KR20090001295A - 원자로 불시 정지방지 시스템 및 그 방법 - Google Patents
원자로 불시 정지방지 시스템 및 그 방법 Download PDFInfo
- Publication number
- KR20090001295A KR20090001295A KR1020070065558A KR20070065558A KR20090001295A KR 20090001295 A KR20090001295 A KR 20090001295A KR 1020070065558 A KR1020070065558 A KR 1020070065558A KR 20070065558 A KR20070065558 A KR 20070065558A KR 20090001295 A KR20090001295 A KR 20090001295A
- Authority
- KR
- South Korea
- Prior art keywords
- output
- control rod
- reactor
- penalty
- operator
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C9/00—Emergency protection arrangements structurally associated with the reactor, e.g. safety valves provided with pressure equalisation devices
- G21C9/02—Means for effecting very rapid reduction of the reactivity factor under fault conditions, e.g. reactor fuse; Control elements having arrangements activated in an emergency
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C7/00—Control of nuclear reaction
- G21C7/36—Control circuits
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C9/00—Emergency protection arrangements structurally associated with the reactor, e.g. safety valves provided with pressure equalisation devices
- G21C9/02—Means for effecting very rapid reduction of the reactivity factor under fault conditions, e.g. reactor fuse; Control elements having arrangements activated in an emergency
- G21C9/027—Means for effecting very rapid reduction of the reactivity factor under fault conditions, e.g. reactor fuse; Control elements having arrangements activated in an emergency by fast movement of a solid, e.g. pebbles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- General Engineering & Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
Description
Claims (5)
- 그룹 내의 12발 단일 제어봉 불시낙하를 감지하여 출력벌점을 계산하여 전송하는 제어봉연산기(22), 및 상기 출력벌점을 적용하여 최소 핵비등이탈율과 최대 선형출력밀도를 계산하여 원자로 정지 여부를 결정하는 노심보호연산기(23)로 이루어진 노심보호연산기계통(20)에 있어서,상기 제어봉연산기(22)에서 12발 단일제어봉 불시낙하가 감지되거나 거짓신호가 지속적으로 입력될 때 미리 설정된 제어봉을 낙하시켜 원자로의 출력을 급감발 시키는 원자로 출력 급감발계통(30)을 더 포함하여 구성함을 특징으로 하는 원자로 불시정지 방지 시스템.
- 제1항에 있어서,상기 노심보호연산기계통(20)은 두 개의 상기 제어봉연산기(22)에서 12발 단일제어봉의 불시낙하가 감지되거나 어느 하나의 제어봉연산기(22)에서 노이즈나 거짓신호가 전송될 때 제어봉 편차에 의한 출력벌점 적용을 유예시키는 기능과, 원자로 출력 급감발 신호를 발생시킨 뒤 목표출력에 도달하여 출력이 안정될 때 상기 출력벌점을 적용하는 기능을 더 포함하여 구성함을 특징으로 하는 원자로 불시정지 방지 시스템.
- 제1항에 있어서,상기 원자로 출력 급감발계통(30)은 상기 노심보호연산기계통(20)의 원자로 출력 급감발 신호로 인해 RPC제어봉이 낙하한 후 제어봉 삽입과 재배열에 따른 평면반경방향 첨두 출력인자(Fxy)값과 제어봉 그림자계수(RSF)값의 적용을 일정시간 유예시키는 기능을 더 포함하여 이루어진 것을 특징으로 하는 원자로 불시정지 방지 시스템.
- 본 발명은 제어봉 낙하시 원자로 정지방지 방법에 있어서,두 제어봉연산기(22)에서 12발 단일제어봉의 불시낙하를 감지하고 출력벌점을 계산하여 노심보호연산기(23)에서 상기 제어봉연산기(22)로부터 출력벌점을 전송받고 출력벌점 유예시간(②)을 갖는 단계와; 상기 노심보호연산기(23)에서 원자로출력급감발신호를 원자로 출력 급감발계통(30)으로 전송하는 단계와; 상기 원자로 출력 급감발계통(30)에 의해 선택된 RPC제어봉그룹을 낙하시켜 목표출력에 도달하고 출력이 안정될 때까지 지연시간(④)을 갖는 단계와; 상기 원자로 출력 급감발계통(30)에 의한 제어봉 삽입이 정상적으로 이루어지는지 확인(⑤)하는 단계와; 상기 출력벌점 유예시간(②) 이후 출력벌점을 적용(⑥)하는 단계와; 상기 지연시간(④)이 지난 후 제어봉 재배열을 통해 계산되는 평면반경방향 첨두출력인자(Fxy), 및 제어봉 그림자계수(RSF)를 결정(⑦)하는 단계로 이루어진 것을 특징으로 하는 원자로 불시 정지방지 방법.
- 본 발명은 제어봉연산기(22) 중 어느 하나에서 거짓신호가 지속적으로 전송될 때 원자로 정지방지 방법에 있어서,하나의 제어봉연산기(22)에서는 정상상태의 출력벌점이 전송되고 또 다른 제어봉연산기(22)에서는 거짓신호가 전송되는 단계와; 노심보호연산기(23)가 상기 제어봉연산기(22)로부터 전송된 출력벌점이 서로 다를 경우 신호의 지속성을 확인하기 위해 대기시간(③)을 갖음과 동시에 출력벌점 유예시간(②)을 갖는 단계와; 상기 대기시간(③) 이후 노심보호연산기(23)에서 원자로출력급감발신호를 원자로 출력 급감발계통(30)으로 전송하는 단계와; 상기 원자로 출력 급감발계통(30)에 의해 선택된 RPC제어봉그룹을 낙하시켜 목표출력에 도달하고 출력이 안정될 때까지 지연시간(⑤)을 갖는 단계와; 상기 원자로 출력 급감발계통(30)에 의한 제어봉 삽입이 정상적으로 이루어지는지 확인(⑥)하는 단계와; 상기 출력벌점 유예시간(②) 이후 출력벌점을 적용(⑦)하는 단계와; 상기 지연시간(⑤)이 지난 후 제어봉 재배열을 통해 계산되는 평면반경방향 첨두출력인자(Fxy), 및 제어봉 그림자계수(RSF)를 결정(⑧)하는 단계로 이루어진 것을 특징으로 하는 원자로 불시 정지방지 방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070065558A KR100878437B1 (ko) | 2007-06-29 | 2007-06-29 | 원자로 불시 정지방지 시스템 및 그 방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070065558A KR100878437B1 (ko) | 2007-06-29 | 2007-06-29 | 원자로 불시 정지방지 시스템 및 그 방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090001295A true KR20090001295A (ko) | 2009-01-08 |
KR100878437B1 KR100878437B1 (ko) | 2009-01-13 |
Family
ID=40484391
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070065558A KR100878437B1 (ko) | 2007-06-29 | 2007-06-29 | 원자로 불시 정지방지 시스템 및 그 방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100878437B1 (ko) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114596972A (zh) * | 2022-03-09 | 2022-06-07 | 上海核工程研究设计院有限公司 | 一种对堆外探测器控制棒阴影效应的修正方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR970003174B1 (ko) * | 1992-07-25 | 1997-03-14 | 한국전력공사 | 불필요한 제어봉 낙하 방지장치 |
KR100619663B1 (ko) * | 2003-08-14 | 2006-09-08 | 한국전력기술 주식회사 | 원자력발전소 제어봉 불시낙하 방지 장치 및 방법 |
-
2007
- 2007-06-29 KR KR1020070065558A patent/KR100878437B1/ko active IP Right Grant
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114596972A (zh) * | 2022-03-09 | 2022-06-07 | 上海核工程研究设计院有限公司 | 一种对堆外探测器控制棒阴影效应的修正方法 |
CN114596972B (zh) * | 2022-03-09 | 2024-01-26 | 上海核工程研究设计院股份有限公司 | 一种对堆外探测器控制棒阴影效应的修正方法 |
Also Published As
Publication number | Publication date |
---|---|
KR100878437B1 (ko) | 2009-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110366760B (zh) | 核反应堆保护系统和方法 | |
CN107110118B (zh) | 机电驱动系统 | |
CN101248269B (zh) | 具有单个斜度装置的风力发电设备 | |
KR100808787B1 (ko) | 발전소 보호 시스템 | |
CN101840737B (zh) | 一种数字化棒位控制系统及其控制方法 | |
GB2544355A (en) | Diverse actuation system and method and diverse protection system in a nuclear power plant | |
KR101903073B1 (ko) | 원자로냉각재펌프 1대 상실 시 원자로 정지 방지 장치 및 방법 | |
US6477218B1 (en) | Control system of nuclear power plant, and control method thereof | |
KR100878437B1 (ko) | 원자로 불시 정지방지 시스템 및 그 방법 | |
CN208858418U (zh) | 一种汽轮机保护系统 | |
KR101199625B1 (ko) | 원자력 발전소의 디지털 신호 전자제어 처리를 위한 장치 및 방법 | |
EP3046111B1 (en) | Nuclear reactor power regulator and method | |
EP0026563A2 (en) | Method of controlling the power output of a nuclear reactor | |
KR100850484B1 (ko) | 디지털 원자로 보호계통의 트립설정치 조절 방법 및 장치 | |
KR101042030B1 (ko) | 비교논리 및 동시논리를 통합한 발전소보호계통 | |
KR100980263B1 (ko) | 노심보호연산기 계통의 가변 과출력 정지 제어 방법 | |
KR101831398B1 (ko) | 다양성보호계통시스템 | |
KR100764880B1 (ko) | 다중의 노심 고출력 정지 설정치를 가지는 가변 과출력원자로 정지방법 | |
CN102831050A (zh) | 一种风电机组控制软件异常行为检测与导向安全方法 | |
KR101070560B1 (ko) | 원자로의 노심 보호 연산장치 및 방법 | |
CN114688520B (zh) | 一种核电站蒸汽发生器液位辅助控制方法和系统 | |
KR102578178B1 (ko) | 소형원자로의 원자로냉각재펌프 1 대 정지 시 원자로 정지 예방 시스템 | |
CN110566288B (zh) | 核电站汽轮机组一次调频系统及方法 | |
Shin et al. | DIVERSITY AND DEFENSE-IN-DEPTH ANALYSIS FOR I&C SYSTEMS OF RESEARCH REACTORS: A CASE STUDY ON TWO RESEARCH REACTORS | |
Wei-zhi et al. | Study of AP1000 Protection System Based on FirmSys |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
AMND | Amendment | ||
E601 | Decision to refuse application | ||
AMND | Amendment | ||
J201 | Request for trial against refusal decision | ||
B701 | Decision to grant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130104 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140102 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141231 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20160107 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20170106 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20180105 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20190107 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20200106 Year of fee payment: 12 |