한 형태의 변형도 포함한다.The embodiments of the present invention specifically illustrate ideal embodiments of the present invention. As a result, various variations of the illustration are expected. Thus, the embodiment is not limited to any particular form of the depicted area, but includes modifications of the form, for example, by manufacture.

이하, 도 1 내지 도 6을 참조하여 본 발명의 제1 실시예에 따른 생태환경 보전 사방댐(101)을 설명한다.Hereinafter, an ecological environment conservation dam 101 according to a first embodiment of the present invention will be described with reference to Figs. 1 to 6. Fig.

도 1 및 도 2에 도시한 바와 같이, 본 발명의 제1 실시예에 따른 생태환경 보전 사방댐(101)은 댐본체(200), 동물 통과로(270), 및 토사 투과로(290)를 포함한다.1 and 2, the ecological conservation square dam 101 according to the first embodiment of the present invention includes a dam main body 200, an animal passage passage 270, and a soil-permeation passage passage 290 do.

또한, 본 발명의 제1 실시예에 따른 생태환경 보전 사방댐(101)은 보강 철근(808), 물받이부(400), 날개벽(450), 유속 저감 돌출부(406)를 더 포함할 수 있다.The eco environment preservation dam 101 according to the first embodiment of the present invention may further include a reinforcing bar 808, a water receiving part 400, a wing wall 450, and a flow rate reduction protrusion 406.

또한, 도 3에 도시한 바와 같이, 본 발명의 제1 실시예에 따른 생태환경 보전 사방댐(101)은 통과로 폐색 방지벽(301)을 더 포함할 수 있다.3, the ecological conservation square dam 101 according to the first embodiment of the present invention may further include a passage blocking wall 301. [

댐본체(200)는 양측에 형성된 댐어깨부(220)와, 댐어깨부(200) 사이에 댐어깨부(220)보다 낮은 높이를 갖는 방수부(210)를 포함한다. 즉, 댐본체(200)의 가운데 형성된 방수부(210)로 생태환경 보전 사방댐(101)의 수위를 넘는 물이 배수된다.The dam main body 200 includes a dam shoulder 220 formed on both sides and a waterproof portion 210 having a lower height than the dam shoulder 220 between the dam shoulder 200. That is, water exceeding the water level of the ecological environment conservation dam 101 is drained to the waterproof portion 210 formed at the center of the dam body 200.

물받이부(400)는 댐본체(200)의 하류측 바닥에 형성된다. 그리고 댐본체(200)의 하류측과 물받이부(400) 사이에는 경사면(407)이 형성될 수 있다.The water receiving portion 400 is formed at the bottom of the downstream side of the dam body 200. An inclined surface 407 may be formed between the downstream side of the dam main body 200 and the water receiving portion 400.

물받이부(400)에는 계곡물의 유속을 조절하도록 돌과 자갈이 혼합되어 적층된 구조를 가질 수 있다.The water receiving part 400 may have a structure in which stones and gravel are mixed and laminated to control the flow rate of the valley water.

특히, 본 발명의 제1 실시예에서, 물받이부(400)는 후술할 동물 통과로(270)로 인하여 동물 이동에는 유리하나 유속 저감 효과가 다소 저하될 수 있으므로, 물받이부(400)와 경사면(407)에 유속 저감 돌출부(406)를 형성할 수 있다.Particularly, in the first embodiment of the present invention, the water receiving portion 400 is advantageous for animal movement due to the animal passage 270 to be described later, but the effect of reducing the flow velocity may be somewhat lowered. Therefore, the water receiving portion 400 and the inclined surface The flow rate reduction protrusion 406 can be formed in the flow rate reduction projection 407.

일례로, 유속 저감 돌출부(406)는 돌출식 돌쌓기를 통해 형성될 수 있다.For example, the flow rate reduction protrusion 406 may be formed through protruding stones.

날개벽(450)은 물받이부(400) 및 경사면(407)의 양측에 세워질 수 있다. 그리고 날개벽(450)은 계곡과 이어질 수 있다.The wing wall 450 may be erected on both sides of the water receiving portion 400 and the inclined surface 407. And the wings 450 can lead to the valleys.

동물 통과로(270)는, 도 3 및 도 4에 도시한 바와 같이, 댐본체(200)의 기저부에 인접하게 댐본체(200)를 관통하도록 형성된다.The animal passage 270 is formed to penetrate the dam main body 200 adjacent to the base of the dam main body 200, as shown in Figs.

동물 통과로(270)는 물고기 또는 개구리와 같이 물에서 주로 생활하는 동물이 하천의 하류에서 생태환경 보전 사방댐(101)을 가로질러 하천의 상류로 이동할 수 있는 통로가 된다. 즉, 동물 통과로(270)는 동물이 통과하기에 용이하도록 댐본체(200)의 기저부에 인접하게 형성될 뿐만 아니라 동물이 통과할 수 있는 크기를 갖는다.An animal passage 270 serves as a passage through which an animal mainly living in the water, such as a fish or a frog, can move downstream of the river and across the ecosystem environment preservation dam 101 to the upstream of the river. That is, the animal passage 270 is formed to be adjacent to the base portion of the dam main body 200 so that the animal can easily pass through, and has a size allowing the animal to pass through.

일례로, 동물 통과로(270)는 폭과 높이가 500mm 정도의 크기를 갖는 사각형 통로일 수 있다.For example, the animal passage 270 may be a rectangular passage having a width and a height of about 500 mm.

통과로 폐색 방지벽(301)은 동물 통과로(270)의 상류측 입구를 둘러싸도록 형성될 수 있다.The passage blocking wall 301 may be formed to surround the upstream entrance of the animal passage 270.

통과로 폐색 방지벽(301)은 상류에서 흘러온 암석 및 토사 등에 의해 동물 통과로(270)가 막히는 것을 억제한다.The passage blocking wall 301 prevents the passage of the animal passage 270 from clogging by the rock and the gravel flowing from the upstream.

통과로 폐색 방지벽(301)은, 도 5 및 도 6에 도시한 바와 같이, 방지벽 본체부(311)와, 동물 통과로(270)의 상류측 입구에서 멀어질수록 높이가 높아지는 탈출 경사부(312)를 포함할 수 있다.As shown in Figs. 5 and 6, the passage blocking wall 301 includes a barrier wall body portion 311, an escape slope portion 313 which increases in height from the upstream entrance of the animal passage passage 270, (312).

따라서, 통과로 폐색 방지벽(301)은 암석 및 토사 등이 동물 통과로(270)를 폐색시키는 것을 억제하면서, 동시에 동물 통과로(270)를 통과한 동물이 용이하게 통과로 폐색 방지벽(301)을 넘어 상류로 이동할 수 있다.Therefore, the passage blocking wall 301 prevents the rock and soil from obstructing the passage passage 270, and at the same time, the animal passing through the passage passage 270 can easily pass through the passage blocking wall 301 ) To move upstream.

또한, 통과로 폐색 방지벽(301)의 탈출 경사부(312)는, 도 6에 도시한 바와 같이, 동물이 용이하게 오를 수 있도록 표면이 거칠게 형성될 수 있다.In addition, the escape slanting portion 312 of the passage obstruction preventing wall 301 can be roughly roughened so that the animal can easily climb, as shown in Fig.

도 7 내지 도 9는 본 발명의 제1 실시예의 변형례에 따른 통과로 폐색 방지벽(302, 303, 304)의 다양한 형상들을 나타낸다.Figs. 7-9 illustrate various configurations of passage passage blocking walls 302,303, 304 according to a variation of the first embodiment of the present invention.

도 7 내지 도 9에 도시한 바와 같이, 통과로 폐색 방지벽(302, 303, 304)의 일영역에는 물이 흐르는 배수틈(309)이 형성될 수 있다. 배수틈(309)은 통과로 폐색 방지벽(302, 303, 304)의 중앙 또는 가장자리에 형성될 수 있다.As shown in Figs. 7 to 9, a drainage gap 309 through which water flows can be formed in one region of the passage blocking-preventing walls 302, 303, and 304. A drainage gap 309 may be formed at the center or edge of the passage blocking walls 302, 303, 304.

또한, 통과로 폐색 방지벽(302, 303, 304)은 원호 형상 또는 사각 형상으로 형성될 수도 있다.Further, the passage blocking walls 302, 303, 304 may be formed in an arc shape or a square shape.

또한, 통과로 폐색 방지벽(302, 303, 304)은 'ㅅ'자 형상으로 형성될 수도 있다.In addition, the passage blocking walls 302, 303, and 304 may be formed in a shape of 'g'.

토사 투과로(290)는, 앞서 도 2 및 도 4에 도시한 바와 같이, 동물 통과로(270)보다 상부에서 댐본체(200)를 관통하도록 형성된다.2 and 4, the soil-permeation passage 290 is formed so as to pass through the dam main body 200 above the animal passage 270. As shown in Fig.

또한, 토사 투과로(290)는 동물 통과로(270)보다 작은 크기의 단면적을 가질 수 있다.In addition, the soil-permeation passage 290 may have a cross-sectional area smaller than that of the animal passage 270.

또한, 토사 투과로(290)는 복수개가 마련되어 댐본체(200)의 기저부로부터 서로 다른 높이를 갖는 다단 구조로 형성될 수 있다. 그리고 토사 투과로(290)는 댐본체(200)의 기저부에서 상부로 갈수록 단면적이 작아질 수 있다.In addition, a plurality of soil-water permeation paths 290 may be provided and may be formed in a multi-stage structure having different heights from the base of the dam body 200. The cross-sectional area of the soil-permeation passage 290 may be reduced from the bottom of the dam body 200 to the upper portion thereof.

구체적으로, 토사 투과로(290)는 동물 통과로(270)보다 상부에 위치하는 제1 토사 투과로(291)와, 제1 토사 투과로(291)보다 상부에 위치하는 제2 토사 투과로(292)를 포함할 수 있다.Specifically, the soil-permeation passage 290 includes a first soil-permeation passage 291 located above the animal passage 270, and a second soil-permeation passage 291 located above the first soil- 292).

댐본체(200)에 의해 흐름이 차단된 암석 및 토사 중 직경이 상대적으로 작은 토사는 제1 토사 투과로(291)를 통과하여 하류로 향하게 된다. 이에, 하천 하류의 생태계의 건전성을 유지할 수 있다.The gravel and the gravel whose flow is blocked by the dam body 200 and the diameter of which is relatively small among the gravels pass through the first gravel-permeated path 291 and are directed downstream. Thus, the integrity of the ecosystem downstream of the stream can be maintained.

또한, 토사가 퇴적되어 제1 토사 투과로(291)가 막히면, 토사는 제2 토사 투과로(292)를 통과하여 하류로 향하므로, 댐본체(200)에 의한 토사의 퇴적이 상당 부분 진행된 경우에도 하천 하류의 생태계의 건정성을 계속 유지할 수 있으며, 제2 토사 투과로(292) 마저 막히면 제3 토사 투과로(293)를 통해 하천 하류의 생태계의 건정성을 계속 유지할 수 있다.If the first soil-permeation path 291 is clogged with the gravel-like material, the gravel-like material passes through the second gravel-permeated path 292 and is directed downstream, so that when the deposition of the gravel- It is possible to maintain the dryness of the ecosystem downstream of the river stream and to keep the integrity of the ecosystem downstream of the stream through the third soil permeation path 293 even if the second soil penetration path 292 is blocked.

또한, 본 발명의 제1 실시예에 따르면, 제1 토사 투과로(291)보다 제2 토사 투과로(292)의 단면적을 작게 하고, 제2 토사 투과로(292)보다 제3 토사 투과로(293)의 단면적을 작게 하여, 토사의 퇴적 높이에 따른 토사 투과량의 편차를 줄일 수 있다.According to the first embodiment of the present invention, the sectional area of the second soil-permeable path 292 is made smaller than that of the first earth-sea-permeated path 291, 293) can be made small, and the deviation of the soil-soil permeation amount according to the sedimentation height of the gravel-like material can be reduced.

즉, 제1 토사 투과로(291)와 제2 토사 투과로(292)가 완전히 막히지 않는 상태에서 암석 및 토사 등에 의해 퇴적 높이만 상승한 경우에도, 제1 토사 투과로(291), 제2 토사 투과로(292), 및 제3 토사 투과로(293)를 포함하는 전체적인 토사 투과로(290)를 통해 투과되는 토사를 상대적으로 균일화할 수 있다.That is, even when the sedimentation height is increased only by the rock and the gravel in the state where the first and second gravel-permeated paths 291 and 292 are not completely blocked, the first gravel-permeated path 291, It is possible to relatively equalize the gravels to be transmitted through the entire gravel-permeated road 290 including the second gravel passage 292 and the third gravel-permeated roadway 293.

또한, 본 발명의 제1 실시예에가 전술한 바에 한정되는 것은 아니며, 토사 투과로(290)를 2단 또는 4단 이상의 다단 구조로 형성하여 토사의 흐름을 다양하게 조절할 수 있다.In addition, the first embodiment of the present invention is not limited to the above-described embodiment, and the soil-permeation passage 290 may be formed in a multi-stage structure having two or more stages so as to control the flow of the soil.

또한, 앞서 도 2에 도시한 바와 같이, 본 발명의 제1 실시예에 따른 생태환경 보전 사방댐(101)은 동물 통과로(270)와 토사 투과로(290)를 둘러싸도록 댐본체(200)에 삽입 설치된 보강 철근(808)을 더 포함할 수 있다. 보강 철근(808)은 댐본체(200)를 관통하여 형성된 동물 통과로(270)와 토사 투과로(290)에 집중되는 응력에 견디기 위해 설치될 수 있다.2, the ecological conservation square dam 101 according to the first embodiment of the present invention is provided with a dam body 200 for enclosing the animal passage 270 and the soil-permeation passage 290, And may further include an inserted reinforcing bar 808. The reinforcing bars 808 can be installed to withstand the stress concentrated on the animal passage 270 and the soil-permeable path 290 formed through the dam body 200.

이와 같은 구성에 의하여, 본 발명의 제1 실시예에 따른 생태환경 보전 사방댐(101)은 암석과 토사를 선택적으로 차단 또는 투과시켜 암석 및 토사의 급격한 유입을 효과적으로 저지하고 하천 하류 생태 환경을 보전할 뿐만 아니라 하천의 상하류 생태 환경 단절을 억제할 수 있다.According to the above-described structure, the eco environment preservation dam 101 according to the first embodiment of the present invention selectively blocks or permeates rocks and gravels to effectively prevent the rapid inflow of rocks and gravels, In addition, it is possible to suppress the disconnection of upstream and downstream ecological environments of rivers.

이하, 도 10 및 도 11을 참조하여 본 발명의 제2 실시예에 따른 생태환경 보전 사방댐(102)을 설명한다.Hereinafter, the ecological conservation square dam 102 according to the second embodiment of the present invention will be described with reference to FIGS. 10 and 11. FIG.

도 10 및 도 11에 도시한 바와 같이, 본 발명의 제2 실시예에 따른 생태환경 보전 사방댐(102)은 동물 진입 경사부(276)와, 보조 동물 통과로(272)를 더 포함한다.As shown in Figs. 10 and 11, the ecological conservation square dam 102 according to the second embodiment of the present invention further includes an animal entering slope portion 276 and an auxiliary animal passage passage 272. Fig.

동물 진입 경사부(276)는 댐본체(200)의 하류측 일면에서 하류측 방향으로 돌출 형성된다. 그리고 동물 진입 경사부(276)는 댐본체(200)의 기저부에 인접하게 형성되며 양측면이 경사진 사다리꼴 형상을 갖는다. 여기서, 동물 진입 경사부(276)의 경사진 양측면은 동물이 기어오를 수 있도록 완만한 경사를 가질 수 있다.The animal entering slope portion 276 is formed to protrude in the downstream direction from one surface of the downstream side of the dam body 200. [ The animal entering slope portion 276 is formed adjacent to the base portion of the dam body 200 and has a trapezoidal shape with both sides inclined. Here, the inclined opposite sides of the animal entering slope portion 276 may have a gentle slope so that the animal can climb.

보조 동물 통과로(272)는 동물 진입 경사부(276)의 상부면에서 댐본체(200)를 관통하도록 형성된다.The auxiliary animal passage 272 is formed to penetrate the dam main body 200 on the upper surface of the animal entering slope portion 276.

또한, 본 발명의 제2 실시예에서, 동물 통과로(270)는 댐본체(200)와 동물 진입 경사부(276)를 함께 관통하도록 형성된다.In addition, in the second embodiment of the present invention, the animal passage 270 is formed so as to penetrate the dam main body 200 and the animal entering inclined portion 276 together.

또한, 도 10 및 도 11에 도시한 바와 같이, 동물 진입 경사부(276) 및 보조 동물 통과로(272)가 상하 2단으로 구성될 수 있으나, 본 발명의 제2 실시예가 이에 한정되는 것은 아니다.As shown in Figs. 10 and 11, the animal entering slope portion 276 and the auxiliary animal passage 272 may be constituted by two upper and lower stages, but the second embodiment of the present invention is not limited thereto .

즉, 댐본체(200)의 높이에 따라 동물 진입 경사부(276) 및 보조 동물 통과로(272)는 1단으로 구성되거나 3단 이상으로 구성될 수도 있다.That is, depending on the height of the dam main body 200, the animal entering slope portion 276 and the auxiliary animal passage 272 may be composed of one stage or three or more stages.

이와 같은 구조에 의해, 통과로 폐색 방지벽(301)을 설치함에도 불구하고 토사의 퇴적으로 동물 통과로(270)가 폐색되면, 동물들은 동물 진입 경사부(276)의 경사진 양측면을 타고 올라 동물 진입 경사부(276)의 상부면에 인접하게 형성된 보조 동물 통과로(272)를 통해 댐본체(200)를 통과하여 상류측으로 이동할 수 있다.With this structure, when the passage passage 270 is closed by the accumulation of the gravel in spite of the provision of the passage blocking wall 301, the animals climb up the sloping sides of the animal entrance slope portion 276, Through the auxiliary animal passage 272 formed adjacently to the upper surface of the entry slope portion 276, to move upstream through the dam main body 200.

이와 같은 구성에 의하여, 본 발명의 제2 실시예에 따른 생태환경 보전 사방댐(102)은 토사가 퇴적되어 동물 통과로(270)가 폐색된 경우에도 보조 동물 통과로(272)를 통해 동물들이 상류측으로 이동할 수 있어 하천의 상하류 생태 환경 단절을 더욱 효과적으로 억제할 수 있다.According to the second embodiment of the present invention, the ecosystem environment conservation dam 102 according to the second embodiment of the present invention can prevent the animals from passing through the auxiliary animal passage 272 even when the soil is deposited and the animal passage 270 is closed. So that it is possible to more effectively suppress the disconnection of the upstream and downstream ecological environments of the river.

이상 첨부된 도면을 참조하여 본 발명의 실시예를 설명하였지만, 본 발명이 속하는 기술분야의 당업자는 본 발명이 그 기술적 사상이나 필수적 특징을 변경하지 않고 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art. will be.

그러므로 이상에서 기술한 실시예는 모든 면에서 예시적인 것이며 한정적인 것이 아닌 것으로서 이해되어야 하고, 본 발명의 범위는 상기 상세한 설명은 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 등가개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.It is therefore to be understood that the embodiments described above are to be considered in all respects only as illustrative and not restrictive, the scope of the invention being indicated by the appended claims, It is intended that all changes and modifications derived from the equivalent concept be included within the scope of the present invention.

101, 102: 생태환경 보전 사방댐 200: 댐본체
210: 방수부 220: 댐어깨부
270: 동물 통과로 272: 보조 동물 통과로
276: 동물 진입 경사부 290: 토사 투과로
291: 제1 토사 투과로 292: 제2 토사 투과로
293: 제3 토사 투과로
301, 302, 303, 304: 통과로 폐색 방지벽
311: 방지벽 본체부 312: 탈출 경사부
400: 물받이부 406: 유속 저감 돌출부
407: 경사면 450: 날개벽
808: 보강 철근
101, 102: Conservation of ecological environment Sambang dam 200: Dam body
210: Waterproof part 220: Dam shoulder part
270: Animal passage 272: Animal passage
276: Animal entering slope part 290: Soil penetration furnace
291: first trough penetration path 292: second trough penetration path
293: As the third soil-permeation furnace
301, 302, 303, 304: passage blocking wall
311: preventing wall body 312: escape slope part
400: water receiving portion 406: flow rate reducing projection
407: slope 450: wing wall
808: Rebar

Claims (10)

암석, 토사, 및 유목을 차단하는 댐본체;
상기 댐본체의 기저부에 인접하게 상기 댐본체를 관통하도록 형성된 동물 통과로; 및
상기 동물 통과로보다 상부에서 상기 댐본체를 관통하도록 형성된 토사 투과로
를 포함하는 생태환경 보전 사방댐.
A dam body to block rocks, soil, and driftwood;
An animal passage formed to penetrate the dam body adjacent to the base of the dam body; And
Permeable path formed so as to penetrate the dam main body above the animal passage;
The ecological environment conservation zebang dam including.
제1항에서,
상기 동물 통과로의 상류측 입구를 둘러싸도록 형성된 통과로 폐색 방지벽을 더 포함하는 생태환경 보전 사방댐.
The method of claim 1,
Further comprising a passage passage blocking wall formed to surround the upstream entrance of the animal passage.
제2항에서,
상기 통과로 폐색 방지벽의 일영역에는 상기 동물 통과로의 상류측 입구에서 멀어질수록 높이가 높아지는 탈출 경사부가 형성된 생태환경 보전 사방댐.
3. The method of claim 2,
And an escape ramp portion having a height higher as the distance from the upstream entrance of the animal passage is formed in one region of the passage obstruction preventing wall.
제3항에서,
상기 통과로 폐색 방지벽의 일영역에는 물이 흐르는 배수틈이 형성된 생태환경 보전 사방댐.
4. The method of claim 3,
And a drainage gap through which water flows is formed in one area of the passage blocking wall.
제1항에서,
상기 토사 투과로는 복수개가 마련되어 상기 댐본체의 기저부로부터 서로 다른 높이를 갖는 다단 구조로 형성된 생태환경 보전 사방댐.
The method of claim 1,
Wherein a plurality of the soil-penetration passages are provided and formed into a multi-stage structure having different heights from the base of the dam body.
제5항에서,
상기 토사 투과로는 상기 댐본체의 기저부에서 상부로 갈수록 단면적이 작아지는 생태환경 보전 사방댐.
The method of claim 5,
Wherein the cross-sectional area of the soil-permeation passage decreases from the base portion of the dam main body to the upper portion of the dam main body.
제1항에서,
상기 동물 통과로와 상기 토사 투과로를 둘러싸도록 상기 댐본체에 삽입 설치된 보강 철근을 더 포함하는 생태환경 보전 사방댐.
The method of claim 1,
Further comprising a reinforcing bar inserted in the dam body so as to surround the animal passage and the soil-permeation passage.
제1항에서,
상기 댐본체의 하류측 바닥에 형성된 물받이부와;
상기 물받이부의 양측에 세워진 날개벽
을 더 포함하는 생태환경 보전 사방댐.
The method of claim 1,
A water receiving part formed at the bottom of the dam body on the downstream side;
A wing installed on both sides of the water receiving portion,
Which is an ecological environment conservation zone.
제1항 내지 제8항 중 어느 한 항에서,
상기 댐본체의 하류측 일면에서 기저부에 인접하게 돌출 형성되며, 양측면이 경사진 사다리꼴 형상을 갖는 동물 진입 경사부와;
상기 동물 진입 경사부의 상부면에서 상기 댐본체를 관통하도록 형성된 보조 동물 통과로
를 더 포함하며,
상기 동물 통과로는 상기 댐본체와 상기 동물 진입 경사부를 관통하도록 형성된 생태환경 보전 사방댐.
9. The method according to any one of claims 1 to 8,
An animal entering slope portion protruding from the one surface of the downstream side of the dam main body adjacent to the base portion and having a trapezoidal shape with both sides inclined;
And an auxiliary animal passage formed to penetrate the dam body from an upper surface of the animal entering slope portion
Further comprising:
Wherein the animal passage is formed so as to pass through the dam main body and the animal entering slope part.
제9항에서,
상기 동물 진입 경사부 및 상기 보조 동물 통과로가 상하 2단으로 구성된 생태환경 보전 사방댐.
The method of claim 9,
Wherein the animal entering slope portion and the auxiliary animal passage path are composed of two upper and lower stages.
KR1020140044627A 2014-04-15 2014-04-15 Debris Barrier for Preserving the Ecological Environmnet KR20150118727A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140044627A KR20150118727A (en) 2014-04-15 2014-04-15 Debris Barrier for Preserving the Ecological Environmnet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140044627A KR20150118727A (en) 2014-04-15 2014-04-15 Debris Barrier for Preserving the Ecological Environmnet

Publications (1)

Publication Number Publication Date
KR20150118727A true KR20150118727A (en) 2015-10-23

Family

ID=54427203

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140044627A KR20150118727A (en) 2014-04-15 2014-04-15 Debris Barrier for Preserving the Ecological Environmnet

Country Status (1)

Country Link
KR (1) KR20150118727A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101887359B1 (en) * 2017-12-15 2018-09-10 주식회사 대흥미래기술 Complex Screen Concrete Dam
CN108708354A (en) * 2018-07-26 2018-10-26 上海勘测设计研究院有限公司 A kind of simple sediment trapping promotees silt dam and its method of construction
KR101943861B1 (en) * 2018-05-25 2019-01-31 강원도 erosion control dam having a rear type fish ladder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101887359B1 (en) * 2017-12-15 2018-09-10 주식회사 대흥미래기술 Complex Screen Concrete Dam
KR101943861B1 (en) * 2018-05-25 2019-01-31 강원도 erosion control dam having a rear type fish ladder
CN108708354A (en) * 2018-07-26 2018-10-26 上海勘测设计研究院有限公司 A kind of simple sediment trapping promotees silt dam and its method of construction

Similar Documents

Publication Publication Date Title
KR200440994Y1 (en) Slope method Drain for a living rock debris barrier
CN106801403B (en) A method of preventing mud-stone flow disaster and mudstone apoblema recycles
CN106087953B (en) A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow
KR101250185B1 (en) Erosion Control Dam
KR20150118727A (en) Debris Barrier for Preserving the Ecological Environmnet
CN110145007A (en) The drainage system of Dumping Sites
KR101201544B1 (en) Underground Penetration Type Side Gutter Assembly
KR101289723B1 (en) Debris barrier capable of preserving scenery
JP3483847B2 (en) Intake structure of river surface water with sloped intake screen installed at floor stop
KR20150031002A (en) Debris barrier with fish habitat
JP3654424B2 (en) Drain drainage structure and construction method
JP5712253B2 (en) Underground seepage channel block and channel using the same
KR101170789B1 (en) Complex debris barrier of eco-friendly
KR101342986B1 (en) Waterway with extended weir for sediment trap and elevated water level
KR101973572B1 (en) Erosion dam structure
JP2005220610A (en) Continuous flow type slit sand control dam
KR20160097458A (en) Debris barrier enhanced regulation of floods and debris flows by remodeling
CN106049373A (en) Gravity dam body structure for blocking debris flow
KR101039619B1 (en) River with acceleration channel preventing sedimentation
KR101064916B1 (en) Drainage canal for prevention of overflowing
KR100510884B1 (en) Construction method of rivers using natural stone
JP4118770B2 (en) Sabo dam storage and drainage structure
KR101103086B1 (en) Debris barrier with eco-corridor
JP6763936B2 (en) Canal formation block and canal structure
JP3232449U (en) Underdrain type gutter

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application