KR20120140284A - The the construction method for bit corner-cover bathroom type - Google Patents

The the construction method for bit corner-cover bathroom type Download PDF

Info

Publication number
KR20120140284A
KR20120140284A KR1020110059909A KR20110059909A KR20120140284A KR 20120140284 A KR20120140284 A KR 20120140284A KR 1020110059909 A KR1020110059909 A KR 1020110059909A KR 20110059909 A KR20110059909 A KR 20110059909A KR 20120140284 A KR20120140284 A KR 20120140284A
Authority
KR
South Korea
Prior art keywords
duct
bathroom
finishing
corner bracket
corner
Prior art date
Application number
KR1020110059909A
Other languages
Korean (ko)
Inventor
배기호
Original Assignee
배기호
주범수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 배기호, 주범수 filed Critical 배기호
Priority to KR1020110059909A priority Critical patent/KR20120140284A/en
Publication of KR20120140284A publication Critical patent/KR20120140284A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/022Borders; Finishing strips, e.g. beadings; Light coves for use at vertical intersections of walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/06Borders; Finishing strips, e.g. beadings; Light coves specially designed for securing panels or masking the edges of wall- or floor-covering elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to a construction method of the duct finishing material for the bathroom.
The construction method of the duct finisher for the bathroom of the present invention comprises a construction preparation step for arranging the walls and floors of the bathroom adjacent to the duct in which the main pipe is installed; Corner bracket installation step of constructing corner brackets at a predetermined distance in the vertical direction on the wall surface of the bathroom adjacent to the duct; Panel installation step of fixing the panel to the corner bracket to surround the duct; A corner bracket installation step of fixing the corner brackets while the panels are formed at right angles to form corners; An impact resistant finishing material installation step of installing an impact resistant finishing material on the corner bracket; And a finishing step of finishing by attaching tiles to the surfaces of the panels fixed to the corner brackets.
According to the present invention, the construction of the duct finishing material for the bathroom, which is not only a skilled person, but also requires a curing period of cement and bricks, since the wall covering the duct where the main pipe is installed is prefabricated, and the construction period is greatly reduced. to provide.

Description

Construction method of duct finish material for bathroom {THE THE CONSTRUCTION METHOD FOR BIT CORNER-COVER BATHROOM TYPE}

The present invention relates to a method for constructing a duct finisher for a bathroom, and more specifically, it is possible to construct a wall that surrounds a duct in which a main pipe is installed in a prefabricated manner even if the skilled person is not skilled, and does not require curing period of cement and brick. The present invention relates to a construction method of duct finishes for bathrooms, which greatly reduces the construction period.

In general, there is a duct in which a main pipe is installed in a bathroom such as a multi-family house, and such a duct is usually finished with a wall made of concrete or brick.

In the present invention, the bathroom means a bathroom or a bathroom equipped with a toilet.

As such, the wall of the bathroom installed to surround the duct has a lot of research due to the nature of moisture and noise due to the frequent use of water in the home by frequent shower, washing, toilet, laundry, etc. .

For example, Korean Patent Publication No. 10-0730239 discloses a construction method for constructing a pipe duct or an air duct that protects a drain pipe installed in a bathroom or a balcony, wherein the foamed polystyrene foam board is formed on one surface or both surfaces thereof. Lightweight non-insulating insulation board or magnesium foam board, or foamed polystyrene foam board, glass fiber mesh is installed on one surface or both surfaces and mortar is applied on the surface by 1-3mm to form surface reinforcement layer. Lightweight, non-flammable insulation board with magnesium board, which constitutes air or pipe ducts installed inside the bathroom or balcony, and the side wall or ceiling of the building using fastening means such as connecting accessories, adhesives, bolts, etc. Fix the wall of the air duct or pipe duct that is a non-bearing wall to the lower end of the duct by applying a waterproofing agent Air pipes and pipe duct construction method of the bath and a balcony, characterized in that so as to be fixed with the dakmyeon is disclosed.

However, the conventional technology as described above is possible to maintain, but first, it is impossible to prevent damage caused by moisture, second, it is impossible to block the noise generated in the main pipe of the duct, third, when installed adjacent to the outside air Insulation is inferior, safety prevention is impossible, and fourth, there is a structural problem that is easily broken due to the weak binding force of the corner portion.

Korean Patent Publication No. 10-0730239, 'Air duct and pipe duct construction method for bathroom or balcony'

The present invention is to solve such a problem, it is possible to construct a wall that surrounds the duct to install the main pipe in a prefabricated manner not only skilled construction, but also need a curing period of cement and brick, bathroom construction time is significantly reduced It is to provide a construction method of the duct finish material for the.

In addition, it is also to provide a construction method of the duct finish material for the bathroom is easy to maintain, because it is not necessary to tear down the wall when the main pipe is repaired prefabricated.

In addition, to provide a construction method of the duct finish material for the bathroom to prevent the safety accident caused by the wall edge due to the sliding of the bathroom.

In addition, due to the panels to close the duct is excellent in sound insulation, heat insulation, fire resistance and waterproof and durable, and to provide a construction method of the duct finish material for the bathroom to block the electromagnetic waves.

Construction method of the duct finisher for the bathroom of the present invention for achieving the above object comprises a construction preparation step of arranging the wall surface and the floor of the bathroom adjacent to the duct is installed main pipe; Corner bracket installation step of constructing corner brackets at a predetermined distance in the vertical direction on the wall surface of the bathroom adjacent to the duct; Panel installation step of fixing the panel to the corner bracket to surround the duct; A corner bracket installation step of fixing the corner brackets while the panels are formed at right angles to form corners; An impact resistant finishing material installation step of installing an impact resistant finishing material on the corner bracket; And a finishing step of finishing by attaching tiles to the surfaces of the panels fixed to the corner brackets.

The panel is preferably manufactured by attaching an aluminum foil to the surface of the magnesium board.

In addition, the corner bracket is a "b" shape, the fitting grooves are formed at both ends along the length, respectively formed between the fitting grooves between the first, second support protrusions having different lengths, formed in the diagonal direction It is preferably made of a saw blade groove.

In addition, the impact preventing finish material is an arrow shape, the impact preventing portion forming a round shape, the saw blade projection is formed along the length at the lower end of the impact preventing portion, formed between the saw blade projection and the impact preventing portion, the angle of 45 degrees left and right It is preferably made of a finishing projection that is formed on each side protruding.

In addition, it is preferable that the end of the finishing protrusion is tapered to prevent foreign matter from being caught inside the finishing protrusion.

By the above solution, the present invention can be constructed even if the skilled person is not a skilled construction by the wall surrounding the duct on which the main pipe is installed, as well as the curing period of cement and brick is not required, the construction period is greatly reduced.

In addition, there is no need to tear down the wall when the main pipe is repaired because of the prefabricated structure.

In addition, there is an effect of preventing the safety accident caused by the edge of the wall due to the sliding of the bathroom.

In addition, due to the panels covering the duct is excellent in sound insulation, heat insulation, fire resistance and waterproof and durable, and also has the effect of blocking the electromagnetic waves.

1 is a schematic view of the construction method of the duct finish material for a bathroom of the present invention.
Figure 2 is a perspective view of the duct finisher for the bathroom of the present invention.
3 is an exploded view of the duct finish material for a bathroom of the present invention.
Figure 4 is a plan sectional view of the duct finisher for the bathroom of the present invention.
Figure 5 is a construction state of the duct finisher for the bathroom of the present invention.

Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described.

1 is a schematic view of the construction method of the bathroom duct finish material of the present invention, Figure 2 is a perspective view of the duct finish material for the bathroom of the present invention, Figure 3 is an exploded view of the bathroom duct finish material, Figure 4 is a bathroom for the present invention Fig. 5 is a plan view showing a construction state of the duct finisher for the bathroom of the present invention.

1 to 5, the construction method of the duct finishing material for the bathroom of the present invention is the construction preparation step (S10), corner bracket installation step (S20), panel installation step (S30), corner bracket installation step (S40), the impact preventing finish material installation step (S50), and the finishing step (S60).

The construction preparation step (S10) is a step of arranging the wall and the floor of the bathroom adjacent to the duct (A) where the main pipe is installed.

At this time, it is preferable to set the position of the corner clamp (C) on the wall of the bathroom to reduce the error during construction.

The corner bracket installation step S20 is a step of constructing corner brackets C at a predetermined distance in the vertical direction on the wall surface of the bathroom adjacent to the duct A.

Such a corner bracket (C) is preferably constructed at a distance of 50 cm from each other in the "b" shape.

The panel installation step (S30) is a step of fixing the panel 100 to the corner bracket (C) to surround the duct (A).

At this time, the panel 100 is fixed to the wall surface of the bathroom to form a right angle to each other to surround the duct (A) where the main pipe is installed to protect the duct.

The panel 100 is preferably manufactured by attaching the aluminum foil 120 to the surface of the magnesium board 110.

Here, the magnesium board 110 is a flame retardant grade 1 product, which is excellent in fire resistance, has no deformation against moisture, is excellent in waterproofness and has high strength, and is an environmentally friendly building material that blocks durability and harmful electromagnetic waves.

At this time, by using the aluminum foil 120 attached to the surface of the magnesium board 110 to effectively block the heat when adjoining the outside air to prevent the outside air to enter the inside or the bet to go outside.

In addition, the panel 100 can be assembled and processed in the field, unlike the wall made of cement and brick, it is possible to construct even if you are not skilled.

The corner bracket installation step (S40) is a step of fixing the corner brackets 200 by inserting the panel brackets 100 at right angles to form corners.

The corner bracket 200 has a length “b” shaped to be fitted between the panels 100 to form a corner at right angles to each other to be firmly coupled to the panels 100.

The corner brackets 200 are formed with fitting grooves 210 formed at both ends along the length thereof, and the fitting grooves 210 are interposed therebetween, and the first and second supporting protrusions 220 and 230 having different lengths from each other. It consists of a saw blade groove 250 formed in an oblique direction.

At this time, the first support protrusion 220 is preferably shorter the protruding length than the second support protrusion 230 to facilitate the fitting coupling of the panel 100.

In addition, the material of the corner bracket 200 is preferably made of rigid PVC.

The anti-impact finish material installation step (S50) is a step of fitting the anti-impact finish material 300 to the corner bracket 200.

The impact preventing finish material 300 is fitted in the diagonal direction in the corner bracket 200 in the shape of an arrow having a length.

The anti-impact finish 300 prevents the safety accidents caused by the wall edges of the bathroom, and prevents the breakage of the tiles (B) attached to the edges formed by the panels 100 and finished. .

The impact preventing finish material 300 is a saw blade protrusion 320, a saw blade protrusion 320 is formed along the length at the lower end of the impact preventing portion 310 to form a round shape, the saw blade projection 320 and the impact protection portion It is formed between the 310, made of a 45 degree angle is formed of the finishing projections 330 protruding on each of the left and right sides.

That is, the saw blade projection 320 of the impact preventing finish material 300 is inserted into the saw blade groove 250 of the corner bracket 200 to prevent the cracks of the tiles of the corner portion formed by the panel 100 through the finishing protrusion 330. And prevent the safety accident caused by hitting the corners, such as sliding in the bathroom due to the impact prevention unit 310

At this time, the material of the impact preventing finish 300 is preferably made of soft PVC.

In addition, the end of the finishing protrusion 330 is formed to be tapered to prevent the foreign matter is caught in the interior of the finishing protrusion 330.

The finishing step (S60) is a step of pasting the tile (B) to the surface of the panel 100 is fixed to the corner bracket 200.

At this time, the gap of the panel 100 adjacent to the floor and the ceiling of the bathroom is preferably waterproof.

As such, the present invention, first, the construction of the wall surrounding the duct to be installed the main pipe is prefabricated, not only can be installed by skilled workers, but also no need for curing period of cement and brick construction period significantly reduced, maintenance of the main pipe Maintenance is easy because there is no need to tear down the wall. Second, it prevents safety accidents caused by the edges of the wall due to slipping of the bathroom. Third, the panels that close the duct provide sound insulation, heat insulation, fire resistance and waterproofness and durability. In addition to being excellent, there is an effect of blocking electromagnetic waves.

As described above, according to the present invention, the wall covering the duct to which the main pipe is installed is prefabricated and can be installed even if the skilled person is not skilled, as well as the curing period of the cement and brick is not necessary, and thus the construction period is drastically reduced. Provide construction method of

In addition, it provides a construction method of the duct finisher for the bathroom is easy to maintain, because it is not necessary to tear down the wall when the main pipe is repaired prefabricated.

In addition, there is also provided a construction method of the duct finishing material for the bathroom to prevent a safety accident caused by the edge of the wall due to the sliding of the bathroom.

In addition, the panels to close the duct provides excellent sound insulation, heat insulation, fire resistance and waterproof and durable, and also provides a construction method of the duct finish material for the bathroom to block the electromagnetic waves.

S10: Construction Preparation Stage
S20: Corner bracket installation step
S30: Panel installation step
S40: Corner bracket installation step
S50: Installation step of impact prevention finish
S60: Finishing Step
A: Duct
B: Tile
C: Corner Brackets
100: panel
110: magnesium board
120: aluminum foil
200: Corner Bracket
210: fitting groove
220: first support protrusion
230: second support protrusion
250: saw blade groove
300: impact prevention finish
310: shock prevention part
320: saw blade
330: finish projection

Claims (5)

Construction preparation step (S10) for arranging the wall and floor of the bathroom adjacent to the duct (A) in which the main pipe is installed;
Corner clamp installation step (S20) for constructing corner brackets (C) at a predetermined distance in the vertical direction on the wall surface of the bathroom adjacent to the duct (A);
Panel installation step (S30) for fixing the panel 100 to the corner bracket (C) so as to surround the duct (A);
Corner bracket installation step (S40) of the panel 100 is installed at the right angles to each other to form a corner bracket 200 between the corners to be installed;
An impact prevention finishing material installation step (S50) of fitting the impact prevention finishing material 300 into the corner bracket 200; And
Construction method of the duct finishing material for a bathroom, characterized in that it comprises a finishing step (S60) to paste the tile (B) on the surface of the panel 100 is fixed to the corner bracket (200).
The method according to claim 1, wherein the panel 100 is manufactured by attaching an aluminum foil 120 to the surface of the magnesium board 110. According to claim 1, wherein the corner bracket 200 is a "b" shaped, the fitting grooves 210 are formed at both ends along the length, respectively formed between the fitting grooves 210 and the different lengths The first and second support protrusions 220 and 230 having, the construction method of the duct finishing material for the bathroom, characterized in that consisting of a saw blade groove 250 formed in an oblique direction. The method of claim 1, wherein the impact preventing finish material 300 is an arrow shape, the round shape of the impact preventing portion 310, the saw blade projection 320 is formed along the length of the lower end of the impact preventing portion 310, The saw blade protrusion 320 is formed between the impact preventing portion 310, the construction method of the duct finish material for the bathroom, characterized in that consisting of the finishing protrusions 330 are formed to protrude on the left and right sides at an angle of 45 degrees. The method of claim 4, wherein the end of the finishing protrusion 330 is tapered to prevent foreign matter from being caught inside the finishing protrusion 330.
KR1020110059909A 2011-06-21 2011-06-21 The the construction method for bit corner-cover bathroom type KR20120140284A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110059909A KR20120140284A (en) 2011-06-21 2011-06-21 The the construction method for bit corner-cover bathroom type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110059909A KR20120140284A (en) 2011-06-21 2011-06-21 The the construction method for bit corner-cover bathroom type

Publications (1)

Publication Number Publication Date
KR20120140284A true KR20120140284A (en) 2012-12-31

Family

ID=47906353

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110059909A KR20120140284A (en) 2011-06-21 2011-06-21 The the construction method for bit corner-cover bathroom type

Country Status (1)

Country Link
KR (1) KR20120140284A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592787A (en) * 2016-12-14 2017-04-26 陈杰良 Assembly for protecting wall surfaces of building against water leakage
CN106592785A (en) * 2016-12-14 2017-04-26 陈杰良 Method for protecting wall surfaces of building against water leakage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592787A (en) * 2016-12-14 2017-04-26 陈杰良 Assembly for protecting wall surfaces of building against water leakage
CN106592785A (en) * 2016-12-14 2017-04-26 陈杰良 Method for protecting wall surfaces of building against water leakage

Similar Documents

Publication Publication Date Title
KR100759368B1 (en) Prefabricating permanent form unit and wall construction method using the same
US8607523B2 (en) Building that uses composite light-weight panels for structure and a construction method therefor
KR101649969B1 (en) A Insulation end panels which can be Easily Dry-Finished and external wall insulation dry method using the same
JP2019504945A (en) Unit bus and manufacturing method thereof
KR101723976B1 (en) Building having double slave
KR20110104589A (en) Prefabricated wall panel and wall installation method using the same
KR20130098239A (en) Method of dry-constructuring outer wall with heat-isolating property
KR20130094040A (en) Ondol panel for proofing inter layer noise and for arranging heating pipe
KR20120000702A (en) Prefabricating permanent form unit with light weight materials and wall construction method using the same
KR20120140284A (en) The the construction method for bit corner-cover bathroom type
BG65765B1 (en) Heat insulation composite panel, method for the manufacture thereof, and building structure of such panels
KR101041582B1 (en) Prefabricated partition wall for apartment house has a lot of potential for recycling
KR20180062087A (en) Prefabrication Wall Of Bathroom And Installation Method Thereof
JP2015506426A (en) Connector having a conical or semi-conical projection
KR101272061B1 (en) The ceiling Panel
KR101351106B1 (en) Construction structure for inner-insulation of reinforced concrete wall and construction method thereof
RU2632617C2 (en) Method of facing facade of floors in monolithic construction of buildings
KR20120140283A (en) The duct-cover for bathroom type
KR20160023284A (en) Sandwich panels
KR200373829Y1 (en) Assembly set for a nonstructural dry wall
KR200396362Y1 (en) Wall structure for air duct and pipe duct of bathroom and balcony
KR200286459Y1 (en) A panel-coupler to protect concrete construction.
JP6043072B2 (en) Seismic insulation insulation structure
KR101250680B1 (en) Method for constructing bathroom using dry process
KR101776783B1 (en) Integrated module block for Building Construction

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E601 Decision to refuse application