KR20130082538A - Cutting process management method and system - Google Patents

Cutting process management method and system Download PDF

Info

Publication number
KR20130082538A
KR20130082538A KR1020110130679A KR20110130679A KR20130082538A KR 20130082538 A KR20130082538 A KR 20130082538A KR 1020110130679 A KR1020110130679 A KR 1020110130679A KR 20110130679 A KR20110130679 A KR 20110130679A KR 20130082538 A KR20130082538 A KR 20130082538A
Authority
KR
South Korea
Prior art keywords
cutting
cutting process
schedule
date
management server
Prior art date
Application number
KR1020110130679A
Other languages
Korean (ko)
Inventor
허호훈
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020110130679A priority Critical patent/KR20130082538A/en
Publication of KR20130082538A publication Critical patent/KR20130082538A/en

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Manufacturing & Machinery (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Automation & Control Theory (AREA)
  • Educational Administration (AREA)
  • General Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

PURPOSE: A cutting process management system and a method thereof are provided to confirm a place of a member in a shipbuilding process and a progress situation of after work of the member. CONSTITUTION: A cutting process management server (110) receives registration for a cutting process schedule from a manager by executing a cutting order for a cutting member. The cutting process management server shares the cutting process schedule with a manager, an interested person, and a cutting company by reflecting a real cutting state of the cutting member, which is transmitted from a cutting company terminal (130), on the cutting process schedule. The cutting company terminal reflects change information, which is received from the cutting process management server, on the cutting process schedule. [Reference numerals] (110) Cutting process management server; (120) Communication network; (130) Cutting company terminal

Description

Cutting process management method and system

The present invention allows the ordering company or the cutting company to easily grasp the progress of the cutting process of the steel member after the commissioner asks the cutting company to cut the steel member so that it can be adjusted so that the construction schedule of the ship is not disrupted. It relates to a cutting process control system and method.

Generally, ships are special products that are manufactured to meet customer preferences through thorough order production, unlike automobiles and home appliances. Therefore, it is common for shipbuilding contracts to be concluded through consultations between owners and shipyards, negotiating all contents including linearity, delivery date and ship prices.

Once the construction of the ship is confirmed, the basic design and hull structure drawing of hull diagram, general layout, cross section, steel / engine layout based on basic data such as cargo, passenger loading capacity, ship speed, hull structure, navigation capability and habitability The detailed design includes the deck design and the deck design.

For the construction of ships, members of various types and quantities are used. Such a member arrives at the ordering place through the steps of ordering, manufacturing and feeding. Such a member may be used as it is, but may be cut and used in the field for transportation management and the like. The member to be cut and used as described above is called a mother member and the cut member is called a magnetic member.

On the other hand, the inserted member is moved to the required position and placed in a state, when the required time comes to use it directly or after adding a process such as cutting.

However, in the past, it was not possible to manage in which place the placed member is placed, and the stacked member needs post-work such as cutting. Since the members are not effectively managed, such problems as the management of the members need to be taken out and checked, and the members that need post-work need to be reselected. There is a problem.

Republic of Korea Patent Publication No. 10-2009-0105336 (Published: October 07, 2009)

An object of the present invention for solving the above-described problems, the shipbuilder or the cutting company easily grasp the progress of the cutting process of the steel member in the ordering company or the cutting company after requesting the cutting company to cut the steel member construction of the ship It is to provide a cutting process management system and method for adjusting the cutting schedule so that the schedule does not occur.

According to an aspect of the present invention for achieving the above object, by executing a cutting order for the cutting member, the cutting process schedule including the type and line, area (LOT), quantity of the cutting member from the manager is registered, Subsequently, the cutting process management server receives the actual cutting state of the cutting member from the cutting company terminal and reflects the cutting process schedule to be shared by the manager, the related person, and the cutting company; And connecting to the cutting process management server through a network, inputting the actual cutting state of the cutting member including the type and line, area, lot, start date, completion date, and quantity of the cutting members, and cutting process management. There is provided a cutting process management system including a cutting company terminal for receiving and reflecting change information of a cutting process schedule from a server.

On the other hand, according to another aspect of the present invention for achieving the above object, a communication unit for communicating with a cutting company terminal through a communication network; A cutting process registration unit that receives information on a cutting process schedule including a type, a line, an area (LOT), and a quantity of cutting members from a manager, and registers a cutting process; A cutting process management unit which receives the actual cutting state of the cutting member from the cutting company terminal and reflects it in the cutting process schedule so as to be shared by a manager, a related person, and a cutting company; A cutting process inquiry unit which provides a cutting process progress status with respect to the cutting process schedule according to a search condition; And information about the registered cutting process schedule, information about the actual cutting state of the cutting member, including the type and line of the cutting member, the line, the area (LOT), the start date, the completion date, and the quantity, and the actual cutting state of the cutting member. Cutting process management server is provided that includes a cutting process database that stores information about the cutting process schedule reflected.

In addition, the cutting process management unit, after the information about the cutting process schedule is registered, when the site request date is input from the manager to the change target, and changes the field request date to the cutting process schedule, the change to the cutting process schedule This can be communicated to the cutting company terminal.

In addition, the cutting process management unit, the yard, steel grade, line, LOT, shipping available date, cutting start date, uncut quantity, waiting for shipment, unloaded quantity, block number, minor symbols, absent symbols, P from the cutting company terminal (Steel) / S (shape steel) can be reflected in the cutting process schedule to receive the actual cutting state of the cutting member, including the classification, the number of small nailing, the small department code, the small STAGE, the plate-based starting date.

The cutting process inquiry unit is an item for inquiring a cutting process based on an inquiry item including a business unit, a ship / LOT, a P / S classification, a cutting thread, a processing start date, a start date of a counterfeit, a DATA standard, and an inquiry target material. Based on the search conditions, the cutting process progress can be retrieved and the results provided.

On the other hand, according to another aspect of the present invention for achieving the above object, (a) a cutting company terminal accessing the cutting process management server through a communication network; (b) the cutting process management server providing a cutting process management screen to the cutting company terminal; (c) inputting, by the cutting company terminal, the actual cutting progress state of the cutting member, including the type and line of the cutting member, line, area (LOT), start date, completion date, and quantity; And (d) cutting process management server reflecting the actual cutting progress state in the cutting process schedule and storing or displaying on the screen and managing the cutting process management.

On the other hand, according to another aspect of the present invention for achieving the above object, as a cutting process management method of the management server that communicates through the communication network with the cutting company terminal, (a) the type and line, area ( LOT), receiving information on a cutting process schedule including a quantity and registering the cutting process; (b) receiving the actual cutting progress state of the cutting member from the cutting company terminal; (c) managing the cutting process by reflecting the actual cutting progress in a cutting process schedule so as to be shared by a manager, a related person, and a cutting company; (d) receiving a request for retrieving the cutting process progress status of the cutting process schedule from the cutting company terminal; And (e) the cutting process based on the information on the registered cutting process schedule, and the information on the actual cutting state of the cutting member, including the type and line of the cutting member, the line, the area (LOT), the start date, the completion date, and the quantity. There is provided a cutting process management method of the management server comprising the step of providing the cutting process progress for the schedule to the cutting company terminal.

In addition, in the step (a), after the information on the cutting process schedule is registered, the site request date is changed to the cutting process schedule when the site request date is input from the manager as a change target, and the cutting process schedule is changed to the cutting process schedule. It will notify the cutting company terminal of the change.

In addition, the step (c), the yard, steel grade, line, LOT, shipping available date, cutting commencement date, uncut quantity, shipment waiting quantity, unreleased quantity, block number, minor symbol, absent symbol, The actual cutting progress of the cutting member, including the P (steel) / S (shape steel) classification, the small welding date, the small department code, the small STAGE, the plate-based starting date is received and reflected in the cutting process schedule.

In addition, the step (e) is an item for inquiring the cutting process to the inquiry items including division, line / LOT, P / S classification, cutting company, processing start date, start date of construction, DATA standard, the subject material for inquiry Based on the search conditions, the progress of the cutting process is searched and the result is provided.

As described above, according to the present invention, it is possible to confirm to what place the member introduced in the shipbuilding drying process is placed, and how much post-work such as cutting the stacked member is in progress.

In addition, after executing the cutting order of the steel member, by changing and registering the cutting process can be immediately confirmed by the company to change the cutting process can be processed.

Therefore, the orderer does not have to visit the cutting process of the steel member on-site and check it manually, and solves the trouble of having to re-order the cutting process manually by the cutting company. Can be.

1 is a configuration diagram schematically showing the overall configuration of a cutting process management system according to an embodiment of the present invention.
2 is a block diagram showing a functional block of the cutting process management server according to an embodiment of the present invention.
3 is a view schematically showing an overall operation of the cutting process management method according to an embodiment of the present invention.
4 is a flowchart illustrating a cutting process management method of a cutting process management server according to an exemplary embodiment of the present invention.
5 is a diagram illustrating an example of registering a cutting process by receiving information on a cutting process schedule according to an exemplary embodiment of the present invention.
FIG. 6 is a diagram illustrating an example of changing and registering a site request date in a cutting process schedule according to an exemplary embodiment of the present invention. FIG.
7 is a view showing an example of receiving the actual cutting progress state of the cutting member from the cutting company according to an embodiment of the present invention.
8 is a diagram illustrating an example of inputting a search condition for retrieving a cutting process progress status with respect to a cutting process schedule according to an exemplary embodiment of the present invention.
9 is a view showing an example of providing a detailed status of the cutting process progress status with respect to the cutting process schedule retrieved according to an embodiment of the present invention.
10 is a diagram illustrating an example of providing a cutting process progress status in an Excel file regarding a cutting process schedule according to an exemplary embodiment of the present invention.
11 is a view showing an example of providing the cutting process progress status to the cutting company in accordance with an embodiment of the present invention.

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Reference will now be made in detail to the preferred embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the like elements throughout. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

1 is a configuration diagram schematically showing the overall configuration of a cutting process management system according to an embodiment of the present invention.

Referring to FIG. 1, a cutting process management system 100 according to an exemplary embodiment of the present invention includes a cutting process management server 110, a network 120, a cutting company terminal 130, and the like.

The cutting process management server 110 executes a cutting order for the cutting members, and receives a cutting process schedule including the type, line, area, and lot of the cutting members from the manager, and thereafter, the cutting company terminal 130. It receives the actual cutting status of the cutting member from the cutting process and reflects it in the cutting process schedule so that it can be shared by managers, stakeholders, and cutting companies.

The communication network 120 provides a connection path for the cutting company terminal 130 to access the cutting process management server 110, and includes a wired communication network such as the Internet or PSTN, and includes a mobile communication network such as WCDMA or HSPA. And include local area networks such as Zigbee, Bluetooth, and Wi-Fi.

Cutting company terminal 130 is connected to the cutting process management server 110 through the communication network 120, the actual cutting of the cutting member including the type and line, area (LOT), start date, completion date, quantity of the cutting member Input the state, and receives and reflects the change information of the cutting process schedule from the cutting process management server 110.

Hereinafter, a detailed configuration of the cutting process management server according to an embodiment of the present invention and its operation will be described.

2 is a block diagram showing a functional block of the cutting process management server according to an embodiment of the present invention.

2, the cutting process management server 110 according to an embodiment of the present invention, the communication unit 210, cutting process registration unit 220, cutting process management unit 230, cutting process inquiry unit 240 and cutting Process database 250 and the like.

The communication unit 210 communicates with the cutting company terminal 130 through the communication network 120.

The cutting process registration unit 220 receives information about a cutting process schedule including a type, a line, an area (LOT), and a quantity of cutting members from a manager and registers a cutting process.

The cutting process management unit 230 receives the actual cutting state of the cutting member from the cutting company terminal 130 and reflects it in the cutting process schedule so that the manager and the related parties and the cutting company can be shared.

In addition, the cutting process management unit 230, after the information about the cutting process schedule is registered, when the site request date is input from the manager to the change target, the cutting process management unit 230 changes the field request date to the cutting process schedule, and changes to the cutting process schedule The presence of this can be communicated to the cutting company terminal 130.

In addition, the cutting process management unit 230, the yard, steel grade, line, LOT, shipping date, cutting start date, uncut quantity, shipment waiting quantity, unloaded quantity, block number, minor code, The actual cutting state of the cutting member, including a member symbol, P (steel) / S (shape steel) classification, a small fitting date, a small department code, a small STAGE, and a plate type starting date can be received and reflected in a cutting process schedule.

The cutting process inquiry unit 240 provides a cutting process progress status with respect to a cutting process schedule according to a search condition.

In addition, the cutting process inquiry unit 240 is an item for inquiring the cutting process, including a division, line / LOT, P / S classification, cutting yarn, processing start date, the start date of creation, DATA standard, inquiry target material Based on the item, the cutting process progress is searched according to the search condition and the result is provided.

The cutting process database 250 includes information on the registered cutting process schedule, information on the actual cutting state of the cutting member, including the type and line of the cutting member, the line, the area LOT, the start date, the completion date, and the quantity, and the cutting. Information on the cutting process schedule reflecting the actual cutting state of the member is stored.

3 is a view schematically showing an overall operation of the cutting process management method according to an embodiment of the present invention.

3, the cutting company terminal 130 according to an embodiment of the present invention is connected to the cutting process management server 110 through the communication network 120 (S310).

Subsequently, the cutting process management server 110 provides a cutting process management screen to the cutting company terminal 130 (S320).

Subsequently, the cutting company terminal 130 inputs the actual cutting progress state of the cutting member, including the type of cutting member and the line, the area LOT, the start date, the completion date, and the quantity (S330).

Accordingly, the cutting process management server 110 reflects the actual cutting progress state in the cutting process schedule and stores or manages the displayed cutting on the screen (S340).

4 is a flowchart illustrating a cutting process management method of a cutting process management server according to an exemplary embodiment of the present invention.

Referring to Figure 4, the cutting process management server 110 according to an embodiment of the present invention, as shown in Figure 5 from the user or manager cutting the cutting member including the type and line, area (LOT), quantity The cutting schedule is registered by receiving information on the process schedule (S410). 5 is a diagram illustrating an example of registering a cutting process by receiving information on a cutting process schedule according to an exemplary embodiment of the present invention. That is, the cutting process management server 110 provides a cutting process management screen as shown in FIG. 5 on the screen when the cutting process management system is executed. Provides a screen for defining field values for planning and work units. In Fig. 5, serial numbers are sequentially given in order, such as "1, 2, 3 ...", yards are given, for example, "ZPDCT4000_ZYARD", and the steel grade selects steel plate (P) or shaped steel (S). The route shall be based on the date of processing start (ZPDCT4000_SHPNO) or the date of small start date (ZPSCT406_PSPID), and the LOT number shall be based on the date of processing start (ZPDCT4000_LOTNO) or the date of small start date (ZPSCT406_ZZWKOBJ). In addition, the field values for commodities include steel and unloaded quantities, unloaded quantities include yards and direct sales, and unloaded quantities include customers such as foreign capital, country of origin, POSCO, Hyundai, and others. In addition, the field values related to the cutting member progressing contents include the uncut quantity and the shipment waiting quantity as the uncut cutting quantity, the uncut weight and the waiting weight as the cutting uncut weight, Progress schedules, and the like. The cutting progress schedule includes a cutting start date, a cutting completion date, and a shipping completion date. In addition, the field values for the mid-schedule plan and the work department include the PP start date, the start date of the countermeasure, the start date of assembly, the start date of assembly, and the cut time, the step STAGE, and the assembly STAGE.

At this time, the cutting process management server 110, after the information on the cutting process schedule is registered, when the site request date as a change target from the user or manager as shown in Figure 6, the site request to the cutting process schedule The job is changed and notified to the cutting company terminal 130 of the change in the cutting process schedule. FIG. 6 is a diagram illustrating an example of changing and registering a site request date in a cutting process schedule according to an exemplary embodiment of the present invention. FIG. Therefore, the cutting company can check the changed site requirements date and change the process schedule accordingly.

Subsequently, the cutting process management server 110 receives the actual cutting progress state of the cutting member from the cutting company terminal 130 as shown in FIG. 7 (S420). That is, the cutting company terminal 130 may query and select the cutting process from the cutting process schedule by the operator as shown in FIG. 7, and then select and input a shipment available date, cutting start date, etc. collectively. 7 is a view showing an example of receiving the actual cutting progress state of the cutting member from the cutting company according to an embodiment of the present invention.

Subsequently, the cutting process management server 110 reflects the actual cutting progress state in the cutting process schedule and manages it to be shared by the manager, the related person, and the cutting company (S430).

In addition, the cutting process management server 110 is a yard, steel grade, line, LOT, shipping available date, cutting start date, uncut quantity, waiting for shipment, unloaded quantity, block number, minor code, absent symbols, The actual cutting progress of the cutting member including P (steel) / S (section steel) classification, the date of the small plate, the department code, the small STAGE, the date of the plate system is received and reflected in the cutting process schedule.

Subsequently, when the cutting company terminal 130 receives a request for retrieving the cutting process progress status for the cutting process schedule, as shown in FIG. 8 (S440-Yes), the cutting process management server 110 receives the registered cutting process schedule. Cutting based on the cutting process schedule as shown in FIG. 9 based on the information relating to the cutting member and the actual cutting state of the cutting member, including the type and line, area, lot, start date, completion date and quantity of the cutting member. Search the process progress (S450).

Then, the cutting process management server 110 provides the cutting process progress status for the retrieved cutting process schedule to the cutting company terminal 130 (S460).

That is, the cutting process management server 110 is an item for inquiring the cutting process, including the division, line / LOT, P / S classification, cutting yarn, processing start date, the start date of creation, DATA standard, inquiry target material Based on the items, the progress of the cutting process is searched according to the search conditions as shown in FIG. 8, and the results are provided as shown in FIG. 9. 8 is a diagram illustrating an example of inputting a search condition for retrieving a cutting process progress status regarding a cutting process schedule according to an embodiment of the present invention, and FIG. 9 illustrates a cutting process schedule retrieved according to an embodiment of the present invention. It is a figure which shows the example which provides the detailed status of the cutting process progress. For example, the cutting process management server 110 shows the detailed status of the steel when double-clicking the numeric field in the progress status for each LOT of the steel member, or shows the detailed status of the member by double-clicking the numeric field.

In addition, the cutting process management server 110 may provide the cutting process progress status with respect to the cutting process schedule as Excel SHEET or Excel file as shown in FIG. 10 at the request of the cutting company. 10 is a diagram illustrating an example of providing a cutting process progress status in an Excel file regarding a cutting process schedule according to an exemplary embodiment of the present invention. Therefore, as shown in FIG. 10, a user, an administrator, or a cutting company can open and check the cutting member management status for each LOT in an Excel form.

Meanwhile, the cutting process management server 110 may provide a drill down function as shown in FIG. 11 when providing the cutting process progress state regarding the cutting process schedule to the cutting company terminal 130. 11 is a view showing an example of providing the cutting process progress status to the cutting company in accordance with an embodiment of the present invention. As shown in FIG. 11, when the cutting process management server 110 provides the cutting member progress, for example, when cutting down the field value of the unloaded quantity from the cut unloaded quantity, the details of the ZPDCO5119 are displayed on the current screen. It is provided as a pop-up screen on the top of the screen. If you drill down on the quantity of unloaded parts, you can see the details of the ZPDCO5119_absence quantity-ZPDCO5119_cutting discharged quantity greater than zero.

As described above, according to the present invention, after the orderer asks the cutting company to cut the steel member, the ordering company or the cutting company easily grasps the progress of the cutting process of the steel member, and thus, the ship's construction work schedule is interrupted. Cutting process management systems and methods can be realized to enable the cutting schedule to be adjusted so as not to occur.

It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the following claims and their equivalents. Only. The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.

The present invention can easily grasp the progress of the cutting process of the steel member in the ordering company or cutting company after the ordering company asks the cutting company to cut the steel member so that the cutting schedule does not occur in the drying operation schedule of the ship It can be applied to a cutting process control system and method that allows to adjust the temperature.

100: cutting process management system
110: cutting process management server
120: communication network
130: cutting company terminal
Communication unit 210, cutting process registration unit 220, cutting process management unit 230, cutting process inquiry unit 240 and cutting process database 250

Claims (10)

By executing the cutting order for the cutting members, the cutting process schedule including the type, line, area, and quantity of the cutting members is registered by the manager, and the cutting member receives the actual cutting status of the cutting members from the cutting company's terminal. Cutting process management server that reflects the process schedule and manages to be shared by managers, stakeholders and cutting companies; And
Connect to the cutting process management server through a network, input the actual cutting state of the cutting member including the type and line, area (LOT), start date, completion date, quantity of the cutting member, cutting process management server Cutting company terminal for receiving and reflecting the change information of the cutting process schedule from the;
Cutting process management system comprising a.
Communication unit for communicating with the cutting company terminal through a communication network;
A cutting process registration unit that receives information on a cutting process schedule including a type, a line, an area (LOT), and a quantity of cutting members from a manager, and registers a cutting process;
A cutting process management unit which receives the actual cutting state of the cutting member from the cutting company terminal and reflects it in the cutting process schedule so as to be shared by a manager, a related person, and a cutting company;
A cutting process inquiry unit which provides a cutting process progress status with respect to the cutting process schedule according to a search condition; And
The information about the registered cutting process schedule, the information about the actual cutting state of the cutting member including the type and line of the cutting member, the line, the area (LOT), the start date, the completion date, the quantity, and the actual cutting state of the cutting member A cutting process database storing information on the reflected cutting schedule;
Cutting process management server comprising a.
3. The method of claim 2,
The cutting process management unit, after the information on the cutting process schedule is registered, when the site request date is input to the change target from the manager, and changes the field request date to the cutting process schedule, there is a change in the cutting process schedule Cutting process management server, characterized in that notified by passing to the cutting company terminal.
3. The method of claim 2,
The cutting process management unit, the yard, steel grade, wire, LOT, shipping date, cutting start date, uncut quantity, shipment waiting quantity, unloaded quantity, block number, minor code, member code, P (steel material) Cutting process management server, characterized in that received the actual cutting state of the cutting member, including / S (shape steel) classification, small nailing date, small nail department code, small nail STAGE, plate-based starting date.
3. The method of claim 2,
The cutting process inquiry unit is an item for inquiring a cutting process, and is searched based on an inquiry item including a business unit, a line / LOT, a P / S classification, a cutting thread, a processing start date, a start date of a counterfeit, a DATA standard, and an inquiry target material. Cutting process management server, characterized in that to retrieve the progress of the cutting process according to the conditions provided.
(a) a cutting company terminal accessing a cutting process management server through a communication network;
(b) the cutting process management server providing a cutting process management screen to the cutting company terminal;
(c) inputting, by the cutting company terminal, the actual cutting progress state of the cutting member, including the type and line of the cutting member, line, area (LOT), start date, completion date, and quantity;
(d) cutting and managing the cutting process management server by reflecting the actual cutting progress state in the cutting process schedule or displaying on the screen;
Cutting process management method comprising a.
A cutting process management method of a management server communicating with a cutting company terminal through a communication network,
(a) registering a cutting process by receiving information on a cutting process schedule including a type of cutting member, a line, an area (LOT), and a quantity from a manager;
(b) receiving the actual cutting progress state of the cutting member from the cutting company terminal;
(c) managing the cutting process by reflecting the actual cutting progress in a cutting process schedule so as to be shared among managers, related parties, and cutting companies;
(d) receiving a request for retrieving the cutting process progress status of the cutting process schedule from the cutting company terminal; And
(e) Cutting process schedule based on the information about the registered cutting process schedule and information on the actual cutting state of the cutting member, including the type and line, area, lot, start date, completion date and quantity of the cutting member. Providing a cutting process progress status for the cutting company terminal for the;
Cutting process management method of the management server comprising a.
The method of claim 7, wherein
In the step (a), after the information on the cutting process schedule is registered, the site request date is changed to the cutting process schedule when the site request date is input from the manager as a change target, and the change is made to the cutting process schedule. Cutting process management method of the management server, characterized in that notified to convey to the cutting company terminal.
The method of claim 7, wherein
In the step (c), the yard, steel grade, line, LOT, shipping date, cutting start date, uncut quantity, waiting for shipment, unloaded quantity, block number, minor code, absent symbol, P ( Management of the management server, characterized in that the actual cutting progress of the cutting member, including the steel) / S (shape steel) classification, the date of the small plate, the department code, the small STAGE, the date of the plate system received by receiving the actual cutting progress How to manage cutting process.
The method of claim 7, wherein
Step (e) is an item for inquiring the cutting process, based on the inquiry item including division, line / lot, P / S classification, cutting company, processing start date, start date of counterfeit, DATA standard, and subject material for inquiry. The cutting process management method of the management server, characterized in that for searching the cutting process progress according to the search conditions and provide the results.
KR1020110130679A 2011-12-08 2011-12-08 Cutting process management method and system KR20130082538A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110130679A KR20130082538A (en) 2011-12-08 2011-12-08 Cutting process management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110130679A KR20130082538A (en) 2011-12-08 2011-12-08 Cutting process management method and system

Publications (1)

Publication Number Publication Date
KR20130082538A true KR20130082538A (en) 2013-07-22

Family

ID=48993767

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110130679A KR20130082538A (en) 2011-12-08 2011-12-08 Cutting process management method and system

Country Status (1)

Country Link
KR (1) KR20130082538A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102383682B1 (en) * 2020-10-23 2022-04-07 곽경목 Planning management system for cutting rebar

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102383682B1 (en) * 2020-10-23 2022-04-07 곽경목 Planning management system for cutting rebar

Similar Documents

Publication Publication Date Title
US7849721B2 (en) Radio frequency identification (RFID) system for manufacturing distribution and retailing of keys
US8074481B2 (en) Radio frequency identification (RFID) system for manufacturing, distribution and retailing of keys
US20050165629A1 (en) Systems and methods for planning the delivery of goods
US20200148486A1 (en) Method and apparatus for picking products
JP2003201015A (en) Shipping management system and shipping management program
US20210090195A1 (en) Computer-implemented systems and methods for centralized logics monitoring
KR102310939B1 (en) Computer―implemented systems and methods for intelligent prediction of out of stock items and proactive reordering
KR102293867B1 (en) Systems and methods for automated merging of split deliveries to a single customer
KR20220065742A (en) Systems and methods for automatic delivery worker assignment
KR102378848B1 (en) Computer-implemented systems and methods for validating and returning fresh items for inventory management
KR20210024947A (en) Automated user interfaces for efficient packaging of objects
KR102265401B1 (en) Systems and methods for automated mobile-device based work period trading
US20070294137A1 (en) Custom order manager
KR20130082538A (en) Cutting process management method and system
KR20170068914A (en) Integrated agricultural management systems
JP5204584B2 (en) Procurement and delivery system using trucking
KR20220074313A (en) System for distribution management based on artificial intelligence
KR20220049636A (en) Smart Logistics Management System for Real-Time Inventory
Prymachenkо et al. Research status of automation of logistics transport and distribution processes
JP2011022658A (en) Product assembly system in assembly ship
Blomqvist A warehouse design framework for order processing and materials handling improvement-Case Etra Oy
KR20130017903A (en) Method for providing inventory information
Shanmugamani et al. The implementation of warehouse management system (wms) to improve warehouse performance in business to business (B2B)
JP4204346B2 (en) Shipping management system and shipping management program
RAJ Evaluation of Supply Chain Management

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination