KR20120013228A - Liquefied natural gas storage tank - Google Patents

Liquefied natural gas storage tank Download PDF

Info

Publication number
KR20120013228A
KR20120013228A KR1020110136446A KR20110136446A KR20120013228A KR 20120013228 A KR20120013228 A KR 20120013228A KR 1020110136446 A KR1020110136446 A KR 1020110136446A KR 20110136446 A KR20110136446 A KR 20110136446A KR 20120013228 A KR20120013228 A KR 20120013228A
Authority
KR
South Korea
Prior art keywords
secondary barrier
board
connection
barrier
lng storage
Prior art date
Application number
KR1020110136446A
Other languages
Korean (ko)
Other versions
KR101337635B1 (en
Inventor
신찬효
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to KR1020110136446A priority Critical patent/KR101337635B1/en
Publication of KR20120013228A publication Critical patent/KR20120013228A/en
Application granted granted Critical
Publication of KR101337635B1 publication Critical patent/KR101337635B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/40Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
    • B63B73/43Welding, e.g. laser welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/40Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
    • B63B73/46Gluing; Taping; Cold-bonding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/40Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
    • B63B73/49Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods by means of threaded members, e.g. screws, threaded bolts or nuts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C3/00Vessels not under pressure
    • F17C3/02Vessels not under pressure with provision for thermal insulation
    • F17C3/025Bulk storage in barges or on ships
    • F17C3/027Wallpanels for so-called membrane tanks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/01Reinforcing or suspension means
    • F17C2203/011Reinforcing means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/06Materials for walls or layers thereof; Properties or structures of walls or their materials
    • F17C2203/0602Wall structures; Special features thereof
    • F17C2203/0612Wall structures
    • F17C2203/0626Multiple walls
    • F17C2203/0631Three or more walls
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2209/00Vessel construction, in particular methods of manufacturing
    • F17C2209/22Assembling processes
    • F17C2209/221Welding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2209/00Vessel construction, in particular methods of manufacturing
    • F17C2209/22Assembling processes
    • F17C2209/227Assembling processes by adhesive means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2209/00Vessel construction, in particular methods of manufacturing
    • F17C2209/22Assembling processes
    • F17C2209/228Assembling processes by screws, bolts or rivets
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • F17C2270/0107Wall panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

PURPOSE: An LNG tank is provided to enhance the airtightness of a secondary barrier between lower insulating members by connecting a secondary barrier for assisting to a secondary barrier for connection. CONSTITUTION: An LNG tank comprises a plurality of lower insulating boards(20), an upper insulating board(30), a connecting board(40), a primary barrier(50), and a secondary barrier(60). The lower insulating boards are installed in inner hull of the LNG tank and are arranged at a first interval(G1). The upper insulating boards are respectively installed on the lower insulating boards. The upper insulating board establishes a second interval(G2) larger than the first interval. The connecting board is installed on the lower insulating board corresponding to the second interval. The connecting board connects the upper insulating boards.

Description

액화천연가스 저장 탱크 {LIQUEFIED NATURAL GAS STORAGE TANK}Liquefied natural gas storage tank {LIQUEFIED NATURAL GAS STORAGE TANK}

본 발명은 액화천연가스 저장 탱크에 관한 것이다.The present invention relates to a liquefied natural gas storage tank.

액화천연가스 저장 탱크는 액화천연가스 저장 탱크 내측으로부터 외측으로 배치되는 1차 방벽, 상부 단열보드, 2차 방벽 및 하부 단열보드를 내부 선체에 설치하여 형성된다. 이때, 액화천연가스 저장 탱크의 제작 과정은 내부 선체에 복수의 하부 단열보드를 고정시킨 후, 복수의 하부 단열보드 위에 2차 방벽을 설치하고, 2차 방벽 위에 상부 단열보드 및 1차 방벽을 설치하는 과정으로 이루어질 수 있다.The liquefied natural gas storage tank is formed by installing a primary barrier, an upper insulation board, a secondary barrier, and a lower insulation board disposed from the inside of the liquefied natural gas storage tank to the outside of the inner hull. At this time, the manufacturing process of the liquefied natural gas storage tank, after fixing a plurality of lower insulation boards to the inner hull, a secondary barrier is installed on the plurality of lower insulation boards, the upper insulation board and the primary barrier is installed on the secondary barrier. It can be done by the process.

예를 들면, 액화천연가스 저장 탱크의 제작 과정은, 하부 단열보드와 주 2차 방벽 및 상부 단열보드가 일체로 형성된 단열보드를 서로 이웃하여 내부 선체에 결합시킨 상태에서, 하부 단열보드 상의 주 2차 방벽 위 및 상부 단열보드 사이 공간에 보조 2차 방벽 및 연결보드를 설치한 후, 상부 단열보드와 연결보드 상에 1차 방벽을 설치하는 과정으로 이루어질 수 있다.For example, the manufacturing process of the LNG storage tank, Note 2 on the lower insulation board in a state in which the lower insulation board and the insulation board formed integrally with the main secondary barrier and the upper insulation board are adjacent to each other and coupled to the inner hull. After installing the secondary secondary barrier and the connection board in the space between the upper barrier and the upper insulation board, it can be made of a process of installing the primary barrier on the upper insulation board and the connection board.

이때, 2차 방벽은 하부 단열보드 상에 위치되는 주 2차 방벽에 보조 2차 방벽을 접착하여 형성된다. 이후, 연결보드는 보조 2차 방벽에 접합되어 서로 이웃하는 상부 단열보드 사이에 설치된다. 이와 같이, 주 2차 방벽 상에 보조 2차 방벽을 접착제로 접합함으로써 접착 불량 및 접착력 부족에 따른 2차 방벽의 기밀성이 저하될 수 있다.At this time, the secondary barrier is formed by adhering the secondary secondary barrier to the primary secondary barrier located on the lower insulating board. Then, the connecting board is bonded to the secondary secondary barrier is installed between the adjacent upper insulating boards. As such, by bonding the secondary secondary barrier to the primary secondary barrier with an adhesive, the airtightness of the secondary barrier due to poor adhesion and lack of adhesion can be reduced.

본 발명은 2차 방벽의 기밀성을 향상시키는 액화천연가스 저장 탱크를 제공하는 것이다.The present invention provides a liquefied natural gas storage tank that improves the airtightness of the secondary barrier.

본 발명의 일 실시예에 따른 액화천연가스 저장 탱크는, 액화 천연 가스 저장 탱크의 내부 선체에 설치되고 제1 간격으로 이격 배치되는 복수의 하부 단열보드, 상기 하부 단열보드에 각각 설치되어 상기 제1 간격보다 큰 제2 간격을 설정하는 상부 단열보드, 상기 제2 간격에 대응하여 상기 하부 단열보드 상에 설치되어 상기 상부 단열보드를 연결하는 연결보드, 상기 상부 단열보드 및 상기 연결보드 상에 설치되는 1차 방벽, 및 상기 하부 단열보드와 상기 상부 단열보드 사이 및 상기 하부 단열보드와 상기 연결보드 사이에 설치되는 2차 방벽을 포함하며, 상기 2차 방벽은 상기 상부 단열보드와 상기 연결보드의 하측에 구비되는 주 2차 방벽, 상기 연결보드의 하측에 구비되어 상기 제1 간격을 덮는 보조 2차 방벽, 및 상기 연결보드와 상기 하부 단열보드 사이에 배치되어 상기 주 2차 방벽과 상기 보조 2차 방벽을 서로 연결하는 연결 2차 방벽을 포함한다.The liquefied natural gas storage tank according to an embodiment of the present invention is installed on the inner hull of the liquefied natural gas storage tank and a plurality of lower insulation boards, which are spaced apart at first intervals, respectively, installed on the lower insulation boards, respectively. An upper insulation board for setting a second interval larger than an interval, a connection board installed on the lower insulation board corresponding to the second interval and connecting the upper insulation board, the upper insulation board and the connection board A primary barrier, and a secondary barrier installed between the lower insulation board and the upper insulation board and between the lower insulation board and the connection board, wherein the secondary barrier is a lower side of the upper insulation board and the connection board. A main secondary barrier provided in the auxiliary secondary barrier provided at a lower side of the connection board to cover the first gap, and the connection board and the lower insulation board; And a connecting secondary barrier disposed between the primary secondary barrier and the secondary secondary barrier.

상기 하부 단열보드는, 상기 제1 간격 측에서 상기 하부 단열부재의 상면에 단차부를 형성하고, 상기 연결 2차 방벽은, 상기 단차부에 설치될 수 있다.The lower insulating board may form a stepped portion on an upper surface of the lower insulating member at the first interval side, and the connection secondary barrier may be installed at the stepped portion.

상기 연결 2차 방벽은, 하면에 상기 연결 2차 방벽 보호판이 부착되어 상기 단차부에 고정부재로 장착될 수 있다.The connection secondary barrier may have a connection secondary barrier protection plate attached to a lower surface thereof and be mounted as a fixing member to the stepped portion.

상기 주 2차 방벽은, 상기 상부 단열보드 밖으로 더 돌출되어 상기 연결 2차 방벽에 접착제로 접합될 수 있다.The main secondary barrier may further protrude out of the upper insulation board and be bonded to the connecting secondary barrier with an adhesive.

상기 보조 2차 방벽은, 상기 제1 간격에 노출되는 신축부를 구비하여, 이웃하는 상기 연결 이차 방벽에 용접으로 접합될 수 있다.The secondary secondary barrier may include a stretchable portion exposed to the first gap, and may be welded to the neighboring connection secondary barrier by welding.

상기 보조 2차 방벽은, 서로 마주하는 2개의 상기 하부 단열부재 사이의 상기 제1 간격 측에 설치되는 제1 보조 2차 방벽 부재와, 서로 마주하는 4개의 상기 하부 단열부재 사이의 상기 제1 간격 측에서 상기 제1 보조 2차 방벽 부재 상에 설치되는 제2 보조 2차 방벽 부재를 포함할 수 있다.The auxiliary secondary barrier is a first auxiliary secondary barrier member provided on the side of the first gap between the two lower heat insulating members facing each other, and the first gap between the four lower heat insulating members facing each other. It may include a second secondary secondary barrier member installed on the first secondary secondary barrier member at the side.

상기 제1 보조 2차 방벽 부재의 상기 신축부는, 상기 제1 간격의 방향으로 설정된 폭과 상기 제1 간격의 방향에 직교하는 방향으로 설정된 길이, 및 깊이를 가지는 제1 오목홈으로 형성될 수 있다.The expansion and contraction portion of the first auxiliary secondary barrier member may be formed as a first concave groove having a width set in the direction of the first interval, a length set in a direction orthogonal to the direction of the first interval, and a depth. .

상기 제2 보조 2차 방벽 부재의 상기 신축부는, 중심에 설정된 직경 및 깊이를 가지는 제2 오목홈으로 형성될 수 있다.The expansion and contraction portion of the second auxiliary secondary barrier member may be formed as a second concave groove having a diameter and a depth set at the center.

상기 연결 2차 방벽은, 상기 연결보드를 향하여 돌출되는 스터드 볼트를 구비하고, 상기 연결보드는, 상기 스터드 볼트에 대응하는 관통구를 가질 수 있다.The connection secondary barrier may have a stud bolt protruding toward the connection board, and the connection board may have a through hole corresponding to the stud bolt.

상기 연결보드는, 연결부재와, 상기 연결부재의 상면과 하면에 각각 부착되는 상부 연결부재 보호판과 하부 연결부재 보호판을 포함하고, 상기 관통구는, 상기 하부 연결부재 보호판에 형성되어 상기 스터드 볼트를 관통시키는 제1 관통구와, 상기 연결부재와 상기 상부 연결부재 보호판에 상기 제1 관통구보다 큰 직경으로 형성되어, 상기 스터드 볼트에 너트를 체결하는 공간을 제공하는 제2 관통구를 포함할 수 있다.The connection board includes a connection member, an upper connection member protection plate and a lower connection member protection plate attached to upper and lower surfaces of the connection member, respectively, and the through hole is formed in the lower connection member protection plate to penetrate the stud bolt. And a second through hole formed at a diameter larger than that of the first through hole in the connection member and the upper connection member protection plate to provide a space for fastening the nut to the stud bolt.

상기 연결보드는, 상기 제2 관통구에 삽입되는 마감부재를 더 포함할 수 있다.The connection board may further include a closing member inserted into the second through hole.

상기 마감부재는, 상기 상부 연결부재 보호판 및 상기 연결부재에 대응하여 서로 다른 재질로 이루어진 적층 구조를 형성하고, 상기 스터드 볼트와 상기 너트에 대응하는 수용홈을 형성할 수 있다.The finishing member may form a laminated structure made of different materials in correspondence with the upper connecting member protective plate and the connecting member, and may form a receiving groove corresponding to the stud bolt and the nut.

이와 같이 본 발명의 일 실시예에 따르면, 연결 2차 방벽을 주 이차 방벽에 연결하고, 하부 단열부재 사이의 제1 간격 측에 배치되는 보조 이차 방벽을 연결 2차 방벽에 연결함으로써, 하부 단열부재 사이에서 2차 방벽의 기밀성을 향상시키는 효과가 있다.Thus, according to an embodiment of the present invention, by connecting the connecting secondary barrier to the primary secondary barrier, and by connecting the secondary secondary barrier disposed on the side of the first gap between the lower insulating member to the connecting secondary barrier, the lower insulation member There is an effect of improving the airtightness of the secondary barrier in between.

도 1은 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 내부 구조의 평면도이다.
도 2는 도 1의 액화천연가스 저장 탱크의 내부 구조에서 보조 2차 방벽의 설치 상태의 사시도이다.
도 3은 도 2의 Ⅲ-Ⅲ 선을 따라 자른 단면도이다.
도 4는 도 3의 보조 2차 방벽에 연결보드를 설치하는 상태의 분해 단면도이다.
도 5는 도 4의 보조 2차 방벽에 연결보드를 설치한 상태의 결합 단면도이다.
1 is a plan view of the internal structure of a liquefied natural gas storage tank according to an embodiment of the present invention.
Figure 2 is a perspective view of the installation state of the secondary secondary barrier in the internal structure of the liquefied natural gas storage tank of FIG.
3 is a cross-sectional view taken along line III-III of FIG. 2.
4 is an exploded cross-sectional view of a state in which a connection board is installed on the secondary secondary barrier of FIG. 3.
FIG. 5 is a cross-sectional view illustrating a state in which a connection board is installed on the secondary secondary barrier of FIG. 4.

이하 도면을 참조하여 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 이차 방벽 설치용 접착제 시공 장치 및 이를 이용한 접착제 시공 방법에 대하여 설명한다.Hereinafter, an adhesive construction device for installing a secondary barrier of a liquefied natural gas storage tank according to an embodiment of the present invention and an adhesive construction method using the same will be described.

도 1은 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크의 내부 구조의 평면도이고, 도 2는 도 1의 액화천연가스 저장 탱크의 내부 구조에서 보조 2차 방벽의 설치 상태의 사시도이다.1 is a plan view of the internal structure of the liquefied natural gas storage tank according to an embodiment of the present invention, Figure 2 is a perspective view of the installation state of the secondary secondary barrier in the internal structure of the liquefied natural gas storage tank of FIG.

도 1 및 도 2를 참조하면, 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크는 내부 선체(10)에 설치되는 하부 단열보드(20) 및 하부 단열보드(20)에 설치되는 상부 단열보드(30)를 포함한다.1 and 2, the liquefied natural gas storage tank according to an embodiment of the present invention is the lower insulation board 20 is installed on the inner hull 10 and the upper insulation board is installed on the lower insulation board 20 (30).

하부 단열보드(20)는 단위 면적을 가지고 복수로 구비되어 내부 선체(10)에 설치된다. 따라서 이웃하는 하부 단열보드들(20)은 온도 변화에 따른 수축 팽창에 대응하도록 서로의 사이에 제1 간격(G1)을 설정한다.The lower insulation board 20 has a unit area and is provided in plurality in the inner hull 10. Therefore, the neighboring lower insulating boards 20 set a first gap G1 between each other so as to correspond to shrinkage expansion according to temperature change.

상부 단열보드(30)는 하부 단열보드(20)의 면적보다 좁은 면적으로 형성되어 하부 단열보드(20) 각각에 설치된다. 따라서 상부 단열보드들(30)은 온도 변화에 따른 수축 팽창에 대응하도록 서로의 사이에 제1 간격(G1)보다 큰 제2 간격(G2)을 설정한다.The upper insulation board 30 is formed in a smaller area than the area of the lower insulation board 20 and is installed on each of the lower insulation boards 20. Accordingly, the upper insulation boards 30 set a second gap G2 greater than the first gap G1 to correspond to shrinkage expansion according to temperature change.

본 발명의 일 실시예에 따른 액화천연가스 저장 탱크는 제2 간격(G2)에 대응하는 연결보드(40)를 더 포함한다. 연결보드(40)는 제2 간격(G2)에 대응하는 면적으로 형성되어 하부 단열보드(20) 상에 설치되어, 제2 간격(G2)을 채워서 이웃하는 상부 단열보드들(30)을 서로 연결한다(도 4 및 도 5 참조).The LNG storage tank according to an embodiment of the present invention further includes a connection board 40 corresponding to the second interval G2. The connection board 40 is formed on an area corresponding to the second gap G2 and is installed on the lower insulating board 20 to fill the second gap G2 to connect neighboring upper insulating boards 30 to each other. (See FIGS. 4 and 5).

하부 단열보드(20)는 내부 선체(10) 측에서 단열 구조를 형성하고, 상부 단열보드(30)는 하부 단열보드(20) 상에서 단열 구조를 더 형성한다. 즉 액화천연가스 저장 탱크는 2중의 단열 구조를 가진다.The lower insulation board 20 forms an insulation structure on the inner hull 10 side, and the upper insulation board 30 further forms an insulation structure on the lower insulation board 20. That is, the LNG storage tank has a double insulation structure.

도 3은 도 2의 Ⅲ-Ⅲ 선을 따라 자른 단면도이다. 도 3을 참조하면, 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크는 상부 단열보드(30)의 상측에 구비되는 1차 방벽(50)과, 상부 단열보드(30)의 하측에 구비되는 2차 방벽(60)을 더 포함한다. 즉 2차 방벽(60)은 하부 단열보드(20) 상에 구비된다.3 is a cross-sectional view taken along line III-III of FIG. 2. 3, the liquefied natural gas storage tank according to an embodiment of the present invention is provided on the primary barrier 50 provided on the upper side of the upper insulation board 30, and the lower side of the upper insulation board 30 It further comprises a secondary barrier 60. That is, the secondary barrier 60 is provided on the lower insulation board 20.

좀 더 구체적으로 설명하면, 하부 단열보드(20)는 내부 선체(10)에 고정되는 하부 단열부재 보호판(21)과 하부 단열부재 보호판(21) 상에 설치되는 하부 단열부재(22)를 포함한다. 2차 방벽(60)은 하부 단열부재(22) 상에 설치된다.More specifically, the lower insulation board 20 includes a lower insulation member protection plate 21 fixed to the inner hull 10 and a lower insulation member 22 installed on the lower insulation member protection plate 21. . The secondary barrier 60 is installed on the lower heat insulating member 22.

상부 단열보드(30)는 2차 방벽(60) 상에 설치되는 상부 단열부재(32)와 상부 단열부재(32) 상에 설치되는 상부 단열부재 보호판(31)을 포함한다. 1차 방벽(50)은 상부 단열부재 보호판(31) 상에 설치된다.The upper insulation board 30 includes an upper insulation member 32 installed on the secondary barrier 60 and an upper insulation member protection plate 31 installed on the upper insulation member 32. The primary barrier 50 is installed on the upper insulating member protection plate 31.

도 4는 도 3의 보조 2차 방벽에 연결보드를 설치하는 상태의 분해 단면도이다. 도 4를 참조하면, 연결보드(40)는 2차 방벽(60) 상에 설치되는 하부 연결부재 보호판(41), 하부 연결부재 보호판(41) 상에 설치되는 연결부재(42), 및 연결부재(42) 상에 설치되는 상부 연결부재 보호판(43)을 포함한다.4 is an exploded cross-sectional view of a state in which a connection board is installed on the secondary secondary barrier of FIG. 3. Referring to FIG. 4, the connection board 40 includes a lower connection member protection plate 41 installed on the secondary barrier 60, a connection member 42 installed on the lower connection member protection plate 41, and a connection member. And an upper connection member protection plate 43 installed on the 42.

도 5는 도 4의 보조 2차 방벽에 연결보드를 설치한 상태의 결합 단면도이다. 도 5를 참조하면, 1차 방벽(50)은 상부 단열부재 보호판(31)과 상부 연결부재 보호판(43) 상에 설치된다. 2차 방벽(60)은 상부 단열부재(32)와 하부 연결부재 보호판(41)의 하측에서 하부 단열부재(22) 상에 설치된다.FIG. 5 is a cross-sectional view illustrating a state in which a connection board is installed on the secondary secondary barrier of FIG. 4. Referring to FIG. 5, the primary barrier 50 is installed on the upper insulation member protection plate 31 and the upper connection member protection plate 43. The secondary barrier 60 is installed on the lower heat insulating member 22 on the lower side of the upper heat insulating member 32 and the lower connection member protecting plate 41.

예를 들면, 액화천연가스 저장 탱크에서, 1차 방벽(50)은 알루미늄, 멤브레인 등의 금속판으로 형성되어 1차 기밀 구조를 형성하고, 2차 방벽(60)은 금속 복합 재료층(metal composite laminate)으로 형성되어 2차 기밀 구조를 형성한다.For example, in a liquefied natural gas storage tank, the primary barrier 50 is formed of a metal plate such as aluminum or a membrane to form a primary hermetic structure, and the secondary barrier 60 is a metal composite laminate. ) To form a secondary hermetic structure.

또한, 하부 단열부재(22), 상부 단열부재(32) 및 연결부재(42)는 폴리우레탄 폼으로 형성되어 내부 선체(10)과 액화천연가스 사이에서 단열성을 부여한다. 하, 상부 단열부재 보호판(21, 31) 및 하, 상부 연결부재 보호판(41, 43)은 플라이우드 등으로 형성되어 하, 상부 단열부재(22, 32) 및 연결부재(42)에 기계적 강성을 부여한다.In addition, the lower heat insulating member 22, the upper heat insulating member 32 and the connecting member 42 is formed of polyurethane foam to impart heat insulation between the inner hull 10 and the liquefied natural gas. The lower and upper insulation member protection plates 21 and 31 and the lower and upper connection member protection plates 41 and 43 are formed of plywood or the like, so that the lower and upper insulation members 22 and 32 and the connection member 42 are mechanically rigid. Grant.

다시 도 2 및 도 3을 참조하면, 2차 방벽(60)은 서로 연결되는 주 2차 방벽(61), 보조 이차 방벽(62) 및 연결 2차 방벽(63)을 포함하여, 상, 하부 단열보드(30, 20) 사이에서 기밀 구조를 형성한다.Referring again to FIGS. 2 and 3, the secondary barrier 60 includes a primary secondary barrier 61, an auxiliary secondary barrier 62, and a connecting secondary barrier 63 that are connected to each other, so that top and bottom insulations are insulated. A gas tight structure is formed between the boards 30 and 20.

주 2차 방벽(61)은 상부 단열보드(30)와 연결보드(40)의 하측에 구비되고, 보조 2차 방벽(62)은 연결보드(40)의 하측에 구비되어 제1 간격(G1)을 덮으며, 연결 2차 방벽(63)은 연결보드(40)와 하부 단열보드(20) 사이에 배치되어 주 2차 방벽(61)과 보조 2차 방벽(62)을 기밀 구조로 서로 연결한다.The primary secondary barrier 61 is provided on the lower side of the upper insulation board 30 and the connection board 40, the secondary secondary barrier 62 is provided on the lower side of the connection board 40, the first gap (G1) The secondary barrier 63 is disposed between the connecting board 40 and the lower insulation board 20 to connect the primary secondary barrier 61 and the secondary secondary barrier 62 to each other in an airtight structure. .

연결 2차 방벽(63)의 설치를 위하여, 하부 단열보드(20)는 제1 간격(G1) 측에서 하부 단열부재(22)의 상면에 단차부(221)를 형성한다. 즉 연결 2차 방벽(63)은 단차부(221)에 안정된 구조로 설치될 수 있다.In order to install the connecting secondary barrier 63, the lower insulation board 20 forms a stepped portion 221 on the upper surface of the lower insulation member 22 at the first interval G1. That is, the connection secondary barrier 63 may be installed in a stable structure on the stepped portion 221.

또한, 연결 2차 방벽(63)은 하면에 연결 2차 방벽 보호판(631)을 부착하여, 하부 단열부재(22)의 단차부(221)에 장착된다. 연결 2차 방벽 보호판(631)은 플라이우드로 형성되어 기계적 강성을 부여한다. 연결 2차 방벽(63)은 연결 2차 방벽 보호판(631)에 적층 구조로 배치되어, 고정부재(632)에 의하여 하부 단열부재(22)에 고정된다. 이 때 고정부재(632)의 상면은 연결 2차 방벽(63)의 상면과 동일한 높이에 위치하거나 또는 주 2차 방벽(61)과 연결 2차 방벽(63)이 접착제에 의해 접착되는데 간섭되지 않을 정도로 위치될 수 있다.In addition, the connection secondary barrier 63 is attached to the stepped portion 221 of the lower heat insulating member 22 by attaching the connection secondary barrier protection plate 631 to the lower surface. The connecting secondary barrier protection plate 631 is formed of plywood to impart mechanical rigidity. The connecting secondary barrier 63 is disposed in a laminated structure on the connecting secondary barrier protection plate 631, and is fixed to the lower heat insulating member 22 by the fixing member 632. At this time, the upper surface of the fixing member 632 is located at the same level as the upper surface of the connecting secondary barrier 63, or the main secondary barrier 61 and the connecting secondary barrier 63 will not interfere with the adhesion by the adhesive. Can be positioned to a degree.

주 2차 방벽(61)은 상부 단열보드(30) 끝으로 더 돌출되어 연결 2차 방벽(63) 상에 포개어져 접착제로 접합된다. 보조 2차 방벽(62)은 제1 간격(G1)을 덮으면서 이웃하는 연결 2차 방벽(63)에 용접으로 접합되므로 강한 접착력과 견고한 접합 구조를 형성하여, 2차 방벽(60)의 기밀성을 향상시킬 수 있다. 이때, 연결 2차 방벽(63)은 용접 열에 의하여 접착제를 손상하지 않는 크기의 폭으로 설정되어 주 2차 방벽(61)과 보조 이차 방벽(62)을 이격한다.The primary secondary barrier 61 is further protruded to the end of the upper insulation board 30 to be superimposed on the connecting secondary barrier 63 and bonded with an adhesive. Since the secondary secondary barrier 62 is welded to the neighboring connection secondary barrier 63 while covering the first gap G1, it forms a strong adhesive force and a rigid bonding structure, thereby ensuring the airtightness of the secondary barrier 60. Can be improved. At this time, the connecting secondary barrier 63 is set to a width of a size that does not damage the adhesive by the welding heat spaced apart from the primary secondary barrier 61 and the secondary secondary barrier (62).

한편, 보조 2차 방벽(62)은 하, 상부 단열보드(20, 30)의 면적 및 배치 구조에 대응할 수 있도록 2가지 구조의 제1, 제2 보조 2차 방벽 부재(621, 622)를 포함한다. 제1 보조 2차 방벽 부재(621)는 서로 마주하는 2개의 하부 단열보드(20) 사이에서 제1 간격(G1) 측에 설치되어 제1 간격(G1)을 덮는다.On the other hand, the secondary secondary barrier 62 includes the first and second secondary secondary barrier members 621 and 622 having two structures so as to correspond to the area and the arrangement structure of the lower insulation boards 20 and 30. do. The first auxiliary secondary barrier member 621 is installed on the first gap G1 side between the two lower insulating boards 20 facing each other to cover the first gap G1.

제2 보조 2차 방벽 부재(622)는 서로 마주하는 4개의 하부 단열보드(20) 사이의 제1 간격(G1) 측에서 제1 보조 2차 방벽 부재(621) 상에 설치된다. 이때, 4개의 제1 보조 2차 방벽 부재(621)의 단부는 4개의 하부 단열보드들(20) 사이에 배치된다.The second auxiliary secondary barrier member 622 is installed on the first auxiliary secondary barrier member 621 at the first gap G1 side between the four lower insulating boards 20 facing each other. At this time, end portions of the four first auxiliary secondary barrier members 621 are disposed between the four lower insulating boards 20.

제1 보조 2차 방벽 부재들(621)의 각 단부는 챔퍼를 형성하여 서로 간에 포개어지는 것을 방지하여 동일 평면에 배치된다. 이 상태에서 제2 보조 2차 방벽 부재(622)는 제1 보조 2차 방벽 부재(621) 상에 용접되어, 제1 보조 2차 방벽 부재들(621)의 단부에서 기밀 구조를 형성한다. 또한 제1 보조 2차 방벽 부재(621)의 단부들은 서로 용접되어 기밀 구조를 더 견고히 형성할 수도 있다.Each end portion of the first auxiliary secondary barrier members 621 is disposed in the same plane to form a chamfer to prevent overlapping with each other. In this state, the second secondary secondary barrier member 622 is welded onto the first secondary secondary barrier member 621 to form an airtight structure at the ends of the first secondary secondary barrier members 621. In addition, ends of the first auxiliary secondary barrier member 621 may be welded to each other to more firmly form an airtight structure.

한편, 보조 2차 방벽(62)은 제1 간격(G1)에 노출되어 하부 단열보드(20)의 신축 및 거동에 대응하여 형성되는 신축부(64)를 더 포함할 수 있다. 예를 들면, 제1, 제2 보조 2차 방벽 부재(621, 622)는 제1 간격(G1)으로 형성되는 빈 공간의 구조 각각에 대응하도록 신축부(64)를 서로 다른 구조의 제1, 제2 오목홈(641, 642)으로 형성한다.On the other hand, the secondary secondary barrier 62 may further include a stretchable portion 64 exposed to the first gap G1 to correspond to the stretch and behavior of the lower insulating board 20. For example, the first and second auxiliary secondary barrier members 621 and 622 may include the first and second auxiliary barrier members 621 and 622 so as to correspond to each of the structures of the empty space formed at the first interval G1. The second concave grooves 641 and 642 are formed.

제1 오목홈(641)은 제1 간격(G1)의 방향으로 설정된 폭(W)과 제1 간격(G1)의 방향에 직교하는 방향으로 설정된 길이(L), 및 깊이(D1)를 가진다. 제1 보조 2차 방벽 부재(621)에서 제1 오목홈(641)은 제1 간격(G1) 방향에 대한 신축, 하중 및 거동에 효과적으로 대응할 수 있다.The first concave groove 641 has a width W set in the direction of the first gap G1, a length L set in a direction orthogonal to the direction of the first gap G1, and a depth D1. In the first auxiliary secondary barrier member 621, the first concave groove 641 may effectively correspond to the stretching, the load, and the behavior in the direction of the first gap G1.

제2 오목홈(642)은 중심에 설정된 직경(D) 및 깊이(D2)를 가진다. 제2 보조 2차 방벽 부재(622)에서 제2 오목홈(642)은 직경(D) 방향에 대한 신축, 하중 및 거동에 효과적으로 대응할 수 있다.The second concave groove 642 has a diameter D and a depth D2 set at the center. In the second auxiliary secondary barrier member 622, the second concave groove 642 may effectively correspond to the stretching, the load, and the behavior in the diameter (D) direction.

다시 도 3 내지 도 5를 참조하면, 연결 2차 방벽(63)은 연결보드(40)를 향하여 돌출되는 스터드 볼트(633)를 구비한다. 연결보드(40)는 스터드 볼트(633)에 대응하는 관통구(44)를 가진다.3 to 5 again, the connection secondary barrier 63 includes a stud bolt 633 protruding toward the connection board 40. The connection board 40 has a through hole 44 corresponding to the stud bolt 633.

관통구(44)는 하부 연결부재 보호판(41)에 형성되는 제1 관통구(441)와, 연결부재(42)와 상부 연결부재 보호판(43)에 제1 관통구(441)보다 큰 직경으로 형성 되는 제2 관통구(442)를 포함한다.The through hole 44 has a diameter larger than that of the first through hole 441 in the first through hole 441 formed in the lower connection member protection plate 41 and the connecting member 42 and the upper connection member protection plate 43. The second through hole 442 is formed.

제1 관통구(441)는 스터드 볼트(633)를 관통시키고, 제2 관통구(442)는 스터드 볼트(633)에 너트(634)를 체결하기 위한 공간을 제공한다. 제1 관통구(441)에 스터드 볼트(633)를 삽입하여 너트(634)에 체결함으로써, 하부 연결부재 보호판(41)은 스터드 볼트(633)에 고정된다. 따라서 연결보드(40)는 상부 단열보드(30) 사이의 제2 간격(G2)에 고정 설치된다.The first through hole 441 penetrates the stud bolt 633, and the second through hole 442 provides a space for fastening the nut 634 to the stud bolt 633. The lower connection member protection plate 41 is fixed to the stud bolt 633 by inserting the stud bolt 633 into the first through hole 441 and fastening to the nut 634. Therefore, the connection board 40 is fixedly installed in the second gap (G2) between the upper insulation board (30).

또한, 연결보드(40)는 제2 관통구(442)에 삽입되는 마감부재(45)를 더 포함한다. 마감부재(45)는 상부 연결부재 보호판(43) 및 연결부재(42)에 대응하는 적층 구조를 형성하고, 각각에 대응하는 동일 재료로 형성될 수 있다. 또한 마감부재(45)는 하부에 수용홈(451)을 형성하여, 체결된 스터드 볼트(633)와 너트(634)를 수용한다. 즉 마감부재(45)는 연결보드(40)와 동일한 평면을 형성한다.In addition, the connection board 40 further includes a closing member 45 inserted into the second through hole 442. The finishing member 45 forms a laminated structure corresponding to the upper connecting member protection plate 43 and the connecting member 42, and may be formed of the same material corresponding to each of the upper connecting member protective plate 43 and the connecting member 42. In addition, the closing member 45 forms a receiving groove 451 at the bottom to accommodate the fastened stud bolt 633 and the nut 634. That is, the closing member 45 forms the same plane as the connection board (40).

따라서 상부 단열보드(30)와 연결보드(40) 상에 설치되는 1차 방벽(50)은 마감부재(45) 상에도 설치되어, 액화천연가스 저장 탱크의 내부에서 액화천연가스와 직접 맞닿는 1차 기밀 구조를 형성한다.Therefore, the primary barrier 50 installed on the upper insulation board 30 and the connection board 40 is also installed on the finishing member 45, and the primary contact directly with the liquefied natural gas in the liquefied natural gas storage tank. To form an airtight structure.

이상에서 본 발명의 일 실시예에 따른 액화천연가스 저장 탱크에 대하여 설명하였으나, 본 발명의 사상은 본 명세서에 제시되는 실시예에 제한되지 아니하며, 본 발명의 사상을 이해하는 당업자는 동일한 사상의 범위 내에서, 구성요소의 부가, 변경, 삭제, 추가 등에 의해서 다른 실시 예를 용이하게 제안할 수 있을 것이나, 이 또한 본 발명의 사상범위 내에 든다고 할 것이다.Although the liquefied natural gas storage tank according to the exemplary embodiment of the present invention has been described above, the spirit of the present invention is not limited to the embodiments presented herein, and those skilled in the art to understand the spirit of the present invention have the same scope. Within the scope of the present invention, other embodiments may be easily proposed by adding, changing, deleting, adding, etc., but this is also within the scope of the present invention.

10 : 내부 선체 20 : 하부 단열보드
21, 31 : 하, 상부 단열부재 보호판 22, 32 : 하, 상부 단열부재
30 : 상부 단열보드 40 : 연결보드
41, 43 : 하, 상부 연결부재 보호판 42 : 연결부재
44 : 관통구 45 : 마감부재
50, 60 : 1, 2차 방벽 61 : 주 2차 방벽
62 : 보조 이차 방벽 63 : 연결 2차 방벽
64 : 신축부 221 : 단차부
441, 442 : 제1, 제2 관통구 451 : 수용홈
621, 622 : 제1, 제2 보조 2차 방벽 부재 631 : 연결 2차 방벽 보호판
632 : 고정부재 633 : 스터드 볼트
634 : 너트 641, 642 : 제1, 제2 오목홈
D1, D2 : 깊이 D : 직경
G1, G2 : 제1, 제2 간격 L : 길이
10: inner hull 20: lower insulation board
21, 31: lower, upper insulation member protection plate 22, 32: lower, upper insulation member
30: upper insulation board 40: connection board
41, 43: lower and upper connecting member protection plate 42: connecting member
44 through hole 45 finishing member
50, 60: 1st and 2nd Barrier 61: Main 2nd Barrier
62: secondary secondary barrier 63: connecting secondary barrier
64: expansion and contraction portion 221: stepped portion
441, 442: first and second through holes 451: receiving groove
621, 622: first and second auxiliary secondary barrier member 631: connecting secondary barrier protection plate
632: fixing member 633: stud bolt
634: Nuts 641, 642: First and second concave grooves
D1, D2: Depth D: Diameter
G1, G2: first and second gap L: length

Claims (12)

액화 천연 가스 저장 탱크의 내부 선체에 설치되고 제1 간격으로 이격 배치되는 복수의 하부 단열보드;
상기 하부 단열보드에 각각 설치되어 상기 제1 간격보다 큰 제2 간격을 설정하는 상부 단열보드;
상기 제2 간격에 대응하여 상기 하부 단열보드 상에 설치되어 상기 상부 단열보드를 연결하는 연결보드;
상기 상부 단열보드 및 상기 연결보드 상에 설치되는 1차 방벽; 및
상기 하부 단열보드와 상기 상부 단열보드 사이 및 상기 하부 단열보드와 상기 연결보드 사이에 설치되는 2차 방벽
을 포함하며,
상기 2차 방벽은
상기 상부 단열보드와 상기 연결보드의 하측에 구비되는 주 2차 방벽,
상기 연결보드의 하측에 구비되어 상기 제1 간격을 덮는 보조 2차 방벽, 및
상기 연결보드와 상기 하부 단열보드 사이에 배치되어 상기 주 2차 방벽과 상기 보조 2차 방벽을 서로 연결하는 연결 2차 방벽을 포함하는
액화천연가스 저장 탱크.
A plurality of lower insulating boards installed in the inner hull of the liquefied natural gas storage tank and spaced apart at a first interval;
Upper insulation boards respectively installed on the lower insulation boards to set a second interval greater than the first interval;
A connection board installed on the lower insulation board corresponding to the second gap to connect the upper insulation board;
A primary barrier installed on the upper insulation board and the connection board; And
A secondary barrier installed between the lower insulation board and the upper insulation board and between the lower insulation board and the connection board;
Including;
The secondary barrier is
A main secondary barrier provided below the upper insulation board and the connection board;
An auxiliary secondary barrier provided at a lower side of the connection board to cover the first gap; and
A connection secondary barrier disposed between the connection board and the lower insulation board to connect the main secondary barrier and the auxiliary secondary barrier to each other;
LNG storage tanks.
제1항에 있어서,
상기 하부 단열보드는,
상기 제1 간격 측에서 상기 하부 단열부재의 상면에 단차부를 형성하고,
상기 연결 2차 방벽은,
상기 단차부에 설치되는 것을 특징으로 하는 액화천연가스 저장 탱크.
The method of claim 1,
The lower insulation board,
Forming a stepped portion on an upper surface of the lower insulating member at the first interval side;
The connecting secondary barrier,
LNG storage tank, characterized in that installed in the stepped portion.
제2항에 있어서,
상기 연결 2차 방벽은,
하면에 상기 연결 2차 방벽 보호판이 부착되어 상기 단차부에 고정부재로 장착되는 것을 특징으로 하는
액화천연가스 저장 탱크.
The method of claim 2,
The connecting secondary barrier,
The connecting secondary barrier protection plate is attached to the lower surface, characterized in that mounted to the step portion as a fixing member
LNG storage tanks.
제2항에 있어서,
상기 주 2차 방벽은,
상기 상부 단열보드 밖으로 더 돌출되어 상기 연결 2차 방벽에 접착제로 접합되는 것을 특징으로 하는
액화천연가스 저장 탱크.
The method of claim 2,
The primary secondary barrier,
It is further protruded out of the upper insulating board, characterized in that bonded to the connecting secondary barrier with an adhesive
LNG storage tanks.
제2항에 있어서,
상기 보조 2차 방벽은,
상기 제1 간격에 노출되는 신축부를 구비하여, 이웃하는 상기 연결 이차 방벽에 용접으로 접합되는 것을 특징으로 하는
액화천연가스 저장 탱크.
The method of claim 2,
The secondary secondary barrier,
And a stretchable portion exposed to the first gap, and welded to the adjacent connecting secondary barrier by welding.
LNG storage tanks.
제5항에 있어서,
상기 보조 2차 방벽은,
서로 마주하는 2개의 상기 하부 단열부재 사이의 상기 제1 간격 측에 설치되는 제1 보조 2차 방벽 부재와,
서로 마주하는 4개의 상기 하부 단열부재 사이의 상기 제1 간격 측에서 상기 제1 보조 2차 방벽 부재 상에 설치되는 제2 보조 2차 방벽 부재
를 포함하는 액화천연가스 저장 탱크.
The method of claim 5,
The secondary secondary barrier,
A first auxiliary secondary barrier member provided at the first gap side between the two lower insulating members facing each other;
A second auxiliary secondary barrier member provided on the first auxiliary secondary barrier member at the first gap side between the four lower insulating members facing each other.
LNG storage tank comprising a.
제6항에 있어서,
상기 제1 보조 2차 방벽 부재의 상기 신축부는,
상기 제1 간격의 방향으로 설정된 폭과 상기 제1 간격의 방향에 직교하는 방향으로 설정된 길이, 및 깊이를 가지는 제1 오목홈으로 형성되는 것을 특징으로 하는
액화천연가스 저장 탱크.
The method of claim 6,
The expansion and contraction portion of the first secondary secondary barrier member,
And a first concave groove having a width set in the direction of the first interval, a length set in a direction orthogonal to the direction of the first interval, and a depth.
LNG storage tanks.
제6항에 있어서,
상기 제2 보조 2차 방벽 부재의 상기 신축부는,
중심에 설정된 직경 및 깊이를 가지는 제2 오목홈으로 형성되는 것을 특징으로 하는
액화천연가스 저장 탱크.
The method of claim 6,
The expansion and contraction portion of the second auxiliary secondary barrier member,
And a second concave groove having a diameter and a depth set at the center.
LNG storage tanks.
제1항에 있어서,
상기 연결 2차 방벽은,
상기 연결보드를 향하여 돌출되는 스터드 볼트를 구비하고,
상기 연결보드는,
상기 스터드 볼트에 대응하는 관통구를 가지는 것을 특징으로 하는
액화천연가스 저장 탱크.
The method of claim 1,
The connecting secondary barrier,
Has a stud bolt protruding toward the connection board,
The connection board,
And a through hole corresponding to the stud bolt.
LNG storage tanks.
제9항에 있어서,
상기 연결보드는,
연결부재와,
상기 연결부재의 상면과 하면에 각각 부착되는 상부 연결부재 보호판과 하부 연결부재 보호판을 포함하고,
상기 관통구는,
상기 하부 연결부재 보호판에 형성되어 상기 스터드 볼트를 관통시키는 제1 관통구와,
상기 연결부재와 상기 상부 연결부재 보호판에 상기 제1 관통구보다 큰 직경으로 형성되어, 상기 스터드 볼트에 너트를 체결하는 공간을 제공하는 제2 관통구를 포함하는
액화천연가스 저장 탱크.
10. The method of claim 9,
The connection board,
With a connecting member,
An upper connection member protection plate and a lower connection member protection plate attached to upper and lower surfaces of the connection member, respectively;
The through hole is,
A first through hole formed in the lower connection member protection plate and penetrating the stud bolt;
A second through hole formed in the connection member and the upper connection member protection plate with a diameter larger than that of the first through hole, and providing a space for fastening a nut to the stud bolt.
LNG storage tanks.
제10항에 있어서,
상기 연결보드는,
상기 제2 관통구에 삽입되는 마감부재를 더 포함하는
액화천연가스 저장 탱크.
The method of claim 10,
The connection board,
Further comprising a closing member inserted into the second through hole
LNG storage tanks.
제11항에 있어서,
상기 마감부재는,
상기 상부 연결부재 보호판 및 상기 연결부재에 대응하여 서로 다른 재질로 이루어진 적층 구조를 형성하고,
상기 스터드 볼트와 상기 너트에 대응하는 수용홈을 형성하는 것을 특징으로 하는
액화천연가스 저장 탱크.
The method of claim 11,
The finishing member,
Forming a laminated structure made of different materials in correspondence with the upper connection member protection plate and the connection member;
Forming a receiving groove corresponding to the stud bolt and the nut.
LNG storage tanks.
KR1020110136446A 2011-12-16 2011-12-16 Liquefied natural gas storage tank KR101337635B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110136446A KR101337635B1 (en) 2011-12-16 2011-12-16 Liquefied natural gas storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110136446A KR101337635B1 (en) 2011-12-16 2011-12-16 Liquefied natural gas storage tank

Publications (2)

Publication Number Publication Date
KR20120013228A true KR20120013228A (en) 2012-02-14
KR101337635B1 KR101337635B1 (en) 2013-12-05

Family

ID=45836875

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110136446A KR101337635B1 (en) 2011-12-16 2011-12-16 Liquefied natural gas storage tank

Country Status (1)

Country Link
KR (1) KR101337635B1 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101399892B1 (en) * 2012-09-19 2014-05-28 삼성중공업 주식회사 Cargo for liquefied gas carrier ship
KR101399843B1 (en) * 2012-09-27 2014-05-30 삼성중공업 주식회사 Lng cargo insulation system
KR101411540B1 (en) * 2012-03-16 2014-06-24 삼성중공업 주식회사 Liquefied natural gas storage tank
KR101412486B1 (en) * 2012-11-02 2014-07-01 삼성중공업 주식회사 Cargo for liquefied gas carrier ship
KR101422517B1 (en) * 2012-11-02 2014-07-24 삼성중공업 주식회사 Cargo for liquefied gas carrier ship and manufacturing method thereof
KR101422520B1 (en) * 2012-05-31 2014-07-24 삼성중공업 주식회사 Insulation structure for cargo hold of LNG carrier
KR20160021362A (en) 2014-08-14 2016-02-25 삼성중공업 주식회사 Fixing and support apparatus for insulation structure and method for manufacturing insulation assembly using the same
KR20160021361A (en) 2014-08-14 2016-02-25 삼성중공업 주식회사 Fit-up apparatus for insulation panel structure
KR20160024014A (en) * 2014-08-22 2016-03-04 삼성중공업 주식회사 Cargo barrier structure
KR20160024043A (en) * 2014-08-22 2016-03-04 삼성중공업 주식회사 Cargo barrier structure
KR20160027569A (en) 2014-09-01 2016-03-10 삼성중공업 주식회사 Insulation panel assembly for liquefied gas cargo tank and method for manufacturing the same
KR20160027560A (en) 2014-09-01 2016-03-10 삼성중공업 주식회사 Fixing and support apparatus for insulation structure
EP3940287A1 (en) * 2012-10-09 2022-01-19 Gaztransport et Technigaz Sealed and thermally insulating vessel comprising a metal membrane corrugated according to orthogonal folds

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101687814B1 (en) * 2015-04-07 2016-12-20 강림인슈 주식회사 A Insulating Pannel For A Tank To Store Low Temperature Liquefied Gas
KR102459477B1 (en) * 2020-09-25 2022-10-27 현대중공업 주식회사 Liquefied gas storage tank and vessel comprising the same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100807961B1 (en) * 2006-05-29 2008-02-28 현대중공업 주식회사 Insulation system with welded type secondary barrier for LNG tank
KR100760481B1 (en) * 2006-09-25 2007-09-20 한국과학기술원 Containment system for liquefied natural gas
WO2008147003A1 (en) 2007-05-29 2008-12-04 Hyundai Heavy Industries Co., Ltd. Lng storage tank insulation system having welded secondary barrier and construction method thereof
KR101088464B1 (en) * 2010-05-25 2011-12-01 한국과학기술원 Heat insulation structure and cryogenic liquid storage tank having the same

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101411540B1 (en) * 2012-03-16 2014-06-24 삼성중공업 주식회사 Liquefied natural gas storage tank
KR101422520B1 (en) * 2012-05-31 2014-07-24 삼성중공업 주식회사 Insulation structure for cargo hold of LNG carrier
KR101399892B1 (en) * 2012-09-19 2014-05-28 삼성중공업 주식회사 Cargo for liquefied gas carrier ship
KR101399843B1 (en) * 2012-09-27 2014-05-30 삼성중공업 주식회사 Lng cargo insulation system
EP3940287A1 (en) * 2012-10-09 2022-01-19 Gaztransport et Technigaz Sealed and thermally insulating vessel comprising a metal membrane corrugated according to orthogonal folds
KR101412486B1 (en) * 2012-11-02 2014-07-01 삼성중공업 주식회사 Cargo for liquefied gas carrier ship
KR101422517B1 (en) * 2012-11-02 2014-07-24 삼성중공업 주식회사 Cargo for liquefied gas carrier ship and manufacturing method thereof
KR20160021362A (en) 2014-08-14 2016-02-25 삼성중공업 주식회사 Fixing and support apparatus for insulation structure and method for manufacturing insulation assembly using the same
KR20160021361A (en) 2014-08-14 2016-02-25 삼성중공업 주식회사 Fit-up apparatus for insulation panel structure
KR20160024014A (en) * 2014-08-22 2016-03-04 삼성중공업 주식회사 Cargo barrier structure
KR20160024043A (en) * 2014-08-22 2016-03-04 삼성중공업 주식회사 Cargo barrier structure
KR20160027569A (en) 2014-09-01 2016-03-10 삼성중공업 주식회사 Insulation panel assembly for liquefied gas cargo tank and method for manufacturing the same
KR20160027560A (en) 2014-09-01 2016-03-10 삼성중공업 주식회사 Fixing and support apparatus for insulation structure

Also Published As

Publication number Publication date
KR101337635B1 (en) 2013-12-05

Similar Documents

Publication Publication Date Title
KR101337635B1 (en) Liquefied natural gas storage tank
KR101325706B1 (en) Pump tower installation structure of lng storage tank
KR101505798B1 (en) Base plate, and cargo tank including the same
JP5894677B2 (en) Pump tower installation structure of liquefied natural gas storage tank and manufacturing method thereof
KR102062837B1 (en) Ship comprising a bearing structure
KR20180002359A (en) Insulation structure of cargo tank for liquefied gas
KR20130099899A (en) Cargo barrier structure
KR20120136329A (en) Pump tower installation structure of lng storage tank, and method for manufacturing the same
JP2017530307A (en) Cargo hold structure
KR101411540B1 (en) Liquefied natural gas storage tank
KR101337638B1 (en) Fixing strip of liquefied natural gas storage tank
KR20160033818A (en) Barrier structure of cargo corner part
KR20120135475A (en) Insulation structure for cargo hold of lng carrier
KR101865162B1 (en) Lng storage tank
KR20120013246A (en) Liquefied natural gas storage tank
KR101563859B1 (en) Cargo barrier structure
KR101337645B1 (en) Liquefied natural gas storage tank
KR101259059B1 (en) Insulation structure of lng cargo tank, method for constructing the same and ship having the same
KR101399888B1 (en) Cargo barrier structure
KR20150129892A (en) Sloshing diminishing unit and cargo barrier structure including the same
KR101661947B1 (en) Barrier structure of cargo corner part
KR102538529B1 (en) Cargo for liquefied gas
KR101661953B1 (en) Method for setting cargo corner part barrier
KR101690933B1 (en) Combination apparatus used for setting cargo barrier
KR101617029B1 (en) Cargo barrier structure

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20171031

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee