KR20100001200U - Safety-bar construction structure - Google Patents

Safety-bar construction structure Download PDF

Info

Publication number
KR20100001200U
KR20100001200U KR2020080009931U KR20080009931U KR20100001200U KR 20100001200 U KR20100001200 U KR 20100001200U KR 2020080009931 U KR2020080009931 U KR 2020080009931U KR 20080009931 U KR20080009931 U KR 20080009931U KR 20100001200 U KR20100001200 U KR 20100001200U
Authority
KR
South Korea
Prior art keywords
railing
bolt
handrail
safety
stairs
Prior art date
Application number
KR2020080009931U
Other languages
Korean (ko)
Other versions
KR200454920Y1 (en
Inventor
장성민
Original Assignee
장성민
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장성민 filed Critical 장성민
Priority to KR2020080009931U priority Critical patent/KR200454920Y1/en
Publication of KR20100001200U publication Critical patent/KR20100001200U/en
Application granted granted Critical
Publication of KR200454920Y1 publication Critical patent/KR200454920Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1842Balusters; Grille-type elements
    • E04F11/1846Balusters with means for fixing to the floor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/18Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using screw-thread elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

본 고안은 안전난간 설치구조에 관한 것으로써, 계단 상면에 설치된 앵커에 난간용 볼트를 나사체결방식으로 간단하게 설치하고, 난간지주도 난간용 볼트에 역시 나사체결방식으로 간단하게 설치함으로써 시공성 및 작업성이 매우 뛰어난 안전난간 설치가 가능하며, 하중전달도 효율적이어서 안정적이어서 종래 용접작업으로 인한 낭비적인 공사비 증가요인을 근본적으로 해결할 수 있는 난간설치구조가 제공된다.The present invention relates to the structure of the installation of safety railings, by simply installing the railing bolts on the anchors installed on the upper surface of the stairs by screwing, and by installing the railing bolts on the railing bolts simply by screwing. It is possible to install safety railing with excellent stability, and it is stable because load transfer is efficient, so it provides a railing installation structure that can fundamentally solve the wasteful construction cost increase factor caused by conventional welding work.

안전난간, 볼트 Safety railing, bolt

Description

안전난간 설치구조{SAFETY-BAR CONSTRUCTION STRUCTURE}Safety railing installation structure {SAFETY-BAR CONSTRUCTION STRUCTURE}

본 고안은 안전난간 설치구조에 구조에 관한 것이다. 더우 구체적으로 계단에 통행인의 안전을 위해서 설치된 난간 설치구조에 관한 것이다.The present invention relates to the structure of the safety railing installation structure. More specifically, it relates to a railing installation structure installed for the safety of passers-by on stairs.

도 1a는 계단(10)에 설치된 안전난간(20)의 예를 도시한 것이다.Figure 1a shows an example of the safety railing 20 installed on the stairs (10).

즉, 다층으로 구성되는 계단(10)의 상면 측방에 난간 지주(21)를 다수 설치하고, 상기 난간 지주(21)의 상단부를 상단지지바(22)로 서로 연결시켜 통행인이 계단(10)을 오르내리면서 상단지지바(22)를 잡고 움직일 수 있도록 한 것이다.That is, a plurality of handrail struts 21 are installed on the upper side of the staircase 10 composed of a multi-layer, and the upper end of the handrail strut 21 is connected to each other by an upper support bar 22 so that a pedestrian passes through the staircase 10. While moving up and down to hold the upper support bar (22).

이에 대부분의 하중은 상단지지바(22)에 의하여 난간 지주(21)로 전달되기 때문에 난간 지주(21)의 하단부를 계단(10)에 완전하게 고정되도록 하는 것이 안전난간(20)의 시공에 있어서는 매우 중요하게 된다.Accordingly, most of the load is transmitted to the railing support 21 by the upper support bar 22, so that the lower end of the railing support 21 is completely fixed to the stairs 10 in the construction of the safety railing 20. It becomes very important.

이에 도 1b 및 도 1c와 같이, 계단(10)의 상면에 앵커(30)를 먼저 매립되도록 설치하는데, 상기 앵커(30)는 계단에 미리 형성시킨 천공홀(40)에 매립되는 몸통부(31)와 몸통부 상부에 형성되어 계단 상면으로부터 상방으로 연장 돌출되는 수나사부(32)로 구성되어 있다.1B and 1C, the anchor 30 is first embedded in the upper surface of the staircase 10. The anchor 30 is buried in the boring hole 40 previously formed in the staircase 31. And a male screw portion 32 formed above the trunk portion and protruding upward from the upper surface of the stairs.

이러한 앵커(30)의 수나사부(32)에는 링형태의 와셔(33)가 삽입되며, 역시 수나사부(32)에 삽입되도록 중앙홀이 형성된 원형받침판(34)이 계단(10) 상면에 받쳐지도록 시공된다.A ring-shaped washer 33 is inserted into the male screw portion 32 of the anchor 30, and a circular support plate 34 having a central hole formed to be inserted into the male screw portion 32 is supported on the upper surface of the stairs 10. It is constructed.

이때 상기 중앙홀을 관통하여 상방 돌출된 앵커(30)의 수나사부(32)를 너트(35)를 이용하여 앵커(30)를 계단(10)에 고정되도록 설치하게 된다.At this time, the male screw portion 32 of the anchor 30 protruding upward through the central hole is installed to be fixed to the stairs 10 by using the nut 35.

다음으로는 원형 강관 형태의 난간 지주(21)의 하단부면이 원형받침판(34)에 지지되어 고정되도록 하는데 통상 용접에 의하여 난간 지주(21)가 원형받침판(34)에 의하여 움직이지 않도록 고정시키게 된다.Next, the lower end surface of the handrail support 21 in the form of a circular steel pipe is supported and fixed to the circular support plate 34. The handrail support 21 is fixed to prevent movement by the circular support plate 34 by welding. .

다음으로는 난간 지주(21)의 두부로부터 삽입되어 원형받침판(34)과 난간 지주(21)의 하단부를 감싸도록 볼록렌즈 형태의 마감캡(50)을 설치하여 용접부위를 감싸 미관을 해치지 않도록 마감하게 된다.Next, a convex lens-type closing cap 50 is installed to be inserted from the head of the railing support 21 to surround the lower end of the circular support plate 34 and the railing support 21 to wrap the welded portion so as not to damage the aesthetics. Done.

이때, 상기 난간 지주(21)는 알루미늄 관으로 제작된 것을 이용하기 때문에 그 고정을 위하여 원형받침판(34)에 용접시킬 때, 용접열에 의하여 하단부가 파손되는 경우가 많아 파손된 난간 지주(21)의 하단부를 통상은 커팅한다. 하지만 난간 지주(21)의 길이는 일정한 길이로 재단된 것을 사용하기 때문에 하단부가 커팅된 난간 지주(21)는 달리 사용하지 못하고 폐자재로 처리되는 경우가 많았다.At this time, since the handrail strut 21 is made of an aluminum tube, when welding to the circular support plate 34 for fixing, the lower end portion is often broken by welding heat, so that the handrail strut 21 is broken. The lower end is usually cut. However, since the length of the handrail strut 21 is cut to a predetermined length, the handrail strut 21 whose lower end is cut was not used otherwise, and was often treated as waste material.

이에 용접작업에 따라서는 지주 사용량이 계획된 사용량을 초과하는 일이 많아 공사비 증감요인이 매우 커 매우 비효율적이라는 문제점이 있었다.Accordingly, there are problems in that the amount of land use exceeds the planned use depending on the welding work, and the increase and decrease of construction cost is very large and inefficient.

이에 본 고안은 안전난간을 계단에 설치함에 있어서, 용접작업에 의한 폐자재가 너무 많아 발생한다는 문제점을 해결하기 위하여 계단에 난간지주를 용접방식이 아닌 나사체결식으로 고정설치하도록 하되, 시공성 및 경제성이 충분히 고려된 안전난간 설치수단 제공을 그 해결하고자 하는 기술적 과제로 한다.Therefore, in order to solve the problem that a large amount of waste material is generated by welding work in installing safety railings on the stairs, the railing column is fixed to the stairs by screwing instead of the welding method. It is a technical problem to be solved to provide a means for installing safety rails sufficiently considered.

상기의 목적을 달성하기 위하여 본 고안은The present invention to achieve the above object

첫째, 계단(A)에 미리 천공홀(B)에 앵커(100)를 매립 설치하고, 상기 앵커에 본 고안에 의한 난간용 볼트(200)를 체결시켜 앵커가 계단에 고정되도록 하고, 상기 난간용 볼트(200)에 지주(300)의 하단부를 나사체결시키는 것만으로 난간 지주가 계단에 고정설치될 수 있도록 하였다.First, the buried anchor 100 is installed in the drill hole (B) in advance in the staircase (A), and fastening the railing bolts 200 according to the present invention to the anchor so that the anchor is fixed to the stairs, for the handrail Just by screwing the lower end of the support (300) to the bolt (200) so that the handrail can be fixed to the staircase.

둘째, 상기 난간용 볼트(200)는 통상 구입가능한 사이즈로써 볼트머리부(210)와 수나사체결부(220)로 형성되도록 하되, 앵커와 체결될 수 있도록 볼트머리부와 수나사부를 관통하는 나사체결공(230)을 형성시켰으며, 이러한 나사체결공(230)은 난간용 볼트를 고정시킨 뒤 드릴머신 등을 이용하여 간단하게 형성시킬 수 있도록 함으로써 경제적인 제작이 가능하도록 하였다.Second, the handrail bolt 200 is generally available in size to be formed of the bolt head 210 and the male screw fastening portion 220, but the screw fastening hole penetrating the bolt head and the male screw portion to be fastened with the anchor 230 was formed, such a screw fastening hole 230 was fixed to the handrail bolt to be easily formed using a drill machine, such as to enable an economical production.

상기한 바와 같은 본 고안에 따른 안전난간 설치구조는 전체적인 설치작업이 용접작업을 요구하지 않으므로 자재손실이 거의 발생하지 않아 공사비 증가요 인을 근본적으로 제거할 수 있을 뿐만 아니라, 난간용 볼트와 지주 및 앵커는 나사체결식으로 서로 결합되도록 하였기 때문에 시공성이 매우 뛰어나 작업능률이 증진될 뿐만 아니라, 난간용 볼트의 제작도 용이하여 전체적인 공사비 원가 절감이 가능하게 된다.As described above, the safety railing installation structure according to the present invention does not require welding work as a whole installation work, so that material loss is hardly generated, and it is possible to fundamentally eliminate the factor of increasing construction cost, as well as railing bolts and props and Since the anchors are screwed to each other to be coupled to each other, the workability is very good and the work efficiency is improved, and the production of handrail bolts is also easy, thereby reducing the overall construction cost.

앞에서 설명되고, 도면에 도시된 본 고안의 일 실시예는 본 고안의 기술적사상을 한정하는 것으로 해석되어서는 안 된다. 본 고안의 보호범위는 청구범위에 기재된 사항에 의하여만 제한되고, 본 고안의 기술분야에서 통상의 지식을 가진 자는 본 고안의 기술적 사상을 다양한 형태로 개량 변경하는 것이 가능하다. 따라서 이러한 개량 및 변경은 통상의 지식을 가진 자에게 자명한 것인 한 본 고안의 보호범위에 속하게 된다.An embodiment of the present invention described above and illustrated in the drawings should not be construed as limiting the technical spirit of the present invention. The scope of protection of the present invention is limited only by the matters described in the claims, and those skilled in the art can change and change the technical idea of the present invention in various forms. Therefore, such improvements and modifications fall within the protection scope of the present invention as long as it is obvious to those skilled in the art.

본 고안을 보다 명확하고 용이하게 설명하기 위해서 이하 본 고안의 최선의 실시예를 첨부도면에 의하여 상세하게 설명하며, 본 고안에 따른 실시예는 여러 가지 다른 형태로 변형될 수 있으므로, 본 고안의 범위가 아래에서 설명되는 실시예에 한정되지 않는다.In order to explain the present invention more clearly and easily described in detail by the accompanying drawings the best embodiment of the present invention, the embodiment according to the present invention can be modified in various other forms, the scope of the present invention Is not limited to the embodiment described below.

도 2는 본 고안에 의한 앵커(100), 난간용볼트(200) 및 난간지주(300)를 각각 도시한 것이며, 도 3은 상기 앵커(100), 난간용볼트(200) 및 난간지주(300)의 결합단면도이며, 도 4는 상기 앵커(100), 난간용볼트(200) 및 난간지주(300)의 조립상태도이다.Figure 2 shows the anchor 100, the handrail bolt 200 and the handrail holder 300 according to the present invention, Figure 3 is the anchor 100, handrail bolt 200 and handrail holder 300 ) Is a cross-sectional view of the coupling, Figure 4 is an assembly state of the anchor 100, the handrail bolt 200 and the railing column 300.

상기 앵커(100)는 통상 계단에 안전난간을 고정설치하기 위하여 이용되는 앵커로써, 계단(A)에 미리 형성시킨 천공홀(B)에 그 몸통부(110)가 매립되며, 고정 세팅을 위하여 에폭시 등과 같은 충진재가 천공홀에 충전될 수 있도록 시공된다.The anchor 100 is usually used to fix the safety railing on the staircase, the body portion 110 is buried in the drill hole (B) formed in advance in the staircase (A), epoxy for a fixed setting Filler such as is constructed so that it can be filled in the drilling hole.

또한 상기 몸통부(110) 상부에 형성된 수나사부(120)는 계단 상면으로부터 상부로 연장돌출되도록 세팅된다.In addition, the male screw portion 120 formed on the upper portion of the body 110 is set to protrude upward from the upper surface of the stairs.

상기 난간용 볼트(200)는 크게 볼트머리부(210)와 수나사체결부(220)로 구성되며, 핵심사항은 상기 볼트머리부(210)와 수나사체결부(220)의 개략 중앙부에 내면에 암나사부가 형성된 나사체결공(230)이 난간용 볼트(200) 전체 길이 또는 일부 길이에 걸쳐 형성되도록 한 것이다.The handrail bolt 200 is largely composed of a bolt head 210 and the male screw fastening portion 220, the core of the bolt head 210 and the male screw fastening portion 220 in the outline of the central portion of the internal thread The additionally formed screw fastening hole 230 is to be formed over the entire length or part of the length of the handrail bolt 200.

이러한 내면에 암나사부가 형성된 나사체결공(230)은 난간용 볼트(200)를 고정시킨 뒤 드릴머신 등을 이용하여 간단하게 형성시킬 수 있도록 할 수 있을 것이다.The screw fastening hole 230 having the female thread formed on the inner surface thereof may be formed by simply fixing the handrail bolt 200 and using a drill machine.

이에 도 3과 같이 앵커(100)의 수나사부(110)는 난간용 볼트(200)의 내면에 암나사부가 형성된 나사체결공(230)에 체결되어 앵커(100)는 난간용볼트(200)에 의하여 계단(A) 상면에 고정될 수 있게 됨을 알 수 있다.Accordingly, as shown in FIG. 3, the male thread part 110 of the anchor 100 is fastened to a screw fastening hole 230 in which an internal thread part is formed on an inner surface of the bolt for railing 200, and the anchor 100 is secured by a bolt for railing 200. It can be seen that it can be fixed to the upper surface of the stairs (A).

이때 상기 난간용 볼트(200)의 볼트머리부(210)의 저면은 계단 천공홀 주변의 상면에 직접 맞닿도록 함으로써 다른 부속자재 없이 난간지주(300)가 용이하게 설치될 수 있도록 하게 된다.At this time, the bottom surface of the bolt head 210 of the handrail bolt 200 is to be in direct contact with the upper surface around the stair drilling hole so that the handrail column 300 can be easily installed without other accessories.

상기 난간지주(300)는 알루미늄 관으로써 소정의 높이를 가지도록 재단된 것이 이용되며, 그 하단부 내면에는 난간용 볼트(200)의 수나사체결부(220)와 체 결될 수 있도록 암나사부(310)가 형성되도록 하게 된다.The handrail holder 300 is cut to have a predetermined height as an aluminum tube is used, the lower end of the inner surface of the inner thread portion 310 to be fastened with the male screw fastening portion 220 of the bolt 200 for the handrail. To form.

이러한 암나사부(310)는 간단한 현장작업으로 형성이 가능하지만 공장에서 미리 난간지주(300)에 기계적 장치를 이용 간단하게 형성이 가능하다.The female thread portion 310 can be formed by a simple field work, but can be easily formed using a mechanical device on the railing column 300 in advance in the factory.

이에 상기 난간지주(300) 하단부를 난간용 볼트(200)의 수나사체결부(220)에 체결시켜 그 설치가 가능하게 된다.Accordingly, the lower end portion of the railing column 300 is fastened to the male screw fastening portion 220 of the bolt for the railing 200, thereby enabling installation thereof.

이때, 상기 난간용 볼트(200)의 볼트머리부(210)의 상면에 난간지주(300) 하단부 저면이 직접 접하도록 하기 때문에, 난간지주(300)로터 전달되는 하중이 난간용 볼트(200)에 그대로 전달되고, 이러한 난간용 볼트(200)는 앵커(100)와 체결되어 있으므로 전달된 하중을 최종 계단에 의하여 저항시킬 수 있으므로 매우 안정적인 하중지지가 가능하게 됨을 알 수 있다.At this time, since the lower surface of the lower end of the railing column 300 directly contacts the upper surface of the bolt head 210 of the railing bolt 200, the load transmitted from the railing column 300 to the railing bolt 200. As it is transmitted, the railing bolt 200 is fastened with the anchor 100, so that the transmitted load can be resisted by the final step, it can be seen that very stable load support is possible.

또한, 앵커(100)와 난간용 볼트(200), 난간용 볼트(200)와 난간지주(300)과의 결합이 나사체결방식으로만 이루어지기 때문에 시공성 및 작업성이 매우 뛰어나기 때문에 작업자는 보다 신속하게 난간 설치가 가능하게 되며,In addition, since the coupling between the anchor 100 and the handrail bolt 200, the handrail bolt 200 and the handrail holder 300 is made only by screwing, the workability and workability are very excellent, so Quickly install railings,

달리 작업과정에서 파손되거나 이를 처리하기 위한 예측지 못한 부가적인 작업이 요구되지 않으므로 불필요한 공사비 증가 요인을 사전에 방지할 수 있게 됨을 알 수 있다.It can be seen that unnecessary construction cost increase factors can be prevented in advance because otherwise, additional work is not required to be damaged or processed in the process.

이때, 난간지주(300)와 난간용 볼트(200)의 체결을 위하여 난간지주(300)의 암나사부(310)를 난간지주(300)의 하단부 내면에 직접 형성시킬 수도 있으나, 난간용 볼트(200)의 수나사부(220)의 직경과 난간지주(300)의 하단부 직경이 서로 차이가 나는 경우에는 난간지주(300)의 하단부 내면에 슬리브(400)를 더 내삽시켜 난간지주(300)과 난간용 볼트(200)를 서로 체결시킬 수 있다.At this time, the female thread portion 310 of the railing column 300 may be directly formed on the inner surface of the lower end of the railing column 300 in order to fasten the railing column 300 and the railing bolt 200. If the diameter of the male screw portion 220 and the lower end diameter of the railing column 300 are different from each other, the sleeve 400 is further inserted into the inner surface of the lower end of the railing column 300 for the railing column 300 and the railing. The bolts 200 may be fastened to each other.

이에 도 5와 같이 계단(A)에 먼저 천공홀(B)를 형성시키고, 상기 천공홀(B)에 앵커(100)를 세팅한 다음, 본 고안에 의한 난간용 볼트(200)를 앵커(100)에 체결시켜 앵커(100)를 먼저 고정시키고, 상기 난간용 볼트(200)에 난간지주(300)를 체결시키고, 난간지주(300)의 상단부를 이어주는 상단지지바(22)를 설치하여 최종 안전난간 설치가 가능하게 된다.Accordingly, as shown in FIG. 5, first, the hole A is formed in the staircase A, the anchor 100 is set in the hole B, and the railing bolt 200 according to the present invention is anchored 100. The anchor 100 is first fixed, and the handrail bolt 300 is fastened to the handrail bolt 200, and the top support bar 22 connecting the upper end of the handrail holder 300 is installed for final safety. Handrail installation is possible.

이때, 도 1b 및 도 1c와 같이, 난간용 볼트(200)와 난간지주(300) 하단부를 감싸는 볼록렌즈 형태의 미도시된 마감캡(50)을 미관을 위하여 더 설치할 수 있을 것이다.At this time, as shown in Figure 1b and Figure 1c, the balustrade bolt 200 and the balustrade holding column 300 is not shown in the convex lens-shaped finish cap 50 may be further installed for aesthetics.

도1a, 도 1b 및 도 1c은 종래 안전난간 설치예를 도시한 것이다.1A, 1B and 1C show an example of installing a conventional safety railing.

도 2, 도 3 및 도 4는 본 고안에 의한 난간용볼트와 앵커와 난간지주의 결합상태의 예를 도시한 것이다.2, 3 and 4 show an example of the coupling state of the handrail bolt and anchor and the handrail holder according to the present invention.

도 5는 본 고안에 의한 난간용볼트를 이용하여 시공된 계단을 도시한 것이다. Figure 5 shows a staircase constructed using a handrail bolt according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100:앵커 110:앵커의 몸통부100: anchor 110: trunk portion of the anchor

120:앵커의 수나사부 200:난간용 볼트120: male thread of the anchor 200: bolt for handrail

210:난간용 볼트의 볼트머리부 220:난간용 볼트의 수나사체결부210: bolt head of the railing bolt 220: male thread fastening of the railing bolt

300:난간지주 400:슬리브300: handrail 400: sleeve

A:계단 B:천공홀A: staircase B: drilling hole

Claims (2)

계단(A) 상면에 몸통부가 매립되고 몸통부 상부의 수나사부가 계단 상면으로부터 상방으로 연장 돌출되도록 설치된 앵커볼트(100);Anchor bolt 100 is installed so that the body portion is embedded in the upper surface of the stairs (A) and the male screw portion of the upper portion of the body portion protrudes upward from the upper surface of the stairs; 내면에 암나사부가 형성된 나사체결공(230)이 볼트머리부(210)와 수나사체결부(220)를 경유하여 관통하도록 제작된 볼트로써, 상기 볼트머리부가 계단 상면에 접하도록 앵커볼트의 수나사부가 나사체결공에 체결되는 난간용 볼트(200); 및The screw fastening hole 230 having a female thread formed on the inner surface of the bolt is manufactured to penetrate through the bolt head 210 and the male screw fastening portion 220, and the male thread portion of the anchor bolt is screwed so that the bolt head contacts the upper surface of the stairs. Handrail bolt 200 is fastened to the fastening hole; And 상기 수나사체결부(220)에 끼워지면서 나사체결된 난간지주(300);Handrail holder 300 is screwed while being fitted to the male screw fastening portion 220; 을 포함하는 안전난간 설치구조.Safety railing installation structure comprising a. 제 1항에 있어서, 상기 난간지주(300)과 수나사체결부(220)의 나사체결은 난간지주 하단부 내면에 형성시킨 암나사부와 수나사체결부가 서로 나사체결되도록 하거나, 난간지주 하단부 내면에 끼워진 슬리브(400) 내면의 암나사부와 수나사체결부가 서로 나사체결되도록 하여 이루어지도록 한 안전난간 설치구조.The screw fastening of the handrail holding portion 300 and the male screw fastening portion 220 is such that the female screw portion and the male screw fastening portion formed on the inner surface of the lower portion of the handrail holding portion are screwed together, or a sleeve fitted to the inner surface of the lower portion of the handrail holding ( 400) Safety railing installation structure that is made by screwing the internal female thread and male thread fastening part together.
KR2020080009931U 2008-07-25 2008-07-25 Safety Rail Installation Structure KR200454920Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020080009931U KR200454920Y1 (en) 2008-07-25 2008-07-25 Safety Rail Installation Structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020080009931U KR200454920Y1 (en) 2008-07-25 2008-07-25 Safety Rail Installation Structure

Publications (2)

Publication Number Publication Date
KR20100001200U true KR20100001200U (en) 2010-02-03
KR200454920Y1 KR200454920Y1 (en) 2011-08-04

Family

ID=44196782

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020080009931U KR200454920Y1 (en) 2008-07-25 2008-07-25 Safety Rail Installation Structure

Country Status (1)

Country Link
KR (1) KR200454920Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200480737Y1 (en) * 2015-08-13 2016-06-30 (주)아르디온 Height-adjustable structure of wooden beams

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101705451B1 (en) * 2015-06-18 2017-02-09 대우조선해양 주식회사 Handrail for submarine deck

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200239552Y1 (en) * 2001-04-12 2001-10-11 주재영 A facilities fixed post
JP4606251B2 (en) 2005-05-26 2011-01-05 矢崎化工株式会社 Post column stand

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200480737Y1 (en) * 2015-08-13 2016-06-30 (주)아르디온 Height-adjustable structure of wooden beams

Also Published As

Publication number Publication date
KR200454920Y1 (en) 2011-08-04

Similar Documents

Publication Publication Date Title
CN209308041U (en) A kind of soil nailing wall lever fixing apparatus
JP2007107374A (en) Wire rope anchor
KR200454920Y1 (en) Safety Rail Installation Structure
KR200440869Y1 (en) A post for handrails
KR200493538Y1 (en) Binding structure of stair railing
KR200433150Y1 (en) upholder for street lamppost
KR100905889B1 (en) Foundation structure for installing poles
KR100894338B1 (en) Connecting apparatus of street lamp prop having the prevention means of rotation
KR200408589Y1 (en) A substructure of post for fence
KR200317236Y1 (en) fixing device for handrail strut
KR20090007419U (en) Prop fixing apparatus for balustrade
KR101474736B1 (en) A roadlamp post fixing apparatus
KR200423892Y1 (en) Street lights with bolt untidy prevention
KR20160104536A (en) Lightning Rod For Thunderbolt Prevention
KR200372218Y1 (en) Street lamppost
CN211232793U (en) Fixing device of outdoor lamp
CN203906472U (en) Novel connecting structure for handrails of platform of derrick
KR200211926Y1 (en) Device for the balustrade setting
CN213572893U (en) Stair rail guard is used in floor construction
KR200375370Y1 (en) An anchor for construction
KR101083603B1 (en) upholder for street lamppost grounding stone made by concrete
CN103132695A (en) Finish-rolled deformed steel bar and nut combination used for cantilever creeping formwork construction and installation method
CN219864159U (en) Auxiliary installation structure for upright post of sunlight room
CN212716404U (en) Ladder stand device for overhead transmission line mountain area high outcrop foundation
KR100763406B1 (en) A post for fence

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee