KR20110013080A - Lower insulation for water meter protection tube - Google Patents

Lower insulation for water meter protection tube Download PDF

Info

Publication number
KR20110013080A
KR20110013080A KR1020090071080A KR20090071080A KR20110013080A KR 20110013080 A KR20110013080 A KR 20110013080A KR 1020090071080 A KR1020090071080 A KR 1020090071080A KR 20090071080 A KR20090071080 A KR 20090071080A KR 20110013080 A KR20110013080 A KR 20110013080A
Authority
KR
South Korea
Prior art keywords
hole
water meter
valve
insulating material
holes
Prior art date
Application number
KR1020090071080A
Other languages
Korean (ko)
Inventor
강순이
Original Assignee
(주)한영계기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)한영계기 filed Critical (주)한영계기
Priority to KR1020090071080A priority Critical patent/KR20110013080A/en
Publication of KR20110013080A publication Critical patent/KR20110013080A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/09Component parts or accessories
    • E03B7/10Devices preventing bursting of pipes by freezing
    • E03B7/12Devices preventing bursting of pipes by freezing by preventing freezing
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/07Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
    • E03B7/072Arrangement of flowmeters
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B9/00Methods or installations for drawing-off water
    • E03B9/02Hydrants; Arrangements of valves therein; Keys for hydrants
    • E03B9/08Underground hydrants
    • E03B9/10Protective plates or covers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F15/00Details of, or accessories for, apparatus of groups G01F1/00 - G01F13/00 insofar as such details or appliances are not adapted to particular types of such apparatus
    • G01F15/10Preventing damage by freezing or excess pressure or insufficient pressure
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F15/00Details of, or accessories for, apparatus of groups G01F1/00 - G01F13/00 insofar as such details or appliances are not adapted to particular types of such apparatus
    • G01F15/14Casings, e.g. of special material

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Volume Flow (AREA)
  • Thermal Insulation (AREA)

Abstract

PURPOSE: A lower insulating structure for a water-meter protecting bin is provided to prevent a lower insulating member from becoming damaged in installation and to improve insulating effect. CONSTITUTION: A lower insulating structure for a water-meter protecting bin comprises a closed part(7) and a protrusion(8). The closed part is formed on a lower insulating member(3). The protrusion comprises a cut part(20), which is formed on one side of the closed part. The protrusion comprises an inspection hole(9), a square groove(10) and a placing groove. The through hole is formed on the plane of one side of the cut part. A long through-hole, a through hole and a linear vertical tunnel(15) are formed on the bottom of the lower insulating member.

Description

수도미터기 보호통용 하부 보온재 구조{omitted}Lower insulation structure for water meter protection box

본 발명은 수도미터기 보호통용 하부 보온재의 구조에 관한 것으로, 더욱 상세하게는 수도미터기 보호통용 하부 보온재의 구조를 변경하여, 수도미터기 보호통에 수도미터기 등을 설치하기 전에 수도미터기 보호통의 바닥면측에 먼저 설치하는 하부 보온재의 구조가 아니라, 수도미터기 보호통 내에 수도미터기와 개폐밸브와 파이프 등을 먼저 설치하고, 하부 보온재를 그 위에서 삽입 설치할 수 있도록 구성한 수도미터기 보호통용 하부 보온재 구조에 관한 것이다.The present invention relates to the structure of the lower thermal insulation material for the water meter protection cylinder, and more particularly, by changing the structure of the lower thermal insulation material for the water meter protection cylinder, before installing the water meter or the like in the water meter protection cylinder, It is not related to the structure of the lower heat insulating material to be installed, but to a water meter protection tube lower heat insulating material structure configured to install the water meter, the opening and closing valve and the pipe in the water meter protective tube, and to insert the lower heat insulating material thereon.

일반적으로 수도미터기를 설치하기 위해 땅을 판 후에 수도미터기 보호통을 설치하는데, 배관을 시키고, 수도미터기 보호통의 다리를 통해 배관 파이프가 돌설되도록 설치한 다음, 수도미터기 보호통 내에 하부 보온재를 먼저 설치하고, 하부 보온재의 내부 공간에서 개폐밸브와 수도미터기와 파이프 등을 연결,설치하고, 상부 보온재를 덮었으나, 상부 보온재와 하부 보온재 모두 속이 모두 텅빈 상태이므로, 동계절에 검침공 뚜껑이나 상부 보온재와 하부 보온재 연결부등을 통하여 상,하부 보온재 내부로 차거운 공기가 유입되어도 차단할 수 없게 되고, 상,하부 보온재 내부의 공중에 설치 되어있는 수도미터기 등을 보호, 보온할 수가 없어, 수도미 터기 등의 동파가 자주 발생하게 되는 문제가 있었다.In general, after installing the water meter to install the water meter to protect the water meter, the pipe is piped, the pipe pipe is installed through the legs of the water meter to protect the pipe, then install the lower insulation in the water meter protector first, In the inner space of the lower insulation, the valves, water meters and pipes were connected and installed, and the upper insulation was covered. However, since both the upper insulation and the lower insulation were hollow, the inspection cap, the upper insulation and the lower insulation were in winter. Even though cold air flows into the upper and lower thermal insulation materials through the connection part, it cannot be blocked, and the water meter installed in the air inside the upper and lower thermal insulation materials cannot be protected and kept warm. There was a problem that occurred.

또한, 수도미터기 보호통의 바닥면에 (수도미터기 등을 설치하기 전에) 하부 보온재를 설치하고, 하부 보온재를 설치한 내부 공간에서 수도미터기 등의 설치작업을 하려면 공간이 좁아, 설치,작업시간이 다량 소용되는 문제점이 있었다.In addition, to install the lower thermal insulation material (before installing the water meter, etc.) on the bottom surface of the water meter protection container, and to install the water meter in the internal space where the lower thermal insulation material is installed, the space is small, so the installation and working time is large. There was a problem.

본 발명은 전술한 바와 같은 종래의 문제를 해소하기 위하여 발명된 것으로서, 수도미터기 보호통 내에 먼저, 개폐밸브와 수도미터기와 파이프 등을 설치한 후에 상부측에 막힘부를 형성시킨 하부 보온재를 위에서 삽입장착시킬 수 있도록 구조를 형성하므로서, 개폐밸브와 수도미터기와 파이프 등의 설치작업이 편리해지고, 설치 작업시 하부 보온재가 훼손 및 파손되던 것을 방지하고, 보온작용이 크게 개선되도록 한 수도미터기 보호통용 하부 보온재 구조를 제공하는데 목적이 있다.The present invention has been invented to solve the conventional problems as described above, first to install the on-off valve, the water meter and the pipe, etc. in the water meter protection tube, and then insert and mount the lower thermal insulation material formed with a blockage on the upper side from above. By forming the structure so that the installation valve, water meter and pipe, etc., the installation work is convenient, and the lower insulation material is prevented from being damaged or damaged during the installation work, and the lower insulation material structure for the water meter protection barrel is designed to greatly improve the thermal insulation action. The purpose is to provide.

본 발명은 수도미터기보호통용 하부 보온재의 구조에 있어서,The present invention in the structure of the lower thermal insulation material for water meter protection barrel,

하부 보온재의 상면측을 덮어 오픈 상태가 없어지도록 한 막힘부를 형성한 것과, 막힘부의 상부측에 돌설부를 돌설시킨 것과, 돌설부에 검침공과 재치홈을 형성한 것과, 밸브용 통공은 돌설부 일측 또는 전면돌출부 일측에 한 개 또는 두 개 형성시킨 것과, 하부 보온재 저면측에는 통과 장공과 통과공과 통과 장공과 일자형 수직 터널을 형성한 것과, 통과 장공과 통과공과 일자형 수직 터널에, 수도미터기 보호통 내에 설치한 개폐밸브와 수도미터기와 연결시킨 파이프가 삽입되어, 위에서 하부 보온재를 삽입장착시킬 수 있도록 하는 수도미터기 보호통용 하부 보온재의 구조로 이루어진 것을 특징으로 한다.The blocking portion is formed to cover the upper surface side of the lower insulating material so that the open state disappears, the protrusion is formed on the upper side of the blocking portion, the metering hole and the tact groove are formed on the protrusion, and the through hole for the valve is one side of the protrusion. Or one or two formed at one side of the front projection, a bottom hole having a passage hole, a passage hole, a passage hole, and a straight vertical tunnel, a passage hole, a passage hole, and a straight vertical tunnel, installed in a water meter protection tube. The pipe is connected to the on-off valve and the water meter is inserted, characterized in that made of a structure of the lower heat insulating material for the water meter protection barrel to insert the lower heat insulating material from above.

본 발명의 수도미터기 보호통용 하부 보온재의 구조는 수도미터기와 개폐밸브와 파이프의 등의 설치작업 공간이 넓어지도록 하여, 수도미터기와 개폐밸브와 파이프의 등의 설치작업이 개선되도록 하고, 하부 보온재의 오픈 되어 있는 상부측을 막고, 위에서 삽입 장착하도록 하므로서, 보온작용이 크게 증대되어, 동계절에 수도미터기 등의 동파를 방지하는 효과도 가질 수 있다.The structure of the lower heat insulating material for the water meter protection tube of the present invention is to increase the installation work space of the water meter, the on-off valve and the pipe, so that the installation work of the water meter, the on-off valve and the pipe is improved, and By blocking the open upper side and inserting from above, the warming action is greatly increased, and it can also have the effect of preventing freezing of water meters and the like during the winter season.

본 발명과 본 발명의 실시에 의해 달성되는 기술적 과제는 다음에서 설명하는 본 발명의 바람직한 실시예 들에 의하여 보다 명확해질 것이다. 다음 실시예들은 본 발명을 설명하기 위하여 예시된 것에 불과하며, 본 발명의 범위를 제한하기 위한 것은 아니다.The technical problem achieved by the present invention and the practice of the present invention will be more clearly understood by the preferred embodiments of the present invention described below. The following examples are merely illustrated to illustrate the present invention and are not intended to limit the scope of the present invention.

이하 본 발명을 첨부된 예시도면을 참조로 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

본 발명에 따른 수도미터기 보호통용 하부 보온재의 구조는, 하부 보온재(3)의 상면측을 덮어 오픈 상태가 없어지도록 막힘부(7)을 형성한 것과, 막힘부(7)의 일측에 돌설부(8)를 돌설시킨 것과, 돌설부(8)에 검침공(9)과 사각홈(10)과 재치홈(11)을 형성한 것과, 돌설부(8) 또는 전면돌출부(17) 에 형성시킨 검침공(9) 일측에 밸브용 통공(12)을 한 개 또는 두 개 형성시킨 것과, 하부 보온재(3)의 저면측에는 통과 장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)을 형성하되, 통과 장공(14)과 통과공(13)(13') 사이에 일자형 수직 터널(15)(16)로 연결하여 개방상태가 되도록 형성한 것과, 하부 보온재(3)의 통과 장공(14)과 통과공(13)(13') 사이로 수도미터기 보호통(1)내에 설치시킨 개폐밸브(4)와 수도미터기(5)를 파이프(6)(6')가 삽입되어, 하부 보온재(3)를 수도미터기 등의 조립부 위에서 삽입장착시킬 수 있도록 하는 수도미터기 보호통용 하부 보온재의 구조로 이루어진 것에 기술적 특징이 있다.The structure of the lower thermal insulation material for the water meter protection tube according to the present invention is to cover the upper surface side of the lower thermal insulation material 3 to form a blockage portion 7 so that the open state is eliminated, and the protrusions on one side of the blockage portion 7 8), the metering hole 9, the square groove 10 and the tact groove 11 are formed in the protrusion part 8, and the meter reading formed in the protrusion part 8 or the front protrusion part 17. One or two through holes 12 for valves are formed on one side of the ball 9, and a through hole 14, a through hole 13, 13 ′, and a straight vertical tunnel are provided on the bottom side of the lower insulation 3. 15) and 16, but are connected to each other through the through hole 14 and the through hole 13, 13 'by a vertical vertical tunnel 15, 16 to form an open state, and the lower thermal insulation material 3 Pipe 6, 6 'is inserted between the opening and closing valve 4 and the water meter 5 installed in the water meter protection tube 1 between the through hole 14 and the through hole 13, 13' of The lower insulation (3) To be inserted so as to mount on the sub-assembly has the technical features that the structure consisting of a lower protective insulation meter commonly used.

전술한 구성에 있어서, 상기, 돌설부(8)와 전면돌출부(8)의 형상과 크기 및 높이는 상부 보온재(2)나 수도미터기 보호통(1)의 크기에 따라 변경 및 변형이 가능하다.In the above-described configuration, the shape, size, and height of the protrusion 8 and the front protrusion 8 may be changed and modified depending on the size of the upper insulation 2 or the water meter protective tube 1.

또한, 상기, 돌설부(8)에 형성시킨 검침공(9)과 밸브용 통공(12)의 크기와 위치도 설치하는 수도미터기(5)의 크기나 필요에 따라 변형 및 변경이 가능하다.In addition, the size and position of the meter reading hole 9 formed in the protrusion 8 and the size and position of the valve through-hole 12 can be modified or changed as necessary.

또한, 상기, 통과공(13)(13')은, 하부 보온재(3)의 막힘부(7)나 돌출부(8)에 밸브용 통공(12)(12')이 한 개 설치된 경우에는 통과공(13)(13')중 일측은 밸브용 통공(12)에 연결되나 타측은 밸브용 통공(12)에 연결되지 않고 일자형 수직 터널(15)(16)과 같은 높이로 상측으로 뚫리다가 막히는 형태가 되도록 구성되어 있다.In addition, the said through hole 13, 13 'is a through hole when the valve | bulb hole 12 and 12' is provided in the blocking part 7 and the protrusion part 8 of the lower heat insulating material 3. One of the ends (13) and (13 ') is connected to the valve through hole (12), but the other side is not connected to the valve through hole (12) and is drilled upward at the same height as the straight vertical tunnels (15) and (16). It is configured to be.

또한, 상기, 상부 보온재(3)에 전면돌출부(17)를 형성하고, 전면돌출부(17)에 검침공(9)만을 형성시킨 경우에는 통과공(13)(13')은 모두 일자형 수직 터널(15)(16)과 같은 높이로 상측으로 뚫리다가 막히는 형태가 되므로, 하부 보온재(3)를 장착시키기 전에 개폐밸브(4)를 작동시키고, 하부보온재(3)를 위에서 삽입 장착시키면 상부측이 거의 막히는 상태가 되므로 보온작용이 더욱 증대되도록 구성되어 있다.In addition, when the front projection 17 is formed in the upper thermal insulation material 3, and only the metering hole 9 is formed in the front projection 17, all the through holes 13 and 13 'are straight vertical tunnels ( 15) (16), the upper side of the lower insulation material 3 is operated by operating the on / off valve 4 before mounting the lower insulation material 3 and inserting the lower insulation material 3 from above. It becomes a blockage state, and it is comprised so that heat insulation action may increase further.

도 1은 본 발명 일 실시예 사시도이고, 도 2는 본 발명 저면상태 사시도이고, 도 3은 본 발명 횡단면 상태도이고, 도 4는 본 발명 종단면 상태도로서, 이를 참조로 본 발명에 따른 수도미터기 보호통용 하부 보온재의 구조의 일 실시예를 들어 설명하면,1 is a perspective view of an embodiment of the present invention, Figure 2 is a perspective view of the bottom state of the present invention, Figure 3 is a cross-sectional state diagram of the present invention, Figure 4 is a longitudinal cross-sectional state diagram of the present invention, with reference to this water meter protection commonly used When explaining an embodiment of the structure of the lower insulation,

상기, 하부 보온재(3)에는 상부측이 막히도록 막힘부(7)를 형성하고, 막힘부(7)의 일측에 절개부(20)를 형성한 돌설부(8)를 형성한 것과, 돌설부(8)의 중앙부에 검침공(9)과 그 일측에 사각홈(10)과 보호카버(26)용 재치홈(11)을 형성하고, 절개부(20)일측 평면부측에 밸브용 통공(12)을 형성한 것과, 상기, 하부 보온재(3)의 저면측에는 통과장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)을 형성하되, 통과장공(14)은 검침공(9)과 연통되고, 일측 통과공(13)는 밸브용 통공(12)과 연결되도록 형성하고, 타측 통과공(13')은 일자형 수직 터널(15)(16)과 같은 높이로, 도 3와 같이 뚫리다가 막히도록 형성한 것과, 하부 보온재(3)의 저면측에 형성시킨 통과장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)사이로, 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')가 삽입되어, 하부 보온재(3)를 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')위에서 삽입시킬 수 있도록 한 것과, 하부 보온재(3)가 수도미터기(5)나 개폐밸브(4)양측에 접촉되는 상태가 되어 보온작용이 증대하도록 구비시킨 수도미터기 보호통용 하부 보온재 구조로 구성되어 있다.The lower insulation 3 is formed with a block 7 to block the upper side, and a protrusion 8 having a cutout 20 formed on one side of the block 7 is formed. The metering hole 9 and the square groove 10 and the mounting groove 11 for the protective cover 26 are formed at the central part of the center, and the through hole 12 for the valve is provided at one side of the cutout part 20. ), And, on the bottom surface side of the lower thermal insulation material 3, a through hole 14, a through hole 13, 13 'and a straight vertical tunnel 15, 16 are formed, but a through hole 14 Silver is in communication with the metering hole (9), the one side through-hole 13 is formed to be connected to the through-hole 12 for the valve, the other side through hole (13 ') is the same height as the straight vertical tunnel (15, 16) 3, between the through hole 14 and the through hole 13, 13 'and the straight vertical tunnel 15, 16 formed on the bottom surface side of the lower insulation 3, , On-off valve (4) and water meter (5) installed in the water meter protector (1) ) And pipes (6) and (6 ') are inserted into the valve (4), the water meter (5) and the pipe (6) (6') in which the lower thermal insulation material (3) is installed in the water meter protection container (1). The lower heat insulating material 3 is configured to be in contact with both the water meter 5 and the opening / closing valve 4 so as to be inserted, and the lower heat insulating material structure for the water meter protection tube provided to increase the heat insulating action.

따라서, 수도미터기 보호통(1)에 개폐밸브(4)와 수도미터기(5)를 파이프 (6)(6')로 연결 배관시키고, 상기, 하부 보온재(3)를 그 위에 삽입시키면 하부 보온재(3)의 통과장공(14)을 통하여는 수도미터기(5)가 삽입되고, 통과공(13)으로는 개폐밸브(4)가 삽입되고, 개페밸브(4)와 수도미터기(5)를 연결시키는 배관 파이프(6)(6')는 일자형 수직 터널(15)(16)에 삽입되며, 하부 보온재(3)가 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')의 양측에 접촉되며 감싸는 상태가 되고, 상단부측이 막힌 상태가 되므로, 동계절에 외부의 차거운 공기가 차단되어, 수도미터기(5)등의 동파를 방지하게 되고, 특히, 동계절에는 다리측(24)(24')에서 올아오는 따뜻한 지열이 외부로 누출되지 않고 하부 보온재 내부를 순환하게 되므로 수도미터기(5)등의 동파를 더욱 방지하도록 구성되어 있다.Accordingly, when the on-off valve 4 and the water meter 5 are connected to the pipe 6 and 6 'by the pipe 6 and 6', the lower heat insulating material 3 is inserted therein. The water meter 5 is inserted through the through-hole 14 of), the on-off valve 4 is inserted into the through-hole 13, and the pipe connecting the open-open valve 4 and the water meter 5 to Pipes 6 and 6 'are inserted into straight vertical tunnels 15 and 16, and the lower insulation 3 is provided on both sides of the shut-off valve 4, the water meter 5 and the pipes 6 and 6'. It is in a state of being wrapped in contact with, and the upper end side is in a blocked state, the outside cold air is blocked in the winter season, to prevent freezing waves such as water meter (5), especially, in the winter season, the leg side (24) Since the warm geothermal heat coming from (24 ') does not leak to the outside and circulates inside the lower insulating material, it is configured to further prevent freezing of the water meter (5).

또한, 전면 돌출부(17)의 일측이 절개된 것과 같은 절개부(20)를 형성한 돌설부(8)를 형성하고, 절개부(20)일측에 밸브용 통공(12)을 형성시킨 것은, 자재를 절감시키나 기능은 동일하도록 한 것으로, 개폐밸브(4)의 개폐작용이 원활하도록 하면서 개폐밸브(4)는 전체가 금속재로 구성되어 있어 동파가 안되나, 수도미터기(5)가 조립 부품 등이 금속재와 유리재와 합성수지재 등으로 혼합 구비되어 있어, 동계절에 동파가 잘 되므로, 수도미터기의 보온 효과가 증대되면서, 밸브용 통공(12) 상측의 자재 절감이 이뤄지도록 구성하고 있다.In addition, the protrusion part 8 which formed the cutout part 20 like the one side of the front protrusion part 17 cut | disconnected was formed, and the valve hole 12 was formed in one side of the cutout part 20, However, the function is the same, so that the opening and closing action of the on-off valve (4) is smooth, while the on-off valve (4) is composed entirely of metal material is not freeze, but the water meter (5) the assembly parts, etc. And a glass material and a synthetic resin material, and are freely mixed in the winter season, so that the thermal insulation effect of the water meter is increased, and the material saving on the upper side of the valve through-hole 12 is achieved.

또한, 상기, 검침공(9)의 일측에 형성시킨 사각홈(10)은 수도미터기(5)와 보호커버(26)를 연결하는 연결부가 돌설되도록 조립한 수도미터기(5)가 설치된 경우에도 삽입될 수 있도록 구성되어 있다.In addition, the square groove 10 formed at one side of the metering hole 9 is inserted even when the water meter 5 is assembled so that the connection portion connecting the water meter 5 and the protective cover 26 is installed. It is configured to be.

도 5와 도 6은 본 발명 제2실시예에 대한 사시도와 횡단면 상태도로서, 이를 참고로 본 발명의 제 2실시예를 설명하면,5 and 6 are a perspective view and a cross-sectional state view of a second embodiment of the present invention, with reference to this description of a second embodiment of the present invention,

하부 보온재(3)에는 상부측이 막히도록 막힘부(7)를 형성하고, 막힘부(7)의 중앙부위에는 전면돌출부(17)를 형성한 것과, 전면돌출부(17)의 중앙부에 검침공(9)과 사각홈(10)과 보호카버(26)용 재치홈(18)을 형성하고, 하부 보온재(3) 저면측에는 통과장공(14)과 통과공(13)(13')과 통과장공(14)과 통과공(13)(13')을 연결시킨 일자형 수직 터널(15)(16)을 형성하되, 통과장공(14)은 검침공(9)과 연통되고, 통과공(13)(13')과 일자형 수직 터널(15)(16)은 같은 높이로, 도6과 같이 뚫리다가 막히도록 형성한 것과, 하부 보온재(3)의 저면측에 형성시킨 통과장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)로, 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')가 삽입되어, 하부 보온재(3)를 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')의 위에서 삽입시킬 수 있도록 한 것과, 하부 보온재(3)가 수도미터기(5)나 개폐밸브(4)양측에 접촉되는 상태로 재치되어 보온작용이 증대되도록 구비시킨 수도미터기 보호통용 하부 보온재 구조로 구성되어 있다.The lower insulation material 3 is formed with a block portion 7 so that the upper side is blocked, and the front projection portion 17 is formed at the central portion of the block portion 7, and the metering hole 9 is formed at the center portion of the front projection portion 17. ) And the square groove 10 and the mounting groove 18 for the protective cover 26, and the through hole 14, the through hole (13) (13 ') and the through hole (14) on the bottom surface side of the lower insulation (3) ) And a straight vertical tunnel 15 and 16 connecting the through holes 13 and 13 ', wherein the through holes 14 communicate with the metering holes 9, and the through holes 13 and 13'. ) And straight vertical tunnels (15) and (16) are formed at the same height so as to be blocked as shown in FIG. 6, and the through-hole (14) and the through-hole (13) formed on the bottom surface side of the lower insulation (3). (13 ') and straight vertical tunnel (15, 16), the on-off valve (4), water meter (5) and pipes (6) (6') are inserted, the lower thermal insulation material (3) to the water meter 1) Insert the valve 4, the water meter 5 and the pipe 6, 6 'installed therein. As a to, a lower heat insulation material (3) may be placed in a state in contact with both sides of the meter 5 and the on-off valve (4) it consists of a lower insulation structure also accepted that the meter comprises such protection insulating effect is increased.

여기서, 상기, 전면돌출부(17)의 중앙부에 검침공(9)과 사각홈(10)과 그 일측에 카버 재치홈(18)만을 형성시킨 하부 보온재(3)를 개폐밸브(4)와 수도미터기(5)와 연결 파이프(6)(6')위에 삽입 장착시킬 때는, 전면돌출부(17)에 밸브용 통공(12)을 형성시키지 않았으므로, 먼저, 개폐밸브(4)를 작동시킨 후에 위에서, 검침공(9)과 보호카버(26)용 재치홈(18)을 형성시킨 하부 보온재(3)를 삽입 장착시키면 되고, 이때, 하부 보온재(3)의 상부측에 검침공(9)만이 뚫려 있고 검침공(9)사이에 수도미터기(5)가 삽입되므로, 더욱 외부의 차거운 공기가 차단되어, 수도미터기(5)등에 침투할 수 없게 되고, 특히, 동계절에는 다리측(24)(24')에서 올아오는 따뜻한 지열이 외부로 거의 누출되지 않고, 하부 보온재(3)의 하부측 내부를 순환하게 되므로, 수도미터기(5)등의 동파를 방지하도록 구성되어 있다.Here, the opening and closing valve (4) and the water meter to the lower insulating material (3) formed only the metering hole (9) and the square groove (10) in the central portion of the front projection (17) and the carver mounting groove (18) on one side thereof. Since the valve through hole 12 is not formed in the front protrusion 17 when the mounting pipe 5 and the connecting pipe 6 and 6 'are inserted and mounted, first, after operating the shut-off valve 4, from above, What is necessary is just to insert the lower heat insulating material 3 which formed the metering hole 9 and the mounting groove 18 for the protective cover 26, and at this time, only the metering hole 9 is drilled in the upper side of the lower heat insulating material 3, Since the water meter 5 is inserted between the metering holes 9, the outside cold air is further blocked, so that the water meter 5 cannot penetrate the water meter 5, etc., particularly during the winter season, the leg side 24 (24 '). Since the warm geothermal heat coming from the) hardly leaks to the outside and circulates inside the lower side of the lower thermal insulation material 3, it is possible to prevent freezing of the water meter 5 and the like. It is configured.

도 7은 본 발명 제 3실시예에 대한 사시도로서, 이를 참고로 본 발명의 제 3실시예를 설명하면,7 is a perspective view of a third embodiment of the present invention. Referring to the third embodiment of the present invention with reference to this,

하부 보온재(3)에는 상부측이 막히도록 막힘부(7)를 형성하고, 막힘부(7)의 중앙부위에는 전면돌출부(17)를 형성한 것과, 전면돌출부(17)의 중앙부에 검침공(9)과 사각홈(10)과 그 일측에 보호카버(26)용 재치홈(18)을 형성하고, 검침공(9)의 일측에는 밸브용 통공(12)을 형성한 것과, 하부 보온재(3) 저면측에는 통과장공(14)과 통과공(13)(13')과 통과장공(14)과 통과공(13)(13')을 연결시킨 일자형 수직 터널(15)(16)을 형성하되, 통과장공(14)은 검침공(9)과 연통되고, 일측 통과공(13)은 밸브용 통공(12)과 연결되도록 형성하고 타측 통과공(13')은 일자형 수직 터널(15)(16)과 같은 높이로, 도 4와 같이 뚫리다가 막히도록 형성한 것과, 하부 보온재(3)의 통과장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16) 사이로, 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')가 삽입되어, 하부 보온재(3)를 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')위에서 삽입시킬 수 있도록 한 것과, 하부 보온재(3)가 수도미터기(5)나 개폐밸브(4)양측에 접촉되는 상태로 재치되어 보온작용도 증대하도록 구비시킨 수도미터기 보호통용 하부 보온재 구조로 구성되어 있다.The lower insulation material 3 is formed with a block portion 7 so that the upper side is blocked, and the front projection portion 17 is formed at the central portion of the block portion 7, and the metering hole 9 is formed at the center portion of the front projection portion 17. ) And the square groove 10 and the mounting groove 18 for the protective cover 26 is formed on one side thereof, and the through hole 12 for the valve is formed on one side of the metering hole 9, and the lower thermal insulating material (3) On the bottom side, a straight vertical tunnel (15, 16) is formed through which the passage hole (14) and the passage hole (13) (13 ') and the passage hole (14) and the passage hole (13) (13') are connected. The long hole 14 is in communication with the metering hole (9), one side through hole (13) is formed to be connected to the through hole for the valve 12, the other side through hole (13 ') is a straight vertical tunnel (15, 16) and At the same height, between the through hole 14 and the through hole 13, 13 'and the straight vertical tunnel 15, 16 of the lower heat insulating material 3 formed so as to be blocked and blocked as shown in FIG. Opening and closing valve (4) and water meter (5) installed in meter protective casing (1) And pipes (6) and (6 ') are inserted into the valve (4) and the water meter (5) and the pipe (6) (6') with the lower heat insulating material (3) installed in the water meter protection container (1). The lower heat insulating material 3 is mounted in contact with both the water meter 5 and the on-off valve 4 so that the heat insulating action is also increased.

도 8은 본 발명 제 4실시예에 대한 사시도로서, 이를 참고로 본 발명의 제 4실시예를 설명하면,8 is a perspective view of a fourth embodiment of the present invention. Referring to the fourth embodiment of the present invention with reference to this,

하부 보온재(3)에는 상부측이 막히도록 막힘부(7)를 형성하고, 막힘부(7)의 중앙부위에는 전면돌출부(17)를 형성한 것과, 전면돌출부(17)의 중앙부에 검침공(9)과 그 일측에 보호카버(26)용 재치홈(18)을 형성하고, 검침공(9)의 양측에 밸브용 통공(12)(12')를 형성한 것과, 하부 보온재(3) 저면측에는 통과장공(14)과 통과공(13)(13')과 통과장공(14)과 통과공(13)(13')을 연결시킨 일자형 수직 터널(15)(16)을 형성하되, 통과장공(14)은 검침공(9)과 연통되고, 통과공(13)(13')는 검침공(9) 양측에 형성시킨 밸브용 통공(12)(12')과 연결되도록 형성한 것과, 하부 보온재(3)의 통과장공(14)과 통과공(13)(13') 및 통과장공(14)과 통과공(13)(13')의 사이에 형성시킨 일자형 수직 터널(15)(16)로, 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')가 삽입되어, 하부 보온재(3)를 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')위에서 삽입시킬 수 있도록 한 것과, 하부 보온재(3)가 수도미터기(5)나 개폐밸브(4)양측에 접촉되는 상태로 재치되어 보온작용도 증대하도록 구비시킨 수도미터기 보호통용 하부 보온재 구조로 구성되어 있다.The lower insulation material 3 is formed with a block portion 7 so that the upper side is blocked, and the front projection portion 17 is formed at the central portion of the block portion 7, and the metering hole 9 is formed at the center portion of the front projection portion 17. ) And a mounting groove 18 for the protective cover 26 on one side thereof, and through holes 12 and 12 'for valves on both sides of the metering hole 9, and on the bottom surface of the lower insulating material 3 Form a straight vertical tunnel (15, 16) connecting the passage hole (14) and the passage hole (13) (13 ') and the passage hole (14) and the passage hole (13) (13'), 14 is in communication with the metering hole (9), the through hole (13, 13 ') is formed so as to be connected to the valve through-holes (12, 12') formed on both sides of the metering hole (9), the lower insulation (3) the straight vertical tunnels 15 and 16 formed between the through holes 14 and the through holes 13 and 13 'and between the through holes 14 and the through holes 13 and 13'. , An on-off valve (4), a water meter (5), and a pipe (6) (6 ') installed in the water meter protector (1) are inserted into the lower beam. Ash (3) can be inserted on the on-off valve (4), water meter (5) and pipes (6) (6 ') installed in the water meter protector (1), and the lower insulating material (3) (5) or the on-off valve 4, which is placed in contact with both sides and is provided with a lower heat insulating material structure for a water meter protection tube provided to increase the heat retention action.

여기서, 검침공(9)의 양측에 밸브용 통공(12)(12')를 형성한 것은 하부 보온재(3)를 임의로 삽입시켜도 개폐밸브(4)가 밸브용 통공(12)(12')에 위치할 수 있으며, 개페밸브(4)의 타측에 여과장치의 개폐볼트 등을 설치한 경우에 사용할 수 있도록 구성되어 있다.Here, the valve through-holes 12 and 12 'are formed on both sides of the metering hole 9, even if the lower thermal insulation material 3 is arbitrarily inserted, the opening / closing valve 4 to the valve through-holes 12 and 12'. It can be located, it is configured to be used when the opening and closing bolts and the like of the filtration device on the other side of the open valve (4).

도 9는 본 발명 제 5실시예에 대한 사시도로서, 이를 참고로 본 발명의 제 5실시예를 설명하면, 하부 보온재(3)는 상부측이 평면상태로 막히도록 막힘부(7)를 형성하고, 막힘부(7)일측에는 밸브용 통공(12)과 돌설부(8)를 형성한 것과, 돌설부(8)의 중앙부위에는 단턱진 평면부(25)를 형성하고, 단턱진 평면부(25)에 검침공(9)을 형성하여, 수도미터기(5)의 보호커버가 돌설되도록 높이를 조절한 것과, 검침공(9)일측 단턱부에는 커버 재치홈(11)을 형성하여, 수도미터기(5)의 합성수지 보호커버를 재껴 놓을 수 있도록 하고, 검침공(9)의 일측에는 사각홈(10)을 형성하여 수도미터기(5)와 커버를 연결하는 연결부가 돌설되도록 조립한 수도미터기(5)도 삽입되도록 형성한 것과, 하부 보온재(3) 저면측에는 통과장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)을 형성하되, 통과장공(14)은 검침공(9)과 연통되고, 통과공(13)은 밸브용 통공(12)과 연통되도록 형성한것과, 통과공(13)(13')중 밸브용 통공(12)과 연통되지 않는 통과공(13')은 일자형 터널(15)(16)과 같은 높이로, 도 3과 같이 일정한 높이로 뚫리다가 막히도록 형성한 것과, 통과장공(14)과 통과공(13)(13')의 사이에는 일자형 터널(15)(16)을 형성하여, 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')가 삽입되도록 하여, 하부 보온재(3)를, 수도미터기 보호통에 설치시킨 개폐밸브(4)와 수도미터기(5)와 파이프(6(6')위에서 삽입시킬 수 있도록 하고, 하부 보온재(3)가 수도미터기(5)나 개폐밸브(4)의 양측에 접촉되는 상태로 재치되어, 보온작용이 증대하도록 구비시킨 수도미터기 보호통용 하부 보온재 구조로 구성되어 있다.9 is a perspective view of a fifth embodiment of the present invention. Referring to the fifth embodiment of the present invention with reference to this, the lower thermal insulating material 3 forms a block 7 so that the upper side thereof is blocked in a planar state. On one side of the clogging portion 7, a valve through-hole 12 and a protrusion 8 are formed, and a stepped flat portion 25 is formed at the central portion of the protrusion 8, and the stepped flat portion 25 is formed. The metering hole (9) is formed in the above, and the height is adjusted so that the protection cover of the water meter (5) protrudes, and the cover mounting groove (11) is formed in one step of the metering hole (9), 5) the synthetic resin protective cover can be re-set, and the water meter (5) assembled so that the connection part connecting the water meter (5) and the cover is formed by forming a square groove (10) on one side of the metering hole (9) It is formed so as to be inserted, and the through-hole hole 14, the through hole 13, 13 'and the straight vertical tunnel (15, 16) on the bottom surface side of the lower insulating material (3) , The passage hole 14 is in communication with the metering hole 9, the passage hole 13 is formed so as to communicate with the valve through-hole 12, and the valve through-hole 12 of the through hole (13) (13 ') ) Is not in communication with the through hole 13 'is formed at the same height as the straight tunnel (15, 16), so as to be blocked by being drilled at a constant height as shown in Figure 3, the passage hole 14 and the through hole (13) A straight tunnel 15, 16 is formed between the 13 'and the open / close valve 4, the water meter 5, and the pipe 6, 6' installed in the water meter protection tube 1 The lower heat insulating material 3 is inserted into the opening / closing valve 4 and the water meter 5 and the pipe 6 (6 ') installed in the water meter protection tube so that the lower heat insulating material 3 It is comprised by the lower heat insulating material structure for water meter protection cylinders which were mounted in the state which contacts the both sides of the meter 5 and the on-off valve 4, and was provided so that the thermal insulation action might increase.

여기서, 상기, 돌설부(8)의 중앙부위에 형성시킨 단턱진 평면부(25)는 검침 공(9)의 높이를 낮춰, 설치된 수도미터기(5)와 높이를 맞추고, 설치된 수도미터기의 보호카버(26)가 검침공(9)의 일측에 형성시킨 재치홈(11)에 제껴질 수 있도록 구성되어 있다.Here, the stepped flat portion 25 formed at the central portion of the protrusion 8 lowers the height of the metering ball 9, matches the height of the installed water meter 5, and protects the installed water meter. (26) is comprised so that it may be meshed with the mounting groove 11 formed in one side of the metering hole 9. As shown in FIG.

이상과 같이 본 발명의 바람직한 실시예에 따른 수도미터기 보호통용 하부 보온재의 구조를 첨부된 도면을 참조로 설명하였으나, 본 발명은 본 명세서에 상세히 설명된 실시 예와 도면에 한정되지 아니하며, 발명의 기술사상 범위내에서 다양한 변형이 이루어질 수 있다.As described above with reference to the accompanying drawings, the structure of the lower insulation for water meter protective casing according to a preferred embodiment of the present invention, the present invention is not limited to the embodiments and drawings described in detail herein, the description of the invention Various modifications may be made within the spirit and scope.

도 1은 본 발명 사시도1 is a perspective view of the present invention

도 2는 본 발명 저면 사시도2 is a bottom perspective view of the present invention

도 3은 본 발명 횡단면 상태도3 is a cross-sectional state diagram of the present invention

도 4는 본 발명 종단면 상태도Figure 4 is a longitudinal cross-sectional view of the present invention

도 5는 본 발명 다른 실시예의 사시도5 is a perspective view of another embodiment of the present invention

도 6은 본 발명 다른 실시예의 횡단면 상태도Figure 6 is a cross-sectional state view of another embodiment of the present invention

도 7은 본 발명 제3 실시예의 사시도7 is a perspective view of a third embodiment of the present invention;

도 8는 본 발명 제4 실시예의 사시도8 is a perspective view of a fourth embodiment of the present invention;

도 9은 본 발명 제5 실시예의 사시도9 is a perspective view of a fifth embodiment of the present invention;

도 10는 본 발명 설치 및 사용상태도10 is a state of installation and use of the present invention

※ 도면의 주요 부분에 대한 설명 ※※ Description of the main parts of the drawings ※

1.수도미터기 보호통 2. 상부 보온재 3.하부 보온재1. Water meter protection container 2. Upper insulation 3. Lower insulation

4. 개폐밸브 5.수도미터기 6,6'.파이프4. Opening and closing valve 5. Water meter 6,6 'pipe

7.막힘부 8.돌설부 9. 검침공7.Blocking section 8.Stone section 9. Meter reading

10.사각홈 11.재치홈 12,12'.밸브용 통공10. Square groove 11. Reposition groove 12, 12'.Valve hole

13,13'.통과공 14.통과장공 15,16일자형 수직 터널13,13 '. Passing hole 14. Passing hole 15, 16 straight vertical tunnel

17.전면돌출부 18.커버 재치홈 19,19'.라운드 돌부17. Front protrusion 18. Cover tact groove 19, 19 '. Round protrusion

20.절개부 21.보온재 상승 방지편 22.뚜껑20.Incision 21.Insulation prevention piece 22.Lid

23.검침용 뚜껑 24,24'.다리 25.단턱진 평면부23.Reading cap 24, 24 '. Leg 25. Stepped flat part

26.보호카버 27.표시부26. Protective cover 27. Display

Claims (3)

수도미터기 보호통용 하부 보온재에 있어서,In the lower thermal insulation material for water meter protection barrel, 하부 보온재(3)에는 상부측이 막히도록 막힘부(7)를 형성하고, 막힘부(7)의 일측에 절개부(20)를 형성한 돌설부(8)를 형성한 것과, 돌설부(8)의 중앙부에 검침공(9)과 사각홈(10)과 재치홈(11)을 형성하고, 절개부(20)일측 평면부측에 밸브용 통공(12)을 형성한 것과, 상기, 하부 보온재(3)의 저면측에는 통과장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)을 형성한 것과, 하부 보온재(3)의 저면측에 형성시킨 통과장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)사이로, 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')가 삽입되어, 하부 보온재(3)를 수도미터기 보호통(1)내에 설치한 개폐밸브(4)와 수도미터기(5)와 파이프(6)(6')위에서 삽입시킬 수 있도록 하여, 보온작용이 증대하도록 구성한 한 것을 특징으로 하는 수도미터기 보호통용 하부 보온재의 구조.In the lower insulation 3, a block 7 is formed so that the upper side is blocked, and a protrusion 8 having a cutout 20 formed on one side of the block 7 is formed. And a metering hole 9, a square groove 10 and a mounting groove 11 in the center of the center, and a through-hole 12 for the valve is formed on one side of the cutout portion 20, and the lower thermal insulation material ( 3, the through holes 14, the through holes 13, 13 'and the straight vertical tunnels 15 and 16 are formed at the bottom of the bottom surface side, and the through holes 14 formed at the bottom of the lower heat insulating material 3 are formed. ), The opening and closing valve (4), the water meter (5) and the pipe (6) (6) installed in the water meter protection tube (1) between the through hole (13), 13 'and the straight vertical tunnel (15, 16). ') Is inserted to allow the lower thermal insulation material 3 to be inserted on the on / off valve 4, the water meter 5, and the pipes 6 and 6' installed in the water meter protection tube 1, thereby keeping warm. Water meter protection characterized in that it is configured to increase Structure of the common lower insulation. 제1항에 있어서,The method of claim 1, 하부 보온재(3)의 막힘부(7) 상측에 전면돌출부(17)를 형성하고, 전면돌출부(17)에 검침공(9)과 사각홈(10)과 보호커버(26)용 재치홈(18)만을 형성한 것과, 하부 보온재(3)의 저면측에는 통과 장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)을 형성하되, 통과 장공(14)은 검침공(9)과 연결되고, 통과공(13)(13')과 일자형 수직 터널(15)(16)을 일정한 높이로 뚫리다가 막히도록 형성하여, 하부 보 온재(3)를 수도미터기 등의 위에서 삽입할 수 있고, 보온작용이 증대되도록 한 것을 특징으로 하는 하는 수도미터기 보호통용 하부 보온재의 구조.The front projection 17 is formed on the block 7 of the lower insulation 3, and the inspection hole 9, the square groove 10, and the mounting groove 18 for the protective cover 26 are formed on the front projection 17. ) And only the through hole 14, the through hole 13, 13 'and the straight vertical tunnel 15, 16 are formed on the bottom side of the lower thermal insulating material 3, and the through hole 14 is a meter reading. It is connected to the ball (9), the through hole 13, 13 'and the straight vertical tunnel (15, 16) is formed so as to be blocked by a certain height, so that the lower insulating material (3) from above the water meter The structure of the lower heat insulating material for water meter protection barrel, which can be inserted, characterized in that the heat retention action is increased. 제1항에 있어서,The method of claim 1, 하부 보온재(3)의 막힘부(7) 상측에 전면돌출부(17)를 형성하고, 전면돌출부(17)에 검침공(9)과 보호커버(26)용 재치홈(18)을 형성하고, 검침공(9) 양측에 밸브용 통공(12)(12')을 형성한 것과, 하부 보온재(3)의 저면측에는 통과장공(14)과 통과공(13)(13')과 일자형 수직 터널(15)(16)을 형성하되, 통과장공(14)은 검침공(9)과 연결되고, 통과공(13)(13')은 밸브용 통공(12)(12')과 연결되도록 형성하여, 하부 보온재(3)를 위에서 삽입할 수 있고, 보온작용이 증대되도록 한 것을 특징으로 하는 하는 수도미터기 보호통용 하부 보온재의 구조.The front projection 17 is formed on the block 7 of the lower insulation 3, and the metering hole 9 and the mounting groove 18 for the protective cover 26 are formed on the front projection 17. The through holes 12 and 12 'for valves are formed on both sides of the ball 9, and the through holes 14 and the through holes 13 and 13' and the straight vertical tunnel 15 are provided on the bottom side of the lower insulating material 3; ) 16, but the through hole 14 is connected to the metering hole (9), the through hole (13) (13 ') is formed to be connected to the through hole for valve 12 (12'), Insulation material (3) can be inserted from above, the structure of the lower heat insulating material for water meter protective barrel, characterized in that the heat retention action is increased.
KR1020090071080A 2009-08-01 2009-08-01 Lower insulation for water meter protection tube KR20110013080A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090071080A KR20110013080A (en) 2009-08-01 2009-08-01 Lower insulation for water meter protection tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090071080A KR20110013080A (en) 2009-08-01 2009-08-01 Lower insulation for water meter protection tube

Publications (1)

Publication Number Publication Date
KR20110013080A true KR20110013080A (en) 2011-02-09

Family

ID=43772909

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090071080A KR20110013080A (en) 2009-08-01 2009-08-01 Lower insulation for water meter protection tube

Country Status (1)

Country Link
KR (1) KR20110013080A (en)

Similar Documents

Publication Publication Date Title
RU2008104150A (en) HOUSING FOR INSULATED PIPES
KR20110013081A (en) Interstitial insulation for lower insulation for water meter protection tube
KR20110013080A (en) Lower insulation for water meter protection tube
KR101041971B1 (en) Device for checking water gauge
KR101479743B1 (en) Faucet for prevention freeze-break
KR100258918B1 (en) Preservation bucket of water works a meter for an improvement of retaining warmth
KR200371082Y1 (en) The freezing protective device for a water meter
KR20110013082A (en) Upper and lower heat insulation structure for water meter protection
JP5191835B2 (en) Hot water outlet
KR20110020347A (en) Water Insulation Protector
JP2022087417A (en) Socket for prevention of freezing
KR20060026555A (en) The freezing protective device for a water meter
CN113303211A (en) Water-saving anti-freezing irrigation system
KR20050033574A (en) The structure of a water meter box
KR20210030822A (en) A box of Water meter installed with a stop valve
KR200468830Y1 (en) Heat Insulating Materials
KR102276999B1 (en) Protection Case water meter
KR200407066Y1 (en) Water Meter Protector Lid
KR200293126Y1 (en) Water meter
KR20010083841A (en) Frost proof faucet
KR102228794B1 (en) Check valve for sewage discharge of water meter protection box
KR100947541B1 (en) Anti-freezingusing device for water gauge
KR200433385Y1 (en) Device for preventing freeze-break
KR20210043164A (en) Freeze delay blocking structure of hydrant
KR200266383Y1 (en) Water meter dual thermostat

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application