KR20130131542A - Preparative device for cutoff accident of crane lifting rope - Google Patents

Preparative device for cutoff accident of crane lifting rope Download PDF

Info

Publication number
KR20130131542A
KR20130131542A KR1020120055154A KR20120055154A KR20130131542A KR 20130131542 A KR20130131542 A KR 20130131542A KR 1020120055154 A KR1020120055154 A KR 1020120055154A KR 20120055154 A KR20120055154 A KR 20120055154A KR 20130131542 A KR20130131542 A KR 20130131542A
Authority
KR
South Korea
Prior art keywords
balancer
loaf
crane
load
lifting rope
Prior art date
Application number
KR1020120055154A
Other languages
Korean (ko)
Inventor
박인
Original Assignee
박인
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박인 filed Critical 박인
Priority to KR1020120055154A priority Critical patent/KR20130131542A/en
Publication of KR20130131542A publication Critical patent/KR20130131542A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear
    • B66C15/02Safety gear for retaining load-engaging elements in the event of rope or cable breakage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/01General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works
    • B66C2700/011Cable cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention is a structure in which a separate loaf is fixed to the drum (1) with two stems, and each end is fixed and the opposite end is fixed to the balancer (2);
The separate loaf is a re-ropping method of a separate loaf that supports the load on the hanging mechanism 112 on the other side and minimizes the tilting impact on the balancer 2 when a cutting accident occurs in one of the lofus. It is a stopper device of the spring balm (3).

Figure P1020120055154

Description

Preparative Device for Cutoff Accident of Crane Lifting Rope}

According to the present invention, a plurality of stems (4, 5) are separated between the sheave (6) and the sheave (10) of the trolley hanger (112) wound on the drum (1) of the trolley (101) of the overhead crane. A device of a spring stopper that buffers the instantaneous impact of the Lopu Balancer 2, which stops the load from falling on the moon mechanism when an accident occurs in which one of the loafs is cut in the hoisting loafers connected in multiple layers. to be.

In the present invention, the ends of the two stems are fixed to the grooves of the drum 1 in the relative twist of the S-twist and Z-twist, respectively, and the sheave 6 and the treve 10 of the trolley 112 are fixed. Separately nutrients (4, 5) to the living (Reeving) and fix the two ends (11, 12) at each end of the balancer (2). The two wire ropes are divided into two parts and the load of the delivery mechanism 112 is loaded. Therefore, when one loaf is cut, its equal load is directed to the other loaf.

In the design of the Rofu, the Rofu is selected with a margin of 5 times or more for the Minimum Breaking Load, so even if either (4 or 5) Rofu is cut, the other side receives 2.5 times the margin of the Rofu Shear Load. Will have

As described above, the balancer (2) is cut when either one of the ropes is cut in a seesaw structure in which the load of the hanging mechanism 112 balances the tension of the ropes due to the load divided by the two groups of ropes. It is a task for the stopper 3 to cushion the instantaneous tilt shock and stop the tilt.

In the present invention, the balancer 2 is adjusted to balance the tension of the tensioning force in which the two independent lofus 4 and 5 separately behave when lifting the load. However, when a cutting accident occurs in one loaf, the shock absorber is absorbed by installing a spring bumper 3 under the balancer in order to cushion the shocks on the other loaf.

When installing the wire rope with a single stem, one of the "S" or "Z" twists is selected. At this time, the twisted wire is loosened and the lug mechanism 112 rotates in the twist direction of the rope. There may be a phenomenon.

In the present invention, since the two strands are equipped with a loaf of relative (S, Z) twist, the deflection of the deflection is eliminated. In addition, the structure that Lofu independently lived in two trunks is a device to prepare for Lofu accidents. The living structure is shown in the reference diagram of FIG.

1 is a front view illustrating a state in which a ceiling crane is assembled and installed;
2 is a planar position view of the balancer in the crane trolley.
3 is a front position view of the balancer in the crane trolley.
4 is a side position view of the balancer in the crane trolley.
5 is an operation indication of the balancer device.
6 is a living relationship diagram of a peripheral device of the Lofu balancer.
Figure 7 is a reference diagram showing the structure equipped with a single loaf (S twist or Z twist).
* Symbols of major parts of drawings
101. Trolley of the overhead crane.
112. Hook Block

Description of the preferred configuration and its operation for achieving the object of the invention with reference to the accompanying drawings are as follows.

1 is a front view of the crane showing the relationship between the trolley 101 and the moon mechanism 112 in the overhead crane. 2, 3, and 4 are diagrams showing the position of the balancer 2 and the peripheral device products. Fig. 5 is a relational view of the shock absorbing spring bumper, and Fig. 6 shows the entire living of the lofu formed with the peripheral device related to the lofu. Fig. 7 is a reference diagram fixed as a stem rofu without measures for cutting of rofu.

When the moon mechanism 112 is separated from the trolley 101 by two separate groups of hoisting loafs of the up-and-down behavior of the connection, the seesaw device having a function of compensating for the balance of tension between the separate loafs and the loads. It consists of a balancer (2).

Detailed description of the present invention relates to a stopper (3) of a spring shock absorber for mitigating the instantaneous impact of the slope of the opposing lofu on the balancer (2) when either loaf of the two groups is cut. will be.

Claims (1)

A configuration in which the hoisting loaf of the crane is composed of two strands of relative twist (S, Z);
Rofus fixed relative to the grooves of the drum 1 are liv- ed on the hanger sheave 6 and the trolly sheave 10 and the ends 11 and 12 of the two groups of rouges 4 and 5 are balanced. With the configuration installed in book 2;
In the balancer (2) device that the load is loaded on the crane lug mechanism 112 to compensate for the balance of tension between the two groups of lofu;
Spring bumper (3) stopper device to cushion the shock of the balancer (2) to instantaneously tilt when a cutting accident occurs in either of the lopu (4 or 5).
KR1020120055154A 2012-05-24 2012-05-24 Preparative device for cutoff accident of crane lifting rope KR20130131542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120055154A KR20130131542A (en) 2012-05-24 2012-05-24 Preparative device for cutoff accident of crane lifting rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120055154A KR20130131542A (en) 2012-05-24 2012-05-24 Preparative device for cutoff accident of crane lifting rope

Publications (1)

Publication Number Publication Date
KR20130131542A true KR20130131542A (en) 2013-12-04

Family

ID=49980623

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120055154A KR20130131542A (en) 2012-05-24 2012-05-24 Preparative device for cutoff accident of crane lifting rope

Country Status (1)

Country Link
KR (1) KR20130131542A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111954266A (en) * 2014-06-23 2020-11-17 北京三星通信技术研究有限公司 Data distribution method and device for split bearer in dual connectivity

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111954266A (en) * 2014-06-23 2020-11-17 北京三星通信技术研究有限公司 Data distribution method and device for split bearer in dual connectivity
CN111954266B (en) * 2014-06-23 2024-04-09 北京三星通信技术研究有限公司 Data distribution method and device for split bearing in double connection

Similar Documents

Publication Publication Date Title
US10526175B2 (en) Low-construction trolley for wire rope hoist
RU2013150668A (en) SHAFT LIFT
EP2177396A3 (en) Seat back frame structure of seat for vehicle and seat for vehicle with seat back frame structure field of the invention
CN105452143A (en) Underslung elevator
MX2018015681A (en) Hoisting arrangement of rope hoist.
CN102145853B (en) Anti-falling hanging hook of crane
CN202201604U (en) Self-balance rope end composite set
KR20130131542A (en) Preparative device for cutoff accident of crane lifting rope
CN209177894U (en) A kind of tower crane attached mounting-demounting hoisting device
CN205204599U (en) Hoist is with many ropes from balance hanger
JP6045958B2 (en) Seismic isolation lifting device
CN105819305B (en) A kind of elevator balanced heavy compensation transmission device of Shuangzi
JP4929785B2 (en) Elevator control cable device
CN102887431A (en) Balance lifting appliance of ultra-high lift crane
CN102976219B (en) Buffer device, engineering machinery, and suspension arm thereof
MX2020002993A (en) Trolley of a crane.
CN208471319U (en) A kind of elevator compensation chain installing component structure
CN203699603U (en) Elevator car suspension structure
CN101434367B (en) Auxiliary power extraction sling
CN202785367U (en) Ultrahigh lift crane
CN109516352B (en) Elevator counterweight device
CN205652979U (en) Balanced heavy compensation transmission of shuangzi elevator
CN203292934U (en) Multiple steel wire rope uniformity stress adaptive adjustment mechanism
CN208395518U (en) Double-steel wire rope protects the transmission system of structure and the clothes airing machine comprising the transmission system
CN104118801B (en) Twin rope grab three multiplying power double structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal