KR20090120592A - Step bolt for steel poles and method for combining the same - Google Patents
Step bolt for steel poles and method for combining the same Download PDFInfo
- Publication number
- KR20090120592A KR20090120592A KR1020080046476A KR20080046476A KR20090120592A KR 20090120592 A KR20090120592 A KR 20090120592A KR 1020080046476 A KR1020080046476 A KR 1020080046476A KR 20080046476 A KR20080046476 A KR 20080046476A KR 20090120592 A KR20090120592 A KR 20090120592A
- Authority
- KR
- South Korea
- Prior art keywords
- steel pipe
- pipe pole
- step bolt
- pole
- coupled
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 119
- 239000010959 steel Substances 0.000 title claims abstract description 119
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000000926 separation method Methods 0.000 claims abstract description 21
- 230000002265 prevention Effects 0.000 claims abstract description 17
- 230000008878 coupling Effects 0.000 claims description 9
- 238000010168 coupling process Methods 0.000 claims description 9
- 238000005859 coupling reaction Methods 0.000 claims description 9
- 230000002093 peripheral effect Effects 0.000 claims description 2
- 230000000694 effects Effects 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 230000009194 climbing Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 208000019901 Anxiety disease Diseases 0.000 description 1
- 230000036506 anxiety Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B35/00—Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Description
본 발명은 본 발명은 작업자가 등주 및 주상 작업시에 발판으로써 사용하는 강관 전주용 스텝 볼트 및 이의 체결 방법에 관한 것이다. 보다 상세하게는 등주 및 주상 작업시에 발판으로써 충분한 지지력을 확보하는 것이 가능하여 작업자의 안전사고 발생을 최소화하며 체결을 위한 사전 작업시간 단축이 가능한 강관 전주용 스텝 볼트 및 이의 체결 방법에 관한 것이다.The present invention relates to a steel pipe pole step bolt and a fastening method thereof used by the worker as a scaffold in the column and column work. More specifically, the present invention relates to a steel pipe pole step bolt and a fastening method thereof capable of securing a sufficient supporting force as a scaffold in the column and column work, thereby minimizing the occurrence of safety accidents of the worker and shortening the pre-work time for fastening.
일반적으로 원거리에 위치한 지역에 대한 전력 공급 및 통신을 위하여 선로가 구축되며, 상기 선로는 지하에 매설하거나 지면으로부터 소정높이가 유지되도록 하는 방식으로 구축이 이루어진다.In general, a track is constructed for power supply and communication to a remotely located area, and the track is constructed in such a way that it is buried underground or maintained at a predetermined height from the ground.
상기 선로를 지상에서 연결할 경우에는 상기 선로를 지지하도록 지상에 소정의 간격으로 복수 개의 전주들을 설치하고 상기 전주의 상측에 선로를 결합하여 상기 전주가 선로를 지지하도록 한다.When the track is connected on the ground, a plurality of poles are installed on the ground at predetermined intervals so as to support the track, and the rail is coupled to the upper side of the pole to support the track.
상기와 같은 역할을 하는 전주의 종류로는 목재 전주, 철근 콘크리트 전주, 및 강관 전주 등이 있으며, 최근에는 무게가 가벼워 운반과 작업이 간편하며 해체 후 보관이 용이한 조립식 강관 전주의 사용이 점차 증가되고 있는 추세이다.Types of poles that play such roles include wooden poles, reinforced concrete poles, and steel pipe poles. Recently, the use of prefabricated steel pipe poles that are light in weight, easy to transport and work, and easy to store after dismantling has gradually increased. It is becoming a trend.
일반적으로 전주에는 선로의 고장 수리와 같은 전주 상에서의 작업시에 작업자가 발을 딛고 강관 전주의 상측에서 작업할 수 있는 발판을 설치하기 위한 홀이 형성되어 있으며 상기 작업시에 전주 상에서 발판으로써 사용하는 것을 스텝 볼트라고 한다.In general, the pole is provided with a hole for installing a scaffold for the operator to step on the pole and work on the upper side of the steel pipe pole when working on the pole, such as repair of track troubles, This is called a step bolt.
종래에는 전주 설치시에 전주 표면에 대하여 내측으로 홀을 형성한 후 상기 홀에 스텝 너트를 매입한 후 선로의 고장 수리와 같은 전주 상에서의 작업시에 작업을 수행하기 위하여 작업자는 전주에 형성되어 있는 각 스텝 너트마다 스텝 볼트를 결합한 후 상기 스텝 볼트를 발판으로써 사용하여 작업을 수행하였다.Conventionally, the operator is formed on the pole in order to perform the work on the pole, such as the repair of the trouble of the track after inserting the step nut into the hole after forming the hole inward with respect to the pole surface when installing the pole After the step bolts were coupled to each step nut, the operation was performed using the step bolts as scaffolding.
그러나 상기와 같은 방식은 스텝 볼트와 결합되는 스텝 너트의 지지력이 부족하여 상기 스텝 볼트가 작업자의 하중을 견디지 못하거나 또는 작업자의 설치 미숙으로 스텝 볼트가 스텝 너트에 제대로 결합되지 않을 경우에는 스텝 볼트가 스텝 너트로부터 이탈하여 등주 및 주상 작업중인 작업자의 추락사고 등의 안전사고가 발생할 확률이 높다는 문제점이 있었다.However, in the above-described method, if the step bolt does not bear the load of the worker because of insufficient support force of the step nut coupled with the step bolt or the step bolt is not properly coupled to the step nut due to the immature installation of the worker, the step bolt is There was a problem that the safety accidents such as fall accidents of the worker in the column climbing and column work is likely to occur from the step nut.
또한, 전주에 형성되어 있는 각각의 스텝 너트에 개별적으로 스텝 볼트를 체결한 후 고정하는 작업을 반복 수행해야 하므로 등주 및 주상 작업전에 스텝 볼트의 설치를 위한 사전 작업시간이 많이 소요되는 문제점이 있었다.In addition, since the step of fastening the step bolt individually to each step nut formed on the pole and then must be repeated to fix the work, there is a problem that takes a lot of pre-work time for the installation of the step bolt before the column and column.
본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서 등주 및 주상 작업시에 작업자에게 발생가능한 안전 사고를 최소화할 수 있으며 스텝 볼트 설치를 위해 소요되는 사전 작업시간을 단축하는 것이 가능한 강관 전주용 스텝 볼트 및 이의 체결 방법을 제공하는 것을 목적으로 한다.The present invention has been made in order to solve the above problems can minimize the safety accidents that can occur to operators during the column and column work, and the steel pipe pole step that can shorten the pre-work time required for step bolt installation An object of the present invention is to provide a bolt and a fastening method thereof.
상기 목적을 달성하기 위한 본 발명에 따른 강관 전주용 스텝 볼트는 강관 전주용 스텝 볼트에 있어서, 강관 전주 양측에 형성된 홀을 관통하여 상기 강관 전주와 결합되며 양단이 상기 강관 전주의 외주면에 대하여 돌출되는 몸체부; 상기 몸체부의 일단에 결합되며 상기 몸체부의 외주면에 대하여 돌출 형성되어 사용자의 발이 상기 몸체부로부터 이탈하는 것을 방지하는 제1 이탈 방지부; 상기 제1 이탈 방지부로부터 소정의 간격만큼 이격되어 결합되며 상기 몸체부가 소정 길이 이상 상기 강관 전주 측으로 삽입되는 것을 방지하는 고정부; 상기 몸체부의 타단에 결합되며 상기 몸체부의 외주면에 대하여 돌출 형성되어 상기 사용자의 발이 상기 몸체부로부터 이탈하는 것을 방지하는 제2 이탈 방지부; 및 상기 제2 이탈 방지부로부터 소정의 간격만큼 이격되어 결합되며 상기 강관 전주의 폭에 따라 상기 몸체부를 상기 강관 전주의 외주면에 고정하는 조절부를 포함하는 것을 특징으로 한다.Steel pipe pole step bolt according to the present invention for achieving the above object is a step bolt for steel pipe pole, through the holes formed on both sides of the steel pipe pole coupled with the steel pipe pole and both ends protrude with respect to the outer peripheral surface of the steel pipe pole Body portion; A first departure preventing part coupled to one end of the body part and protruding from an outer circumferential surface of the body part to prevent the user's foot from leaving the body part; A fixing part which is coupled to be spaced apart from the first separation preventing part by a predetermined interval and prevents the body part from being inserted into the steel pipe pole side more than a predetermined length; A second departure preventing part coupled to the other end of the body part and protruding from the outer circumferential surface of the body part to prevent the user's foot from leaving the body part; And an adjusting part configured to be spaced apart from the second separation preventing part by a predetermined interval and to fix the body part to the outer circumferential surface of the steel pipe pole according to the width of the steel pipe pole.
또한, 본 발명에 따른 강관 전주용 스텝 볼트의 체결 방법은 강관 전주용 스텝 볼트의 체결 방법에 있어서, 상기 강관 전주용 스텝 볼트는 타단으로부터 일단 측으로 소정 길이를 가지는 나사산이 형성되는 몸체부, 상기 몸체부의 일단에 결합되며 상기 몸체부의 외주면에 대하여 돌출 형성되어 사용자의 발이 상기 몸체부로부터 이탈하는 것을 방지하는 제1 이탈 방지부, 및 상기 제1 이탈 방지부로부터 소정의 간격만큼 이격되어 결합되며 상기 몸체부가 소정 길이 이상 강관 전주 측으로 삽입되는 것을 방지하는 고정부를 포함하며, 상기 강관 전주용 스텝 볼트의 체결 방법은, 상기 몸체부의 타단을 상기 강관 전주 일측에 형성된 홀에 끼운 후 상기 제1 이탈 방지부를 상기 강관 전주 측으로 가압하여 상기 고정부를 상기 강관 전주 일측에 접촉시키며 상기 몸체부의 타단이 상기 강관 전주 타측에 형성된 홀의 외측으로 돌출되도록 결합하는 단계; 상기 몸체부의 타단에 조절부를 결합한 후 상기 조절부를 상기 나사산을 따라 상기 강관 전주의 폭에 맞게 조여 상기 강관 전주 타측에 형성되어 있는 홀에 고정하는 단계; 및 제2 이탈 방지부를 상기 몸체부의 타단에 결합하는 단계를 포함하는 것을 특징으로 한다.In addition, the fastening method of the steel pipe pole step bolt according to the present invention is a fastening method of the steel pipe pole step bolt, the steel pipe pole step bolt is a body portion is formed with a thread having a predetermined length from one end to the other end, the body A first separation prevention part coupled to one end of the part and protruding from an outer circumferential surface of the body part to prevent the user's foot from moving away from the body part, and spaced apart from the first departure prevention part by a predetermined interval and coupled to the body It includes a fixed portion for preventing the insertion is inserted into the steel pipe pole side more than a predetermined length, the fastening method of the steel pipe pole step bolt, the first separation preventing part after inserting the other end of the body portion in the hole formed on one side of the steel pipe pole. Pressing to the steel pipe pole side to contact the fixing portion to the steel pipe pole side Coupling so as to project outside the hole formed in the body of the other end group is the steel pipe pole the other side; Coupling the adjusting part to the other end of the body part and tightening the adjusting part to the width of the steel pipe pole along the screw thread to fix the hole formed at the other side of the steel pipe pole; And coupling a second departure preventing part to the other end of the body part.
본 발명에 의하면 강관 전주에 체결되는 스텝 볼트의 충분한 지지력이 획보되어 등주 및 전주 작업시에 작업자의 추락사고 등의 안전사고를 예방할 수 있는 효과를 가진다.According to the present invention has a sufficient support force of the step bolt fastened to the steel pipe pole has the effect that can prevent the safety accidents such as the fall accident of the worker during the column and pole work.
또한, 강관 전주에 양측에 형성되어 있는 홀 각각에 스텝 볼트를 결합하는 대신 상기 강관 전주 양측에 형성되어 있는 홀을 관통하는 방식으로 스텝 볼트를 결합하므로 작업자가 등주 및 전주 작업 전에 스텝 볼트 체결을 위해 소비하게 되는 사전 작업 시간을 단축하는 것이 가능한 효과를 가진다.In addition, instead of coupling the step bolts to each of the holes formed on both sides of the steel pipe poles, the step bolts are coupled in such a manner as to penetrate the holes formed on both sides of the steel pipe poles. It is possible to shorten the pre-work time which is consumed.
또한, 몸체부에 형성된 나사산에 조절부를 끼운 후 상기 조절부를 조여 강관 전주용 스텝 볼트를 강관 전주에 최종적으로 체결하므로 상기 강관 전주의 폭에 따라 상기 조절부를 조절하여 사용하는 것이 가능하여 범용성이 높은 효과를 가진다.In addition, after inserting the adjusting portion to the screw thread formed in the body portion, tightening the adjusting portion finally tightens the steel pipe pole step bolt to the steel pipe pole, so that it is possible to adjust and use the control portion according to the width of the steel pipe pole, high versatility effect Has
이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세하게 설명한다. 우선, 각 도면의 구성 요소들에 참조 부호를 부가함에 있어서, 동일한 구성 요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명을 설명함에 있어서, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다. 또한, 이하에서 본 발명의 바람직한 실시예를 설명할 것이나, 본 발명의 기술적 사상은 이에 한정하거나 제한되지 않고 당업자에 의해 실시될 수 있음은 물론이다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. First, in adding reference numerals to the components of each drawing, it should be noted that the same reference numerals are assigned to the same components as much as possible even if displayed on different drawings. In addition, in describing the present invention, when it is determined that the detailed description of the related well-known configuration or function may obscure the gist of the present invention, the detailed description thereof will be omitted. In addition, preferred embodiments of the present invention will be described below, but the technical idea of the present invention may be implemented by those skilled in the art without being limited or limited thereto.
도 1은 본 발명의 바람직한 실시예에 따른 강관 전주용 스텝 볼트의 사시도, 도 2는 본 발명의 바람직한 실시예에 따른 강관 전주용 스텝 볼트의 분해 사시도 이다.1 is a perspective view of a steel pipe pole step bolt according to a preferred embodiment of the present invention, Figure 2 is an exploded perspective view of a steel pipe pole step bolt according to a preferred embodiment of the present invention.
도 1에 도시된 바와 같이 본 발명의 바람직한 실시예에 다른 강관 전주용 스텝 볼트(1)는 몸체부(10), 제1 이탈 방지부(15), 고정부(20), 제2 이탈 방지부(30), 및 조절부(35)를 포함한다.As shown in FIG. 1, the steel pipe
몸체부(10)는 강관 전주 양측에 형성된 홀을 관통하여 상기 강관 전주와 결합되며 양단이 상기 강관 전주의 외주면에 대하여 돌출되어 강관 전주용 스텝 볼 트(1)가 상기 강관 전주에 결합된 후 작업자의 등주 및 전주 작업시에 상기 작업자가 발을 지지한다.The
제1 이탈 방지부(15)는 몸체부(10)의 일단에 결합되며, 몸체부(10)의 외주면에 대하여 돌출 형성되어 작업자가 강관 전주 상에서 몸체부(10)에 발을 지지한 상태에서 등주 및 주상 작업시에 상기 작업자의 발이 몸체부(10)의 외부로 이탈하는 것을 방지한다.The first
고정부(20)는 제1 이탈 방지부(15)로부터 소정의 간격만큼 이격되어 결합되며, 강관 전주용 스텝 볼트(1)와 강관 전주와의 결합시에 몸체부(15)가 소정 길이 이상 상기 강관 전주의 내측으로 삽입되지 않도록 고정한다.The
이때, 제1 이탈 방지부(15)와 고정부(20) 사이에는 강관 전주용 스텝 볼트(1)를 발판으로 하여 강관 전주 상에서 작업을 수행하는 작업자의 발이 미끄러지지 않도록 외주면을 감싸는 형태의 미끄럼 방지 부재(25)가 결합되는 것이 바람직하다.At this time, the non-slip member that surrounds the outer circumferential surface of the operator to perform the work on the steel pipe pole with the step bolt (1) for steel pipe pole between the first
또한, 도시되지는 않았으나 제1 이탈 방지부(15)와 고정부(20) 사이에 복수 개의 미끄럼 방지 돌기가 돌출 형성되는 것이 바람직하다.In addition, although not shown, it is preferable that a plurality of anti-slip protrusions protrude between the first
또한, 제1 이탈 방지부(15)와 고정부(20)는 몸체부(10)에 대하여 고정 결합되는 것이 바람직하다.In addition, the first
제2 이탈 방지부(30)는 몸체부(10)의 타단에 결합되며, 몸체부(10)의 외주면에 대하여 돌출 형성되어 작업자가 강관 전주 상에서 몸체부(10)에 발을 지지한 상태에서 등주 및 주상 작업시에 상기 작업자의 발이 몸체부(10)의 외부로 이탈하는 것을 방지한다.The second
조절부(35)는 제2 이탈 방지부(30)로부터 소정의 간격만큼 이격되어 결합되며, 강관 전주용 스텝 볼트(1)와 강관 전주와의 결합시에 조절부(35)를 조여 상기 강관 전주에 밀착시켜 몸체부(10)를 상기 강관 전주에 최종 고정한다.The adjusting
이때, 몸체부(10)의 타단으로부터 일단 측으로 소정 길이의 나사산(40)이 형성되는 것이 바람직하며, 도 2에 도시된 바와 같이 조절부(35)는 나사산(40)을 따라 몸체부(10)에 대한 결합 및 분리가 이루어지는 것이 바람직하다.At this time, it is preferable that a
따라서 본 발명의 강관 전주용 스텝 볼트(1)는 결합되는 강관 전주의 폭에 따라 조절부(35)를 조절하여 사용하는 것이 가능하므로 여러 종류의 강관 전주에 범용적으로 사용되는 것이 가능하다.Therefore, the steel pipe pole step bolt (1) of the present invention can be used by adjusting the
도 3a와 도 3b는 본 발명의 바람직한 실시예에 따른 강관 전주용 스텝 볼트를 강관 전주에 결합시킨 상태에 대한 참고도이다.3A and 3B are reference diagrams for a state in which a steel pipe pole step bolt is coupled to a steel pipe pole according to a preferred embodiment of the present invention.
도 3a와 도 3b에 도시된 바와 같이 본 발명의 바람직한 실시예에 따른 강관 전주용 스텝 볼트(1)를 강관 전주(P)에 결합시키는 방법은 다음과 같다.As shown in Figure 3a and Figure 3b is a method for coupling the steel pipe pole step bolt (1) in accordance with the preferred embodiment of the present invention to the steel pipe pole (P) as follows.
먼저, 강관 전주(P)의 일측에 형성되어 있는 홀에 강관 전주용 스텝 볼트(1)의 타단을 끼운 후 제1 이탈 방지부(15)를 강관 전주(P)의 내측으로 가압하여 강관 전주용 스텝 볼트(1)의 타단이 강관 전주(P)의 타측에 형성되어 있는 홀을 관통하여 강관 전주(P)의 외측으로 돌출되도록 한다.First, insert the other end of the steel pipe pole step bolt (1) in the hole formed on one side of the steel pipe pole (P), and then press the first
다음으로, 조절부(35)를 몸체부(10)의 타단에 끼운후 상기 타단으로 부터 상기 일단 측으로 소정 길이가 형성되어 있는 나사산(40)을 따라 조절부(35)를 조여 강관 전주(P)의 타측에 형성되어 있는 홀에 조절부(35)를 밀착시킨 후 조절부(35)를 조여 몸체부(1)를 강관 전주(P)에 최종 고정시킨다.Next, the adjusting
마지막으로, 제2 머리부(30)를 몸체부(10)의 타단에 결합시키면 강관 전주용 스텝 볼트(1)와 강관 전주(P)간의 결합이 완료된다.Finally, when the
이와 같이 본 발명의 강관 전주용 스텝 볼트(1)는 강관 전주(P) 양측에 형성되어 있는 홀을 관통하는 방식으로 결합이 이루어져 몸체부(10)의 일단 및 타단이 강관 전주(P)에 대하여 외측으로 돌출되므로 종래와 달리 강관 전주(P)와의 결합시에 충분한 지지력이 확보된다.Thus, the steel pipe pole step bolt (1) of the present invention is coupled in a manner that penetrates through the holes formed on both sides of the steel pipe pole (P) one end and the other end of the
따라서 종래의 강관 전주용 스텝 볼트가 지지력 부족이나 체결상의 실수로 강관 전주로부터 이탈하여 등주 및 주상 작업시에 작업자에게 발생가능한 추락사고 등의 안전사고를 예방할 수 있으므로 작업중인 작업자의 불안감을 해소할 수 있는 효과를 가진다.Therefore, the conventional steel pipe pole step bolt can be removed from the steel pipe pole due to lack of supporting force or a mistake in the fastening to prevent safety accidents such as falling accidents that can occur to the worker during the column and column work, thereby relieving the anxiety of the working worker. Has the effect.
또한, 몸체부(10)의 일단과 타단에 몸체부(10)의 외주면에 대하여 돌출된 형태의 제1 이탈 방지부(15)와 제2 이탈 방지부(30)가 결합되어 강관 전주 상에서 작업을 수행하는 작업자의 발이 몸체부(10)의 외부로 이탈하는 것을 방지하며, 제1 이탈 방지부(15)와 고정부(20) 사이에는 몸체부(10)의 외주면을 감싸는 형태의 미끄럼 방지 부재(25)가 결합되거나 또는 복수 개의 미끄럼 방지 돌기가 돌출 형성되며, 제2 이탈 방지부(30)와 조절부(35)사이에는 나사산(40)이 형성되어 강관 전주 상에서 작업을 수행하는 작업자의 발이 몸체부(10)에서 미끄러지는 것을 방지할 수 있다.In addition, the first
또한, 종래에 강관 전주의 일측과 타측에 각각 형성되어 있는 홀에 개별적으로 스텝 볼트를 체결하던 것과 달리 본 발명의 강관 전주용 스텝 볼트(1)는 강관 전주(P)를 관통하는 방식으로 결합이 이루어지므로 등주 및 전주 작업전에 스텝 볼트 체결을 위해 소비하는 사전 작업 시간을 단축하는 것이 가능한 효과를 가진다.In addition, unlike conventionally fastening step bolts individually to the holes formed on one side and the other side of the steel pipe pole respectively, the steel pipe pole step bolt (1) of the present invention is coupled in a manner that penetrates the steel pipe pole (P) Since it is made, it is possible to shorten the pre-work time consumed for tightening the step bolt before the column and pole work.
또한, 몸체부(10)에 형성된 나사산(40)에 조절부(35)를 끼운 후 조절부(35)를 조여 강관 전주용 스텝 볼트(1)를 강관 전주(P)에 최종적으로 체결하므로 다양한 폭을 가진 강관 전주에서도 범용적으로 활용할 수 있는 효과를 가진다.In addition, after inserting the adjusting
이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위 내에서 다양한 수정, 변경 및 치환이 가능할 것이다. 따라서 본 발명에 개시된 실시예 및 첨부된 도면들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예 및 첨부된 도면에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구 범위에 의해서 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리 범위에 포함되는 것으로 해석되어야 할 것이다.The above description is merely illustrative of the technical idea of the present invention, and various modifications, changes, and substitutions may be made by those skilled in the art without departing from the essential characteristics of the present invention. will be. Accordingly, the embodiments disclosed in the present invention and the accompanying drawings are not intended to limit the technical spirit of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by the embodiments and the accompanying drawings. The protection scope of the present invention should be interpreted by the following claims, and all technical ideas within the scope equivalent thereto should be construed as being included in the scope of the present invention.
본 발명에 의하면 지지력이 충분하여 강관 전주 상에서의 전주 및 주상 작업시 작업자에게 발생가능한 추락사고 등의 안전사고를 예방할 수 있으며 작업 전 스텝 볼트 결합을 위한 사전 작업 시간을 단축하는 것이 가능하여 종래의 강관 전주용 스텝 볼트를 대체하여 사용하는 것이 가능하다.According to the present invention, the bearing capacity is sufficient to prevent safety accidents such as falling accidents that may occur to workers during pole and column work on steel pipe poles, and it is possible to shorten the pre-work time for step bolt coupling before the operation of conventional steel pipes. It is possible to replace the pole stepping bolt.
도 1은 본 발명의 바람직한 실시예에 따른 강관 전주용 스텝 볼트의 사시도,1 is a perspective view of a step bolt for steel pipe pole according to an embodiment of the present invention,
도 2는 본 발명의 바람직한 실시예에 따른 강관 전주용 스텝 볼트의 분해 사시도, 및2 is an exploded perspective view of a step bolt for steel pipe pole according to an embodiment of the present invention, and
도 3a 내지 도 3b는 본 발명의 바람직한 실시예에 따른 강관 전주용 스텝 볼트를 강관 전주에 결합한 상태에 대한 참고도이다.3A to 3B are reference diagrams for a state in which a steel pipe pole step bolt is coupled to a steel pipe pole according to a preferred embodiment of the present invention.
<도면의 주요 부위에 대한 간단한 설명><Brief description of the main parts of the drawings>
(1) : 강관 전주용 스텝 볼트 (10) : 몸체부(1): Step bolt for steel pipe pole (10): Body part
(15) : 제1 이탈 방지부 (20) : 고정부15: first departure preventing portion 20: fixed portion
(25) : 미끄럼 방지 부재 (30) : 제2 이탈 방지부25: non-slip member 30: second departure preventing portion
(35) : 조절부 (40) : 나사산(35): adjuster 40: thread
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080046476A KR20090120592A (en) | 2008-05-20 | 2008-05-20 | Step bolt for steel poles and method for combining the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080046476A KR20090120592A (en) | 2008-05-20 | 2008-05-20 | Step bolt for steel poles and method for combining the same |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20090120592A true KR20090120592A (en) | 2009-11-25 |
Family
ID=41603809
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080046476A KR20090120592A (en) | 2008-05-20 | 2008-05-20 | Step bolt for steel poles and method for combining the same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20090120592A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101883879B1 (en) | 2017-09-27 | 2018-07-31 | 대진볼트공업(주) | Step bolt for telegraph pole and method for manufacturing step bolt |
KR102555975B1 (en) | 2022-11-04 | 2023-07-14 | 주식회사 천운건설 | Footboard device for transmission and distribution electric pole work |
KR102555974B1 (en) | 2022-11-04 | 2023-07-14 | 주식회사 다일테크 | Safety footboard device for transmission and distribution electric pole |
-
2008
- 2008-05-20 KR KR1020080046476A patent/KR20090120592A/en not_active Application Discontinuation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101883879B1 (en) | 2017-09-27 | 2018-07-31 | 대진볼트공업(주) | Step bolt for telegraph pole and method for manufacturing step bolt |
KR102555975B1 (en) | 2022-11-04 | 2023-07-14 | 주식회사 천운건설 | Footboard device for transmission and distribution electric pole work |
KR102555974B1 (en) | 2022-11-04 | 2023-07-14 | 주식회사 다일테크 | Safety footboard device for transmission and distribution electric pole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200475119Y1 (en) | System scaffold | |
US20210238872A1 (en) | Temporary safety railing system and method | |
KR100911770B1 (en) | Support for a structure | |
JP2010185185A (en) | Temporary handrail and its construction method | |
KR20090120592A (en) | Step bolt for steel poles and method for combining the same | |
CA2638490C (en) | Scaffolding safety device | |
JP3181041U (en) | Mounting member for scaffolding for bridge | |
KR100862700B1 (en) | Safety footboard for electric pole | |
KR101101941B1 (en) | Apparatus for prevent fall and for maintening for fulling level of gang form | |
KR101266282B1 (en) | Construction and dismantle method of scaffolding device for heat power plant | |
KR101607665B1 (en) | Gang form fixture | |
KR20080110373A (en) | A jack base | |
KR20140022678A (en) | Scaffold apparatus | |
KR100980637B1 (en) | Device for both spacer and bearing plate, and retaining wall construction method thereof | |
KR20130129151A (en) | Clamp of system support for construction | |
KR20140068458A (en) | Hanger type compass bracket assembly | |
JP4864135B2 (en) | Holding body installation structure and support | |
KR20170109973A (en) | Lower cage of gang form with supporting tool | |
KR20180103232A (en) | The fixing device of handrail for Gang-form | |
KR20210078119A (en) | Supporter for installating horizontal member of supporting system | |
KR20070119843A (en) | Apparatus for preventing a crashing of gang-form | |
CN219548451U (en) | Building construction protector | |
KR102681059B1 (en) | Hook Type Fastener and Installation Method | |
KR20140100082A (en) | A walk plate | |
KR101548884B1 (en) | Apparatus for preventing loose of connecting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WITN | Withdrawal due to no request for examination |