KR20100096471A - Structure for speed reducer of drop speed in slab form cross member - Google Patents

Structure for speed reducer of drop speed in slab form cross member Download PDF

Info

Publication number
KR20100096471A
KR20100096471A KR1020090015366A KR20090015366A KR20100096471A KR 20100096471 A KR20100096471 A KR 20100096471A KR 1020090015366 A KR1020090015366 A KR 1020090015366A KR 20090015366 A KR20090015366 A KR 20090015366A KR 20100096471 A KR20100096471 A KR 20100096471A
Authority
KR
South Korea
Prior art keywords
support bar
formwork
panel
bar
guide pin
Prior art date
Application number
KR1020090015366A
Other languages
Korean (ko)
Other versions
KR101020755B1 (en
Inventor
김욱종
김태호
차정구
김귀환
김학정
강명환
Original Assignee
(주)거혁산업
(주)거혁건설
대림산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)거혁산업, (주)거혁건설, 대림산업 주식회사 filed Critical (주)거혁산업
Priority to KR1020090015366A priority Critical patent/KR101020755B1/en
Publication of KR20100096471A publication Critical patent/KR20100096471A/en
Application granted granted Critical
Publication of KR101020755B1 publication Critical patent/KR101020755B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete

Abstract

PURPOSE: A structure for reducing the down speed of a slab form support bar is provided to facilitate the disassembly of a deck from a slab and prevent accidents by reducing the decent speed of the form support bar. CONSTITUTION: A structure for reducing the down speed of a slab form support bar comprises a wall form connecting bar(20), a form support bar(50), and a link member(40). The wall form connecting bars are installed at the upper end of two wall forms, respectively. A support plate(30) is coupled with the both sides of the wall form connecting bar. The form support bar is connected to both side parts of each wall form connecting bar. A deck is placed on the form support bar. The link member is installed between the wall form connecting bar and the form support bar. The link member is formed of a first panel and a second panel.

Description

슬라브 거푸집 지지바의 하강속도 감속구조{STRUCTURE FOR SPEED REDUCER OF DROP SPEED IN SLAB FORM CROSS MEMBER}STRUCTURE FOR SPEED REDUCER OF DROP SPEED IN SLAB FORM CROSS MEMBER}

본 발명은 다층 구조의 건축물에서 콘크리트 슬라브를 시공하기 위해 콘크리트가 타설되도록 설치되는 복수개의 데크판넬로 이루어진 데크를 상기 콘크리트 슬라브로부터 해체할 때 상기 데크가 얹혀진 거푸집지지바의 하강속도를 감속하여 상기 거푸집지지바가 서서히 하강함에 따라 상기 데크를 해체할 때 발생할 수 있는 안전사고를 미연에 방지하도록 할 뿐만 아니라 상기 거푸집지지바가 서서히 이동되므로 상기 거푸집지지바와 벽체거푸집연결바를 연결하는 구성들에 가해지는 충격을 완화함에 따라 상기 각 구성들의 손상 및 파손을 방지함은 물론 상기 거푸집지지바가 벽체거푸집연결바로부터 분리되는 것을 방지하면서도 상기 데크를 슬라브로부터 보다 용이하게 해체하도록 하는 슬라브 거푸집 지지바의 하강속도 감속구조에 관한 것이다. The present invention is to decelerate the formwork bar on which the deck is mounted when decomposing the deck consisting of a plurality of deck panels installed so that concrete is poured in order to construct a concrete slab in the multi-layer structure of the formwork support bar As the support bar is gradually lowered, it not only prevents accidents that may occur when the deck is dismantled, but the form support bar is gradually moved, thereby alleviating the impact on the components connecting the form support bar and the wall formwork connecting bar. To prevent the damage and breakage of each of the components, as well as to prevent the formwork bar from being separated from the wall formwork connecting bar, and to lower the deceleration structure of the slab formwork support bar to more easily dismantle the deck from the slab. will be .

일반적으로, 다층 콘크리트 건축물은 벽체와 슬라브를 시공하기 위한 벽체 거푸집과 슬라브 거푸집의 설치하고 상기 설치된 벽체 거푸집 사이와 슬라브 거푸집의 상면으로 콘크리트를 타설하고 나서 일정시간동안 양생시키는 과정을 거치는 방법으로 시공한다. In general, a multi-layer concrete structure is constructed by installing a wall formwork and a slab formwork for the construction of walls and slabs, and placing concrete between the installed wall formwork and the upper surface of the slab formwork and curing it for a predetermined time. .

여기서, 종래의 건축물 벽체와 슬라브를 시공하기 위한 구조는 도 1a와 도 1b에서 도시한 바와 같이, 상기 건축물의 바닥(A)에 설치 고정되는 기초가름대(12)의 상면에 벽체(W)를 형성하기 위해 상기 벽체의 두께만큼의 공간을 형성하도록 복수개의 벽체 거푸집(11)를 세로방향으로 설치한다. Here, the structure for constructing a conventional building wall and slab, as shown in Figure 1a and Figure 1b, to form a wall (W) on the upper surface of the foundation bar 12 is installed and fixed to the floor (A) of the building In order to form a space equal to the thickness of the wall to form a plurality of wall formwork 11 in the longitudinal direction.

이 때, 상기 벽체 거푸집(11)의 전면에는 복수개의 벽체수평·수직지지대(S1,S2)를 설치하여 콘크리트 타설 시 상기 벽체 거푸집(11)이 처음 설치 위치에서 이탈되는 것을 방지한다. At this time, a plurality of wall horizontal and vertical support (S1, S2) is installed on the front surface of the wall formwork 11 to prevent the wall formwork 11 from being separated from the initial installation position.

또한, 상기 벽체 거푸집(11) 중 상측 벽체 거푸집(11)의 상단부에는 슬라브(C)를 형성하기 위해 복수개의 슬라브 거푸집 즉, 복수개의 데코판넬이 연결 결합되는 데크(13)를 수평하게 설치하며, 상기 데크(13)의 저면에 장선(14)과 멍에(15)를 설치함에 따라 상기 테크(13)의 상면에 타설되는 콘크리트의 하중을 견딜수 있도록 한다. In addition, at the upper end of the upper wall formwork 11 of the wall formwork 11 to install a plurality of slab formwork, that is, a deck 13 to which the plurality of decor panels are connected to form a slab (C) horizontally, By installing the joist 14 and the yoke 15 on the bottom of the deck 13 so as to withstand the load of concrete poured on the upper surface of the tech (13).

여기서, 상기 바닥(A)과 데크(13) 사이에 서포터(S)를 설치하여 상기 데크(13)를 지지 및 상기 데크(13)가 해체되는 것을 방지한다. Here, a supporter S is installed between the bottom A and the deck 13 to support the deck 13 and prevent the deck 13 from being disassembled.

상기 슬라브 거푸집은 벽체 거푸집(11)과의 구분하기 위하여 "데크판넬"이라 하기로 하며, 상기 복수개의 데크판넬을 동일 평면상에 밀집 배열한 것을 "데크"(13)라 하기로 한다. The slab formwork will be referred to as a "deck panel" to distinguish it from the wall formwork 11, and the plurality of deck panels arranged densely on the same plane will be referred to as "deck" (13).

상기와 같이, 상기 벽체 거푸집(11)과 데크판넬의 데크(13) 설치가 완료되면 상기 벽체 거푸집(11) 사이와 상기 데크(13) 상면에 콘크리트를 타설하여 일정시간 동안 양생시간을 거친 후 상기 콘크리트가 굳어지면, 상기 벽체 거푸집(11)과 데크(13) 즉, 데크판넬를 해체함에 따라 상기 건축물의 벽체와 슬라브를 시공한다. As described above, when the installation of the deck 13 of the wall formwork 11 and the deck panel is completed, the concrete is poured between the wall formwork 11 and the upper surface of the deck 13 and undergoes curing time for a predetermined time. When the concrete is hardened, as the wall formwork 11 and the deck 13, that is, the deck panel is dismantled, the walls and slabs of the building are constructed.

상기 건축물의 벽체(W)와 슬라브(C)의 시공이 완료되면, 상기 벽체에서 벽체 거푸집(11)을 해체함과 함께 상기 슬라브에서 데크(13)의 데크판넬을 해체하는데, 즉 상기 슬라브에서 데크(13)를 해체할 때 상기 데크(13)의 자체 하중에 의해 상기 데크(13)가 바닥으로 떨어지는 것을 방지하도록 상기 데크(13)를 지지하는 서포터(S)의 길이를 서서히 줄임에 따라 상기의 데크(13)는 슬라브로부터 해체된다. When the construction of the wall (W) and the slab (C) of the building is completed, the wall formwork 11 is dismantled from the wall and the deck panel of the deck 13 is dismantled from the slab, that is, the deck from the slab. When dismantling (13), the length of the supporter (S) supporting the deck (13) is gradually reduced to prevent the deck (13) from falling to the floor by the load of the deck (13). Deck 13 is dismantled from slab.

그러나, 이러한 종래 슬라브의 시공이 완료되어 데크판넬을 해체할 때 서포트만으로는 데크판넬을 안전하게 해체하지 못하는 즉, 상기 데크를 지지하는 복수개의 서포터를 동시에 동일한 속도로 줄이지 못할 뿐만 아니라 상기 데크와 서포터와의 접촉면적이 적음에 따라 상기 데크를 해체하는 과정에서 상기의 데크가 기울어지는 현상이 발생됨은 물론 상기 기울어진 상태로 슬라브에서 해체될 때 상기 데크가 서포터로부터 분리되어 바닥으로 떨어짐에 따라 안전사고의 위험이 따르는 문제점이 있었다. However, when the construction of the conventional slab is completed and the deck panel is dismantled, the support alone does not safely dismantle the deck panel, that is, it does not simultaneously reduce the plurality of supporters supporting the deck at the same speed, but also with the deck and the supporter. As the contact area is small, the deck is inclined during the dismantling of the deck as well as the deck is separated from the supporter and falls to the floor when the deck is dismantled in the tilted state. There was this following issue.

그래서, 본 출원인은 상기 건축물의 슬라브를 시공하기 위해 설치되는 복수개의 데크판넬로 이루어진 데크를 슬라브에서 보다 안전하게 분리 및 해체하기 위하여 "해체가 용이한 슬라브 거푸집 지지바"가 국내특허출원 제10-2007-0067275호에 기재되어 있다. Thus, the present applicant is a domestic patent application No. 10-2007 "easy to dismantle slab formwork bar" to more safely separate and dismantle the deck consisting of a plurality of deck panels installed to construct the slab of the building -0067275.

상기의 구조는, 도 2 내지 도 4에서 도시한 바와 같이 상기 건축물의 벽체를 시공하기 위해 설치되는 두 벽체 거푸집(11)의 상단부에 각각 결합되는 한 쌍의 벽 체거푸집연결바(20,20')와, 상기 각 벽체거푸집연결바(20,20')의 양측부에 가이드핀(P)이 수직결합되는 한 쌍의 지지플레이트(30,30')와, 상기 각 지지플레이트(30,30')에 회동가능하게 힌지 결합되는 제1판넬(41,41')과 제2판넬(42,42')로 이루어진 링크부재(40,40')와, 상기 링크부재(40,40')의 제2판넬(42,42')에 슬라이딩되면서 회동가능하게 결합되어 데크(D)의 데크판넬을 지지 및 상기 슬라브(C)에서 데크판넬을 해체할 때 상기 데크판넬 즉, 데크(D)를 안전하게 분리하도록 하는 거푸집지지바(50)로 구성되어 있다. The structure is, as shown in Figures 2 to 4, a pair of wall formwork connecting bar (20, 20 ') coupled to the upper end of each of the two wall formwork 11 is installed to construct the wall of the building ), A pair of support plates 30 and 30 'in which guide pins P are vertically coupled to both sides of the wall formwork connecting bars 20 and 20', and each of the support plates 30 and 30 '. Link members (40, 40 ') consisting of a first panel (41, 41') and a second panel (42, 42 ') rotatably hinged to The deck panel, that is, the deck (D), is securely separated when supporting the deck panel of the deck (D) and dismantling the deck panel on the slab (C) while being slidably coupled to the two panels (42, 42 '). It consists of a die support bar (50).

상기 링크부재(40,40')의 제1판넬(41,41')은 지지플레이트(30,30')와 가이드핀(P)으로 연결되어 있음은 물론 상기 가이드핀(P)이 가이드되는 가이드공(G1)이 형성되어 있다. The first panels 41 and 41 ′ of the link members 40 and 40 ′ are connected to the support plates 30 and 30 ′ and the guide pins P, as well as the guides to which the guide pins P are guided. The ball G1 is formed.

또한, 상기 링크부재(40,40')의 제2판넬(42,42')은 지지플레이트(30,30')와 고정핀(P1)에 의해 연결됨은 물론 상기 거푸집지지바(50)와는 가이드핀(P2)으로 연결되어 있으며, 상기 제2판넬(42,42')의 중앙부에는 가이드핀(P2)이 슬라이딩되면서 가이드되는 가이드공(G2)이 형성되어 있다. In addition, the second panels 42 and 42 'of the link members 40 and 40' are connected to each other by the support plates 30 and 30 'and the fixing pins P1, as well as guides with the formwork supporting bar 50. It is connected to the pin (P2), the guide hole (G2) is formed in the center portion of the second panel (42, 42 ') guides while sliding the guide pin (P2).

상기 거푸집지지바(50)에는 링크부재(40,40')의 제2판넬(42,42')이 상기 거푸집지지바(50)에서 가이드핀(P2)을 중심으로 슬라이딩되면서 가이드될 때 상기 거푸집지지바(50) 내로 삽탈되도록 하는 가이드공(G3)이 형성되어 있다. The formwork support bar 50 has a second panel (42, 42 ') of the link members (40, 40') when the formwork is guided while sliding around the guide pin (P2) in the formwork support bar (50) Guide holes (G3) are formed to be inserted into the support bar 50.

이러한 구조를 갖는 해체가 용이한 슬라브거푸집 지지바는 건축물의 벽체를 형성하기 위해 설치된 벽체 거푸집(11) 중 상측 벽체 거푸집(11)의 상단부에 한 쌍의 벽체거푸집연결바(20)를 각각 설치하고 상기 각 벽체거푸집연결바(20) 사이에 다수개의 데크판넬이 연결된 데크(D)를 설치한다. Slab formwork support bar is easy to dismantle having such a structure is to install a pair of wall formwork connecting bar 20 on the upper end of the upper wall formwork 11 of the wall formwork 11 installed to form the wall of the building and Between each of the wall formwork connecting bar 20 is installed a deck (D) connected to a plurality of deck panels.

이 때, 상기 데크(D)는 거푸집지지바(50)의 상면에 얹혀지는 형태로 설치되며, 상기 거푸집지지바(50)는 각 벽체거푸집연결바(20)와 결합되도록 설치한다. At this time, the deck (D) is installed in a form that is placed on the upper surface of the formwork support bar 50, the formwork support bar 50 is installed to be coupled to each wall formwork connecting bar (20).

즉, 상기 각 벽체거푸집연결바(20)의 지지플레이트(30)에 링크부재(40)의 제1판넬(41)을 가이드핀(P)으로 연결하고, 상기 거푸집지지바(50)에 가이드핀(P2)으로 연결된 링크부재(40)의 제2판넬(42)을 고정핀(P1)으로 제1판넬(41)과 결합되므로 인해 상기 벽체거푸집연결바(20)와 거푸집지지바(50)는 지지플레이트(30)와 링크부재(40)에 의해 연결 결합된다. That is, the first panel 41 of the link member 40 is connected to the support plate 30 of each wall formwork connecting bar 20 by the guide pin P, and the guide pin to the formwork support bar 50. The wall formwork connecting bar 20 and the formwork supporting bar 50 are coupled to the second panel 42 of the link member 40 connected by (P2) to the first panel 41 by the fixing pin P1. It is connected by the support plate 30 and the link member 40.

이 상태에서, 상기 거푸집지지바(50)는 콘크리트 타설시에는 최초 위치인 최고점에 놓이게 되며, 상기 콘크리트 양생 및 시공 후 해체할 때에는 거푸집지지바(50)는 최저점에 위치한다. In this state, the formwork support bar 50 is placed at the highest point of the initial position when the concrete is poured, the formwork support bar 50 is located at the lowest point when dismantling after the concrete curing and construction.

즉, 거푸집지지바(50)의 상면에 데크(D)가 얹혀진 상태에서 슬라브(C)의 시공이 완료되어 상기 데크(D)를 해체하게 되면 상기 데크(D)의 자체 하중에 의해 상기 거푸집지지바(50)는 하강하게 되는데, 상기 각 벽체거푸집연결바(20)의 지지플레이트(30)에 결합된 링크부재(40)의 제1판넬(41)은 상기 제1판넬(41)의 가이드공(G1)에 힌지결합된 가이드핀(P)을 중심으로 회동됨과 동시에 상기 고정핀(P1)에 의해 제1판넬(41)에 힌지결합된 제2판넬(42)도 회동된다. That is, when the construction of the slab (C) is completed in the state in which the deck (D) is placed on the upper surface of the form support bar (50) to dismantle the deck (D) is supported by the load of the deck (D) itself Bar 50 is to be lowered, the first panel 41 of the link member 40 coupled to the support plate 30 of each wall formwork connecting bar 20 is a guide hole of the first panel 41 At the same time as the pivoting around the guide pin (P) hinged to (G1) and the second panel 42 hinged to the first panel 41 by the fixing pin (P1) is also rotated.

이와 함께, 상기 데크(D)의 자체하중에 의하여 상기 거푸집지지바(50)는 상기 제2판넬(42)의 가이드공(G2)에 힌지결합된 거푸집지지바(50)의 가이드핀(P2)이 상기 가이드공(G2)을 따라 슬라이딩되면서 하방으로 이동됨에 따라 슬라브(C)에서 데크(D)가 해체되고, 상기 거푸집지지바(50)가 최저점에 위치되면 상기 거푸집지지바(50)에서 데크(D)를 분리한다. In addition, the die support bar 50 by the self load of the deck (D) guide pins (P2) of the die support bar 50 hinged to the guide hole (G2) of the second panel 42 The deck (D) is dismantled in the slab (C) as it is moved downward while sliding along the guide hole (G2), and the form support bar (50) is located at the lowest point deck in the form support bar (50) Remove (D).

그러나, 이러한 해체가 용이한 슬라브 거푸집 지지바는 슬라브에서 해체되는 데크를 분리하기 위해 상기 슬라브 거푸집 지지바가 하강할 때 상기 벽체거푸집연결바에서 거푸집지지바가 데크의 자체하중에 의해 급하강 즉, 링크부재의 제2판넬에 형성된 가이드공의 내면이 매끈하면서 편평한 상태로 형성됨은 물론 거푸집지지바의 가이드핀의 외면도 매끈한 상태임에 따라 상기 데크의 자체하중에 의하여 가이드핀은 가이드공을 따라 빠른 속도로 순간적으로 슬라이딩되면서 이동한다. However, such a slab formwork support bar which is easy to dismantle is suddenly descended by the deck's own load from the wall formwork connecting bar when the slab formwork support bar descends to separate the deck dismantled from the slab, that is, the link member. The inner surface of the guide hole formed in the second panel of the smooth and flat state as well as the outer surface of the guide pin of the formwork support bar is smooth, according to the self load of the deck guide pins at high speed along the guide hole It moves while sliding momentarily.

그러므로, 거푸집지지바에 얹혀진 데크가 슬라브에서 해체될 때 순간적으로 이동하는 거푸집지지바에 의해 상기 거푸집지지바에서 데크가 떨어질 수 있으므로 이로 인한 안전사고가 발생하게 되는 문제점이 있었다. Therefore, when the deck mounted on the formwork bar is dismantled in the slab, the deck support bar may be dropped by the formwork bar moving momentarily, thereby causing a safety accident.

또한, 벽체거푸집연결바의 지지플레이트에 결합된 가이드핀과 상기 거푸집지지바의 가이드핀 및 상기 제1판넬과 제2판넬을 연결하는 고정핀에 반복하중에 의한 충격으로 인해 파손 및 손상이 발생될 수 있으며, 이로 인해 벽체거푸집연결바에서 거푸집지지바가 분리되는 문제 및 그로 인한 더욱 더 큰 안전사고의 위험이 발생하게 되는 문제점도 있었다. In addition, breakage and damage may occur due to the impact of repeated loads on the guide pin coupled to the support plate of the wall formwork connecting bar, the guide pin of the formwork support bar, and the fixing pin connecting the first panel and the second panel. This may cause a problem that the formwork supporting bar is separated from the wall formwork connecting bar and thereby a greater risk of safety accidents.

본 발명은 상기한 바와 같은 종래 기술에서의 문제점 해결하기 위하여 제안된 것으로서, 건축물 슬라브를 시공하기 위해 설치되는 데크가 얹혀져 지지되는 거푸집지지바와 벽체거푸집연결바를 연결하는 링크부재와 상기 거푸집지지바와의 연결구조를 변경하도록 하여 상기 시공 완료된 슬라브에서 데크를 해체할 때 상기 거푸집지지바가 벽체거푸집연결바로부터 서서히 하강하도록 상기 거푸집지지바의 하강속도를 감속함에 따라 안전사고의 위험을 미연에 방지할 뿐만 아니라 상기 슬라브로부터 데크를 보다 용이하게 분리 및 해체하도록 하는데 그 목적이 있다. The present invention has been proposed to solve the problems in the prior art as described above, the link member connecting the formwork support bar and the wall formwork connecting bar and the formwork support bar on which the deck is installed to install the building slab is supported, the connection between the formwork support bar When the deck is dismantled from the completed slab by changing the structure, the form support bar slows down the formwork bar so that the form support bar descends slowly from the wall formwork connecting bar, thereby preventing the risk of a safety accident. The purpose is to make it easier to separate and dismantle the deck from the slab.

또한, 본 발명은 거푸집지지바가 서서히 하강하면서 이동함에 따라 상기 벽체거푸집연결바와 거푸집지지바를 연결하는 각 구성들에 가해지는 충격을 완화하여 상기 각 구성들의 손상 및 파손을 방지할 뿐만 아니라 상기 벽체거푸집연결바에서 거푸집지지바가 분리되는 것을 방지하도록 하는데 그 목적이 있다. In addition, the present invention is to reduce the impact applied to the respective components connecting the wall formwork connecting bar and the formwork support bar as the formwork bar is gradually lowered to prevent damage and breakage of the respective components as well as the wall formwork connection The purpose is to prevent the formwork bar from being separated from the bar.

또한, 본 발명은 서서히 하강하는 거푸집지지바에 의해 상기 거푸집지지바에 얹혀진 데크가 떨어지는 것을 방지함에 따라 상기 거푸집지지바 및 데크에 의해 발생할 수 있는 안전사고를 미연에 방지하도록 하는데 그 목적이 있다. In addition, an object of the present invention is to prevent the safety accident that may be caused by the form support bar and the deck in advance by preventing the deck mounted on the form support bar falling by the slowly supporting form support bar.

상기한 바와 같은 목적을 달성하기 위한 본 발명은, 대향하는 두 벽체거푸집의 상단부에 각각 설치되도록 양측부에 지지플레이트가 결합되는 벽체거푸집연결바와, 상기 두 벽체거푸집 사이에 위치 및 상기 각 벽체거푸집연결바의 양측부에 연 결 결합되어 건축물의 슬라브 시공을 위해 설치되는 데크가 얹혀지도록 가이드공을 갖는 거푸집지지바와, 상기 벽체거푸집연결바와 거푸집지지바 사이에 설치되어 상기 각 지지플레이트에 회동되게 힌지결합되는 가이드공을 갖는 제1판넬과 상기 거푸집지지바가 상하로 이동가능하게 상기 거푸집지지바에 힌지결합되는 장공형태의 가이드공을 갖는 제2판넬로 이루어진 링크부재가 구비된 것에 있어서, 상기 링크부재의 제2판넬과 거푸집지지바를 연결 결합시킴과 함께 상기 거푸집지지바를 상하로 이동시키기 위하여 상기 제2판넬의 가이드공을 따라 가이드되도록 상기 거푸집지지바의 양단부에 형성된 힌지공으로 가이드핀이 회전가능하게 삽입 체결되고, 상기 가이드핀의 일단에는 거푸집지지바의 외면에 접촉되도록 머리부가 형성되고, 상기 가이드핀의 타단에는 가이드핀이 거푸집지지바에서 이탈되는 것을 방지하도록 너트가 체결되며, 상기 제2판넬의 가이드공 측 상기 가이드핀의 외주면에는 나사산 형상을 이루도록 상기 가이드핀의 길이방향으로 복수개의 돌출부가 형성되며, 상기 링크부재의 제2판넬에 형성된 가이드공 내주면의 일면에는 거푸집지지바의 하강속도를 감속하기 위하여 상기 가이드공을 따라 가이드되는 가이드핀의 각 돌출부와 맞물리도록 나사산부가 형성됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조가 제공된다. The present invention for achieving the object as described above, the wall formwork connecting bar is coupled to the support plate is coupled to both sides so as to be respectively installed on the upper end of the two opposite wall formwork, the position between the two wall formwork and each wall formwork connection Hinged coupling is installed between the formwork support bar having a guide hole so that the deck is connected to both sides of the bar is installed for the slab construction of the building, and the wall formwork connecting bar and the formwork support bar to be rotated to each support plate A link member comprising a first panel having a guide hole and a second panel having a long hole-shaped guide hole hinged to the formwork support bar so that the formwork support bar is movable up and down is provided. Combine the panel and the formwork bar and move the formwork bar up and down. In order to guide along the guide hole of the second panel guide pin is rotatably inserted into the hinge hole formed on both ends of the formwork support bar, one end of the guide pin is formed to contact the outer surface of the formwork support bar A nut is fastened to the other end of the guide pin to prevent the guide pin from being separated from the die support bar, and a plurality of guide pins are formed in the lengthwise direction of the guide pin so as to form a thread shape on the outer circumferential surface of the guide pin of the second panel. Two projections are formed, and one side of the inner circumferential surface of the guide hole formed in the second panel of the link member is formed with a threaded portion to be engaged with each projection of the guide pin guided along the guide hole in order to reduce the descending speed of the formwork support bar. Provided with the descending speed reduction structure of the slab formwork support bar The.

또한, 본 발명은 거푸집지지바의 외면과 가이드핀 사이에는 제2판넬의 가이드공을 따라 회전하면서 이동하는 가이드핀의 회전속도를 조절하도록 하는 회전조절부재가 결합됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조가 제공된다. In addition, the present invention is the slab formwork support bar between the outer surface of the formwork support bar and the guide pin of the slab formwork support bar is characterized in that the rotation control member for adjusting the rotational speed of the guide pin to move while rotating along the guide hole of the second panel A descending speed reduction structure is provided.

또한, 본 발명은 회전조절부재는 고무패킹으로 형성됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조가 제공된다. In addition, the present invention provides a slab formwork deceleration deceleration structure of the slab formwork support bar is characterized in that the rotation control member is formed of a rubber packing.

또한, 본 발명은 가이드핀 외주면에 형성된 복수개의 돌출부는 기어형상으로 형성하며, 상기 기어형상의 돌출부와 맞물리는 제2판넬의 가이드공 내주면에 형성된 나사산부는 기어형상으로 형성하여 상기 돌출부와 나사산부의 맞물린 상태에서 가이드공을 따라 가이드핀이 가이드되도록 함을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조가 제공된다. In addition, the present invention is a plurality of protrusions formed on the outer peripheral surface of the guide pin is formed in the shape of a gear, the threaded portion formed on the inner peripheral surface of the guide hole of the second panel engaged with the gear-shaped protrusion is formed in the shape of gears to engage the protrusion and the threaded portion The lowering speed reduction structure of the slab formwork support bar is provided to guide the guide pins along the guide hole in the state.

또한, 본 발명은 거푸집지지바의 양측 상면에는 상기 거푸집지지바가 하강할 때 상기 거푸집지지바의 가이드핀을 중심으로 회동되면서 탈거되는 제2판넬과 상기 거푸집지지바와의 간섭을 방지하도록 상기 제2판넬이 삽입 위치되도록 하는 절취홈부가 형성됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조가 제공된다. In addition, the present invention is the second panel to prevent the interference between the second panel and the formwork support bar is removed while rotating around the guide pin of the formwork support bar when the formwork support bar is lowered on both sides of the formwork support bar. A lowering speed reduction structure of the slab formwork support bar is provided, characterized in that a cutting groove is formed to allow the insertion position.

또한, 본 발명은 거푸집지지바에서 제2판넬의 회동을 방지 및 상기 제2판넬을 고정하기 위하여 가이드공 측인 상기 거푸집지지바의 양측면에는 고정공이 형성되고, 상기 제2판넬에는 상기 고정공과 일치됨은 물론 일치된 상태에서 고정볼트가 삽입체결되는 고정공이 형성됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조가 제공된다. In addition, the present invention in the formwork support bar to prevent the rotation of the second panel and to fix the second panel fixing holes are formed on both sides of the formwork support bar that is the guide hole side, the second panel is coincided with the fixing hole Of course, there is provided a descending speed reduction structure of the slab formwork support bar, characterized in that the fixing hole is formed is fastened to the fixed bolt in the matched state.

상기에서 설명한 바와 같이 이루어진 본 발명에 따르면, 건축물 슬라브를 시공하기 위해 설치되는 데크가 얹혀져 지지되는 거푸집지지바와 벽체거푸집연결바를 연결하는 링크부재의 제2판넬에 형성된 가이드공의 내주면 일면에 나사산부를 형성하고, 상기 거푸집지지바와 제2판넬을 연결하도록 체결되는 가이드핀의 외주면에 나사산부와 맞물리도록 나사산 형상을 이루는 복수개의 돌출부를 형성함으로써, 상기 거푸집지지바와 제2판넬과의 연결구조 변경으로 인하여 상기 시공 완료된 슬라브에서 데크를 해체할 때 상기 가이드핀의 돌출부와 상기 가이드공의 나사산부가 맞물린 상태에서 상기 가이드공을 따라 가이드핀이 회동되면서 이동됨에 따라 상기 데크의 자체하중에 의해 하강하는 거푸집지지바는 서서히 하강 즉, 상기 돌출부와 나사산부에 의해 거푸집지지바의 하강속도가 감속된 상태에서 바닥측으로 서서히 이동하므로 상기 거푸집지지바 및 데크(데크판넬)에 의한 안전사고의 위험을 미연에 방지하는 효과가 있다. According to the present invention made as described above, the threaded portion is formed on one surface of the inner peripheral surface of the guide hole formed in the second panel of the link member connecting the formwork support bar and the wall formwork connecting bar on which the deck is installed to install the building slab is supported And, by forming a plurality of protrusions in the form of a thread to engage the threaded portion on the outer circumferential surface of the guide pin fastened to connect the formwork bar and the second panel, due to the change in the connection structure between the formwork bar and the second panel When the deck is dismantled from the completed slab, as the guide pin is rotated along the guide hole while the protrusion of the guide pin and the threaded portion of the guide hole are engaged, the die supporting bar descending by the deck's own load is Slowly descending, i.e., the protrusion and the threaded portion The lowering speed of the die support bar gradually moves toward the bottom in the deceleration state by it has the effect of preventing the risk of accidents caused by the mold support bar and the deck (deck panel) in advance.

즉, 상기 데크의 자체하중에 의해 바닥측으로 하강하는 거푸집지지바의 하강속도가 돌출부와 나사산부에 의해 조절되어 서서히 하강됨에 따라 상기 데크를 해체하는 작업장에서 상기 데크의 해체하는 과정을 충분한 시간을 갖고 지켜보면서 작업을 행함은 물론 상기 서서히 하강하는 거푸집지지바와 작업자 간의 충돌 등을 방지하며, 또한 거푸집지지바의 상면에 얹혀진 상태로 해체되는 데크가 거푸집지지바의 상면에서 떨어지는 것을 방지하는 등 상기 데크를 해체하는 작업장에서의 안전사고를 미연에 방지하는 효과가 있다. That is, as the descending speed of the formwork supporting bar descending to the bottom side by the self load of the deck is gradually lowered by the protrusion and the threaded portion, the process of dismantling the deck at the workshop for dismantling the deck has sufficient time. While watching the work as well as preventing the collision between the slowly descending formwork bar and the worker, and also prevents the deck from being dismantled on the formwork bar to fall off the upper surface of the formwork support bar. It is effective in preventing safety accidents in the dismantling shop.

또한, 건축물의 슬라브로부터 상기의 데크를 보다 안전하면서 용이하게 분리 및 해체함에 따라 상기 데크의 해체작업에 따른 작업 시간 및 인력, 비용 등을 절감할 뿐만 아니라 상기 데크를 해체하는 과정에서의 소음발생 및 먼지 발생이 줄어 듦으로 인해 작업장의 환경을 보다 쾌적하게 유지할 수 있는 효과도 있다. In addition, as the deck is more safely and easily separated and dismantled from the slab of the building, it not only reduces work time, manpower, and cost, etc., due to the dismantling work of the deck, but also generates noise in the process of dismantling the deck. The reduction of dust also has the effect of keeping the workplace environment more comfortable.

그리고, 상기 거푸집지지바는 하강속도가 감속된 상태로 서서히 하강하면서 이동함에 따라 상기 벽체거푸집연결바와 거푸집지지바를 연결하는 각 구성 즉, 벽체거푸집연결바, 거푸집지지바, 제1,2판넬로 이루어진 링크부재 및 가이드핀, 고정핀과 같은 각 구성들에게 가해지는 충격을 완화됨에 따라 상기 각 구성들의 손상 및 파손 등을 방지하여 상기 슬라브 거푸집 지지바를 반영구적으로 오랫동안 사용가능할 뿐만 아니라 상기 각 구성의 손상 및 파손 등의 방지로 인하여 상기 벽체거푸집연결바에서 거푸집지지바가 분리되는 것을 방지함에 따라 안전사고의 위험을 미연에 방지하는 효과도 있다. And, the formwork support bar is composed of each of the components connecting the wall formwork connecting bar and the formwork support bar, the formwork connecting bar, the formwork supporting bar, the first and second panels as the descending speed is moved down gradually The shock applied to the components such as the link member, the guide pin, and the fixing pin is alleviated to prevent damage and breakage of the components, and thus the slab formwork support bar can be used semi-permanently for a long time as well as damage of the components. Due to the prevention of breakage, the formwork support bar is prevented from being separated from the wall formwork connecting bar, thereby preventing the risk of a safety accident.

한편, 상기 가이드핀에 고무패킹인 회전조절부재를 결합함으로써, 상기 가이드핀의 체결력에 의해 회전조절부재가 눌려지는 정도의 차이로 인한 상기 가이드핀과 거푸집지지바 외면과의 마찰력이 조절됨은 물론 상기 가이드핀의 회전력 또한 조절됨에 따라 상기 가이드공을 따라 가이드핀이 서서히 회전 및 이동하므로 인해 상기 거푸집지지바는 서서히 하강되는 등 상기 거푸집지지바의 하강속도를 자유롭게 조절가능한 효과도 있다. On the other hand, by coupling the rotation control member of the rubber packing to the guide pin, the friction between the guide pin and the die support bar outer surface due to the difference in the degree of the rotation control member is pressed by the fastening force of the guide pin is of course the said As the rotational force of the guide pin is also adjusted, the guide pin is gradually rotated and moved along the guide hole, so that the die support bar is gradually lowered, such that the rate of falling of the die support bar can be freely adjusted.

이하 본 발명에 따른 슬라브 거푸집 지지바의 하강속도 감속구조는 첨부된 도 5 내지 도 12를 참조하여 보다 구체적으로 설명하면 다음과 같다. Hereinafter, the descending speed reduction structure of the slab formwork support bar according to the present invention will be described in more detail with reference to FIGS. 5 to 12.

도 5는 본 발명 슬라브 거푸집 지지바의 구조를 나타낸 사시도이고, 도 6은 본 발명 슬라브 거푸집 지지바를 분리한 상태로 나타낸 분리사시도이고, 도 7은 본 발명 슬라브 거푸집 지지바의 일측을 부분확대한 상태로 나타낸 부분확대도이고, 도 8a 내지 도 8c는 본 발명 슬라브 거푸집 지지바가 작동되는 상태를 순차적으로 나타낸 사시도이고, 도 9는 본 발명 슬라브 거푸집 지지바의 하강이 완료된 상태를 나타낸 측면도이고, 도 10은 본 발명 제2판넬의 가이드공에 형성된 나사산부와 가이드핀에 형성된 돌출부가 맞물린 상태를 나타낸 사시도이고, 도 11은 본 발명 슬라브 거푸집 지지바의 거푸집지지바를 나타낸 사시도이고, 도 12는 본 발명 슬라브 거푸집 지지바의 제2판넬을 나타낸 사시도이고, 도 13은 본 발명 슬라브 거푸집 지지바의 가이드핀을 나타낸 사시도이다. 5 is a perspective view showing the structure of the present invention slab formwork support bar, Figure 6 is an exploded perspective view showing the present invention the slab formwork support bar separated, Figure 7 is a partially enlarged state of one side of the present invention slab formwork support bar 8A to 8C are perspective views sequentially showing a state in which the present invention slab formwork support bar is operated, and FIG. 9 is a side view showing a state in which the lowering of the present invention is completed. Figure 11 is a perspective view showing a state in which the threaded portion formed in the guide hole of the second panel of the present invention and the protrusion formed in the guide pin is engaged, Figure 11 is a perspective view showing the formwork support bar of the slab formwork support bar of the present invention, Figure 12 is the present invention slab A perspective view showing a second panel of the formwork support bar, Figure 13 shows a guide pin of the present invention slab formwork support bar. This is a perspective view.

본 발명은, 건축물의 벽체를 시공하기 위해 벽체의 두께만큼 이격되게 복수개의 벽체거푸집(11)이 연결 설치되어 있고, 상기 건축물의 슬라브를 시공하기 위해 복수개의 슬라브거푸집 즉, 복수개의 데크판넬로 이루어진 데크(D)가 설치되어 있다. The present invention, a plurality of wall formwork 11 is installed to be spaced apart by the thickness of the wall for the construction of the wall of the building, a plurality of slab formwork, that is made of a plurality of deck panels to construct the slab of the building Deck D is installed.

상기 벽체를 중심으로 대향되는 위치에 설치되는 두 벽체거푸집(11)의 상단부에는 벽체거푸집연결바(20)가 각각 설치되어 있고, 상기 각 벽체거푸집연결바(20)의 양측부에 지지플레이트(30)가 결합되어 있다. The wall formwork connecting bars 20 are respectively provided at the upper end portions of the two wall formwork 11 installed at opposite positions with respect to the wall, and the support plates 30 at both sides of the wall formwork connecting bars 20. ) Is combined.

그리고, 상기 두 벽체거푸집(11) 사이에 위치됨은 물론 상기 각 벽체거푸집연결바(20)의 양측부에는 건축물의 슬라브(C) 시공을 위해 설치되는 데크(D)가 얹혀지도록 하는 거푸집지지바(50)가 연결 결합되어 있다. And, between the two wall formwork 11 as well as the formwork support bar to be placed on both sides of the wall formwork connecting bar 20 deck (D) is installed for the construction of the slab (C) of the building ( 50) is connected and connected.

상기 벽체거푸집연결바(20)와 거푸집지지바(50) 사이에는 상기 벽체거푸집연결바(20)와 거푸집지지바(50)를 서로 연결시켜줌은 물론 상기 거푸집지지바(50)가 벽체거푸집연결바(20)를 중심으로 상하로 이동가능하도록 하는 링크부재(40)가 설치되어 있다. The wall formwork connecting bar 20 and the formwork support bar 50 connect the wall formwork connecting bar 20 and the formwork support bar 50 to each other, as well as the formwork support bar 50 is a wall formwork connecting bar. A link member 40 is provided to move up and down about the center 20.

상기 링크부재(40)는 상기 지지플레이트(30)에 회동되게 힌지결합되는 가이드공(G1)을 갖는 제1판넬(41)과, 상기 거푸집지지바(50)가 상하로 이동가능하게 상기 거푸집지지바(50)에 힌지결합되는 장공형태의 가이드공(G2)을 갖는 제2판넬(42)로 이루어져 있다. The link member 40 includes a first panel 41 having a guide hole G1 hinged to the support plate 30, and the form support bar 50 to move up and down. It consists of a second panel 42 having a guide hole (G2) in the form of a long hole hinged to the bar (50).

상기 거푸집지지바(50)의 양측 상면에는 도 6과 도 7 및 도 11에서 도시한 바와 같이, 상기 거푸집지지바(50)가 바닥측으로 하강할 때 상기 거푸집지지바(50)의 가이드핀(P2)을 중심으로 회동되면서 탈거되는 제2판넬(42)과 상기 거푸집지지바(50)와의 간섭을 방지하도록 상기 제2판넬(42)이 삽입 위치되도록 하는 절취홈부(51)가 형성되어 있다. As shown in FIGS. 6, 7, and 11 on both side surfaces of the form support bar 50, the guide pins P2 of the form support bar 50 when the form support bar 50 descends to the bottom side. A cutting groove 51 is formed to allow the second panel 42 to be inserted so as to prevent interference between the second panel 42 and the form support bar 50 which are removed while being rotated about the center.

또한, 상기 거푸집지지바(50)에서 제2판넬(42)의 회동을 방지 및 상기 제2판넬(42)을 고정하기 위하여 도 6과 도 7에서 도시한 바와 같이, 상기 가이드공(G3) 측인 상기 거푸집지지바(50)의 양측면에는 제2고정공(52)이 형성되어 있고, 상기 제2판넬(42)에는 상기 제2고정공(52)과 일치됨은 물론 일치된 상태에서 고정볼트(400)가 삽입체결되는 제1고정공(42a)이 형성되어 있다. In addition, to prevent the rotation of the second panel 42 in the die support bar 50 and to fix the second panel 42, as shown in Figure 6 and 7, the guide hole (G3) side Second fixing holes 52 are formed on both sides of the form support bar 50, and the second panel 42 is fixed to the fixing bolt 400 in a state of matching with the second fixing holes 52 as well. The first fixing hole 42a into which the) is inserted is formed.

상기 거푸집지지바(50)의 양측부에는 상기 거푸집지지바(50)가 상하부측으로 이동 시 후술할 가이드핀(P2)을 중심으로 회동하는 상기 링크부재(40)의 제2판넬(42)이 삽입 및 탈거될 수 있도록 일정공간을 형성하는 가이드공(G3)이 형성되어 있다. The second panel 42 of the link member 40 rotates around the guide pin P2, which will be described later, when the die support bar 50 moves to the upper and lower sides of the die support bar 50. And guide hole (G3) forming a predetermined space to be removed is formed.

상기 거푸집지지바(50)의 양단부에는 힌지공(50a)이 각각 형성되어 있고, 상기 거푸집지지바(50)의 힌지공(50a)에는 상기 링크부재(40)의 제2판넬(42)과 거푸집지지바(50)를 연결 결합시킴과 함께 상기 거푸집지지바(50)를 상하로 이동시키도록 상기 제2판넬(42)의 가이드공(G2)을 따라 가이드되는 가이드핀(P2)이 회전가능하게 삽입 체결되어 있다. Hinge holes 50a are formed at both ends of the formwork support bar 50, respectively, and the second panel 42 and the formwork of the link member 40 are formed at the hinge hole 50a of the formwork support bar 50. The guide pin (P2) guided along the guide hole (G2) of the second panel 42 to move the form support bar 50 up and down while connecting and coupling the support bar 50 is rotatable It is inserted and fastened.

상기 가이드핀(P2)는 도 6과 도 7 및 도 13에서 도시한 바와 같이, 상기 가이드핀(P2)의 일단에는 거푸집지지바(50)의 외면에 접촉되도록 머리부(P2a)가 형성되어 있고, 상기 가이드핀(P2)의 타단에는 상기 가이드핀(P2)이 거푸집지지바(50)에서 이탈되는 것을 방지하도록 너트(P2b)가 체결되어 있다. As shown in FIGS. 6 and 7 and 13, the guide pin P2 has a head P2a formed at one end of the guide pin P2 to contact the outer surface of the die support bar 50. At the other end of the guide pin P2, the nut P2b is fastened to prevent the guide pin P2 from being separated from the die support bar 50.

상기 제2판넬(42)의 가이드공(G2) 측 상기 가이드핀(P2)의 외주면에는 나사산 형상을 이루도록 복수개의 돌출부(100)가 상기 가이드핀(P2)의 길이방향으로 길게 형성되어 있다. On the outer circumferential surface of the guide pin (P2) side of the guide hole (G2) of the second panel 42, a plurality of protrusions 100 are formed long in the longitudinal direction of the guide pin (P2) to form a threaded shape.

상기 링크부재(40)의 제2판넬(42)에 형성된 가이드공(G2) 내주면의 일면에는 도 6과 도 7 및 도 12에서 도시한 바와 같이, 상기 데크(D)를 슬라브(C)에서 해체할 때 상기 데크(D)의 자체하중에 의해 바닥으로 하강하는 거푸집지지바(50)의 하강속도를 감속하기 위하여 상기 가이드공(G2)을 따라 가이드되는 가이드핀(P2)의 각 돌출부(100)와 맞물리도록 나사산부(200)가 형성되어 있다. On one surface of the inner circumferential surface of the guide hole G2 formed in the second panel 42 of the link member 40, the deck D is dismantled from the slab C, as shown in FIGS. Each protrusion 100 of the guide pin (P2) guided along the guide hole (G2) in order to slow down the falling speed of the formwork supporting bar (50) descending to the floor by the self load of the deck (D) Thread portion 200 is formed to engage with.

상기 거푸집지지바(50)의 외면과 가이드핀(P2) 사이에는 도 6에서 도시한 바와 같이, 상기 제2판넬(42)의 가이드공(G2)을 따라 회전하면서 이동하는 가이드핀(P2)의 회전속도를 조절하도록 하는 회전조절부재(300)가 결합되어 있으며, 상기 회전조절부재(300)는 가격이 저렴하면서도 제작이 용이하고 밀착력이 좋은 고무패킹으로 형성되어 있다. Between the outer surface of the formwork support bar 50 and the guide pin (P2) of the guide pin (P2) to move while rotating along the guide hole (G2) of the second panel 42 as shown in FIG. Rotation control member 300 is coupled to adjust the rotational speed, the rotation control member 300 is formed of a rubber packing with a low cost, easy to manufacture and good adhesion.

한편, 상기 가이드핀(P2) 외주면에 형성된 복수개의 돌출부(100)와 상기 제2판넬(42)의 가이드공(G2) 내주면의 일면에 형성된 나사산부(200)는 도 6과 도 7에서 도시한 바와 같이 나사산 형상으로 형성하거나 또는 기어형상으로 형성할 수 있는데, 이는 상기 돌출부(100)와 나사산부(200)가 서로 맞물린 상태에서 상기 가이드핀(P2)이 가이드공(G2)을 따라 가이드될 때 상기 거푸집지지바(50)가 서서히 하강하도록 하강속도를 저감하도록 하는 구조라면 어떠한 구조 및 형상으로 형성하여도 무방하다. Meanwhile, the plurality of protrusions 100 formed on the outer circumferential surface of the guide pin P2 and the thread 200 formed on one surface of the inner circumferential surface of the guide hole G2 of the second panel 42 are illustrated in FIGS. 6 and 7. It may be formed in a thread shape or as a gear shape, which is when the guide pin (P2) is guided along the guide hole (G2) in the state in which the projecting portion 100 and the threaded portion 200 is engaged with each other The form support bar 50 may be formed in any structure and shape as long as the structure lowers the speed of descent so that the formwork bar 50 descends gradually.

이와 같이 구성된 본 발명의 작용에 대해 설명하면 다음과 같다. Referring to the operation of the present invention configured as described above are as follows.

먼저, 건축물의 벽체와 슬라브를 시공하기 위하여 상기 벽체의 두께만큼 이격되게 복수개의 벽체 거푸집(11)를 세로방향으로 세워 설치한 후 상기 각 벽체 거푸집(11) 중 상측 벽체 거푸집(11)의 상단부에 벽체거푸집연결바(20)를 각각 고정 설치한다. First, in order to construct a wall and a slab of a building, a plurality of wall formworks 11 are installed in a vertical direction so as to be spaced apart by the thickness of the wall, and then the upper part of the upper wall formworks 11 of the wall formworks 11. Fix the wall formwork connecting bar (20), respectively.

그리고, 상기 벽체와 벽체 사이의 건축물 내부 공간에 위치되도록 상기 각 벽체거푸집연결바(20)에 링크부재(40)에 의해 연결되는 거푸집지지바(50)를 결합 설치한다. Then, the formwork supporting bar 50 is coupled to the wall formwork connecting bar 20 by the link member 40 so as to be located in the building interior space between the wall and the wall.

상기 링크부재(40)에 의해 벽체거푸집연결바(20)와 거푸집지지바(50)를 연결 및 결합되는 상태를 설명하면, 상기 각 벽체거푸집연결바(20)의 양측부에 각각 결합된 지지플레이트(30)에 상기 링크부재(40)의 제1판넬(41)를 연결 결합한다. Referring to the state in which the wall formwork connecting bar 20 and the formwork supporting bar 50 are connected and coupled by the link member 40, the support plates respectively coupled to both side portions of the wall formwork connecting bar 20, respectively. The first panel 41 of the link member 40 is coupled to 30.

즉, 상기 지지플레이트(30)에 형성된 핀홀과 상기 제1판넬(41)의 가이드공(G1)을 일치시킨 후 상기 일치된 핀홀과 가이드공(G1)으로 가이드핀(P)을 삽입 체결함에 따라 상기 가이드핀(P)은 가이드공(G1)을 따라 가이드되므로 인해 상기 지지플레이트(30)에 제1판넬(41)은 상기 가이드핀(P)을 중심으로 회동됨은 물론 상기 지지플레이트(30)로부터 슬라이딩되면서 이동된다. That is, after matching the pin hole formed in the support plate 30 and the guide hole G1 of the first panel 41, the guide pin P is inserted into the matched pin hole and the guide hole G1. Since the guide pin (P) is guided along the guide hole (G1), the first panel 41 on the support plate 30 is rotated around the guide pin (P) as well as from the support plate (30) It is moved while sliding.

그리고, 상기 링크부재(40)의 제2판넬(42) 일측부는 상기 제1판넬(41)과 고정핀(P1)에 의해 회동가능하게 결합됨과 함께 상기 제2판넬(42)의 중앙부에 형성된 가이드공(G2)과 상기 거푸집지지바(50)의 양측면에 형성된 힌지공(50a)이 일치 및 상기 일치된 가이드공(G2)와 힌지공(50a)으로 가이드핀(P2)을 삽입 체결함에 따라 상기 제2판넬(42)은 제1판넬(41) 및 거푸집지지바(50)에 연결 결합된다. In addition, one side portion of the second panel 42 of the link member 40 is rotatably coupled to the first panel 41 by the fixing pin P1, and a guide formed at the center of the second panel 42. The hinge hole 50a formed on both sides of the ball G2 and the die support bar 50 coincides and the guide pins P2 are inserted into the matched guide hole G2 and the hinge hole 50a. The second panel 42 is connected to the first panel 41 and the die support bar 50.

상기와 같이, 상기 벽체거푸집연결바(20)와 거푸집지지바(50)의 설치가 완료되면 상기 거푸집지지바(50)의 양측부에 형성된 가이드공(G3) 내로 제2판넬(42)을 삽입시키고 나서 상기 거푸집지지바(50)의 제2고정공(50a)와 제2판넬(42)의 제1고정공(42a)을 일치시켜 고정볼트(400)를 삽입 체결하여 상기 거푸집지지바(50)에 제2판넬(42)을 움직이지 않도록 고정한다. As described above, when installation of the wall formwork connecting bar 20 and the formwork support bar 50 is completed, the second panel 42 is inserted into guide holes G3 formed at both sides of the formwork support bar 50. After making the second fixing hole (50a) of the form support bar 50 and the first fixing hole (42a) of the second panel 42 to match the inserting fastening bolt 400 to the form support bar (50) ) To fix the second panel 42 so as not to move.

이 상태에서, 상기 거푸집지지바(50)의 상면에 데크판넬을 복수개 연결한 데크(D)를 설치한 후 상기 대향하는 두 벽체거푸집(11) 사이와 상기 데크(D) 상면에 콘크리트를 타설하며, 상기 타설된 콘크리트가 양생되도록 일정시간동안 양생하는 과정으로 거친 후에 굳어지게 되면 상기 건축물의 벽체와 슬라브의 시공이 완료된다. In this state, after installing a deck (D) connecting a plurality of deck panels on the upper surface of the formwork support bar (50) between the two opposite wall formwork 11 and the top of the deck (D) while placing concrete When the concrete is hardened after being cured for a predetermined time so that the poured concrete is cured, construction of walls and slabs of the building is completed.

상기 건축물의 벽체와 슬라브의 시공이 완료되면 상기 벽체 거푸집(11)를 벽체로부터 분리 및 해체함과 함께 상기 슬라브로부터 데크(D)를 분리 및 해체한다. When the construction of the wall and the slab of the building is completed, the wall formwork 11 is separated and dismantled from the wall, and the deck D is separated and dismantled from the slab.

상기 슬라브로부터 데크(D)를 분리 및 해체하는 과정을 설명하면, 도 8a와 같은 상태로 슬라브 거푸집 지지바가 설치 고정된 상태에서 상기 거푸집지지바(50)의 제2고정공(50a)와 제2판넬(42)의 제1고정공(42a)으로부터 고정볼트(400)를 빼낸다. Referring to the process of separating and dismantling the deck (D) from the slab, the second fixing hole (50a) and the second fixing hole 50a of the formwork support bar 50 in a state in which the slab formwork support bar is installed and fixed as shown in Figure 8a The fixing bolt 400 is pulled out from the first fixing hole 42a of the panel 42.

그러면, 상기 데크(D)의 자체하중에 의해 거푸집지지바(50)는 바닥측으로 하강하게 되는데, 즉 상기 벽체거푸집연결바(20)의 지지플레이트(30)에서 링크부재(40)의 제1판넬(41)이 가이드핀(P)을 중심으로 회동됨과 동시에 상기 가이드공(G1)을 따라 가이드핀(P)이 슬라이딩되면서 이동한다.Then, the formwork supporting bar 50 is lowered to the bottom side by the self load of the deck (D), that is, the first panel of the link member 40 in the support plate 30 of the wall formwork connecting bar 20 41 is rotated around the guide pin (P) and at the same time the guide pin (P) is sliding along the guide hole (G1).

그리고, 상기 링크부재(40)의 제1판넬(41)과 고정핀(P1)에 의해 힌지결합된 제2판넬(42)은 상기 고정핀(P1)을 중심으로 회동된다. In addition, the second panel 42 hinged by the first panel 41 and the fixing pin P1 of the link member 40 is rotated around the fixing pin P1.

이와 함께, 상기 거푸집지지바(50)의 가이드공(G3)에서 링크부재(40)의 제2판넬(42)이 탈거되는데, 상기 제2판넬(42)은 거푸집지지바(50)의 가이드핀(P2)을 중심으로 회동됨과 동시에 상기 제2판넬(42)의 가이드공(G2)을 따라 가이드핀(P2)이 슬라이딩되면서 이동된다. Along with this, the second panel 42 of the link member 40 is removed from the guide hole G3 of the die support bar 50, and the second panel 42 is a guide pin of the die support bar 50. At the same time as the center of rotation (P2) and the guide pin (P2) is moved along the guide hole (G2) of the second panel (42).

즉, 상기 거푸집지지바(50)가 도 8a와 같이 위치된 상태에서 고정볼트(400)를 빼냄과 함께 데크(D)의 자체하중에 의해 도 8b와 같이 상기 거푸집지지바(50)이 바닥측으로 하강이 이루어지고, 상기 거푸집지지바(50)가 완전히 하강 완료되면 상기 거푸집지지바(50)는 도 8c와 도 9에서와 같이 위치된 상태에서 고정된다. That is, the die support bar 50 is pulled out of the fixing bolt 400 in the state as shown in Figure 8a and the die support bar 50 as shown in Figure 8b by the self load of the deck (D) to the bottom side When the lowering is made, and the formwork supporting bar 50 is completely lowered, the formwork supporting bar 50 is fixed in a position as shown in FIGS. 8C and 9.

이 때, 상기 링크부재(40)의 제2판넬(42)에 형성된 가이드공(G2)을 따라 가이드핀(P2)이 슬라이딩되면서 이동할 때 상기 가이드공(G2)에서 가이드핀(P2)이 서서히 이동 즉, 제2판넬(42)과 힌지 결합된 거푸집지지바(50)가 바닥측으로 서서히 하강하도록 상기 거푸집지지바(50)의 하강속도를 조절하기 위해 상기 가이드핀(P2)의 외주면에는 나사산 형상을 이루는 복수개의 돌출부(100)를 형성함과 함께 상기 가이드공(G2)의 내주면에는 상기 돌출부(100)와 맞물리는 나사산부(200)이 형성되어 있다. At this time, when the guide pin (P2) is moved while sliding along the guide hole (G2) formed in the second panel 42 of the link member 40, the guide pin (P2) is gradually moved in the guide hole (G2) That is, the outer peripheral surface of the guide pin (P2) to adjust the descending speed of the formwork support bar 50 so that the formwork support bar (50) hinged to the second panel 42 is lowered to the bottom side has a thread shape While forming a plurality of protrusions 100 to be formed, a threaded portion 200 engaged with the protrusions 100 is formed on the inner circumferential surface of the guide hole G2.

그러므로, 상기 데크(D)의 자체하중에 의해 바닥측으로 거푸집지지바(50)이 하강할 때 상기 가이드핀(P2)의 돌출부(100)가 상기 나사산부(200)와 맞물린 상태로 작동됨과 함께 상기 가이드핀(P2)이 회동되므로 인해 상기 거푸집지지바(50)는 나사산부(200)에 맞물린 상태로 회동하는 가이드핀(P2)에 의해 바닥측으로 서서히 하강하게 된다(도 10). Therefore, when the formwork supporting bar 50 descends to the bottom side by the self load of the deck D, the protrusion 100 of the guide pin P2 is operated in engagement with the threaded portion 200 and the Because the guide pin (P2) is rotated, the die support bar 50 is gradually lowered to the bottom side by the guide pin (P2) to rotate in a state engaged with the screw thread 200 (Fig. 10).

또한, 상기 거푸집지지바(50)의 외면과 상기 가이드핀(P2)의 머리부(P2a) 또는 너트(P2b) 사이에는 고무재질인 회전조절부재(300)가 결합되어 있으므로 상기 가이드핀(P2)에 너트(P2b)를 체결하는 체결력에 의해 회전조절부재(300)가 눌려지면서 상기 거푸집지지바(50)와 가이드핀(P2)간의 마찰력이 조절된다. In addition, the guide pin (P2) because the rubber ring rotation control member 300 is coupled between the outer surface of the die support bar 50 and the head (P2a) or nut (P2b) of the guide pin (P2). The rotation control member 300 is pressed by the fastening force for fastening the nut (P2b) to the friction between the die support bar 50 and the guide pin (P2) is adjusted.

그럼에 따라, 상기 회전조절부재(300)에 의해 상기 거푸집지지바(50)와 가이드핀(P2) 간의 마찰력이 조절됨에 따라 상기 가이드핀(P2)의 회전력 또한 조절되므로 인해 상기 가이드핀(P2)은 가이드공(G2)을 따라 서서히 이동됨은 물론 상기 거푸집지지바(50) 또한 서서히 하강한다. Therefore, as the friction force between the die support bar 50 and the guide pin (P2) by the rotation control member 300 is also adjusted because the rotational force of the guide pin (P2) because the guide pin (P2) Is gradually moved along the guide hole (G2), as well as the formwork support bar 50 is also gradually lowered.

상기 거푸집지지바(50)의 가이드핀(P2)을 중심으로 회동되는 제2판넬(42)이 도 8c에서와 같이 완전하게 펴지게 되면 상기 제2판넬(42)은 거푸집지지바(50)의 절취홈부(51)으로 삽입 위치됨에 따라 상기 거푸집지지바(50)와 제2판넬(42)간에는 간섭현상이 발생되지 않으면서 상기 제2판넬(42)이 보다 원활하게 회동된다. When the second panel 42 rotated around the guide pin P2 of the die support bar 50 is completely unfolded as shown in FIG. 8C, the second panel 42 is formed of the die support bar 50. As the insertion groove 51 is inserted into the cutout groove 51, the second panel 42 is rotated more smoothly without interference between the die support bar 50 and the second panel 42.

상기 거푸집지지바(50)가 도 8c 및 도 9에서와 같이 바닥측으로의 하강이 완료되면 상기 거푸집지지바(50)의 상면에 위치 및 얹혀져 있는 데크(D)를 상기 거푸집지지바(50)로부터 내림에 따라 상기 슬라브로부터 데크(D)는 분리 및 해체된다. When the formwork supporting bar 50 is completed to descend to the bottom side as shown in FIGS. 8C and 9, the deck D positioned and mounted on the top surface of the formwork supporting bar 50 is removed from the formwork supporting bar 50. As it is lowered, deck D is separated and dismantled from the slab.

이와 같이, 본 발명에 따른 상기의 슬라브 거푸집 지지바의 하강속도 감속구조는 예시된 도면을 참조하여 설명하였으나, 본 명세서에 기재된 실시예와 도면에 의해 본 발명은 한정되지 않으며 그 발명의 기술범위 내에서 당업자에 의해 다양한 변형이 이루어질 수 있으므로 본 발명의 기술적 사상이나 전망으로부터 개별적으로 이해되어져서는 안되는 것이다. As described above, the lowering speed reduction structure of the slab formwork support bar according to the present invention has been described with reference to the illustrated drawings, but the present invention is not limited by the embodiments and drawings described herein and is within the technical scope of the present invention. Since various modifications can be made by those skilled in the art, they should not be individually understood from the technical spirit or the prospect of the present invention.

도 1a는 종래 건축물에서 벽체와 슬라브를 시공하기 위해 벽체 거푸집과 슬라브 데크가 결합된 구조를 사시도 형태로 나타낸 일실시예. Figure 1a is an embodiment showing a structure in which the wall formwork and the slab deck is combined to construct a wall and slab in a conventional building in a perspective view form.

도 1b는 벽체 거푸집과 슬라브 데크가 결합된 구조를 측면에서 나타낸 측면도. Figure 1b is a side view showing a structure in which the wall formwork and the slab deck is combined.

도 2는 건축물에서 벽체와 슬라브를 시공하기 위해 벽체 거푸집과 슬라브 데크가 결합된 구조를 나타낸 다른 실시예. Figure 2 is another embodiment showing a structure in which the wall formwork and the slab deck is combined to construct walls and slabs in the building.

도 3은 슬라브 데크를 지지하는 거푸집지지바의 구조를 나타낸 사시도. Figure 3 is a perspective view showing the structure of the formwork support bar for supporting the slab deck.

도 4는 거푸집지지바의 일측을 부분확대한 상태로 나타낸 부분확대도. Figure 4 is a partially enlarged view showing one side of the formwork supporting bar in a partially enlarged state.

도 5는 본 발명 슬라브 거푸집 지지바의 구조를 나타낸 사시도. Figure 5 is a perspective view showing the structure of the present invention slab formwork support bar.

도 6은 본 발명 슬라브 거푸집 지지바를 분리한 상태로 나타낸 분리사시도. Figure 6 is an exploded perspective view showing the present invention slab formwork supporting bar separated state.

도 7은 본 발명 슬라브 거푸집 지지바의 일측을 부분확대한 상태로 나타낸 부분확대도. Figure 7 is a partially enlarged view showing one side of the present invention the slab formwork support bar in a partially enlarged state.

도 8a 내지 도 8c는 본 발명 슬라브 거푸집 지지바가 작동되는 상태를 순차적으로 나타낸 사시도. 8a to 8c are perspective views sequentially showing a state in which the present invention the slab formwork support bar is operated.

도 9는 본 발명 슬라브 거푸집 지지바의 하강이 완료된 상태를 나타낸 측면도. Figure 9 is a side view showing a state in which the lowering of the slab formwork support bar of the present invention is completed.

도 10은 본 발명 제2판넬의 가이드공에 형성된 나사산부와 가이드핀에 형성된 돌출부가 맞물린 상태를 나타낸 사시도. 10 is a perspective view showing a state in which a thread formed in the guide hole of the second panel of the present invention and a protrusion formed in the guide pin are engaged.

도 11은 본 발명 슬라브 거푸집 지지바의 거푸집지지바를 나타낸 사시도. Figure 11 is a perspective view of the formwork support bar of the present invention slab formwork support bar.

도 12는 본 발명 슬라브 거푸집 지지바의 제2판넬을 나타낸 사시도. 12 is a perspective view showing a second panel of the present invention slab formwork support bar.

도 13은 본 발명 슬라브 거푸집 지지바의 가이드핀을 나타낸 사시도. Figure 13 is a perspective view of the guide pin of the present invention slab formwork support bar.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

20: 벽체거푸집연결바 30: 지지플레이트20: wall formwork connecting bar 30: support plate

40: 링크부재 41: 제1판넬40: link member 41: first panel

42: 제2판넬 42a: 제1고정공42: 2nd panel 42a: 1st fixed hole

50: 거푸집지지바 51: 절취홈부50: form support bar 51: cutout groove

52: 제2고정공 100: 돌출부52: second fixing hole 100: protrusion

200: 나사산부 300: 회전조절부재200: thread portion 300: rotation control member

400: 고정볼트 C: 슬라브400: Fixing bolt C: Slab

D: 데크 G1,G2,G3: 가이드공D: Deck G1, G2, G3: Guide Ball

P2: 가이드핀 P2a: 머리부P2: Guide Pin P2a: Head

P2b: 너트P2b: Nut

Claims (6)

대향하는 두 벽체거푸집(11)의 상단부에 각각 설치되도록 양측부에 지지플레이트(30)가 결합되는 벽체거푸집연결바(20)와, 상기 두 벽체거푸집(11) 사이에 위치 및 상기 각 벽체거푸집연결바(20)의 양측부에 연결 결합되어 건축물의 슬라브(C) 시공을 위해 설치되는 데크(D)가 얹혀지도록 가이드공(G3)을 갖는 거푸집지지바(50)와, 상기 벽체거푸집연결바(20)와 거푸집지지바(50) 사이에 설치되어 상기 각 지지플레이트(30)에 회동되게 힌지결합되는 가이드공(G1)을 갖는 제1판넬(41)과 상기 거푸집지지바(50)가 상하로 이동가능하게 상기 거푸집지지바(50)에 힌지결합되는 장공형태의 가이드공(G2)을 갖는 제2판넬(42)로 이루어진 링크부재(40)가 구비된 것에 있어서, The wall formwork connecting bar 20 to which the support plate 30 is coupled to both sides so as to be respectively installed at the upper end of the two opposing wall formwork 11 and the two wall formwork 11 and the respective wall formwork connection It is connected to both sides of the bar 20, the formwork supporting bar 50 having a guide hole (G3) so that the deck (D) is installed for the construction of the slab (C) of the building and the wall formwork connecting bar ( The first panel 41 and the die support bar 50 are installed between the die support bar 50 and the guide panel G1 which is hinged to the respective support plates 30 so as to be pivoted up and down. In that provided with a link member 40 made of a second panel 42 having a guide hole (G2) in the form of a long hole which is hinged to the die support bar (50), 상기 링크부재(40)의 제2판넬(42)과 거푸집지지바(50)를 연결 결합시킴과 함께 상기 거푸집지지바(50)를 상하로 이동시키기 위하여 상기 제2판넬(42)의 가이드공(G2)을 따라 가이드되도록 상기 거푸집지지바(50)의 양단부에 형성된 힌지공(50a)으로 가이드핀(P2)이 회전가능하게 삽입 체결되고, A guide hole of the second panel 42 in order to connect the second panel 42 and the form support bar 50 of the link member 40 to move the form support bar 50 up and down ( Guide pins P2 are rotatably inserted and fastened to hinge holes 50a formed at both ends of the die support bar 50 so as to be guided along G2). 상기 가이드핀(P2)의 일단에는 거푸집지지바(50)의 외면에 접촉되도록 머리부(P2a)가 형성되고, 상기 가이드핀(P2)의 타단에는 가이드핀(P2)이 거푸집지지바(50)에서 이탈되는 것을 방지하도록 너트(P2b)가 체결되며, 상기 제2판넬(42)의 가이드공(G2) 측 상기 가이드핀(P2)의 외주면에는 나사산 형상을 이루도록 상기 가이드핀(P2)의 길이방향으로 복수개의 돌출부(100)가 형성되며, One end of the guide pin (P2) is formed in the head portion (P2a) to contact the outer surface of the die support bar 50, the other end of the guide pin (P2) guide pin (P2) die support bar (50) The nut (P2b) is fastened so as to prevent the deviation from the, the longitudinal direction of the guide pin (P2) to form a thread shape on the outer peripheral surface of the guide pin (P2) side of the guide hole (G2) of the second panel 42 A plurality of protrusions 100 are formed, 상기 링크부재(40)의 제2판넬(42)에 형성된 가이드공(G2) 내주면의 일면에는 거푸집지지바(50)의 하강속도를 감속하기 위하여 상기 가이드공(G2)을 따라 가이드되는 가이드핀(P2)의 각 돌출부(100)와 맞물리도록 나사산부(200)가 형성됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조. On one surface of the inner circumferential surface of the guide hole (G2) formed in the second panel 42 of the link member 40, a guide pin guided along the guide hole (G2) in order to reduce the descending speed of the die support bar (50) ( Lowering speed reduction structure of the slab formwork support bar, characterized in that the threaded portion 200 is formed to engage with each protrusion 100 of P2). 제 1항에 있어서,The method of claim 1, 거푸집지지바(50)의 외면과 가이드핀(P2) 사이에는 제2판넬(42)의 가이드공(G2)을 따라 회전하면서 이동하는 가이드핀(P2)의 회전속도를 조절하도록 하는 회전조절부재(300)가 결합됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조. Rotation adjusting member for adjusting the rotational speed of the guide pin (P2) to move while rotating along the guide hole (G2) of the second panel 42 between the outer surface of the die support bar (50) and the guide pin (P2) ( Falling speed reduction structure of the slab formwork support bar, characterized in that the 300 is coupled. 제 2항에 있어서, 3. The method of claim 2, 회전조절부재(300)는 고무패킹으로 형성됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조. Rotation control member 300 is a lowering speed reduction structure of the slab formwork support bar, characterized in that formed by rubber packing. 제 1항에 있어서, The method of claim 1, 가이드핀(P2) 외주면에 형성된 복수개의 돌출부(100)는 기어형상으로 형성하며, 상기 기어형상의 돌출부(100)와 맞물리는 제2판넬(42)의 가이드공(G2) 내주면에 형성된 나사산부(200)는 기어형상으로 형성하여 상기 돌출부(100)와 나사산부(200)의 맞물린 상태에서 가이드공(G2)을 따라 가이드핀(P2)이 가이드되도록 함 을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조. The plurality of protrusions 100 formed on the outer circumferential surface of the guide pin P2 may be formed in a gear shape, and threaded portions formed on the inner circumferential surface of the guide hole G2 of the second panel 42 engaged with the gear-shaped protrusions 100 ( 200 is formed in the shape of a gear descending speed of the slab formwork support bar characterized in that the guide pin (P2) is guided along the guide hole (G2) in the engaged state of the projecting portion 100 and the threaded portion (200) Deceleration structure. 제 1항에 있어서.The method of claim 1. 거푸집지지바(50)의 양측 상면에는 상기 거푸집지지바(50)가 하강할 때 상기 거푸집지지바(50)의 가이드핀(P2)을 중심으로 회동되면서 탈거되는 제2판넬(42)과 상기 거푸집지지바(50)와의 간섭을 방지하도록 상기 제2판넬(42)이 삽입 위치되도록 하는 절취홈부(51)가 형성됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조. On both sides of the form support bar 50, when the form support bar 50 is lowered, the second panel 42 and the formwork are removed while being rotated about the guide pin P2 of the form support bar 50. Lowering speed reduction structure of the slab formwork support bar, characterized in that the cutting groove 51 is formed so that the second panel 42 is inserted to prevent interference with the support bar (50). 제 1항에 있어서, The method of claim 1, 거푸집지지바(50)에서 제2판넬(42)의 회동을 방지 및 상기 제2판넬(42)을 고정하기 위하여 가이드공(G3) 측인 상기 거푸집지지바(50)의 양측면에는 고정공(52)이 형성되고, 상기 제2판넬(42)에는 상기 고정공(52)과 일치됨은 물론 일치된 상태에서 고정볼트(400)가 삽입체결되는 고정공(42a)이 형성됨을 특징으로 하는 슬라브 거푸집 지지바의 하강속도 감속구조. Fixing holes 52 on both sides of the formwork support bar 50 on the side of the guide hole G3 to prevent rotation of the second panel 42 in the formwork support bar 50 and to fix the second panel 42. Is formed, the second panel 42, the slab formwork support bar, characterized in that the fixing hole (42a) is formed to be matched with the fixing hole 52 as well as the fixing bolt 400 is inserted in the matched state Descent speed reduction structure
KR1020090015366A 2009-02-24 2009-02-24 Structure for speed reducer of drop speed in slab form cross member KR101020755B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090015366A KR101020755B1 (en) 2009-02-24 2009-02-24 Structure for speed reducer of drop speed in slab form cross member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090015366A KR101020755B1 (en) 2009-02-24 2009-02-24 Structure for speed reducer of drop speed in slab form cross member

Publications (2)

Publication Number Publication Date
KR20100096471A true KR20100096471A (en) 2010-09-02
KR101020755B1 KR101020755B1 (en) 2011-03-09

Family

ID=43003990

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090015366A KR101020755B1 (en) 2009-02-24 2009-02-24 Structure for speed reducer of drop speed in slab form cross member

Country Status (1)

Country Link
KR (1) KR101020755B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180068420A (en) * 2016-12-14 2018-06-22 (주)남경 Apparatus for supporting mold
KR20190111589A (en) 2018-03-23 2019-10-02 (주)혜성산업개발 A device for prevention of drop down slab forms
KR20190111591A (en) 2018-03-23 2019-10-02 (주)혜성산업개발 An up-down guide apparatus for slab form

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101180845B1 (en) * 2011-12-26 2012-09-07 오경근 Supporting System for Slab Form and Construction Method Using the Same
KR101527564B1 (en) * 2013-04-26 2015-06-10 손종락 Supporting apparatus for slab formwork
KR101653940B1 (en) 2016-01-22 2016-09-02 강호환 Yoke beam of drop type having forms system
KR101710492B1 (en) * 2016-04-20 2017-02-27 (주)남경 Apparatus for supporting mold

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050101258A (en) * 2004-04-16 2005-10-21 한정화 Movable safety window
KR200437465Y1 (en) 2006-11-27 2007-12-05 김귀환 The cross member for slab form being dismantled easily
KR20080097735A (en) * 2007-05-03 2008-11-06 이영상 Shaft for mold support
KR100812551B1 (en) 2007-07-04 2008-03-13 (주)거혁건설 The cross member for slab form being dismantled easily

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180068420A (en) * 2016-12-14 2018-06-22 (주)남경 Apparatus for supporting mold
KR20190111589A (en) 2018-03-23 2019-10-02 (주)혜성산업개발 A device for prevention of drop down slab forms
KR20190111591A (en) 2018-03-23 2019-10-02 (주)혜성산업개발 An up-down guide apparatus for slab form

Also Published As

Publication number Publication date
KR101020755B1 (en) 2011-03-09

Similar Documents

Publication Publication Date Title
KR101020755B1 (en) Structure for speed reducer of drop speed in slab form cross member
KR101514395B1 (en) Supporting device of slab form
KR20190114731A (en) Apparaurs for constructing slab of building and method for the same
KR100839352B1 (en) The horizentally controlled molding panel and the method of construction using the same
KR101142875B1 (en) Drop apparatus for supporter
KR20120106264A (en) Structure for supporter having shock absorber
KR101945418B1 (en) Supporter for concrete forms of slab
KR20110135259A (en) Drop apparatus for supporter
JP6009332B2 (en) Fixing device for self-elevating external curing device and its installation method
KR101647347B1 (en) The electric supporter for concrete forms of slab
KR101180845B1 (en) Supporting System for Slab Form and Construction Method Using the Same
KR102457474B1 (en) Device for supporting a slab formwork
KR100665340B1 (en) The construction structure of slab deck being dismantled easily
KR20080097735A (en) Shaft for mold support
KR20160126231A (en) The supporter for concrete forms of slab
KR101213276B1 (en) System form combined with exterior insulation installation, and construction method thereof
KR101969434B1 (en) Connecting unit for gang form and construction method using the same
KR101655786B1 (en) Support for releasing dice interval holding device
KR101630760B1 (en) The supporter for concrete forms of slab
KR100817883B1 (en) Slab mold setting structure
KR100475544B1 (en) Wall form climbing system for constructing concrete wall of high-rise buldings
KR20110043120A (en) Apparatus for lifting up and down a slab form assembly
KR101819196B1 (en) Form system
KR200366291Y1 (en) Wall form climbing system for constructing concrete wall of high-rise buldings
KR101834630B1 (en) Supporting device for slab form

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140303

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150302

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170302

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180312

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190404

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20200302

Year of fee payment: 10