KR20140083434A - Storage device for drill pipe - Google Patents

Storage device for drill pipe Download PDF

Info

Publication number
KR20140083434A
KR20140083434A KR1020120153171A KR20120153171A KR20140083434A KR 20140083434 A KR20140083434 A KR 20140083434A KR 1020120153171 A KR1020120153171 A KR 1020120153171A KR 20120153171 A KR20120153171 A KR 20120153171A KR 20140083434 A KR20140083434 A KR 20140083434A
Authority
KR
South Korea
Prior art keywords
pipe
drilling
storage
buffer
lower side
Prior art date
Application number
KR1020120153171A
Other languages
Korean (ko)
Inventor
윤정웅
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020120153171A priority Critical patent/KR20140083434A/en
Publication of KR20140083434A publication Critical patent/KR20140083434A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B12/00Accessories for drilling tools
    • E21B12/04Drill bit protectors
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/20Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/18Connecting or disconnecting drill bit and drilling pipe

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a device for storing a drilling pipe for drilling equipment and, more specifically, to a device for storing a drilling pipe for drilling equipment which is capable of buffering impact applied on the bottom part of a storage pipe using an elastic force of a spring, when inputting the drilling pipe inside the storage pipe, by joining a buffering unit equipped with the spring, on the lower side of the storage pipe where multiple drilling pipes are received while connected by a flange and forming a drain nozzle unit for discharging foreign materials such as mud on the lower side of the buffering unit; easily maintaining the spring and a plate inside the buffering unit by separately forming the buffering unit; and rapidly installing the drilling pipes by immediately utilizing the drilling pipes on an underwater working site, as the drilling pipes are kept inside a separate storage device while the drilling pipes are in a connected state.

Description

Storage device for drill pipe for drilling equipment

The present invention relates to a drilling pipe storage device for a drilling rig, and more particularly, to a drilling pipe storage device for a drilling rig, more specifically, to a drilling pipe storage device for a drilling rig, And a drain nozzle unit for discharging the same foreign substance to the outside. Thus, when the drilling pipe is put into the storage pipe, the shock applied to the bottom of the storage pipe can be buffered by the elastic force of the spring, It is possible to easily maintain the springs and plates in the cushion part and to store it in a separate storage device connected with the drilling pipe, Cost drilling pipe storage device.

Generally drilling rigs (drilling rigs) use drilling pipes to drill holes in the seabed.

These drilling pipes are temporarily loaded before they are installed and are connected to the drilling pipe just before installation.

However, conventionally, the drilling pipe is temporarily installed on the floor of the drilling equipment immediately before the drilling pipe is installed, or when the drilling pipe is dismantled after use, so that there is a problem that the drilling pipe can not be installed quickly when the drilling pipe is used continuously In addition, the foreign substances on the drilling pipe are contaminated at the bottom of the drilling equipment, and the working environment can not be kept clean.

In order to solve the above problems, according to the present invention, a cushioning portion having a spring is coupled to a lower side of a storage pipe in which a plurality of drilling pipes are connected in a flanged state, and a foreign matter such as clay is discharged to the outside The impact applied to the bottom of the storage pipe can be buffered by the elastic force of the spring when the drilling pipe is inserted into the storage pipe. By forming the buffer part in a detachable form, Provides a drilling pipe storage device for drilling pipes that can be installed easily and can be installed in a subsea site by storing the drilling pipe in a separate storage device in a connected state. .

According to an aspect of the present invention,

A storage pipe for storing a plurality of drilling pipes connected to each other in a flanged state is coupled to a lower side of the loading part and a buffer part for buffering an impact when the drilling pipe is inserted into the storage pipe is coupled to the lower side of the storage pipe.

According to the present invention, when the drilling pipe is inserted into the storage pipe, the shock applied to the bottom of the storage pipe can be buffered by the elastic force of the spring, and the buffer part can be separated so that the spring and the plate in the buffer part can be easily In addition, the drilling pipe can be stored in a separate storage device in a connected state, and the drilling pipe can be directly put into the subsea site, so that the drilling pipe installation work can be realized more quickly.

BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 shows a drilling pipe storage device of the present invention.
2 is a cross-sectional view showing a configuration of the essential part of the present invention.

Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, FIG. 1 and FIG.

According to the above drawings,

A storage pipe 2 in which a plurality of drilling pipes 20 are housed in a flanged state is coupled to a lower portion of the charging unit 1 and a shock is absorbed when the drilling pipe 20 is inserted into the storage pipe 2 And the buffer part (4) is coupled to the lower side of the storage pipe (2).

The buffering part (4)

And a buffer pipe (5) connected to the lower side of the storage pipe (2)

A hollow support part (11) is formed on the inner lower end of the buffer pipe (5)

A spring (10) is interposed on the upper portion of the receiving portion (11)

A top plate 7 for supporting the lower portion of the drilling pipe 20 is installed on the inner upper end of the damping pipe 5,

A shaft 8 is extended downward from the top plate 7 and a washer 9 engaged with the bottom of the receiving portion 11 is coupled to the end of the shaft 8 with a nut .

A first flange 3 is formed on the lower side of the storage pipe 2 and a second flange 6 is coupled to the upper end of the cushioning pipe 5 constituting the buffer part 4 so as to abut against the first flange 3, So that the buffer part 4 can be separated from the storage pipe 2.

And a drain nozzle part (12) for discharging foreign substances existing in the buffer pipe (5) to the outside is formed at the lower end of the buffer pipe (5).

The present invention relates to a drilling pipe storage device for temporarily storing a drilling pipe (20) before a drilling pipe (20) is installed under a deck below the sea, or vice versa when installing a drilling pipe (20) .

The drilling pipe storage device of the present invention is roughly divided into a charging section (1), a storage pipe (2), a buffer section (4), and a drain nozzle section (12).

The input unit 1 is an inlet through which the drilling pipe 20 is inserted.

A storage pipe 2 having a predetermined length is connected to the lower side of the charging unit 1 and a first flange 3 is formed at the lower end of the storage pipe 2.

Normally, the storage pipe 2 is used in a standing state, and three drilling pipes 20 connected by a flange are inserted and stored inside the storage pipe 2.

In the present invention, the buffer part (4) for buffering the shock applied when the drilling pipe (20) is inserted into the storage pipe (2) is coupled to the lower side of the storage pipe (2).

The buffering part 4 couples a separate buffering pipe 5 to the lower side of the storage pipe 2 and a second flange 6 is formed on the upper part of the buffering pipe 5, And the second flange 6 is connected as a bolt in a state in which they are in alignment with each other.

A hollow support portion 11 is formed at the middle portion of the buffer pipe 5 and a coil spring 10 is provided at an upper side of the support portion 11. [

The surface of the spring 10 is preferably coated with Teflon.

A top plate 7 for supporting the lower portion of the drilling pipe 20 is installed at the inner upper end of the damping pipe 5,

The shaft 8 is extended to the lower side of the top plate 7 so that the end of the shaft 8 passes through the center hole of the receiving portion 11 and the receiving portion 11 And the top plate 7 is supported by the elasticity of the spring 10. In this way,

When the top plate 7 is elastically supported by the spring 10 as described above, the impact applied to the top plate 7 when the drilling pipe 20 is inserted into the storage pipe 2 is transmitted to the spring 10, . ≪ / RTI >

The shock absorber 4 can be separated from the storage pipe 2 as described above so that when an abnormality occurs in the spring 10 or the top plate 7 constituting the shock absorber 4, It will be possible to do.

On the other hand, a drain nozzle portion 12 is formed below the buffer pipe 5.

The drain nozzle unit 12 discharges the foreign substance to the outside when the foreign substance such as clay is accumulated in the buffer pipe 5 or when the liquid exists. The foreign matter is discharged to the drain nozzle unit 12 by connecting a separate hose to the drain nozzle unit 12 do.

The drilling pipe 20 used in the drilling equipment can be stored in a state of being connected to the storage device in advance and can be lifted from the storage device and moved to a position where the drilling pipe 20 can be installed Therefore, it is expected that the installation work of the drilling pipe becomes very easy.

1: input part, 2: storage pipe,
3: first flange, 4: buffer,
5: buffer pipe, 6: second flange,
7: Top plate, 8: Axis,
9: washer, 10: spring,
11: receiving portion, 12: drain nozzle portion,
20: Drilling pipe,

Claims (4)

A storage pipe 2 in which a plurality of drilling pipes 20 are housed in a flanged state is coupled to a lower portion of the charging unit 1 and a shock is absorbed when the drilling pipe 20 is inserted into the storage pipe 2 Characterized in that the buffer part (4) is connected to the lower side of the storage pipe (2).
The method according to claim 1,
The buffering part (4)
And a buffer pipe (5) connected to the lower side of the storage pipe (2)
A hollow support part (11) is formed on the inner lower end of the buffer pipe (5)
A spring (10) is interposed on the upper portion of the receiving portion (11)
A top plate 7 for supporting the lower portion of the drilling pipe 20 is installed on the inner upper end of the damping pipe 5,
Wherein a shaft 8 is extended to the lower side of the top plate 7 and a washer 9 engaged with the bottom of the receiving portion 11 is coupled to the end of the shaft 8 with a nut Drilling pipe storage equipment for drilling rigs.
3. The method of claim 2,
A first flange 3 is formed on the lower side of the storage pipe 2 and a second flange 6 is coupled to the upper end of the cushioning pipe 5 constituting the buffer part 4 so as to abut against the first flange 3, Wherein the buffer part (4) is detachable from the storage pipe (2).
3. The method of claim 2,
Characterized in that a drain nozzle part (12) for discharging foreign substances present inside the buffer pipe (5) is formed at the lower end of the buffer pipe (5).
KR1020120153171A 2012-12-26 2012-12-26 Storage device for drill pipe KR20140083434A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120153171A KR20140083434A (en) 2012-12-26 2012-12-26 Storage device for drill pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120153171A KR20140083434A (en) 2012-12-26 2012-12-26 Storage device for drill pipe

Publications (1)

Publication Number Publication Date
KR20140083434A true KR20140083434A (en) 2014-07-04

Family

ID=51733873

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120153171A KR20140083434A (en) 2012-12-26 2012-12-26 Storage device for drill pipe

Country Status (1)

Country Link
KR (1) KR20140083434A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685743A (en) * 2019-11-14 2020-01-14 兖州煤业股份有限公司 Water drainage device
WO2020132624A1 (en) * 2018-12-21 2020-06-25 Zentech, Inc. A sock for a floating vessel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020132624A1 (en) * 2018-12-21 2020-06-25 Zentech, Inc. A sock for a floating vessel
US11834930B2 (en) 2018-12-21 2023-12-05 Zentech, Inc. Sock for a floating vessel
CN110685743A (en) * 2019-11-14 2020-01-14 兖州煤业股份有限公司 Water drainage device

Similar Documents

Publication Publication Date Title
RU2734469C2 (en) Bit replacement mechanism for drilling machine
JP2014517178A (en) Centering system
WO2006130934A3 (en) Apparatus with flexibly mounted spud carriage
WO2009135047A3 (en) Mobile hydraulic workover rig
KR20140083434A (en) Storage device for drill pipe
EP2880248A2 (en) Isolator
US9341033B1 (en) Riser tensioner assembly
KR101434957B1 (en) Structure of top drive system
US9962630B2 (en) Craneless MGS vessel and swivel joint U-tube mud line and method of installation
US8967914B2 (en) Riser protection structures
KR101516207B1 (en) Impact absorbing apparatus of mousehole
KR20140122794A (en) Heave compensation device, and drilling ship having the same
KR101102808B1 (en) Riser tensioner
US20100116505A1 (en) Control Package Container
CN216866649U (en) Blowout preventer for oil pipe operation in oil field
CN204626404U (en) Many vibrating hammers combined platform
KR101875090B1 (en) Supporting Structure Of Overboard Pipe For Fixed Drilling Platform
CN109072674A (en) Combination of drilling equipment and control and signal line deployment modules and methods of use
CN110924290B (en) Bridge shock absorber
KR101836902B1 (en) Stacking platform of bare riser joint
CN213089217U (en) Damping device for electromechanical device
KR101652275B1 (en) Hyraracker Installing Apparatus
WO2017053568A1 (en) Impact attenuating media
KR101613213B1 (en) Integral type riser handling apparatus and riser transfer system having the same
KR200481083Y1 (en) Install structure of access basket for drillship

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination