KR20130065099A - Construction apparatus of flare tower and the construction process of the same - Google Patents

Construction apparatus of flare tower and the construction process of the same Download PDF

Info

Publication number
KR20130065099A
KR20130065099A KR1020110131818A KR20110131818A KR20130065099A KR 20130065099 A KR20130065099 A KR 20130065099A KR 1020110131818 A KR1020110131818 A KR 1020110131818A KR 20110131818 A KR20110131818 A KR 20110131818A KR 20130065099 A KR20130065099 A KR 20130065099A
Authority
KR
South Korea
Prior art keywords
frame
temporary structure
middle frame
flare tower
construction
Prior art date
Application number
KR1020110131818A
Other languages
Korean (ko)
Inventor
김규태
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020110131818A priority Critical patent/KR20130065099A/en
Publication of KR20130065099A publication Critical patent/KR20130065099A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B39/00Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude
    • B63B39/02Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by displacement of masses
    • B63B39/03Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by displacement of masses by transferring liquids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for
    • B63B43/02Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
    • B63B43/04Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability
    • B63B43/06Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability using ballast tanks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/006Platforms with supporting legs with lattice style supporting legs

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Jib Cranes (AREA)

Abstract

PURPOSE: An apparatus and a method for constructing a flare tower are provided to construct the flare tower even through the maximum height to be lifted by a crane is lower than an upper frame. CONSTITUTION: An apparatus for constructing a flare tower comprises a deck(12), a temporary structure(14), and a counterweight(16). The deck is separated from a jacket(2). The temporary structure is constructed above the deck. The counterweight is connected to a middle frame(6) and is placed on the temporary structure in the construction of the middle frame. The counter weight is separated from the middle frame and the temporary structure after the flare tower is constructed.

Description

플레어 타워의 시공 장치 및 그 시공 방법{Construction apparatus of flare tower and the construction process of the same}Construction apparatus of flare tower and construction method {Construction apparatus of flare tower and the construction process of the same}

본 발명은 플레어 타워의 시공 장치 및 그 시공 방법에 관한 것으로서, 특히 로우어 프레임과 미들 프레임과 어퍼 프레임을 갖는 플레어 타워를 시공하는 플레어 타워의 시공 장치 및 그 시공 방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction apparatus for a flare tower and a construction method thereof, and more particularly to a construction apparatus for a flare tower and a construction method for constructing a flare tower having a lower frame, a middle frame, and an upper frame.

일반적으로 해양 플랜트는 바다에 있는 석유나 가스를 탐사하고 굴착, 생산하는 시설이다.In general, offshore plants are facilities for the exploration, excavation and production of oil or gas in the sea.

플레어 타워(Flare Tower)는 정제 중 잉여가스를 소각하고, 가스가 갑자기 과다하게 분출될 경우 이를 일시에 소각, 배출시키는 안전시설이다.The Flare Tower is a safety facility that incinerates surplus gas during refining, and incinerates and discharges it at once when gas is suddenly excessively ejected.

플레어 타워는 복수개의 프레임이 적층되는 구조로 이루어 질 수 있고, 시공 위치에 재킷이 시공될 수 있으며, 재킷 위에 로우어 프레임이 시공될 수 있고, 로우어 프레임 위에 미들 프레임이 시공될 수 있으며, 미들 프레임 위에 어퍼 프레임이 시공될 수 있다.Flare tower can be made of a structure in which a plurality of frames are stacked, the jacket can be constructed at the construction position, the lower frame can be installed on the jacket, the middle frame can be constructed on the lower frame, the middle An upper frame can be constructed on the frame.

플레어 타워는 미들 프레임을 기중기로 로우어 프레임 상측으로 들어 올린 후 로우어 프레임에 시공할 수 있고, 어퍼 프레임을 미들 프레임의 상측으로 들어 올린 후 미들 프레임에 시공할 수 있다.The flare tower may be constructed on the lower frame after lifting the middle frame up the lower frame with a crane, and may be installed on the middle frame after lifting the upper frame up the middle frame.

종래의 플레어 타워 시공 방법은 플레어 타워의 전체 높이가 높을 경우 기중기로 어퍼 프레임을 들어올리기 어렵고, 기중기의 제약에 의해 플레어 타워의 시공이 용이하지 않을 수 있는 문제점이 있다.The conventional flare tower construction method has a problem in that when the overall height of the flare tower is high, it is difficult to lift the upper frame with a crane, and the construction of the flare tower may not be easy due to the limitation of the crane.

국내특허공보 공개번호 제2009-0135126호(2009.12.31)Korean Patent Publication No. 2009-0135126 (2009.12.31) 국내특허공보 공개번호 제2011-0077628호(2011.07.07)Korean Patent Publication No. 2011-0077628 (2011.07.07)

본 발명이 해결하고자 하는 과제는, 플레어 타워 시공 시 플레어 타워의 전체 높이가 높아 한계높이를 갖는 기중기로 어퍼 프레임을 들어올리기 어려운 시공 제약에도 불구하고, 기존 기중기를 그대로 이용하여 높이가 높은 플레이 타워의 시공을 용이하게 수행할 수 있는 플레이 타워의 시공 장비 및 그 시공 방법을 제공하는 것이다.The problem to be solved by the present invention, despite the construction constraints of lifting the upper frame with a crane having a limit height because the overall height of the flare tower is high when the flare tower construction, using the existing crane as it is of high play tower It is to provide a construction equipment and a construction method of the play tower that can be easily carried out construction.

상기한 과제를 해결하기 위한 본 발명에 따른 플레어 타워의 시공 장비는 재킷 위에 로우어 프레임이 위치되고 상기 로우어 프레임 위에 미들 프레임이 위치되며 상기 미들 프레임 위에 어퍼 프레임이 위치되는 플레어 타워를 시공하는 플레어 타워의 시공 장비에 있어서, 상기 재킷과 이격되게 시공되는 데크와; 상기 데크 위에 시공되는 임시 구조물와; 상기 미들 프레임과 연결되어 상기 미들 프레임의 시공시 상기 임시 구조물에 올려지고 상기 플레어 타워의 시공 후 상기 미들 프레임 및 임시 구조물에서 분리되는 카운터 웨이트를 포함한다.The construction equipment of the flare tower according to the present invention for solving the above problems is a flare for constructing a flare tower in which a lower frame is positioned on a jacket, a middle frame is positioned on the lower frame, and an upper frame is positioned on the middle frame. A construction equipment of a tower, comprising: a deck spaced apart from the jacket; A temporary structure constructed on the deck; It is connected to the middle frame includes a counter weight mounted on the temporary structure during the construction of the middle frame and separated from the middle frame and the temporary structure after the construction of the flare tower.

상기 카운터 웨이트는 상기 미들 프레임에 연결되는 수평 프레임부와; 상기 수평 프레임부 중 상기 미들 프레임이 반대편에 직교하게 형성되어 상기 임시 구조물 위에 시공되는 수직 프레임부와; 상기 수직 프레임부에 설치되고 물이 담겨져서 상기 수평 프레임부의 좌우 밸런스를 조절하는 중량 조절 탱크를 포함할 수 있다.The counter weight may include a horizontal frame portion connected to the middle frame; A vertical frame portion of the horizontal frame portion formed perpendicular to the opposite side of the horizontal frame portion to be constructed on the temporary structure; It may include a weight control tank installed in the vertical frame portion and the water is contained to adjust the left and right balance of the horizontal frame portion.

상기 수직 프레임부는 기중기의 와이어가 연결되는 와이어 연결부가 복수개 형성될 수 있다.The vertical frame portion may be formed with a plurality of wire connecting portion to which the wire of the crane is connected.

본 발명에 따른 플레어 타워의 시공 방법은 재킷 위에 로우어 프레임이 위치되고 상기 로우어 프레임 위에 미들 프레임이 위치되며 상기 미들 프레임 위에 어퍼 프레임이 위치되는 플레어 타워를 시공하는 플레어 타워의 시공 방법에 있어서, 상기 재킷 위에 로우어 프레임을 시공하는 제 1 단계와; 상기 재킷과 이격된 위치의 데크에 임시 구조물을 시공하는 제 2 단계와; 상기 미들 프레임 위에 상기 어퍼 프레임이 시공되고 상기 미들 프레임에 카운터 웨이트가 연결된 조립체를 리프팅시켜 상기 카운터 웨이트를 상기 임시 구조물 위에 올리면서 상기 미들 프레임을 상기 로우어 프레임에 시공하는 제 3 단계와; 상기 카운터 웨이트를 상기 미들 프레임에서 분리하고 상기 임시 구조물을 상기 데크에서 분리하는 제 4 단계를 포함한다.In the construction method of the flare tower according to the present invention, in the construction method of the flare tower for constructing a flare tower in which the lower frame is positioned on the jacket, the middle frame is positioned on the lower frame, the upper frame is positioned on the middle frame, A first step of constructing a lower frame on the jacket; Constructing a temporary structure on the deck spaced apart from the jacket; A third step of constructing the middle frame on the lower frame by lifting the assembly having the upper frame mounted on the middle frame and having a counter weight connected to the middle frame by raising the counter weight on the temporary structure; Separating the counter weight from the middle frame and separating the temporary structure from the deck.

본 발명은 플레어 타워의 전체 높이가 높은 경우에도 미들 프레임과 어퍼 프레임을 시공할 수 있고, 기중기가 들어올릴 수 있는 최대 높이가 어퍼 프레임 보다 낮은 경우에도 플레어 타워를 시공할 수 있는 이점이 있다.According to the present invention, even when the overall height of the flare tower is high, the middle frame and the upper frame can be constructed, and the flare tower can be constructed even when the maximum height that the crane can lift is lower than the upper frame.

도 1은 본 발명에 따른 플레어 타워의 시공 장비 일실시예가 도시된 정면도,
도 2는 본 발명에 따른 플레어 타워의 시공 방법 일실시예가 도시된 순서도이다.
도 3은 도 1에 도시된 재킷 위에 로우어 프레임을 시공하였을 때의 정면도,
도 4는 도 3에 도시된 데크에 임시 구조물을 시공하였을 때의 정면도,
도 5는 도 4에 도시된 임시 구조물에 카운터 웨이트를 시공하고 도 4에 도시된 미들 프레임을 로우어 프레임을 시공하였을 때의 정면도,
도 6은 도 5에 도시된 카운터 웨이트와 임시 구조물을 분리하였을 때의 정면도이다.
1 is a front view showing an embodiment of the construction equipment of the flare tower according to the present invention,
2 is a flow chart showing an embodiment of the construction method of the flare tower according to the present invention.
3 is a front view when the lower frame is constructed on the jacket shown in FIG. 1;
4 is a front view when constructing a temporary structure on the deck shown in FIG.
5 is a front view when the counter weight is constructed in the temporary structure illustrated in FIG. 4 and the lower frame is constructed in the middle frame illustrated in FIG. 4;
6 is a front view when the counter weight and the temporary structure shown in FIG. 5 are separated.

이하, 본 발명의 실시 예를 첨부된 도면을 참조하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 플레어 타워의 시공 장비 일실시예가 도시된 정면도이다.1 is a front view showing an embodiment of the construction equipment of the flare tower according to the present invention.

본 실시예의 플레어 타워의 시공 장비는 재킷(2) 위에 로우어 프레임(4)이 위치되고 로우어 프레임(4) 위에 미들 프레임(6)이 위치되며 미들 프레임(6) 위에 어퍼 프레임(8)이 위치되는 플레어 타워(T)를 시공하는 데 사용될 수 있다.In the construction equipment of the flare tower of the present embodiment, the lower frame 4 is positioned on the jacket 2, the middle frame 6 is positioned on the lower frame 4, and the upper frame 8 is positioned on the middle frame 6. Can be used to construct the flare tower (T) located.

플레어 타워의 시공 장비는 재킷(2)과 이격되게 시공되는 데크(12)와; 데크(12) 위에 시공되는 임시 구조물(14)와; 미들 프레임(6)과 연결되어 미들 프레임(6)의 시공시 임시 구조물(14)에 올려지고 플레어 타워(T)의 시공 후 미들 프레임(6) 및 임시 구조물(14)에서 분리되는 카운터 웨이트(16)를 포함할 수 있다.The construction equipment of the flare tower includes a deck 12 constructed to be spaced apart from the jacket 2; A temporary structure 14 constructed on the deck 12; Counter weight 16 connected to the middle frame 6 and mounted on the temporary structure 14 during construction of the middle frame 6 and separated from the middle frame 6 and the temporary structure 14 after construction of the flare tower T. ) May be included.

임시 구조물(14)은 임시 구조물(14)이 설치되었을 때 임시 구조물(14)의 상단 높이가 로우어 프레임(4)의 상단 높이와 일치되는 높이로 이루어질 수 있다. 임시 구조물(14)은 수직하게 배치되는 적어도 4개의 수직봉(18)와, 수직봉(18)의 상부에 수평하게 형성된 4개의 수평봉(20)을 포함하는 임시 프레임으로 이루어질 수 있다. 임시 구조물(14)은 수직봉(18)의 각각이 데크(12)에 끼워져서 시공될 수 있다. 임시 구조물(14)은 수직봉(18)의 상부에 카운터 웨이트(16)가 끼워질 수 있다.The temporary structure 14 may have a height at which the top height of the temporary structure 14 coincides with the top height of the lower frame 4 when the temporary structure 14 is installed. The temporary structure 14 may be formed of a temporary frame including at least four vertical rods 18 arranged vertically and four horizontal rods 20 formed horizontally on top of the vertical rods 18. The temporary structure 14 may be constructed by fitting each of the vertical rods 18 to the deck 12. The temporary structure 14 may be fitted with a counter weight 16 on top of the vertical rod (18).

카운터 웨이트(16)는 미들 프레임(6)에 연결되는 수평 프레임부(22)와; 수평 프레임부(22) 중 미들 프레임(6)이 반대편에 직교하게 형성되어 임시 구조물(14) 위에 시공되는 수직 프레임부(24)와; 수직 프레임부(24)에 설치되고 물이 담겨져서 수평 프레임부(22)의 좌우 밸런스를 조절하는 중량 조절 탱크(26)를 포함할 수 있다.The counter weight 16 includes a horizontal frame portion 22 connected to the middle frame 6; A vertical frame portion 24 of the horizontal frame portion 22, the middle frame 6 being formed orthogonal to the opposite side and constructed on the temporary structure 14; It may include a weight adjustment tank 26 installed in the vertical frame portion 24 and the water is contained to adjust the left and right balance of the horizontal frame portion 22.

수평 프레임부(22)는 기중기의 와이어(W)가 연결되는 와이어 연결부(28)(30)가 복수개 형성될 수 있다. 와이어 연결부(28)(30)는 복수개가 수평 프레임부(22)의 상부에 좌우 방향으로 이격되게 형성될 수 있다.The horizontal frame part 22 may be provided with a plurality of wire connection parts 28 and 30 to which the wires W of the crane are connected. The wire connecting portions 28 and 30 may be formed to be spaced apart from each other in the left and right directions on the upper portion of the horizontal frame portion 22.

수직 프레임부(24)는 하단이 임시 구조물(14)의 상단에 올려지는 것에 의해 임시 구조물(14)에 의해 지지될 수 있다.The vertical frame portion 24 may be supported by the temporary structure 14 by raising its lower end to the top of the temporary structure 14.

중량 조절 탱크(26)는 카운터 웨이트(16)를 기중기로 들어올려 이동시킬 때 수평 프레임부(22)가 좌우 중 일측으로 기울어지지 않고 수평하게 유지되도록 할 수 있다. 중량 조절 탱크(26)는 미들 프레임(6)의 중량과 어퍼 프레임(8)의 중량이 무거울 경우 다량의 물이 담겨지고, 미들 프레임(6)의 중량과 어퍼 프레임(8)의 중량이 가벼울 경우 미들 프레임(6)의 중량과 어퍼 프레임(8)의 중량이 무거울 경우 보다 소량의 물이 담겨지게 된다. 중량 조절 탱크(26)는 수직 프레임부(24)의 하부에 설치될 수 있다.
The weight control tank 26 may allow the horizontal frame portion 22 to be horizontally maintained without tilting to one side of the left and right sides when the counter weight 16 is lifted and moved by the crane. The weight control tank 26 contains a large amount of water when the weight of the middle frame 6 and the weight of the upper frame 8 are heavy, and when the weight of the middle frame 6 and the weight of the upper frame 8 are light. When the weight of the middle frame 6 and the weight of the upper frame 8 are heavy, a smaller amount of water is contained. The weight control tank 26 may be installed below the vertical frame part 24.

도 2는 본 발명에 따른 플레어 타워의 시공 방법 일실시예가 도시된 순서도이고, 도 3은 도 1에 도시된 재킷 위에 로우어 프레임을 시공할 때의 도이며, 도 4는 도 3에 도시된 데크에 임시 구조물을 시공할 때의 도이고, 도 5는 도 4에 도시된 임시 구조물에 카운터 웨이트를 시공하고 도 4에 도시된 미들 프레임을 로우어 프레임을 시공할 때의 도이며, 도 6은 도 5에 도시된 카운터 웨이트와 임시 구조물을 분리하였을 때의 도이다.2 is a flow chart showing an embodiment of the construction method of the flare tower according to the present invention, Figure 3 is a view when constructing a lower frame on the jacket shown in Figure 1, Figure 4 is the deck shown in Figure 3 FIG. 5 is a view when constructing a temporary structure in FIG. 5, FIG. 5 is a view when constructing a counter weight on the temporary structure shown in FIG. 4 and constructing a lower frame with the middle frame shown in FIG. 4, and FIG. Figure 5 shows the counterweight and the temporary structure shown in FIG.

본 실시예의 플레어 타워의 시공 방법은 재킷(2) 위에 로우어 프레임(4)을 시공하는 제 1 단계(S1)와; 재킷(2)과 이격된 위치의 데크(12)에 임시 구조물(14)을 시공하는 제 2 단계(S2)와; 미들 프레임(6) 위에 어퍼 프레임(8)이 시공되고 미들 프레임(6)에 카운터 웨이트(16)가 연결된 조립체(A)를 리프팅시켜 카운터 웨이트(16)를 임시 구조물(14) 위에 올리면서 미들 프레임(6)을 로우어 프레임(4)에 시공하는 제 3 단계(S3)와; 카운터 웨이트(16)를 미들 프레임(6)에서 분리하고 임시 구조물(14)을 데크(12)에서 분리하는 제 4 단계(S4)를 포함할 수 있다.The construction method of the flare tower of the present embodiment includes a first step S1 of constructing a lower frame 4 on the jacket 2; A second step S2 of constructing the temporary structure 14 on the deck 12 at a position spaced apart from the jacket 2; The upper frame 8 is constructed on the middle frame 6 and the middle frame 6 is lifted by lifting the assembly A having the counter weight 16 connected to the middle frame 6 while raising the counter weight 16 on the temporary structure 14. A third step S3 of constructing (6) the lower frame (4); A fourth step S4 may be included to separate the counter weight 16 from the middle frame 6 and to separate the temporary structure 14 from the deck 12.

제 1 단계(S1)는 기중기에 의해 로우어 프레임(4)을 재킷(2) 위로 리프팅 시킬 수 있다. 제 1 단계는 기중기에 의해 리프팅되는 로우어 프레임(4)을 재킷(2) 위에 안착시킬 수 있다.The first step S1 may lift the lower frame 4 over the jacket 2 by a crane. The first step may seat the lower frame 4 which is lifted by the crane on the jacket 2.

제 2 단계(S2)는 기중기에 의해 임시 구조물(14)을 데크(12) 위로 리프팅시킬 수 있다. 제 2 단계는 기중기에 의해 리프팅되는 임시 구조물(14)을 데크(12)에 안착시킬 수 있고 임시 구조물(14)을 데크(12)에 고정시킬 수 있다.The second step S2 may lift the temporary structure 14 over the deck 12 by a crane. The second step may seat the temporary structure 14 lifted by the crane on the deck 12 and secure the temporary structure 14 to the deck 12.

제 3 단계(S3)는 미들 프레임(6) 위에 어퍼 프레임(8)이 시공하는 과정과, 미들 프레임(6)의 옆에 카운터 웨이트(16)를 연결하는 과정을 포함할 수 있다. 어퍼 프레임(8)은 기중기에 의해 미들 프레임(6)의 위로 리프팅될 수 있고, 기중기에 의해 리프팅되는 어퍼 프레임(8)은 미들 프레임(6)에 안착될 수 있다. 카운터 웨이트(16)는 수평 프레임부(22)가 적어도 하나의 체결부재나 용접에 의해 미들 프레임(6)의 옆에 연결될 수 있다. 제 3 단계(S3)는 카운터 웨이트(16)의 좌우 밸런스를 맞추는 과정을 더 포함할 수 있다. 카운터 웨이트(16)를 기중기로 들어올릴 때 수평 프레임부(22)의 좌우 밸런스가 맞지 않고 수평 프레임부(22)가 미들 프레임(6)의 방향으로 기울어지는 경우 중량 조절 탱크(26)로 물을 공급하여 수평 프레임부(22)의 좌우 밸런스를 맞출 수 있다.The third step S3 may include a process in which the upper frame 8 is constructed on the middle frame 6, and a process of connecting the counter weight 16 to the side of the middle frame 6. The upper frame 8 can be lifted over the middle frame 6 by a crane, and the upper frame 8 lifted by the crane can be seated on the middle frame 6. The counter weight 16 may have the horizontal frame portion 22 connected to the side of the middle frame 6 by at least one fastening member or welding. The third step S3 may further include balancing left and right balance of the counter weight 16. When the counterweight 16 is lifted by the crane, when the horizontal frame portion 22 is not balanced left and right and the horizontal frame portion 22 is inclined in the direction of the middle frame 6, water is supplied to the weight control tank 26. The left and right balance of the horizontal frame portion 22 can be provided by supplying.

제 4 단계(S4)는 카운터 웨이트(16)의 수평 프레임부(22)를 미들 프레임(6)에서 분리하고, 수직 프레임부(24)를 임시 구조물(14)에서 분리하는 카운터 웨이트 분리 과정을 포함할 수 있다. 제 4 단계(S4)는 카운터 웨이트 분리 과정 후 임시 구조물(14)을 데크(12)에서 들어 올려 임시 구조물(14)을 데크(12)에서 분리하는 임시 구조물 분리 과정을 더 포함할 수 있다.The fourth step S4 includes a counterweight separation process of separating the horizontal frame portion 22 of the counter weight 16 from the middle frame 6 and the vertical frame portion 24 from the temporary structure 14. can do. The fourth step S4 may further include a temporary structure separating process of lifting up the temporary structure 14 from the deck 12 after the counterweight separation process and separating the temporary structure 14 from the deck 12.

상기와 같이, 카운터 웨이트(16)와 임시 구조물(14)를 분리하면, 데크(12)는 플레어 타워의 옆에 위치될 수 있고, 플레어 타워의 시공은 종료될 수 있다.As described above, when the counterweight 16 and the temporary structure 14 are separated, the deck 12 may be located next to the flare tower, and the construction of the flare tower may be terminated.

(2) : 재킷 (4) : 로우어 프레임
(6) : 미들 프레임 (8) : 어퍼 프레임
(12) : 데크 (14) : 임시 구조물
(16) : 카운터 웨이트 (22) : 수평 프레임부
(24) : 수직 프레임부 (26) : 중량 조절 탱크
(28,30) : 와이어 연결부
(2): jacket (4): lower frame
(6): middle frame 8: upper frame
12: Deck 14: Temporary Structure
(16): counter weight 22: horizontal frame portion
24: vertical frame portion 26: weight control tank
(28,30): Wire connection

Claims (4)

재킷 위에 로우어 프레임이 위치되고 상기 로우어 프레임 위에 미들 프레임이 위치되며 상기 미들 프레임 위에 어퍼 프레임이 위치되는 플레어 타워를 시공하는 플레어 타워의 시공 장치에 있어서,
상기 재킷과 이격되게 시공되는 데크와;
상기 데크 위에 시공되는 임시 구조물와;
상기 미들 프레임과 연결되어 상기 미들 프레임의 시공 시 상기 임시 구조물에 올려지고 상기 플레어 타워의 시공 후 상기 미들 프레임 및 임시 구조물에서 분리되는 카운터 웨이트를 포함하는 플레어 타워의 시공 장치.
A flare tower construction apparatus for constructing a flare tower in which a lower frame is positioned on a jacket, a middle frame is positioned on the lower frame, and an upper frame is positioned on the middle frame,
A deck spaced apart from the jacket;
A temporary structure constructed on the deck;
And a counterweight connected to the middle frame and mounted on the temporary structure during construction of the middle frame and separated from the middle frame and temporary structure after construction of the flare tower.
제 1 항에 있어서,
상기 카운터 웨이트는 상기 미들 프레임에 연결되는 수평 프레임부와; 상기 수평 프레임부 중 상기 미들 프레임이 반대편에 직교하게 형성되어 상기 임시 구조물 위에 시공되는 수직 프레임부와; 상기 수직 프레임부에 설치되고 물이 담겨져서 상기 수평 프레임부의 좌우 밸런스를 조절하는 중량 조절 탱크를 포함하는 플레어 타워의 시공 장치.
The method of claim 1,
The counter weight may include a horizontal frame portion connected to the middle frame; A vertical frame portion of the horizontal frame portion formed perpendicular to the opposite side of the horizontal frame portion to be constructed on the temporary structure; The installation apparatus of the flare tower comprising a weight control tank installed in the vertical frame portion and contained in the water to adjust the left and right balance of the horizontal frame portion.
제 2 항에 있어서,
상기 수직 프레임부는 기중기의 와이어가 연결되는 와이어 연결부가 복수개 형성된 플레어 타워의 시공 장치.
3. The method of claim 2,
The vertical frame portion construction device of the flare tower is formed with a plurality of wire connection portion to which the wire of the crane is connected.
재킷 위에 로우어 프레임이 위치되고 상기 로우어 프레임 위에 미들 프레임이 위치되며 상기 미들 프레임 위에 어퍼 프레임이 위치되는 플레어 타워를 시공하는 플레어 타워의 시공 방법에 있어서,
상기 재킷 위에 로우어 프레임을 시공하는 제 1 단계와;
상기 재킷과 이격된 위치의 데크에 임시 구조물을 시공하는 제 2 단계와;
상기 미들 프레임 위에 상기 어퍼 프레임이 시공되고 상기 미들 프레임에 카운터 웨이트가 연결된 조립체를 리프팅시켜 상기 카운터 웨이트를 상기 임시 구조물 위에 올리면서 상기 미들 프레임을 상기 로우어 프레임에 시공하는 제 3 단계와;
상기 카운터 웨이트를 상기 미들 프레임에서 분리하고 상기 임시 구조물을 상기 데크에서 분리하는 제 4 단계를 포함하는 플레어 타워의 시공 방법.
A method of constructing a flare tower in which a flare tower is constructed in which a lower frame is positioned on a jacket, a middle frame is positioned on the lower frame, and an upper frame is positioned on the middle frame.
A first step of constructing a lower frame on the jacket;
Constructing a temporary structure on the deck spaced apart from the jacket;
A third step of constructing the middle frame on the lower frame by lifting the assembly having the upper frame mounted on the middle frame and having a counter weight connected to the middle frame by raising the counter weight on the temporary structure;
And a fourth step of separating the counter weight from the middle frame and separating the temporary structure from the deck.
KR1020110131818A 2011-12-09 2011-12-09 Construction apparatus of flare tower and the construction process of the same KR20130065099A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110131818A KR20130065099A (en) 2011-12-09 2011-12-09 Construction apparatus of flare tower and the construction process of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110131818A KR20130065099A (en) 2011-12-09 2011-12-09 Construction apparatus of flare tower and the construction process of the same

Publications (1)

Publication Number Publication Date
KR20130065099A true KR20130065099A (en) 2013-06-19

Family

ID=48861813

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110131818A KR20130065099A (en) 2011-12-09 2011-12-09 Construction apparatus of flare tower and the construction process of the same

Country Status (1)

Country Link
KR (1) KR20130065099A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017092058A1 (en) * 2015-12-04 2017-06-08 深圳智慧能源技术有限公司 Ejection combustion apparatus having movable support frame
WO2017092051A1 (en) * 2015-12-04 2017-06-08 深圳智慧能源技术有限公司 Skid-mount structure for ejector-type combustion device
CN108341335A (en) * 2017-01-21 2018-07-31 张家界航空工业职业技术学院 A kind of gantry tower crane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017092058A1 (en) * 2015-12-04 2017-06-08 深圳智慧能源技术有限公司 Ejection combustion apparatus having movable support frame
WO2017092051A1 (en) * 2015-12-04 2017-06-08 深圳智慧能源技术有限公司 Skid-mount structure for ejector-type combustion device
CN108341335A (en) * 2017-01-21 2018-07-31 张家界航空工业职业技术学院 A kind of gantry tower crane
CN108341335B (en) * 2017-01-21 2019-08-23 张家界航空工业职业技术学院 A kind of gantry tower crane

Similar Documents

Publication Publication Date Title
GB201209006D0 (en) High rise building elevation concept
KR101213756B1 (en) Method for installing flare tower
KR20130065099A (en) Construction apparatus of flare tower and the construction process of the same
KR20140141442A (en) Installing apparatus for marine file
CN102393003B (en) Assembling method of steam generator
CN205917601U (en) Integrally lift up device of bridge arch rib
KR101151963B1 (en) Tube supporting device for bridge
CN205822172U (en) Borehole filling pile cage of reinforcement installation plummer
CN105672672B (en) A kind of pier stud construction system and construction method
KR101708372B1 (en) Method of manufacturing and disassembling goliath crane
CN206873475U (en) A kind of steel jacket box
CN208899342U (en) A kind of casing decentralization guide and limit structure for underwater support table construction
JP6438931B2 (en) Temporary column, temporary column installation structure, and roof frame construction method
JP2009001983A (en) Disassembling method and device for double structure chimney
CN106310548A (en) Fire-fighting escape passage
CN105553397A (en) Fishing light complementation photovoltaic fixing support
JP2013036287A (en) Device and method for lifting floor unit
JP4460619B1 (en) Underwater rubble leveling device
CN107182877A (en) A kind of Largesize deepwater net cage of use longitudinal framing main truss
JP5948828B2 (en) Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof
JP5635163B1 (en) How to build a scaffold in a boiler
KR20130065931A (en) Riser guard structure for offshore platform
JP2017031729A (en) Anchor cap
KR101080982B1 (en) Apparatus for generating using tidal current
KR20100001241A (en) Construction apparatus and method for floating structures in the sea

Legal Events

Date Code Title Description
WITN Application deemed withdrawn, e.g. because no request for examination was filed or no examination fee was paid