KR20050048298A - Method for pre-constructing staircase in building and pc member therefor - Google Patents

Method for pre-constructing staircase in building and pc member therefor Download PDF

Info

Publication number
KR20050048298A
KR20050048298A KR1020030082201A KR20030082201A KR20050048298A KR 20050048298 A KR20050048298 A KR 20050048298A KR 1020030082201 A KR1020030082201 A KR 1020030082201A KR 20030082201 A KR20030082201 A KR 20030082201A KR 20050048298 A KR20050048298 A KR 20050048298A
Authority
KR
South Korea
Prior art keywords
staircase
fixing
floor
wall
room
Prior art date
Application number
KR1020030082201A
Other languages
Korean (ko)
Other versions
KR100583072B1 (en
Inventor
최명식
김익배
이강철
Original Assignee
삼성물산 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사 filed Critical 삼성물산 주식회사
Priority to KR1020030082201A priority Critical patent/KR100583072B1/en
Publication of KR20050048298A publication Critical patent/KR20050048298A/en
Application granted granted Critical
Publication of KR100583072B1 publication Critical patent/KR100583072B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F2011/0203Miscellaneous features of stairways not otherwise provided for
    • E04F2011/0205Stairways characterised by the use of specific materials for the supporting structure of the treads
    • E04F2011/021Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass
    • E04F2011/0212Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete
    • E04F2011/0214Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

본 발명은 건축물의 계단실의 선 시공방법 및 그 시공방법에 사용되는 피씨부재에 관한 것으로서, The present invention relates to a line member method of the staircase room of a building and a PC member used in the construction method,

좌측 계단실용 피씨벽부재(1)의 설치 단계와, 우측 계단실용 피씨벽부재(3)의 설치 단계와; 후측 계단실용 피씨벽부재(4)의 설치단계와, 상기 좌, 우측 계단실용 피씨벽부재(1)(3)와 후측 계단실용 피씨벽부재(4)의 각 측면 연결부의 접합단계와, 중간 계단참용 피씨부재(5)의 접합단계와, 제 1계단용 피씨부재(7)의 접합단계와, 제2 플로어 계단참용 하프슬래브 피씨부재(8)의 접합단계와; 제2 계단용 피씨부재(9)의 접합단계와; 콘크리트타설부의 상면에 현장에서 콘크리트를 타설하는 단계와; 유리판이 고정 설치된 통상의 유리창틀(11)을 설치하는 단계들에 의하여 한개층의 계단실의 시공이 완료되며; 상기와 같은 시공과정에 의하여 기준층(B)의 구축에 선행하여 적어도 2층의 계단실이 구축되어 있도록 하는 시공과정을 최상층까지 계속해서 반복하여 수행하도록 한 것이다.An installation step of the left staircase PC wall member 1, and an installation step of the right staircase PC wall member 3; The installation step of the rear wall PC wall member (4), the joining step of each side connection portion of the left and right stairs room PC wall member (1) (3) and the rear stair room PC wall member (4), the intermediate landing A joining step of the PCB member 5, a joining step of the first step PC member 7, and a joining step of the second floor stairway half slab PC member 8; Joining the second staircase PC member 9; Placing concrete in the field on an upper surface of the concrete pouring portion; The construction of the staircase of one floor is completed by the steps of installing a conventional window frame 11 in which the glass plate is fixed; Prior to the construction of the reference layer (B) by the construction process as described above, the construction process to ensure that at least the second floor staircase is built to continue to be repeatedly performed to the top floor.

본 발명은 공사비용절감 및 계단 구축작업을 간략화하여 단시간내에 계단실(A)을 구축할 수 있게 되고, 건축에 필요한 자재의 운반통로로 활용할 수 있게 됨은 물론, 작업자의 통로로 활용할 수 있기 때문에 종래와 같이 작업자의 통로를 위한 설치가 필요없게 되는 효과가 있다. The present invention can be constructed in a short time by reducing the construction cost and stairs construction work, and can be used as a transport passage of materials required for construction, as well as can be used as a worker's passage, Likewise, there is no need for installation for the passage of the worker.

Description

건축물의 계단실의 선 시공방법 및 그 시공방법에 사용되는 피씨부재{METHOD FOR PRE-CONSTRUCTING STAIRCASE IN BUILDING AND PC MEMBER THEREFOR} METHOD FOR PRE-CONSTRUCTING STAIRCASE IN BUILDING AND PC MEMBER THEREFOR}

본 발명은 건축물의 계단실의 선 시공방법 및 그 시공방법에 사용되는 피씨(precast concrete)부재에 관한 것으로서, 특히 피씨부재만을 이용하여 계단실을 기준층보다 먼저 선행하여 간편하게 시공하도록 함으로써 시공성과 품질의 향상은 물론 구조적으로 안정성을 크게 향상시켜 초고층 건축물의 시공이 가능하도록 구성한 건축물의 계단실의 선 시공방법 및 그 시공방법에 사용되는 피씨부재에 관한 것이다.The present invention relates to the pre-construction method of the staircase room of the building and the precast concrete member used in the construction method, and in particular, to improve the construction and quality by allowing the construction of the staircase room before the reference floor simply using only the PC member. Of course, it relates to the pre-construction method of the staircase room of the structure configured to enable the construction of high-rise buildings by greatly improving the structural stability and the PC member used in the construction method.

현대에는 인구의 증가에도 불구하고 주거용 가옥이나 사무용 건물이 한정되어 있으므로 인구의 과밀지역인 도시 지역에는 주거 및 사무용 건물을 고층으로 건설하여 인구의 과밀에 따른 주거 및 사무용 공간의 부족분을 해소하고 있음은 이미 잘 알려진 사실이다.In modern times, despite the increase in population, residential houses and office buildings are limited, so in urban areas, the overcrowded areas of the population, residential and office buildings are built on high floors, eliminating shortages of residential and office space due to overcrowding. This is a well known fact.

그리고 1990년대 초에 피씨부재를 사용한 아파트의 시공이 활발하였지만 15층 이상의 고층 아파트가 일반화되면서 점차 감소하는 추세이다.In the early 1990s, the construction of apartments using PC members was active, but it is gradually decreasing as high-rise apartments with 15 or more floors become more common.

이는 기존의 피씨 공법이 법적, 기술적 제약으로 인해 아파트의 초고층화에는 한계가 있게 된다는 점과, 피씨부재가 공장에서 생산되기 때문에 제반 품질이 우수함에도 불구하고 설계나 시공상의 결함으로 인해 고객의 품질 욕구를 만족시켜주지 못하였기 때문이다.This is because the existing PC method has limitations on the high-rise of apartments due to legal and technical constraints, and the quality needs of customers due to defects in design and construction despite the excellent quality since the PC members are produced at the factory. Because it did not satisfy.

따라서, 요즈음 건설되는 16층 이상의 많은 고층 건물이 피씨부재를 사용하지 않고 현장타설 콘크리트만을 사용하여 시공(RC공법)하는 추세이다.Therefore, many high-rise buildings with more than 16 floors being constructed these days do not use PC members, and use only cast-in-place concrete (RC method).

즉, 건설 현장에서 기초공사를 한 상태에서 그 위에 바닥과 벽체 등을 모두 현장에서 콘크리트를 타설하여 시공해오고 있다.In other words, in the state of the foundation construction at the construction site, the floor and walls, etc., all the concrete has been poured in the construction site.

그러나, 상기와 같은 종래의 현장타설 콘크리트만을 이용한 고층 건물의 시공방법에 의해서는 현장에서 모든 콘크리트를 타설하기 위하여 거푸집을 설치해야 하는 번거러움과 콘크리트가 완전히 굳어야 그 위에 벽체용 콘크리트를 타설할 수 있어 공사기간이 길어지게 되는 단점이 있음은 물론, 현장 타설시 사용하였던 건설 폐기물이 발생하여 환경을 오염시키는 원인이 되었다.However, according to the construction method of a high-rise building using only the conventional cast-in-place concrete as described above, it is necessary to install the formwork in order to pour all the concrete in the field, and the concrete must be completely solid so that the concrete for the wall can be poured on it. Not only has the disadvantage of lengthening the construction period, but also construction wastes that were used during site casting were generated, which caused the environment to be polluted.

그리고, 건설인력이 고령화되는 추세에서 현장타설 콘크리트만으로 고층 건물을 건축하기에는 생산성이 저하되는 직접적인 요인이 되었다.In addition, in the trend of aging construction workers, productivity has been a direct factor in building high-rise buildings with only cast-in-place concrete.

또한 현장타설을 위해 거푸집을 모두 설치하고 해체시키는 비효율적인 작업성과 함께 작업시 소음과 분진이 발생하여 건설 현장의 주변 공기를 오염시키게 되는 등의 문제점이 있었다.In addition, there was a problem such as noise and dust generated at work and polluting the surrounding air at the construction site with the inefficient workability to install and dismantle all the formwork for site casting.

특히, 계단을 현장에서 콘크리트 타설에 의해서 시공하려면 모든 계단을 구축하기 위한 거푸집을 제작하여야 하는데 이는 작업시간과 작업자가 많이 소요되고, 이렇게 시간과 작업자를 많이 필요함에도 불구하고 마감이 미려하지 않음은 물론 정확하고 균일하게 시공되지 않는 경우가 발생하는 등의 문제점이 있었다.In particular, in order to construct a staircase by pouring concrete in the field, it is necessary to manufacture a formwork for constructing all the staircases, which requires a lot of work time and workers, and despite the need for a lot of time and workers, There have been problems such as a case where the construction is not carried out correctly and uniformly.

본 발명은 상기 종래의 계단실의 시공방법의 문제점을 해소하기 위하여 안출된 것으로서, 본 발명의 목적은 모든 계단을 구축하기 위한 거푸집을 설치하지 않으면서 계단실을 기준층보다 먼저 피씨부재로 선행하여 시공함으로써 시공성과 품질의 향상은 물론, 시공기간을 더욱 단축시킬 수 있으며 인력을 크게 절감할 수 있는 건축물의 계단실의 선 시공방법 및 그 시공방법에 사용되는 피씨부재를 제공하는데 있다. The present invention has been made in order to solve the problems of the conventional construction method of the staircase room, the object of the present invention is to construct the stairs room prior to the construction of the stairs prior to the reference layer without installing the formwork for building all the stairs To improve the quality and quality, as well as to shorten the construction period and to significantly reduce the manpower to provide a pre-installation method of the staircase of the building and the PC member used in the construction method.

이하, 본 발명의 실시예를 첨부된 도면을 참조하면서 상세히 설명하기로 한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명의 건축물의 계단실의 선 시공방법은 계단실(A) 주변의 구축예정 건축구조물(이하, 기준층이라고 함)보다 계단실(A)을 먼저 조립하여 시공한 후, 상기 계단실(A)을 지지부로 하여 기준층(B)을 최하층(지하층 포함)으로부터 최상층까지 차례로 공사를 수행하여 건축물을 시공하는 방법이다The pre-construction method of the staircase room of the building of the present invention is to assemble the staircase (A) before the construction structure (hereinafter referred to as the reference floor) to be built around the staircase room (A), and then the staircase (A) as a support A method of constructing a building by sequentially constructing the reference floor B from the lowest floor (including the basement floor) to the top floor.

즉, 상기 기준층(B)에 콘크리트를 타설하여 건축구조물을 구축하는 것보다 먼저 선행하여 상기 구축예정의 건축구조물보다 상측에 크레인 등에 의해서 적어도 2층 높이의 계단실(A)을 선행하여 구축하는 것으로서, 다음에 본 발명의 각 시공단계별로 설명하기로 한다. That is, prior to constructing the building structure by placing concrete in the reference layer (B), and prior to building the staircase chamber (A) of at least two stories high by a crane or the like above the building structure to be constructed, Next, each construction step of the present invention will be described.

본 발명의 계단실의 선 시공방법은 도 1 내지 도 19에 도시된 바와같이, 좌측의 계단실용 피씨벽부재(1)를 바로 아래층(이하, 하층이라고 함)의 좌측의 계단실용 피씨벽부재(2)에 접합하여 설치하는 좌측 계단실용 피씨벽부재(1)의 설치 단계와;As shown in Figs. 1 to 19, the line construction method of the staircase of the present invention includes the PC wall member 1 for the staircase room on the left side of the stairs layer for the left side of the stairs (hereinafter referred to as the lower layer) on the left side. An installation step of the left side PC wall member (1) to be bonded to and installed);

상기 좌측 계단실용 피씨벽부재(1)의 맞은편인 우측의 계단실용 피씨벽부재(3)를 상기 하층의 우측의 계단실용 피씨벽부재(2')에 접합하여 설치하는 우측 계단실용 피씨벽부재(3)설치 단계와;The right staircase PC wall member 3 is formed by joining the right staircase PC wall member 3 opposite the left staircase PC wall member 1 to the lower step stairs PC wall member 2 '. (3) the installation step;

상기 좌, 우측 계단실용 피씨벽부재(1)(3)로부터 후측인 후측 계단실용 피씨벽부재(4)를 상기 하층의 후측 계단실용 피씨벽부재(2")에 접합하여 설치하는 후측 계단실용 피씨벽부재(4)의 설치 단계와;Rear staircase PC for joining the rear staircase PC wall member 4, which is the rear side from the left and right staircase PC wall members 1, 3, to the rear staircase PC wall member 2 " Installing the wall member (4);

상기 좌, 우측 계단실용 피씨벽부재(1)(3)의 각 후단부에 후측 계단실용 피씨벽부재(4)의 양단부를 접합하는 각 계단실용 피씨벽부재(1)(3)(4) 상호간의 측면 연결부인 수직접합부의 접합단계와;Each staircase PC wall member (1) (3) (4) which joins both ends of the rear staircase PC wall member (4) to each rear end of the left and right stairs room PC wall members (1) (3) Bonding step of the vertical junction of the side connection of the;

상기 좌, 우측 계단실용 피씨벽부재(1)(3)의 각 내측면의 전방부의 대략 중간부위의 하측에 지지할 수 있도록 돌출하여서 형성된 지지용 돌기부(1a)(3a)의 상면의 깔모르타르(38) 위에 중간 계단참용 피씨부재(5)가 안치된 상태에서 상기 중간 계단참용 피씨부재(5)를 상기 좌, 우측 계단실용 피씨벽부재(1)(3)에 접합하는 중간 계단참용 피씨부재(5)의 접합단계와;Calmor tar on the upper surface of the supporting projections 1a and 3a formed so as to protrude so as to support the lower portion of the front portion of each of the inner side surfaces of the left and right stairs room PC wall members 1 and 3 below. 38) The intermediate landing PC member for joining the intermediate landing PC member 5 to the left and right stairs room PC wall members 1 and 3 while the intermediate landing PC member 5 is placed thereon ( Conjugation step 5);

상기 중간 계단참용 피씨부재(5)의 후단부와, 하층의 좌, 우측 계단실용 피씨벽부재(2)(2')의 후방측의 상단부에 이미 설치되어 있는 제1 플로어계단참용 하프슬래브 피씨부재(6)의 선단부의 우측에 제1계단용 피씨부재(7)의 상, 하단부를 접합하는 제 1계단용 피씨부재(7)의 접합단계와;The half-slab PC member for first floor stepping, which is already installed at the rear end of the intermediate landing PC member 5 and the upper end of the rear side of the lower left and right stairs room PC wall members 2 and 2 '. A joining step of the first stepping PC member (7) for joining the upper and lower ends of the first stepping PC member (7) to the right side of the front end of (6);

상기 후측 계단실용 피씨벽부재(4)의 상면의 일측과 상기 좌, 우측 계단실용 피씨벽부재(1)(3)의 후방측의 상단부에 지지할 수 있도록 돌출하여서 형성된 지지용 돌기부(1a)(3a)의 상측 깔모르타르(38) 위에 제2 플로어계단참용 하프슬래브 피씨부재(8)를 안치시킨 상태에서 상기 제2플로어계단참용 하프슬래브 피씨부재(8)를 상기 좌, 우측 계단실용 피씨벽부재(1)(3)와 후측 계단실용 피씨벽부재(4)에 접합하여 설치하는 제2 플로어 계단참용 하프슬래브 피씨부재(8)의 접합단계와;Supporting projections 1a formed by protruding to support one side of an upper surface of the rear staircase PC wall member 4 and an upper end of the rear side of the left and right stairs PC wall members 1 and 3 ( The second slab half slab PC member 8 is placed on the upper floor mortar 38 of the upper floor mortar 38, and the second slab half slab PC member 8 is placed on the left and right stairs room PC wall members. (1) (3) and the step of joining the second floor staircase half slab PC member 8 bonded to and installed in the rear staircase PC wall member 4;

상기 제1 계단용 피씨부재(7)로부터 소정의 간격(19)을 유지하면서 그 좌측에 상기 중간계단참용 피씨부재(5)의 후단부와 상기 제2플로어계단참용 하프슬래브 피씨부재(8)의 선단부에 제2 계단용 피씨부재(9)의 상, 하단부를 접합하여 설치하는 제2 계단용 피씨부재(9)의 접합단계와;While maintaining a predetermined distance 19 from the first step PC member 7, the rear end portion of the intermediate step participation PC member 5 and the second floor step entry half slab PC member 8 on its left side. A joining step of the second staircase PC member 9 for joining and installing the upper and lower ends of the second staircase PC member 9 at the distal end portion;

상기 제2 플로어계단참용 하프슬래브 피씨부재(8)의 후방측인 콘크리트 타설부(8a)의 상면에 현장에서 콘크리트를 타설하는 단계와;Placing concrete in the field on an upper surface of the concrete placing portion 8a, which is a rear side of the second slab stepping half slab PC member 8;

상기 좌, 우측 계단실용 피씨벽부재(1)(3)의 선단부의 사이에 유리판이 고정 설치된 통상의 유리창틀(11)을 설치하는 단계들에 의하여 한개층의 계단실(A)의 시공이 완료되며;Construction of the staircase A of one floor is completed by the steps of installing a common window frame 11 in which a glass plate is fixed between the tip portions of the left and right stairs wall members 1 and 3. ;

상기와 같은 시공과정에 의하여 계속해서 바로 윗층의 계단실(A)을 시공하여 기준층(B)의 구축에 선행하여 적어도 두층의 계단실(A)이 구축되어 있도록 시공하는 시공과정을 최상층까지 계속해서 반복하여 수행함으로써 건축물의 전층의 계단실(A)의 시공이 완료되며 두층의 계단실(A)의 시공이 완료될 때마다 기준층(B)을 시공(RC공법)하게 된다.By the above construction process, the construction process of continuously constructing the staircase chamber A on the upper floor and constructing the at least two staircase chamber A in advance of the construction of the reference layer B is continuously repeated up to the top floor. By performing the construction of the staircase (A) of the entire floor of the building is completed, each time the construction of the staircase (A) of the two floors is completed, the reference floor (B) is constructed (RC method).

도 19에 도시한 바와 같이, 상기 각 좌측, 우측 및 후측의 계단실용 피씨벽부재(1)(3)(4)를 설치하는 단계에서 좌측, 우측 및 후측의 각 계단실용 피씨벽부재(1)(3)(4)들과 하층의 각 계단실용 피씨벽부재(2)(2')(2") 사이의 접합은 상기 각 계단실용 피씨벽부재(1)(3)(4)의 하부의 내부에 복수의 슬리브(1b)(3b)(4a)가 각각 매설되고 (이때 상기 각 슬리브(1b)(3b)(4a)의 하측의 몰탈주입구(1ba)(3ba)(4aa) 및 공기배출구(1bb)(3bb)(4ab)는 외부로 연통되도록 설치함) 상기 각 슬리브(1b)(3b)(4a)의 상부의 내측으로 상기 각 계단실용 피씨벽부재(1)(3)(4)의 내부에 수직방향으로 매설되어 있는 철근{1c, 3c, 4b(이하, 수직철근이라고 함)}들의 하단부를 삽입하고, 상기 각 슬리브(1b)(3b)(4a)에 대응하는 하층의 좌측, 우측 및 후측의 각 계단실용 피씨벽부재(2)(2')(2")에 매설되어 있는 복수의 수직철근(2a)(2'a)(2"a)의 상측의 외부로 노출되어 있는 부분(이하, 상측 노출철근부(2aa)(2'aa)(2"aa)라고 함)이 상기 각 슬리브(1b)(3b)(4a)들의 하부의 내측으로 삽입되면서 상기 각 계단실용 피씨벽부재(1)(3)(4)와 하층의 좌측, 우측 및 후측의 각 계단실용 피씨벽부재(2)(2')(2")의 사이에 접합용 공간부(20)가 형성되어 있는 상태에서 상기 각 슬리브(1b)(3b)(4a)의 하측 몰탈 주입구(1ba)(3ba)(4aa)를 통하여 주입하는 몰탈에 의하여 상기 몰탈이 상기 슬리브(1b)(3b)(4a)의 내부공간은 물론, 계단실용 피씨벽부재(1)(3)(4)와 하층의 좌측, 우측 및 후측의 각 계단실용 피씨벽부재(2)(2')(2")사이에 형성된 접합용 공간부(20)까지 충전되면서 상기 각 계단실용 피씨벽부재(1)(3)(4)와 하층의 각 계단실용 피씨벽부재 (2)(2')(2")가 서로 견고하게 접합된다.As shown in Fig. 19, each of the left and right and rear side PC wall members 1 in the step of installing the left and right and rear PC wall members 1, 3 and 4 respectively. (3) (4) and the joint between the lower floor PC wall members 2, 2 'and 2 " A plurality of sleeves 1b, 3b, 4a are embedded therein (at this time, mortar inlets 1ba, 3ba, 4aa and air outlets below the sleeves 1b, 3b, 4a, respectively). 1bb) (3bb) 4ab are installed so as to communicate with the outside) of the PC wall members 1, 3, and 4 for the staircases inside the upper portions of the sleeves 1b, 3b, and 4a. Insert the lower ends of the reinforcing bars (1c, 3c, 4b (hereinafter referred to as vertical reinforcing bar)) embedded in the vertical direction therein, the left and right of the lower layer corresponding to each of the sleeve (1b) (3b) (4a) And a plurality of verticals embedded in the PC wall members 2, 2 ', 2 "for the staircases at the rear side. The portion exposed to the outside of the upper side of the roots 2a, 2'a, and 2 "a (hereinafter, referred to as upper exposed reinforcing bars 2aa, 2'aa, and 2" aa) is said sleeve. (1b) (3) and (4a) each step room PC wall member (1) (3) (4) and each step room PC wall member (2) on the left, right and rear sides of the lower floor while being inserted into the lower part of the lower part. The lower mortar injection ports 1ba, 3ba, 4aa of the sleeves 1b, 3b, and 4a are formed in a state in which the joining space 20 is formed between (2 ') and 2 ". The mortar is injected into the mortar by the mortar to the inner space of the sleeves 1b, 3b and 4a, as well as to the left, right and rear sides of the PC wall members 1, 3 and 4 for the staircase. The PC wall members (1) (3) (4) for each staircase and each step of the lower floor are filled with the space for joining (20) formed between the PC wall members (2) (2 ') and "2" for the staircase rooms. The utility PC wall members 2, 2 ', 2 "are firmly bonded to each other.

도 17에 도시한 바와 같이, 상기 서로 인접하는 좌측 계단실용 피씨벽부재(1)와 후측 계단실용 피씨벽부재(4) 사이의 측면 연결부인 수직접합부의 상호 접합은 후단부의 좌측에 수직방향으로 돌기부(1j)가 형성된 좌측 계단실용 피씨벽부재(1)의 후단부와 좌단부의 전방측 측면의 우측에 수직방향으로 돌기부(4d)가 형성된 후측의 계단실용 피씨벽부재(4)의 좌단부의 전방측 측면부 사이에 형성되는 접합용 공간부의 외측에서 내측으로 들어가 있는 소정의 위치에 백업부재(40a)를 삽입한 후, 그 외측에 누수차단재가 주입된 코킹부(40a')로 구성된 누수차단부를 형성하고 나서, 상기 백업부재(40a)로부터 그 내측에 소정의 단열 및 누수유도용 공간부(40c)를 형성한다.As shown in Fig. 17, the mutual joining of the vertical joint, which is a side connection between the left staircase PC wall member 1 and the rear staircase PC wall member 4 adjacent to each other, is a projection in the vertical direction to the left of the rear end. The front end of the left end of the staircase PC wall member 4 on the rear side in which the projection 4d is formed in the vertical direction on the right side of the rear end of the left staircase PC wall member 1 on which (1j) is formed and the front side of the left end of the left end chamber. After inserting the backup member 40a in a predetermined position which enters from the outer side to the inner side of the joining space formed between the side portions, the leakage blocking portion composed of the caulking portion 40a 'into which the leakage blocking material is injected is formed. Then, a predetermined heat insulating and leak-inducing space portion 40c is formed inside the backup member 40a.

그 다음에 상기 단열 및 누수유도용 공간부(40c)의 내측의 굴곡되어진 공간부인 누수차단용 충전부(40b)에 충전물인 우레아폼을 충전한 후, 상기 충전물이 충전되어 있는 누수차단용 충전부(40b)로부터 내측으로 형성된 공간부에서 상기 좌측 계단실용 피씨벽부재(1)의 길이방향으로 일정한 간격을 두고 형성되어 있는 복수의 전단변형방지용 요부(1i)내에 각각 형성된 루프바(1h)의 고리형상부위와 이에 대응하는 후측의 계단실용 피씨벽부재(4)의 복수의 전단변형방지용 요부(4f)내에 각각 형성된 루프바(4c)의 고리형상부위를 서로 겹치지게 하여 중첩시킨 후, 상기 서로 겹쳐진 루프바(1h)(4c)의 고리형상부위의 내측에 수직조인트 보강철근(41)을 수직방향으로 삽입하고 나서 상기 공간부에 모르타르를 충전시키면 인접하는 좌측 계단실용 피씨벽부재(1)와 후측 계단실용 피씨벽부재(4)를 서로 접합하여 연결하는 과정이 완료된다.Next, after filling the leakage blocking unit 40b, which is a curved space part inside the space for insulated and leak-inducing space 40c, a urea foam as a filler, the leakage blocking unit 40b in which the filler is filled. ) Annular portions of the loop bars 1h formed in the plurality of shear deformation preventing recesses 1i formed at regular intervals in the longitudinal direction of the left staircase PC wall member 1 in the space portion formed inwardly from And the annular portions of the loop bars 4c formed in the plurality of shear deformation preventing recesses 4f of the rear staircase PC wall member 4 corresponding to each other so as to overlap each other, and then overlap each other. (1h) Inserting the vertical joint reinforcing bar 41 in the vertical direction to the inside of the annular portion of (4c), and then filling the mortar with the space part, the adjacent left staircase wall member (1) and after The process steps for connecting to each other the bonding practical PC wall members (4) is completed.

도 16에 도시한 바와 같이, 상기 서로 인접하는 우측 계단실용 피씨벽부재(3)와 후측 계단실용 피씨벽부재(4)사이의 측면 연결부인 수직 접합부의 상호 접합은 후단부의 좌측면의 전방측에 수직방향으로 돌기부(3g)가 형성된 우측 계단실용 피씨벽부재(3)의 후단부의 좌측면과 우단부의 후측에 수직방향으로 돌기부(4e)가 형성된 후측의 계단실용 피씨벽부재(4)의 우단부 사이에 형성되는 접합용 공간부의 외측에서 내측으로 들어가 있는 소정의 위치에 백업부재(42a)를 삽입한 후, 그 외측에 누수차단재가 주입된 코킹부(42a')로 구성된 누수차단부를 형성하고 나서, 상기 백업부재(42a)로부터 그 내측에 소정의 단열 및 누수유도용 공간부(42c)를 형성한다.As shown in Fig. 16, the mutual joining of the vertical joints, which are side connections between the right side staircase PC wall member 3 and the rear staircase PC wall member 4 adjacent to each other, is located on the front side of the left side of the rear end. The right end of the staircase PC wall member 4 on the rear side of which the projection 4e is formed in the vertical direction on the left side of the rear end and the right end of the rear end of the right staircase PC wall member 3 having the projections 3g formed in the vertical direction. After inserting the backup member 42a in the predetermined position which enters inward from the outer side of the joining space part formed in between, after forming the leakage blocking part which consists of the caulking part 42a 'into which the leakage blocking material was injected, In addition, a predetermined space portion 42c for insulating and leaking water is formed inside the backup member 42a.

그 다음에 상기 단열 및 누수유도용 공간부(42c)의 내측의 굴곡되어진 공간부인 누수차단용 충전부(42b)에 충전물인 우레아 폼을 충전한 후, 상기 충전물이 충전된 누수차단용 충전부(42b)로부터 내측으로 형성된 공간부에서 상기 우측 계단실용 피씨벽부재(3)의 길이방향으로 일정한 간격을 두고 형성되어 있는 복수의 전단변형방지용 요부(3i)내에 각각 형성된 루프바(3h)의 고리형상부위와 이에 대응하는 후측의 계단실용 피씨벽부재(4)의 복수의 전단변형방지용 요부(4f)내에 각각 형성된 루프바(4c)의 고리형상부위를 서로 겹쳐지게 하여 중첩시킨 후, 상기 서로 겹쳐진 루프바(3h)(4c)의 고리형상부위의 내측에 수직조인트보강철근(43)을 수직방향으로 삽입하고 나서 상기 공간부에 모르타르를 충전시키면 인접하는 우측 계단실용 피씨벽부재(3)와 후측 계단실용 피씨벽부재(4)를 서로 접합하여 연결하는 과정이 완료된다.After filling the urea foam, which is a filler, to the leakage blocking portion 42b, which is a curved space portion inside the space for insulated and leak-inducing space 42c, the leakage blocking portion 42b in which the filler is filled is filled. An annular portion of each of the loop bars 3h formed in the plurality of shear deformation preventing recesses 3i formed at regular intervals in the longitudinal direction of the right staircase PC wall member 3 in the space portion formed inwardly from Corresponding to each other by overlapping the annular portions of the loop bars 4c formed in the plurality of shear deformation preventing recesses 4f of the rear staircase PC wall member 4 corresponding to each other, and then overlapping the loop bars ( 3h) Inserting the vertical joint reinforcing bar 43 in the vertical direction to the inside of the annular portion of (4c), and then filling the mortar with the space part, the PC wall member 3 for the adjacent right staircase and the rear step The process of connecting to a PC for the wall member (4) joined to each other is completed.

도 15에 도시한 바와 같이, 상기 좌측 계단실용 피씨벽부재(1)의 선단부의 좌측면과 그 좌측의 인접하는 피씨벽부재(10)의 우단부 사이의 수직접합부의 접합과정도 상기 서로 인접하는 좌측 계단실용 피씨벽부재(1)와 후측 계단실용 피씨벽부재(4) 또는 우측 계단실용 피씨벽부재(3)와 후측 계단실용 피씨벽부재(4) 사이의 수직접합부의 접합과정과 동일하며, 다만, 좌측 계단실용 피씨벽부재(1)의 선단부의 돌기부(1j)가 선단부의 좌측면의 후측에 형성되어 있으면서 좌측 계단실용 피씨벽부재(1)의 선단부의 우측면이 아닌 좌측면에서 인접하는 피씨벽부재(10)와 접합된다는 점이 다를 뿐이다.As shown in Fig. 15, the joining process of the vertical joint between the left side of the tip of the left staircase PC wall member 1 and the right end of the adjacent PC wall member 10 on the left side is also adjacent to each other. It is the same as the joining process of the vertical joint between the left wall PC member 1 and the rear wall PC wall member 4 or the right wall PC wall member 3 and the rear wall PC wall member 4, However, the projections 1j of the distal end of the left stairwell PC wall member 1 are formed on the rear side of the left side of the distal end part, and the PCs adjacent to the left side of the left stairwell PC wall member 1 are not adjacent to the right side of the distal end. The only difference is that they are joined to the wall member 10.

그리고, 상기 좌측 계단실용 피씨벽부재(1)의 선단부의 우측면과 우측 계단실용 피씨벽부재(3)의 선단부의 좌측면에 수직방향으로 형성된 유리창틀고정용 요부(1f)(3f)에 유리판이 고정 설치된 통상의 유리창틀(11)을 삽입하여 고정시킴으로써 상기 서로 인접하는 좌측, 우측 및 후측 계단실용 피씨벽부재(1)(3)(4) 및 유리창틀(11)의 사이의 각 측면 연결부인 수직 접합부의 접합과정이 완료된다.The glass plate is fixed to the window frame fixing recesses 1f and 3f formed in the vertical direction on the right side of the distal end of the left staircase PC wall member 1 and the left side of the distal end of the right staircase PC wall member 3. By inserting and fixing the ordinary window frame 11 installed thereon, each side connection portion between the left, right and rear stairs PC wall members 1, 3, 4 and the window frame 11 adjacent to each other is vertical. The joining process of the joint is completed.

도 6에 도시한 바와 같이, 상기 중간계단참용 피씨부재(5)의 좌측단부와 좌측 계단실용 피씨벽부재(1)의 상호 접합은 중간계단참용 피씨부재(5)의 좌측단부가 좌측 계단실용 피씨벽부재(1)의 지지용 돌기부(1a)의 상면이 깔모르타르(38)의 위에 올려 놓여진 상태에서 중간계단참용 피씨부재(5)의 좌측에 형성된 복수의 각 고정용 요부(5d)에 일측면을 제외한 고정대(5ba)를 포함하여 나머지 부위가 매설되어 고정된 고정용 금속편(5b)과, 이에 대응하는 좌측 계단실용 피씨벽부재(1)의 일측에 형성된 복수의 고정용 요부(1d)에 일측면을 제외한 고정대(1ea)를 포함하여 나머지 부위가 매설되어 고정된 고정용 금속편(1e)의 일측면에 각각 접하도록 직각으로 굴곡되어 있는 연결용 금속편(21)의 양측면이 각각 접해진 상태에서 상기 금속편(5b)(1e)(21)들을 서로 용접한 후, 상기 중간 계단참용 피씨부재(5)의 복수의 고정용 요부(5d)와 좌측 계단실용 피씨벽부재(1)의 복수의 각 고정용 요부(1d)내에 모르타르를 충전함으로써 서로 견고하게 접합된다. As shown in Fig. 6, the left end of the intermediate stairwell PC member 5 and the left staircase PC wall member 1 are joined to each other so that the left end of the intermediate stairwell PC member 5 has a left staircase PC. One side surface of each of the plurality of fixing recesses 5d formed on the left side of the intermediate stepping PC member 5 in a state where the upper surface of the supporting protrusion 1a of the wall member 1 is placed on the top of the mortar 38. Including the fixing bar (5ba), except for the remaining portion is buried in the fixing metal piece (5b) and a plurality of fixing recesses (1d) formed on one side of the left side room PC wall member (1) corresponding thereto In the state in which both sides of the connecting metal piece 21, which are bent at right angles to be in contact with each other to one side of the fixing metal piece 1e, each of which is embedded by including the fixing stand 1ea except the side, respectively, are in contact with each other. After welding the metal pieces 5b, 1e and 21 to each other, The plurality of fixing recesses 5d of the intermediate landing PC member 5 and the plurality of fixing recesses 1d of the left staircase PC wall member 1 are firmly bonded to each other by filling mortar.

도 6에 도시한 바와 같이, 상기 중간 계단참용 피씨부재(5)의 우측단부와 우측 계단실용 피씨벽부재(3)의 상호접합도 상기 중간 계단참용 피씨부재(5)의 좌측단부와 좌측 계단실용 피씨벽부재(1)의 상호 접합과정과 마찬가지로 중간계단참용 피씨부재(5)의 우측단부가 우측계단실용 피씨벽부재(3)의 지지용 돌기부(3a)의 상면의 깔모르타르(38)의 위에 올려놓여진 상태에서 상기 중간 계단참용 피씨부재(5)의 우측에 형성된 복수의 고정용 요부(5d)에 일측면을 제외한 고정대(5ba)를 포함하여 나머지 부위가 매설되어 고정된 고정용 금속편(5b)과 이에 대응하는 우측 계단실용 피씨벽부재(3)의 일측에 형성된 복수의 고정용 요부(3d)에 일측면을 제외한 고정대(3ea)를 포함하여 나머지 부위가 매설되어 고정된 고정용 금속편(3e)의 일측면에 각각 접하도록 직각으로 굴곡되어 있는 연결용 금속편(21)의 양측면이 각각 접해진 상태에서 상기 금속편(3e)(5b)(21)을 서로 용접한 후, 상기 중간 계단참용 피씨부재(5)의 복수의 고정용 요부(5d)와 우측의 계단실용 피씨벽부재(3)의 복수의 각 고정용 요부(3d)내에 모르타르를 충전함으로써 서로 견고하게 접합된다.As shown in FIG. 6, a diagram showing the mutual junction between the right end of the intermediate landing PC member 5 and the PC wall member 3 for the right staircase room, and the left end of the intermediate landing PC member 5 and the left staircase Similarly to the mutual joining process of the PC wall member 1, the right end of the PC member 5 for the intermediate stairway part is placed on the top of the mortar 38 on the upper surface of the support protrusion 3a of the PC wall member 3 for the right staircase thread. Fixing metal piece 5b in which the remaining portions are embedded and fixed in a plurality of fixing recesses 5d formed on the right side of the intermediate landing PC member 5 in a placed state, including a fixing bar 5ba except for one side. And a fixing metal piece 3e in which the remaining portions are embedded and fixed in a plurality of fixing recesses 3d formed on one side of the right side stairwell PC wall member 3 corresponding thereto, except for one side. Perpendicular to each other on one side of After welding the metal pieces 3e, 5b, 21 to each other in a state where both sides of the curved connecting metal piece 21 are in contact with each other, a plurality of fixing recesses of the intermediate member PC member 5 5d) and the plurality of fixing recesses 3d of the staircase PC wall member 3 on the right side are firmly joined to each other by filling mortar.

도 5에 도시한 바와 같이, 상기 제1 계단용 피씨부재(7)와 상기 제1플로어계단참용 하프슬래브 피씨부재 (6)의 접합은 제1플로어계단참용 하프슬래브 피씨부재(6)의 선단부와 제1 계단용 피씨부재(7)의 하측의 후단부와의 사이에 직각으로 굴곡되어서 형성되는 접합용 공간부의 하측 소정의 위치에 백업부재(22a)를 삽입하고, 그 외측에 누수를 차단하기 위하여 코킹재가 주입되어 있는 코킹부(22b)로 이루어진 수직방향의 누수차단부(22)를 형성하며, 상기 백업부재(22a)로부터 그 내측부에 소정의 수직방향의 공간부(23)를 형성하고, 상기 공간부(23)에 이어서 형성된 수평방향의 공간부에 깔모르타르(24)를 개재시키며, 상기 깔 모르타르(24)가 개재되어 있는 부위의 일측 단부로부터 상측으로 수직방향의 공간부(25)를 형성하며, 상기 공간부(25)의 상측에 복수의 각 연결용 금속편(26)이 상기 제1 계단용 피씨부재(7)의 하부의 후단부의 상측에 일정한 간격을 두고 형성된 복수의 각 고정용 요부(7ba)에 일측면을 제외한 고정대(7aa)를 포함하여 나머지 부위가 각각 매설되어 고정되어 있는 각 고정용 금속편(7a)과 이에 대응하는 제1플로어 계단참용 하프슬래브 피씨부재(6)의 선단부의 상측에 형성된 복수의 각 고정용 요부(6ba)에 일측면을 제외한 고정대(6ca)를 포함하여 나머지 부위가 각각 매설되어서 고정되어 있는 각 고정용 금속편(6c)에 올려놓은 후 서로 용접하고, 그 위의 각 고정용 요부(7ba)(6ba)에 모르타르를 충전시킴에 의해서 상기 제1 계단용 피씨부재(7)와 제1 플로어 계단참용 하프슬래브 피씨부재(6)가 상호 견고하게 접합된다.As shown in FIG. 5, the joining of the first step PC member 7 and the first floor stepping half slab PC member 6 is performed by the distal end of the first floor stepping half slab PC member 6. In order to insert the backup member 22a in the predetermined position of the lower part of the joining space part formed by bend | omitted at right angles between the rear end part of the lower part of the 1st step PC member 7, and to block the water leakage on the outer side. A vertical leakage blocking portion 22 formed of a caulking portion 22b into which a caulking material is injected, and a space portion 23 in a predetermined vertical direction is formed in an inner portion thereof from the backup member 22a; Intercalate the mortar 24 in the horizontal space formed next to the space 23, and form the space 25 in the vertical direction upward from one end of the portion where the mortar 24 is interposed. And a plurality of upper portions of the space part 25. The connecting metal piece 26 includes a fixing base 7aa excluding one side of each of the plurality of fixing recesses 7ba formed at regular intervals above the rear end of the lower part of the first step PC member 7. One side surface of each of the fixing metal pieces 7a on which the remaining portions are buried and fixed, respectively, and a plurality of fixing recesses 6ba formed on an upper end of the corresponding half-slab PC member 6 for the first floor landing. The remaining parts, including the holder 6ca except for the above, are placed on each fixing metal piece 6c which is embedded and fixed, and then welded to each other, and the mortar is filled in each fixing recess 7ba or 6ba thereon. The first step PC member 7 and the first half step slab PC member 6 for joining the first step are firmly joined to each other.

도 7에 도시되어 있는 바와 같이, 상기 제1 계단용 피씨부재(7)와 상기 중간계단참용 피씨부재(5)의 접합은 중간 계단참용 피씨부재(5)의 후단부와 제1 계단용 피씨부재(7)의 상측부의 선단부와의 사이에 직각으로 굴곡되어서 형성되는 접합용 공간부의 하측 소정의 위치에 백업부재(27a)를 삽입하고 그 외측에 누수를 차단하기 위하여 코킹재가 주입되어 있는 코킹부(27b)로 이루어지는 수직방향의 누수차단부(27)를 형성하며, 상기 백업부재(27a)로부터 그 내측부에 소정의 수직방향의 공간부(28)를 형성하고, 상기 공간부(28)에 이어서 수평방향의 공간부에 깔모르타르(29)를 개재시키며, 상기 깔모르타르(29)의 일측 단부로부터 상측으로 수직방향의 공간부(30)를 형성하고, 상기 공간부(30)의 상측에 복수의 각 연결용 금속편(31)이 상기 제1계단용 피씨부재(7)의 상측의 선단부의 상측에 일정한 간격을 두고 형성된 복수의 각 고정용 요부(7ca)에 일측면을 제외한 고정대(7aa)를 포함하여 나머지 부위가 각각 매설되어서 고정되어 있는 각 고정용 금속편(7a)과 이에 대응하는 중간 계단참용 피씨부재(5)의 후단부의 상측에 형성된 복수의 각 고정용 요부(5a)에 일측면을 제외한 고정대(5ba)를 포함하여 나머지 부위가 각각 매설되어 있는 각 금속편(5b)에 올려놓은 후 서로 용접하고, 그 위의 각 고정용 요부(7ca)(5a)에 모르타르를 충전시킴에 의해서 상기 제1계단용 피씨부재(7)와 중간 계단참용 피씨부재(5)가 상호 견고하게 접합된다.As shown in FIG. 7, the joining of the first step PC member 7 and the intermediate step PC member 5 is performed by the rear end of the intermediate step PC member 5 and the first step PC member. A caulking portion into which a caulking material is injected to insert a backup member 27a at a predetermined position on the lower side of the joining space portion formed by bending at a right angle between the tip portion of the upper portion of the upper portion (7), and to prevent leakage. A water leakage blocking portion 27 formed in a vertical direction formed of 27b), and a space portion 28 in a predetermined vertical direction is formed on the inner side thereof from the backup member 27a, and then horizontally formed after the space portion 28. Interposed between the mortar 29 in the direction of the space, forming a vertical space 30 in the vertical direction from one end of the side of the mortar 29, a plurality of angles on the upper side of the space 30 A connecting metal piece 31 is formed on the first step PC member 7. Each of the fixing metal pieces 7a in which the remaining portions are embedded and fixed to each of the plurality of fixing recesses 7ca formed at regular intervals on the upper end of the side, except for one side, are embedded and fixed thereto. On each of the metal pieces 5b in which the remaining portions are embedded, respectively, in each of the fixing recesses 5a formed on the rear end of the corresponding intermediate landing PC member 5, including the fixing bar 5ba except for one side. The first stepped PC member 7 and the intermediate stepped PC member 5 are firmly joined to each other by placing mortar on each of the fixing recesses 7ca and 5a thereon. Are bonded.

