KR20100127643A - Punch apparatus for main iron through - Google Patents

Punch apparatus for main iron through Download PDF

Info

Publication number
KR20100127643A
KR20100127643A KR1020090046173A KR20090046173A KR20100127643A KR 20100127643 A KR20100127643 A KR 20100127643A KR 1020090046173 A KR1020090046173 A KR 1020090046173A KR 20090046173 A KR20090046173 A KR 20090046173A KR 20100127643 A KR20100127643 A KR 20100127643A
Authority
KR
South Korea
Prior art keywords
hole
coupling
pressing
excavator
skimmer
Prior art date
Application number
KR1020090046173A
Other languages
Korean (ko)
Other versions
KR101099680B1 (en
Inventor
조대현
한상곤
Original Assignee
현대제철 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대제철 주식회사 filed Critical 현대제철 주식회사
Priority to KR1020090046173A priority Critical patent/KR101099680B1/en
Publication of KR20100127643A publication Critical patent/KR20100127643A/en
Application granted granted Critical
Publication of KR101099680B1 publication Critical patent/KR101099680B1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/14Discharging devices, e.g. for slag
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D25/00Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag
    • F27D25/001Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag comprising breaking tools, e.g. hammers, drills, scrapers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/14Charging or discharging liquid or molten material
    • F27D3/145Runners therefor

Abstract

PURPOSE: A piercing apparatus for a main iron runner is provided to separate foreign materials accumulated in the lower hole of the skimmer without approaching a main iron runner. CONSTITUTION: A piercing apparatus for a main iron runner comprises a pressing part(50) and a coupling part(70). The pressing part passes through the lower hole of the skimmer of a main iron runner and separates foreign materials from the hole. The coupling part is connected to the pressing part and detachably coupled to an excavator, and formed with a hook(52) projected in the lateral direction. The coupling part comprises a base portion(71) connected to the pressing part, a coupling panel(72) extended upward from the base portion, a first coupling hole(74) formed in the coupling panel, and a second coupling hole(76) which is formed in the coupling panel and separated from the first coupling hole.

Description

대탕도용 관통장치 {PUNCH APPARATUS FOR MAIN IRON THROUGH}PUNCH APPARATUS FOR MAIN IRON THROUGH}

본 발명은 대탕도용 관통장치에 관한 것으로서, 특히, 굴삭기에 결합하여 이물질을 제거할 수 있는 대탕도용 관통장치에 관한 것이다.The present invention relates to a penetration device for large tap water, and more particularly, to a large tap water penetration device that can remove foreign substances by coupling to an excavator.

일반적인 철강제조는 용선(쇳물)을 생산하는 제선공정, 용선에서 불순물을 제거하는 제강공정, 액체 상태의 철이 고체가 되는 연주공정, 철을 강판이나 선재로 만드는 압연공정으로 이루어진다.General steel production consists of a steelmaking process for producing molten iron, a steelmaking process for removing impurities from molten iron, a regeneration process in which iron in a liquid state becomes a solid, and a rolling process in which iron is made of steel or wire.

철광석으로 강철을 만드는 공정 중 앞 단계인 선철을 만드는 공정을 제철, 제선(製銑)이라 하고, 선철로 강철을 만드는 공정을 제강이라 한다.The process of making pig iron, the first step in the process of making steel from iron ore, is called steelmaking and steelmaking, and the process of making steel from pig iron is called steelmaking.

연주공정은 액체 상태인 용선을 주형(mold)에 주입한 후 연속 주조기를 통과시키며 냉각, 응고시켜 연속적으로 슬래브(Slab)나 블룸(Bloom) 등의 중간 소재로 만들어내는 공정이다.The casting process is a process of injecting molten iron in a mold into a mold, then passing it through a continuous casting machine, cooling, and solidifying it to continuously form an intermediate material such as slab or bloom.

이 과정에서 블룸은 다시 강편 압연기를 거쳐 빌릿(Billet)으로 가공되며 선재 압연기를 통해 선재로 가공된다.In this process, the bloom is again processed into a billet (Billet) through a steel sheet rolling mill and processed into a wire rod through a wire rod rolling mill.

또한, 슬래브는 후판 압연기를 거쳐 후판으로 생산되거나 열간 압연기를 통과하면서 열연코일이나 열연강판 등으로 만들어진다.In addition, the slab is made of a hot rolled coil or a hot rolled steel sheet while being produced in a thick plate through a thick plate rolling mill or through a hot rolling mill.

앞에서 설명한 제선공정을 행하기 위해 고로 또는 전기로가 사용되며, 고로는 철광석으로부터 용선을 추출하는 노이고, 전기로는 유도 전류가 일으키는 열을 이용하여 고철을 용선으로 만드는 노이다.A blast furnace or an electric furnace is used to perform the above-described steelmaking process, a blast furnace is a furnace for extracting molten iron from iron ore, and an electric furnace is a furnace for making molten iron using heat generated by an induced current.

일반적으로 고로의 출선구에는 대탕도가 설치되어 고로에서 배출되는 용선과 슬래그를 분리하고, 슬래그가 분리된 용선은 지탕도를 지나 경주통으로 모아진다.In general, a large hot water is installed at the exit of the blast furnace to separate the molten iron and slag discharged from the blast furnace, and the molten iron from which the slag is separated is collected into the raceway through the jitang.

대탕도에는 용선으로부터 분리된 슬래그를 배출하는 재탕도가 설치되고, 대탕도로부터 재탕도가 분기되는 부분에 스키머가 설치되어 비중 차이에 의해 용선의 표면에 뜨는 슬래그는 스키머에 의해 지탕도 측으로 흐르지 못하고, 재탕도 측으로 흐르게 된다.The reflow water is discharged from the molten metal and the skimmer is installed at the part where the reflow water diverges from the molten iron.The slag floating on the surface of the molten metal due to the difference in specific gravity does not flow to the scorched water by the skimmer. The ash flows to the side.

스키머는 대탕도의 상단 측에 설치되는 바 형상의 구조물로서, 비중 차이에 의해 대탕도의 바닥면을 따라 흐르는 용선은 스키머를 지나 지탕도 측으로 흐르고, 용선의 표면에 떠서 흐르는 슬래그는 스키머에 의해 흐름이 차단되어 재탕도 측으로 흐르게 된다.The skimmer is a bar-shaped structure that is installed on the upper side of the large bathway, and the molten iron that flows along the bottom surface of the large waterway flows through the skimmer to the jitangdo side due to the difference in specific gravity, and the slag flowing on the surface of the molten iron flows by the skimmer. This is blocked and flows to the reflowing side.

상기한 기술구성은 본 발명의 이해를 돕기 위한 배경기술로서, 본 발명이 속하는 기술분야에서 널리 알려진 종래기술을 의미하는 것은 아니다.The technical structure described above is a background technique for assisting the understanding of the present invention, and does not mean the prior art widely known in the technical field to which the present invention belongs.

종래 기술에 따른 대탕도는 정기적으로 내화물을 보수하고, 스키머 하부에 누적되는 이물질을 제거하는 작업이 요구되기 때문에 누적된 이물질을 제거하는 작업 중에 고온의 작업환경이나 고온의 용선에 의해 작업자가 피해를 입을 수 있는 문제점이 있다.Since the large water bath according to the prior art regularly repairs refractory materials and removes foreign matter accumulated in the lower part of the skimmer, the worker may be damaged by a hot working environment or a hot molten iron during the removal of accumulated foreign matter. There is a problem that can be worn.

따라서 이를 개선할 필요성이 요청된다.Therefore, there is a need for improvement.

본 발명은 상기와 같은 문제점들을 개선하기 위해 안출된 것으로서, 굴삭기에 결합하여 이물질을 제거할 수 있는 대탕도용 관통장치를 제공하는데 그 목적이 있다.The present invention has been made in order to improve the above problems, the object of the present invention is to provide a penetration device for large tap water that can remove the foreign matter by coupling to the excavator.

상기와 같은 목적을 달성하기 위하여 본 발명은, 대탕도의 스키머 하측 홀부를 통과하여 상기 홀부로부터 이물질을 분리시키는 가압부; 및 상기 가압부와 연결되고, 굴삭기에 착탈 가능하게 결합되는 결합부를 포함하는 것을 특징으로 하는 대탕도용 관통장치를 제공한다.In order to achieve the above object, the present invention, the pressing portion for separating the foreign matter from the hole through the skimmer lower hole of the large bath; And a coupling part connected to the pressing part and detachably coupled to the excavator.

또한, 본 발명의 상기 가압부에는 측 방향으로 돌출되는 걸림고리가 형성되는 것을 특징으로 하는 대탕도용 관통장치를 제공한다.In addition, the pressing portion of the present invention provides a penetrating device for anti-tangling, characterized in that the hook is formed to protrude in the lateral direction.

또한, 본 발명의 상기 결합부는, 상기 가압부와 연결되는 베이스부; 상기 베이스로부터 상측으로 연장되는 결합패널; 상기 결합패널에 형성되는 제1체결홀부; 및 상기 결합패널에 형성되고, 상기 제1체결홀부와 이격되는 제2체결홀부를 포함하는 것을 특징으로 하는 대탕도용 관통장치를 제공한다.In addition, the coupling portion of the present invention, the base portion connected to the pressing portion; A coupling panel extending upward from the base; A first fastening hole formed in the coupling panel; And a second fastening hole formed in the coupling panel and spaced apart from the first fastening hole.

또한, 본 발명의 상기 결합부에는 상기 가압부의 단부로부터 경사지게 연장되는 경사부가 형성되는 것을 특징으로 하는 대탕도용 관통장치를 제공한다.In addition, the coupling portion of the present invention provides a penetrating device for large tap water, characterized in that the inclined portion extending inclined from the end of the pressing portion.

본 발명에 따른 대탕도용 관통장치는 굴삭기에 결합되어 스키머 하부의 홀부를 가압함으로써, 대탕도에 근접하는 작업자 없이 스키머 하부의 홀부에 누적된 이물질을 홀부로부터 분리시킬 수 있으므로 대탕도 보수작업을 행할 때에 고온에 의한 안전사고 발생을 억제할 수 있는 이점이 있다.When the through-water tapping device according to the present invention is coupled to an excavator and presses the hole in the lower part of the skimmer, the foreign matter accumulated in the hole in the lower part of the skimmer can be separated from the hole part without a worker approaching the large tap-water. There is an advantage that can suppress the occurrence of safety accidents due to high temperatures.

이하, 첨부된 도면들을 참조하여 본 발명에 따른 대탕도용 관통장치의 일 실시예를 설명한다.Hereinafter, with reference to the accompanying drawings will be described an embodiment of a large water tap through apparatus according to the present invention.

이러한 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다.In this process, the thickness of the lines or the size of the components shown in the drawings may be exaggerated for clarity and convenience of description.

또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로써, 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다.In addition, terms to be described later are terms defined in consideration of functions in the present invention, which may vary according to a user's or operator's intention or custom.

그러므로 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Therefore, definitions of these terms should be made based on the contents throughout this specification.

도 1은 본 발명의 일 실시예에 따른 대탕도용 관통장치가 도시된 사시도이고, 도 2는 본 발명의 일 실시예에 따른 대탕도용 관통장치가 도시된 사용 상태도이고, 도 3은 본 발명의 일 실시예에 따른 대탕도용 관통장치의 전진 상태가 도시된 도면이고, 도 4는 본 발명의 일 실시예에 따른 대탕도용 관통장치의 후진 상태가 도시된 도면이다.1 is a perspective view showing a large water supply penetrating device according to an embodiment of the present invention, Figure 2 is a state diagram showing the use of a large water supply penetrating device according to an embodiment of the present invention, Figure 3 is a view of the present invention 4 is a view showing a forward state of the large tap water penetration apparatus according to the embodiment, Figure 4 is a view showing a reverse state of the large tap water penetration apparatus according to an embodiment of the present invention.

도 1 내지 도 4를 참조하면, 본 발명의 일 실시예에 따른 대탕도용 관통장치(100)는 대탕도(10)의 스키머(12) 하측 홀부(14)를 통과하여 홀부(14)로부터 이물질을 분리시키는 가압부(50)와, 가압부(50)와 연결되고, 굴삭기에 착탈 가능하게 결합되는 결합부(70)를 포함한다.1 to 4, the through-hole 100 for large waterways according to an embodiment of the present invention passes foreign substances from the hole 14 by passing through the lower hole 14 of the skimmer 12 of the large waterway 10. The pressing unit 50 to separate, and the coupling unit 70 is connected to the pressing unit 50, detachably coupled to the excavator.

따라서 대탕도(10)의 정기 보수작업이 개시되면 결합부(70)를 굴삭기에 연결하고, 굴삭기를 구동시켜 가압부(50)를 스키머(12) 하부의 홀부(14)로 통과시켜 홀부(14)에 누적된 이물질을 분리시키는 작업을 행하여 스키머(12) 하부의 홀부(14)에 누적되는 이물질에 의해 용선의 흐름이 방해되는 것을 억제토록 한다.Therefore, when the regular maintenance work of the large bath 10 is started, the coupling part 70 is connected to the excavator, and the excavator is driven to pass the pressing part 50 through the hole part 14 below the skimmer 12, and then the hole part 14. ) To separate the accumulated foreign matter to suppress the flow of molten iron by the foreign matter accumulated in the hole 14 in the lower portion of the skimmer 12.

가압부(50)에는 홀부(14)에 누적된 이물질을 분리시키도록 측 방향으로 돌출되는 걸림고리(52)가 형성되므로 가압부(50)를 홀부(14)의 일측 방향으로 통과시켜 이물질을 분리시킬 수 있고, 가압부(50)를 홀부(14)의 타측 방향으로 후진시킬 때도 걸림고리(52)에 의해 이물질이 분리될 수 있다.Since the pressing portion 50 is formed with a hook 52 that protrudes laterally to separate the foreign matter accumulated in the hole portion 14, the foreign matter is separated by passing the pressing portion 50 in one direction of the hole portion 14. The foreign matter may be separated by the catching ring 52 even when the pressing unit 50 is reversed in the other direction of the hole unit 14.

굴삭기를 운전하는 작업자가 가압부(50)를 홀부(14)로 통과시킨 후에, 가압부(50)를 측 방향으로 소정량 이동시켜 후진시키면 걸림고리(52)에 이물질이 걸리므로 후진하는 가압부(50)에 의해서 보다 많은 양의 이물질이 분리될 수 있게 된 다.When the operator operating the excavator passes the pressing unit 50 through the hole unit 14, and moves the pressing unit 50 in the lateral direction by a predetermined amount, if the foreign matter is caught in the catch ring 52, the pressing unit to move backward By (50), more foreign matter can be separated.

상기한 바와 같이 가압부(50) 및 걸림고리(52)에 의해 홀부(14)로부터 분리되는 이물질은 대탕도(10)의 바닥면에 형성되는 잔선공(18)을 따라 외부로 배출된다.As described above, the foreign matter separated from the hole 14 by the pressing unit 50 and the catching ring 52 is discharged to the outside along the remnant hole 18 formed on the bottom surface of the large bath 10.

결합부(70)는 가압부와 연결되는 베이스부(71)와, 베이스부(71)로부터 상측으로 연장되는 결합패널(72)과, 결합패널(72)에 형성되는 제1체결홀부(74)와, 결합패널(72)에 형성되고, 제1체결홀부(74)와 간격을 이루는 제2체결홀부(76)를 포함한다.The coupling part 70 includes a base part 71 connected to the pressing part, a coupling panel 72 extending upward from the base part 71, and a first fastening hole part 74 formed in the coupling panel 72. And a second fastening hole 76 formed in the coupling panel 72 and spaced apart from the first fastening hole 74.

제1체결홀부(74)와 제2체결홀부(76)에 굴삭기의 암(30)이 각각 연결되므로 굴삭기 암(30)의 구동 여부에 따라 가압부(50)의 상승 또는 하강이 이루어지며, 가압부(50)의 각도가 조절된다.Since the arm 30 of the excavator is connected to the first fastening hole 74 and the second fastening hole 76, respectively, the pressing part 50 is raised or lowered according to whether the excavator arm 30 is driven or pressed. The angle of the part 50 is adjusted.

또한, 결합부(70)에는 대탕도(10)의 경사면(16)을 따라 대탕도(10) 내측으로 삽입되도록 일측 단부로부터 하측 방향으로 경사지게 연장되고, 가압부(50)와 연결되는 경사부(80)가 형성된다.In addition, the inclined portion extending inclined downward from one end portion to be inserted into the mating surface 10 in the mating surface 10 along the inclined surface 16 of the large waterway 10, and connected to the pressing unit 50. 80) is formed.

따라서 굴삭기의 암(30)을 구동시켜 결합부(70)를 대탕도(10)의 상면에 안착시키면 경사부(80)가 대탕도(10)의 경사면(16)에 안착되고, 가압부(50)가 스키머(12)의 홀부(14)에 대향되도록 대탕도(10) 바닥면에 안착된다.Therefore, when the arm 30 of the excavator is driven to seat the coupling part 70 on the upper surface of the large tap 10, the inclined part 80 is seated on the inclined surface 16 of the large tap 10, and the pressing unit 50 is disposed. ) Is seated on the bottom surface of the main bath 10 so that the hole 14 of the skimmer 12 faces the hole 14.

따라서 굴삭기 또는 암(30)의 전진, 후진 작동만으로 스키머(12)의 홀부(14)에 누적된 이물질을 제거할 수 있게 되어 굴삭기를 운전하는 작업자가 용이한 운전을 행하게 된다.Therefore, it is possible to remove the foreign matter accumulated in the hole 14 of the skimmer 12 only by the forward or backward operation of the excavator or the arm 30, so that the operator who operates the excavator easily operates.

여기서, 결합부(70)는 다양한 형상으로 변경이 가능하므로 굴삭기가 아닌 다른 주상장치에 연결이 가능하며, 이는 본 발명의 기술구성을 인지한 당업자가 용이하게 변경하여 실시할 수 있는 것이므로 다른 실시예에 대한 구체적인 도면이나 설명은 생략하기로 한다.Here, the coupling part 70 can be connected to a columnar device other than an excavator because it can be changed into various shapes, which can be easily changed and implemented by those skilled in the art having recognized the technical configuration of the present invention another embodiment Detailed drawings or descriptions thereof will be omitted.

상기와 같이 구성된 본 발명의 일 실시예에 따른 대탕도용 관통장치의 동작을 살펴보면 다음과 같다.Looking at the operation of the penetrating device for large water in accordance with an embodiment of the present invention configured as described above are as follows.

고로의 정기 수리작업이 개시되면 대탕도(10)에서 용선을 배출한 후에 대탕도용 관통장치(100)를 사용하여 스키머(12)의 홀부(14)에 누적된 이물질을 분리시키는 작업을 행한다.When the regular repair work of the blast furnace is started, after the molten iron is discharged from the large tap water 10, the foreign material accumulated in the hole 14 of the skimmer 12 is separated using the large tap water penetrating device 100.

이때, 대탕도용 관통장치(100)의 결합부(70)에 굴삭기의 암(30)을 결합하는데, 한 쌍으로 이루어지는 결합패널(72) 사이에 굴삭기의 암(30)을 삽입한 후에 제1체결홀부(74) 및 제2체결홀부(76)와 암(30)을 체결부재로 결합하여 대탕도용 관통장치(100)와 굴삭기의 결합을 행한다.At this time, the arm 30 of the excavator is coupled to the coupling portion 70 of the large water supply penetrating device 100, and the first fastening after inserting the arm 30 of the excavator between the pair of coupling panel 72. The hole portion 74 and the second fastening hole portion 76 and the arm 30 are coupled to each other by a fastening member, and the through-hole apparatus 100 for the large water tap is combined with the excavator.

이렇게 결합된 굴삭기의 암(30)을 구동시켜 가압부(50)를 스키머(12)의 홀부(14)에 대향되도록 대탕도(10) 내측으로 삽입하면 경사부(80)가 대탕도(10)의 경사면(16)에 안착되고, 결합부(70)는 대탕도(10)의 상면에 안착된다.When the arm 30 of the excavator thus coupled is inserted into the counter tap 10 to face the hole 14 of the skimmer 12, the inclined part 80 is the counter tap 10. It is seated on the inclined surface 16, the coupling portion 70 is seated on the upper surface of the large bath 10.

가압부(50)가 대탕도(10) 바닥면에 안착된 후에, 굴삭기를 전진시키거나 암(30)을 전진시키면 가압부(50)가 스키머(12)의 홀부(14)를 관통하면서 홀부(14)에 누적된 이물질이 분리된다.After the pressing unit 50 is seated on the bottom surface of the large bath 10, when the excavator is advanced or the arm 30 is advanced, the pressing unit 50 penetrates the hole 14 of the skimmer 12 and the hole unit ( The foreign matter accumulated in 14) is separated.

또한, 가압부(50)가 홀부(14)를 관통한 후에 굴삭기 또는 암(30)을 측 방향 으로 소정량 이동시킨 후에 굴삭기 또는 암(30)을 후진시키면 가압부(50)가 홀부(14)를 통과하면서 걸림고리(52)에 걸리는 이물질이 홀부(14)로부터 분리된다.In addition, when the excavator 50 or the arm 30 is moved backwards by a predetermined amount after passing through the hole 14, the excavator 50 or the arm 30 is reversed. The foreign matter caught in the locking ring 52 is separated from the hole 14 while passing through.

상기한 바와 같이 굴삭기 또는 암(30)의 전진과 후진을 반복하여 스키머(12)의 홀부(14)에 누적된 이물질을 홀부(14)로부터 분리시킬 수 있다.As described above, the foreign material accumulated in the hole 14 of the skimmer 12 may be separated from the hole 14 by repeating forward and backward of the excavator or the arm 30.

이렇게 분리된 이물질은 대탕도(10)의 바닥면을 따라 흘러 잔선공(18)을 따라 대탕도(10) 외측으로 배출된다.The foreign matter thus separated flows along the bottom surface of the large bath 10 and is discharged to the outside of the large bath 10 along the remnant hole 18.

이로써, 굴삭기에 결합하여 이물질을 제거할 수 있으므로 고온의 대탕도 근처에 작업자가 위치하지 않아 안전사고를 방지할 수 있는 대탕도용 관통장치를 제공할 수 있게 된다.As a result, the foreign matter can be removed by coupling to the excavator, so that the worker is not located near the high temperature hot water, thereby providing a water penetrating device for preventing the water accident.

본 발명은 도면에 도시되는 일 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술이 속하는 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다.Although the present invention has been described with reference to one embodiment shown in the drawings, this is merely exemplary, and various modifications and equivalent other embodiments are possible to those skilled in the art. Will understand.

또한, 대탕도용 관통장치를 예로 들어 설명하였으나, 이는 예시적인 것에 불과하며, 대탕도가 아닌 다른 제품에도 본 발명의 관통장치가 사용될 수 있다.In addition, although the through-water device for large tapping was described as an example, this is merely illustrative, and the penetrating device of the present invention may be used in other products other than the tapping water.

따라서 본 발명의 진정한 기술적 보호범위는 아래의 특허청구범위에 의해서 정하여져야 할 것이다.Therefore, the true technical protection scope of the present invention will be defined by the claims below.

도 1은 본 발명의 일 실시예에 따른 대탕도용 관통장치가 도시된 사시도이다.1 is a perspective view showing a penetrating device for large water in accordance with an embodiment of the present invention.

도 2는 본 발명의 일 실시예에 따른 대탕도용 관통장치가 도시된 사용 상태도이다.Figure 2 is a state diagram used in the penetrating device for large water in accordance with an embodiment of the present invention.

도 3은 본 발명의 일 실시예에 따른 대탕도용 관통장치의 전진 상태가 도시된 도면이다.Figure 3 is a view showing the advanced state of the large water tap through apparatus according to an embodiment of the present invention.

도 4는 본 발명의 일 실시예에 따른 대탕도용 관통장치의 후진 상태가 도시된 도면이다.Figure 4 is a view showing a reverse state of the through-water tapping apparatus according to an embodiment of the present invention.

<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>

10 : 대탕도 30 : 암10: large bath 30: cancer

50 : 가압부 70 : 결합부50: pressing part 70: coupling part

80 : 경사부 100 : 대탕도용 관통장치80: inclined portion 100: large water supply penetrating device

Claims (4)

대탕도의 스키머 하측 홀부를 통과하여 상기 홀부로부터 이물질을 분리시키는 가압부; 및A pressing unit for separating foreign matters from the hole by passing through the lower hole in the skimmer of the large bath; And 상기 가압부와 연결되고, 굴삭기에 착탈 가능하게 결합되는 결합부를 포함하는 것을 특징으로 하는 대탕도용 관통장치.Connected to the pressing portion, the through-water penetrating device comprising a coupling portion detachably coupled to the excavator. 제1항에 있어서,The method of claim 1, 상기 가압부에는 측 방향으로 돌출되는 걸림고리가 형성되는 것을 특징으로 하는 대탕도용 관통장치.The pressing device is characterized in that the through hook for protruding in the lateral direction characterized in that the through-hole. 제1항에 있어서, 상기 결합부는,The method of claim 1, wherein the coupling portion, 상기 가압부와 연결되는 베이스부;A base part connected to the pressing part; 상기 베이스로부터 상측으로 연장되는 결합패널;A coupling panel extending upward from the base; 상기 결합패널에 형성되는 제1체결홀부; 및A first fastening hole formed in the coupling panel; And 상기 결합패널에 형성되고, 상기 제1체결홀부와 이격되는 제2체결홀부를 포함하는 것을 특징으로 하는 대탕도용 관통장치.And a second fastening hole formed in the coupling panel and spaced apart from the first fastening hole. 제1항 내지 제3항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 3, 상기 결합부에는 상기 가압부의 단부로부터 경사지게 연장되는 경사부가 형성되는 것을 특징으로 하는 대탕도용 관통장치.The coupling portion is a penetration device for large tap water, characterized in that the inclined portion extending inclined from the end of the pressing portion.
KR1020090046173A 2009-05-26 2009-05-26 Punch apparatus for main iron through KR101099680B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090046173A KR101099680B1 (en) 2009-05-26 2009-05-26 Punch apparatus for main iron through

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090046173A KR101099680B1 (en) 2009-05-26 2009-05-26 Punch apparatus for main iron through

Publications (2)

Publication Number Publication Date
KR20100127643A true KR20100127643A (en) 2010-12-06
KR101099680B1 KR101099680B1 (en) 2011-12-28

Family

ID=43504849

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090046173A KR101099680B1 (en) 2009-05-26 2009-05-26 Punch apparatus for main iron through

Country Status (1)

Country Link
KR (1) KR101099680B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102312438B1 (en) * 2019-12-20 2021-10-12 현대제철 주식회사 Apparatus for dropping slag

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000234869A (en) 1999-02-17 2000-08-29 Nippon Steel Corp Refractory dismantling machine

Also Published As

Publication number Publication date
KR101099680B1 (en) 2011-12-28

Similar Documents

Publication Publication Date Title
KR101099680B1 (en) Punch apparatus for main iron through
CN204234940U (en) The online slag of square billet cutting blows and fuses device
KR101246252B1 (en) Guide apparatus for main iron through in blast furnace
CN102266937A (en) Processing device and method of cast residual steel of continuous casting intermediate ladle
CN201669283U (en) CSP high-pressure descaling water retention device
CN105290345A (en) Treatment method for steel ladle casting remaining liquid steel
KR101099682B1 (en) Supporter for tap hole of blast furnace
KR200463206Y1 (en) sluice way of rough mill
CN202238937U (en) Guide groove assembly of waste box of finishing mill
CN106694835A (en) Slag flushing chute device
KR101087129B1 (en) Hot metal recovery apparatus for blast furnace
CN215440629U (en) Waste catalyst melting circulation water-cooling is retrieved and is used receiving device
KR101399857B1 (en) Dust collector for blast furnace
KR101193879B1 (en) Guide apparatus for hot rolling facilities
JP4259232B2 (en) Slab continuous casting method for ultra-low carbon steel
CN103849708A (en) Converter slagging device and method for controlling converter slagging
KR101099678B1 (en) Hot metal recovery apparatus for blast furnace
CN107737894A (en) A kind of scrap iron and steel continuous casting manufacturing technique
CN110253006B (en) Continuous casting tundish, device and method for reducing casting residual cutting amount of continuous casting tundish
KR101061787B1 (en) Air-cooled chiller
CN216620674U (en) Hot melt slag chute for feeding of smelting furnace
KR101024752B1 (en) Support structure of side-roller
KR101175796B1 (en) Apparatus for tapping hole in blast furnace
KR101298754B1 (en) Changing apparatus for feed roller in rolling mill
KR20140080344A (en) Device for removing scale of slab

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141127

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151211

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20161205

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20181023

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20191210

Year of fee payment: 9