KR20100119137A - Remote switchboard management system - Google Patents
Remote switchboard management system Download PDFInfo
- Publication number
- KR20100119137A KR20100119137A KR1020090038095A KR20090038095A KR20100119137A KR 20100119137 A KR20100119137 A KR 20100119137A KR 1020090038095 A KR1020090038095 A KR 1020090038095A KR 20090038095 A KR20090038095 A KR 20090038095A KR 20100119137 A KR20100119137 A KR 20100119137A
- Authority
- KR
- South Korea
- Prior art keywords
- unit
- switchboard
- power
- measured
- load switch
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00007—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
- H02J13/00009—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission using pulsed signals
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02K—DYNAMO-ELECTRIC MACHINES
- H02K11/00—Structural association of dynamo-electric machines with electric components or with devices for shielding, monitoring or protection
- H02K11/20—Structural association of dynamo-electric machines with electric components or with devices for shielding, monitoring or protection for measuring, monitoring, testing, protecting or switching
- H02K11/25—Devices for sensing temperature, or actuated thereby
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Abstract
Description
본 발명은 배전반 인입선로상에 설치되어 상기 인입선로로 공급되는 전원, 전압 등을 계측하는 계측부와; 상기 계측부가 계측한 전원, 전압값 등을 표시하는 디스플레이부와; 상기 계측부가 계측한 전원, 전압값 등이 상기 디스플레이부에 표시될 수 있도록 상기 디스플레이부를 제어하는 인터페이스용 PLC;를 포함하여 이루어지는 배전반에 있어서, 상기 배전반에 설치된 부스바 및 부하개폐기의 온도를 감지하는 온도감지부와; 상기 배전반의 내부 및 외부를 촬영하여 감시하는 카메라부와; 상기 온도감지부 및 상기 카메라부가 출력하는 신호를 수신하고, 상기 인터페이스용 PLC와 이더넷을 통해 연결되는 인터페이스용 PC와; 상기 인터페이스용 PC와 네트워크망을 통해 연결되고, 부하개폐기를 포함한 상기 배전반의 저,고압기기의 개폐를 제어하며, 상기 배전반의 이상트립의 기준을 설정하고, 상기 카메라부의 촬영영상을 요청할 수 있는 관리프로그램을 클라이언트 PC의 요청에 의해 제공하는 관리서버;를 포함하여 이루어지는 것을 특징으로 하는 원격 배전반 관리시스템에 관한 것이다.The present invention is installed on the switchboard lead-in line and measuring unit for measuring the power, voltage, etc. supplied to the lead-in line; A display unit which displays a power supply, a voltage value, etc. measured by the measurement unit; An interface PLC for controlling the display unit such that power, voltage, etc. measured by the measurement unit are displayed on the display unit, the switchboard comprising: detecting a temperature of a bus bar and a load switch installed in the switchboard; A temperature sensing unit; A camera unit for photographing and monitoring the inside and outside of the switchboard; An interface PC for receiving signals output from the temperature sensing unit and the camera unit and connected to the interface PLC through Ethernet; Connected via the network for the interface PC and the network, and controls the opening and closing of the low and high voltage equipment of the switchgear, including the load switchgear, set the criteria of the trip trip of the switchgear, the management to request a photographed image of the camera unit It relates to a remote switchboard management system comprising a; management server for providing a program at the request of the client PC.
일반적으로, 공장과 같은 산업용 설비에서는 3상 교류전력을 사용하므로 대전력이 요구되며, 발전소로부터 송전선로를 통하여 공급되는 수만V의 교류전압을 변압기를 통해 수천V의 교류전압으로 감압하고, 이 감압된 교류전압을 공장의 각 설비로 공급하기 위한 배전반이 구비된다.In general, industrial facilities such as factories use three-phase AC power, which requires a large amount of power, and depressurizes tens of thousands of AC voltages supplied from power plants through transmission lines to thousands of V AC voltages through transformers. A switchboard for supplying the alternating AC voltage to each facility of the factory is provided.
각 배전반에서는 고전압 대전류를 각 공장 내의 설비로 공급하기 위하여 통상적으로 각 설비와 배전반을 부스바(Bus-bar)로 연결하게 되며, 배전반에서 감압된 교류전압이 상기 부스바를 통해 설비로 공급된다. In each switchboard, in order to supply high voltage and high current to the facilities in each plant, each facility and the switchboard are typically connected by a bus-bar, and an AC voltage reduced in the switchboard is supplied to the equipment through the busbar.
