KR20090018293A - Electric boiler - Google Patents

Electric boiler Download PDF

Info

Publication number
KR20090018293A
KR20090018293A KR1020070082632A KR20070082632A KR20090018293A KR 20090018293 A KR20090018293 A KR 20090018293A KR 1020070082632 A KR1020070082632 A KR 1020070082632A KR 20070082632 A KR20070082632 A KR 20070082632A KR 20090018293 A KR20090018293 A KR 20090018293A
Authority
KR
South Korea
Prior art keywords
hot water
water
reservoir
pipe
heater
Prior art date
Application number
KR1020070082632A
Other languages
Korean (ko)
Other versions
KR100904998B1 (en
Inventor
이희태
김혁원
Original Assignee
이희태
김혁원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이희태, 김혁원 filed Critical 이희태
Priority to KR1020070082632A priority Critical patent/KR100904998B1/en
Priority to PCT/KR2007/006534 priority patent/WO2008111722A1/en
Publication of KR20090018293A publication Critical patent/KR20090018293A/en
Application granted granted Critical
Publication of KR100904998B1 publication Critical patent/KR100904998B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • F24H1/20Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes
    • F24H1/201Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes using electric energy supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/48Water heaters for central heating incorporating heaters for domestic water
    • F24H1/52Water heaters for central heating incorporating heaters for domestic water incorporating heat exchangers for domestic water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/0005Details for water heaters
    • F24H9/001Guiding means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/18Arrangement or mounting of grates or heating means
    • F24H9/1809Arrangement or mounting of grates or heating means for water heaters
    • F24H9/1818Arrangement or mounting of electric heating means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H2250/00Electrical heat generating means
    • F24H2250/02Resistances

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

An electric boiler is provided to smoothly eject the hot water through the exhaust line by supplying a part of the water of water storage tank to the exhaust line with the drain water remedial measure. An electric boiler comprises water tank(110) having four sides shut tightly, and stores the water flowed in through the water pipe(112); the rapidity heating water supply apparatus(120) which rapidly heats up a part of the water of water storage tank with the high temperature by using the external electricity; the hot water supply pipe(130) guiding the hot water in the top of the water tank, and supplies the hot water to the top of the water tank; the exhaust line(140) ejecting the hot water with the pumping pressure of the heating pump to the outside of the water tank; and the drain water remedial measure filling up the exhaust line with the water stored on the top of the water tank.

Description

전기보일러 { ELECTRIC BOILER }Electric Boiler {ELECTRIC BOILER}

본 발명은 전기를 이용하여 외부에서 유입된 물을 고온으로 가공하고, 고온으로 가공된 고온수를 난방펌프의 펌핑압에 의해 배출하여 난방을 실시하는 보일러에 관한 것이다.The present invention relates to a boiler for processing water introduced from the outside using electricity at a high temperature and discharging the hot water processed at a high temperature by the pumping pressure of the heating pump to perform heating.

특히, 외부에서 유입된 물을 급탕가열하여 난방을 실시하는 순간온수식 전기보일러에 관한 것이다.In particular, it relates to an instantaneous hot water type electric boiler for heating by heating the hot water introduced from the outside.

일반적으로 전기보일러는 가정이나 공장 또는 농축산 농가 등에서 주로 사용된다. 특히, 공장이나 농가등에 사용되는 전기보일러는 산업용으로 분류되어 대용량으로 제조되며, 주로 가격이 저렴한 심야의 전기를 이용하여 저수된 물을 가열한다.In general, electric boilers are mainly used in homes, factories, or farms for concentrated livestock. In particular, electric boilers used in factories and farms are classified as industrial and manufactured in large capacity, and mainly heat the stored water by using low-cost late night electricity.

이러한 전기보일러는 가정에서 사용될 경우 소용량으로 제조되므로 전력이 크게 소요되지 않는다. 하지만, 공장이나 농가 또는 빌딩과 같은 건물에 사용되는 전기보일러는 대용량으로 제조되므로, 대용량의 물을 가열하기 위해 아주 많은 전력이 소요된다. 따라서, 본 발명에 의한 출원인은 첨부된 도 1에 도시된 바와 같은 전기보일러를 대한민국 특허청에 특허출원하여 2007년 8월 13일부로 등록결정되었 다.(2007년 8월 13일부로 등록결정되어 2007년 8월 16일부로 등록료를 납부함)Since these electric boilers are manufactured in small capacity when used at home, they do not consume much power. However, since electric boilers used in buildings such as factories, farms, or buildings are manufactured at a large capacity, a large amount of power is required to heat a large amount of water. Accordingly, the applicant of the present invention filed an electric boiler as shown in FIG. 1 to the Korean Intellectual Property Office and was determined to be registered as of August 13, 2007. Registration fee is due on 16th of March)

이와 같이 본 발명의 출원인에 의해 등록된 종래기술에 의한 전기보일러는, 도시된 바와 같이 저수조(50)의 하부(L)에 내장된 급탕기(60)의 히터(64)가 관통공(62a)을 통해 하부챔버(62)에 유입되는 저수조(50)의 물을 급속가열한다. 그리고, 온수공급관(70)은 하부챔버(62)에서 가열된 고온수를 저수조(50)의 상부(U)로 유도한다. 이때, 온수공급관(70)에 연결된 상부챔버(80)는 온수공급관(70)에서 공급되는 고온수를 집수하여 배출공(80a)를 통해 저수조(50)의 상부(U)에 확산시킨다. 이에 따라, 저수조(50)는 상부(U)에 고온수가 존재한다. 따라서, 저수조(50)는 난방배수관(54)에 연결된 미도시된 난방펌프가 작동할 경우, 난방배수관(54)을 통해 상부(U)의 고온수를 공급한다. 물론, 난방배수관(54)은 실내가 난방되도록 미도시된 난방배관으로 고온수를 공급한다.As described above, in the electric boiler according to the prior art registered by the applicant of the present invention, the heater 64 of the hot water heater 60 built in the lower portion L of the water reservoir 50 as shown in the through hole 62a. Rapidly heats the water in the reservoir 50 flowing into the lower chamber 62 through. Then, the hot water supply pipe 70 guides the hot water heated in the lower chamber 62 to the upper portion U of the reservoir 50. At this time, the upper chamber 80 connected to the hot water supply pipe 70 collects the hot water supplied from the hot water supply pipe 70 and diffuses it to the upper portion U of the reservoir 50 through the discharge hole 80a. Accordingly, the reservoir 50 has hot water in the upper portion (U). Therefore, the reservoir 50 supplies the hot water of the upper portion U through the heating drain pipe 54 when the heating pump not shown connected to the heating drain pipe 54 is operated. Of course, the heating drain pipe 54 supplies the hot water to the heating pipe not shown so that the room is heated.

이러한 종래기술에 의한 전기보일러는 급탕기(60)에서 고온으로 가열된 고온수가 저수조(50)의 물과 열교환하지 않고, 온수공급관(70) 및 상부챔버(80)를 통해 곧바로 난방배수관(54)으로 배출된다. 따라서, 고온수를 곧바로 난방에 사용할 수 있는 이점이 있다.The electric boiler according to the related art does not heat exchange with the water of the water tank 50 in the hot water heater 60 at high temperature, but directly to the heating drain pipe 54 through the hot water supply pipe 70 and the upper chamber 80. Discharged. Therefore, there is an advantage that the hot water can be used directly for heating.

또한, 상부챔버(80)가 고온수를 이용하여 저수조(50)의 상부에 존재하는 저온수를 가열하므로 단시간에 저수조(50)의 물을 가열할 수 있는 이점도 있다.In addition, since the upper chamber 80 heats the low temperature water present in the upper portion of the water storage tank 50 using the high temperature water, there is an advantage in that the water of the water storage tank 50 can be heated in a short time.

그러나, 본 발명의 출원인은 등록된 종래기술에 의한 전기보일러를 보다 효율적이면서 편리하게 개량하였기에 본 특허를 출원하게 되었다.However, the applicant of the present invention has applied for the present patent because the registered prior art electric boiler is improved more efficiently and conveniently.

한편, 도면상 미설명 부호 52는 저수조(50)에 물을 공급하는 급수관이고, 미 설명 부호 90은 바이패스관(92) 및 순환펌프(94)로 이루어진 순환부재이다.On the other hand, reference numeral 52 in the drawing is a water supply pipe for supplying water to the reservoir 50, reference numeral 90 is a circulation member consisting of the bypass pipe 92 and the circulation pump 94.

본 발명은 실내 난방을 위해 난방펌프가 작동할 경우, 난방펌프의 펌핑압에 대응되는 유량을 확보하면서 급탕기에서 순간적으로 급속가열된 고온수를 신속하게 난방배관으로 공급할 수 있는 전기보일러를 제공하기 위함이 그 목적이다.The present invention is to provide an electric boiler that can quickly supply the hot water instantaneously rapid heating from the hot water heater to the heating pipe while ensuring a flow rate corresponding to the pumping pressure of the heating pump when the heating pump is operated for indoor heating. This is the purpose.

또, 급탕기로 저온수가 공급되는 것은 허용하고, 급탕기에서 가열된 고온수가 역류하는 것은 방해할 수 있는 구조로 구성된 부재가 급탕기에 일체적으로 마련된 전기보일러를 제공하기 위함이 다른 목적이다.Another object is to provide an electric boiler integrally provided with a water heater in a member configured to allow low temperature water to be supplied to the hot water heater, and to prevent backflow of the hot water heated in the hot water heater.

또한, 급탕기의 열기를 이용하여 난방용 온수와 별도로 욕실에서 사용되는 욕실용 온수를 제공할 수 있는 전기보일러를 제공하기 위함이 또 다른 목적이다.In addition, another object of the present invention is to provide an electric boiler that can provide hot water for bathrooms used in the bathroom separately from the hot water for heating by using the heat of the hot water heater.

이와 같은 본 발명의 목적을 달성하기 위한 본 발명에 의한 전기를 이용하여 외부에서 유입된 물을 고온으로 가공하고, 고온으로 가공된 고온수를 난방펌프의 펌핑압에 의해 배출하여 난방을 실시하는 보일러에 있어서, 사방이 밀폐되어 일측에 마련된 급수관으로 유입되는 물을 저수하는 저수조; 상기 저수조에 저수된 일부의 물을 격리시켜서 외부에서 공급되는 전기를 이용하여 고온으로 급속가열하는 급탕기; 상기 급탕기에서 급속가열된 고온수를 상기 저수조의 상부로 유도하여, 상기 저수조의 상부측으로 고온수를 공급하는 온수공급관; 상기 온수공급관에서 공급되는 고온의 온수를 상기 난방펌프의 펌핑압에 의해 상기 저수조의 외부로 배출하는 배출관 및; 상기 배출관에 작용하는 상기 난방펌프의 펌핑압에 대응하는 유량이 상 기 배출관에 제공되도록, 상기 저수조의 상부측에 저수된 물을 상기 배출관에 보충하는 배출수 보충수단;을 포함한다.By using the electricity according to the present invention for achieving the object of the present invention to process the water introduced from the outside at a high temperature, the hot water processed at a high temperature is discharged by the pumping pressure of the heating pump to perform the heating In the, the water tank is sealed in all directions to store the water flowing into the water supply pipe provided on one side; A hot water heater for isolating some of the water stored in the water storage tank and rapidly heating to a high temperature using electricity supplied from the outside; A hot water supply pipe configured to induce hot water rapidly heated in the hot water heater to an upper portion of the reservoir, and supply hot water to an upper side of the reservoir; A discharge pipe discharging hot water of high temperature supplied from the hot water supply pipe to the outside of the water storage tank by a pumping pressure of the heating pump; And discharge water replenishment means for replenishing the discharge pipe with water stored in the upper side of the reservoir so that a flow rate corresponding to the pumping pressure of the heating pump acting on the discharge pipe is provided to the discharge pipe.

여기서, 상기 급탕기는 예컨대, 상기 저수조의 하부에 일체적으로 내장되고, 일측에 형성된 유입구를 통해 상기 저수조의 하부에 저수된 일부의 물을 유입하여 격리시키며, 타측에 일체적으로 연결된 상기 온수공급관을 통해 격리된 물을 상기 저수조의 상부로 공급하는 격리챔버 및; 상기 격리챔버에 내장되어 외부에서 공급되는 전기에 의해 발열하면서 상기 격리챔버에 격리된 물을 고온으로 가열하는 전열히터;를 포함하여 구성할 수 있다.Here, the hot water supply unit is integrally embedded in the lower portion of the reservoir, for example, by introducing a portion of the water stored in the lower portion of the reservoir through an inlet formed in one side, isolating the hot water supply pipe integrally connected to the other side An isolation chamber for supplying the water isolated through the reservoir to an upper portion of the reservoir; It may be configured to include; an electric heat heater for heating the water isolated in the isolation chamber to a high temperature while generating heat by electricity supplied from the outside is built in the isolation chamber.

그리고, 전술한 상기 배출수 보충수단은 예컨대, 상기 저수조의 내부 상측과 연통된 상태로 상기 배출관의 일측에 마련되어, 상기 저수조의 상부측에 저수된 물을 상기 배출관으로 공급하는 유량보충구;로 구성할 수 있다.And, the discharge water replenishing means described above, for example, is provided on one side of the discharge pipe in a state in communication with the inner upper side of the reservoir, the flow rate supplement for supplying the water stored in the upper side of the reservoir to the discharge pipe; Can be.

한편, 본 발명에 의한 전기보일러는, 상기 온수공급관의 토출측 단부가 일측에 연결되고, 상기 배출관의 유입구측 단부가 타측에 연결되어, 상기 저수조의 상부에서 상기 온수공급관으로 유도되는 고온수를 집수하여 확산시키는 동시에, 확산되는 고온수를 상기 배출관으로 공급하는 집수챔버;를 더 포함하여 구성할 필요가 있다.On the other hand, the electric boiler according to the present invention, the discharge side end of the hot water supply pipe is connected to one side, the inlet side end of the discharge pipe is connected to the other side, to collect the hot water guided to the hot water supply pipe from the top of the reservoir It is necessary to further include a collecting chamber for diffusing and at the same time supplying the hot water to be diffused into the discharge pipe.

또한, 상기 급탕기와 연통상태를 이루면서 급탕기에 일체적으로 마련됨에 따라 상기 저수조의 물이 급탕기의 유입구에 유입되는 것은 허용하고, 유입된 물이 역류하는 것을 방해하는 구조로 형성됨에 따라 급탕기에서 격리상태로 가열된 물이 온도차에 의해 상기 유입구로 역류하는 것은 억제하는 역류억제부재;를 더 포함하 여 구성할 필요도 있다.In addition, as the communication with the hot water heater is provided integrally with the hot water heater, the water of the reservoir is allowed to flow into the inlet of the hot water heater, and is isolated from the hot water heater as it is formed in a structure that prevents the inflow of water. It is also necessary to further include a; back flow inhibiting member for suppressing the water is heated back to the inlet port by the temperature difference.

여기서, 전술한 상기 역류억제부재는 예컨대, 상기 급탕기에 일체적으로 설치되어 상기 유입구를 차폐하고, 일측에 상기 유입구와 실질적으로 직교상태를 이루면서 연통되는 흡입공이 형성되며, 상기 저수조에 저수된 물을 흡입공으로 흡입하여 상기 유입구에 공급하는 흡입챔버;로 구성할 수 있다.Here, the above-mentioned backflow inhibiting member is, for example, integrally installed in the hot water heater to shield the inlet, and a suction hole is formed in communication with the inlet to form a substantially orthogonal state on one side, the water stored in the reservoir It may be configured as a suction chamber for sucking into the suction hole and supply to the inlet.

이와 달리, 상기 역류억제부재는 예컨대, 상기 급탕기에 양단이 노출된 상태로 삽입되고, 노출된 양단부에 상기 저수조의 물을 흡입하는 흡입공이 형성되며, 이 흡입공과 실질적으로 직교상태를 이루면서 흡입공으로 흡입된 물을 상기 격리챔버에 공급하는 공급공이 형성된 흡입관;으로 구성할 수도 있다.On the contrary, the countercurrent suppression member is inserted into the hot water heater, for example, with both ends exposed, and suction holes are formed at the exposed both ends to suck water from the reservoir, and sucked into the suction holes while being substantially orthogonal to the suction holes. It may be configured as a suction pipe formed with a supply hole for supplying the water to the isolation chamber.

또 한편, 본 발명에 의한 전기보일러는, 상기 배출수에서 제공되는 난방용 온수와 별개로 욕실용 온수를 제공하는 욕실온수 가공부재;를 더 포함하여 구성할 필요도 있다. 이러한 상기 욕실온수 가공부재는 예컨대, 상기 급탕기의 열기에 의해 실질적으로 욕실용 온수를 가공하는 온수코일;로 구성할 수 있다.On the other hand, the electric boiler according to the present invention, the bathroom hot water processing member for providing hot water for the bathroom separately from the heating hot water provided in the discharge water; The bathroom hot water processing member may be configured, for example, a hot water coil for substantially processing the hot water for the bathroom by the heat of the hot water heater.

상기와 같은 본 발명에 의한 전기보일러는, 급탕기에서 가열되어 온수공급관으로 공급되는 고온수를 배출관이 곧바로 미도시된 난방배관으로 공급하므로, 고열로 가열된 고온수를 열손실 없이 난방수로 이용할 수 있는 효과가 있다.Electric boiler according to the present invention as described above, the hot water is heated in the hot water supply to the hot water supply pipe supply pipe to the heating pipe not shown immediately, it is possible to use the hot water heated at high heat as heating water without heat loss. It has an effect.

특히, 배출수 보충수단이 저수조에 저수된 물의 일부를 배출관으로 공급하므로, 배출관이 원활하게 고온수를 배출할 수 있는 효과가 있다.In particular, since the discharge water replenishing means supplies a portion of the water stored in the reservoir to the discharge pipe, there is an effect that the discharge pipe can smoothly discharge the hot water.

또, 역류억제부재가 급탕기에 격리된 물이 역류하는 것을 방지하므로, 급탕 기에서 급속가열된 고온수가 역류하면서 열손실되는 것을 방지할 수 있는 효과도 있다.In addition, since the backflow inhibiting member prevents backflow of the water isolated from the hot water heater, there is also an effect of preventing the heat loss during the backflow of the hot water rapidly heated in the hot water heater.

또한, 온수공급관 및 배출관 사이에 집수챔버를 마련할 경우 온수공급관에서 공급되는 고온수를 이용하여 저수조 상부에 저수된 물을 가열할 수 있는 효과도 있다.In addition, when the collection chamber is provided between the hot water supply pipe and the discharge pipe, there is an effect of heating the water stored in the upper portion of the reservoir using the hot water supplied from the hot water supply pipe.

아울러, 욕실온수 가공부재를 마련할 경우 급탕기의 열기를 이용하여 난방수와 별개로 욕실용 온수를 제공할 수 있는 효과도 있다.In addition, when providing a hot water processing member in the bathroom there is an effect that can provide hot water for the bathroom separately from the heating water by using the heat of the hot water heater.

이하, 첨부된 도면을 참조하여 본 발명에 의한 전기보일러를 설명하면 다음과 같으며, 첨부된 도 2는 본 발명의 실시예에 의한 전기보일러의 종단면도이다.Hereinafter, an electric boiler according to the present invention will be described with reference to the accompanying drawings. FIG. 2 is a longitudinal sectional view of the electric boiler according to an embodiment of the present invention.

도시된 바와 같이, 본 발명의 실시예에 의한 전기보일러는 저수조(110); 급탕기(120); 온수공급관(130); 배출관(140) 및; 배출수 보충수단;을 포함한다. 이러한 구성요소를 좀더 자세히 설명하면 다음과 같다.As shown, the electric boiler according to an embodiment of the present invention is a reservoir (110); Hot water heater 120; Hot water supply pipe 130; Discharge tube 140; And effluent replenishment means. The following describes these components in more detail.

먼저, 전술한 저수조(110)는 외부에서 공급되는 물을 저수한다. 이러한 저수조(110)는 도시된 바와 같이 사방이 밀폐되고, 일측에 외부의 물이 공급되는 급수관(112)이 마련된다. 즉, 저수조(110)는 일측의 급수관(112)을 통해 물을 저수한다. 이때, 급수관(112)은 도시된 바와 같이 저수조(110)의 하부에 마련되는 것이 바람직하다.First, the above-described reservoir 110 stores water supplied from the outside. The reservoir 110 is sealed in all directions as shown, the water supply pipe 112 is supplied with external water on one side. That is, the reservoir 110 stores water through the water supply pipe 112 on one side. At this time, the water supply pipe 112 is preferably provided in the lower portion of the reservoir 110 as shown.

다음, 전술한 급탕기(120)는 저수조(110)에 저수된 일부의 물을 격리시켜서 외부에서 공급되는 전기를 이용하여 고온으로 급속가열한다. 이러한 급탕기(120)는 예컨대, 도시된 바와 같이 격리챔버(122) 및; 전열히터(124);를 포함하여 구성할 수 있다.Next, the above-mentioned hot water heater 120 isolates a part of the water stored in the reservoir 110 and rapidly heats it to a high temperature by using electricity supplied from the outside. The hot water heater 120 includes, for example, an isolation chamber 122 as shown; Electrothermal heater 124; can be configured to include.

여기서, 전술한 격리챔버(122)는 도시된 바와 같이 저수조(110)의 하부에 일체적으로 내장되며, 일측에 형성된 유입구(122a)를 통해 상기 저수조(110)의 하부에 저수된 일부의 물을 유입하여 격리시킨다. 그리고, 타측에 일체적으로 연결된 후술되는 온수공급관(130)을 통해 격리된 일부의 물을 상기 저수조(110)의 상부로 공급한다. 즉, 격리챔버(122)는 유입구(122a)로 유입되는 물을 격리시키고, 격리된 물이 후술되는 전열히터(124)에 의해 가열되면, 후술되는 온수공급관(130)을 통해 저수조(110)의 상부로 이송시킨다.Here, the above-described isolation chamber 122 is integrally embedded in the lower portion of the reservoir 110 as shown, through the inlet (122a) formed on one side of the water stored in the lower portion of the reservoir 110 Enter and isolate. Then, a part of the water isolated through the hot water supply pipe 130 which is integrally connected to the other side is supplied to the upper portion of the reservoir 110. That is, the isolation chamber 122 isolates the water flowing into the inlet 122a, and when the isolated water is heated by the heat transfer heater 124 which will be described later, the water tank 110 of the reservoir 110 will be described. Transfer it to the top.

그리고, 전술한 전열히터(124)는 도시된 바와 같이 격리챔버(122)에 내장되어 외부에서 공급되는 전기에 의해 발열하면서 격리챔버(122)에 격리된 물을 고온으로 가열한다. 이러한 전열히터(124)는 도시된 바와 같이 복수로 구성할 수 있으며, 이와 달리 단수로 구성할 수도 있다.The heat transfer heater 124 described above heats the water isolated in the isolation chamber 122 to a high temperature while being generated in the isolation chamber 122 and generating heat by electricity supplied from the outside. The heat transfer heater 124 may be configured as a plurality, as shown, alternatively may be configured in a singular.

이와 같은 전열히터(124)는 격리챔버(122)에 내장된 상태로 발열하므로, 격리챔버(122)에 격리된 물을 급속가열한다. 즉, 전열히터(124)는 격리챔버(122)에 격리된 물만을 고온으로 가열한다. 물론, 격리챔버(122)에 격리된 물은 격리챔버(122) 외측의 물과 격리됨에 따라 전열히터(124)에 의해 급속가열된다.Since the heat transfer heater 124 generates heat in a state of being embedded in the isolation chamber 122, it rapidly heats the water isolated in the isolation chamber 122. That is, the heat transfer heater 124 heats only the water isolated in the isolation chamber 122 to a high temperature. Of course, the water isolated in the isolation chamber 122 is rapidly heated by the heat transfer heater 124 as it is isolated from the water outside the isolation chamber 122.

계속해서, 전술한 온수공급관(130)은 도시된 바와 같이 급탕기(120)에 수직으로 직결되는 파이프이다. 따라서, 온수공급관(130)은 급탕기(120)에서 급속가열된 고온수를 저수조(110)의 상부로 유도하여, 저수조(110)의 상부측으로 고온수를 공급한다. 즉, 급탕기(120)의 격리챔버(122)에서 고온으로 가열된 고온수는 온수공급관(130)을 따라 상부로 이동한다.Subsequently, the above-described hot water supply pipe 130 is a pipe directly connected to the hot water heater 120 as shown. Thus, the hot water supply pipe 130 guides the hot water rapidly heated in the hot water heater 120 to the upper portion of the reservoir 110, and supplies the hot water to the upper side of the reservoir 110. That is, the hot water heated to a high temperature in the isolation chamber 122 of the hot water heater 120 moves upward along the hot water supply pipe 130.

이때, 고온수는 온도차에 의해 상부로 이동한다. 즉, 온수공급관(130)으로 공급되는 고열의 고온수는 저수조(110)의 상부 온도가 급속가열된 고온수의 온도 보다 낮으므로. 온도차에 의한 열교환을 하기 위해 온수공급관(130)을 통해 자연히 상부로 이동한다.At this time, the hot water moves upward by the temperature difference. That is, since the high temperature hot water supplied to the hot water supply pipe 130 is lower than the temperature of the high temperature water of the rapid heating of the reservoir 110. In order to exchange heat due to the temperature difference, it naturally moves upward through the hot water supply pipe 130.

여기서, 전술한 온수공급관(130)은 도시된 바와 같이 복수로 구성할 수 있으며, 이와 달리 단수로 구성할 수도 있다. 이러한 온수공급관(130)은 많은 양의 고온수가 단시간에 상부로 이동하도록, 도시된 바와 같이 복수개로 구성하는 것이 바람직하다.Here, the above-described hot water supply pipe 130 may be configured in plural as shown, alternatively may be configured in the singular. The hot water supply pipe 130 is preferably configured in plural as shown, so that a large amount of hot water moves to the top in a short time.

다시 계속해서, 전술한 배출관(140)은 온수공급관(130)에서 공급되는 고온수를 저수조(110)의 외부로 배출한다. 즉, 배출관(140)은 온수공급관(130)의 고온수를 곧바로 저수조(110)의 외부로 배출한다.Subsequently, the discharge pipe 140 described above discharges the hot water supplied from the hot water supply pipe 130 to the outside of the reservoir 110. That is, the discharge pipe 140 immediately discharges the hot water of the hot water supply pipe 130 to the outside of the reservoir 110.

이때, 배출관(140)은 미도시된 난방배관에 연결된 난방펌프의 펌핑압에 의해 고온수를 외부로 배출한다. 물론, 저수조(110)의 외부로 배출되는 고온수는 미도시된 난방배관으로 유입되어 난방을 실시한 후, 저수조(110)의 하부측 급수관(112)을 통해 다시 저수조(110)로 유입된다. 즉, 고온수는 난방배관을 통해 난방을 실시한 후, 저수조(110))로 다시 유입되어 급속가열된 다음, 다시 난방배관으로 공급되는 과정을 순환한다.At this time, the discharge pipe 140 discharges the hot water to the outside by the pumping pressure of the heating pump connected to the heating pipe not shown. Of course, the hot water discharged to the outside of the reservoir 110 is introduced into the heating pipe not shown, and after heating, is introduced into the reservoir 110 again through the lower side water supply pipe 112 of the reservoir 110. That is, the hot water is heated through the heating pipe, flows back into the reservoir 110, is rapidly heated, and then circulates again supplied to the heating pipe.

여기서, 전술한 배출관(140)은 도시된 바와 같이 온수공급관(130)의 단부에 형성하는 것이 바람직하다. 이러한 배출관(140)은 도시된 바와 같이 온수공급관(130)과 별개로 제조하여, 용접이나 나사결합을 통해 온수공급관(130)에 일체적으로 연결하여 구성할 수 있다. 이와 달리, 배출관(140)은 온수공급관(130)의 단부를 길게 연장형성한 후 상단부를 절곡하여 도시된 바와 같이 구성할 수도 있다.Here, the discharge pipe 140 described above is preferably formed at the end of the hot water supply pipe 130 as shown. The discharge pipe 140 is manufactured separately from the hot water supply pipe 130 as shown, can be configured to be integrally connected to the hot water supply pipe 130 through welding or screwing. Alternatively, the discharge pipe 140 may be configured as shown by bending the upper end after extending the end of the hot water supply pipe 130 long.

마지막으로, 전술한 배출수 보충수단은 저수조(110)의 상부측에 저수된 물의 일부를 배출관(140)으로 공급한다. 이렇게, 배출수 보충수단이 배출관(140)에 물을 공급하는 이유는, 배출관(140)에 작용하는 미도시된 난방펌프의 펌핑압에 대응하는 유량이 배출관(140)에 제공되도록 하기 위함이다.Finally, the above-described discharge water replenishing means supplies a portion of the water stored in the upper side of the reservoir 110 to the discharge pipe 140. In this way, the discharge water replenishing means to supply water to the discharge pipe 140, so that the flow rate corresponding to the pumping pressure of the heating pump not shown acting on the discharge pipe 140 is provided to the discharge pipe 140.

이에 대해 좀더 자세히 설명하면, 배출관(140)은 미도시된 난방펌프의 펌핑에 의해 온수공급관(130)의 고온수를 미도시된 난방배관으로 배출하여야 한다. 하지만, 배출관(140)은 급탕기(120)의 격리챔버(122)에 격리된 물만 온수공급관(130)에 공급되므로, 난방펌프의 펌핑량에 대응하는 양의 물을 공급받지 못한다. 이에 따라, 배출수 보충수단은 배출관(140)이 난방펌프의 펌핑량에 대응하는 물을 공급받아서 배출하도록, 저수조(110)의 상부측에 저수된 물의 일부를 배출관(140)으로 공급한다. 따라서, 배출관(140)은 난방펌프의 펌핑량에 충분히 대응하는 물을 배출한다.In more detail about this, the discharge pipe 140 should discharge the hot water of the hot water supply pipe 130 to the heating pipe not shown by the pumping of the heating pump not shown. However, since the discharge pipe 140 is supplied to the hot water supply pipe 130 only the water isolated from the isolation chamber 122 of the hot water heater 120, it does not receive the amount of water corresponding to the pumping amount of the heating pump. Accordingly, the discharge water replenishing means supplies a portion of the water stored in the upper side of the reservoir 110 to the discharge pipe 140 so that the discharge pipe 140 receives the water corresponding to the pumping amount of the heating pump and discharges the water. Therefore, the discharge pipe 140 discharges water sufficiently corresponding to the pumping amount of the heating pump.

이와 같은 배출수 보충수단은 예컨대, 도시된 바와 같이 저수조(110)의 내부 상측과 연통된 상태로 배출관(140)의 일측에 마련되어, 저수조(110)의 상부측에 저수된 물을 배출관(140)으로 공급하는 유량보충구(162)로 구성할 수 있다. 이러한 유량보충구(162)는 도시된 바와 같은 관형태의 파이프로 구성할 수 있으며, 이와 달리 확대 도시된 바와 같은 구멍(164) 형태로 형성하여 구성할 수도 있다. Such discharge water replenishing means is provided on one side of the discharge pipe 140 in a state in communication with the inner upper side of the reservoir 110, for example, the water stored in the upper side of the reservoir 110 to the discharge pipe 140 It can be comprised by the flow rate filling port 162 to supply. The flow filler 162 may be configured as a pipe in the form of a tube as shown, alternatively, may be formed in the form of a hole 164 as shown enlarged.

이와 같은 유량보충구(162)는 배수관(140)에서 배출되는 물의 양을 보충한다. 따라서, 배출관(140)은 미도시된 난방배관에 충분한 양의 물을 공급한다.The flow filler 162 as such supplements the amount of water discharged from the drain pipe 140. Therefore, the discharge pipe 140 supplies a sufficient amount of water to the heating pipe not shown.

한편, 본 발명의 실시예에 의한 전기보일러는 배출관(140)에서 배출되는 난방용 온수와 별개로 욕실용 온수를 가공하는 욕실온수 가공부재;를 더 포함하여 구성할 필요가 있다.On the other hand, the electric boiler according to an embodiment of the present invention needs to further include a; bathroom hot water processing member for processing hot water for the bathroom separately from the hot water for heating discharged from the discharge pipe (140).

이러한, 욕실온수 가공부재는 급탕기(120)의 열기에 의해 실질적으로 욕실용 온수를 가공하도록 구성하는 것이 바람직하다. 이러한 욕실온수 가공부재는 예컨대, 도시된 바와 같이 온수공급관(130)에 와인딩되어 온수공급관(130)의 온도에 의해 욕실용 온수를 가공하는 온수코일(180);로 구성할 수 있다. 즉, 온수코일(180)은 급탕기(120)의 고온수가 관류하는 온수공급관(130)의 열기에 의해 내부의 물을 가열한다. 따라서, 온수코일(180)은 고온의 온수를 미도시된 욕실이나 주방에 제공한다.Such a bathroom hot water processing member is preferably configured to process the hot water for the bathroom substantially by the heat of the hot water heater (120). The bathroom hot water processing member may be configured to include, for example, a hot water coil 180 wound on the hot water supply pipe 130 to process hot water for bathroom by the temperature of the hot water supply pipe 130. That is, the hot water coil 180 heats the water inside by the heat of the hot water supply pipe 130 through which the hot water of the hot water heater 120 flows. Accordingly, the hot water coil 180 provides hot water of high temperature to a bathroom or a kitchen not shown.

이와 같은 온수코일(180)은 도시된 바와 같이 전술한 온수공급관(130)과 별개로 제조되어 온수공급관(130)에 와인딩될 수 있으며, 이와 달리 온수공급관(130)이나 배출관(140)을 관류하는 온수를 곧바로 욕실이나 주방에 공급하도록, 도시된 바와 달리 온수공급관(130)이나 배출관(140)에 연통상태로 직결될 수도 있다. 즉, 온수코일(180)은 온수공급관(130)에 와인딩될 경우 외부에서 공급되는 냉수를 온수공급관(130)의 열기로 가열할 수 있으며, 이와 달리 온수공급관(130)이나 배출관(140)에 연통될 경우 온수공급관(130)이나 배출관(140)의 고온수를 곧바로 배출 할 수도 있다. 하지만, 온수코일(180)은 난방시 난방온수가 욕실용 온수로 배출되는 것이 방지되도록, 도시된 바와 같이 온수공급관(130)에 와인딩되는 것이 바람직하다.The hot water coil 180 may be manufactured separately from the above-described hot water supply pipe 130 as shown in the figure, and may be wound in the hot water supply pipe 130. Alternatively, the hot water coil 180 may flow through the hot water supply pipe 130 or the discharge pipe 140. In order to supply hot water directly to the bathroom or kitchen, it may be directly connected to the hot water supply pipe 130 or the discharge pipe 140 in a different state than shown. That is, when the hot water coil 180 is wound on the hot water supply pipe 130, the cold water supplied from the outside may be heated by the heat of the hot water supply pipe 130. Alternatively, the hot water coil 180 may communicate with the hot water supply pipe 130 or the discharge pipe 140. If the hot water supply pipe 130 or the discharge pipe 140 may be immediately discharged hot water. However, the hot water coil 180 is preferably wound in the hot water supply pipe 130 as shown, so that the heating hot water is prevented from being discharged to the hot water for bathroom.

다른 한편, 도면상 미설명부호 190은 바이패스관(192) 및 순환펌프(194)로 이루어진 순환부재이다. 이러한 순환부재(190)는 저수조(110)의 상부측 물을 바이패스관(192)으로 우회시켜서 저수조(110)의 하부로 공급한다. 이때, 순환펌프(194)는 바이패스관(192)을 관류하는 물을 펌핑한다. 따라서, 저수조(110)의 물은 순환부재(190)에 의해 강제로 순환된다. On the other hand, reference numeral 190 in the drawing is a circulation member consisting of the bypass pipe 192 and the circulation pump (194). The circulation member 190 bypasses the upper side water of the reservoir 110 to the bypass pipe 192 and supplies it to the lower portion of the reservoir 110. At this time, the circulation pump 194 pumps water flowing through the bypass pipe 192. Therefore, the water in the reservoir 110 is forcedly circulated by the circulation member 190.

이상과 같이 구성된 본 발명의 실시예에 의한 전기보일러는, 급탕기(120)에서 급속가열된 저수조(110)의 물을 온수공급관(130)을 통해 배출관(140)으로 공급한다. 따라서, 배출관(140)은 고온수를 미도시된 난방배관으로 공급하여 실내를 난방한다. 이때, 유량보충구(162)로 구성된 배출수 보충수단은 배출관(140)으로 고온수가 원활하게 배출되도록, 저수조(110)의 상부에 저수된 일부의 물을 배출관(140)으로 공급한다.The electric boiler according to the embodiment of the present invention configured as described above supplies the water of the reservoir 110 rapidly heated in the hot water heater 120 to the discharge pipe 140 through the hot water supply pipe 130. Therefore, the discharge pipe 140 supplies the hot water to the heating pipe not shown to heat the room. At this time, the discharge water replenishing means composed of the flow rate supplement 162 supplies a portion of the water stored in the upper portion of the reservoir 110 to the discharge pipe 140 so that the hot water smoothly discharged to the discharge pipe 140.

한편, 온수공급관(130) 및 배출관(140)은 내부에 관류하는 고온수를 이용하여 저수조(110) 상부에 저수된 물을 가열한다. 즉, 온수공급관(130) 및 배출관(140)은 필요에 따라 고온수를 미도시된 난방배관으로 배출할 뿐만 안니라, 자체 고온을 이용하여 저수조(110)에 저수된 물을 가열한다.On the other hand, the hot water supply pipe 130 and the discharge pipe 140 heats the water stored in the upper portion of the reservoir 110 by using the hot water flowing through the inside. That is, the hot water supply pipe 130 and the discharge pipe 140 not only discharges the hot water into a heating pipe not shown as needed, but also heats the water stored in the reservoir 110 using its own high temperature.

또 한편, 온수공급관(130)에 와인딩된 온수코일(180)은 온수공급관(130)을 관류하는 고온수의 열기로 인하여 가열된다. 따라서, 온수코일(180)은 미도시된 욕실이나 주방으로 온수를 공급한다.On the other hand, the hot water coil 180 wound on the hot water supply pipe 130 is heated due to the heat of the hot water flowing through the hot water supply pipe 130. Thus, the hot water coil 180 supplies hot water to a bathroom or kitchen not shown.

다른 한편, 첨부된 도 3은 본 발명의 다른 실시예에 의한 전기보일러의 종단면도로서, 다른 실시예에 의한 전기보일러는 전술한 도 2에 도시된 전기보일러와 모든 구성이 동일하고, 다만 도시된 바와 같이 온수공급관(130)의 상단에 집수챔버(170)가 설치된 것이 도 2에 도시된 전기보일러와의 차이점이다. 따라서, 첨부된 도면을 참조하여 이러한 차이점만을 설명하면 다음과 같다.On the other hand, Figure 3 attached is a longitudinal cross-sectional view of the electric boiler according to another embodiment of the present invention, the electric boiler according to another embodiment is the same as all the configuration of the electric boiler shown in FIG. As described above, the collection chamber 170 is installed at the upper end of the hot water supply pipe 130, which is different from the electric boiler shown in FIG. Accordingly, only these differences will be described with reference to the accompanying drawings.

도시된 바와 같이, 본 발명의 다른 실시예에 의한 전기보일러는 온수공급관(130)의 상단에 설치된 집수챔버(170)가 온수공급관(130)에서 공급되는 고온수를 집수한다. 이러한 집수챔버(170)는 도시된 바와 같이 온수공급관(130)의 토출측 단부가 일측에 연결되고, 배출관(140)의 유입구측 단부가 타측에 연결되어, 저수조(110)의 상부에서 온수공급관(130)으로 유도되는 고온수를 집수하여 확산시키는 동시에, 확산되는 고온수를 배출관(140)으로 공급한다.As shown, the electric boiler according to another embodiment of the present invention collects the hot water supplied from the hot water supply pipe 130, the collection chamber 170 installed on the top of the hot water supply pipe 130. As shown in the collection chamber 170, the discharge side end of the hot water supply pipe 130 is connected to one side, and the inlet side end of the discharge pipe 140 is connected to the other side, the hot water supply pipe 130 from the upper portion of the reservoir 110 At the same time, the hot water is guided to the discharge pipe 140 by collecting and diffusing the hot water.

이렇게, 저수조(110)의 상부에 집수챔버(170)를 마련한 이유는, 집수챔버(170)가 온수공급관(130)에서 공급되는 고온수를 저수조(110)의 상부에 확산시켜서, 저수조(110)의 상부에 저수된 물이 집수챔버(170)에서 제공되는 열기에 의해 간접적으로 가열되도록 하기 위함이다. 즉, 저수조(110)의 상부에 저수된 물은 집수챔버(170)에서 발열되는 열기에 의해 가열된다. 따라서, 저수조(110)에 저수된 물은 보다 빨리 가열된다.Thus, the reason for providing the collecting chamber 170 in the upper portion of the reservoir 110, the collecting chamber 170 diffuses the hot water supplied from the hot water supply pipe 130 to the upper portion of the reservoir 110, the reservoir 110 This is to allow the water stored in the upper portion of the to be indirectly heated by the heat provided from the collection chamber 170. That is, the water stored in the upper portion of the reservoir 110 is heated by the heat generated by the collection chamber 170. Thus, the water stored in the reservoir 110 is heated faster.

한편, 전술한 배출수 보충수단의 유량보충구(162)는 도시된 바와 같이 집수챔버(170)의 일측에 연통상태로 마련하는 것이 바람직하다. 따라서, 유량보충구(162)는 미도시된 난방펌프에 의해 배출관(140)으로 고온수가 배출될 경우, 저수조(110)의 상부에 저수된 물의 일부를 집수챔버(170)를 통해 배출관(140)으로 공급한다.On the other hand, it is preferable that the flow rate supplement 162 of the discharge water replenishing means is provided in communication with one side of the collecting chamber 170 as shown. Therefore, when the hot water is discharged to the discharge pipe 140 by the heating pump (not shown), the flow filler 162 discharges a portion of the water stored in the upper portion of the reservoir 110 through the collection chamber 170. To supply.

다른 한편, 첨부된 도 4는 도 2 및 도 3에 도시된 급탕기에 설치되는 역류억제부재를 도시한 종단면도이다. 이러한 역류억제부재를 첨부된 도면을 참조하여 설명하면 다음과 같다.On the other hand, Figure 4 is a longitudinal cross-sectional view showing a backflow inhibiting member installed in the hot water heater shown in Figs. When described with reference to the accompanying drawings, such a backflow inhibiting member.

도시된 바와 같이, 급탕기(120)는 유입구(122a)를 통해 저수조(110)의 물이 유입된 후 격리된다. 그러나, 급탕기(120)는 격리된 물이 가열될 경우 온도차에 의해 가열된 물이 유입구(122a)를 통해 역류되면서 배출된다. 따라서, 본 발명의 실시예에 의한 전기보일러는 역류억제부재를 구비할 필요가 있다.As shown, the hot water heater 120 is isolated after the water in the reservoir 110 is introduced through the inlet 122a. However, when the isolated water is heated, the hot water heater 120 is discharged while the water heated by the temperature difference flows back through the inlet 122a. Therefore, the electric boiler according to the embodiment of the present invention needs to include a backflow inhibiting member.

이러한 역류억제부재는 급탕기(120)와 연통상태를 이루면서 급탕기(120)에 일체적으로 마련됨에 따라 저수조(110)의 물이 급탕기(120)의 유입구(122a)에 유입되는 것은 허용하고, 유입된 물이 역류하는 것을 방해하는 구조로 형성됨에 따라 급탕기(120)에서 격리상태로 가열된 물이 온도차에 의해 유입구(122a)로 역류하는 것은 억제하도록 구성하는 것이 바람직하다. 즉, 역류억제부재는 급탕기(120)로 물이 유입되는 것은 허용하고 역류하는 것은 억제한다.The countercurrent suppression member is in communication with the hot water heater 120 while being integrally provided in the hot water heater 120 to allow the water of the reservoir 110 to be introduced into the inlet 122a of the hot water heater 120. As water is formed in a structure that prevents backflow, it is preferable to configure the water heated in isolation from the hot water heater 120 to reflux back to the inlet 122a due to a temperature difference. That is, the backflow inhibiting member allows water to flow into the hot water heater 120 and suppresses backflow.

이와 같은 역류억제부재는 예컨대, 도시된 바와 같이 급탕기(120)의 격리챔 버(122)에 일체적으로 설치되어 유입구(122a)를 차폐하고, 일측에 유입구(122a)와 실질적으로 직교상태를 이루면서 연통되는 흡입공(126a)이 형성된 흡입챔버(126)로 구성할 수 있다. 이러한 흡입챔버(126)는 저수조(110)에 저수된 물을 흡입공(126a)으로 흡입하여 유입구(122a)에 공급한다. 즉, 흡입챔버(126)의 흡입공(126a)으로 흡입된 물은 직각으로 꺽이면서 유입구(122a)로 들어간다.Such a reverse flow inhibiting member is integrally installed in the isolation chamber 122 of the hot water heater 120, for example, to shield the inlet 122a and substantially perpendicular to the inlet 122a on one side. It may be configured as a suction chamber 126 is formed in communication with the suction hole (126a). The suction chamber 126 sucks the water stored in the reservoir 110 into the suction hole 126a and supplies it to the inlet 122a. That is, the water sucked into the suction hole 126a of the suction chamber 126 enters the inlet 122a while bending at a right angle.

따라서, 격리챔버(122)에 유입된 물은 가열되어도 유입구(122a)에서 직각으로 꺽여야 흡입공(126a)을 통해 배출되므로 사실상 역류가 불가능하다. 즉, 흡입챔버(126)는 흡입공(126a)이 유입구(122a)와 직각을 이루므로, 격리챔버(122)의 외측에 실질적으로 역류방지를 위한 단차를 제공한다.Therefore, even if the water introduced into the isolation chamber 122 is discharged through the suction hole 126a at a right angle at the inlet 122a even when heated, reverse flow is virtually impossible. That is, the suction chamber 126 has a suction hole 126a perpendicular to the inlet 122a, and thus provides a step for substantially preventing backflow to the outside of the isolation chamber 122.

여기서, 전술한 흡입공(126a)은 격리챔버(122)에서 역류하는 물이 흡입챔버(126)의 외부로 배출되는 것을 보다 확실하게 억제하도록, 도면상의 확대도 "A"에 도시된 바와 같이 흡입챔버(126)의 측방 상부에 형성하는 것이 바람직하다. 하지만, 흡입공(126a)은 확대도 "A"에 파선으로 도시된 바와 같이 흡입챔버(126)의 측방 하부에 형성할 수도 있다. 물론, 흡입공(126a)은 흡입챔버(126)의 측방 상부 및 하부에 모두 형성할 수도 있다.Here, the above-described suction hole 126a is sucked as shown in the enlarged view "A" in the drawing so as to more reliably suppress the water flowing back from the isolation chamber 122 to the outside of the suction chamber 126. It is preferable to form in the upper side of the chamber 126. However, the suction hole 126a may be formed in the lower side of the suction chamber 126 as shown by the broken line in the enlarged view "A". Of course, the suction hole 126a may be formed at both the upper side and the lower side of the suction chamber 126.

전술한 바와 달리 역류억제부재는 예컨대, 도면상의 확대도 "B"에 도시된 바와 같이 급탕기(120)의 격리챔버(122)에 양단이 노출된 상태로 삽입되고, 노출된 양단부에 상기 저수조(110)의 물을 흡입하는 흡공입(128a)이 형성되며, 이 흡입공(128a)과 실질적으로 직교상태를 이루면서 흡입공(128a)으로 흡입된 물을 격리챔버(122)에 공급하는 공급공(128b)이 형성된 흡입관(128)으로 구성할 수도 있다. 즉, 흡입관(128)은 격리챔버(122)에 내장되며, 양단부 및 상부에 흡입공(128a) 및 공급공(128b)이 제각기 형성된다. 따라서, 흡입관(128)은 흡입공(128a)으로 물을 흡수하여 공급공(128b)을 통해 격리챔버(122)로 물을 공급한다. 이때, 흡입공(128a)으로 흡입된 물은 직각으로 꺽인 후 공급공(128b)을 통해 격리챔버(122)에 공급된다. 물론, 공급공(128b)에 공급된 물은 역류시 꺽인 후 흡입공(128a)으로 배출되어야 하므로, 원활하게 배출되지 못하고 사실상 역류가 억제된다.Unlike the above, the countercurrent suppression member is inserted, for example, with both ends exposed to the isolation chamber 122 of the water heater 120 as shown in an enlarged view "B" in the drawing, and the reservoir 110 is exposed at both ends thereof. A suction hole 128a is formed to suck water from the suction hole 128a. The suction hole 128a is substantially orthogonal to the suction hole 128a and supplies the water sucked into the suction hole 128a to the isolation chamber 122. It may be configured as a suction pipe 128 is formed. That is, the suction pipe 128 is embedded in the isolation chamber 122, and suction holes 128a and supply holes 128b are formed at both ends and the upper portions, respectively. Thus, the suction pipe 128 absorbs water into the suction hole 128a and supplies water to the isolation chamber 122 through the supply hole 128b. At this time, the water sucked into the suction hole (128a) is bent at a right angle and then supplied to the isolation chamber 122 through the supply hole (128b). Of course, the water supplied to the supply hole (128b) is to be discharged to the suction hole (128a) after bending in the reverse flow, it is not discharged smoothly, in fact the backflow is suppressed.

여기서, 전술한 흡입공(128a)은 확대 도시된 바와 같이 흡입관(128)의 양단측 상부에 형성할 수 있으며, 이와 달리 파선으로 확대 도시된 바와 같이 흡입관(128)의 양단측 하부에 형성할 수도 있다. 또한, 흡입공(128a)은 흡입관(128)의 양단을 완전하게 개방하여 형성할 수도 있다.Here, the above-described suction hole 128a may be formed at both upper ends of the suction pipe 128 as shown in enlargement. Alternatively, the suction hole 128a may be formed at both lower ends of the suction pipe 128 as shown in enlarged dashed lines. have. In addition, the suction hole 128a may be formed by completely opening both ends of the suction pipe 128.

결론적으로, 흡입챔버(126) 또는 흡입관(128)으로 유입된 물은 쉽게 다시 밖으로 나가지 못한다. 따라서, 격리챔버(122)에 격리된 물은 역류에 의해 배출되지 않는다.In conclusion, the water introduced into the suction chamber 126 or the suction pipe 128 does not easily go out again. Therefore, the water sequestered in the isolation chamber 122 is not discharged by the reverse flow.

상기한 실시예는 본 발명의 바람직한 실시예를 설명한 것에 불과하므로, 본 발명의 적용 범위는 이와 같은 것에 한정되지 않으며, 동일 사상의 범주내에서 적절한 변경이 가능하다. 따라서, 본 발명의 실시예에 나타난 각 구성 요소의 형상 및 구조는 변형하여 실시할 수 있으므로, 이러한 형상 및 구조의 변형은 첨부된 본 발명의 특허청구범위에 속함은 당연한 것이다.Since the above embodiments are merely illustrative of preferred embodiments of the present invention, the scope of application of the present invention is not limited to the above, and appropriate modifications are possible within the scope of the same idea. Therefore, since the shape and structure of each component shown in the embodiment of the present invention can be carried out by deformation, it is natural that the modification of the shape and structure belong to the appended claims of the present invention.

도 1은 종래기술에 의한 전기보일러의 종단면도;1 is a longitudinal sectional view of an electric boiler according to the prior art;

도 2는 본 발명의 실시예에 의한 전기보일러의 종단면도;2 is a longitudinal sectional view of an electric boiler according to an embodiment of the present invention;

도 3은 본 발명의 다른 실시예에 의한 전기보일러의 종단면도; 및3 is a longitudinal sectional view of an electric boiler according to another embodiment of the present invention; And

도 4는 도 2 및 도 3에 도시된 급탕기에 설치되는 역류억제부재를 도시한 종단면도.4 is a longitudinal sectional view showing a backflow inhibiting member installed in the hot water heater shown in FIGS. 2 and 3.

<도면의 주요부호 설명><Description of Major Symbols in Drawing>

110 : 저수조 112 : 급수관110: reservoir 112: water pipe

120 : 급탕기 130 : 온수공급관120: hot water heater 130: hot water supply pipe

140 : 배출관 122 : 격리챔버140: discharge pipe 122: isolation chamber

122a : 유입구 124 : 전열히터122a: inlet 124: electric heater

126 : 흡입챔버 126a, 128a : 흡입공126: suction chamber 126a, 128a: suction hole

128 : 흡입관 128b : 공급공128: suction pipe 128b: supply hole

162 : 유량보충구 170 : 집수챔버162: flow refill 170 170: collection chamber

180 : 온수코일180: hot water coil

Claims (8)

전기를 이용하여 외부에서 유입된 물을 고온으로 가공하고, 고온으로 가공된 고온수를 난방펌프의 펌핑압에 의해 배출하여 난방을 실시하는 보일러에 있어서,In a boiler in which water introduced from the outside is heated to a high temperature using electricity, and the hot water processed at a high temperature is discharged by a pumping pressure of a heating pump to perform heating. 사방이 밀폐되어 일측에 마련된 급수관(112)으로 유입되는 물을 저수하는 저수조(110);Water storage tank 110 for storing the water flowing into the water supply pipe 112 is provided on one side is sealed on all sides; 상기 저수조(110)에 저수된 일부의 물을 격리시켜서 외부에서 공급되는 전기를 이용하여 고온으로 급속가열하는 급탕기(120);A hot water heater (120) for isolating some of the water stored in the water storage tank (110) and rapidly heating it to a high temperature by using electricity supplied from the outside; 상기 급탕기(120)에서 급속가열된 고온수를 상기 저수조(110)의 상부로 유도하여, 상기 저수조(110)의 상부측으로 고온수를 공급하는 온수공급관(130);A hot water supply pipe 130 for guiding hot water rapidly heated in the hot water heater 120 to an upper portion of the water storage tank 110 to supply hot water to an upper side of the water storage tank 110; 상기 온수공급관(130)에서 공급되는 고온수를 상기 난방펌프의 펌핑압에 의해 상기 저수조(110)의 외부로 배출하는 배출관(140); 및A discharge pipe 140 discharging the hot water supplied from the hot water supply pipe 130 to the outside of the water storage tank 110 by a pumping pressure of the heating pump; And 상기 배출관(140)에 작용하는 상기 난방펌프의 펌핑압에 대응하는 유량이 상기 배출관(140)에 제공되도록, 상기 저수조(110)의 상부측에 저수된 물을 상기 배출관(140)에 보충하는 배출수 보충수단;을 포함하는 전기보일러.Discharge water for replenishing the discharge pipe 140 with water stored in the upper side of the reservoir 110 so that the flow rate corresponding to the pumping pressure of the heating pump acting on the discharge pipe 140 is provided to the discharge pipe 140. An electric boiler comprising a supplementary means. 제 1 항에 있어서, 상기 급탕기(120)는,According to claim 1, The hot water heater 120, 상기 저수조(110)의 하부에 일체적으로 내장되고, 일측에 형성된 유입구(122a)를 통해 상기 저수조(110)의 하부에 저수된 일부의 물을 유입하여 격리시키며, 타측에 일체적으로 연결된 상기 온수공급관(130)을 통해 격리된 물을 상기 저수조(110)의 상부로 공급하는 격리챔버(122); 및The hot water integrally embedded in the lower portion of the reservoir 110, inflows and insulates some of the water stored in the lower portion of the reservoir 110 through an inlet 122a formed on one side, and integrally connected to the other side. An isolation chamber 122 for supplying the water isolated through the supply pipe 130 to the upper portion of the reservoir 110; And 상기 격리챔버(122)에 내장되어 외부에서 공급되는 전기에 의해 발열하면서 상기 격리챔버(122)에 격리된 물을 고온으로 가열하는 전열히터(124);를 포함하는 전기보일러.And an electrothermal heater (124) for heating the water isolated in the isolation chamber (122) to a high temperature while generating heat by electricity supplied from the outside, which is embedded in the isolation chamber (122). 제 1 항에 있어서, 상기 배출수 보충수단은,The method of claim 1, wherein the effluent replenishing means, 상기 저수조(110)의 내부 상측과 연통된 상태로 상기 배출관(140)의 일측에 마련되어, 상기 저수조(110)의 상부측에 저수된 물을 상기 배출관(140)으로 공급하는 유량보충구(162);인 것을 특징으로 하는 전기보일러.It is provided on one side of the discharge pipe 140 in a state in communication with the inner upper side of the reservoir 110, the flow supplement 162 for supplying the water stored in the upper side of the reservoir 110 to the discharge pipe 140. Electric boiler characterized in that; 제 1 항에 있어서The method of claim 1 상기 온수공급관(130)의 토출측 단부가 일측에 연결되고, 상기 배출관(140)의 유입구측 단부가 타측에 연결되어, 상기 저수조(110)의 상부에서 상기 온수공급관(130)으로 유도되는 고온수를 집수하여 확산시키는 동시에, 확산되는 고온수를 상기 배출관(140)으로 공급하는 집수챔버(170);를 더 포함하는 전기보일러.The discharge side end of the hot water supply pipe 130 is connected to one side, the inlet side end of the discharge pipe 140 is connected to the other side, the hot water guided to the hot water supply pipe 130 from the top of the reservoir 110 And a collecting chamber (170) for supplying the diffused hot water to the discharge pipe (140). 제 1 항에 있어서, The method of claim 1, 상기 급탕기(120)와 연통상태를 이루면서 급탕기(120)에 일체적으로 마련됨에 따라 상기 저수조(110)의 물이 급탕기(120)의 유입구(122a)에 유입되는 것은 허용하고, 유입된 물이 역류하는 것을 방해하는 구조로 형성됨에 따라 급탕기(120)에 서 격리상태로 가열된 물이 온도차에 의해 상기 유입구(122a)로 역류하는 것은 억제하는 역류억제부재;를 더 포함하는 전기보일러.As the water heater 120 is integrally provided with the hot water heater 120 while being in communication with the hot water heater 120, the water of the water tank 110 is allowed to flow into the inlet 122a of the hot water heater 120, and the introduced water flows backward. And a backflow inhibiting member which prevents the water heated in an isolated state from the hot water heater 120 from flowing back into the inlet 122a due to the temperature difference as it is formed in a structure that prevents the water from flowing into the inlet 122a. 제 5 항에 있어서, 상기 역류억제부재는,The method of claim 5, wherein the backflow inhibiting member, 상기 급탕기(120)에 일체적으로 설치되어 상기 유입구(122a)를 차폐하고, 일측에 상기 유입구(122a)와 실질적으로 직교상태를 이루면서 연통되는 흡입공(126a)이 형성되며, 상기 저수조(110)에 저수된 물을 흡입공(126a)으로 흡입하여 상기 유입구(122a)에 공급하는 흡입챔버(126);인 것을 특징으로 하는 전기보일러.It is integrally installed in the water heater 120 to shield the inlet (122a), the suction hole 126a is formed in communication with the inlet (122a) substantially orthogonal to one side is formed, the reservoir 110 And a suction chamber (126) for sucking the water stored in the suction hole (126a) and supplying the water to the inlet (122a). 제 5 항에 있어서, 상기 역류억제부재는,The method of claim 5, wherein the backflow inhibiting member, 상기 급탕기(120)에 양단이 노출된 상태로 삽입되고, 노출된 양단부에 상기 저수조(110)의 물을 흡입하는 흡입공(128a)이 형성되며, 이 흡입공(128a)과 실질적으로 직교상태를 이루면서 흡입공(128a)으로 흡입된 물을 상기 격리챔버(122)에 공급하는 공급공(128b)이 형성된 흡입관(128);인 것을 특징으로 하는 전기보일러.Both ends are inserted into the hot water heater 120 in an exposed state, and suction holes 128a are formed at both exposed ends of the water tank 110 to suck water from the reservoir 110, and the suction holes 128a are substantially perpendicular to the suction holes 128a. And a suction pipe (128) having a supply hole (128b) for supplying the water sucked into the suction hole (128a) to the isolation chamber (122). 제 1 항 내지 제 7 항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 7, 상기 배출수(140)에서 제공되는 난방용 온수와 별개로 욕실용 온수를 제공하는 욕실온수 가공부재;를 더 포함하며,Further comprising a; hot water processing member for providing hot water for the bathroom separately from the hot water for heating provided in the discharge water 140, 상기 욕실온수 가공부재는, 상기 급탕기(120)의 열기에 의해 실질적으로 욕실용 온수를 가공하는 온수코일(180);을 더 포함하는 전기보일러.The bathroom hot water processing member, the hot water coil 180 for processing the hot water for the bathroom substantially by the heat of the hot water heater (120); electric boiler further comprising.
KR1020070082632A 2007-03-14 2007-08-17 Electric boiler KR100904998B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020070082632A KR100904998B1 (en) 2007-08-17 2007-08-17 Electric boiler
PCT/KR2007/006534 WO2008111722A1 (en) 2007-03-14 2007-12-14 Electric boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070082632A KR100904998B1 (en) 2007-08-17 2007-08-17 Electric boiler

Publications (2)

Publication Number Publication Date
KR20090018293A true KR20090018293A (en) 2009-02-20
KR100904998B1 KR100904998B1 (en) 2009-06-26

Family

ID=40686587

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070082632A KR100904998B1 (en) 2007-03-14 2007-08-17 Electric boiler

Country Status (1)

Country Link
KR (1) KR100904998B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014112791A1 (en) * 2013-01-18 2014-07-24 Lee Jong Chul Electric boiler compatibly used for hot water using method of heating room heating water
KR101632568B1 (en) * 2015-01-21 2016-06-22 주식회사 그랑쏠레이 Indoor type boiler

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030062373A (en) * 2002-01-16 2003-07-25 박일순 Electric boiler with built in fast heating system
KR100411514B1 (en) * 2002-02-08 2003-12-24 대원전기 주식회사 Thermal energy storage system miniaturizing capacity of heater of heat-saving electic boiler
KR100751485B1 (en) * 2007-03-14 2007-08-27 이희태 Electric boiler

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014112791A1 (en) * 2013-01-18 2014-07-24 Lee Jong Chul Electric boiler compatibly used for hot water using method of heating room heating water
KR101632568B1 (en) * 2015-01-21 2016-06-22 주식회사 그랑쏠레이 Indoor type boiler

Also Published As

Publication number Publication date
KR100904998B1 (en) 2009-06-26

Similar Documents

Publication Publication Date Title
JP2010196992A (en) Water heater
KR101373830B1 (en) Vacuum steam boiler
KR101355124B1 (en) A Expansion Tank Equipped a Warm-up Function of a Boiler and A Boiler-System Using the Same
KR100904998B1 (en) Electric boiler
KR101195436B1 (en) Hot water boiler
JP2010002061A (en) Storage type water heater
KR100961937B1 (en) Electric heating hot water supply apparatus
KR101069068B1 (en) An electrical boiler
JP2007139200A (en) Hot water system, and hot water system with electric reheating and circulating filtration device
JP2010190466A (en) Water heater
WO2008111722A1 (en) Electric boiler
KR101120247B1 (en) small electric boiler
KR101812263B1 (en) Electric boiler using Indirect heating type electric water heater
CN212619283U (en) Instant heating assembly, instant cooling and instant heating structure and gas water heater
JP2012102944A (en) Hot water storage type water heater
KR101752395B1 (en) Steam and hot water mixed boiler
JP5606139B2 (en) Heat source device, heating device, and water filling control method
CN218379919U (en) Water source heat pump hot water system for recovering waste water and waste heat by utilizing fire pool
JP5912995B2 (en) Bath water heater
JP2009019802A5 (en)
KR20080000851U (en) An Electric Instant Water Heater
KR100863272B1 (en) Boiler for mat
KR100809021B1 (en) A heat exchanger for a public bath
JP2006105453A (en) Bathtub water utilizing device
KR20090098363A (en) Heater structure for warm water supply device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment
FPAY Annual fee payment

Payment date: 20140501

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160418

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee