KR20090083615A - H beam and constructing method using the h beam - Google Patents

H beam and constructing method using the h beam Download PDF

Info

Publication number
KR20090083615A
KR20090083615A KR1020080009523A KR20080009523A KR20090083615A KR 20090083615 A KR20090083615 A KR 20090083615A KR 1020080009523 A KR1020080009523 A KR 1020080009523A KR 20080009523 A KR20080009523 A KR 20080009523A KR 20090083615 A KR20090083615 A KR 20090083615A
Authority
KR
South Korea
Prior art keywords
concrete
web
reinforcing bar
lower flange
reinforcing
Prior art date
Application number
KR1020080009523A
Other languages
Korean (ko)
Other versions
KR100991046B1 (en
Inventor
송정환
Original Assignee
송정환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 송정환 filed Critical 송정환
Priority to KR1020080009523A priority Critical patent/KR100991046B1/en
Publication of KR20090083615A publication Critical patent/KR20090083615A/en
Application granted granted Critical
Publication of KR100991046B1 publication Critical patent/KR100991046B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/08Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0404Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
    • E04C2003/0443Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
    • E04C2003/0452H- or I-shaped

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

An H-beam and a construction method of a frame constructed building using the same are provided to support a steel reinforcement by forming a concrete supporting hole at a web. An H-beam comprises a top and a bottom flange(110,120) and a web(130). The top and the bottom flange are formed with the specific width. The concrete injection hole(122) is formed on the surface of the bottom flange. The web is perpendicularly and integrally formed between the top and bottom flange. A steel reinforcement supporting hole(132) is formed at the surface of the web. The steel reinforcement passes through the steel reinforcement support hole.

Description

에이치빔 및 그 에이치빔을 이용한 철골구조 건축물의 시공방법 { H beam and constructing method using the H beam }H beam and construction method of steel structure structure using H beam {H beam and constructing method using the H beam}

본 발명은 에이치빔 및 그 에이치빔을 이용한 철골구조 건축물의 시공방법에 관한 것으로서, 보다 상세하게는 건축물의 구조체를 형성하되 콘크리트를 이용하여 벽체나 슬라브를 형성시 콘크리트와 일체로 결합되어 견고한 건축물을 시공할 수 있는 에이치빔 및 그 에이치빔을 이용한 철골구조 건축물의 시공방법에 관한 것이다.The present invention relates to a H beam and a method of constructing a steel structure structure using the H beam, and more particularly, to form a structure of the building, when the wall or slab is formed using concrete to be integrally combined with the concrete to provide a solid building It relates to a H beam that can be constructed and a construction method of a steel structure structure using the H beam.

일반적으로 철골구조 건축물은 에이치빔을 수직방향 또는 가로방향으로 설치하여 기둥과 보 등의 건물의 기본적인 구조체를 완성한 후에 바닥 또는 벽체 등의 후속 공사를 진행하게 된다.In general, the steel structure building is to install the H-beam in the vertical or horizontal direction to complete the basic structure of the building, such as columns and beams, and then proceed with the subsequent construction of the floor or wall.

이와 같은 철골구조 건축물의 시공시에 사용되는 에이치빔(H beam)은 도 1에 도시한 바와 같이 상부 플랜지(2)와 하부 플랜지(3)의 사이에 수직으로 웨브(4)가 일체로 형성된다.As shown in FIG. 1, the H beam used in the construction of the steel structure structure has a web 4 integrally formed vertically between the upper flange 2 and the lower flange 3. .

특히. 상기 에이치빔(1)을 이용한 철골구조 건축물은 도 2에 도시한 바와 같이 건축물의 바닥 슬라브(5)를 콘크리트로 타설하고 일정기간 양생시킨 후 다수의 에이치빔(1)을 이용하여 구조체를 형성한 후 거푸집을 대고 콘크리트를 타설한 후 양생하면서 벽체(6)와 천장슬라브(7)를 차례대로 반복하여 고층(高層)의 건축물을 시공하게 된다.Especially. As shown in FIG. 2, the steel structure structure using the H beam 1 is formed by placing a floor slab 5 of the concrete into concrete and curing for a predetermined period of time to form a structure using a plurality of H beams 1. After placing the formwork and placing concrete, curing and repetition of the wall (6) and ceiling slab (7) in order to construct a high-rise building.

그런데, 이와 같은 벽체(6)를 형성하기 위해서는 에이치빔을 이용하여 구조체를 형성하고, 수평 방향으로 설치되는 에이치빔(1)의 하부에 바닥면으로 부터 수직방향으로 거푸집(8,8')을 설치하게 되는데, 콘크리트를 투입하기 위한 투입구가 별도로 존재하지 않아 상기 수직방향 거푸집(8,8')을 에이치빔(1)의 하부 플랜지(3)의 하부에 공간(G)을 형성하도록 고정하고 그 공간(G)을 통해 콘크리트를 투입하게 된다.However, in order to form such a wall 6, a structure is formed by using H beams, and formwork 8, 8 'is formed in the vertical direction from the bottom surface to the lower part of H beams 1 installed in the horizontal direction. Since there is no inlet for injecting concrete, the vertical formwork (8,8 ') is fixed to form a space (G) under the lower flange (3) of the H-beam (1) Concrete is introduced through the space (G).

그리고 양생과정을 거쳐 수직방향 거푸집(8,8')을 탈거시켜 벽체(6)를 완성하게 된다.After the curing process, the vertical formwork (8,8 ') is removed to complete the wall (6).

따라서, 상기 과정을 거쳐 벽체(6)를 양생하게 되면 에이치빔(1)의 하부 플랜지(3)와 벽체(6)의 상단 사이에 일정한 공간(G)이 형성되어 별도의 벽돌(9) 등을 괴어 그 공간(G)을 메우게 된다.Accordingly, when curing the wall 6 through the above process, a predetermined space G is formed between the lower flange 3 of the H beam 1 and the upper end of the wall 6 to form a separate brick 9 or the like. It fills the space G.

따라서, 공간(G)에 의해 벽체의 측면에서 가해지는 측면강도에 취약하며, 거푸집(8,8') 사이의 콘크리트 투입을 위한 공간을 확보하기 위해 거푸집(8,8')을 설치하는 경우 그 설치 과정이 쉽지 않은 문제점을 가지고 있으며, 공간(G)을 메우기 위해 벽돌 등을 괴어 마무리작업을 함에 따라 부실시공의 우려가 있었다.Therefore, it is vulnerable to the lateral strength applied from the side of the wall by the space G, and when the form (8,8 ') is installed to secure a space for the concrete input between the form (8,8') There is a problem that the installation process is not easy, and there was a fear of secondary construction as the finishing work by grating bricks to fill the space (G).

그리고, 상기 벽체(6)를 형성한 후 천장슬라브(7)를 시공하는 경우에는 수평방향 거푸집(10)을 고정하고 그 거푸집의 상부에는 그 단면이 "

Figure 112008500558375-PAT00008
" 형상인 데크플레이트(11)를 설치하고 상기 거푸집(10)의 하부에 다수의 수평지지대(12)와 수직지지대(13)를 촘촘히 교차 지지해 줌으로서 거푸집(10)의 처짐을 방지하는 구성을 취하고는 있으나, 상기 데크플레이트(11)가 거푸집(10)의 상부에 걸쳐진 상태이며 또한 그 데크플레이트(11)의 테두리를 에이치빔(1)에 고정하는 것이 쉽지 않은 단점이 있었다.And, when the ceiling slab 7 is constructed after the wall 6 is formed, the horizontal formwork 10 is fixed and the cross section is formed on the upper portion of the formwork.
Figure 112008500558375-PAT00008
"To install the deck plate 11 of the shape and to support the plurality of horizontal support 12 and the vertical support 13 closely to the lower portion of the formwork 10 to prevent the configuration of sagging of the formwork 10 Although taking, the deck plate 11 is in the state spanning the upper portion of the formwork 10 and also has a disadvantage that it is not easy to fix the edge of the deck plate 11 to the H beam (1).

물론, 이와 같은 종래의 에이치빔의 문제점을 해소하기 위하여 본출원인은 특허출원 제2007-0024376호를 출원한 바 있다.Of course, the present applicant has filed a patent application No. 2007-0024376 in order to solve such problems of the conventional H-beam.

그런데 상기 특허출원은 종래의 에이치빔의 문제점을 일정부분 해소한 장점을 가지는데 반해 그 구조가 매우 복잡하고, 제조 단가가 높은 단점을 가지고 있다.By the way, the patent application has the advantage of solving some of the problems of the conventional H-beam, while the structure is very complicated, and has a disadvantage of high manufacturing cost.

따라서, 이러한 문제점들을 해결하기 위하여 안출된 것으로서, 본 발명의 목적은 철골구조 건축물을 시공시에 사용되어 콘크리트 벽체 등을 용이하고 견고하게 형성할 수 있도록 함과 동시에 구조가 단순하고 제조 단가를 낮출 수 있는 에이치빔을 제공하는데 있다.Therefore, to solve these problems, the object of the present invention is to be used in the construction of steel structure buildings to facilitate the formation of concrete walls, etc. easily and at the same time simple structure and lower the manufacturing cost It is to provide H. beam.

본 발명의 다른 목적은 개선된 에이치빔을 이용하여 철골구조 건축물을 시공하되 콘크리트 벽체와 슬라브의 연결부위가 일체로 결합되어 견고한 건축물을 시공할 수 있는 철골구조 건축물의 시공방법을 제공하는데 있다.Another object of the present invention is to provide a method of constructing a steel structure structure using the H-beam improved construction of the steel structure structure can be combined with the connection of the concrete wall and the slab integrally to construct a solid structure.

이와 같은 목적을 달성하기 위해 본 발명은;The present invention to achieve this object;

일정폭을 가지는 상부 플랜지와 하부 플랜지의 사이에 수직으로 웨브가 일체로 형성되는 에이치빔에 있어서, 상기 하부 플랜지의 표면에는 건축물의 시공시 콘크리트 투입이 가능한 콘크리트 투입공이 형성되고, 상기 웨브의 표면에는 철근이 관통지지되는 철근 지지공이 형성되는 것을 특징으로 하는 에이치빔을 제공한다.In an H-beam in which a web is vertically integrally formed between an upper flange and a lower flange having a predetermined width, a concrete inlet is formed on the surface of the lower flange to allow concrete input during construction of a building, and on the surface of the web. It provides an H beam, characterized in that the reinforcing bar is formed through the reinforcing bar is supported.

또한, 본 발명은; 일정폭을 가지는 상부 플랜지와 하부 플랜지의 사이에 수직으로 웨브가 일체로 형성되되 상기 하부 플랜지의 표면에는 다수의 콘크리트 투입공이 형성되고, 상기 웨브의 표면에는 건축물의 시공시 설치되는 철근의 단부가 관통 지지되는 철근 지지공이 형성되는 에이치빔에 있어서,In addition, the present invention; A web is integrally formed vertically between the upper flange and the lower flange having a predetermined width, and a plurality of concrete input holes are formed on the surface of the lower flange, and the end of the reinforcing bar which is installed during construction of the web passes through the surface of the web. In the H-beam in which the reinforcing bar supporting hole is formed,

다수의 에이치빔을 수직방향 및 수평방향으로 설치고정하여 구조체를 형성하는 단계와; 상기 구조체를 형성한 후 수평으로 설치되는 상기 에이치빔의 하부 플랜지 양단부에 수직거푸집을 밀착시켜 내부에 벽체를 성형할 수 있는 공간을 확보한 상태로 고정시키고 상기 에이치빔의 하부 플랜지에 형성된 콘크리트 투입공을 통해 콘크리트를 투입 및 양생시키고 상기 수직거푸집을 탈거시키는 단계와; 상기 에이치빔의 하부 플랜지 양단에 데크플레이트의 테두리부분을 밀착시킨 후 용접 고정하고, 수평 거푸집을 그 하부에 설치하는 단계와; 상기 데크플레이트의 상부에는 종횡방향으로 철근을 설치하되 그 철근의 단부를 웨브의 표면에 형성되는 철근 지지공에 관통 지지하고, 그 상부에 콘크리트를 투입 및 양생시키고 상기 수평 거푸집을 탈거시키는 단계;로 이루어지는 것을 특징으로 하는 에이치빔을 이용한 철골구조 건축물의 시공방법을 제공한다.Installing and fixing a plurality of H beams in a vertical direction and a horizontal direction to form a structure; After forming the structure, the vertical formwork is attached to both ends of the lower flange of the H-beam installed horizontally so as to secure a space for forming a wall therein, and the concrete input hole formed in the lower flange of the H-beam. Injecting and curing the concrete through and removing the vertical formwork; Contacting both edges of the deck plate to both ends of the lower flange of the H-beam and then welding and fixing the horizontal formwork; Installing reinforcing bars in the longitudinal and transverse directions on the upper part of the deck plate, supporting the end of the reinforcing bars through the reinforcing holes formed on the surface of the web, putting and curing concrete on the upper part, and removing the horizontal formwork; Provided is a construction method of a steel structure building using H-beam, characterized in that made.

그리고, 본 발명은;And, the present invention;

일정폭을 가지는 상부 플랜지와 하부 플랜지의 사이에 수직으로 웨브가 일체로 형성되되 상기 하부 플랜지의 표면에는 다수의 콘크리트 투입공이 형성되고, 상기 웨브의 표면에는 건축물의 시공시 설치되는 철근의 단부가 관통 지지되는 철근 지지공이 형성되는 에이치빔에 있어서,A web is integrally formed vertically between the upper flange and the lower flange having a predetermined width, and a plurality of concrete input holes are formed on the surface of the lower flange, and the end of the reinforcing bar which is installed during construction of the web passes through the surface of the web. In the H-beam in which the reinforcing bar supporting hole is formed,

다수의 에이치빔을 수직방향 및 수평방향으로 설치고정하여 구조체를 형성하는 단계와;Installing and fixing a plurality of H beams in a vertical direction and a horizontal direction to form a structure;

상기 구조체를 형성한 후 상기 에이치빔의 철근 지지공에 끼워지는 수평방향으로 철근을 관통 지지하고, 상기 에이치빔의 상부플랜지 및 하부 플랜지(120)에 형성된 콘크리트 투입공을 통해 수직방향으로 철근을 관통지지하는 단계와;After the structure is formed, the reinforcing bar is supported in the horizontal direction fitted to the reinforcing bar of the H-beam, and the reinforcing bar is vertically through the concrete inlet formed in the upper flange and the lower flange 120 of the H-beam. Supporting;

상기 철근을 설치한 후 에이치빔의 하부 플랜지의 양단부에 밀착되어 벽체 및 슬라브를 형성하기 위한 공간을 확보하기 위해 거푸집을 설치하는 단계와;Installing formwork to secure space for forming walls and slabs in close contact with both ends of the lower flange of the H-beam after installing the reinforcing bar;

상기한 거푸집을 설치한 후 에이치빔의 상/하부 플랜지에 형성된 콘크리트 투입공을 통해 콘크리트를 투입한 후 일정시간 양생을 시키고, 다수의 거푸집들을 탈거하는 단계;로 이루어지는 것을 특징으로 하는 에이치빔을 이용한 철골구조 건축물의 시공방법을 제공한다.After installing the formwork, and after the concrete is put through the concrete input hole formed in the upper / lower flange of the H-beam and curing for a predetermined time, removing a plurality of formwork; using H-beam characterized in that consisting of Provide construction method of steel structure building.

본 발명에 따른 에이치빔은 하부 플랜지의 중앙에 콘크리트 투입공을 형성하여 건축물의 구조체를 형성하는 경우 그 콘크리트 투입공을 통해 콘크리트를 투입할 수 있어 콘크리트 벽체를 형성하는 경우 틈새가 사라져 그와 같은 틈새를 막기 위한 별도의 작업이 필요없어 시공이 편리하고, 웨브에 큰크리트 지지공을 형성하여 철근을 안정되게 지지해 주어 철골구조 건축물의 시공시 견고함을 극대화하는 장점이 있다.H-beam according to the present invention can form the concrete input hole in the center of the lower flange when forming the structure of the building can be put concrete through the concrete input hole, when forming the concrete wall, the gap disappears such a gap There is no need for additional work to prevent the construction is convenient, there is a large concrete support hole formed on the web to support the reinforcement stably has the advantage of maximizing the robustness of the construction of steel structure buildings.

아울러, 기존의 에이치빔에서 간단한 구조 변경을 통해 그 에이치빔의 기능을 향상시킴으로서, 철골구조 건축물의 시공시 작업 능률을 향상시킴과 동시에 그와 같은 에이치빔의 제조단가를 낮추는 장점도 있다.In addition, by improving the function of the H-beam through a simple structural change in the existing H-beam, there is an advantage to improve the work efficiency during the construction of steel structure buildings and at the same time lower the manufacturing cost of such H-beam.

본 발명에 따른 에이치빔 및 그 에이치빔을 이용한 철골구조 건축물의 시공방법을 첨부한 도면을 참고로 하여 이하 상세히 기술되는 실시예에 의하여 그 특징들을 이해할 수 있을 것이다.With reference to the accompanying drawings, the H-beam according to the present invention and the construction method of the steel structure structure using the H-beam will be understood by the embodiments described in detail below.

이때, 도 3은 본 발명에 따른 에이치빔을 도시한 사시도이고, 도 4는 도 3의 A-A선의 단면을 도시한 도면이고, 도 5는 본 발명에 따른 에이치빔을 이용한 철골구조 건축물의 벽체 시공 과정을 설명하기 위해 도시한 건축물 단면도이고, 도 6은 본 발명에 따른 에이치빔을 이용한 철골구조 건축물의 슬라브 시공 과정을 설명하기 위해 도시한 건축물 단면도이고, 도 7은 본 발명의 다른 실시예에 따른 에이치빔을 이용한 철골구조 건축물의 슬라브 시공 과정을 설명하기 위해 도시한 건축물 단면도이다.At this time, Figure 3 is a perspective view showing the H-beam according to the present invention, Figure 4 is a view showing a cross section of the AA line of Figure 3, Figure 5 is a wall construction process of the steel structure structure using the H-beam according to the present invention Figure 6 is a cross-sectional view of the building to illustrate, Figure 6 is a cross-sectional view of the building to explain the slab construction process of the steel structure structure using H-beam according to the present invention, Figure 7 is a H in accordance with another embodiment of the present invention It is a cross-sectional view of the building to explain the slab construction process of the steel structure structure using a beam.

먼저, 도 3 및 도 4에 의하면 본 발명에 따른 에이치빔(100)은 일정폭을 가지는 상부 플랜지(110)와 하부 플랜지(120)가 서로 일정간격을 유지하도록 그 상부 플랜지(110)와 하부 플랜지(120)의 사이에 수직으로 웨브(130)가 일체로 형성되며, 상기 하부 플랜지(120)의 표면에는 상하로 관통되는 다수의 콘크리트 투입공(122)이 일정간격을 유지하며 형성된다.First, according to FIGS. 3 and 4, the H beam 100 according to the present invention has an upper flange 110 and a lower flange so that the upper flange 110 and the lower flange 120 having a predetermined width maintain a predetermined distance from each other. A vertically formed web 130 between the 120 is formed, the surface of the lower flange 120 is formed with a plurality of concrete input holes 122 penetrating up and down maintaining a constant interval.

그리고, 상부 플랜지(110)의 표면에도 일정간격을 유지하며 다수의 콘크리트 투입공(112)을 형성하여 수평방향의 슬라브를 형성시에 콘크리트를 투입하여 빈공간이 없도록 하여 슬라브와 완전 일체화시킬 수 있게 된다.And, to maintain a certain interval on the surface of the upper flange 110 and to form a plurality of concrete input holes 112 to form a concrete slab in the horizontal direction so that there is no empty space to be completely integrated with the slab do.

이때, 상기 콘크리트 투입공(112,122)은 장공형상으로 이루어지며 그 에이치빔(100)의 길이방향을 따라 상부 플랜지(110) 및 하부 플랜지(120)의 표면에 일정간격을 유지하며 다수가 형성된다.At this time, the concrete injection holes (112, 122) is made of a long hole shape and maintains a predetermined interval on the surface of the upper flange 110 and the lower flange 120 along the longitudinal direction of the H beam 100 is formed a plurality.

이와 같은 콘크리트 투입공(112,122)은 추후 다수의 에이치빔(100)을 이용하여 건축물의 뼈대를 이루는 구조체를 형성시, 그 콘크리트 투입공(112,122)을 통해 콘크리트를 투입할 수 있게 된다.Such concrete input holes (112, 122) will be able to inject concrete through the concrete input holes (112, 122) when forming a structure forming the skeleton of the building using a plurality of H-beams (100) later.

그리고, 상기 웨브(130)의 표면에는 다수의 철근 지지공(132)이 일정간격을 유지하며 관통 형성된다. 이때, 상기 철근 지지공(132)에는 수평상태로 콘크리트를 타설 및 양생하여 슬라브를 형성하는 경우 그 일자(-)형 철근(140)의 단부가 삽입되어 지지될 수 있다.In addition, a plurality of rebar supporting holes 132 are formed in the surface of the web 130 while maintaining a predetermined interval. At this time, when the slab is formed by placing and curing concrete in a horizontal state in the reinforcing support hole 132, the end of the straight (-) type rebar 140 may be inserted and supported.

이때, 상기 철근(140)의 단부에는 견고한 결합력을 확보할 수 있도록 하기 위해 고정너트(150)가 체결되거나, 또는 용접을 통해 고정될 수 있다.In this case, the fixing nut 150 may be fastened or fixed by welding to the end of the reinforcing bar 140 to secure a firm coupling force.

한편, 상기 철근(140)은 건축물의 보를 형성시에 연장이 가능하도록 그 철근(140)의 양단부에 나사산(142a,142b)이 형성되고, 그 일단부 나사산(142b)에는 나사탭(162)이 관통 형성된 연결너트(160)가 체결된다.Meanwhile, the rebar 140 has threads 142a and 142b formed at both ends of the rebar 140 so that the rebar 140 can be extended at the time of forming the beam of the building, and the thread tab 162 is formed at one end of the thread 142b. The connection nut 160 formed therethrough is fastened.

따라서, 연결너트(160)의 일측에는 철근(140)의 일단부가 체결되고, 연결너트(160)의 타측에는 다른 철근(140')의 일단부가 체결되도록 함으로서, 다수의 철근을 연결할 수 있으며, 그 철근(140')의 타단부는 다른 에이치빔(100')의 웨브(130')에 형성된 철근 지지공(132')에 관통 지지된다.Accordingly, one end of the reinforcing bar 140 is fastened to one side of the connection nut 160, and one end of the other rebar 140 ′ is fastened to the other side of the connecting nut 160, thereby connecting a plurality of rebars. The other end of the reinforcing bar 140 'is penetrated and supported by the reinforcing bar 132' formed in the web 130 'of the other H beam 100'.

이와 같이 웨브(130)의 표면에 철근(140)이 관통 지지될 수 있는 철근 지지공(132)을 형성함으로서 건축물 시공시 용이하고도 견고히 철근(140)을 지지할 수 있는 장점이 있다.As such, by forming the reinforcing bar support hole 132 through which the reinforcing bar 140 can be penetrated and supported on the surface of the web 130, there is an advantage that the reinforcing bar 140 can be easily and firmly supported in the construction of the building.

한편, 상기 철근 지지공(132)은 상기 웨브(130)의 표면에 형성되되, 그 상측면과 하측면에 각각 다수를 형성하게 됨으로써, 다수의 철근(140)을 각각 웨브(130)의 상측면과 하측면에 형성되는 철근 지지공(132)에 관통 지지할 수 있어 철골구조 건축물의 슬라브 등을 더욱더 견고하게 시공할 수 있게 된다.On the other hand, the reinforcing support hole 132 is formed on the surface of the web 130, by forming a plurality on the upper side and the lower side, respectively, a plurality of reinforcing bars 140, respectively, the upper side of the web 130 It can be penetrated and supported by the reinforcing steel support hole 132 formed on the lower side and can be more firmly constructed slabs of steel structure buildings.

이하에서는 도 5 및 도 6을 참고로 상기 에이치빔을 이용하여 철골구조 건축물을 시공하는 과정을 상세히 설명한다.Hereinafter, a process of constructing a steel structure building using the H beam will be described in detail with reference to FIGS. 5 and 6.

(A1) 우선, 콘크리트를 타설 및 양생하는 과정을 거치면서 건축물의 기초 바닥 슬라브를 콘크리트로 타설하고 일정기간 양생시킨 후 다수의 에이치빔(100)을 수직방향 및 수평방향으로 설치고정하여 일정한 뼈대인 구조체를 형성하게 된다.(A1) First, the foundation floor slab of the building is laid with concrete and cured for a certain period of time while the concrete is poured and cured, and then a number of H beams 100 are installed and fixed in the vertical direction and the horizontal direction to fix the skeleton. To form a structure.

(A2) 상기 구조체를 형성한 후 수평 에이치빔(100)의 하부 플랜지(120)의 양단부에 수직거푸집(200,202)을 각각 밀착시켜 내부에 벽체(210)를 성형할 수 있는 공간을 확보한 상태로 고정시켜 주게 된다.(A2) After the structure is formed, vertical dies 200 and 202 are brought into close contact with both ends of the lower flange 120 of the horizontal H beam 100, respectively, to secure a space for forming the wall 210 therein. Will be fixed.

(A3) 상기한 바와 같이 수직거푸집(200,202)을 설치한 후 에이치빔(100)의 하부 플랜지(120)에 형성된 콘크리트 투입공(122)을 통해 콘크리트를 투입한 후 일정시간 양생을 시키게 된다.(A3) After the vertical molds 200 and 202 are installed as described above, the concrete is put through the concrete input hole 122 formed in the lower flange 120 of the H beam 100, and then cured for a predetermined time.

(A4) 이와 같이 콘크리트 벽체(210)를 형성한 후 수평 에이치빔(100)의 하부 플랜지(120)의 양단에 "

Figure 112008500558375-PAT00009
" 형상인 데크플레이트(220)의 테두리부분을 밀착시킨 후 용접 등을 통해 일체로 고정시켜 주게 된다.(A4) After forming the concrete wall 210 in this way, both ends of the lower flange 120 of the horizontal H beam 100 "
Figure 112008500558375-PAT00009
After contacting the edge portion of the deck plate 220 having a shape to be fixed integrally by welding or the like.

(A5) 상기 데크플레이트(220)를 고정한 후, 수평 거푸집(230)을 그 하부에 설치하고, 상기 수평 거푸집(230)의 하부에 다수의 수평지지대(240)와 수직지지대(242)를 일정간격을 유지하며 지지해 줌으로서 그 수평 거푸집(230)의 처짐을 방지하고, 상기 데크플레이트(220)의 상부에는 철근(140)을 종횡방향으로 설치하게 된다. 이때, 철근(140)의 단부를 웨브(130)의 표면에 형성되는 철근 지지공(132)에 끼워 지지하게 된다.(A5) After fixing the deck plate 220, the horizontal formwork 230 is installed at its lower portion, and a plurality of horizontal support 240 and the vertical support 242 at a lower portion of the horizontal formwork 230 at regular intervals. By maintaining the support to prevent sagging of the horizontal formwork 230, the reinforcing bar 140 is installed in the longitudinal direction in the upper portion of the deck plate 220. At this time, the end of the reinforcing bar 140 is fitted into the reinforcing bar support hole 132 formed on the surface of the web 130.

한편, 상기 철근 지지공(132)에 끼워지는 철근(140)은 단순히 끼운 상태로 지지함도 가능하나 별도의 고정너트(150)를 철근(140)의 단부에 형성된 나사산(142a)에 체결하여 에이치빔(100)의 웨브(130)상에 결합시켜 줌으로서 견고히 고정된다.On the other hand, the reinforcing bars 140 fitted in the reinforcing hole 132 may be supported by simply inserted state, but a separate fixing nut 150 is fastened to the thread 142a formed at the end of the reinforcing bar 140 to H. It is firmly fixed by coupling onto the web 130 of the beam 100.

(A6) 그리고, 상기 별도의 거푸집(201) 등을 설치하고 데크플레이트(220)의 상부와 에이치빔(100)의 상부 플랜지(110)에 형성된 콘크리트 투입공(112)을 통해 콘크리트를 투입한 후 양생시키고 상기 수평/수직지지대(240,242) 및 수평 거푸집(230)을 제거하여 천장 슬라브(250)를 완성하게 된다.(A6) And, after installing the separate formwork 201 and the like through the concrete injection hole 112 formed in the upper flange 110 of the upper portion of the deck plate 220 and the H-beams (100) Curing and removing the horizontal / vertical support (240 242) and horizontal formwork 230 to complete the ceiling slab (250).

이때에도 상기 천장 슬라브(250)는 상기 에이치빔(100)과 일체로 형성되어 이탈이 방지되어 강한 결합력을 가지게 된다.At this time, the ceiling slab 250 is formed integrally with the H-beam 100 is prevented from being separated to have a strong bonding force.

이하에서는 도 7을 참고로 상기 에이치빔을 이용하여 철골구조 건축물을 시공하는 다른 실시 예를 상세히 설명한다.Hereinafter, another embodiment of constructing a steel structure building using the H beam will be described in detail with reference to FIG. 7.

(B1) 우선, 콘크리트를 타설 및 양생하는 과정을 거치면서 건축물의 기초 바닥 슬라브를 콘크리트로 타설하고 일정기간 양생시킨 후 다수의 에이치빔(100)을 수직방향 및 수평방향으로 설치고정하여 일정한 뼈대인 구조체를 형성하게 된다.(B1) First, the foundation floor slab of the building is laid with concrete and cured for a certain period of time while the concrete is poured and cured, and then a number of H beams 100 are installed in a vertical direction and a horizontal direction to fix a fixed skeleton. To form a structure.

(B2) 상기 구조체를 형성한 후 상기 철근 지지공(132)에 끼워지는 수평방향의 철근(140)은 단순히 끼운 상태로 지지함도 가능하나 별도의 고정너트(150)를 철근(140)의 단부에 형성된 나사산(142a)에 체결하여 에이치빔(100)의 웨브(130)상에 결합시켜 줌으로서 견고히 고정되며, 철근(140)을 종횡방향으로 설치함도 가능하다.(B2) After forming the structure, the horizontal rebar 140 inserted into the reinforcing support hole 132 may be supported by simply being inserted, but a separate fixing nut 150 may be end of the reinforcing bar 140. By fastening to the screw thread (142a) formed in the coupled to the web 130 of the H-beam 100 is firmly fixed, it is also possible to install the reinforcing bars 140 in the longitudinal and transverse direction.

그리고, 상기 에이치빔(100)의 상부플랜지(110) 및 하부 플랜지(120)에 형성된 콘크리트 투입공(112,122)을 통해 수직방향으로 철근(141)을 관통시키게 된다.Then, the reinforcing bars 141 are vertically penetrated through the concrete injection holes 112 and 122 formed in the upper flange 110 and the lower flange 120 of the H beam 100.

이때, 상기 철근(141)의 단부는 콘크리트 투입공(112,122)상에 별도의 고정너트(151)로 체결해 줌도 가능하며, 별도의 연결너트(161)를 이용하여 철근(141)을 길게 연장함도 가능하다.At this time, the ends of the reinforcing bars 141 may be fastened to a separate fixing nut 151 on the concrete injection holes 112 and 122, and the reinforcing bars 141 are extended by using a separate connection nut 161. It is also possible.

그리고, 상기 수평방향의 철근(140)과 수직방향의 철근(141)이 교차부분에는 철사(144)를 이용하여 결합시켜 줌으로서 견고한 지지상태를 유지함이 바람직하다.In addition, the horizontal reinforcing bar 140 and the vertical reinforcing bar 141 are preferably coupled to each other using a wire 144 to maintain a firm support state.

(B3) 상기 철근(140,141)을 설치한 후 에이치빔(100)의 하부 플랜지(120)의 양단부에 밀착되어 벽체를 형성하기 위한 공간을 확보하는 거푸집(200,202) 및 슬 라브를 형성하기 위한 거푸집(230)을 밀착시켜 내부에 벽체(210) 또는 슬라브(250)를 성형할 수 있는 공간을 확보한 상태로 고정시켜 주게 된다.(B3) After installing the reinforcing bars (140, 141) are in close contact with both ends of the lower flange 120 of the H-beam 100 formwork (200, 202) to secure a space for forming the wall and formwork for forming the slab ( 230 is in close contact with the interior of the wall 210 or the slab 250 to secure a space to form a fixed state.

이때, 벽체(210) 또는 슬라브(250)가 만나는 모서리부분이 모가 나지 않도록 하기 위해 거푸집용 면귀(142)를 함께 설치하여 주게 된다.At this time, in order to prevent the corner portion where the wall 210 or the slab 250 meets, the form face 142 is installed together.

한편, 상기 다수의 거푸집을 설치하는 경우 에이치빔(100)의 하부 플랜지(120)의 양단에 "

Figure 112008500558375-PAT00010
" 형상인 데크플레이트를 더 밀착시킨 후 용접 등을 통해 일체로 고정시켜 줌도 바람직하다.On the other hand, in the case of installing the plurality of formwork at both ends of the lower flange 120 of the H-beam 100
Figure 112008500558375-PAT00010
It is also preferable that the deck plate having the shape of "" is further brought into close contact and then fixed integrally by welding or the like.

(B4) 상기한 바와 같이 다수의 거푸집(200,202,230)을 설치한 후 에이치빔(100)의 상부(110) 및 하부 플랜지(120)에 형성된 콘크리트 투입공(112,122)을 통해 콘크리트를 투입한 후 일정시간 양생을 시키고, 다수의 거푸집들을 제거하여 벽체 및 천장 슬라브를 완성하게 된다.(B4) After installing a plurality of formwork (200,202,230) as described above, after the concrete is put through the concrete input holes 112,122 formed in the upper 110 and the lower flange 120 of the H-beam 100, a predetermined time It cures and removes many formwork to complete the walls and ceiling slabs.

이상과 같이 본 발명의 실시예에 대하여 상세히 설명하였으나, 본 발명의 권리범위는 이에 한정되지 않으며, 본 발명의 실시예와 실질적으로 균등의 범위에 있는 것까지 본 발명의 권리범위가 미친다.As described above, embodiments of the present invention have been described in detail, but the scope of the present invention is not limited thereto, and the scope of the present invention extends to the range substantially equivalent to the embodiments of the present invention.

도 1은 종래 일반적인 에이치빔을 도시한 사시도.1 is a perspective view showing a conventional general H-beam.

도 2는 종래 일반적인 에이치빔을 이용한 철골구조 건축물의 시공 과정을 설명하기 위해 도시한 건축물 단면도.Figure 2 is a cross-sectional view of the building to explain the construction process of a steel structure structure using a conventional conventional H beam.

도 3은 본 발명에 따른 에이치빔을 도시한 사시도.3 is a perspective view showing an H beam according to the present invention;

도 4는 도 3의 A-A선의 단면을 도시한 도면.4 is a cross-sectional view taken along the line A-A of FIG.

도 5는 본 발명에 따른 에이치빔을 이용한 철골구조 건축물의 벽체 시공 과정을 설명하기 위해 도시한 건축물 단면도.Figure 5 is a cross-sectional view showing the construction of the wall construction process of the steel structure building using H-beam according to the present invention.

도 6은 본 발명에 따른 에이치빔을 이용한 철골구조 건축물의 슬라브 시공 과정을 설명하기 위해 도시한 건축물 단면도.Figure 6 is a cross-sectional view of the building to explain the slab construction process of the steel structure building using H-beam according to the present invention.

도 7은 본 발명의 다른 실시예에 따른 에이치빔을 이용한 철골구조 건축물의 슬라브 시공 과정을 설명하기 위해 도시한 건축물 단면도.Figure 7 is a cross-sectional view of the building to explain the slab construction process of the steel structure building using H-beam according to another embodiment of the present invention.

*** 도면의 주요부분에 대한 부호의 설명 ****** Explanation of symbols for main parts of drawing ***

100: 에이치빔 110: 상부 플랜지100: H beam 110: upper flange

120: 하부 플랜지 122: 콘크리트 투입공120: lower flange 122: concrete injection hole

130: 웨브 132: 철근 지지공130: web 132: rebar supporter

140,141: 철근 160: 연결너트140,141: Rebar 160: Connecting Nut

210: 콘크리트 벽체 250: 천장 슬라브210: concrete wall 250: ceiling slab

Claims (7)

일정폭을 가지는 상/하부 플랜지(110,120)의 사이에 수직으로 웨브(130)가 일체로 형성되는 에이치빔(100)에 있어서,In the H beam 100 in which the web 130 is integrally formed vertically between the upper and lower flanges 110 and 120 having a predetermined width, 상기 하부 플랜지(120)의 표면에는 건축물의 시공시 콘크리트 투입이 가능한 콘크리트 투입공(122)이 형성되고, 상기 웨브(130)의 표면에는 철근(140)이 관통지지되는 철근 지지공(132)이 형성되는 것을 특징으로 하는 에이치빔.On the surface of the lower flange 120 is formed a concrete input hole 122 that can be put concrete in the construction of the building, the reinforcing support hole 132 through which the reinforcing bar 140 is supported on the surface of the web 130 H beam, characterized in that formed. 제 1항에 있어서,The method of claim 1, 상기 상부 플랜지(110)의 표면에는 건축물의 시공시 콘크리트 투입이 가능한 콘크리트 투입공(112)가 더 형성되는 것을 특징으로 하는 에이치빔.H beam, characterized in that the concrete input hole 112 is further formed on the surface of the upper flange 110, the concrete can be injected during the construction of the building. 제 1항에 있어서,The method of claim 1, 상기 웨브(130)의 철근 지지공(132)에 지지되는 철근(140)은 그 양단부에는 연결너트(160)가 체결되는 나사산(142a,142b)이 더 형성되는 것을 특징으로 하는 에이치빔.The reinforcing bar 140 supported by the reinforcing bar support hole 132 of the web 130 has a thread (142a, 142b) is further formed on both ends of the connection nut 160 is fastened. 제 1항에 있어서,The method of claim 1, 상기 웨브(130)의 철근 지지공(132)에 지지되는 철근(140)의 단부에는 고정너트(150)가 체결되는 것을 특징으로 하는 에이치빔.H beam, characterized in that the fixing nut 150 is fastened to the end of the reinforcing bars 140 supported by the reinforcing support hole 132 of the web 130. 일정폭을 가지는 상/하부 플랜지(110,120)의 사이에 수직으로 웨브(130)가 일체로 형성되되 상기 하부 플랜지(110)의 표면에는 다수의 콘크리트 투입공(122)이 형성되고, 상기 웨브(130)의 표면에는 건축물의 시공시 설치되는 철근의 단부가 관통 지지되는 철근 지지공(132)이 형성되는 에이치빔(100)에 있어서,The web 130 is vertically integrally formed between the upper and lower flanges 110 and 120 having a predetermined width, but a plurality of concrete injection holes 122 are formed on the surface of the lower flange 110, and the web 130 In the H beam 100 is formed on the surface of the reinforcing bar support hole 132 through which the end of the reinforcing bar is installed at the time of construction of the building, 다수의 에이치빔을 수직방향 및 수평방향으로 설치고정하여 구조체를 형성하는 단계와;Installing and fixing a plurality of H beams in a vertical direction and a horizontal direction to form a structure; 상기 구조체를 형성한 후 수평으로 설치되는 상기 에이치빔(100)의 하부 플랜지(120) 양단부에 수직거푸집(200,202)을 밀착시켜 내부에 벽체를 성형할 수 있는 공간을 확보한 상태로 고정시키고 상기 에이치빔(100)의 하부 플랜지(120)에 형성된 콘크리트 투입공(122)을 통해 콘크리트를 투입 및 양생시키고 상기 수직거푸집(200,202)을 탈거시키는 단계와;After forming the structure, the vertical formwork (200, 202) is in close contact with both ends of the lower flange 120 of the H-beam 100 is installed horizontally to secure a space to form a wall therein and the H Injecting and curing concrete through concrete input holes 122 formed in the lower flange 120 of the beam 100 and removing the vertical molds 200 and 202; 상기 에이치빔(100)의 하부 플랜지(120) 양단에 데크플레이트(220)의 테두리부분을 밀착시킨 후 용접 고정하고, 수평 거푸집(230)을 그 하부에 설치하는 단계와;Contacting both edges of the deck plate 220 to both ends of the lower flange 120 of the H beam 100 and then welding and fixing the horizontal formwork 230 at a lower portion thereof; 상기 데크플레이트(220)의 상부에는 종횡방향으로 철근(140)을 설치하되 그 철근(140)의 단부를 웨브(130)의 표면에 형성되는 철근 지지공(132)에 관통 지지하고, 그 상부에 콘크리트를 투입 및 양생시키고 상기 수평 거푸집(230)을 탈거시키는 단계;로 이루어지는 것을 특징으로 하는 에이치빔을 이용한 철골구조 건축물의 시공방법.The reinforcing bar 140 is installed in the vertical and horizontal direction on the deck plate 220, but the end of the reinforcing bar 140 is supported through the reinforcing support hole 132 formed on the surface of the web 130, the upper Adding and curing concrete and removing the horizontal formwork 230; Construction method of steel structure building using a H beam, characterized in that consisting of. 일정폭을 가지는 상/하부 플랜지(110,120)의 사이에 수직으로 웨브(130)가 일체로 형성되되 상기 하부 플랜지(110)의 표면에는 다수의 콘크리트 투입공(122)이 형성되고, 상기 웨브(130)의 표면에는 건축물의 시공시 설치되는 철근의 단부가 관통 지지되는 철근 지지공(132)이 형성되는 에이치빔(100)에 있어서,The web 130 is vertically integrally formed between the upper and lower flanges 110 and 120 having a predetermined width, but a plurality of concrete injection holes 122 are formed on the surface of the lower flange 110, and the web 130 In the H beam 100 is formed on the surface of the reinforcing bar support hole 132 through which the end of the reinforcing bar is installed at the time of construction of the building, 다수의 에이치빔(100)을 수직방향 및 수평방향으로 설치고정하여 구조체를 형성하는 단계와;Installing a plurality of H beams 100 in a vertical direction and a horizontal direction to form a structure; 상기 구조체를 형성한 후 상기 에이치빔(100)의 철근 지지공(132)에 끼워지는 수평방향으로 철근(140)을 관통 지지하고, 상기 에이치빔(100)의 상부플랜지(110) 및 하부 플랜지(120)에 형성된 콘크리트 투입공(112,122)을 통해 수직방향으로 철근(141)을 관통 지지하는 단계와;After the structure is formed, the rebar 140 is penetrated and supported in the horizontal direction fitted to the reinforcing support hole 132 of the H beam 100, and the upper flange 110 and the lower flange of the H beam 100 ( Supporting the reinforcing bars 141 in the vertical direction through the concrete injection holes 112 and 122 formed in the 120; 상기 철근(140,141)을 설치한 후 에이치빔(100)의 하부 플랜지(120)의 양단부에 밀착되어 벽체 및 슬라브를 형성하기 위한 공간을 확보하기 위해 거푸집을 설치하는 단계와;Installing formwork to secure space for forming walls and slabs in close contact with both ends of the lower flange 120 of the H beam 100 after installing the reinforcing bars 140 and 141; 상기한 거푸집을 설치한 후 에이치빔(100)의 상부(110) 및 하부 플랜지(120)에 형성된 콘크리트 투입공(112,122)을 통해 콘크리트를 투입한 후 일정시간 양생을 시키고, 다수의 거푸집들을 탈거하는 단계;로 이루어지는 것을 특징으로 하는 에이치빔을 이용한 철골구조 건축물의 시공방법.After installing the formwork, the concrete is put into the concrete through the concrete input holes 112 and 122 formed in the upper 110 and the lower flange 120 of the H-beam 100 to cure for a predetermined time, and remove a plurality of formwork Construction method of a steel structure building using a H-beam, characterized in that consisting of. 제 6항에 있어서,The method of claim 6, 상기 에이치빔(100)의 철근 지지공(132)에 끼워지는 수평방향의 철근(140)과, 상기 에이치빔(100)의 상부플랜지(110) 및 하부 플랜지(120)에 형성된 콘크리트 투입공(112,122)을 통해 수직방향 관통되는 철근(141)의 교차부분에는 철사(144)로 결합시켜 주는 것을 특징으로 하는 에이치빔을 이용한 철골구조 건축물의 시공방법.Reinforcing bar 140 in the horizontal direction fitted to the reinforcing support hole 132 of the H-beam 100, concrete input holes 112, 122 formed in the upper flange 110 and the lower flange 120 of the H-beam 100 Construction method of steel structure building using H-beam, characterized in that coupled to the intersection of the reinforcing bars 141 through the vertical direction through a wire (144).
KR1020080009523A 2008-01-30 2008-01-30 H beam and constructing method using the H beam KR100991046B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080009523A KR100991046B1 (en) 2008-01-30 2008-01-30 H beam and constructing method using the H beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080009523A KR100991046B1 (en) 2008-01-30 2008-01-30 H beam and constructing method using the H beam

Publications (2)

Publication Number Publication Date
KR20090083615A true KR20090083615A (en) 2009-08-04
KR100991046B1 KR100991046B1 (en) 2010-10-29

Family

ID=41204381

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080009523A KR100991046B1 (en) 2008-01-30 2008-01-30 H beam and constructing method using the H beam

Country Status (1)

Country Link
KR (1) KR100991046B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101456366B1 (en) * 2013-02-28 2014-11-04 (주)더나은구조엔지니어링 Open channel and H-shaped composite beam and steel structure using the same
CN106677426A (en) * 2016-12-22 2017-05-17 安徽伟宏钢结构集团股份有限公司 Steel member for workshop equipment assembly
WO2020070665A1 (en) * 2018-10-02 2020-04-09 Waco Africa (Pty] Ltd T/A Formscaff Multi-functional beam for formwork, support work and scaffolding related applications
KR102307134B1 (en) * 2020-10-06 2021-09-29 김진필 H-beam whose surface is finished with synthetic resin and method of manufacturing the same
KR20220103245A (en) * 2021-01-14 2022-07-22 동국대학교 산학협력단 Seismic Resistant Structure Attaching A Fastening External PC Wall Panel And Construction Method Thereof
KR20220103242A (en) * 2021-01-14 2022-07-22 동국대학교 산학협력단 Seismic Resistant Structure Attaching A External PC Wall Panel And Construction Method Thereof
KR20220103241A (en) * 2021-01-14 2022-07-22 동국대학교 산학협력단 Seismic Resistant Structure Attaching A External PC Wall Panel Having Anchor Through Hole And Construction Method Thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102505555B1 (en) 2020-03-16 2023-03-06 이혜원 H-beams for easy assembly and connection for building structures

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3836920B2 (en) 1996-09-20 2006-10-25 株式会社フジタ Construction method of pier overhang

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101456366B1 (en) * 2013-02-28 2014-11-04 (주)더나은구조엔지니어링 Open channel and H-shaped composite beam and steel structure using the same
CN106677426A (en) * 2016-12-22 2017-05-17 安徽伟宏钢结构集团股份有限公司 Steel member for workshop equipment assembly
WO2020070665A1 (en) * 2018-10-02 2020-04-09 Waco Africa (Pty] Ltd T/A Formscaff Multi-functional beam for formwork, support work and scaffolding related applications
KR102307134B1 (en) * 2020-10-06 2021-09-29 김진필 H-beam whose surface is finished with synthetic resin and method of manufacturing the same
KR20220103245A (en) * 2021-01-14 2022-07-22 동국대학교 산학협력단 Seismic Resistant Structure Attaching A Fastening External PC Wall Panel And Construction Method Thereof
KR20220103242A (en) * 2021-01-14 2022-07-22 동국대학교 산학협력단 Seismic Resistant Structure Attaching A External PC Wall Panel And Construction Method Thereof
KR20220103241A (en) * 2021-01-14 2022-07-22 동국대학교 산학협력단 Seismic Resistant Structure Attaching A External PC Wall Panel Having Anchor Through Hole And Construction Method Thereof

Also Published As

Publication number Publication date
KR100991046B1 (en) 2010-10-29

Similar Documents

Publication Publication Date Title
KR100991046B1 (en) H beam and constructing method using the H beam
KR101556545B1 (en) Method for constructing using a double wall Precast Concrete
KR101107300B1 (en) Steel plate shear wall
KR101379305B1 (en) Wall structure manufacturing method using precast front wall panel and precast back wall panel
KR100903398B1 (en) Precast multi tee fiber and wiremesh slab
KR20070059690A (en) Mold-concrete composite crossbeam and construction method using the same
JP6108595B2 (en) Ribbed precast concrete plate and method of placing concrete floor slab and beam using it
EA025335B1 (en) Assemblable disposable shuttering for constructing modular formworks for making concrete foundations
KR101355926B1 (en) Reusable waffle type slab form assembly
KR100923564B1 (en) Precast concrete panel, construction method and structure of precast concrete panel using steel plate
KR20160142985A (en) Concrete Girder With Coupler And Method For Constructing Rhamen Bridge Using The Same
KR200406615Y1 (en) T shape precast concrete panel
CN218091465U (en) Assembled non-bearing masonry wall structure
KR100747665B1 (en) Concrete mold for slab and construction method of slab using the same
KR100694586B1 (en) Wall Structure Using Precast Concrete Panel with Rib Rows
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR100860592B1 (en) Temporary system for vertical structure using precast concreat block
KR101109244B1 (en) Structural Wall having Fiber Concrete Reinforcing Part for Plastic Hinge
KR101064752B1 (en) Deck for concrete slab construction
KR101140627B1 (en) Construction method of concrete building
KR100626326B1 (en) concrete structure
KR20080083780A (en) H beam and building construction method using the h beam
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
JP7479228B2 (en) Precast concrete slabs and method for constructing concrete structures
KR101165587B1 (en) Multipurpose panal for civil engineering and construction.

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140428

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140901

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160907

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170821

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20181002

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190827

Year of fee payment: 10