KR20130117835A - Cable treatment device for elevator - Google Patents
Cable treatment device for elevator Download PDFInfo
- Publication number
- KR20130117835A KR20130117835A KR1020137018906A KR20137018906A KR20130117835A KR 20130117835 A KR20130117835 A KR 20130117835A KR 1020137018906 A KR1020137018906 A KR 1020137018906A KR 20137018906 A KR20137018906 A KR 20137018906A KR 20130117835 A KR20130117835 A KR 20130117835A
- Authority
- KR
- South Korea
- Prior art keywords
- cable
- elevator
- fixing
- base
- processing apparatus
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/06—Arrangements of ropes or cables
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/06—Arrangements of ropes or cables
- B66B7/064—Power supply or signal cables
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Insertion, Bundling And Securing Of Wires For Electric Apparatuses (AREA)
Abstract
승강로 내를 연장하는 케이블을 소정의 베이스에 용이하게 장착할 수 있는 엘리베이터의 케이블 처리장치를 제공한다. 케이블 처리장치는 승강로 내를 연장하는 케이블(3)을 지지해 두는 지지부재(4)와, 지지부재가 고정되는 베이스(1f)를 구비한다. 지지부재 및 베이스의 한쪽에는 근원 부분의 지름보다도 큰 지름을 가지는 확경 부분을 포함하는 돌기부(4a)가 적어도 하나 마련되어 있다. 지지부재 및 베이스의 다른 쪽에는 돌기부가 삽입 통과되는 고정구멍(13)이 돌기부에 대응해서 마련되어 있다. 고정구멍은 통과 부분과 유지 부분을 가지고 있다. 통과 부분은 돌기부의 확경 부분이 관통할 수 있는 크기를 가지고 있다. 유지 부분은 돌기부의 확경 부분이 통과할 수 없고 또한 근원 부분이 관통할 수 있는 크기를 가지고 있다.Provided is an elevator cable processing apparatus that can easily mount a cable extending in a hoistway to a predetermined base. The cable processing apparatus is provided with the support member 4 which supports the cable 3 which extends in a hoistway, and the base 1f to which the support member is fixed. At least one of the supporting member and the base is provided with at least one projection portion 4a including an enlarged diameter portion having a diameter larger than that of the base portion. On the other side of the support member and the base, a fixing hole 13 through which the projection is inserted is provided corresponding to the projection. The fixing hole has a passage portion and a holding portion. The passage portion has a size through which the enlarged diameter portion of the projection can penetrate. The holding portion has a size that the enlarged diameter portion of the projection cannot penetrate and the source portion can penetrate.
Description
본 발명은 엘리베이터의 케이블 처리장치에 관한 것이다.The present invention relates to a cable processing apparatus of an elevator.
엘리베이터는 구조물에 형성된 복수 층의 승강장과 승강로와, 또한 그 승강로 내에 승강 가능하게 배치된 엘리베이터칸을 구비하고 있다. 엘리베이터의 각 승강장에는 엘리베이터로 콜(call)을 등록하거나, 엘리베이터의 현재위치를 표시하거나하기 위한 조작표시장치가 마련되어 있다. 이 조작표시장치는 버튼이나 표시기를 내장하기 위한 케이스가 승강장을 구성하는 구조물의 벽에 매설되어 있다. 통상, 조작표시장치의 버튼이나 표시기 등에 케이블을 접속하기 위해, 조작표시장치의 케이스에는 배선구멍이나, 배선구멍을 덮는 배선장치가 마련되어 있고, 그들 배선구멍이나 배선장치를 이용하여, 케이블이 케이스에 대해서 입선(入線)·고정되어 있다.The elevator is provided with a plurality of floors and a platform, which are formed in the structure, and an elevator car arranged in the platform. Each platform of the elevator is provided with an operation display device for registering a call with the elevator or displaying the current position of the elevator. In this operation display device, a case for embedding a button or an indicator is embedded in a wall of a structure forming a platform. Usually, in order to connect a cable to a button or an indicator of an operation display device, a wiring hole or a wiring device covering the wiring hole is provided in the case of the operation display device, and the cable is connected to the case by using the wiring hole or the wiring device. It is fixed in a line with a fixed line.
이와 같은 배선용의 커버로서, 일본국 특개평3-42481호 공보에 개시된 구성이 있다. 이 구성에서는, 박스의 이면에 케이블을 통과시키는 배선구멍, 케이블 고정용의 클램프를 장착하기 위한 상부 나사구멍, 하부 가이드구멍, 또한 케이블을 누르기 위한 돌기부 등이 형성되어 있다. 그리고, 클램프를 박스 이면에 장착하는 것으로, 케이블을 박스 이면과 클램프 사이에 끼워 넣도록 하여 케이블의 고정을 행한다. 클램프의 박스 이면으로의 고정은 클램프 하부의 두 개의 가이드를 박스의 대응하는 하부 가이드구멍에 삽입하여 건 상태인 채로, 클램프의 위로부터 나사를 박스의 상부 나사구멍에 나사끼움으로 행해진다.As such a wiring cover, there is a configuration disclosed in Japanese Patent Laid-Open No. 3-42481. In this configuration, a wiring hole for passing the cable through the back of the box, an upper screw hole for attaching the clamp for fixing the cable, a lower guide hole, and a protrusion for pressing the cable are formed. Then, the clamp is attached to the back of the box, and the cable is clamped between the back of the box and the clamp to fix the cable. The clamp is fixed to the back of the box by screwing the screw from the top of the clamp into the upper threaded hole of the box, with the two guides at the bottom of the clamp inserted into the corresponding lower guide holes of the box.
또, 다른 예로서는, 일본국 특개2008-81311호 공보에 개시된 구성이 있다. 이 구성에서는, 케이블의 선단 측에 앵글 모양의 장착부재 및 가요성 부재를 장착해 두고, 박스의 배면부와 장착부재와의 사이에 가요성 부재가 끼워지는 상태에서, 장착부재를 볼트에 의해서 배면부에 고정한다.As another example, there is a configuration disclosed in Japanese Patent Laid-Open No. 2008-81311. In this configuration, the angled mounting member and the flexible member are attached to the front end side of the cable, and the mounting member is attached to the rear surface by a bolt while the flexible member is sandwiched between the back portion of the box and the mounting member. Fix it.
그렇지만, 이러한 종래의 구성에서는, 작업 스페이스의 제약이 많은 승강로 내로부터 클램프나 장착부재의 위치선정 작업, 나사구멍 등의 엄밀한 위치맞춤 작업 또 그 후의 나사체결 작업이라고 하는 작업을 행해야 했다. 따라서, 하기 힘들게 수고가 걸리는 작업이 되고 있었다.However, in such a conventional configuration, the work of positioning the clamp or the mounting member, the rigorous positioning work such as the screw hole, or the like afterwards has to be performed from inside the hoistway with a lot of work space restrictions. Therefore, it became the laborious work hard to do.
본 발명은 상기에 감안하여 이루어진 것으로, 승강로 내를 연장하는 케이블을 소정의 베이스에 용이하게 장착할 수 있는 엘리베이터의 케이블 처리장치를 제공하는 것을 목적으로 한다.This invention is made | formed in view of the above, It aims at providing the cable processing apparatus of the elevator which can attach easily the cable which extends in a hoistway to a predetermined base.
상술한 목적을 달성하기 위해, 본 발명의 엘리베이터의 케이블 처리장치는, 승강로 내를 연장하는 케이블을 지지해 두는 지지부재와, 상기 지지부재가 고정되는 베이스를 구비하고, 상기 지지부재 및 상기 베이스의 한쪽에는 근원(根元) 부분의 지름보다도 큰 지름을 가지는 확경(擴徑) 부분을 포함한 돌기부가 적어도 하나 마련되어 있으며, 상기 지지부재 및 상기 베이스의 다른 쪽에는 상기 돌기부가 삽입 통과되는 고정구멍이 이 돌기부에 대응하여 마련되어 있고, 상기 고정구멍은 통과 부분(passage portion)과 유지 부분(retaining portion)을 가지고 있으며, 상기 통과 부분은 상기 돌기부의 상기 확경 부분이 관통할 수 있는 크기를 가지고 있고, 상기 유지 부분은 상기 돌기부의 상기 확경 부분이 통과할 수 없고 또한 상기 근원 부분이 관통할 수 있는 크기를 가지고 있다.In order to achieve the above object, the cable processing apparatus of the elevator of the present invention includes a support member for supporting a cable extending in the hoistway, a base to which the support member is fixed, and the support member and the base. At least one projection portion including an enlarged diameter portion having a diameter larger than the diameter of the root portion is provided on one side, and a fixing hole through which the projection portion is inserted is provided on the support member and the other side of the base. The fixing hole has a passage portion and a retaining portion, wherein the passage portion has a size through which the enlarged diameter portion of the protrusion can pass, and the holding portion Is a size through which the enlarged diameter portion of the protrusion cannot pass and that the source portion can penetrate. Have.
본 발명의 엘리베이터의 케이블 처리장치에 의하면, 승강로 내를 연장하는 케이블을 소정의 베이스에 용이하게 장착할 수 있다.According to the cable processing apparatus of the elevator of the present invention, a cable extending in the hoistway can be easily attached to a predetermined base.
도 1은 엘리베이터의 승강장 측에 마련된 조작표시장치를 나타내는 도면이다.
도 2는 도 1의 II-II선에 따른 조작표시장치의 단면을 나타내는 도면이다.
도 3은 승강로 측에서 본 케이블 처리장치의 사시도이다.
도 4의 (a), (b) 및 (c)는 각각, 실시형태 1에 관한 엘리베이터의 케이블 처리장치에 대해서, 승강로 측, 측방 및 아래쪽으로부터 본 상태를 나타내는 도면이다.
도 5의 (a), (b) 및 (c)는 각각, 실시형태 2에 관한 엘리베이터의 케이블 처리장치에 대해서, 승강로 측, 측방 및 아래쪽으로부터 본 상태를 나타내는 도면이다.
도 6은 실시형태 2에 관한 엘리베이터의 케이블 처리장치에 마련된 고정 스프링을 나타내는 도면이다.
도 7의 (a), (b) 및 (c)는 각각, 실시형태 3에 관한 엘리베이터의 케이블 처리장치에 대해서, 승강로 측, 측방 및 아래쪽으로부터 본 상태를 나타내는 도면이다.1 is a view showing the operation display device provided on the landing side of the elevator.
FIG. 2 is a cross-sectional view of the manipulation display device taken along line II-II of FIG. 1.
3 is a perspective view of the cable processing apparatus seen from the hoistway side.
Fig.4 (a), (b) and (c) are the figures which showed the state seen from the hoistway side, the side, and the bottom about the cable processing apparatus of the elevator which concerns on Embodiment 1, respectively.
5 (a), 5 (b) and 5 (c) are diagrams showing states seen from the hoistway side, the side and the bottom of the cable processing apparatus of the elevator according to the second embodiment, respectively.
It is a figure which shows the fixed spring provided in the cable processing apparatus of the elevator which concerns on
FIG.7 (a), (b) and (c) is a figure which shows the state seen from the hoistway side, the side, and the bottom about the cable processing apparatus of the elevator which concerns on
이하, 본 발명에 관한 엘리베이터의 케이블 처리장치의 실시형태에 대해서 첨부 도면에 근거하여 설명한다. 또한, 도면 중, 동일 부호는 동일 또는 대응 부분을 나타내는 것으로 한다.EMBODIMENT OF THE INVENTION Hereinafter, embodiment of the cable processing apparatus of the elevator which concerns on this invention is described based on an accompanying drawing. In addition, in the figure, the same code | symbol shall represent the same or corresponding part.
실시형태 1.Embodiment 1
도 1은 엘리베이터의 승강장 측에 설치된 조작표시장치를 나타내는 도면이며, 도 2는 도 1의 II-II선에 따른 조작표시장치의 단면을 나타내는 도면이다. 조작표시기구(1)는 엘리베이터의 승강장에 설치되고, 엘리베이터 이용자에게 엘리베이터칸의 도착을 알리는 위치표시기나 승강장 콜을 등록하는 승강장 버튼을 내장하는 것이다. 조작표시기구(1)는 표판(表板)(1a)의 이면에 승강장 벽(2)에 매설된 케이스(1f)를 구비하고 있다. 케이스(1f) 내에는 위치표시기(1b)나 콜 버튼(1c)이 수납되어 있고, 이러한 위치표시기(1b)나 콜 버튼(1c)은 표판(1a)으로 노출하고 있다.1 is a view showing an operation display device installed on the landing side of the elevator, Figure 2 is a view showing a cross section of the operation display device along the line II-II of FIG. The operation display mechanism 1 is provided in the boarding point of an elevator, and incorporates the position indicator which informs an elevator user of the arrival of a car and the boarding point button which registers a boarding point call. The operation display mechanism 1 is provided with the
본 실시형태의 엘리베이터의 케이블 처리장치는, 상기의 위치표시기(1b)나 콜 버튼(1c)에 대해서, 승강로 내를 연장하는 케이블(3)을 접속하는 것이다. 주로, 도 3 및 도 4에 근거하여, 본 실시형태에 관한 엘리베이터의 케이블 처리장치의 자세한 내용을 설명한다. 도 3은 승강로 측에서 본 케이블 처리장치의 사시도이며, 도 4의 (a), (b) 및 (c)는 각각, 실시형태 1에 관한 엘리베이터의 케이블 처리장치에 대해서, 승강로 측, 측방 및 아래쪽으로부터 본 상태를 나타내는 도면이다.The cable processing apparatus of the elevator of this embodiment connects the
케이블 처리장치(10)는 케이블(3)을 지지해 두는 지지부재로서의 배선용 커버(4)와, 그 지지부재가 고정되는 베이스로서의 케이스(1f)를 포함하고 있다. 또한, 배선용 커버나 케이스는 지지부재나 베이스의 일례이다. 따라서, 본 발명은 본 실시형태에 나타내는 구조와는 다른 구조의 배선용 커버나 케이스를 지지부재나 베이스로서 적용해도 되고, 또, 배선용 커버나 케이스와는 완전히 다른 것을 지지부재나 베이스의 대상으로 하여 실시할 수도 있다.The
지지부재 및 베이스의 한쪽, 즉 본 실시형태에서는, 배선용 커버(4)에는 근원 부분의 지름보다도 큰 지름을 가지는 확경 부분을 포함하는 돌기부가 적어도 하나 마련되어 있다. 구체적으로는, 돌기부로서 체결 부재를 이용할 수 있고, 본 예에서는, 2개의 나사(4a)를 체결 부재로서 이용한다. 나사(4a)는 각각, 근원 부분으로서의 나사 축부(11)와, 확경 부분으로서의 나사 두부(頭部)(12)를 가진다. 나사(4a)는 각각, 배선용 커버(4)에서의 케이스(1f)와 대면하는 부분에 케이스(1f)측(승강장 측)으로부터 나사끼움된다.At least one of the support member and the base, that is, the present embodiment, is provided with at least one projection portion including an enlarged diameter portion having a diameter larger than the diameter of the base portion. Specifically, a fastening member can be used as the protrusion, and in this example, two
케이스(1f)의 배면(승강로 측의 면)에는 케이블(3)을 통과시키기 위한 연락창으로서의 직사각형의 배선구멍(1g)이 형성되어 있다. 배선구멍(1g)은 위치표시기(1b)나 콜 버튼(1c)에 접속하기 위한 케이블(3)을 고정하는 배선용 커버(4)에 의해서 승강로 측으로부터 덮여 있고, 그에 따라 먼지나 물 등이 배선구멍(1g)을 통하여 케이스(1f) 내로 침입하는 것이 방지되고 있다.On the back surface of the
또, 지지부재 및 베이스의 다른 쪽, 즉 본 실시형태에서는, 케이스(1f)에는 나사(4a)가 삽입 통과되는 고정구멍(13)이 당해 나사(4a)에 대응하여 2개 마련되어 있다. 고정구멍(13)은 각각, 통과 부분(14)과 유지 부분(15)을 가지고 있다. 통과 부분(14)은 유지 부분(15)보다도 크게 형성되어 있다. 상세하게는, 통과 부분(14)은 나사(4a)의 나사 두부(12)를 관통할 수 있는 크기를 가지고 있다. 유지 부분(15)은 나사(4a)의 나사 두부(12)가 통과할 수 없고 또한 나사 축부(11)가 관통할 수 있는 크기를 가지고 있다.In addition, in the
통과 부분(14) 및 유지 부분(15)을 보다 구체적으로 설명한다. 우선, 1번째의 고정구멍(13)은 배선구멍(1g)의 위쪽에 위치하고 있고, 그 통과 부분(14)은 큰 직경의 둥근 구멍으로 구성되며, 유지 부분(15)은 통과 부분(14)의 큰 직경의 둥근 구멍보다도 작고 또한 큰 직경의 둥근 구멍과 겹치도록 당해 큰 직경의 둥근 구멍과 연결된 작은 직경의 둥근 구멍으로 구성되어 있다. 한편, 2번째의 고정구멍(13)은 배선구멍(1g)을 이용하여 구성되어 있다. 즉, 2번째의 고정구멍(13)의 통과 부분(14)은 큰 직경의 각진 구멍인 배선구멍(1g) 그 자체이며, 유지 부분(15)은 배선구멍(1g)의 하측 각부(角部)에서 배선구멍(1g)과 연결되는 작은 직경의 둥근 구멍으로 구성되어 있다.The
또, 도 3 및 도 4에 나타내는 바와 같이, 고정구멍(13) 각각에 있어서, 유지 부분(15)은 통과 부분(14)보다도 하측에 위치하고 있다. 특히 본 실시형태에서는, 각 유지 부분(15)은 대응하는 통과 부분(14)의 하측에 비스듬하게 배치되어 있다.3 and 4, in each of the fixing holes 13, the holding
다음으로, 배선용 커버(4)와 케이블(3)과의 접속에 대해서 설명한다. 배선용 커버(4)에는 하향(下向)으로 개구함과 아울러 승강로 측으로 돌출하는 덮개 부분(16)이 형성되어 있다. 이 덮개 부분(16)에서의 승강장 측의 면에는 케이블(3)을 케이스(1f)에 도입하기 위한 홈(4b)이 형성되어 있다. 케이블(3)은 덮개 부분(16)의 내측에 배치되고 당해 덮개 부분(16)에 의해서 상하방향으로 안내된다.Next, the connection of the
또한, 배선용 커버(4)에서의 외면(승강로 측의 면)으로서, 덮개 부분(16)의 아래쪽의 부분에는 케이블 고정 클램프(4c)가 장착되어 있다. 케이블 고정 클램프(4c)는, 특히 도 4의 (c)에 잘 나타내어져 있는 바와 같이, 대부분이 아치 모양으로 구성되어 있다. 케이블 고정 클램프(4c)의 일단은 덮개 부분(16) 하부의 개구 또는 전용의 관통 구멍을 통하여, 배선용 커버(4)의 승강로 측으로부터 승강장 측에 걸려 있고, 케이블 고정 클램프(4c)의 타단은 체결수단(4d)에 의해서 배선용 커버(4)에 고정되어 있다. 케이블(3)은 케이블 고정 클램프(4c)의 아치 내측면과 배선용 커버(4)의 외면과의 사이에 끼워져 고정되어 있다.Moreover, as the outer surface (surface of the hoistway side) in the
다음으로, 상기와 같이 구성된 배선용 커버의 케이스로의 장착 순서에 대해서 설명한다. 우선, 케이블(3)을 케이블 고정 클램프(4c)를 이용하여 배선용 커버(4)에 고정한 상태에서, 배선용 커버(4)를 케이스(1f) 근방에 배치한다. 또, 배선용 커버(4)에는 2개의 나사(4a)를 장착해 두지만, 이 때, 각 나사(4a)의 나사 두부(12)는 배선용 커버(4)의 승강장 측의 표면으로부터 소정의 거리(예를 들면 케이스의 두께 +1㎜ 정도) 띄운 상태로 유지해 둔다.Next, the mounting procedure to the case of the wiring cover comprised as mentioned above is demonstrated. First, the
그리고, 상술한 상태의 배선용 커버(4)를 2개의 나사(4a)가 대응하는 고정구멍(13)의 통과 부분(14)에 삽입되도록 하여, 케이스(1f)에 가져다 댄다. 이 때, 나사 두부(12)는 상기와 같이 배선용 커버(4)의 표면으로부터 띄운 상태에 있으므로, 고정구멍(13)의 통과 부분(14)을 빠져나가 있고, 고정구멍(13) 내에는 나사 축부(11)가 위치하게 되어 있다. 또, 케이블(3)의 선단은 배선구멍(1g)을 빠져 나가, 위치표시기(1b)나 콜 버튼(1c)에 충분히 닿도록 연장해 있다. 환언한다면, 이와 같은 상태가 얻어지도록 하는 관계·위치·형태로 상술한 배선구멍(1g), 고정구멍(13) 및 나사(4a)가 마련되어 있는 것으로 한다.Then, the
그 후, 배선용 커버(4)를 케이스(1f)에 대해서 아래쪽으로 비스듬하게 슬라이드시키고, 2개의 나사(4a)의 나사 축부(11)가 대응하는 고정구멍(13)의 유지 부분(15)에 위치하도록 한다. 이것에 의해, 나사(4a)의 나사 두부(12)가 고정구멍(13)의 유지 부분(15)에 걸리게 되고, 배선용 커버(4)는 케이스(1f)에 대해서 이격하지 않도록 지지되며, 즉, 배선용 커버(4)가 가고정된다.Thereafter, the
그 후, 승강장 측에서 위치표시기(1b), 콜 버튼(1c)으로 케이블(3)의 커넥터를 접속함과 아울러, 배선용 커버(4)에 나사 맞춤하는 나사(4a) 각각을 충분히 단단히 조이는 것에 의해서 배선용 커버(4)의 케이스(1f)로의 본고정을 완료시킨다. 또한, 케이블(3)의 커넥터 접속과, 배선용 커버(4)의 본고정은 상황에 따라 어느 쪽을 먼저 개시해도 되고, 어느 쪽을 먼저 종료해도 된다.After that, by connecting the connector of the
이상과 같은 본 실시형태에 관한 엘리베이터의 케이블 처리장치에 의하면, 돌기부를 고정구멍에 거는 것만으로 배선용 커버를 조작표시기구의 케이스에 가고정할 수 있기 때문에, 작업자는 승강로 측으로부터 나사구멍 등의 엄밀한 위치 맞춤 작업이나 그 후의 나사 체결 작업이라고 하는 작업을 행하지 않아도 된다. 즉, 작업 스페이스의 제약이 많은 승강로 내에서는, 돌기부를 소정의 구멍에 건다고 하는 작업만으로 되어, 공구도 이용하지 않고 승강로 측에서 필요한 작업을 완료할 수 있고, 승강로 내를 연장하는 케이블을 소정의 대상에 용이하게 장착할 수 있다.According to the cable processing apparatus of the elevator according to the present embodiment as described above, since the wiring cover can be temporarily fixed to the case of the operation display mechanism only by hanging the projection part in the fixing hole, the operator places a rigid position such as a screw hole from the hoistway side. It is not necessary to perform work called a fitting operation or a subsequent screwing operation. That is, in a hoistway with a lot of work space restrictions, only the task of hanging the protrusions into a predetermined hole can be completed without the use of a tool, and thus the necessary work can be completed on the hoistway side. It can be easily attached to the object.
또, 돌기부로서는, 승강장 측으로부터 나사끼움된 체결수단을 이용하므로, 가고정시에는 체결 부재를 느슨하게 한 상태에서 나사끼움해 두고, 체결 부재를 고정구멍에 건 상태에서 체결 부재를 단단히 조으면, 그대로 본고정을 행할 수 있다. 따라서, 가고정과 본고정에 공통의 수단을 이용할 수 있어, 부품 점수의 삭감을 도모할 수 있다. 또한, 본고정 전에는 이미 체결수단이 세팅된 상태로 되어 있기 때문에 체결수단을 손에 쥐고 나사구멍에 넣어지기 전에 체결수단이 낙하해 버릴 우려가 없으며, 또한, 본고정시에는 승강장 측으로부터 드라이버 등의 지극히 일반적인 공구를 이용한 간편한 작업만으로 된다. 따라서, 작업성이 지극히 양호하게 되어 있다.Moreover, since the fastening means screwed from the landing side side is used as a projection part, when screwing in the state which loosened the fastening member at the time of temporarily fixing, and fastening a fastening member firmly in the state which fastened the fastening member to the fixing hole, it will be seen as it is. Fixing can be performed. Therefore, a common means can be used for temporary fixation and this fixation, and the part score can be reduced. In addition, since the fastening means has already been set before the main fastening, there is no fear that the fastening means may fall before the fastening means is held in the hand and inserted into the screw hole. All you need is a simple tool with a common tool. Therefore, workability is extremely favorable.
또, 케이스에 마련한 구멍을, 케이블을 대상물에 접속하도록 유도하는 구멍(연락창)과, 돌기부의 확경 부분을 삽입 통과시키기 위한 통과 부분으로서의 구멍이라는 두 개의 기능으로 이용할 수 있다. 따라서, 개별적으로 통과 부분을 마련하지 않아도 되기 때문에, 제작·가공의 간소화를 도모함과 아울러, 구조의 복잡화를 회피할 수 있다. 또, 고정구멍을 형성하기 위해서 필요로 하는 영역의 공간 절약화를 도모할 수도 있다.Moreover, the hole provided in the case can be utilized by two functions, a hole (contact window) which guides a cable to an object, and a hole as a passage part for inserting the enlarged diameter part of a projection part. Therefore, since the passage portion does not have to be provided separately, the production and processing can be simplified, and the complexity of the structure can be avoided. Moreover, the space saving of the area | region required for forming a fixed hole can also be aimed at.
또, 돌기부 및 고정구멍이 복수 세팅하여 마련되어 있으므로, 본고정 전의 가고정의 단계에서 이미 배선용 커버의 케이스에 대한 회전이 억제되고 있어, 안정된 상태에서 가고정으로부터 본고정 작업으로 이행할 수 있다.Moreover, since the protrusion part and the fixing hole are provided in multiple settings, rotation with respect to the case of the wiring cover is already suppressed in the step of temporarily fixing before this fixation, and it is possible to shift from temporary fixation to this fixation work in a stable state.
또, 케이블은 배선용 커버의 덮개 부분에 의해서 상하방향으로 연장하도록 안내되므로, 배선용 커버로부터 승강로로 연장하는 케이블을 하향으로 눕혀서, 즉, 배선용 커버로부터 케이블을 수직으로 연장하지 않도록 하여, 승강로 측으로 케이블이 비어져 나가는 것을 회피할 수 있다.In addition, since the cable is guided to extend in the up and down direction by the cover portion of the wiring cover, the cable extending from the wiring cover to the hoistway is laid downward, that is, the cable is not extended vertically from the wiring cover so that the cable is not extended vertically. It can avoid escaping.
또한, 케이블은 덮개 부분으로 안내된 상태에서, 케이블 고정 클램프에 의해서 밀어 붙여지도록 하여 고정되므로, 케이블이 배선용 커버의 외면에 대해서 덜컹거리는 것을 방지하여, 케이블이 덮개 부분 내에서 바람직한 상태로 유지되도록 할 수 있다.In addition, the cable is secured by being pushed by the cable fixing clamp in the state where it is guided to the cover part, thereby preventing the cable from rattling against the outer surface of the wiring cover, so that the cable remains in the desired state within the cover part. Can be.
실시형태 2.
다음으로, 도 5 및 도 6에 근거하여, 실시형태 2에 관한 엘리베이터의 케이블 처리장치에 대해서 설명한다. 도 5의 (a), (b) 및 (c)는 각각, 실시형태 2에 관한 엘리베이터의 케이블 처리장치에 대해서, 승강로 측, 측방 및 아래쪽으로부터 본 상태를 나타내는 도면이며, 도 6은 실시형태 2에 관한 엘리베이터의 케이블 처리장치에 마련된 고정 스프링을 나타내는 도면이다.Next, based on FIG. 5 and FIG. 6, the cable processing apparatus of the elevator which concerns on
본 실시형태 2는, 실시형태 1에 있어서, 고정 클램프에 관계하는 구성을 개선한 것으로, 다른 부분에 대해서는, 실시형태 1과 동일한 구성으로 해도 되는 것으로 한다. 케이블 처리장치(20)는 판 모양의 고정 스프링(5)을 구비하고 있다. 고정 스프링(5)은 배선용 커버(4)에서의 덮개 부분(16)의 내측에 장착되어 있다.This
고정 스프링(5)은 반원 형상의 케이블 누름부(5a)와, 그 양단에 위치하는 좌우 한 쌍의 산부(5b)를 가지고 있다. 또, 배선용 커버(4)의 덮개 부분(16)의 양측부에는 한 쌍의 산부(山部)(5b)가 삽입되는 삽입 구멍(4e)이 복수 쌍 형성되어 있다.The fixed
고정 스프링(5)은 자연 상태보다도 만곡된 상태가 되도록 좌우 한 쌍의 산부(5b)가 덮개 부분(16)의 대응하는 쌍의 삽입 구멍(4e)에 삽입되고, 자신의 탄성 복원력에 의해서 덮개 부분(16)에 장착되어 있다. 그리고, 고정 스프링(5)은 도시와 같이 덮개 부분(16)의 내측면과의 사이에 케이블(3)을 끼워 넣는 것으로 케이블(3)을 고정하고 있다. 또, 한 쌍의 산부(5b)를 삽입하는 대상의 삽입 구멍(4e)의 쌍을 바꾸는 것으로, 고정 스프링(5)과 덮개 부분(16)의 내측면과의 사이에 발생하는 공간의 크기를 변경할 수 있다.The fixed
이상과 같은 본 실시형태 2에 관한 엘리베이터의 케이블 처리장치에 의해서도, 상기 실시형태 1과 마찬가지로, 승강로 내를 연장하는 케이블을 소정의 대상에 용이하게 장착할 수 있다. 또한, 본 실시형태 2에서는, 고정 스프링의 탄성 복원력을 이용하여, 고정 스프링 자신의 유지와, 케이블의 고정을 행할 수 있어, 부품 점수의 삭감과 고정 스프링의 착탈 작업의 용이화를 실현할 수 있다. 또한, 고정 스프링은 탄성 복원력을 이용해서 장착되기 때문에, 장착 위치의 변경이 용이하다. 또한, 고정 스프링에는 고정시에 변형과 복원력 발생이 기대할 수 있어, 하나의 고정 스프링을 가지고, 다른 굵기의 케이블의 고정에 대응할 수 있으며, 나아가서는 준비해야 할 고정 스프링의 종류의 삭감으로도 이어진다.In the elevator cable processing apparatus according to the second embodiment as described above, similarly to the first embodiment, the cable extending in the hoistway can be easily attached to a predetermined object. In the second embodiment, by using the elastic restoring force of the fixing spring, the fixing spring itself can be held and the cable can be fixed, so that the number of parts can be reduced and the fixing spring can be easily removed. In addition, since the fixed spring is mounted using elastic restoring force, it is easy to change the mounting position. In addition, the fixing spring can be expected to generate deformation and restoring force at the time of fixing, having one fixing spring, can cope with the fixing of the cable of different thickness, and also leads to the reduction of the type of fixing spring to be prepared.
실시형태 3.Embodiment 3:
다음으로, 도 7에 근거하여, 실시형태 3에 관한 엘리베이터의 케이블 처리장치에 대해서 설명한다. 도 7의 (a), (b) 및 (c)는 각각, 실시형태 3에 관한 엘리베이터의 케이블 처리장치에 대해서, 승강로 측, 측방 및 아래쪽으로부터 본 상태를 나타내는 도면이다.Next, based on FIG. 7, the cable processing apparatus of the elevator which concerns on
본 실시형태 3도, 실시형태 1에 있어서, 고정도구에 관계하는 구성을 개선한 것으로, 다른 부분에 대해서는 실시형태 1과 동일한 구성으로 해도 되는 것으로 한다. 케이블 처리장치(30)는 고정 선부재(6)를 구비하고 있다. 고정 선부재(6)는, 예를 들면 바인드(bind)선 등의 끈 모양의 부재이며, 배선용 커버(4)에서의 덮개 부분(16)에 감겨진다. 덮개 부분(16)의 양측부에는 관통 구멍(4f)이 형성되어 있다. 또, 덮개 부분(16)의 돌출과 관련되는 꼭대기부에는 장공(長孔)(4g)이 마련되어 있다.In the third embodiment, the configuration related to the fixing tool is also improved in the first embodiment, and other portions may be the same as the first embodiment. The
고정 선부재(6)는 좌우의 관통 구멍(4f)을 교호로 삽입 통과되는 것에 의해서, 덮개 부분(16)의 내외를 꿰매도록 연장한다. 이것에 의해, 고정 선부재(6)는, 도시되는 바와 같이, 덮개 부분(16)의 내측면과의 사이에서 케이블(3)을 끼워 넣는 것으로 케이블(3)을 고정하고 있다. 일례로서, 고정 선부재(6)는 어느 정도 충분한 길이를 미리 준비해 두고, 고정 대상의 케이블(3)의 굵기에 따른 길이 분(分)을 이용하여 감기를 행하여, 남은 길이 분은 감기 후에 잘라내도록 해도 된다.The fixed
또, 고정 선부재(6)를 덮개 부분(16)에 감았을 때, 고정 선부재(6)를 장공(4g)에 떨어져 들어가게 한다. 그것에 의해, 고정 선부재(6)는 장공(4g)에 걸려, 덮개 부분(16)에 대한 고정 선부재(6)의 위치 어긋남을 방지할 수 있다.In addition, when the
이상과 같은 본 실시형태 3에 관한 엘리베이터의 케이블 처리장치에 의해서도, 상기 실시형태 1과 마찬가지로, 승강로 내를 연장하는 케이블을 소정의 대상에 용이하게 장착할 수 있다. 또한, 본 실시형태 3에서는, 고정 선부재에서의 이용 길이 분이 상황에 따라 다를 뿐으로, 부재로서는 충분히 긴 끈 모양인 것을 단지 준비해 두기만 하면 되기 때문에, 고정 선부재로서 많은 베리에이션을 준비하지 않아도, 광범위한 케이블 굵기에 걸쳐서 케이블의 고정에 대응할 수 있다.In the elevator cable processing apparatus according to the third embodiment as described above, similarly to the first embodiment, the cable extending in the hoistway can be easily attached to a predetermined object. Moreover, in
이상, 바람직한 실시형태를 참조하여 본 발명의 내용을 구체적으로 설명했지만, 본 발명의 기본적 기술 사상 및 교시에 근거하여, 당업자라면, 여러 가지의 개변 형태를 채득(採得)할 수 있는 것은 자명하다.As mentioned above, although the content of this invention was concretely demonstrated with reference to preferable embodiment, it is clear that those skilled in the art can acquire various modified forms based on the basic technical idea and teaching of this invention. .
예를 들면, 상술한 실시형태는, 승강장 측의 조작표시기구에 대한 케이블의 접속을 위해서 케이블 처리장치를 마련하는 형태로서 설명한 것이지만, 본 발명의 엘리베이터의 케이블 처리장치는 엘리베이터칸 측의 조작표시기구에 대한 케이블의 접속을 위해서 이용하는 것도 가능하다.For example, the above-described embodiment has been described as a form in which a cable processing apparatus is provided for connection of a cable to an operation display mechanism on the landing side, but the cable processing apparatus of the elevator of the present invention is the operation display mechanism on the side of the car. It is also possible to use for the connection of the cable to.
또, 본 발명에서 취급하는 케이블은 선상(線狀) 부재이면 특별히 한정되지 않고, 전기적 신호의 전달이나 급전의 용도에 이용하는 것에 한정되지 않는다. 따라서, 본 발명은, 다른 것을 들면, 광섬유를 포함하는 케이블이나, 동력 전달용의 와이어 등 대해 적용하는 것도 가능하다.Moreover, if the cable handled by this invention is a linear member, it will not specifically limit, It is not limited to what is used for the use of electric signal transmission and power supply. Therefore, the present invention can also be applied to cables including optical fibers, wires for power transmission, and the like.
또, 승강장 측, 엘리베이터칸 측을 불문하고, 본 발명은 조작표시기구 이외의 기기에 선상 부재를 접속하는 경우를 대상으로 넓게 적용할 수 있다.Regardless of the landing side or the car side, the present invention can be widely applied to a case where the linear member is connected to a device other than the operation display mechanism.
또, 상기 실시형태에서의 나사는 돌기부 또는 돌기부를 구성하는 체결수단으로서의 일례이며, 본 발명의 돌기부는 나사 이외의 것을 이용해도 된다. 예를 들면, 가고정을 제공하는 돌기부를 지지부재와 일체 성형 또는 접착 등 해 두고, 본고정은 가고정용의 돌기부와는 다른 나사 등의 수단을 준비해 두어도 된다.In addition, the screw in the said embodiment is an example as a fastening means which comprises a protrusion part or a protrusion part, and the protrusion part of this invention may use other than a screw. For example, the protruding portion providing the temporary fixation may be integrally molded or adhered to the support member, or the fixing may be provided with a screw or the like which is different from the protruding portion for the temporary fixation.
또, 본 발명은 돌기부를 베이스 측에 마련하고, 고정구멍을 지지부재 측에 마련하여 실시할 수도 있다. 또한, 돌기부 및 고정구멍의 수나 그 형성 위치는 적절히 개량 변경하는 것이 가능하다.Moreover, this invention can also be implemented by providing a projection part in the base side, and providing a fixing hole in the support member side. In addition, the number of the projections and the fixing holes and the formation positions thereof can be appropriately improved and changed.
1f 케이스(베이스), 1g 배선구멍(연락창),
3 케이블, 4 배선용 커버(지지부재),
4a 나사(돌기부), 4c 케이블 고정 클램프,
5 고정 스프링, 6 고정 선부재,
10, 20, 30 케이블 처리장치, 11 나사 축부(근원 부분),
12 나사 머리 부분(확경 부분), 13 고정구멍,
14 통과 부분, 15 유지 부분,
16 덮개 부분.1f case (base), 1g wiring hole (contact window),
3 cables, 4 wiring covers (support members),
4a screw (projection), 4c cable fixing clamp,
5 fixed springs, 6 fixed wire members,
10, 20, 30 cable handling unit, 11 screw shaft (source),
12 screw heads (diameter), 13 fixing holes,
14 passing parts, 15 holding parts,
16 Cover parts.
Claims (8)
상기 지지부재가 고정되는 베이스를 구비하고,
상기 지지부재 및 상기 베이스의 한쪽에는 근원(根元) 부분의 지름보다도 큰 지름을 가지는 확경(擴徑) 부분을 포함한 돌기부가 적어도 하나 마련되어 있고,
상기 지지부재 및 상기 베이스의 다른 쪽에는 상기 돌기부가 삽입 통과되는 고정구멍이 이 돌기부에 대응하여 마련되어 있으며,
상기 고정구멍은 통과 부분과 유지 부분을 가지고 있고,
상기 통과 부분은 상기 돌기부의 상기 확경 부분이 관통할 수 있는 크기를 가지고 있으며,
상기 유지 부분은 상기 돌기부의 상기 확경 부분이 통과할 수 없고 또한 상기 근원 부분이 관통할 수 있는 크기를 가지고 있는 엘리베이터의 케이블 처리장치.A support member for supporting a cable extending in the hoistway,
It has a base to which the support member is fixed,
At least one projection portion including an enlarged diameter portion having a diameter larger than the diameter of the root portion is provided on one of the support member and the base,
The other side of the support member and the base is provided with a fixing hole through which the projection is inserted corresponding to the projection,
The fixing hole has a passage portion and a holding portion,
The passage portion has a size that can penetrate the enlarged diameter portion of the protrusion,
And the retaining portion is sized such that the diameter-expanded portion of the protrusion cannot pass and the source portion can penetrate.
상기 돌기부는 상기 지지부재에서의 상기 베이스와 대면하는 부분에 이 베이스 측으로부터 나사끼움된 체결 부재이며,
상기 근원 부분은 상기 체결 부재의 나사 축부이고, 또한, 상기 확경 부분은 상기 체결 부재의 나사 두부(頭部)인 엘리베이터의 케이블 처리장치.The method according to claim 1,
The protruding portion is a fastening member screwed from the base side to a portion of the supporting member that faces the base,
The said base part is a screw shaft part of the said fastening member, and the said diameter expansion part is a screw head of the said fastening member.
상기 베이스에는 상기 케이블을 위한 연락창이 형성되어 있고,
상기 고정구멍의 상기 통과 부분은 상기 연락창으로 이루어지는 엘리베이터의 케이블 처리장치.The method according to claim 1 or 2,
The base is formed with a contact window for the cable,
The cable processing apparatus of the elevator which the said passage part of the said fixing hole consists of the said communication window.
상기 돌기부 및 대응하는 상기 고정구멍은 각각 복수 마련되어 있는 엘리베이터의 케이블 처리장치.4. The method according to any one of claims 1 to 3,
The cable processing apparatus of the elevator provided with the said projection part and the said corresponding fixing hole respectively, respectively.
상기 지지부재에는 하향(下向)으로 개구한 덮개 부분을 가지고 있고,
상기 케이블은 상기 덮개 부분의 내측에 배치되어 이 덮개 부분에 의해서 상하방향으로 안내되는 엘리베이터의 케이블 처리장치.5. The method according to any one of claims 1 to 4,
The support member has a cover portion opened downwards,
The cable processing apparatus of the elevator arrange | positioned inside the said cover part and guided up and down by this cover part.
상기 지지부재에서의 외면으로서, 상기 덮개 부분의 아래쪽의 부분에는 상기 고정 클램프가 장착되어 있고,
상기 케이블은 상기 고정 클램프와 상기 지지부재의 외면과의 사이에 끼워져 고정되어 있는 엘리베이터의 케이블 처리장치.6. The method according to any one of claims 1 to 5,
As the outer surface of the supporting member, the fixing clamp is attached to a portion below the lid portion,
And the cable is fitted between the fixing clamp and the outer surface of the support member and is fixed to the elevator cable processing apparatus.
상기 지지부재에서의 상기 덮개 부분의 내측에는 고정 스프링이 장착되어 있고,
상기 고정 스프링은 자신의 탄성 복원력에 의해서 상기 덮개 부분에 장착됨과 아울러, 이 덮개 부분의 내측면과의 사이에서 상기 케이블을 끼워 넣는 것으로 이 케이블을 고정하고 있는 엘리베이터의 케이블 처리장치.6. The method according to any one of claims 1 to 5,
A fixing spring is mounted inside the lid portion of the supporting member,
The fixing spring is mounted to the cover portion by its elastic restoring force, and the cable handling device of the elevator which fixes the cable by inserting the cable between the inner surface of the cover portion.
상기 지지부재에서의 상기 덮개 부분에는 고정 선부재가 감겨져 있고,
상기 고정 선부재는 상기 덮개 부분의 내외를 꿰매도록 연장하며, 이 덮개 부분의 내측면과의 사이에서 상기 케이블을 끼워 넣는 것으로 이 케이블을 고정하고 있는 엘리베이터의 케이블 처리장치.6. The method according to any one of claims 1 to 5,
A fixed wire member is wound around the cover portion of the support member,
The fixing wire member extends to sew the inside and the outside of the cover portion, and the cable processing apparatus of the elevator fixing the cable by sandwiching the cable between the inner surface of the cover portion.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2010/073159 WO2012086030A1 (en) | 2010-12-22 | 2010-12-22 | Cable treatment device for elevator |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20130117835A true KR20130117835A (en) | 2013-10-28 |
KR101532853B1 KR101532853B1 (en) | 2015-06-30 |
Family
ID=46313334
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020137018906A KR101532853B1 (en) | 2010-12-22 | 2010-12-22 | Cable treatment device for elevator |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP2657172B1 (en) |
JP (1) | JP5550745B2 (en) |
KR (1) | KR101532853B1 (en) |
CN (1) | CN103221328B (en) |
WO (1) | WO2012086030A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE112018007044T5 (en) * | 2018-02-09 | 2020-10-22 | Mitsubishi Electric Corporation | Elevator control panel |
JP6656489B1 (en) * | 2019-04-10 | 2020-03-04 | 三菱電機株式会社 | Power converter |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58136215A (en) * | 1982-02-05 | 1983-08-13 | 株式会社東芝 | Electric wiring device |
JPS60177176U (en) * | 1984-04-27 | 1985-11-25 | 三菱電機株式会社 | Elevator cable holding device |
JPH0342481A (en) * | 1989-07-10 | 1991-02-22 | Hitachi Ltd | Display device for elevator |
JPH05306080A (en) * | 1992-05-06 | 1993-11-19 | Mitsubishi Electric Corp | Cable connecting device for elevator |
JP5114909B2 (en) | 2006-09-29 | 2013-01-09 | フジテック株式会社 | Elevator electrical wiring device |
JP4738466B2 (en) * | 2008-10-15 | 2011-08-03 | 東芝エレベータ株式会社 | Elevator equipment |
JP4707747B2 (en) * | 2009-03-09 | 2011-06-22 | 東芝エレベータ株式会社 | Elevator hoistway wiring method and apparatus |
-
2010
- 2010-12-22 EP EP10860917.3A patent/EP2657172B1/en active Active
- 2010-12-22 CN CN201080070295.XA patent/CN103221328B/en active Active
- 2010-12-22 KR KR1020137018906A patent/KR101532853B1/en active IP Right Grant
- 2010-12-22 WO PCT/JP2010/073159 patent/WO2012086030A1/en active Application Filing
- 2010-12-22 JP JP2012549529A patent/JP5550745B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
KR101532853B1 (en) | 2015-06-30 |
EP2657172B1 (en) | 2019-05-22 |
CN103221328B (en) | 2016-03-23 |
EP2657172A1 (en) | 2013-10-30 |
JPWO2012086030A1 (en) | 2014-05-22 |
JP5550745B2 (en) | 2014-07-16 |
EP2657172A4 (en) | 2017-09-27 |
WO2012086030A1 (en) | 2012-06-28 |
CN103221328A (en) | 2013-07-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20130117835A (en) | Cable treatment device for elevator | |
JP5653967B2 (en) | Cable holder | |
KR200393275Y1 (en) | wire harness fixing clip structure | |
KR101241104B1 (en) | Hanger for communication cable arrangement | |
KR200388148Y1 (en) | Wire harness fix clip | |
KR101792666B1 (en) | Wire fixing unit and wire follower having the same | |
JP4437755B2 (en) | Cable holding device and electronic / electrical device | |
JP6796283B2 (en) | How to remove the transmission device, cable guide set, and board | |
JP3847042B2 (en) | Fiber optic cable clamping device | |
KR101400547B1 (en) | Integrated band cable | |
KR200207471Y1 (en) | A tension cable hanger for photo communication cable | |
JP4787714B2 (en) | Optical cable closure | |
JP4458539B2 (en) | Optical cable connector | |
JP2009128471A (en) | Connector for optical drop cable | |
JP2005276738A (en) | Wire harness assembling jig | |
JP2007178777A (en) | Splice box | |
JPH0540482Y2 (en) | ||
JP3933521B2 (en) | Flat harness assembly method and routing jig used therefor | |
JP3001056U (en) | Printed circuit board with cable fixture | |
JP2005253192A (en) | Wiring duct | |
JP4215033B2 (en) | Electronic instrument signal cable fixing structure | |
JPS6348158Y2 (en) | ||
JP5535001B2 (en) | Fixing bracket for plug-in equipment | |
JP2006087234A (en) | Cable bracket mounting device for control center | |
JP2001013329A (en) | Anchoring member for optical cable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20180530 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20190530 Year of fee payment: 5 |