KR20080006442U - A Top Cover of Breaker - Google Patents
A Top Cover of Breaker Download PDFInfo
- Publication number
- KR20080006442U KR20080006442U KR2020070009985U KR20070009985U KR20080006442U KR 20080006442 U KR20080006442 U KR 20080006442U KR 2020070009985 U KR2020070009985 U KR 2020070009985U KR 20070009985 U KR20070009985 U KR 20070009985U KR 20080006442 U KR20080006442 U KR 20080006442U
- Authority
- KR
- South Korea
- Prior art keywords
- breaker
- support
- upper cover
- sides
- arm
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/96—Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements
- E02F3/966—Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements of hammer-type tools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25D—PERCUSSIVE TOOLS
- B25D2222/00—Materials of the tool or the workpiece
- B25D2222/72—Stone, rock or concrete
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25D—PERCUSSIVE TOOLS
- B25D2250/00—General details of portable percussive tools; Components used in portable percussive tools
- B25D2250/121—Housing details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60Y—INDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
- B60Y2200/00—Type of vehicle
- B60Y2200/40—Special vehicles
- B60Y2200/41—Construction vehicles, e.g. graders, excavators
- B60Y2200/412—Excavators
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Shovels (AREA)
- Percussive Tools And Related Accessories (AREA)
Abstract
본 고안은 굴삭기의 붐 선단의 아암과 연결되어 각종 토목작업을 수행하는 브레이커의 상부덮개 전,후방으로 경사부가 형성되는 보강 지지대가 착설되고, 상기 아암이 고정핀을 통하여 연결토록 상부덮개 양측으로 고정핀 결합홀이 형성되는 지지 돌기부 전방 및 후방으로 브레이커의 응력을 분산시키도록 양측이 돌출된 돌기부를 갖는 지지 브라켓트가 용접에 의해 일체로 착설토록 됨으로써, 굴삭기의 붐 선단의 아암의 작동에 의해 승강 및 하강동작을 수행하는 브레이커 상부덮개가 전,후방 경사부를 개재하여 착설된 보강 지지대에 의해 가일층 견고한 상태로 연결 고정되어, 내구성이 증대될 수 있도록 하며, 상기 브레이커 상부덮개의 지지 돌기부 전방 및 후방으로 착설되는 지지 브라켓트에 의해 응력이 상부덮개에 골고루 분산되어 상기 굴삭기의 아암 결합부인 양측 지지 돌기부가 틀어지는 변형 발생을 미연에 예방할 수 있도록한 브레이커의 상부 덮개에 관한 것이다.The present invention is installed with a reinforcing support that is inclined to the front and rear of the upper cover of the breaker is connected to the arm of the boom end of the excavator to perform various civil works, the arm is fixed to both sides of the upper cover through the fixing pins The support brackets having protrusions protruding on both sides are integrally installed by welding so as to distribute the stress of the breaker to the front and rear of the supporting protrusions in which the pin coupling holes are formed, thereby raising and lowering by operation of the arm of the boom tip of the excavator. The breaker upper cover performing the lowering operation is connected and fixed in a more solid state by the reinforcing supporter installed through the front and rear inclined portions, so that durability can be increased, and the support protrusions of the breaker upper cover are installed in front and rear. The excavation is evenly distributed to the upper cover by the support bracket which is the excavation The arm of the coupling support on both sides denied projection teuleojineun deformation relates to a top cover of the breaker to prevent in advance.
그 기술적인 구성은, 굴삭기의 붐 선단의 아암과 고정핀(150)을 통하여 연결토록 브레이커(110)의 상부덮개(120) 양측으로 고정핀 결합홀(130)이 형성되는 지지 돌기부(140)가 일체로 형성고, 상기 브레이커(110)의 상부덮개(120) 양측으로 형성되는 지지 돌기부(140) 사이에는 전후방에 경사부(161)가 형성되는 보강 지지대(160)가 착설되며, 상기 부움 선단의 아암이 고정핀(150)을 통하여 연결토록 고정핀 결합홀(130)이 형성되는 지지 돌기부(140) 전방 및 후방으로 브레이커의 응력을 분산토록 양측으로 돌기부(171)가 각각 형성되는 지지 브라켓트(170)가 용접에 의해 일체로 착설토록 되는 것을 요지로 한다. The technical configuration, the support protrusion 140 is formed with a fixing pin coupling hole 130 is formed on both sides of the upper cover 120 of the breaker 110 through the arm and the fixing pin 150 of the boom tip of the excavator It is formed integrally, between the support protrusions 140 formed on both sides of the upper cover 120 of the breaker 110, the reinforcing support 160 is formed in the front and rear inclined portion 161 is installed, Support brackets 170 in which protrusions 171 are formed on both sides of the support protrusions 140 in which the fixing pin coupling holes 130 are formed through the fixing pins 150, respectively, so that the stresses of the breaker are distributed to the front and the rear thereof. ) Should be installed integrally by welding.
상부덮개, 지지 돌기부, 보강 지지대, 경사부, 지지 브라켓트 Top cover, support protrusion, reinforcement support, slope, support bracket
Description
도 1은 일반적인 브레이커 상부덮개의 개략 사시도.1 is a schematic perspective view of a typical breaker top cover;
도 2는 종래 브레이커 상부덮개의 사시도. Figure 2 is a perspective view of a conventional breaker top cover.
도 3은 본 고안에 따른 브레이커 상부덮개의 결합상태 사시도.Figure 3 is a perspective view of the state of engagement of the breaker top cover according to the present invention.
도 4는 본 고안인 브레이커 상부덮개의 사시도.Figure 4 is a perspective view of the breaker top cover of the present invention.
도 5는 본 고안에 의한 브레이커 상부덮개의 정면 구조도.Figure 5 is a front structural view of the breaker top cover according to the present invention.
도 6은 본 고안에 의한 브레이커 상부덮개의 측단면 구조도.Figure 6 is a side cross-sectional structural view of the breaker top cover according to the present invention.
* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
110...브레이커 120...상부덮개110
130...고정핀 결합홀 140...지지 돌기부130 fixing
150...고정핀 160...보강 지지대150
161...경사부 170...지지 브라켓트161
171...돌기부171 ... protrusion
본 고안은 굴삭기의 붐 선단의 아암과 연결되어 각종 토목작업을 수행하는 브레이커의 상부덮개 전,후방으로 경사부가 형성되는 보강 지지대가 착설되고, 상기 아암이 고정핀을 통하여 연결토록 상부덮개 양측으로 고정핀 결합홀이 형성되는 지지 돌기부 전방 및 후방으로 브레이커의 응력을 분산시키도록 양측이 돌출된 돌기부를 갖는 지지 브라켓트가 용접에 의해 일체로 착설토록 됨으로써, 굴삭기의 붐 선단의 아암의 작동에 의해 승강 및 하강동작을 수행하는 브레이커 상부덮개가 전,후방 경사부를 개재하여 착설된 보강 지지대에 의해 가일층 견고한 상태로 연결 고정되어, 내구성이 증대될 수 있도록 하며, 상기 브레이커 상부덮개의 지지 돌기부 전방 및 후방으로 착설되는 지지 브라켓트에 의해 응력이 상부덮개에 골고루 분산되어 상기 굴삭기의 아암 결합부인 양측 지지 돌기부가 틀어지는 변형 발생을 미연에 예방할 수 있도록한 브레이커의 상부 덮개에 관한 것이다. The present invention is installed with a reinforcing support that is inclined to the front and rear of the upper cover of the breaker is connected to the arm of the boom end of the excavator to perform various civil works, the arm is fixed to both sides of the upper cover through the fixing pins The support brackets having protrusions protruding on both sides are integrally installed by welding so as to distribute the stress of the breaker to the front and rear of the supporting protrusions in which the pin coupling holes are formed, thereby raising and lowering by operation of the arm of the boom tip of the excavator. The breaker upper cover performing the lowering operation is connected and fixed in a more solid state by the reinforcing supporter installed through the front and rear inclined portions, so that durability can be increased, and the support protrusions of the breaker upper cover are installed in front and rear. The excavation is evenly distributed to the upper cover by the support bracket which is the excavation The arm of the coupling support on both sides denied projection teuleojineun deformation relates to a top cover of the breaker to prevent in advance.
일반적으로 굴삭기의 붐 선단의 아암과 브레이커 상부덮개가 연결 설치되어 각종 토목작업을 수행하는 브레이커는, 유압을 통한 굴착등과 같은 작업시 메인 프레임의 실린더와 연설된 로드의 타격에 의해 분쇄물에 타격을 가하여 분쇄하는 것이다.In general, a breaker that carries out various civil works by connecting the arm of the boom tip of the excavator and the breaker top cover, and hits the pulverized product by the blow of the cylinder and the spoke rod of the main frame during work such as excavation through hydraulic pressure By grinding.
이와같은 기술과 관련된 종래의 브레이커 상부덮개의 결합구조에 있어서는 도1 및 도 2에 도시한 바와같이, 굴삭기의 붐 선단의 아암(미도시)과 고정핀(50)을 통하여 연결토록 브레이커(10)의 상부덮개(20) 양측으로 고정핀 결합홀(30)이 형성 되는 지지 돌기부(40)가 일체로 형성되는 구성으로 이루어진다. In the conventional structure of the breaker top cover associated with this technique, as shown in Figures 1 and 2, the
따라서, 상기 브레이커(10)의 상측에 다수개의 고정 볼트로서 결합되는 상부덮개(20)는, 그 양측으로 설치되는지지 돌기부(40)의 고정핀 결합홀(30)내에 고정핀(50)을 이용하여 굴삭기의 붐 선단의 아암과 연결 설치함으로써, 상기 굴삭기의 부움 작동에 의해 브레이커(10)를 상,하 동작시키면서 물체의 타격등과 같은 분쇄작업을 수행하는 것이다.Therefore, the
그러나, 상기 굴삭기의 붐 선단의 아암과 고정핀(50)을 통하여 연결 설치되는 상부덮개(20)는, 이와 결합되어 파쇄작업을 수행하는 브레이커(10)가 중량물로 구성되는 관계로, 브레이커(10)를 통하여 파쇄 작업시 발생되는 충격력이 상부덮개(20)에 그대로 전달되어, 상기 상부덮개(20)가 쉽게 파손이 발생하게 됨은 물론, 특히 아암과 고정핀(50)을 통해 결합되는 결합부위인 상부덮개(20)의 양측지지 돌기부(40)가 뒤틀어져 변형이 발생하게 되는 경우가 빈번하게 발생되는등 많은 문제점이 있었던 것이다.However, the
본 고안은 상기와 같은 종래의 문제점들을 개선시키기 위하여 안출된 것으로서 그 목적은, 굴삭기의 붐 선단의 아암과 연결되어 각종 토목작업을 수행하는 브레이커의 상부덮개 전,후방으로 경사부가 형성되는 보강 지지대가 착설되고, 상기 아암이 고정핀을 통하여 연결토록 상부덮개 양측으로 고정핀 결합홀이 형성되는 지지 돌기부 전방 및 후방으로 브레이커의 응력을 분산시키도록 양측이 돌출된 돌기 부를 갖는 지지 브라켓트가 용접에 의해 일체로 착설토록 됨으로써, 굴삭기의 붐 선단의 아암의 작동에 의해 승강 및 하강동작을 수행하는 브레이커 상부덮개가 전,후방 경사부를 개재하여 착설된 보강 지지대에 의해 가일층 견고한 상태로 연결 고정되어, 내구성이 증대될 수 있도록 하며, 상기 브레이커 상부덮개의 지지 돌기부 전방 및 후방으로 착설되는 지지 브라켓트에 의해 응력이 상부덮개에 골고루 분산되어 상기 굴삭기의 아암 결합부인 양측 지지 돌기부가 틀어지는 변형 발생을 미연에 예방할 수 있는 브레이커의 상부 덮개를 제공하는 데에 있다. The present invention has been made in order to improve the conventional problems as described above, the purpose of the reinforcing support is formed in the inclined portion before and after the top cover of the breaker connected to the arm of the boom end of the excavator to perform various civil works The support brackets are installed by welding, and the support brackets having protrusions protruding from both sides to distribute the stress of the breaker to the front and rear of the support protrusions in which the fixing pin coupling holes are formed on both sides of the upper cover so as to connect the arms through the fixing pins. By the installation of the boom, the breaker upper cover which lifts and lowers by the operation of the arm of the boom tip of the excavator is connected and fixed in a more solid state by the reinforcing support which is installed through the front and rear slopes, and the durability is increased. The front and rear support protrusions of the breaker top cover. The stress is evenly distributed on the top cover by a supporting bracket chakseol is to provide a top cover of the breaker in combination with the arm supporting protrusion denied both sides of the excavator teuleojineun deformation be prevented in advance.
상기와 같은 목적을 달성하기 위한 기술적인 수단으로서 본 고안은, 굴삭기의 붐 선단의 아암과 고정핀을 통하여 연결토록 브레이커의 상부덮개 양측으로 고정핀 결합홀이 형성되는 지지 돌기부가 일체로 형성되는 브레이커의 상부덮개에 있어서,As a technical means for achieving the above object, the present invention, a breaker that is integrally formed with a support protrusion that is formed with a fixed pin coupling hole on both sides of the upper cover of the breaker through the arm and the fixing pin of the boom end of the excavator In the top cover of,
상기 브레이커의 상부덮개 양측으로 형성되는 지지 돌기부 사이에는 전후방에 경사부가 형성되는 보강 지지대가 착설되고, 상기 부움 선단의 아암이 고정핀을 통하여 연결토록 고정핀 결합홀이 형성되는 지지 돌기부 전방 및 후방으로 브레이커의 응력을 분산토록 양측으로 돌기부가 각각 형성되는 지지 브라켓트가 용접에 의해 일체로 착설토록 되는 구성으로 이루어진 것을 특징으로 하는 브레이커의 상부 덮개를 마련함에 의한다.Between the support protrusions formed on both sides of the upper cover of the breaker is installed a reinforcing support having a slope formed in the front and rear, and the support protrusion front and rear to form a fixing pin coupling hole for connecting the arm of the buoy end through the fixing pin By providing the upper cover of the breaker, characterized in that the support bracket is formed so that the protrusions are formed on both sides to distribute the stress of the breaker integrally by welding.
이하, 첨부된 도면에 의거하여 본 고안의 실시예를 상세하게 설명하면 다음과 같다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도3 및 도 4는 본 고안에 따른 브레이커 상부덮개의 결합상태 사시도 및 브레이커 상부덮개의 사시도이고, 도5 및 도 6은 본 고안인 브레이커 상부덮개의 정면 및 측단면 구조도로서, 굴삭기의 붐 선단의 아암과 고정핀(150)을 통하여 연결토록 브레이커(110)의 상부덮개(120) 양측으로 고정핀 결합홀(130)이 형성되는 지지 돌기부(140)가 일체로 형성된다.3 and 4 are perspective views of the breaker top cover and the state of the breaker top cover according to the present invention, Figure 5 and Figure 6 is a front and side cross-sectional structural view of the breaker top cover of the present invention, the boom tip of the excavator The
또한, 상기 브레이커(110)의 상부덮개(120) 양측으로 형성되는 지지 돌기부(140) 사이에는 전후방에 경사부(161)가 형성되는 보강 지지대(160)가 착설되며, 상기 부움 선단의 아암이 고정핀(150)을 통하여 연결토록 고정핀 결합홀(130)이 형성되는 지지 돌기부(140) 전방 및 후방으로 브레이커의 응력을 분산토록 양측으로 돌기부(171)가 각각 형성되는 지지 브라켓트(170)가 용접에 의해 일체로 착설토록 되는 구성으로 이루어진다.In addition, between the
이와같은 구성으로 이루어진 본 고안의 작용 및 효과를 설명하면 다음과 같다.Referring to the operation and effects of the present invention made of such a configuration as follows.
도3 내지 도 6에 도시한 바와같이, 브레이커(110)의 상측에 다수개의 고정 볼트로서 결합되는 상부덮개(120)는, 그 양측으로 설치되는 지지 돌기부(140)의 고정핀 결합홀(130)내에 고정핀(150)을 이용하여 굴삭기의 붐 선단의 아암과 연결 설치함으로써, 상기 굴삭기의 부움 작동에 의해 브레이커(110)를 상,하 동작시키면서 물체의 타격등과 같은 분쇄작업을 수행하는 것이다.3 to 6, the
이때, 상기 브레이커(110)의 상부덮개(120) 양측으로 형성되는 지지 돌기부(140) 사이에는 전후방에 경사부(161)가 형성되는 보강 지지대(160)가 용접에 의해 일체로 착설토록 됨으로써, 상기 굴삭기의 붐 선단의 아암의 작동에 의해 승강 및 하강동작을 수행하는 브레이커(110) 상부덮개(120)가 전,후방 경사부(161)를 개재하여 지지 돌기부(140) 사이에 착설된 보강 지지대(160)에 의해 가일층 견고한 상태로 연결 고정되어, 내구성이 가일층 증대될 수 있도록 한다.In this case, between the
또한, 상기 부움 선단의 아암이 고정핀(150)을 통하여 연결토록 고정핀 결합홀(130)이 형성되는 지지 돌기부(140)는, 그 전방 및 후방으로 브레이커(100)의 작동시 발생되는 응력을 분산토록 양측으로 돌기부(171)가 각각 형성되는 지지 브라켓트(170)가 용접에 의해 일체로 착설토록 됨으로 인하여, 상기 브레이커(110)에서 충격에 의해 전달되는 응력이 상부덮개(120)의 지지 돌기부(140)의 전방 및 후방으로 착설되는 지지 브라켓트(170)에 의해 응력이 상부덮개(120)에 골고루 분산되며, 특히 상기 굴삭기의 아암 결합부인 양측 지지 돌기부(171)가 틀어지는 변형 발생을 미연에 예방할 수 있는 것이다.In addition, the
이상과 같이 본 고안인 브레이커의 상부 덮개에 의하면, 굴삭기의 붐 선단의 아암과 연결되어 각종 토목작업을 수행하는 브레이커의 상부덮개 전,후방으로 경사부가 형성되는 보강 지지대가 착설되고, 상기 아암이 고정핀을 통하여 연결토록 상 부덮개 양측으로 고정핀 결합홀이 형성되는 지지 돌기부 전방 및 후방으로 브레이커의 응력을 분산시키도록 양측이 돌출된 돌기부를 갖는 지지 브라켓트가 용접에 의해 일체로 착설토록 됨으로써, 굴삭기의 붐 선단의 아암의 작동에 의해 승강 및 하강동작을 수행하는 브레이커 상부덮개가 전,후방 경사부를 개재하여 착설된 보강 지지대에 의해 가일층 견고한 상태로 연결 고정되어, 내구성이 증대될 수 있도록 하며, 상기 브레이커 상부덮개의 지지 돌기부 전방 및 후방으로 착설되는 지지 브라켓트에 의해 응력이 상부덮개에 골고루 분산되어 상기 굴삭기의 아암 결합부인 양측 지지 돌기부가 틀어지는 변형 발생을 미연에 예방할 수 있는 우수한 효과가 있다. According to the upper cover of the breaker according to the present invention as described above, a reinforcing support is installed in which the inclined portion is formed before and after the upper cover of the breaker which is connected to the arm of the boom end of the excavator to perform various civil works, the arm is fixed The support brackets having protrusions protruding from both sides to distribute the stress of the breaker to the front and rear of the support protrusions in which the fixing pin coupling holes are formed on both sides of the upper cover so as to be connected through the pins are integrally installed by welding. Breaker upper cover for lifting and lowering by the operation of the arm of the boom end of the boom is connected and fixed in a more solid state by the reinforcing support installed through the front and rear inclined portion, so that durability can be increased, By the support brackets installed in front of and behind the support protrusions of the breaker top cover. This force has been evenly distributed in the top cover excellent effect that the arm coupling denied both sides of the support protrusion to prevent the excavator teuleojineun deformation from occurring.
본 고안은 특정한 실시예에 관련하여 도시하고 설명하였지만, 이하의 실용신안등록청구의 범위에 의해 마련되는 본 고안의 정신이나 분야를 벗어나지 않는 한도내에서 본 고안이 다양하게 개조 및 변화될수 있다는 것을 당업계에서 통상의 지식을 가진자는 용이하게 알수 있음을 밝혀두고자 한다.Although the present invention has been illustrated and described in connection with specific embodiments, it should be understood that the present invention may be variously modified and changed without departing from the spirit or the scope of the present invention provided by the following claims for utility model registration. Those skilled in the art will want to know easily.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020070009985U KR200443113Y1 (en) | 2007-06-18 | 2007-06-18 | A Top Cover of Breaker |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020070009985U KR200443113Y1 (en) | 2007-06-18 | 2007-06-18 | A Top Cover of Breaker |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20080006442U true KR20080006442U (en) | 2008-12-23 |
KR200443113Y1 KR200443113Y1 (en) | 2009-01-13 |
Family
ID=41327185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020070009985U KR200443113Y1 (en) | 2007-06-18 | 2007-06-18 | A Top Cover of Breaker |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200443113Y1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10604910B2 (en) | 2018-05-07 | 2020-03-31 | Caterpillar Inc. | Rock claw for demolition hammer |
-
2007
- 2007-06-18 KR KR2020070009985U patent/KR200443113Y1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR200443113Y1 (en) | 2009-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4741298B2 (en) | Counterweight device for construction machinery | |
US8075242B2 (en) | Working machine with structure for assembling boom thereof | |
KR200443113Y1 (en) | A Top Cover of Breaker | |
CN101381996B (en) | Improved loader | |
JP2009293262A (en) | Boom assembly structure of working machine | |
CN102787618A (en) | Excavator bucket rod and excavator | |
US20090084454A1 (en) | Apparatus for fixing hydraulic pipes for zero tail swing excavator | |
JP3907356B2 (en) | Steel bridge dedicated replacement device and steel bridge support replacement method using it | |
KR100489626B1 (en) | Lifting method and apparatus of the bridge beam | |
KR20090007171A (en) | An apparatus for combine of breaker housing and main frame | |
CN207760908U (en) | A kind of perching knife component | |
CN206302235U (en) | A kind of stator hanging-into type motor | |
KR20090016177A (en) | Pin for contracting the excavating equipment of the excavator | |
CN205046544U (en) | Ram horn frame device and strong machine that rams by force | |
CN201801895U (en) | Excavator and movable arm thereof | |
CN217076781U (en) | Hoisting mechanism based on excavator movable arm | |
CN221030401U (en) | Excavator quartering hammer oil inlet pipe mounting structure | |
CN215558294U (en) | Hydraulic turbine paddle demolishs appurtenance | |
KR200455354Y1 (en) | Breaker's rod play prevention device | |
CN214574275U (en) | Engine cover and excavator | |
CN219992585U (en) | Pedal of excavator | |
CN214530879U (en) | Connecting rod structure of material grabbing machine | |
CN221262608U (en) | Battery box with improved lifting lug structure | |
CN214994228U (en) | Rack of scarifier, beam of scarifier, scarifier and engineering machinery | |
CN215948300U (en) | Link mechanism for working device and loader |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20130131 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140103 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141230 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20161223 Year of fee payment: 9 |
|
EXPY | Expiration of term |