한편, 배전반은 경기침체로 인해 도난사고 및 전기사고에 무방비한 상태이며 특히, 전력사용량이 급증하고 있는 요즘 전력 사용의 효율성 및 안정성을 도모하기 위해서는 배전반의 상황을 감시하여야 할 필요가 있으나, 대게 배전반에 흐르는 전력을 한 눈에 파악하기가 어려워 정전사고 및 기타 안전사고율이 높을 뿐만 아니라 전기 통전중에 각 계기의 열화상태점검 및 각 계기의 이상유무판단이 어렵다.On the other hand, the switchboard is unprotected against theft and electric accidents due to the economic recession. In particular, in order to promote the efficiency and stability of power use, which is rapidly increasing, it is necessary to monitor the status of the switchboard. It is difficult to grasp the power flowing into the power supply at a glance, so it is not only high power failure and other safety accident rate, but also it is difficult to check the deterioration status of each instrument and determine the abnormality of each instrument during electricity supply.
최근에는 전력감시시스템(HMI SYSTEM)을 사용하여 전력의 흐름을 감시하고 있으나, 이는 고가의 장비일 뿐만 아니라 많은 관리인원을 필요로 하며 특히, 관수 및 민수업체는 이 시스템을 도입하기가 여의치 않을 뿐더러 배전반에 문제가 발생할 시 담당자가 없으면 발생된 문제점을 해결하기가 어렵다.In recent years, the power system is used to monitor the flow of power, but it is not only expensive equipment but also requires a lot of management personnel. Especially, watering and civilian companies are not able to adopt this system. When a problem occurs in the switchboard, it is difficult to solve the problem if there is no person in charge.
본 발명은 상술한 문제점을 해결하기 위하여 창출된 것으로써, 인터페이스용 PC와 네트워크망을 통해 연결되고, 부하개폐기를 포함한 상기 배전반의 저,고압기기의 개폐를 제어하며, 배전반의 이상트립의 기준을 설정하고, 상기 카메라부의 촬영영상을 요청할 수 있는 관리프로그램을 클라이언트 PC의 요청에 의해 제공하는 관리서버로 인해 상기 배전반을 보다 효율적으로 관리할 수 있음은 물론 이로 인해 특히 정전사고를 포함한 안전사고율을 현저히 낮출수 있는 원격 배전반 관리시스템을 제공하는 것을 그 목적으로 한다.The present invention was created in order to solve the above problems, is connected via a PC for the interface and a network network, and controls the opening and closing of the low and high voltage equipment of the switchgear including a load switch, and the standard of abnormal trip of the switchgear It is possible to manage the switchboard more efficiently due to the management server that provides a management program that can set and request the photographed image of the camera unit by the request of the client PC, and this also significantly reduces the safety accident rate including power failure. Its purpose is to provide a remote switchboard management system that can be lowered.
상기와 같은 목적을 달성하기 위한 본 발명은 배전반 인입선로상에 설치되어 상기 인입선로로 공급되는 전원, 전압 등을 계측하는 계측부와; 상기 계측부가 계측한 전원, 전압값 등을 표시하는 디스플레이부와; 상기 계측부가 계측한 전원, 전압값 등이 상기 디스플레이부에 표시될 수 있도록 상기 디스플레이부를 제어하는 인터페이스용 PLC;를 포함하여 이루어지는 배전반에 있어서, 상기 배전반에 설치된 부스바 및 부하개폐기의 온도를 감지하는 온도감지부와; 상기 배전반의 내부 및 외부를 촬영하여 감시하는 카메라부와; 상기 온도감지부 및 상기 카메라부가 출력하는 신호를 수신하고, 상기 인터페이스용 PLC와 이더넷을 통해 연결되는 인터페이스용 PC와; 상기 인터페이스용 PC와 네트워크망을 통해 연결되고, 부하개폐기를 포함 한 상기 배전반의 저,고압기기의 개폐를 제어하며, 상기 배전반의 이상트립의 기준을 설정하고, 상기 카메라부의 촬영영상을 요청할 수 있는 관리프로그램을 클라이언트 PC의 요청에 의해 제공하는 관리서버;를 포함하여 이루어지는 것을 특징으로 하는 원격 배전반 관리시스템을 제공한다.The present invention for achieving the above object is installed on the switchboard lead-in line and measuring unit for measuring the power, voltage, etc. supplied to the lead-in line; A display unit which displays a power supply, a voltage value, etc. measured by the measurement unit; An interface PLC for controlling the display unit such that power, voltage, etc. measured by the measurement unit are displayed on the display unit, the switchboard comprising: detecting a temperature of a bus bar and a load switch installed in the switchboard; A temperature sensing unit; A camera unit for photographing and monitoring the inside and outside of the switchboard; An interface PC for receiving signals output from the temperature sensing unit and the camera unit and connected to the interface PLC through Ethernet; Connected through the network for the interface PC and the network, and controls the opening and closing of the low and high voltage equipment of the switchgear including a load switch, set the criteria of abnormal trip of the switchgear, and can request a photographed image of the camera unit It provides a remote switchboard management system comprising a; management server for providing a management program at the request of the client PC.
여기서, 상기 관리프로그램은 상기 배전반의 이상트립 발생 기준을 설정하는 셋팅부와; 상기 셋팅부에 설정된 기준 설정값에 따라 상기 배전반에 설치된 부하개폐기를 포함한 저,고압기기를 제어하는 컨트롤부와; 상기 배전반에 이상트립이 발생여부를 알리는 알람리스트부와; 상기 배전반에 설치된 부하개폐기를 포함한 저,고압기기의 제어상태 및 상기 계측부가 계측한 계측값을 출력하는 이벤트 리스트부와; 상기 계측부가 계측한 계측값을 그래픽으로 출력하는 트랜드부와; 상기 이벤트 리스트부가 출력한 부하개폐기를 포함한 저,고압기기의 제어상태 및 상기 계측부가 계측한 계측값과 상기 트랜드부가 그래픽으로 출력한 계측값을 엑셀 출력하는 리포트부와; 상기 카메라부의 촬영영상을 요청하는 캠부;를 포함하여 이루어지는 것이 바람직하다.Here, the management program and a setting unit for setting the abnormal trip occurrence criteria of the switchboard; A control unit for controlling a low and high pressure device including a load switch installed in the switchboard according to a reference set value set in the setting unit; An alarm list unit informing whether the abnormal trip is generated in the switchboard; An event list unit for outputting a control state of a low and high pressure device including a load switch installed in the switchboard and the measured values measured by the measurement unit; A trend unit for graphically outputting measurement values measured by the measurement unit; A report unit for outputting the control state of the low and high voltage apparatus including the load switch output by the event list unit, the measured value measured by the measurement unit, and the measured value output by the trend unit graphically; And a cam unit for requesting a photographed image of the camera unit.
또한, 상기 배전반에 발생된 이상트립상황을 관리자의 단말기로 전송하는 SMS전송부를 포함하여 이루어지는 것이 바람직하다.In addition, it is preferable to include an SMS transmission unit for transmitting the abnormal trip situation generated in the switchboard to the terminal of the administrator.
나아가, 상기 배전반의 전방에 구비된 전면도어의 열림 및 닫힘 상태를 감지 하는 도어감지부를 포함하여 이루어지는 것이 바람직하다.Furthermore, it is preferable to include a door detecting unit for detecting the open and closed state of the front door provided in front of the switchboard.
아울러, 상기 배전반의 인입선로로 공급되는 전원의 흐름상태를 나타내는 전원계통도가 구비되는 것이 바람직하다.In addition, it is preferable that a power supply system diagram showing a flow state of the power supplied to the incoming line of the switchboard.
본 발명은 인터페이스용 PC와 네트워크망을 통해 연결되고, 부하개폐기를 포함한 상기 배전반의 저,고압기기의 개폐를 제어하며, 배전반의 이상트립의 기준을 설정하고, 상기 카메라부의 촬영영상을 요청할 수 있는 관리프로그램을 클라이언트 PC의 요청에 의해 제공하는 관리서버로 인해 상기 배전반을 보다 효율적으로 관리할 수 있음은 물론 이로 인해 특히 정전사고를 포함한 안전사고율을 현저히 낮출수 있는 효과가 있다.The present invention is connected via an interface PC and a network network, to control the opening and closing of the low and high voltage equipment of the switchgear including a load switch, to set the criteria of abnormal trip of the switchgear, and to request a photographed image of the camera unit The management server providing the management program by the request of the client PC not only manages the switchboard more efficiently, but also has the effect of significantly lowering the safety accident rate, especially power failure.
특히, 상기 관리프로그램이 셋팅부, 컨트롤부, 알람리스트부, 이벤트 리스트부, 트랜드부, 리포트부 및 캠부를 포함하여 이루어지기 때문에 관리자가 상기 배전반을 보다 더욱 효율적으로 관리할 수 있는 효과가 있다.In particular, since the management program includes a setting unit, a control unit, an alarm list unit, an event list unit, a trend unit, a report unit, and a cam unit, there is an effect that an administrator can manage the switchboard more efficiently.
그리고, 상기 배전반에 발생된 이상트립상황을 관리자의 단말기로 전송하는 SMS전송부로 인해 관리자가 상기 배전반에 발생된 이상트립상황을 단말기를 통해 한눈에 파악할 수 있게 되는 효과가 있다.In addition, the SMS transmission unit which transmits the abnormal trip situation generated in the switchboard to the terminal of the manager has an effect that the manager can grasp the abnormal trip situation generated in the switchboard at a glance through the terminal.
또한, 상기 배전반의 전방에 구비된 전면도어의 열림 및 닫힘상태를 감지하는 도어감지부를 통해 관리자가 상기 전면도어의 열림 및 닫힘 상태를 보다 용이하 게 확인할 수 있음은 물론 이로 인해 상기 배전반의 도난사고를 보다 효율적으로 예방할 수 있게 되는 효과가 있다.In addition, through the door detection unit for detecting the open and closed state of the front door provided in front of the switchboard, the administrator can more easily check the open and closed state of the front door, of course, theft accident of the switchboard There is an effect that can be prevented more efficiently.
나아가, 상기 배전반의 인입선로로 공급되는 전원의 흐름상태를 나타내는 전원계통도로 인해 관리자가 전원의 흐름상태 또한 보다 용이하게 한눈에 파악할 수 있게 되는 효과가 있다.In addition, the power system diagram indicating the flow state of the power supplied to the incoming line of the switchboard has the effect that the administrator can easily grasp the flow state of the power at a glance.
이하, 본 발명의 바람직한 실시예를 첨부한 도면에 의거하여 보다 상세하게 설명하면 다음과 같다. 물론 본 발명의 권리범위는 하기의 실시예에 한정되는 것은 아니며, 본 발명의 기술적 요지를 벗어나지 않는 범위 내에서 당해 기술분야의 통상적인 지식을 가진자에 의하여 다양하게 변형 실시될 수 있다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. Of course, the scope of the present invention is not limited to the following examples, and various modifications can be made by those skilled in the art without departing from the technical gist of the present invention.
도 1은 본 발명의 일실시예인 원격 배전반 관리시스템을 구현하기 위한 구성도이다.1 is a block diagram for implementing a remote switchboard management system according to an embodiment of the present invention.
본 발명의 일실시예인 원격 배전반 관리시스템은 도 1에서 보는 바와 같이 크게, 계측부(10), 디스플레이부(20), 인터페이스용 PLC(30), 온도감지부(40), 카메라부(50), 인터페이스용 PC(60) 및 관리서버(70)를 포함하여 이루어진다.Remote switchboard management system according to an embodiment of the present invention is large, as shown in Figure 1, the
상기 계측부(10)는 배전반(5) 인입선로상에 설치되어 상기 인입선로로 공급되는 전원, 전압, 위상, 전력, 전력량, 역률, 고조파, 영상전압, 무효전력 등을 계 측하는 것이고, 상기 디스플레이부(20)는 상기 계측부(10)가 계측한 전원, 전압, 위상, 전력, 전력량, 역률, 고조파, 영상전압, 무효전력값 등을 표시하는 것이고, 상기 인터페에스용 PLC(30)는 상기 계측부(10)가 계측한 전원, 전압, 위상, 전력, 전력량, 역률, 고조파, 영상전압, 무효전력값 등이 상기 디스플레이부(20)에 표시될 수 있도록 상기 디스플레이부(20)를 제어하는 것으로써, 이는 공지된 기술임과 동시에 본 발명이 속하는 기술분야의 당업자라면 자명하게 이해하여 실시할 수 있는 사항임으로 이하 자세한 설명은 생략하도록 한다.The
한편, 상기 온도감지부(40)는 상기 배전반(5)에 설치된 부스바 및 부하개폐기의 온도를 감지하는 것으로써, 상기 인터페이스용 PC(60)로 감지한 신호를 출력하게 된다.On the other hand, the
다음으로, 상기 카메라부(50)는 상기 배전반(5)의 내부 및 외부를 촬영하여 감시하기 위한 것으로써, 상기 인터페이스용 PC(60)로 촬영영상을 출력하게 된다.Next, the
상기 카메라부(50)는 예를 들어 상기 배전반(5)의 내부에 구비되어 상기 배전반(5)의 내부에 설치된 부하개폐기를 포함한 저, 고압기기의 상태를 촬영하는 제 1카메라부와; 상기 배전반(5)과 인접한 거리에 위치하도록 상기 배전반(5)의 외부에 설치되어 상기 배전반(5)을 촬영하는 제 2카메라부;로 이루어질 수 있다.The
다음으로, 상기 인터페이스용 PC(60)는 상기 인터페이스용 PLC(30)와 이더넷을 통해 연결되는 것으로써, 상기 온도감지부(40) 및 상기 카메라부(50)가 출력하는 신호를 수신함과 동시에 수신한 상기 온도감지부(40) 및 상기 카메라부(50)가 출력하는 신호를 상기 관리서버(70)로 출력하게 된다.Next, the interface PC 60 is connected to the
다음으로, 상기 관리서버(70)는 상기 인터페이스용 PC(60)와 네트워크망을 통해 연결되는 것으로써, 부하개폐기를 포함한 상기 배전반(5)의 저,고압기기의 개폐를 제어하며, 상기 배전반(5)의 이상트립의 기준을 설정하고, 상기 카메라부(50)의 촬영영상을 요청할 수 있는 관리프로그램(81)을 클라이언트 PC(80)의 요청에 의해 제공하게 된다.Next, the
보다 구체적으로, 상기 클라이언트 PC(80)에는 상기 관리서버(70)가 제공한 관리프로그램(81)이 설치된다.More specifically, the
상기 배전반(5)을 관리하는 관리자는 예를 들어, 상기 관리프로그램(81)에 ID와 비밀번호를 입력하여 인터넷 등의 상기 네트워크망을 통해 상기 관리서버에 접속할 수 있다.The administrator managing the
도 2는 클라이언트 PC(80)에 설치되는 관리프로그램(81)을 개략적으로 나타내는 블럭도이고, 도 3은 본 원격 배전반 관리시스템이 배전반(5)을 관리하는 상태를 개략적으로 나타내는 순서도이다.FIG. 2 is a block diagram schematically showing a
여기서, 상기 관리프로그램(81)은 도 2에서 보는 바와 같이 상기 배전반(5)의 이상트립 발생 기준을 설정하는 셋팅부(810)와; 상기 셋팅부(810)에 설정된 기준 설정값에 따라 상기 배전반(5)에 설치된 부하개폐기를 포함한 저, 고압기기를 제어하는 컨트롤부(811)와; 상기 배전반(5)에 이상트립 발생여부를 알리는 알람리스트부(812)와; 상기 배전반(5)에 설치된 부하개폐기를 포함한 저,고압기기의 제어 상태 및 상기 계측부(10)가 계측한 계측값을 출력하는 이벤트 리스트부(813)와; 상기 계측부(10)가 계측한 계측값을 그래픽으로 출력하는 트랜드부(814)와; 상기 이벤트 리스트부(813)가 출력한 부하개폐기를 포함한 저, 고압기기의 제어상태 및 상기 계측부(10)가 계측한 계측값과 상기 트랜드부(814)가 그래픽으로 출력한 계측값을 엑셀출력하는 리포트부(815)와; 상기 카메라부(50)의 촬영영상을 요청하는 캠부(816);를 포함하여 이루어질 수 있다.Here, the
상기 컨트롤부(811)는 상기 배전반(5)에 설치된 부하개폐기를 포함한 저, 고압기기의 동작신호를 출력하는 것으로써, 상기 클라이언트 PC(80)는 상기 컨트롤부(811)가 출력하는 신호를 수신하여 상기 관리서버(70)로 출력하게 되고, 상기 관리서버(70)는 상기 클라이언트 PC(80)가 출력하는 신호에 따라 상기 배전반(5)에 설치된 부하개폐기를 포함한 저, 고압기기의 동작을 ON 및 OFF상태로 제어하게 된다.The
그리고, 관리자는 상기 클라이언트 PC(80)에 설치된 관리프로그램(81)의 셋팅부(810)를 통해 기준온도값과 전원, 전압, 위상, 전력, 전력량, 역률, 고조파, 영상전압, 무효전력 등의 기준 계측값을 상기 클라이언트 PC(80)로 입력할 수 있다.In addition, the manager may set the reference temperature value, power, voltage, phase, power, power amount, power factor, harmonics, image voltage, reactive power, etc. through the
상기 클라이언트 PC(80)로 입력된 기준 온도값과 기준 계측값은 상기 관리서버(70)로 출력되고, 상기 관리서버(70)는 상기 클라이언트 PC(80)가 출력하는 기준온도값 및 기준 계측값과 상기 온도감지부(40)가 감지한 온도값 및 상기 계측부(10)가 계측한 계측값을 각각 비교하여 상기 온도감지부(40)가 감지한 온도값과 상기 계측부(10)가 계측한 계측값이 기준온도값 및 기준 계측값을 초과할 경우 상기 배전반(5)에 이상트립이 발생한 것으로 판단하게 된다.The reference temperature value and the reference measurement value input to the client PC 80 are output to the
상기 관리서버(70)가 상기 배전반(5)에 이상트립이 발생한것으로 판단한 경우 상기 알람리스트부(812)는 예를 들어, 상기 클라이언트 PC(80)에 내장된 스피커등의 경보부재를 통해 벨소리 등의 경보음을 발생시켜 상기 배전반(5)을 관리하는 관리자에게 이상트립을 알리게 된다.When the
이와 동시에 상기 관리서버(70)는 상기 배전반(5)에 설치된 부하개폐기를 포함한 저, 고압기기의 동작 특히, 상기 부하개폐기가 상기 배전반(5)에 공급되는 전원을 차단할 수 있도록 제어하게 된다.At the same time, the
한편, 이벤트 리스트부(813)는 상기 배전반(5)에 설치된 부하개폐기를 포함한 저, 고압기기의 ON 및 OFF 상태를 날짜별, 년도별, 일별로 상기 클라이언트 PC(80)의 모니터로 화면출력함과 동시에 상기 계측부(10)가 계측한 계측값 즉, 전원, 전압, 위상, 전력, 전력량, 역률, 고조파, 영상전압 및 무효전력값등을 상기 클라이언트 PC(80)의 모니터로 화면출력하게 된다.Meanwhile, the
그리고, 상기 트랜드부(814)는 상기 클라이언트 PC(80)의 모니터를 통해 상기 계측부(10)가 계측한 계측값을 막대, 곡선 그래프등의 그래픽으로 화면출력하게 된다.The
그리고, 상기 리포트부(815)는 상기 이벤트 리스트부(813)가 출력한 부하개폐기를 포함한 저, 고압기기의 제어상태 즉 ON 및 OFF상태 및 상기 계측부(10)가 계측한 계측값과, 상기 트랜드부(814)가 그래픽으로 출력한 계측값을 상기 클라이 언트 PC(80)의 모니터를 통해 엑셀화 하여 화면출력하게 된다.The
그리고, 상기 캠부(816)가 요청한 상기 카메라부(50)의 촬영영상은 상기 클라이언트 PC(80)의 모니터를 통해 영상출력된다.In addition, the captured image of the
상기 관리프로그램(81)이 셋팅부(810), 컨트롤부(811), 알람리스트부(812), 이벤트 리스트부(813), 트랜드부(814), 리포트부(815) 및 캠부(816)를 포함하여 이루어지기 때문에 상기 배전반(5)을 관리하는 관리자가 상기 배전반(5)을 보다 더욱 효율적으로 관리할 수 있는 이점이 있게 된다The
다음으로, 상기 배전반(5)에 발생한 이상트립상황을 관리자의 단말기로 단문메세지 전송하는 SMS전송부(71)가 더 구비될 수 있다.Next, the
상기 SMS전송부(71)는 예를 들어, 상기 관리서버(70)내에 구비된 상태에서 상기 네트워크망을 통해 상기 배전반(5)에 발생한 이상트립상황을 관리자의 휴대폰, PDA 를 포함한 단말기로 단문메세지 전송할 수 있다.The
상기 배전반(5)에 발생된 이상트립상황을 관리자의 단말기로 단문메세지 전송하는 상기 SMS전송부(71)로 인해 관리자가 상기 배전반(5)에 발생된 이상트립상황을 단말기를 통해 한눈에 파악할 수 있게 되는 이점이 있게 된다.The
다음으로, 상기 배전반(5)의 전방에 구비된 전면도어의 열림 및 닫힘 상태를 감지하는 도어감지부(90)가 더 구비될 수 있다.Next, the
상기 도어감지부(90)는 상기 전면도어의 열림 및 닫힘 상태를 감지하여 그 신호를 상기 관리서버(70)로 출력하게 되고, 이때 상기 SMS전송부(71)는 배전반(5)의 전면도의 열림 및 닫힘 상태를 상기 네트워크망을 통해 관리자의 단말기로 단문 메세지 전송할 수 있다.The
상기 배전반(5)의 전방에 구비된 전면도어의 열림 및 닫힘상태를 감지하는 상기 도어감지부(90)를 통해 관리자가 상기 전면도어의 열림 및 닫힘 상태를 보다 용이하게 확인할 수 있음은 물론 이로 인해 상기 배전반(5)의 도난사고를 보다 효율적으로 예방할 수 있게 되는 이점이 있게 된다.Through the
다음으로, 도면에서는 도시되지 않았으나, 상기 배전반(5)의 인입선로로 공급되는 전원의 흐름상태를 나타내는 전원계통도가 더 구비될 수 있다.Next, although not shown in the figure, a power system diagram showing a flow state of power supplied to the incoming line of the
상기 전원계통도는 상기 디스플레이부(20)를 통해 막대 및 곡선등의 그래픽으로 화면출력될 수 있다.The power system diagram may be output through a graphic such as a bar and a curve through the
또한, 상기 전원계통도는 예를 들어 상기 전면도어에 부착되는 입체형 아크릴판과; 상기 입체형 아크릴판상에 일정간격으로 구비된 상태에서 상기 관리서버(70)에 의해 점멸되어 전원의 흐름상태를 표시하는 다수의 LED;로 이루어질 수 있겠으나, 반드시 이에 한정되는 것은 아니다.In addition, the power system diagram is a three-dimensional acrylic plate attached to the front door, for example; In the state provided at a predetermined interval on the three-dimensional acrylic plate flashes by the
상기 배전반(5)의 인입선로로 공급되는 전원의 흐름상태를 나타내는 상기 전원계통도로 인해 상기 배전반(5)을 관리하는 관리자가 전원의 흐름상태 또한 보다 용이하게 한눈에 파악할 수 있게 되는 이점이 있게 된다.Due to the power system diagram indicating the flow of power supplied to the incoming line of the
상술한 바와 같이 구성된 본 발명은 상기 인터페이스용 PC(60)와 네트워크망을 통해 연결되고, 부하개폐기를 포함한 상기 배전반(5)의 저, 고압기기의 개폐를 제어하며, 배전반(5)의 이상트립의 기준을 설정하고, 상기 카메라부(50)의 촬영영상을 요청할 수 있는 상기 관리프로그램(81)을 클라이언트 PC(80)의 요청에 따라 제공하는 상기 관리서버(70)로 인해 상기 배전반(5)을 보다 효율적으로 관리할 수 있음은 물론 이로 인해 특히 정전사고를 포함한 안전사고율을 현저히 낮출 수 있는 이점이 있다.The present invention configured as described above is connected through the network for the
도 1은 본 발명의 일실시예인 원격 배전반 관리시스템을 구현하기 위한 구성도이고,1 is a block diagram for implementing a remote switchboard management system according to an embodiment of the present invention,
도 2는 클라이언트 PC에 설치되는 관리프로그램을 개략적으로 나타내는 블럭도이고,2 is a block diagram schematically showing a management program installed in a client PC;
도 3은 본 원격 배전반 관리시스템이 배전반을 관리하는 상태를 개략적으로 나타내는 순서도이다.3 is a flowchart schematically showing a state in which the remote switchboard management system manages a switchboard.
*** 도면의 주요부분에 대한 부호의 설명****** Explanation of symbols for main parts of drawing ***
10; 계측부, 20; 디스플레이부,10; Measuring
30; 인터페이스용 PLC, 40; 온도감지부,30; PLC for interface, 40; Temperature Sensor,
50; 카메라부, 60; 인터페이스용 PC,50;
70; 관리서버.70; Management Server.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090038095A KR101040406B1 (en) | 2009-04-30 | 2009-04-30 | Remote switchboard management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090038095A KR101040406B1 (en) | 2009-04-30 | 2009-04-30 | Remote switchboard management system |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20100119137A true KR20100119137A (en) | 2010-11-09 |
KR101040406B1 KR101040406B1 (en) | 2011-06-09 |
Family
ID=43405242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090038095A KR101040406B1 (en) | 2009-04-30 | 2009-04-30 | Remote switchboard management system |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101040406B1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101136446B1 (en) * | 2011-12-14 | 2012-04-20 | (주) 금성시스템 | Switchgear with a security control management system and a flat type bushing and an air control system |
KR101336888B1 (en) * | 2012-04-17 | 2013-12-04 | (주) 디지털파워 | Switchgear with High, low busbar of Wireless Monitoring |
WO2016028338A1 (en) * | 2014-08-20 | 2016-02-25 | Vedero Software, Inc | Method and apparatus for remote electrical load management |
KR101725494B1 (en) | 2016-03-24 | 2017-04-11 | 주식회사 라이트 제림 | Control method of distribution box based on internet of thing |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101190244B1 (en) | 2011-07-14 | 2012-10-12 | (주)가온테크 | Apparatus for remote controlling and heat sensing in distributing board |
CN109274180A (en) * | 2018-11-26 | 2019-01-25 | 重庆朗天通讯股份有限公司 | A kind of public power distribution room unattended system |
KR102557316B1 (en) * | 2022-09-21 | 2023-07-24 | 주식회사 아라산전 | Remote management system of nonflammable power board by solar energy |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1132405A (en) * | 1997-07-08 | 1999-02-02 | Toshiba Corp | Switchboard controller |
KR100709694B1 (en) * | 2006-06-27 | 2007-04-25 | (주)태성계전 | Estimation system of insulation degradation for switchgear and method thereof |
KR100842789B1 (en) * | 2006-09-20 | 2008-07-01 | 주식회사 케이디파워 | An electric power receiving and distributing system based on digital graphic |
-
2009
- 2009-04-30 KR KR1020090038095A patent/KR101040406B1/en active IP Right Grant
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101136446B1 (en) * | 2011-12-14 | 2012-04-20 | (주) 금성시스템 | Switchgear with a security control management system and a flat type bushing and an air control system |
KR101336888B1 (en) * | 2012-04-17 | 2013-12-04 | (주) 디지털파워 | Switchgear with High, low busbar of Wireless Monitoring |
WO2016028338A1 (en) * | 2014-08-20 | 2016-02-25 | Vedero Software, Inc | Method and apparatus for remote electrical load management |
KR101725494B1 (en) | 2016-03-24 | 2017-04-11 | 주식회사 라이트 제림 | Control method of distribution box based on internet of thing |
Also Published As
Publication number | Publication date |
---|---|
KR101040406B1 (en) | 2011-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101040406B1 (en) | Remote switchboard management system | |
KR102008472B1 (en) | Real Time Remote Management and Alarm Call out System of Electrical Consumers Type based on IoT | |
EP2448087B1 (en) | Reliable electrical distribution system with alternate power source | |
KR101039313B1 (en) | A Assembled Power Distriburting Unit Making Possible Monitoring | |
KR101423559B1 (en) | Intelligent deterioration monitoring vision system for electric distributing board | |
KR101194021B1 (en) | Distributing board using many area temperature sensing | |
CN204758748U (en) | Cubical switchboard intelligent integrated monitoring devices | |
KR101306772B1 (en) | A protection system of solar power generation facility | |
CN113049901A (en) | Electrical control and protection device | |
KR100763881B1 (en) | Method for digital diagnosising circuit breaker motion time of measurement | |
KR20090131354A (en) | Method for monitoring a photovoltaic power generation system | |
KR101713076B1 (en) | Measuring value and operating state indicating system for protection function of protective relay | |
KR20140073043A (en) | Application service system of smart terminal for watching power equipment | |
KR101081929B1 (en) | A distributing switch watch system | |
CN109713789B (en) | Intelligent real-time grading alarm method for substation based on BIM technology | |
KR101056063B1 (en) | Pump station monitering and control system of water treatment plant by using spot(smart process operation terminal) | |
CN201819947U (en) | Lightning protection monitoring and alarming system | |
KR101200950B1 (en) | Power management system for using wired and wireless data gathering unit | |
US9312727B2 (en) | Local monitoring apparatus, monitoring system and method of digital protective relay | |
KR101302068B1 (en) | The integrated gis local controlling panel digital system | |
KR20170118393A (en) | Monitoring apparatus for solar power generation system using mppt | |
CN104678910A (en) | Intelligent transformer and distribution comprehensive monitoring system | |
KR20210042598A (en) | System for monitoring power cable and method thereof | |
CN206922507U (en) | A kind of intelligent integrated switch board | |
CN105119384A (en) | High risk and important client remote monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20140821 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20151202 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20170224 Year of fee payment: 6 |
|
R401 | Registration of restoration | ||
FPAY | Annual fee payment |
Payment date: 20170602 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20180604 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20190603 Year of fee payment: 9 |