KR20130042972A - Fixing device for construction protective net - Google Patents

Fixing device for construction protective net Download PDF

Info

Publication number
KR20130042972A
KR20130042972A KR1020110107155A KR20110107155A KR20130042972A KR 20130042972 A KR20130042972 A KR 20130042972A KR 1020110107155 A KR1020110107155 A KR 1020110107155A KR 20110107155 A KR20110107155 A KR 20110107155A KR 20130042972 A KR20130042972 A KR 20130042972A
Authority
KR
South Korea
Prior art keywords
bat
guide
guard
band
vertical
Prior art date
Application number
KR1020110107155A
Other languages
Korean (ko)
Other versions
KR101435528B1 (en
Inventor
김진곤
박장욱
Original Assignee
김진곤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김진곤 filed Critical 김진곤
Priority to KR1020110107155A priority Critical patent/KR101435528B1/en
Publication of KR20130042972A publication Critical patent/KR20130042972A/en
Application granted granted Critical
Publication of KR101435528B1 publication Critical patent/KR101435528B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3219Means supported by the building wall, e.g. security consoles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

PURPOSE: An installation device of a vertical type falling protective net is provided to reduce manufacturing costs of a vertical type falling protective net while easily performing deconstruction work and installation work of the vertical type falling protective net. CONSTITUTION: An installation device(100) of a vertical type falling protective net comprises a net body(101), a net(103), a fixing band(105), connection bands(109,110), a drawing guide(111), and a drawing means. The fixing band is fixed to a guard(102) of the net and is connected to a fixing means installed at an opening unit. The connection band is guided by the drawing guide and is fixed to the other side of the guard. The drawing means controls the connection band passing through the drawing guide to maintain tight tension. The drawing means comprises a turn buckle or a latch combination in order to supply simplicity of deconstruction.

Description

수직형 추락 방망 설치장치{FIXING DEVICE FOR CONSTRUCTION PROTECTIVE NET}Vertical Fall Bat Mounting Device {FIXING DEVICE FOR CONSTRUCTION PROTECTIVE NET}

본 발명은 수직형 추락 방망 설치장치에 관한 것으로서 더욱 상세하게는 아파트나 연립주택과 같은 다가구 주택 또는 상업용 건축물 구축시 수직벽면에 형성되는 개구부를 차단하여 안전성을 확보할 수 있도록 하는 수직형 추락 방망의 설치를 용이하게 할 수 있도록 한 개선된 설치장치의 제공에 관한 것이다.The present invention relates to a vertical fall bat installation apparatus, and more particularly to the vertical fall bat to ensure the safety by blocking the opening formed in the vertical wall when building multi-family houses or commercial buildings such as apartments or town houses The present invention relates to the provision of an improved installation apparatus to facilitate installation.

수직형 추락 방망은 건축물을 구축할 때 건축물의 창문을 형성할 수 있도록 수직벽면에 형성되는 개구부를 차단하여 외부에서 구축되는 건축물의 내부를 시각적으로 확인할 수 없도록 하는 것은 물론, 내부에서도 외부로의 시선을 차단하면서 개구부를 통하여 자재의 추락 또는 작업자의 추락과 같은 안전사고를 미연에 방지하고, 구축되는 건축물의 내부에서 발생하는 이물질 또는 분진이 외부로 유출되어 민원이 야기되는 것을 방지하기 위한 목적으로 설치되는 것이다.The vertical fall bat blocks the openings formed on the vertical walls so that the windows of the building can be formed when building the building. It is installed to prevent safety accidents such as falling of materials or falling of workers through openings, and to prevent foreign substances or dust generated inside the building to be leaked to the outside and cause civil complaints. Will be.

상기와 같은 수직형 추락 방망은 종래에도 다양한 방식으로 이루어졌으며, 본원 출원인 또한 "건축물 구축용 수직보호망"이라는 명칭으로 선행하여 특허를 출원(제 2010 - 0011586 호)한 바 있으며 이를 도 9를 통하여 구성을 살펴보면 다음과 같다.The vertical fall bat as described above has been made in various ways in the prior art, the applicant of the present application has also applied for a patent (No. 2010-0011586) prior to the name "vertical protection net for building construction" and configured through FIG. Looking at it as follows.

종래 기술이 적용되는 수직보호망(1)은, 건축물에 형성한 개구부(2)의 크기에 맞게 구비되는 보호망(3)과 와이어(4)를 밴딩수단(5)으로 결합하고, 상기 보호망(3)과 결합 되는 와이어(4)에 보호망(3)의 사방 모서리부위를 안정되게 유지할 수 있도록 코너가이드(7)를 결합한 상태에서 현장으로 이동하여 개구부(2)에 설치한 앵커볼트(8)와 코너가이드(7)를 고정수단으로 단속수단으로 단속한다.The vertical protection net (1) to which the prior art is applied, combines the protection net (3) and the wire (4) provided with a bending means (5) provided in accordance with the size of the opening (2) formed in the building, the protection net (3) Anchor bolts 8 and corner guides installed in the openings 2 by moving to the site with the corner guides 7 coupled to the wires 4 coupled to the wires 4 so as to stably maintain the four corners of the protection net 3. (7) is clamped by means of clamping means.

상기 앵커볼트(8)와 코너가이드(7)를 고정수단으로 단속한 후 보호망(3)과 결합 된 와이어(4)의 양단부에 구비되는 턴버클과 같은 결속수단으로 보호망(3)과 와이어(4)를 팽팽한 상태로 유지시킨다.After the anchor bolt 8 and the corner guide 7 are clamped by a fixing means, the protection net 3 and the wire 4 are formed by binding means such as turnbuckles provided at both ends of the wire 4 coupled with the protection net 3. Is kept in a taut state.

상기 코너가이드(7)는 개구부(2)의 코너에 장착되는 앵커볼트(8)와 고정수단으로 단속될 수 있도록 단속공(9)을 형성하여 개략 ㄱ 형상으로 코너바디(10)를 구비하고, 상기 코너바디(10)에는 와이어(4)가 경유할 수 있도록 와이어가이드(11)를 형성하여 구성하고 있다.The corner guide (7) is provided with a corner body (10) in a roughly a-shape by forming an interruption hole (9) to be interrupted by anchor bolts (8) and fixing means mounted to the corners of the opening (2), The corner body 10 is formed by forming a wire guide 11 so that the wire 4 can pass through.

상기와 같은 종래 기술이 적용되는 건축물 구축용 수직보호망은, 건축물의 내부공사를 수행할 때에는 내부에서 발생하는 비산먼지가 외부로 번지는 것을 일부 방지하여 주면서 작업도구 등이 지상으로 낙하하는 것을 방지하고 작업자가 개구부에 의하여 추락하게 되는 안전사고의 위험을 감소시켜주거나 방지하는 기능을 수행하게 된다.The vertical protection net for building construction to which the prior art is applied as described above prevents the work tools from falling to the ground while preventing some scattering dust generated from the inside from spreading to the outside when performing the internal construction of the building. The operator performs a function to reduce or prevent the risk of safety accidents falling by the opening.

종래 기술이 적용된 수직보호망의 경우에는, 견인수단에 의하여 개구부의 가장자리를 코너가이드에 의하여 1회전 하여 긴장된 상태를 유지하는 와이어에 보호망의 가장자리와 밴딩수단을 이용하여 와이어와 연결하여 고정하기 때문에 설치작업이 용이하지 못하게 된다.In the case of the vertical protection net to which the prior art is applied, since the edge of the opening is rotated once by the corner guide by the towing means and fixed to the wire by using the edge of the protection net and the banding means to fix the wire to maintain the tensioned state. This will not be easy.

이는, 보호망의 사방 가장자리에 와이어와 연결할 수 있는 로우프홀 또는 로우프밴드를 많은 수로 형성하거나 고정한 후 로우프와 같은 밴딩수단을 이용하여 와이어와 결속하여야 하기 때문에 수직보호망을 준비하는 데에도 많은 시간과 노력을 필요로 하게 된다.This requires a lot of time and effort to prepare a vertical protection net because a large number of rope holes or rope bands that can be connected to the wires are formed or fixed at the edges of the protection net and then bound with the wires using a banding means such as a rope. Needed.

특히, 보호망과 와이어를 연결하는 로우프의 경우 하나를 이용하여 연속적으로 연결하기 때문에 로우프를 로우프홀과 와이어를 번갈아가면서 결속시키는 것이 쉽게 이루어지지 못하게 되고, 이를 해결하기 위하여 클립과 같은 밴딩수단을 이용할 경우에는 연결작업을 쉽게 이루어질 수 있으나 부품수의 증가로 인하여 제조와 물류에 어려움이 발생하게 된다.In particular, in the case of the rope connecting the protection net and the wire, the rope is continuously connected by using one, so it is not easy to bind the rope alternately between the rope hole and the wire, and when using a bending means such as a clip to solve the problem The connection work can be done easily, but due to the increase in the number of parts, difficulties arise in manufacturing and logistics.

이와 같이 로우프를 이용하거나 또는 밴딩수단을 이용하여 보호망과 와이어를 서로 결합하여 수직보호망을 설치하는 데에도 많은 시간과 노력이 필요하기 때문에 전체적인 설치기간이 길어지고 설치에 소요되는 비용이 증가하게 되는 원인이 되고 있는 실정이다.In this way, it is necessary to take a lot of time and effort to install the vertical protection net by combining the protection net and the wire by using the rope or the banding means, so the overall installation period becomes longer and the cost of installation increases. This situation is becoming.

보호망에 형성되는 로우프홀과 로우프밴드가 쉽게 손상되는 것을 방지할 수 있도록 아이렛을 고정하거나 견고한 재질로 구성한다 하여도 와이어와 밴딩수단이 당기는 힘에 의하여 쉽게 손상되기 때문에 수직보호망이 철거되기 전까지 온전한 상태를 유지하는 것이 힘들게 되고, 이 경우에는 추락방지와 더불어 내부에서 발생하는 이물질의 외부유출을 방지하기 위한 근본적인 목적을 달성하는 것이 힘들게 되는 등 여러 문제점이 발생하고 있는 실정이다.The wire and banding means are easily damaged by the pulling force even if the eyelets are fixed or made of a solid material to prevent the rope holes and the rope band formed in the protection net from being easily damaged. It is difficult to maintain the situation, in which case it is difficult to achieve the fundamental purpose to prevent the fall and the external leakage of foreign matters generated from the inside, it is a situation that occurs a number of problems.

이에 본 발명에서는 상기와 같은 문제점들을 해결하기 위하여 발명한 것으로서, 망목을 가지는 망체와, 상기 망체의 가장자리 또는 망체의 폭 방향에 하나 또는 하나 이상의 가드를 고정하여 구비하는 방망과, 상기 방망의 상,하측에 구비되는 가드의 일측에 고정하여 개구부에 설치되는 고정수단과 결속시키는 고정밴드와, 상기 가드의 다른측에 고정하는 결속밴드와, 상기 개구부의 코너에 설치되어 결속밴드를 안내하는 견인가이드와, 상기 견인가이드를 경유한 결속밴드를 팽팽한 장력을 유지한 상태로 단속하는 견인수단을 포함하여, 방망의 설치와 해체를 신속하게 수행하면서 방망이 추구하고자 하는 근본적인 목적 달성을 가능하게 한다.In the present invention, to solve the above problems, the present invention, a mesh having a mesh, a bat having one or more guards fixed to the edge of the mesh or the width direction of the mesh, and the image of the bat, A fixing band fixed to one side of the guard provided at the lower side and engaged with a fixing means installed at the opening, a binding band fixed at the other side of the guard, a traction guide provided at the corner of the opening and guiding the binding band; Including a traction means for clamping the binding band via the traction guide in the state of maintaining the tension, it is possible to achieve the fundamental purpose of the bat while pursuing the installation and dismantling of the bat quickly.

본 발명은 수직형 추락 방망의 길이방향 일측은 개구부의 일측에 고정수단으로 견고하게 고정하고, 다른 측은 밴드와 견인수단을 이용하여 단속할 수 있도록 함으로서 수직형 추락 방망의 설치와 해체작업의 용이성을 제공하면서 수직형 추락 방망의 제조에 따른 비용부담을 줄이는 것은 물론, 작업자의 추락과 작업자재 또는 이물질이 외부로 유출되는 것을 방지하기 위한 기본 목적을 충실하게 달성할 수 있는 등 다양한 효과를 가지는 발명이다.According to the present invention, one side of the vertical fall bat is firmly fixed to one side of the opening by a fixing means, and the other side can be clamped by using a band and a towing means to facilitate the installation and dismantling of the vertical fall bat. It is an invention having various effects such as reducing the cost burden of manufacturing a vertical fall bat, and faithfully fulfilling the basic purpose of preventing a worker from falling and spilling of worker materials or foreign substances to the outside. .

도 1은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치를 도시한 전체 구성도.
도 2는 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 A부위를 발췌하여 도시한 구성도.
도 3은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 B부위를 발췌하여 도시한 사시도.
도 4는 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 B부위를 발췌한 정면 구성도.
도 5는 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 2 실시 예를 도시한 구성도.
도 6은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 3 실시 예를 도시한 구성도.
도 7은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 4 실시 예를 도시한 구성도.
도 8은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 5 실시 예를 도시한 구성도.
도 9는 종래 기술이 적용된 수직형 추락 방망 설치구를 도시한 구성도.
1 is an overall configuration diagram showing a vertical fall bat installation apparatus to which the technique of the present invention is applied.
Figure 2 is a block diagram showing a portion A of the vertical fall bat installation apparatus to which the technique of the present invention is applied.
Figure 3 is a perspective view showing the portion B of the vertical fall bat installation apparatus to which the technique of the present invention is applied.
Figure 4 is a front configuration view taken a portion B of the vertical fall bat installation apparatus to which the technique of the present invention is applied.
Figure 5 is a block diagram showing an embodiment of the vertical fall bat installation apparatus to which the technique of the present invention is applied.
Figure 6 is a block diagram showing an embodiment of the vertical fall bat installation apparatus to which the technique of the present invention is applied.
Figure 7 is a block diagram showing an embodiment of the vertical fall bat installation apparatus to which the technique of the present invention is applied.
Figure 8 is a block diagram showing an embodiment of the vertical fall bat installation apparatus to which the technique of the present invention is applied.
Figure 9 is a block diagram showing a vertical fall bat installation device to which the prior art is applied.

이하 첨부되는 도면과 관련하여 상기 목적을 달성하기 위한 본 발명의 바람직한 구성과 작용에 대하여 설명하면 다음과 같다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치를 도시한 전체 구성도, 도 2는 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 A부위를 발췌하여 도시한 구성도, 도 3은 본 발명의 기술이 적용된 수직형 추락 방망 설치정치의 B부위를 발췌하여 도시한 사시도, 도 4는 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 B부위를 발췌한 정면 구성도, 도 5는 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 2 실시 예를 도시한 구성도로서 함께 설명한다.1 is an overall configuration diagram showing a vertical fall bat installation apparatus to which the technique of the present invention is applied, Figure 2 is a configuration diagram showing a portion A of the vertical fall bat installation apparatus applied to the technology of the present invention, Figure 3 Figure 4 is a perspective view showing a portion B of the vertical fall bat installation politics applied to the technology of the present invention, Figure 4 is a front configuration diagram of a portion B of the vertical fall bat installation apparatus applied to the technology of the present invention, Figure 5 2 is a configuration diagram showing two embodiments of a vertical fall bat installation apparatus to which the technique of the present invention is applied.

본 발명의 기술이 적용되는 수직형 추락 방망 설치장치(100)는, 조밀한 망목을 가지는 망체(101)를 구비하고, 상기 망체(101)의 가장자리와 망체(101)의 폭 방향에 하나 또는 하나 이상의 가드(102)를 고정한 방망(103)을 구비한다.Vertical fall bat installation device 100 to which the technique of the present invention is applied, has a network 101 having a dense mesh, one or one on the edge of the network 101 and the width direction of the network 101 The bat 103 which fixed the guard 102 mentioned above is provided.

상기 방망(103)의 상,하측에 구비되는 가드(102)의 일측(104)에는 고정밴드(105)를 고정하여 개구부(106)에 설치되는 고정수단(107)과 결속시키고, 상기 가드(102)의 다른측(108)에는 결속밴드(109,110)를 고정한다.The fixing band 105 is fixed to one side 104 of the guard 102 provided at the upper and lower sides of the bat 103 to bind with the fixing means 107 installed at the opening 106. Fastening bands 109 and 110 are fixed to the other side 108).

상기 결속밴드(109,110)는 개구부(106)의 코너에 설치되는 견인가이드(111)를 경유한 후 견인수단(112)에 의하여 팽팽한 장력을 유지한 상태로 단속되어 방망(103)에 작업자나 작업도구 또는 이물질이 부딪치더라도 외부로 낙하 또는 추락하는 것을 방지할 수 있을 것이다.The binding bands 109 and 110 are intermittently held by the towing means 112 to maintain a tight tension after passing through the towing guide 111 installed at the corner of the opening 106. Alternatively, even if the foreign material hits it can be prevented from falling or falling outside.

상기 견인가이드(111)는, 동일한 길이를 가지는 한 쌍의 빗변부(113)와 빗변부(113)에 비하여 상대적으로 길이가 긴 밑변부(114)를 가지는 이등변삼각형상의 가이드바디(115)를 구비하고, 상기 가이드바디(115)는 금속봉재를 절곡 또는 다이캐스팅, 사출성형 등을 통하여 구성한다.The traction guide 111 has an isosceles triangular guide body 115 having a pair of hypotenuse portions 113 having the same length and a base portion 114 having a relatively longer length than the hypotenuse portion 113. And, the guide body 115 is configured through bending or die casting, injection molding and the like metal rod.

상기 견인가이드(111)의 빗변부(113)와 밑변부(114)가 이루는 삼각형상의 공간부(116)를 통하여 결속밴드(109,110)가 수평상태로 진입한 후 개구부(106)의 코너위치에서 코너에 대하여 45°의 경사를 가지는 밑변부(114)를 경유하여 두 결속밴드(109,110)가 마주보게 상,하측으로 방향을 전환하여 수직상태로 전환할 수 있도록 한다.After the binding bands 109 and 110 enter the horizontal state through the triangular space portions 116 formed by the hypotenuse portion 113 and the base portion 114 of the traction guide 111, the corners are at the corner positions of the openings 106. The two binding bands 109 and 110 face up and down to face each other via the base 114 having an inclination of 45 ° with respect to the vertical side.

상기 고정수단(107)과 견인가이드(111)은 앵커세트볼트를 이용하여 개구부(106)의 코너에 고정하여 사용할 수 있으나 본원 출원인이 선출원한 특허출원(제 2011 - 88694 호)에 기재된 방망 설치구를 이용하는 것이 수직형 추락 방망(103)을 개구부(106)의 중앙과 외측으로 가변시켜 개구부(106)에 난간대와 창호를 설치할 때까지 해체하지 않음으로 방망(103) 본래의 목적을 충실하게 달성할 수 있을 것이다.The fixing means 107 and the traction guide 111 can be fixed to the corner of the opening 106 using an anchor set bolt, but the bat installation device described in the patent application (No. 2011-88694) filed by the applicant of the present application It is possible to faithfully achieve the original purpose of the bat 103 by varying the vertical fall bat 103 to the center and the outside of the opening 106 so as not to dismantle until the handrail and the windows are installed in the opening 106. Could be.

상기 견인가이드(111)의 밑변부(114) 인접위치에는 밑변부(114)를 경유하는 결속밴드(109,110)가 당겨질 때 꼬이거나 비틀리는 현상을 방지하여 결속밴 드(109,110)가 항상 면 접촉상태를 유지할 수 있도록 꼬임방지가이드(120)를 더 구비하도록 한다.The binding bands 109 and 110 are always in surface contact state by preventing the twisting or twisting phenomenon when the binding bands 109 and 110 are pulled through the lower side 114 at the adjacent position of the bottom side 114 of the traction guide 111. To further maintain the twist guide 120 to maintain the.

상기 견인수단(112)은, 견인가이드(111)를 통과하면서 방향을 전환한 결속밴드(109,110)의 양단부를 결합 또는 연결하여 결속밴드(109,110)를 당겨 팽팽한 긴장상태로 유지할 수 있도록 통상적인 턴버클 또는 래칫조합으로 구성한다.The towing means 112 is a conventional turnbuckle or the like to be coupled to or connected to both ends of the binding bands (109, 110) to change the direction while passing through the traction guide 111 to maintain the tension band by pulling the binding band (109,110) It consists of a ratchet combination.

상기 결속밴드(109,110)의 어느 한 끝단부는 턴버클 또는 래칫조합으로 구성되는 견인수단(112)과 고정하고, 다른 한 끝단부는 견인수단(112)과 결합 또는 분리될 수 있게 하고, 견인수단(112)의 작동에 의하여 결속밴드(109,110)가 당겨져 팽팽한 상태를 유지할 수 있도록 한다.One end of the coupling band 109 and 110 is fixed to the pulling means 112 constituted by a turnbuckle or a ratchet combination and the other end is engaged with or separated from the pulling means 112, The binding bands 109 and 110 can be pulled to maintain a tight state.

물론, 상기 결속밴드(109,110)의 양단부에 걸고리와 같은 걸이수단을 이용하여 견인수단(112)과 결합과 분리를 용이하게 하면서 견인가이드(111)로의 진입 또한 용이하게 이루어질 수 있도록 하여도 무방할 것이다.Of course, by using hooking means such as hooks at both ends of the binding bands (109, 110) to facilitate the engagement and separation with the towing means 112, it may be also made easy to enter the towing guide 111. .

상기 견인수단(112)은, 방망(103)의 폭이 좁을 경우에는 결속밴드(109,110)가 상,하측에 하나씩 구비되나, 방망(103)의 폭이 넓을 경우에는 상,하측은 물론 중간위치에 고정되는 가드(102)의 양측에도 고정밴드(105)와 결속밴드(109,110)를 고정하고, 상측과 그 하방에 구비되는 결속밴드(109,110)를 견인수단(112)으로 결속하고, 하측과 그 상방에 구비되는 결속밴드(109,110)를 또 다른 견인수단(112)으로 결속하여 방망(103)이 팽팽한 상태를 유지할 수 있도록 하여도 된다.The towing means 112, when the width of the bat 103 is narrow, the binding bands (109, 110) are provided one at the top, the lower side, but if the width of the bat 103 is wide, as well as the upper and lower sides of the intermediate position The fixing band 105 and the binding bands 109 and 110 are also fixed to both sides of the guard 102 to be fixed, and the binding bands 109 and 110 provided on the upper side and the lower side are bound by the towing means 112, and the lower side and the upper side thereof. The binding bands (109, 110) provided in the binding to another traction means 112 may be to maintain the bat 103 in a taut state.

이때에는, 개구부(106)의 코너위치에만 견인가이드(111)를 고정하지 않고 방망(103)의 중간위치에 구비되는 결속밴드(109,110) 위치에 수직면에도 견인가이드(111)를 고정하는 것은 당연하다 할 것이다.At this time, it is natural that the traction guide 111 is not fixed to the corner position of the opening 106 but also fixed to the vertical band at the binding bands 109 and 110 provided at the intermediate position of the bat 103. something to do.

상기와 같은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치(100)를 이용하여 개구부(106)에 방망(103)을 설치하는 과정을 살펴보면 다음과 같다.Looking at the process of installing the bat 103 in the opening 106 by using the vertical fall bat installation device 100 applied the technology of the present invention as described above are as follows.

망체(101)에 가드(102)가 고정되고, 가드(102)에는 고정밴드(105)와 결속밴드(109,110)를 고정한 방망(103)의 준비가 완료되면, 개구부(106)의 일측 상,하측 코너부위에 고정수단(107)을 설치하여 고정밴드(105)를 견고하게 고정한다.When the guard 102 is fixed to the mesh 101, and the preparation of the bat 103 fixing the fixing band 105 and the binding bands 109 and 110 to the guard 102 is completed, one side up and down of the opening 106 is completed. The fixing means 107 is installed at the corner to fix the fixing band 105 firmly.

상기 고정수단(107)이 설치된 대향 위치의 개구부(106) 코너 위치에는 고정수단(107)을 이용하여 견인가이드(111)를 설치하거나 또는 본원 출원인이 선출원한 특허출원(2011 - 88694 호)의 방망 설치구에 결합 또는 고정시켜 사용하여도 무방할 것이다.At the corner of the opening 106 in the opposite position where the fixing means 107 is installed, a traction guide 111 is installed using the fixing means 107 or a patent application (2011-88694) filed by the applicant of the present application. It may be used in combination or fixed to the mounting fixture.

상기 견인가이드(111)의 설치가 완료되면, 결속밴드(109,110)를 견인가이드(111)를 구성하는 공간부(116)로 진입시킨 후, 밑변부(114)를 통하여 방향을 하향 또는 상향으로 전환되도록 한다.When the installation of the traction guide 111 is completed, the binding bands 109 and 110 enter the space 116 constituting the traction guide 111, and then the direction is changed downward or upward through the bottom side 114. Be sure to

그러면, 결속밴드(109,110)는 수평상태로 견인가이드(111)의 공간부(116)로 진입한 후 밑변부(114)를 통하여 수직상태로 방향을 전환하게 되며, 이때 밑변부(114) 인접위치에 더 구비되는 꼬임방지가이드(120)에 의하여 결속밴드(109,110)가 꼬이거나 비틀리지 않고 밑변부(114)와 결속밴드(109,110)가 면접촉상태를 유지할 수 있게 된다.Then, the binding bands 109 and 110 enter the space portion 116 of the traction guide 111 in a horizontal state and then change the direction through the bottom side 114 in a vertical state, and at this time, the adjacent position of the bottom side 114. By the anti-twist guide 120 is further provided in the binding bands (109, 110) is not twisted or twisted so that the bottom portion 114 and the binding bands (109, 110) can maintain the surface contact state.

이러한 상태에서 결속밴드(109,110)의 양 끝단부를 견인수단(112)과 결합시킨 후 견인수단(112)을 이용하여 결속밴드(109,110)를 당겨서 팽팽한 상태를 유지함으로서 설치를 완료할 수 있게 된다.In such a state, the both ends of the binding bands 109 and 110 may be combined with the towing means 112, and the binding bands 109 and 110 may be pulled using the towing means 112 to maintain a taut state.

도 6은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 3 실시 예를 도시한 구성도로서, 방망(103)의 수평방향에 결속밴드(109,110)를 고정하여 방망(103)의 수직방향에서 결속밴드(109,110)를 견인수단(112)으로 견인할 경우 수평방향의 가드(102)는 팽팽한 상태를 유지할 수 있으나 수직방향의 가드(102)는 팽팽한 상태를 유지하지 못하는 현상이 발생하는 데 이를 보완할 수 있도록 한 것이다.FIG. 6 is a configuration diagram showing three embodiments of a vertical fall bat installation apparatus to which the technique of the present invention is applied, in which the binding bands 109 and 110 are fixed to the horizontal direction of the bat 103 in the vertical direction of the bat 103. FIG. When the towing bands 109 and 110 are towed by the towing means 112, the horizontal guard 102 can maintain the tension, but the vertical guard 102 cannot maintain the tension. It is to be done.

상기 방망(103)의 수직방향 가드(102)에 결속밴드(109)를 고정하고 상기 결속밴드(109)는 수평방향 가드(102)에 고정되는 견인고리(120)를 경유한 후 개구부(106)에 설치되는 견인가이드(111)를 통하여 견인수단(112)과 연결하여 당겨지도록 함으로서 방망(103)의 수직 및 수평방향을 동시에 당길 수 있도록 구성한다.The binding band 109 is fixed to the vertical guard 102 of the bat 103, and the binding band 109 passes through the traction ring 120 fixed to the horizontal guard 102, and then the opening 106. It is configured to be pulled in connection with the towing means 112 through the towing guide 111 is installed in the vertical and horizontal directions of the bat 103 at the same time.

이 과정에서 상기 결속밴드(109,110)는 방망(103)의 수직방향의 가드(102)에서 수평방향의 가드(102)의 코너부위를 대각선 형태로 연결되도록 하는 것은 당연할 것이다.In this process, it will be obvious that the binding bands 109 and 110 are connected to the corners of the guard 102 in the horizontal direction from the guard 102 in the vertical direction of the bat 103 in a diagonal form.

도 7은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 4 실시 예를 도시한 구성도로서, 상기 방망(103)의 수평방향 가드(102)에 견인수단(112)을 고정하고, 수직방향 가드(102)에는 결속밴드(109,110)를 고정하여 결속밴드(109,110)가 개구부(106)에 설치되는 견인가이드(111)를 통하여 견인수단(112)과 연결되어 당겨지도록 하여도 된다.FIG. 7 is a block diagram showing four embodiments of the vertical fall bat installation apparatus to which the technique of the present invention is applied. The pulling means 112 is fixed to the horizontal guard 102 of the bat 103 and the vertical direction. The binding bands 109 and 110 may be fixed to the guard 102 so that the binding bands 109 and 110 may be connected to and pulled from the towing means 112 through the traction guide 111 installed in the opening 106.

도 8은 본 발명의 기술이 적용된 수직형 추락 방망 설치장치의 5 실시 예를 도시한 구성도로서, 상기 방망(103)을 구성하는 가드(102)와 상기 가드(102)에 고정되는 결속밴드(109,110)가 견인수단(112)에 의하여 당겨질 때 서로 이격(벌어지는) 되는 것을 방지할 수 있도록 가드(102)에 결속밴드(109,110)가 경유할 수 있는 가이드밴드(125)를 더 구비하여도 무방할 것이다.8 is a configuration diagram showing five embodiments of the vertical fall bat installation apparatus to which the technique of the present invention is applied, the guard band constituting the bat 103 and the binding band fixed to the guard 102 ( The guard band 102 may further include a guide band 125 through which the binding bands 109 and 110 may pass through to prevent the 109 and 110 from being separated from each other when being pulled by the towing means 112. will be.

이러한 본 발명은 수직형 추락 방망(103)의 설치와 해체 작업을 용이하게 수행할 수 있어 전체적인 설치작업을 대폭 단축할 수 있는 것은 물론, 방망(103)을 견고한 상태로 유지할 수 있어 설치 후 시간이 많이 경과 한 후에도 실내에서 작업과정에서 추락과 같은 안전사고를 방지할 수 있게 된다.The present invention can easily perform the installation and dismantling operation of the vertical fall bat 103 can greatly reduce the overall installation work, as well as maintain the bat 103 in a solid state time after installation Even after much elapses, it is possible to prevent safety accidents such as falls during work indoors.

또한, 방망(103)에 고정되는 고정밴드(105)를 고정하기 위한 고정수단(107)과 결속밴드(109,110)를 유지하여 가이드 하기 위한 견인가이드(111)를 앵커세트볼트를 이용하여도 되나, 본원 출원인이 선출원한 특허출원(2011 - 88694 호)의 방망 설치구를 이용할 경우에는 설치된 방망(103)을 견고하게 유지하면서도 개구부(106)의 내, 외측으로 이동(가변)을 용이하게 할 수 있기 때문에 개구부(106)에 난간대 또는 창호의 설치가 완료될 때까지 방망(103)를 개구부(106)에 잔존시킬 수 있어 방망이 추구하고자 추락방지 및 이물질의 실외유출을 충실하게 달성할 수 있는 장점을 가진다.In addition, the anchor set bolt may be used for the traction guide 111 for holding and guiding the fixing means 107 and the binding bands 109 and 110 for fixing the fixing band 105 fixed to the bat 103, In case of using the batting device of the patent application (2011-88694), the applicant of the present application can easily move (variable) in and out of the opening 106 while maintaining the bat 103 installed firmly. Therefore, the batter 103 can remain in the opening 106 until the installation of the handrail or window in the opening 106 is completed, and thus, the bat has the advantage of faithfully achieving the fall prevention and the outflow of foreign substances in order to pursue the bat. .

100; 방망 설치장치
103; 방망
105; 고정밴드
107; 고정수단
109,110; 결속밴드
111; 견인가이드
112; 견인수단
115; 가이드바디
120; 꼬임방지가이드
100; Bat Mounting Device
103; Bat
105; Fixed band
107; Fixing means
109,110; Binding band
111; Towing guide
112; Towing means
115; Guide Body
120; Twist Prevention Guide

Claims (7)

망목을 가지는 망체와;
상기 망체의 가장자리 또는 망체의 폭 방향에 하나 또는 하나 이상의 가드를 고정하여 구비하는 방망과;
상기 방망의 상,하측에 구비되는 가드의 일측에 고정하여 개구부에 설치되는 고정수단과 결속시키는 고정밴드와;
상기 가드의 다른측에 고정하는 결속밴드와;
상기 개구부의 코너에 설치되어 결속밴드를 안내하는 견인가이드와;
상기 견인가이드를 경유한 결속밴드를 팽팽한 장력을 유지한 상태로 단속하는 견인수단을 포함하는 것을 특징으로 하는 수직형 추락 방망 설치장치.
A network having a network;
A bat having one or more guards fixed to the edge of the mesh or the width direction of the mesh;
A fixing band which is fixed to one side of the guard provided on the upper and lower sides of the bat to bind with fixing means installed in the opening;
A binding band fixed to the other side of the guard;
A traction guide installed at a corner of the opening to guide the binding band;
And a pulling means for controlling the binding band via the traction guide while maintaining the tension.
제 1 항에 있어서;
상기 견인가이드는, 동일한 길이를 가지는 한 쌍의 빗변부와;
상기 빗변부에 비하여 상대적으로 길이가 긴 밑변부를 가지고 이등변삼각형상으로 구비하는 가이드바디로 구성하고;
상기 빗변부와 밑변부가 이루는 삼각형상의 공간부를 통하여 결속밴드가 수평상태로 진입한 후 개구부의 코너위치에서 코너에 대하여 45°의 경사를 가지는 밑변부를 경유하여 두 결속밴드가 마주보게 상,하측으로 방향을 전환하여 수직상태로 전환할 수 있게 하는 것을 특징으로 하는 수직형 추락 방망 설치장치.
The method of claim 1, further comprising:
The traction guide includes a pair of hypotenuses having the same length;
It consists of a guide body having a base having a relatively long length compared to the hypotenuse portion in an isosceles triangle shape;
After the binding band enters a horizontal state through the triangular space formed by the hypotenuse and the bottom, the two binding bands face upwards and downwards through the bottom edge having an inclination of 45 ° with respect to the corner at the corner position of the opening. Vertical fall bat installation device, characterized in that to switch to the vertical state by switching.
제 1 항에 있어서;
상기 견인가이드의 밑변부 인접위치에는 밑변부를 경유하는 결속밴드가 당겨질 때 꼬이거나 비틀리는 현상을 방지하기 위한 꼬임방지가이드를 더 형성하는 것을 특징으로 하는 수직형 추락 방망 설치장치.
The method of claim 1, further comprising:
Vertical fall bat installation device, characterized in that to form an additional twist prevention guide for preventing the twisting or twisting phenomenon when the binding band passing through the bottom side in the adjacent position of the towing guide.
제 1 항에 있어서;
상기 견인수단은 견인가이드를 통과하면서 방향을 전환한 결속밴드의 양단부를 결합 또는 연결하여 결속밴드를 당겨 팽팽한 장력을 유지함과 아울러 해체의 용이성을 제공할 수 있도록 턴버클 또는 래칫조합으로 구성하는 것을 특징으로 하는 수직형 추락 방망 설치장치.
The method of claim 1, further comprising:
The towing means is characterized in that it consists of a turnbuckle or ratchet combination to maintain the tension and to provide ease of disengagement by engaging or connecting both ends of the binding band is changed direction while passing through the traction guide Vertical fall bat installation device.
제 1 항에 있어서;
상기 방망의 수직방향 가드에 결속밴드를 고정하고;
상기 결속밴드는 수평방향 가드에 고정되는 견인고리를 경유한 후 개구부에 설치되는 견인가이드를 통하여 견인수단과 연결하여 방망의 수직방향과 수평방향을 동시에 당길 수 있도록 구성하는 것을 특징으로 하는 수직형 추락 방망 설치장치.
The method of claim 1, further comprising:
Fixing a binding band to the guard in the vertical direction of the hedge;
The binding band is a vertical fall, characterized in that configured to be pulled in the vertical and horizontal direction of the bat at the same time by connecting to the traction means through the traction guide installed in the opening after the traction ring is fixed to the horizontal direction guard Bat Mounting Device.
제 1 항에 있어서;
상기 방망의 수평방향 가드에 견인수단을 고정하고;
상기 방망의 수직방향 가드에 결속밴드를 고정하여 결속밴드가 개구부에 설치되는 견인가이드를 통하여 견인수단과 연결되어 당겨지도록 구성하는 것을 특징으로 하는 수직형 추락 방망 설치장치.
The method of claim 1, further comprising:
Fixing traction means to the horizontal guard of the bat;
And a binding band fixed to the vertical guard of the bat so that the binding band is pulled in connection with the towing means through a towing guide installed in the opening.
제 1 항 내지 제 6 항 중 어느 한 항에 있어서;
상기 방망을 구성하는 가드에는 결속밴드가 견인수단에 의하여 당겨질 때 가드와 결속밴드가 서로 이격되는 것을 방지할 수 있도록 가이드밴드를 더 구비하는 것을 특징으로 하는 수직형 추락 방망 설치장치.
The method of any one of claims 1 to 6;
And a guard band constituting the bat further comprises a guide band to prevent the guard and the band from being separated from each other when the band is pulled by the towing means.
KR1020110107155A 2011-10-19 2011-10-19 Fixing device for construction protective net KR101435528B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110107155A KR101435528B1 (en) 2011-10-19 2011-10-19 Fixing device for construction protective net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110107155A KR101435528B1 (en) 2011-10-19 2011-10-19 Fixing device for construction protective net

Publications (2)

Publication Number Publication Date
KR20130042972A true KR20130042972A (en) 2013-04-29
KR101435528B1 KR101435528B1 (en) 2014-09-11

Family

ID=48441426

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110107155A KR101435528B1 (en) 2011-10-19 2011-10-19 Fixing device for construction protective net

Country Status (1)

Country Link
KR (1) KR101435528B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453203A (en) * 2014-12-09 2015-03-25 重庆建工第九建设有限公司 Scaffold external corner protector
KR102129545B1 (en) 2018-06-25 2020-07-02 쓰리에스코리아(주) Safety net connecting apparatus for gang form

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200446067Y1 (en) * 2008-09-05 2009-09-24 현대 아이앤에스(주) A safety fence
KR101022463B1 (en) * 2010-01-18 2011-03-16 김성식 Connecting structure of vertical protection net for construction

Also Published As

Publication number Publication date
KR101435528B1 (en) 2014-09-11

Similar Documents

Publication Publication Date Title
KR101246665B1 (en) Supporting bracket and supporting device with safety net using thereof
KR101263002B1 (en) fall preventing safety net apparatus
KR200400993Y1 (en) Safe support means of parapet for construction's work
KR20120129415A (en) Installation structure of rock fall net
KR20130042972A (en) Fixing device for construction protective net
KR20200126688A (en) Safety device for inter-layer slab
KR200446067Y1 (en) A safety fence
JP7464177B2 (en) Anti-scattering device and anti-scattering method
KR101541837B1 (en) Falling and falling object protection device for concrete form
KR102153895B1 (en) The Construction safety net construction method and its equipment
US6035967A (en) Safety apparatus using parallel line catchers for elevated work site operations
KR20110004717A (en) The safety fence of balcony
CN203626276U (en) Hanging structure of horizontal safety net
KR101928383B1 (en) Vertically installed net for fall prevention
KR20170000701U (en) Building vertical safety net
KR101407063B1 (en) Fence connecting device
CN205777440U (en) A kind of scaffold with safety guard net
KR101209190B1 (en) Construction for protective net
KR20120001878U (en) Tensioning device of dust net and safety net
EP1972739A2 (en) Extendable safety guardrail
KR101019118B1 (en) Wire connecting assembly
KR100912199B1 (en) Fixing device of wire lope for falling rock preventing net
KR101277515B1 (en) Fixing device for construction protective net
KR200465064Y1 (en) A corner guider for construction for protective net
KR200495306Y1 (en) Scaffold tread plate tightening device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20170823

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180822

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190823

Year of fee payment: 6