KR20140122088A - Mooring management apparatus possible of smart control based on Information Technology, and control method of the same - Google Patents
Mooring management apparatus possible of smart control based on Information Technology, and control method of the same Download PDFInfo
- Publication number
- KR20140122088A KR20140122088A KR20130038734A KR20130038734A KR20140122088A KR 20140122088 A KR20140122088 A KR 20140122088A KR 20130038734 A KR20130038734 A KR 20130038734A KR 20130038734 A KR20130038734 A KR 20130038734A KR 20140122088 A KR20140122088 A KR 20140122088A
- Authority
- KR
- South Korea
- Prior art keywords
- mooring
- user
- power
- water
- amount
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B9/00—Methods or installations for drawing-off water
- E03B9/02—Hydrants; Arrangements of valves therein; Keys for hydrants
- E03B9/20—Pillar fountains or like apparatus for dispensing drinking water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
- E03F1/008—Temporary fluid connections for emptying mobile sewage holding tanks, e.g. of trailers, boats
Abstract
The present invention relates to a mooring management apparatus applied to a ship mooring system for managing a mooring of a ship and installed in a mooring facility, The amount of power or water corresponding to the inputted user's demand is calculated and displayed to the user, and when the payment for the indicated amount is applied by the user, The method of claim 1, further comprising the steps of: receiving a power from a power source installed in the docking facility, when the settlement of the calculated amount is completed and the calculated amount is related to power, And the settlement of the calculated amount is completed, and the calculated amount is the capital When characterized by supplying also the ship from the berth it is installed in the berth facilities source. As described above, the present invention can actively apply IT (Information Technology) technology to automate and integrate various functions in existing devices, thereby improving user convenience.
Description
The present invention relates to a mooring management apparatus applied to a marine mooring system, and more particularly, to a mooring management apparatus installed in a mooring facility to control the marine mooring structure by applying IT (Information Technology) And a control method thereof.
The mooring management system is generally applied to ship mooring system which manages the mooring of ship by using mooring device for ship 's eye and mooring, and is installed in the mooring facility.
The mooring control system can control the mooring of the ship on the ship's yard facilities as shown in the Korean Utility Model Practical Bulletin (20-0453349).
However, in order to meet the demand for convenience of the mooring facility of the ship, and to moor the expensive ship such as the leisure yacht, efforts to develop an automated and integrated mooring management apparatus are urgently needed.
An object of the present invention is to provide a mooring management apparatus and a control method thereof that actively apply IT (Information Technology) technology to automate and integrate various functions in existing devices, thereby improving user convenience.
According to an aspect of the present invention, there is provided a mooring management apparatus that is applied to a marine mooring system that manages a mooring of a ship and is installed in a mooring facility, A user interface module for receiving a request of a user for supplying power and water to the moored vessel; A communication module for connecting to an external payment server through a network set in advance; Wherein the payment module displays the payment amount in the user interface module in accordance with the user's request inputted through the user interface module and displays the payment amount in the user interface module, A payment module connected to the settlement module and processing payment for the calculated amount; A power supply module for supplying power from the power supply source installed in the docking facility to the berth when the settlement of the calculated amount is completed and the calculated amount is for power; And a water supply module for supplying the water from the water supply source installed in the docking facility to the watercraft, when the settlement of the estimated amount is completed and the calculated amount is water.
The mooring management apparatus is connected to an external user terminal through the set network, and transmits information on the calculated amount and supply status information of the power or water to the user terminal, and controls supply of the power and water From the user terminal device.
According to another aspect of the present invention, there is provided a method of controlling a mooring management apparatus installed in a mooring facility, the method being applied to a mooring system for managing a mooring of a ship, The method includes the steps of receiving a user's request for supplying power and water to a moored vessel at a user's request; The method of claim 1, further comprising the steps of: calculating an amount of power or water corresponding to the input user request and displaying the calculated amount to the user; connecting the payment server to an external payment server via a network Processing the payment for the amount; Supplying electric power to the berth vessel from a power source installed in the berth facility when the calculated amount is paid and the calculated amount is for power; And supplying the water from the water supply source installed in the docking facility to the ship docked when the payment for the calculated amount is completed and the calculated amount is for the water service.
As described above, the present invention can improve user convenience by actively applying IT (Information Technology) technology to automate and integrate various functions in existing devices.
In addition, the present invention can provide mooring management information through a predetermined network to the user terminal device and perform mooring management through the user terminal device, thereby improving mooring management convenience.
1 is a conceptual diagram of a ship mooring system including a mooring management apparatus according to an embodiment of the present invention.
Fig. 2 is a functional block diagram of the mooring management apparatus shown in Fig. 1. Fig.
Fig. 3 is a control flowchart for explaining an operation of the mooring management apparatus shown in Fig. 1. Fig.
Fig. 4 is a control procedure diagram for explaining another operation of the mooring management apparatus shown in Fig. 1. Fig.
Hereinafter, a ship mooring system according to an embodiment of the present invention will be described with reference to the accompanying drawings. The configurations shown in the drawings are conceptual diagrams for explaining the concept of the present invention, and a description of known technologies will be omitted from the description of the configurations.
Embodiments of the present invention are provided to more fully describe the present invention to those skilled in the art. Thus, the shape and size of the elements in the figures may be exaggerated for clarity.
FIG. 1 is a conceptual diagram of a ship mooring system including a mooring management apparatus according to an embodiment of the present invention, and FIG. 2 is a functional block diagram of the mooring management apparatus shown in FIG.
Referring to FIG. 1, a ship mooring system including a mooring management apparatus according to the present embodiment may include a
The
The
As an example, the float may be produced by plastic injection molding in an empty form so that it floats on water. The buoyant force of the float can be adjusted by inflow or outflow of the inner water.
In addition, various methods for controlling the structure and buoyancy of the float can be provided. The float may also be produced by injection molding as a plastic material. The
The
2, the
The
The
The
The
In addition, the
The
The
The eyepiece and
The
The
Also, the
In addition, the
That is, the
The
Hereinafter, the operation of the
3, when a user's power supply request is inputted through the
Next, the
4, the water supply operation will be described. When the water supply request of the user is input through the
Next, the
As described above, the
In addition, the
As described above, the present invention has been described with reference to particular embodiments, such as specific elements, and specific embodiments and drawings. However, it should be understood that the present invention is not limited to the above- And various modifications and changes may be made thereto by those skilled in the art to which the present invention pertains.
100: Facing facilities
200: Mooring management device
210: User Interface Module
220: Communication module
230: Payment module
240: power supply module
250: water supply module
260: Ian and eyepiece module
270: Height adjustment module
300: Payment Server
400: User terminal device
Claims (3)
A user interface module for receiving a request of a user for supplying power and water to the moored vessel at the request of the user;
A communication module for connecting to an external payment server through a network set in advance;
Wherein the payment module displays the payment amount in the user interface module in accordance with the user's request inputted through the user interface module and displays the payment amount in the user interface module, A payment module connected to the settlement module and processing payment for the calculated amount;
A power supply module for supplying power from the power supply source installed in the docking facility to the berth when the settlement of the calculated amount is completed and the calculated amount is for power; And
And a water supply module for supplying the water from the water supply source installed in the bellows to the ship when the settlement of the calculated amount is completed and the calculated amount is for the water supply, Device.
And transmits a control signal for controlling the supply of the power and the water to the user terminal device by connecting the calculated information on the amount of money and the supply status information of the power or water to the user terminal device through the set network From the user terminal device.
Receiving a request of a user for supplying power and water to the moored vessel at the request of the user;
The method of claim 1, further comprising the steps of: calculating an amount of electric power or water corresponding to the input user request and displaying the calculated amount to the user; connecting the payment server to an external payment server through a pre- Processing the payment for the amount;
Supplying electric power to the berth vessel from a power supply installed in the berth facility when the calculated amount is paid and the calculated amount is about power; And
And when the settlement of the calculated amount is completed and the calculated amount is for the water supply, the step of supplying the water from the water supply source installed in the docking facility to the docked ship Control method.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20130038734A KR20140122088A (en) | 2013-04-09 | 2013-04-09 | Mooring management apparatus possible of smart control based on Information Technology, and control method of the same |
PCT/KR2013/003014 WO2014168266A1 (en) | 2013-04-09 | 2013-04-11 | Mooring management apparatus having telecommunication-based smart control function and control method therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20130038734A KR20140122088A (en) | 2013-04-09 | 2013-04-09 | Mooring management apparatus possible of smart control based on Information Technology, and control method of the same |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20140122088A true KR20140122088A (en) | 2014-10-17 |
Family
ID=51689665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20130038734A KR20140122088A (en) | 2013-04-09 | 2013-04-09 | Mooring management apparatus possible of smart control based on Information Technology, and control method of the same |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR20140122088A (en) |
WO (1) | WO2014168266A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015147358A1 (en) * | 2014-03-28 | 2015-10-01 | 원시스템 주식회사 | Information communication-based smart mooring management apparatus |
WO2020013365A1 (en) * | 2018-07-13 | 2020-01-16 | 이산 주식회사 | Ubiquitous integrated smart mooring platform based on iot technology |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112669022A (en) * | 2021-01-07 | 2021-04-16 | 广东省交通运输规划研究中心 | Low-voltage small-capacity shore power system and method based on intelligent payment and monitoring |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003132378A (en) * | 2001-10-24 | 2003-05-09 | Sowa System:Kk | Confirming method for ship by radio communication means, automatic settlement method for fee and system for embodying methods |
JP2008178228A (en) * | 2007-01-19 | 2008-07-31 | Terasaki Electric Co Ltd | Method and system for supplying power from land to ship |
JP5334470B2 (en) * | 2008-06-30 | 2013-11-06 | 三井造船株式会社 | Non-contact power supply system for ships, ship and ship power supply method |
KR200451326Y1 (en) * | 2008-10-17 | 2010-12-09 | 최연호 | The electric power supply and water supply device for a moorage |
EP2377224B1 (en) * | 2008-12-12 | 2021-04-21 | ABB Schweiz AG | System and apparatus for power transfer to vessels |
-
2013
- 2013-04-09 KR KR20130038734A patent/KR20140122088A/en not_active Application Discontinuation
- 2013-04-11 WO PCT/KR2013/003014 patent/WO2014168266A1/en active Application Filing
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015147358A1 (en) * | 2014-03-28 | 2015-10-01 | 원시스템 주식회사 | Information communication-based smart mooring management apparatus |
WO2020013365A1 (en) * | 2018-07-13 | 2020-01-16 | 이산 주식회사 | Ubiquitous integrated smart mooring platform based on iot technology |
Also Published As
Publication number | Publication date |
---|---|
WO2014168266A1 (en) | 2014-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20140122089A (en) | Vessel mooring system and its operating method | |
KR20140122088A (en) | Mooring management apparatus possible of smart control based on Information Technology, and control method of the same | |
KR101607904B1 (en) | Ship docking guide system using 3-Dimensional laser scanner | |
US20200079007A1 (en) | Method of peeling physical model from material tank | |
KR101379821B1 (en) | Mooring service pedestal system | |
CN104123855B (en) | A kind of boats and ships pass through safety navigation backup system and the method for ship lock | |
CN104485022B (en) | According to the navigation control system of boats and ships oil mass switching route | |
CN110001895A (en) | A kind of latent device draw off gear | |
CN104129492B (en) | A kind of ship running method | |
CN201685997U (en) | Shipbuilding tooling utilizing floating dock | |
CN105549472B (en) | A kind of anchoring system and its control method | |
KR20190070519A (en) | Method for real-time reporting and managing the work process for a repairing ships | |
CN101945137B (en) | Comprehensive system for combining mobile broadband communication technology with ship AIS (Automatic Identification System) information display | |
KR20150114001A (en) | Smart mooring management apparatus based on information technology | |
CN114168827A (en) | Method and device for indicating ship to park and electronic equipment | |
KR20180130666A (en) | Apparatus and method for integrated measuring in a smart pedestal | |
CN104658319B (en) | Navigation control system according to ship oil amount switching route | |
CN104658320B (en) | Navigation control system according to ship oil amount switching route | |
Gucma et al. | Optimization of LNG terminal parameters for a wide range of gas tanker sizes: the case of the port of Świnoujście | |
CN103129700A (en) | Large-size bulk rudder blade installing method based on low-level slipway | |
CN102522003A (en) | ATS integrated machine having data recording and playback functions | |
WO2023199615A1 (en) | Liquefied natural gas supply support system, liquefied natural gas supply apparatus, liquefied natural gas supply method, and liquefied natural gas supply support program | |
CN204587262U (en) | A kind of emergency clock controller peculiar to vessel based on Programmable Logic Controller | |
CN114363848A (en) | Unmanned ship fuel supply method and system | |
CN108132631A (en) | A kind of deep sea equipment electric power supply control system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E90F | Notification of reason for final refusal | ||
E601 | Decision to refuse application |