도 8에 도시한 바와 같이, 상기 제2 계단용 피씨부재(9)와 상기 중간 계단참용 피씨부재(5)의 접합은 중간 계단참용 피씨부재(5)의 후단부와 제2계단용 피씨부재(9)의 하측부의 선단부와의 사이에 직각으로 굴곡되어서 형성되는 접합용 공간부의 하측 소정의 위치에 백업부재(27a)를 삽입하고, 그 외측에 누수를 차단하기 위하여 코킹재가 주입되어 있는 코킹부(27b)로 이루어지는 수직방향의 누수차단부(27)가 형성하며, 상기 백업부재(27a)로부터 그 내측부에 소정의 수직방향의 공간부(28)를 형성하고, 상기 공간부(28)의 상단부로부터 수평방향의 공간부에 깔모르타르(29)를 개재시키며, 상기 깔모르타르(29)의 일측 단부로부터 상측으로 수직방향의 공간부(30)를 형성하고, 상기 공간부(30)의 상측에 복수의 각 연결용 금속편(31)이 상기 제2계단용 피씨부재(9)의 하측의 선단부의 상측에 일정한 간격을 두고 형성된 복수의 각 고정용 요부(9ca)에 일측면을 제외한 고정대(9aa)를 포함하여 나머지 부위가 각각 매설되어서 고정되어 있는 각 고정용 금속편(9a)과 이에 대응하는 중간 계단참용 피씨부재(5)의 후단부 상측에 형성된 복수의 각 고정용 요부(5a)에 일측면을 제외한 고정대(5ba)를 포함하여 나머지 부위가 각각 매설되어 있는 각 금속편(5b)에 올려놓은 후, 서로 용접하고 그 위의 각 고정용 요부(9ca)(5d)에 모르타르를 충전시킴에 의해서 중간계단참용 피씨부재(5)와 제2 계단용 피씨부재(9)가 서로 견고하게 접합된다. As shown in FIG. 8, the joining of the second step PC member 9 and the intermediate step PC member 5 is performed by the rear end of the intermediate step PC member 5 and the second step PC member ( A caulking portion into which a backing member 27a is inserted at a predetermined position on the lower side of the joining space portion formed by bending at right angles between the distal end portion of the lower portion of 9), and a caulking material is injected to block leakage. 27b), a vertical water leakage blocking portion 27 is formed, and a predetermined vertical space portion 28 is formed in the inner side from the backup member 27a, and from the upper end of the space portion 28, Interposed between the mortar 29 in the horizontal space, forming a vertical space 30 in the vertical direction from one end of the mortar 29, a plurality of the upper side of the space 30 Each connecting metal piece 31 has a lower portion of the second staircase PC member 9. Each of the fixing metal pieces 9a in which a plurality of fixing recesses 9ca formed at regular intervals on the upper end of the side, including fixing bars 9aa except one side, are embedded and fixed, respectively. On each of the metal pieces 5b in which the remaining portions are embedded, respectively, in the plurality of fixing recesses 5a formed on the rear end of the corresponding intermediate landing PC member 5, including the fixing bar 5ba except for one side. After mounting, the intermediate member PC member 5 and the second step PC member 9 are firmly joined to each other by welding each other and filling mortar with the fixing recesses 9ca and 5d thereon. do.

도 9에 도시되어 있는 바와 같이, 상기 제2 계단용 피씨부재(9)와 상기 제2플로어계단참용 하프슬래브 피씨부재(8)의 접합은 제2 플로어계단참용 하프슬래브 피씨부재(8)의 선단부와 제2 계단용 피씨부재(9)의 상측의 후단부와의 사이에 직각으로 굴곡되어서 형성되는 접합용 공간부의 하측 소정의 위치에 백업부재(33a)를 삽입하고, 그 외측에 누수를 차단하기 위하여 코킹재가 주입되어 있는 코킹부(33b)로 이루어진 수직방향의 누수차단부(33)를 형성하며, 상기 백업부재(33a)로부터 그 내측부에 소정의 수직방향의 공간부(34)를 형성하고, 상기 공간부(34)의 상단부로부터 수평방향의 공간부에 깔모르타르(35)를 개재시키며, 상기 깔모르타르(35)의 일측단부로부터 상측으로 수직방향의 공간부(36)를 형성하며, 상기 공간부(36)의 상측에 복수의 각 연결용 금속편(37)이 상기 제2계단용 피씨부재(9)의 상측부의 후단부의 상측에 일정한 간격을 두고 형성된 복수의 각 고정용 요부(9ba)에 일측면을 제외한 고정대(9aa)를 포함하여 나머지 부위가 각각 매설되어서 고정되어 있는 각 고정용 금속편(9a)과 이에 대응하는 제2플로어 계단참용 하프슬래브 피씨부재(8)의 선단부의 상측에 형성된 복수의 각 고정용 요부(8ba)에 일측면을 제외한 고정대(8ca)를 포함하여 나머지 부위가 각각 매설되어서 고정되어 있는 각 고정용 금속편(8c)에 올려놓은 후 서로 용접하고, 그 위의 각 고정용 요부(9ba)(8ba)에 모르타르를 충전시킴에 의해서 제2 플로어 계단참용 하프슬래브 피씨부재(8)와 제2 계단용 피씨부재(9)가 서로 견고하게 접합된다.As shown in FIG. 9, the joining of the second stepped PC member 9 and the second floor stepped half slab PC member 8 is performed at the distal end portion of the second floor stepped half slab PC member 8. Inserting the backup member 33a at a predetermined position on the lower side of the joining space formed by bending at right angles between the second stepped PC member 9 and the rear end of the second step PC member 9, and blocking the leakage on the outside thereof. In order to form a leakage blocking portion 33 in the vertical direction consisting of the caulking portion (33b) in which the caulking material is injected, a predetermined vertical space portion 34 is formed in the inner portion from the backup member (33a), Interposed between the mortar 35 in the horizontal direction from the upper end of the space portion 34, and forms a space 36 in the vertical direction from the one end of the mortar 35 in the vertical direction, the space On each side of the part 36, a plurality of connecting metal pieces 3 7) a plurality of fixing recesses 9ba formed at regular intervals above the rear end of the upper part of the second staircase PC member 9, including the fixing base 9aa except for one side, and the remaining portions are respectively Fixing plate except one side to a plurality of fixing recesses 8ba formed on the upper end portion of each of the fixing metal pieces 9a buried and fixed and the corresponding second floor stairway half slab PC member 8 ( 8ca), the remaining parts are embedded in each of the fixing metal pieces 8c which are embedded and fixed, and then welded to each other, and the mortar is filled in the fixing recesses 9ba and 8ba thereon. The half-slab PC member 8 for second floor landing and the 2nd stairs PC member 9 are firmly joined to each other.

도 3 및 도 4에 도시한 바와 같이, 상기 제2플로어계단참용 하프슬래브 피씨부재(8)와 좌, 우측 계단실용 피씨벽부재(1)(3)의 상호 접합, 상기 제2플로어계단참용 하프슬라브 피씨부재(8)와 후측 계단실용 피씨벽부재(4)의 상호접합은 상기 후측 계단실용 피씨벽부재(4)의 상면의 일측과 좌, 우측 계단실용 피씨벽부재(1)(3)의 각 지지용 돌기부(1a)(3a)의 상면에 깔아놓은 깔모르타르(38)의 위에 상기 제2플로어계단참용 하프슬래브 피씨부재(8)의 좌측단부 및 후단부의 저면이 각각 접하도록 올려 놓은 후, 상기 제2플로어 계단참용 하프슬래브피씨부재(8)의 좌측단부와 좌측 계단실용 피씨벽부재(1), 상기 제2 플로어 계단참용 하프슬래브 피씨부재(8)의 우측단부와 우측 계단실용 피씨벽부재(3)를 접합시키고 콘크리트 타설부(8a)의 상면에 현장에서 콘크리트를 타설하면 된다.As shown in Figs. 3 and 4, the half slab PC member 8 for the second floor stepping and the PC wall members 1 and 3 for the left and right staircases are mutually joined, and the second floor stepping harp. The mutual joining of the slab PC member 8 and the rear staircase PC wall member 4 is performed on one side of the upper surface of the rear staircase PC wall member 4 and of the left and right stairs PC wall members 1 and 3. After placing the bottom end of the left end and the rear end of the second slab engagement half slab PC member 8 on the inclined mortar 38 laid on the upper surface of each supporting protrusion 1a, 3a, respectively, The left end of the second floor stairwell half slab PC member 8 and the left staircase PC wall member 1, the second floor stairway half slab PC member 8 and the right end of the second floor stairwell PC wall member (3) Joining and placing concrete in the field on the upper surface of the concrete pouring portion 8a Just do it.

즉, 상기 제2 플로어 계단참용 하프슬래브 피씨부재(8)의 좌측단부와 좌측 계단실용 피씨벽부재(1)의 접합방식 또는 제2플로어 계단참용 하프슬래브 피씨부재(8)의 우측단부와 우측 계단실용 피씨벽부재(3)의 접합방법은 상기 중간 계단참용 피씨부재(5)의 좌측단부와 좌측 계단실용 피씨벽부재(1), 중간 계단참용 피씨부재(5)의 우측단부와 우측 계단실용 피씨벽부재(3)의 접합과정과 동일한 과정으로 접합시키는 것으로서, That is, the bonding method of the left end of the second floor stairway half slab PC member 8 and the left staircase PC wall member 1 or the right end of the second floor stairway half slab PC member 8 and the right step The joining method of the practical PC wall member 3 includes the left end of the intermediate landing PC member 5, the right end of the PC wall member 1 for the left staircase, and the PC for the intermediate stairway 5 and the right staircase PC. In the same process as the bonding process of the wall member 3,

상기 제2플로어계단참용 하프슬래브 피씨부재(8)의 좌측단부와 좌측 계단실용 피씨벽부재(1)의 상호 접합은 제2플로어 계단참용 하프슬래브 피씨부재(8)의 좌측에 형성된 복수의 고정용 요부(8bb)에 일측면을 제외한 고정대(8ca)를 포함하여 나머지 부위가 매설되어 고정된 고정용 금속편(8c)과 이에 대응하는 좌측 계단실용 피씨벽부재(1)의 일측에 형성된 복수의 고정용 요부(1d)에 일측면을 제외한 고정대(1ea)를 포함하여 나머지 부위가 매설되어 고정된 고정용 금속편(1e)의 일측면에 각각 접하도록 직각으로 굴곡되어 있는 연결용 금속편(39)의 양측면이 각각 접해진 상태에서 상기 금속편(8c)(1e)(39)들을 상호 용접한 후, 상기 제2 플로어 계단참용 하프슬래브 피씨부재(8)의 복수의 고정용 요부(8bb)와 좌측 계단실용 피씨벽부재(1)의 복수의 각 고정용 요부(1d)내에 모르타르를 충전함에 의해서 견고하게 접합된다. A plurality of fixing parts formed at the left side of the second floor stairwell half slab PC member 8 are joined to each other by the left end of the second floor stairwell half slab PC member 8 and the left stairwell PC wall member 1. A plurality of fixing parts formed on one side of the fixing metal piece 8c and the corresponding left side stairs PC wall member 1 including the fixing stand 8ca except the one side in the recessed part 8bb. Both sides of the connecting metal piece 39, which are bent at right angles to contact the one side of the fixing metal piece 1e, which includes the fixing base 1ea except for one side in the recessed part 1d, is embedded. After welding the metal pieces 8c, 1e and 39 in contact with each other, a plurality of fixing recesses 8bb and a left stairwell PC wall of the second floor stairway half slab PC member 8 are welded to each other. A plurality of fixing recesses 1d of the member 1 To be firmly connected by charging as a mortar.

상기 제2플로어계단참용 하프슬래브 피씨부재(8)의 우측단부와 우측 계단실용 피씨벽부재(3)의 상호접합은 상기 제2 플로어 계단참용 하프슬래브 피씨부재(8)의 우측에 형성된 복수의 고정용 요부(8bb)에 일측면을 제외한 고정대(8ca)를 포함하여 나머지 부위가 매설되어 고정된 고정용 금속편(8c)과 이에 대응하는 우측 계단실용 피씨벽부재(3)의 일측에 형성된 복수의 고정용 요부(3d)에 일측면을 제외한 고정대(3ea)를 포함하여 나머지 부위가 매설되어 고정된 고정용 금속편(3e)의 일측면에 각각 접하도록 직각으로 굴곡되어 있는 연결용 금속편(39)의 양측면이 각각 접해진 상태에서 상기 금속편(8c)(3e)(39)들을 상호 용접한 후, 상기 제2플로어 계단참용 하프슬라브 피씨부재(8)의 복수의 고정용 요부(8bb)와 우측 계단실용 피씨벽부재(3)의 복수의 각 고정용 요부(3d) 내에 모르타르를 충전함으로써 견고하게 접합된다.Interconnection of the right end of the second floor stepping half slab PC member 8 and the right staircase PC wall member 3 is a plurality of fixings formed on the right side of the second floor stairway half slab PC member 8. A plurality of fixings formed on one side of the fixing metal piece 8c and the right side staircase PC wall member 3 corresponding to the fixing portion 8bb, including the fixing stand 8ca except one side, are embedded and fixed. Both side surfaces of the connecting metal piece 39, which are bent at right angles to contact one side of the fixing metal piece 3e, which includes the fixing base 3ea except for one side in the recessed part 3d, and is embedded. After welding the metal pieces 8c, 3e and 39 in contact with each other, the plurality of fixing recesses 8bb and the right staircase PC of the second floor stairway half slab PC member 8 are welded to each other. A plurality of fixing recesses of the wall member 3 It is firmly bonded by filling mortar in (3d).

상기 고정용 금속편(1e)(3e)(8c)은 사각형상의 금속판재의 이면에 양측으로 굴곡된 고정대(1ea)(3ea)(8ca)가 용접되어 고정되어서 상기 고정대(1ea)(8ca) 및 금속편(1e)(8c)의 일부의 부위가 좌측 계단실용 피씨벽부재(1)와 제2플로어계단참용 하프슬래브 피씨부재(8) 내에 각각 매설되어 있으므로 각 금속편(1e)(8c)이 견고하게 고정되어 있다.The fixing metal pieces 1e, 3e and 8c are welded and fixed to the back surfaces of the rectangular metal plate by being welded and fixed to both sides, so that the fixing bars 1ea and 8ca and the metal pieces are fixed. A portion of (1e) (8c) is embedded in the left staircase PC wall member (1) and the half slab PC member (8) for the second floor stepping, so that each metal piece (1e) (8c) is firmly fixed. It is.

도 3에 도시되어 있는 바와 같이, 상기 제2플로어계단참용 하프슬래브 피씨부재(8)의 콘크리트타설부(8a)의 상면에 현장에서 콘크리트를 타설하는 단계는 상기 후측 계단실용 피씨벽부재(4)의 상면 일측과 좌, 우측 계단실용 피씨벽부재(1)(3)의 지지용 돌기부(1a)(3a)의 깔모르타르 위에 좌, 우측단부 및 후단부가 각각 접합되어진 상기 제2플로어계단참용 하프슬라브 피씨부재(8)의 일측의 콘크리트 타설부(8a)의 내부에 하측이 매설되면서 상측이 위쪽 외부로 돌출하여 노출된 트러스거더(8aa), 상기 트러스거더(8aa)에 연결되면서 수평방향으로 설치되어 있는 철근(8ab) 및 상기 후측 계단실용 피씨벽부재(4)의 수직 철근(4b)과 다수의 철근들을 종방향과 횡방향으로 내장한 후, 현장에서 거푸집을 별도로 설치하지 않고도 제2플로어 계단참용 하프슬래브 피씨부재(8)의 일측에 보강타설층이 형성되도록 현장에서 상기 콘크리트 타설부(8a)의 위에 콘크리트를 타설함으로써 상기 제2플로어 계단참용 하프슬래브 피씨부재(8)가 후측계단실용 피씨벽부재(4), 좌측 및 우측 계단실용 피씨벽부재(1)(3)에 견고하게 접합된다.As shown in Figure 3, the step of placing concrete in the field on the upper surface of the concrete placing portion (8a) of the half-slab PC member 8 for the second floor stair step (4) The second floor stairway half slab, wherein the left, right and rear ends are joined to the top surface of the upper wall of the left and right, respectively, on the mortar of the supporting projections 1a and 3a of the PC wall members 1 and 3a for the staircase. As the lower side is embedded in the concrete pouring portion 8a of one side of the PC member 8, the upper side protrudes upward and is exposed to the truss girder 8aa, which is installed in the horizontal direction while being connected to the truss girder 8aa. After the reinforcing bars 8ab and vertical bars 4b and the plurality of bars of the rear wall PC wall member 4 are built in the longitudinal and transverse directions, the second floor stairs can be used without installing the formwork separately in the field. Half Slab PC Member Placing concrete on the concrete pouring portion 8a at the site so that a reinforcing casting layer is formed on one side of the 8, the half slab PC member 8 for the second floor stairway is the PC wall member 4 for the rear staircase. It is firmly bonded to the left and right PC wall members 1 and 3 for the staircase.

상기 좌, 우측 계단실용 피씨벽부재(1)(3)의 높이는 후측 계단실용 피씨벽부재(4)의 높이보다 대략 제2플로어계단참용 하프슬래브피씨부재(8)의 높이만큼 낮게 형성되어 있다.The height of the left and right stairs room PC wall members 1 and 3 is formed to be approximately lower than the height of the rear stairs room PC wall member 4 by about the height of the second floor stepping half slab PC member 8.

상기 각 고정용 금속편(1e)(3e)(5b)(6c)(7a)(9a)은 각각 사각형상의 금속판재의 이면에 양측으로 굴곡된 고정대(1ea)(3ea)(5ba)(6ca)(7aa)(8ca)(9aa)가 각각 용접되어 있다. Each of the fixing metal pieces 1e, 3e, 5b, 6c, 7a, and 9a is fixed to the sides of the rectangular metal plate, respectively, to the sides 1ea, 3ea, 5ba, and 6ca. 7aa) and 8ca and 9aa are welded respectively.

다음에 본 발명의 건축물의 계단실의 선 시공방법에 사용되는 계단실용 각 피씨부재에 관하여 설명하기로 한다.Next, each PC member for staircase rooms used in the line construction method of the staircase rooms of the building of this invention is demonstrated.

도 10 및 도 11에 도시되어 있는 바와 같이, 상기 제2플로어 계단참용 하프슬래브 피씨부재{8(제1 플로어 계단참용 하프슬래브 피씨부재(6)는 제2 플로어 계단참용 하프슬래브 피씨부재(8)와 동일한 구조이므로 이에 대한 설명을 생략함)}는 선단부의 하측에 형성되어 있는 고정용 돌기부(8d)와; 후측부에 형성되면서 콘크리트가 수장되는 요부가 형성되어 있는 부위인 콘크리트타설부(8a)와; 상기 고정용 돌기부(8d)와 콘크리트타설부(8a) 사이에 형성되면서 상부의 일측과 양측에 각각 고정용 요부(8ba)(8bb)들이 각각 일정한 간격을 두고 형성되어 있는 접합부(8b)로 구성되어 있으며; 상기 콘크리트 타설부(8a)의 상면에 일정한 간격을 두고 트러스 거더(8aa) 및 각 트러스 거더(8aa)들을 연결해주는 철근(8ab)이 설치되어 있다.As shown in Figs. 10 and 11, the second slab landing half slab PC member {8 (the first floor landing slab PC member 6 is the second floor landing slab PC member 8). Since the same structure and a description thereof will be omitted)} is a fixing projection (8d) formed on the lower side of the front end; A concrete pouring portion 8a which is a portion in which a recess is formed on the rear side and the concrete portion is formed; It is formed between the fixing projection (8d) and the concrete pouring portion (8a) and is composed of a bonding portion (8b) formed on the one side and both sides of the fixing recesses (8ba) (8bb) are formed at regular intervals, respectively. And; Reinforcing bars 8ab are installed on the upper surface of the concrete pouring part 8a to connect the truss girder 8aa and the respective truss girder 8aa.

도 10 및 도 11에 도시되어 있는 바와 같이, 상기 제2계단용 피씨부재{9(제1 계단용 피씨부재(7)는 제2 계단용 비씨부재(9)와 동일한 구조이므로 이에 대한 설명을 생략함)는 상단부에 상기 제2플로어계단참용 하프슬래브 피씨부재(8)의 고정용 돌기부(8d)의 상면의 깔모르타르부에 얹혀져서 지지되도록 상단부의 상반부가 돌출되어서 형성된 걸림용돌기부(9b)와; 상기 걸림용돌기부(9b)의 상측에 일정한 간격을 두고 형성되어 있는 복수의 고정용 요부(9ba)와; 상기 중간 계단참용 피씨부재(5)의 고정용 돌기부(5c)의 상면에 깔려있는 깔모르타르부에 얹혀져서 지지되도록 하단부의 상반부가 돌출되어서 형성된 걸림용돌기부(9c)와; 상기 걸림용돌기부(9c)의 상측에 일정한 간격을 두고 형성되어 있는 복수개의 고정용 요부(9ca)로 구성되어 있으며; 상기 상, 하측의 각 고정용 요부(9ba)(9ca)내에 고정용 금속편(9a)이 일측면을 제외한 고정대(9aa)를 포함하여 나머지 부위가 각각 매설되어 있다.10 and 11, the second step PC member {9 (the first step PC member 7 is the same structure as the second step BC member 9, so the description thereof will be omitted. And a locking projection 9b formed by protruding the upper half of the upper end so as to be mounted on and supported by the calmor tar on the upper surface of the fixing protrusion 8d of the second floor stepping half slab PC member 8 at the upper end. ; A plurality of fixing recesses 9ba which are formed at regular intervals on an upper side of the locking protrusion 9b; A locking projection 9c formed by protruding from the upper half of the lower end portion so as to be mounted on and supported by the mortar portion laid on the upper surface of the fixing projection 5c of the intermediate landing PC member 5; It is composed of a plurality of fixing recesses (9ca) formed at regular intervals on the upper side of the locking projection (9c); In the upper and lower fixing recesses 9ba and 9ca, the remaining metal parts 9a are embedded, including the fixing base 9aa except for one side.

도 10 및 도 11에 도시되어 있는 바와 같이, 상기 중간계단참용 피씨부재(5)는 일측의 하부에 돌출하여 형성되어 있는 고정용 돌기부(5c)와; 상기 고정용 돌기부(5c)의 일측으로부터 상부의 일측 단부에 일정한 간격을 두고 형성된 복수의 고정용 요부(5a)와; 양측에 형성된 복수의 고정용 요부(5d)와; 상기 복수의 고정용 요부(5a)(5d) 내에 고정용 금속편(5b)이 일측면을 제외한 고정대(5ba)를 포함하여 나머지 부위가 각각 매설되어 있다.As shown in Figures 10 and 11, the intermediate stepping PC member 5 is a fixing projection (5c) is formed to protrude to the lower side of one side; A plurality of fixing recesses 5a formed at regular intervals from one side of the fixing protrusion 5c to one end of the upper portion; A plurality of fixing recesses 5d formed on both sides; In the plurality of fixing recesses 5a and 5d, the remaining metal parts 5b are embedded, including the fixing table 5ba except for one side.

도 12 및 도 15에 도시되어 있는 바와 같이, 좌측의 계단실용 피씨벽부재(1)는 측부에 형성된 상, 하측의 공기 배출구(1bb) 및 몰탈주입구(1ba)의 끝단부가 몸체(a)의 외부에 보이도록 소정의 간격을 두고 각각 매설되어 있는 복수개의 슬리브(1b)와;12 and 15, the PC wall member 1 for the staircase room on the left side has an upper end and a lower end of the air outlet 1bb and the mortar inlet 1ba formed on the side of the body a. A plurality of sleeves 1b each embedded at predetermined intervals so as to be visible to the plurality of sleeves;

상기 각 슬리브(1b)의 상부의 내측으로 하단부가 삽입되어 있고 수직방향으로 매설되어 있으면서 상단부가 상측의 외부로 노출된 노출철근부(1ca)가 형성되어 있는 수직철근(1c)과;A vertical reinforcing bar 1c having a lower end part inserted into an upper part of each of the sleeves 1b and having an exposed reinforcing part 1ca having an upper end part exposed to the outside while being embedded in a vertical direction;

몸체(a)의 후단부의 일측에 돌기부(1g)가 형성되면서 타측에 복수의 각 루프바(1h)의 일단부의 고리형상부위가 수직방향으로 일정한 간격을 두고 형성된 각 전단변형방지용 요부(1i)가 형성된 일측 측면연결부(a')와;The projection 1g is formed at one side of the rear end of the body a, and each shear deformation preventing recess 1i formed at regular intervals in the vertical direction at the other end of the annular portions of the plurality of roof bars 1h is formed at the other side. One side connection portion (a ') formed;

상기 일측 측면연결부(a')의 반대측인 몸체(a)의 타측의 일측면에 돌기부(1j)가 수직방향으로 형성되어 있고, 상기 돌기부(1j)에 루프바(1h)의 일단부의 고리형상부위가 수직방향으로 일정한 간격을 두고 각각 형성된 각 전단변형방지용 요부(1i)가 형성되어 있는 타측 측면연결부(a")로 구성된 것에 있어서,A projection 1j is formed in a vertical direction on one side of the other side of the body a, which is the opposite side of the one side connection part a ', and an annular portion of one end of the loop bar 1h is formed on the projection 1j. Is composed of the other side connection portion (a ") is formed with each shear deformation preventing recess (1i) formed at regular intervals in the vertical direction,

상기 몸체(a)의 후단부인 일측 측면연결부(a')에 근접되어 있는 부위인 내면의 상측부에 복수의 고정용 요부(1d)가 형성되어 있으면서 그 하측에 지지용 돌기부(1a)가 형성되어 있고, 상기 몸체(a)의 선단부의 일측인 타측 측면 연결부(a")의 반대측면에 수직방향으로 유리창틀 고정용 요부(1f)가 형성되어 있고; 상기 유리창틀 고정용 요부(1f)로부터 그 내측의 중간부에 복수의 고정용 요부(1d)가 형성되어 있으면서 그 하측에 지지용 돌기부(1a)가 형성되어 있다. A plurality of fixing recesses 1d are formed at an upper side of an inner surface, which is a portion adjacent to one side side connecting portion a ', which is a rear end of the body a, and a supporting protrusion 1a is formed at a lower side thereof. A window frame fixing recess 1f is formed in a vertical direction on an opposite side of the other side connection portion a ", which is one side of the tip end of the body a; from the window frame fixing recess 1f; While the plurality of fixing recesses 1d are formed in the middle portion of the inner side, the supporting protrusions 1a are formed on the lower side thereof.

도 13 및 도 16에 도시된 바와 같이, 우측의 계단실용 피씨벽부재(3)는 측부에 형성된 상, 하측 공기배출구(3bb) 및 몰탈주입구(3ba)의 끝단부가 몸체(b)의 외부에 보이도록 소정의 간격을 두고 각각 매설되어 있는 복수개의 슬리브(3b)와;13 and 16, the PC wall member 3 for the staircase room on the right side has the upper and lower air outlets 3bb and the end portions of the mortar inlet 3ba formed on the side portions of the stairs wall visible on the outside of the body b. A plurality of sleeves 3b which are embedded at predetermined intervals so as to be respectively;

상기 각 슬리브(3b)의 상부의 내측으로 하단부가 삽입되어 있고 수직방향으로 매설되어 있으면서 상단부가 상측의 외부로 노출된 노출철근부(3ca)가 형성되어 있는 수직철근(3c)과;A vertical reinforcing bar 3c having a lower end inserted into an upper part of each of the sleeves 3b and having an exposed reinforcing part 3ca having an upper end exposed outward while being embedded in a vertical direction;

몸체(b)의 후단부의 내측면의 내측에 돌기부(3g)가 수직방향으로 형성되고, 상기 돌기부(3g)에 루프바(3h)의 일단부의 고리형상부위가 수직방향으로 일정한 간격을 두고 각각 형성된 복수의 각 전단변형방지용 요부(3i)가 형성된 일측 측면연결부(b')로 구성된 것에 있어서,Protrusions 3g are formed in the vertical direction on the inner side of the rear end of the body b, and annular portions of one end of the loop bar 3h are formed on the protrusions 3g at regular intervals in the vertical direction, respectively. In the one side connection portion (b ') formed with a plurality of shear deformation preventing recesses (3i),

상기 몸체(b)의 후단부인 일측 측면연결부(b')에 근접되어 있는 부위인 내면의 상측부에 복수의 고정용 요부(3d)가 형성되어 있으면서 그 하측에 지지용 돌기부(3a)가 형성되어 있고,While a plurality of fixing recesses 3d are formed at an upper side of an inner surface which is a portion adjacent to one side side connecting portion b ', which is a rear end of the body b, a supporting protrusion 3a is formed at the lower side thereof. There is,

상기 몸체(b)의 선단부의 일측면의 내측에 수직방향으로 유리창틀 고정용 요부(3f)가 형성되어 있으며;A recess portion 3f for fixing the window frame in the vertical direction is formed inside one side of the tip portion of the body b;

상기 유리창틀 고정용 요부(3f)로부터 그 내측의 중간부에 복수의 고정용 요부(3d)가 형성되어 있으면서 그 하측에 지지용 돌기부(3a)가 형성되어 있다.A plurality of fixing recesses 3d are formed in the middle portion of the inner side of the glass window frame fixing recess 3f, and a supporting protrusion 3a is formed on the lower side thereof.

도 14, 도 16 및 도 17에 도시되어 있는 바와 같이, 후측 계단실용 피씨벽부재(4)는 측부에 형성된 상, 하측 공기배출구(4ab) 및 몰탈주입구(4aa)의 끝단부가 몸체(c)의 외부에 보이도록 소정의 간격을 두고 각각 매설되어 있는 복수개의 슬리브(4a)와;As shown in Figs. 14, 16 and 17, the PC wall member 4 for the rear staircase rooms has the upper and lower air outlets 4ab and the mortar inlet 4aa formed at the sides of the body c. A plurality of sleeves 4a, each embedded at predetermined intervals so as to be visible to the outside;

상기 각 슬리브(4a)의 상부의 내측으로 하단부가 삽입되어 있고 수직방향으로 매설되어 있으면서 상단부가 상측의 외부로 노출된 노출철근부(4ba)가 형성되어 있는 수직철근(4b)과;A vertical reinforcing bar 4b having a lower end part inserted into an upper part of each of the sleeves 4a and having an exposed reinforcing bar part 4ba having an upper end part exposed outwardly while being embedded in a vertical direction;

몸체(c)의 좌측단부의 일측면의 내측에 수직방향으로 돌기부(4d)가 형성되어 있고, 상기 돌기부(4d)에 복수의 각 루프바(4c)의 일단부의 고리형상부위들이 수직방향으로 일정한 간격을 두고 각각 형성된 복수의 전단 변형방지용 요부(4f)가 형성된 일측 측면연결부(c')와;A projection 4d is formed in the vertical direction inside one side of the left end of the body c, and the annular portions of one end of each of the plurality of roof bars 4c are fixed in the vertical direction in the projection 4d. A side connection portion c 'formed with a plurality of shear deformation preventing recesses 4f formed at intervals, respectively;

상기 몸체(c)의 우측단부의 일측에 돌기부(4e)가 형성되고 타측에 각 루프바(4c)의 일단부의 고리형상부위가 수직방향으로 일정한 간격을 두고 각각 형성된 복수의 전단변형방지용 요부(4f)가 형성된 타측 측면연결부(c")로 구성되어 있다.A plurality of shear deformation preventing recesses 4f are formed at one side of the right end of the body c, and the annular portions at one end of each roof bar 4c are formed at regular intervals in the vertical direction on the other side. ) Is formed of the other side connection portion (c ") formed.

상기 좌, 우측 계단실용 피씨벽부재(1)(3)의 높이는 후측 계단실용 피씨벽부재(4)의 높이보다 대략 플로어계단참용 하프슬래브피씨부재의 높이만큼 낮게 형성되어 있다. 도면중 미설명부호 6a는 콘크리트 타설부, 6aa는 트러스거더, 6ab는 철근, 6b는 접합부, 6bb는 고정용 요부, 32는 현장타설 콘크리트이다. The heights of the left and right staircase PC wall members 1 and 3 are formed to be approximately lower than the height of the floor stairway half slab PC member than that of the rear staircase PC wall member 4. In the figure, reference numeral 6a denotes a concrete pour portion, 6aa is a truss girder, 6ab is a reinforcing bar, 6b is a joint portion, 6bb is a fixing recess, 32 is a cast-in-place concrete.

이와 같이 구성된 본 발명의 건축물의 계단실의 선 시공과정에 관하여 설명하기로 한다. The line construction process of the staircase room of the building of the present invention configured as described above will be described.

통상의 현장타설 콘크리트(RC공법)에 의해서 기초부를 시공한 후, 계단실(A)을 이미 제작되어 있는 좌측, 우측 및 후측 계단실용 피씨벽부재(1)(3)(4), 제1, 제2 계단용 피씨부재(7)(9), 제1, 제2 플로어계단참용 하프슬래브 피씨부재(6)(8), 중간계단참용 피씨부재(5)를 상호 접합하여 설치하는 것이며 상기 계단실(A)은 계단실(A)을 제외한 기준층을 구축하기 전에 먼저 계단실(A)의 시공을 선행하여 적어도 2층의 계단을 기준층보다 미리 구축해 놓는 것으로서,After constructing the foundation by ordinary cast-in-place concrete (RC method), the PC wall members (1) (3) (4), first, and first for the left, right and rear staircases in which the staircase A has already been manufactured. 2 Stair PCs (7) (9), half slab PC members (6) (8) for the first and second floor stairs, and PC members (5) for the intermediate stairs are mutually bonded to each other. ) Is to build a staircase of at least two floors in advance of the reference floor prior to the construction of the staircase room A before building the reference floor except for the staircase room A,

먼저, 하층의 좌측 계단실용 피씨벽부재(2)의 내부에 일정한 간격을 두고 매설된 수직철근(2a)의 상측부가 외부로 노출되어진 노출철근부(2aa)를 상기 기준층의 좌측계단실용 피씨벽부재(1)의 내부에 일정한 간격을 두고 매설되면서 수직철근(1c)의 하단부가 상측 내부로 삽입된 슬리브(1b)의 하부내로 삽입시킨 후, 무수축 고강도 모르타르를 상기 슬리브(1b)의 하측 몰탈주입구(1ba)를 통하여 주입시켜서 상기 슬리브(1b)의 내부는 물론 상기 좌측 계단실용 피씨벽부재(1)와 하층의 좌측계단실용 피씨벽부재(2)와의 사이의 접합용 공간부(20)까지 충전되어 좌측 계단실용 피씨벽부재(1)가 상기 하층의 좌측계단실용 피씨벽부재(2)에 견고하게 접합되어 설치된다.First, the exposed reinforcing bar portion 2aa in which the upper side of the vertical reinforcing bar 2a embedded at regular intervals in the left staircase PC wall member 2 of the lower floor is exposed to the outside is exposed to the left staircase PC wall member of the reference layer. The lower end of the vertical reinforcing bar 1c is inserted into the lower part of the sleeve 1b inserted into the upper side while being embedded at regular intervals in the interior of the upper part 1, and then the non-shrink high strength mortar is inserted into the lower mortar inlet of the sleeve 1b. And injected through 1ba to the interior space of the sleeve 1b as well as the space 20 for joining between the left staircase PC wall member 1 and the lower left staircase PC wall member 2. The left staircase PC wall member 1 is firmly joined to the left staircase PC wall member 2 in the lower layer.

다음에 상기 좌측계단실용 피씨벽부재(1)와 하층의 좌측계단실용피씨벽부재(2)의 접합과정과 같은 접합과정에 의해서 우측 계단실용 피씨벽부재(3) 및 후측 계단실용 피씨벽부재(4)의 순서로 상기 우측 계단실용 피씨벽부재(3) 및 후측계단실용피씨벽부재(4)를 상기 하층의 우측계단실용 피씨벽부재(2') 및 후측 계단실용 피씨벽부재(2")에 각각 접합시킨다.Next, the PC wall member 3 for the right staircase and the PC wall member for the rear staircase are joined by the same bonding process as that of the left staircase PC wall member 1 and the lower staircase PC wall member 2 below. In the order of 4), the right staircase PC wall member 3 and the rear staircase PC wall member 4 are placed in the lower staircase right stairroom PC wall member 2 'and the rear staircase PC wall member 2 ". To each.

그 다음에 상기 좌, 우측 계단실용 피씨벽부재(1)(3) 및 후방측 계단실용 피씨벽부재(4)의 상호간의 측부끼리 서로 접합시키는 과정은 다음과 같다.Then, the process of joining the sides of the left and right stairs room PC wall members 1 and 3 and the rear side stairs PC wall member 4 to each other is as follows.

상기 인접하는 좌측 계단실용 피씨벽부재(1)와 후측 계단실용 피씨벽부재(4) 끼리의 측면 연결부인 수직접합부의 상호 접합은 좌측 계단실용 피씨벽부재(1)의 후단부와 후측의 계단실용 피씨벽부재(4)의 좌단부의 전방측 측면부 사이에 형성되는 접합용 공간부의 외측에서 내측으로 들어가 있는 소정의 위치에 백업부재(40a)를 삽입한 후, 그 외측에 누수차단재가 주입된 코킹부(40a')를 형성하고 나서, 상기 백업부재(40a)로부터 그 내측에 소정의 단열 및 누수 유도용 공간부(40c)를 형성한다.The mutual joining of the vertical joint, which is a side connection between the adjacent left staircase PC wall member 1 and the rear staircase PC wall member 4, is used for the rear end of the left staircase PC wall member 1 and the rear staircase. A caulking portion into which a leakage blocking material is injected into the outer side after inserting the backup member 40a into a predetermined position inward from the outer side of the joining space portion formed between the front side surface portions of the left end portion of the PC wall member 4. After the 40a 'is formed, a predetermined space portion 40c for insulating and leaking water is formed inside the backup member 40a.

그 다음에 상기 단열 및 누수유도용 공간부(40c)의 내측의 굴곡되어진 공간부인 누수차단용 충전부(40b)에 충전물인 우레아폼을 충전한 후, 상기 충전물이 충전되어 있는 누수차단용 충전부(40b)로부터 내측으로 형성된 공간부에서 상기 좌측 계단실용 피씨벽부재(1)의 루프바(1h)의 고리형상부위와 후측의 계단실용 피씨벽부재(4)의 루프바(4c)의 고리형상부위를 서로 겹쳐지게 하여 중첩시킨 상태에서 상기 서로 겹쳐진 루프바(1h)(4c)의 고리형상부위의 내측에 수직조인트 보강철근(41)을 수직방향으로 삽입하고 나서 상기 공간부에 모르타르를 충전시키면 인접하는 좌측 계단실용 피씨벽부재(1)와 후측 계단실용 피씨벽부재(4)가 서로 견고하게 접합된다.Next, after filling the leakage blocking unit 40b, which is a curved space part inside the space for insulated and leak-inducing space 40c, a urea foam as a filler, the leakage blocking unit 40b in which the filler is filled. The annular portion of the loop bar 1h of the left staircase PC wall member 1 and the annular portion of the loop bar 4c of the rear stairs PC wall member 4 in the space formed inward from When the vertical joint reinforcing bars 41 are inserted in the vertical direction inside the annular portions of the loop bars 1h and 4c overlapping each other in the overlapping state, the mortar is filled to the adjacent space. The left wall PC wall member 1 and the rear wall PC wall member 4 are firmly joined to each other.

그리고, 상기 인접하는 우측 계단실용 피씨벽부재(3)와 후측 계단실용 피씨벽부재(4)사이의 측면 연결부인 수직접합부의 상호 접합은 우측 계단실용 피씨벽부재(3)의 후단부의 좌측면과 후측의 계단실용 피씨벽부재(4)의 우단부 사이에 형성되는 접합용 공간부의 외측에서 내측으로 들어가 있는 소정의 위치에 백업부재(42a)를 삽입한 후, 그 외측에 누수차단재가 주입된 코킹부(42a')를 형성하고 나서, 상기 백업부재(42a)로부터 그 내측에 소정의 단열 및 누수유도용 공간부(42c)를 형성한다.Then, the mutual joining of the vertical joint, which is a side connection between the adjacent right staircase PC wall member 3 and the rear staircase PC wall member 4, is connected to the left side of the rear end of the right staircase PC wall member 3 and The backing member 42a is inserted into a predetermined position inward from the outside of the joining space portion formed between the right end portions of the PC wall member 4 for the staircase at the rear side, and then the leaking blocking material is injected into the outside thereof. After the portion 42a 'is formed, a predetermined space portion 42c for insulating and leaking water is formed inside the backup member 42a.

그 다음에 상기 단열 및 누수유도용 공간부(42c)의 내측의 굴곡되어진 공간부인 누수차단용 충전부(42b)에 충전물인 우레아폼을 충전한 후, 상기 충전물이 충전되어 있는 누수차단용 충전부(42b)로부터 내측에 형성된 공간부에서 상기 우측 계단실용 피씨벽부재(3)의 루프바(3h)의 고리형상부위와 후측 계단실용 피씨벽부재(4)의 루프바(4c)의 고리형상부위를 서로 겹쳐지게 하여 중첩시킨 상태에서 상기 서로 겹쳐진 루프바(3h)(4c)의 고리형상부위의 내측에 수직조인트보강철근(43)을 수직방향으로 삽입하고 나서 상기 공간부에 모르타르를 충전시키면 인접하는 우측 계단실용 피씨벽부재(3)와 후측 계단실용 피씨벽부재(4)가 서로 견고하게 접합된다.Next, after filling the leakage blocking portion 42b, which is a curved space portion inside the space for insulated and leak-inducing space 42c, a urea foam as a filler, the leakage blocking portion 42b in which the filler is filled. The annular portion of the loop bar 3h of the right staircase PC wall member 3 and the annular portion of the roof bar 4c of the rear staircase PC wall member 4 in the space portion formed inward). When the vertical joint reinforcing bars 43 are inserted in the vertical direction inside the annular portions of the loop bars 3h and 4c overlapped with each other in the overlapping state, the mortar is filled to the space part, and the adjacent right side The staircase PC wall member 3 and the rear staircase PC wall member 4 are firmly joined to each other.

그리고, 상기 좌측 계단실용 피씨벽부재(1)의 선단부의 우측면과 우측 계단실용 피씨벽부재(3)의 선단부의 좌측면에 수직방향으로 형성된 각 유리창틀 고정용 요부(1f)(3f)에 유리판이 고정된 유리창틀(11)을 삽입함으로써 상기 서로 인접하는 좌측, 우측 및 후측 계단실용 피씨벽부재(1)(3)(4) 및 유리판이 고정된 유리창틀(11)의 사이의 각 측면 연결부인 수직 접합부의 접합과정이 완료된다. Then, a glass plate is formed on each of the window frame fixing recesses 1f and 3f formed in the vertical direction on the right side of the front end of the left staircase PC wall member 1 and the left side of the front end of the right staircase PC wall member 3. By inserting the fixed window frame 11, each side connection between the adjacent left, right and rear PC wall members 1, 3, 4 and the window frame 11 on which the glass plate is fixed is inserted. The splicing process of the lean vertical splice is complete.

그 다음에 중간계단참용 피씨부재(5)를 좌, 우측 계단실용 피씨벽부재(1)(3)에 접합시켜서 설치하게 되는데, 상기 중간 계단참용 피씨부재(5)를 상기 양측 지지용돌기부(1a)(3a)의 깔모르타르(38) 위에 올려놓고 나서 중간계단참용 피씨부재(5)의 양측에 형성되어 있는 각 고정용요부(5d)의 금속편(5b)과 좌, 우측 계단실용 피씨벽부재(1)(3)의 각 고정용요부(1d)(3d)의 각 고정용 금속편(1e)(3e)에 니은자 형상의 연결용 금속편(21)을 접하도록 한 후 용접한다.Then, the intermediate stairwell PC member 5 is joined to the left and right stairs room PC wall members 1 and 3, and the intermediate stairwell PC member 5 is installed on both sides of the support projections 1a. (3a) and then the metal pieces 5b of each fixing recess 5d formed on both sides of the intermediate stepping PC member 5 and the left and right PC wall members (3a). 1) (3) of each of the fixing recesses (1d) and (3d) of the fixing metal pieces (1e) (3e) is in contact with the metal piece 21 of the needle-shaped connection and welded.

그 다음에 상기 기준층(B)의 바닥면의 제1 플로어계단참용 하프슬래브 피씨부재(6)의 일측의 고정용 돌기부(6d)와 중간계단참용 피씨부재(5)의 고정용 돌기부(5c)의 각 깔모르타르(24)(29) 위에 제1 계단용 피씨부재(7)의 상, 하단부의 걸림용 돌기부(7b)(7c)가 접하도록 올려놓아서 걸려있도록 한 후 제1 플로어계단참용 하프슬래브피씨부재(6)의 고정용 요부(6ba)에 고정되어 있는 고정용 금속편(6c)과 상기 제1계단용 피씨부재(7)의 하단부에 형성된 걸림용돌기부(7c)내에 고정되어 있는 고정용 금속편(7a)에 양측부가 접하도록 연결용 금속편(26)을 올려놓고 용접시킨다.Next, the fixing protrusion 6d on one side of the first slab half slab PC member 6 for the bottom floor of the reference layer B and the fixing protrusion 5c of the intermediate engagement PC member 5 are provided. After placing the upper and lower locking projections 7b and 7c of the first stairs PC member 7 on each of the mortars 24 and 29 so as to be in contact with each other, the half slab PC for the first floor stairs A fixing metal piece 6c fixed to the fixing recess 6ba of the member 6 and a fixing metal piece fixed in the locking projection 7c formed at the lower end of the first staircase PC member 7 ( The metal piece 26 for a connection is put up and welded so that both sides may contact 7a).

그 다음에 좌, 우측계단실용 피씨벽부재(1)(3)의 지지용돌기부(1a)(3a)의 상면과 깔아놓은 깔모르타르(38)의 상면과 후측계단실용 피씨벽부재(4)의 상면 일측에 접하도록 상기 제2 플로어계단참용 하프슬라브 피씨부재(8)를 올려놓고 나서 상기 제2 플로어계단참용 하프슬래브 피씨부재(8)의 일측의 고정용 돌기부(8d)에 제2계단용 피씨부재(9)의 상단부의 걸림용돌기부(9b)를 올려 놓아서 걸려있도록 하고 제2계단용 피씨부재(9)의 상단부의 걸림용 돌기부(9b)와 하단부의 걸림용 돌기부(9c)를 중간 계단참용 피씨부재(5)의 일측의 고정용 돌기부(5c)에 접하도록 각각 올려놓고 나서 상기 제2플로어계단참용 하프슬라브 피씨부재(8)의 접합부(8b)의 고정용 요부(8ba)내에 고정되어 있는 금속편(8c)과 제2 계단용 피씨부재(9)의 상단부에 형성된 고정용 요부(9ba)내에 고정되어 있는 금속편(9a)의 상면에 양측의 저면이 접하도록 연결용 금속편(37)을 올려놓고 상호 용접시킨후, 상기 중간계단참용 피씨부재(5)의 고정용 요부(5a)내에 고정되어 있는 금속편(5b)과 제2계단용 피씨부재(9)의 하단부에 형성된 고정용 요부(9ca)내에 고정되어 있는 금속편(9a)에 양측의 저면이 접하도록 연결용 금속편(31)을 올려놓고 상호 용접시킨다.Then, the upper surface of the supporting projections 1a and 3a of the left and right staircase PC wall members 1 and 3 and the upper surface of the covered mortar 38 and the PC wall member 4 for the rear staircase After placing the second slab engagement half slab PC member 8 so as to be in contact with one side of the upper surface, the second stairwell PC is placed on the fixing projection 8d of one side of the second slab engagement half slab PC member 8. The locking projection 9b of the upper end of the member 9 is put on the hook, and the locking projection 9b of the upper end of the second staircase PC member 9 and the locking projection 9c of the lower end of the member 9 are engaged. Each of them is placed in contact with the fixing protrusion 5c on one side of the PC member 5, and then fixed in the fixing recess 8ba of the joint 8b of the half-slave PC member 8 for the second floor stepping. It is fixed in the fixing recessed part 9ba formed in the upper end of the metal piece 8c and the 2nd step PC member 9. The metal pieces fixed on the fixing recesses 5a of the intermediate step PC member 5 are placed on the upper surface of the metal piece 9a so as to contact the bottom surfaces of both sides with each other, and welded to each other. (5b) and the metal pieces 31 for connection are placed on the metal pieces 9a fixed in the fixing recesses 9ca formed at the lower ends of the second stepped PC members 9 so as to contact the bottom surfaces of both sides and welded to each other. .

그 다음에 상기 제2 플로어계단참용 하프슬래브 피씨부재(8)의 콘크리트 타설부(8a)의 상면에 현장에서 콘크리트를 타설한다. Then, concrete is poured in the field on the upper surface of the concrete placing portion 8a of the second slab PCS 8 for floor entry.

그리고, 상기 좌, 우측계단실용 피씨벽부재(1)(3)의 선단부 사이에 고정되도록 전방부에 유리판이 고정된 유리창틀(11)을 설치한 후 계속해서 상기와 같은 과정을 계속 반복해서 시공하여 최상층까지 기준층(B)의 시공보다 그 상측에 적어도 2층 높이의 계단실을 선행하여 구축해 나가면 된다.Then, after installing the glass window frame 11, the glass plate is fixed to the front part so as to be fixed between the front end portions of the left and right stairs wall PC (1) (3), and then continue to repeat the above process Therefore, it is sufficient to construct a staircase of at least two stories above the construction of the reference floor B up to the top floor.

전술한 바와 같이, 본 발명은 계단실(A)의 구축에 필요한 부재들을 공장에서 제작한 피씨부재를 사용함으로써 거푸집 등의 설치가 필요없게 되어 공사비용절감 및 계단 구축작업을 간략화하여 단시간내에 계단실(A)을 구축할 수 있게 되고, 건물의 계단실(A)을 기준층(B)의 시공보다 적어도 2층정도 먼저 시공한 후, 기준층(B)을 시공하는 과정을 반복함으로써, 상기 계단실(A)을 건축에 필요한 자재의 운반통로로 활용할 수 있기 때문에 안전한 시공을 할 수 있게 됨은 물론, 작업자의 통로로 활용할 수 있기 때문에 종래와 같이 작업자의 통로를 위한 설치가 필요없게 되는 효과가 있다. As described above, the present invention eliminates the need for installation of formwork, etc. by using the PC members manufactured at the factory for the construction of the staircase A, thereby reducing construction costs and simplifying the construction of the staircase. The construction of the staircase A can be achieved by repeating the construction of the staircase A of the building at least two floors prior to the construction of the reference floor B, and then constructing the reference floor B. Since it can be used as a transport passage of the material required for the safe construction can be used, of course, because it can be used as a worker's passage, there is an effect that does not need to install for the passage of the worker as in the prior art.

도 1은 본 발명의 건축물의 계단실의 선 시공방법에 따라 시공한 일부 계단실의 개략 종단면도,1 is a schematic longitudinal cross-sectional view of a part of the staircase constructed in accordance with the line construction method of the staircase of the building of the present invention;

도 2는 본 발명의 피씨부재를 이용하여 시공한 계단실의 개략 평면도,Figure 2 is a schematic plan view of the staircase room constructed using the PC member of the present invention,

도 3은 도 1의 C부 확대 종단면도,3 is an enlarged longitudinal sectional view of part C of FIG. 1;

도 4는 도 2에서 플로어계단참용 하프슬래브 피씨부재와 좌, 우측계단 실용 피씨벽부재 사이의 상호 접합부인 D부 확대 종단면도,4 is an enlarged vertical cross-sectional view of a part D, which is an interconnection portion between the floor slab PC member and the left and right staircase practical PVC wall members in FIG. 2;

도 5는 도 1의 E부 확대 종단면도,5 is an enlarged vertical cross-sectional view of part E of FIG. 1;

도 6은 도 2의 F부 확대 종단면도,6 is an enlarged vertical cross-sectional view of portion F of FIG. 2;

도 7은 도 1의 G부 확대 종단면도,7 is an enlarged longitudinal sectional view of the portion G of FIG. 1;

도 8은 도 1에서 제2계단용 피씨부재의 하단부와 중간 계단참용 피씨부재 사이의 상호 접합부의 확대 종단면도,8 is an enlarged longitudinal cross-sectional view of the mutual joint between the lower end of the second staircase PC member and the intermediate landing PC member in FIG.

도 9는 도 1에서 제2계단용 피씨부재의 상단부와 플로어계단참용 하프 슬래브 피씨부재 사이의 상호 접합부의 확대 종단면도,9 is an enlarged longitudinal cross-sectional view of the mutual joint between the upper end of the second staircase PC member and the half-slab PC member for floor engagement in FIG.

도 10은 도 1에서 측벽부를 제외한 일부 계단실의 구축물의 접합된 상태의 사시도,10 is a perspective view of the bonded state of the construction of the part of the stairs except for the side wall in FIG.

도 11은 도 10의 서로 접합되어 있는 계단실용 피씨부재들 중 일부를 발췌하여 분리시킨 상태의 분리사시도,FIG. 11 is an exploded perspective view of a state in which some of the staircase PC members joined to each other in FIG. 10 are extracted and separated;

도 12는 본 발명의 좌측 피씨벽부재의 사시도,12 is a perspective view of a left PC wall member of the present invention;

도 13은 본 발명의 우측 피씨벽부재의 사시도,Figure 13 is a perspective view of the right PC wall member of the present invention,

도 14는 본 발명의 후측 피씨벽부재의 사시도, 14 is a perspective view of the rear PC wall member of the present invention;

도 15는 도 2의 H부 확대 횡단면도,15 is an enlarged cross-sectional view of an H portion of FIG. 2;

도 16은 도 2의 I부 확대 횡단면도,16 is an enlarged cross-sectional view of part I of FIG. 2;

도 17은 도 2의 J부 확대 횡단면도,17 is an enlarged cross-sectional view of part J of FIG. 2;

도 18은 본 발명의 계단실용 각 피씨부재들 사이의 상호 접합에 사용되는 금속편의 이면부를 나타낸 사시도, 18 is a perspective view showing the rear surface of a metal piece used for mutual bonding between the PC members for the staircase of the present invention;

도 19는 본 발명의 상, 하측 계단실용 피씨벽부재의 상호 접합구조를 나타낸 요부 종단면도이다.Fig. 19 is a longitudinal sectional view showing the main parts of the upper and lower staircase PC wall members of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 좌측 계단실용 피씨벽부재 1a : 지지용 돌기부DESCRIPTION OF SYMBOLS 1: Left-handed PC wall member 1a: Supporting protrusion part

1b, 3b, 4a : 슬리브 3 : 우측 계단실용 피씨벽부재1b, 3b, 4a: sleeve 3: PC wall member for right staircase

3a : 지지용 돌기부 4 : 후측 계단실용 피씨벽부재3a: Supporting projection part 4: PC wall member for rear staircase

5 : 중간 계단참용 피씨부재 5a : 고정용 요부5: Intermediate stairwell PC member 5a: Fixing recess

6 : 제1 플로어 계단참용 하프 슬래브 피씨부재 7 : 제1 계단용 피씨부재 6: Half slab PC member for first floor stairwell 7: 7: PC member for first staircase

8 : 제2 플로어 계단참용 하프 슬래브 피씨부재 9 : 제2 계단용 피씨부재 8: Half slab PC member for second floor stairwell 9: 9: PC member for second staircase

11 : 유리창 11: glass window

Claims (13)

좌측의 계단실용 피씨벽부재를 기준층의 바로 하층의 좌측의 계단실용 피씨벽부재에 접합하여 설치하는 좌측 계단실용 피씨벽부재의 설치 단계와; 상기 좌측 계단실용 피씨벽부재의 맞은편인 우측의 계단실용 피씨벽부재를 상기 하층의 우측의 계단실용 피씨벽부재에 접합하여 설치하는 우측 계단실용 피씨벽부재의 설치 단계와; 상기 좌, 우측 계단실용 피씨벽부재로부터 후측인 후측 계단실용 피씨벽부재를 상기 하층의 후측 계단실용 피씨벽부재에 접합하여 설치하는 후측 계단실용 피씨벽부재의 설치단계와; 상기 좌, 우측 계단실용 피씨벽부재의 각 후단부에 후측 계단실용 피씨벽부재의 양단부를 접합하는 각 계단실용 피씨벽부재 상호간의 측면 연결부의 접합단계와; 상기 좌, 우측 계단실용 피씨벽부재의 각 내측면의 전방부의 중간부위의 하측에 지지할 수 있도록 돌출하여서 형성된 지지용 돌기부의 상면의 깔모르타르 위에 중간 계단참용 피씨부재가 안치된 상태에서 상기 중간 계단참용 피씨부재를 상기 좌, 우측 계단실용 피씨벽부재에 접합하는 중간 계단참용 피씨부재의 접합단계와; 상기 중간 계단참용 피씨부재의 후단부와, 하층의 좌, 우측 계단실용 피씨벽부재 (2)(2')의 후방측의 상단부에 이미 설치되어 있는 제1 플로어계단참용 하프슬래브 피씨부재의 선단부의 우측에 제1계단용 피씨부재의 상, 하단부를 접합하는 제 1계단용 피씨부재 접합단계와; 상기 후측 계단실용 피씨벽부재의 상면의 일측과 상기 좌, 우측 계단실용 피씨벽부재의 후측의 상단부에 지지할 수 있도록 돌출하여서 형성된 지지용 돌기부의 상측 깔모르타르 위에 제2 플로어계단참용 하프 슬래브 피씨부재를 안치시킨 상태에서 상기 제2 플로어 계단참용 하프슬래브 피씨부재를 상기 좌, 우측 계단실용 피씨벽부재와 후측 계단실용 피씨벽부재에 접합하여 설치하는 제2 플로어 계단참용 하프슬래브 피씨부재 접합단계와; 상기 제1 계단용 피씨부재로부터 소정의 간격을 유지하면서 그 좌측에 상기 중간계단참용 피씨부재의 후단부와 상기 제2 플로어계단참용 하프슬래브 피씨부재의 선단부에 제2 계단용 피씨부재의 상, 하단부를 접합하여 설치하는 제2 계단용 피씨부재의 접합단계와; 상기 제2 플로어계단참용 하프슬래브 피씨부재의 후방측인 콘크리트타설부의 상면에 현장에서 콘크리트를 타설하는 단계와; 상기 좌, 우측 계단실용 피씨벽부재의 선단부의 사이에 유리판이 고정된 유리창틀을 설치하는 단계들에 의하여 한개층의 계단실의 시공이 완료되며; 상기와 같은 시공과정에 의하여 기준층의 구축에 선행하여 적어도 2층의 계단실이 구축되어 있도록 하는 시공과정을 최상층까지 계속해서 반복하여 수행함으로써 건축물의 전층의 계단실의 시공이 완료되는 것을 특징으로 하는 건축물의 계단실의 선 시공방법.An installation step of the left staircase PC wall member for joining the left staircase PC wall member to the staircase PC wall member on the left side of the lower floor immediately below the reference layer; An installation step of the right staircase PC wall member for joining and installing the right staircase PC wall member opposite the left staircase PC wall member to the staircase PC wall member on the right side of the lower layer; An installation step of the rear staircase PC wall member for attaching the rear staircase PC wall member that is rearward from the left and right stairs room PC wall members to the lower staircase PC wall member; A step of joining side connection portions between the respective stairs room PC wall members which join both ends of the rear stairs PC wall members to the rear ends of the left and right stairs room PC wall members; The intermediate landing in the state in which the intermediate landing part PC member is placed on the calmor tar of the upper surface of the support protrusion formed by protruding to support the lower side of the front part of each inner side surface of the left and right stairs room PC wall members. Joining the intermediate landing PC member for joining the PC member for the left and right stairs room PC wall members; The rear end portion of the intermediate landing PC member and the front end portion of the first floor stepping half slab PC member already provided at the upper end portion of the rear side of the lower left and right stairs room PC wall members (2) and (2 '). Joining the first step PC member for joining the upper and lower parts of the first step PC member on the right side; Half slab PC member for second floor stepping on the upper side of the mortar of the support protrusion formed to protrude so as to be supported on one side of the upper surface of the rear staircase PC wall member and the upper end of the rear side of the left and right stairs PC wall member. Bonding the second floor stairwell half slab PC member to the left and right staircase PC wall members and the rear staircase PC wall member in a state of placing the second floor stairwell; Upper and lower portions of the second stairs PC member at the rear end of the intermediate stairwell PC member and the distal end of the second floor landing slab PC member on the left side while maintaining a predetermined distance from the first stairs PC member. Bonding step of the second step PC member for bonding and installing; Placing concrete in the field on an upper surface of the concrete placing portion, which is a rear side of the half slab PC member for entering the second floor; Construction of a staircase of one floor is completed by the steps of installing a glass frame with a glass plate fixed between the front end portions of the left and right PCR wall members; The construction of the staircases of the entire floor of the building is completed by repeatedly performing the construction process to ensure that at least two floors of staircase rooms are constructed in advance of the construction of the reference floor by the above-described construction process. Line construction method of stairs room. 제 1항에 있어서, 상기 중간계단참용 피씨부재와 좌, 우측 계단실용 피씨벽부재의 상호 접합은 중간계단참용 피씨부재의 좌, 우측단부가 좌, 우측 계단실용 피씨벽부재의 각 지지용 돌기부의 상면의 깔모르타르의 위에 올려놓여진 상태에서 중간계단참용 피씨부재의 좌, 우측에 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 각 고정용 금속편과 이에 대응하는 좌측 계단실용 피씨벽부재의 일측에 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 각 고정용 금속편의 일측면에 각각 접하도록 직각으로 굴곡되어 있는 연결용 금속편의 양측면이 각각 접해진 상태에서 상기 서로 접하고 있는 금속편을 서로 용접한 후, 상기 중간 계단참용 피씨부재의 복수의 고정용 요부와 좌, 우측의 계단실용 피씨벽부재의 복수의 각 고정용 요부내에 모르타르를 충전하여서 접합하는 것을 특징으로 하는 건축물의 계단실의 선 시공방법. The method of claim 1, wherein the left and right ends of the intermediate step PC member and the left and right PC room wall members are joined to each other, the left and right ends of each of the support projections of the left and right stairs PC wall member. Each of the fixing metal pieces and the corresponding left staircase PC wall members which are partially embedded in the plurality of fixing recesses formed on the left and right sides of the intermediate stairwell PC member in the state of being placed on the upper mortar of the upper surface. The metal pieces which are in contact with each other in a state where both sides of the connecting metal pieces that are bent at right angles to be in contact with each other, respectively, are partially embedded in a plurality of fixing recesses formed on one side to be in contact with one side surface of each of the fixing metal pieces. After welding with each other, the plurality of fixing recesses of the intermediate landing PC member and the plurality of fixing walls of the left and right stairs room PC wall members A line construction method for staircases in a building, characterized in that the mortar is filled and joined in the recess. 제 1항에 있어서, 상기 계단용 피씨부재와 상기 플로어계단참용 하프슬라브 피씨부재의 상호접합은 플로어계단참용 하프슬래브 피씨부재의 선단부와 계단용 피씨부재의 하측의 후단부와의 사이에 직각으로 굴곡되어서 형성되는 접합용 공간부의 하측 소정의 위치에 백업부재를 삽입하고, 그 외측에 코킹부를 형성하며, 상기 백업부재로부터 그 내측부에 소정의 수직방향의 공간부를 형성하고, 상기 공간부에 이어서 형성된 수평방향의 공간부에 깔모르타르를 개재시키며, 상기 깔모르타르가 개재되어 있는 부위의 일측 단부로부터 상측으로 수직방향의 공간부를 형성하며, 상기 공간부의 상측에 복수의 연결용 금속편이 상기 계단용 피씨부재의 하부의 후단부의 상측에 일정한 간격을 두고 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 각 고정용 금속편과 이에 대응하는 플로어 계단참용 하프슬래브 피씨부재의 선단부의 상측에 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 각 고정용 금속편에 올려놓은 후 서로 용접하며 그 위의 각 고정용 요부에 모르타르를 충전시킴에 의해서 상기 계단용 피씨부재와 플로어 계단참용 하프슬래브 피씨부재를 상호 접합시키는 것을 특징으로 하는 건축물의 계단실의 선 시공방법. 2. The method of claim 1, wherein the mutual joining of the staircase PC member and the floor stairway half slab PC member is bent at a right angle between the distal end of the floor slab half slab PC member and the rear end of the staircase PC member. A backup member is inserted at a lower predetermined position under the joining space portion formed, and a caulking portion is formed on the outer side thereof, and a predetermined vertical space portion is formed on the inner side from the backup member, and the horizontal portion is formed next to the space portion. Intercalating the mortar through a space portion in a direction, and forming a space portion in a vertical direction from one end of the portion where the mortar is interposed therebetween, and a plurality of connecting metal pieces on the upper portion of the space portion of the step PC member. A part is buried and fixed to each of the plurality of fixing recesses formed at regular intervals above the rear end of the lower part. Each part of the fixing metal piece and the corresponding plurality of fixing recesses formed on the upper end of the half slab PC member corresponding to the floor landing part are embedded in each fixing metal piece and welded to each other. A method of preliminary construction of a staircase room in a building, characterized by bonding the staircase PC member and the floor slab half slab PC member to each other by filling mortar with each fixing recess. 제 1항에 있어서, 상기 제1 계단용 피씨부재와 상기 중간계단참용 피씨부재의 접합은 중간 계단참용 피씨부재의 후단부와 제1 계단용 피씨부재의 상측부의 선단부와의 사이에 직각으로 굴곡되어서 형성되는 접합용 공간부의 하측 소정의 위치에 백업부재를 삽입하고 그 외측에 코킹부를 형성하며, 상기 백업부재로부터 그 내측부에 소정의 수직방향의 공간부를 형성하고, 상기 공간부에 이어서 수평방향의 공간부에 깔모르타르를 개재시키며, 상기 깔모르타르의 일측 단부로부터 상측으로 수직방향의 공간부를 형성하고, 상기 공간부의 상측에 복수의 각 연결용 금속편을 상기 각 제1 계단용 피씨부재의 상측의 선단부의 상측에 일정한 간격을 두고 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 각 고정용 금속편과 이에 대응하는 중간 계단참용 피씨부재의 후단부의 상측에 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 각 고정용 금속편에 올려놓은 후, 서로 용접하고, 그 위의 각 고정용 요부에 모르타르를 충전시켜서 상호 접합하는 것을 특징으로 하는 건축물의 계단실의 선 시공방법. The method of claim 1, wherein the joining of the first step PC member and the intermediate step PC member is bent at a right angle between the rear end of the intermediate step PC member and the tip of the upper part of the first step PC member. Inserting a backup member in a predetermined position on the lower side of the joining space to be formed and forming a caulking portion on the outside thereof, and forming a predetermined vertical space portion from the backup member on the inner side thereof, followed by the space portion in a horizontal space. A portion of the tip of the upper side of each of the first staircase PC member is formed by interposing a mortar in a portion, and forming a space portion in a vertical direction from an end of one side of the mortar to a vertical direction. Each of the fixing metal pieces and a corresponding middle part which are partially embedded in each of the plurality of fixing recesses formed at regular intervals on the upper side and fixed thereto. A part of each of the fixing recesses formed on the upper end of the rear end portion of the landing member is embedded in each of the fixing metal pieces fixed to each other, and then welded to each other, and the mortar is filled in the fixing recesses thereon. Line construction method of staircase of building characterized by joining. 제 1항에 있어서, 상기 제2 계단용 피씨부재와 상기 중간 계단참용 피씨부재의 접합은 중간 계단참용 피씨부재의 후단부와 제2계단용 피씨부재의 하측부의 선단부와의 사이에 직각으로 굴곡되어서 형성되는 접합용 공간부의 하측 소정의 위치에 백업부재를 삽입하고, 그 외측에 누수를 차단하기 위한 코킹부로 이루어지는 수직방향의 누수차단부를 형성하며, 상기 백업부재로부터 그 내측부에 소정의 수직방향의 공간부를 형성하고, 상기 공간부의 상단부로부터 수평방향의 공간부에 깔모르타르를 개재시키며, 상기 깔모르타르의 일측 단부로부터 상측으로 수직방향의 공간부를 형성하고, 상기 공간부의 상측에 복수의 각 연결용 금속편을 상기 제2계단용 피씨부재의 하측의 선단부의 상측에 일정한 간격을 두고 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 각 고정용 금속편과 이에 대응하는 중간 계단참용 피씨부재의 후단부 상측에 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 각 고정용 금속편에 올려놓은 후, 서로 용접하고, 그 위의 각 고정용 요부에 모르타르를 충전하여 상호 접합하는 것을 특징으로 하는 건축물의 계단실의 선 시공방법.The method of claim 1, wherein the joining of the second staircase PC member and the intermediate landing PC member is bent at a right angle between the rear end of the intermediate landing PC member and the tip of the lower part of the second staircase PC member. Inserts a backup member in a predetermined position on the lower side of the joining space formed to form a vertical leakage blocking portion consisting of a caulking portion for blocking the leakage on the outside, a predetermined vertical space in the inner portion from the backup member Forming a portion, interposing a calmor tar in a horizontal space portion from an upper end of the space portion, forming a space portion in a vertical direction from one end of the calmor tar to an upper side, and forming a plurality of connecting metal pieces on the upper portion of the space portion. Part of each of the plurality of fixing recesses formed at regular intervals above the distal end of the second staircase PC member Each part of each fixing metal piece which is buried and fixed, and a plurality of fixing recesses formed on the rear end of the corresponding intermediate landing PC member, is partially embedded and placed on each fixing metal piece that is fixed, and then welded to each other. The method of preliminary construction of a staircase room of a building, characterized in that the mortar is filled with each other for fixing the above. 제 1항에 있어서, 상기 플로어계단참용 하프슬래브 피씨부재의 좌, 우측단부와 좌, 우측 계단실용 피씨벽부재의 상호 접합은 상기 플로어 계단참용 하프슬래브 피씨부재의 좌, 우측에 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 고정용 금속편과 이에 대응하는 좌, 우측 계단실용 피씨벽부재의 각 일측 형성된 복수의 각 고정용 요부에 일부가 각각 매설되어 고정된 고정용 금속편의 일면에 연결용 금속편의 양측면이 각각 접해진 상태에서 상기 각 금속편들을 상호 용접한 후, 상기 플로어 계단참용 하프슬래브 피씨부재의 각 고정용 요부와 좌, 우측 계단실용 피씨벽부재의 각 고정용 요부내에 모르타르를 충전하여 접합하는 것을 특징으로 하는 건축물의 계단실의 선 시공방법. The method of claim 1, wherein the mutual bonding of the left and right ends of the floor slab half member slab PC member and the left and right stairs room PC wall member comprises a plurality of fixings formed on the left and right sides of the floor stair half slab PC member. A part of the fixing metal piece, which is partially embedded and fixed to the main recess, and a part of each fixing recess formed on each side of each of the left and right stairs room PC wall members corresponding thereto, is partially embedded and connected to one surface of the fixing metal piece that is fixed. After welding the metal pieces to each other while both sides of the metal piece are in contact with each other, the mortar is filled in each fixing recess of the floor slab half slab PC member and each fixing recess of the left and right staircase PC wall members. Line construction method of the staircase room of the building, characterized in that the joining. 제 2항 내지 제 6항중 어느 한 항에 있어서, 상기 각 고정용 금속편은 사각형상의 금속판재의 이면에 양측으로 굴곡된 고정대가 용접되어 있고, 일측면을 제외한 상기 고정대를 포함하여 나머지 부위가 해당되는 각 고정용 요부에 매설되어 고정된 것을 특징으로 하는 건축물의 계단실의 선 시공방법.The fixing piece according to any one of claims 2 to 6, wherein the fixing metal pieces are welded to both sides of the rectangular metal plate, and the remaining parts are included, including the fixing bar except one side. A preliminary construction method for a staircase room of a building, characterized by being embedded in and fixed to each fixing recess. 플로어 계단참용 하프슬래브 피씨부재는 선단부의 하측에 형성되어 있는 상기 고정용 돌기부와; 그 후측부에 형성되면서 콘크리트가 수장되는 요부가 형성된 부위인 콘크리트 타설부와; 상기 고정용 돌기부와 콘크리트타설부 사이에 형성되면서 상부의 일측과 양측에 각각 고정용 요부들이 각각 일정한 간격을 두고 형성되어 있는 접합부와; 상기 복수의 각 고정용 요부내에 일부가 각각 매설되어 고정된 고정용 금속편이 각각 구성되어 있으며; 상기 콘크리트 타설부의 상면에 일정한 간격을 두고 트러스 거더 및 각 트러스 거더들을 연결해주는 철근이 설치되어 있는 것을 특징으로 하는 건축물의 계단실의 선 시공방법에 사용되는 피씨부재.The floor slab half slab PC member includes: the fixing protrusion formed on the lower side of the tip portion; A concrete pouring portion which is formed at a rear side thereof and is a portion in which a recess is formed; A connection part formed between the fixing protrusion and the concrete pouring part, the fixing recesses being formed at regular intervals on one side and both sides of the upper portion, respectively; Fixed metal pieces each of which is partially embedded and fixed in the plurality of fixing recesses, respectively; PC member used in the pre-construction method of the staircase room of the building, characterized in that the reinforcing bar is connected to the truss girder and each truss girder at regular intervals on the upper surface of the concrete pouring portion. 계단용 피씨부재는 각각 하단부 또는 상단부에 상기 플로어계단참용 하프슬래브 피씨부재의 고정용 돌기부의 상면의 깔모르타르부에 얹혀져서 지지되도록 상단부의 상반부가 돌출되어서 형성된 걸림용돌기부와; 상기 걸림용돌기부의 상측에 일정한 간격을 두고 형성되어 있는 복수의 고정용 요부와; 상기 중간 계단참용 피씨부재의 고정용 돌기부의 상면에 깔려있는 깔모르타르부에 얹혀져서 지지되도록 상단부 또는 하단부의 상반부가 돌출되어서 형성된 걸림용돌기부와; 상기 걸림용돌기부의 상측에 일정한 간격을 두고 형성되어 있는 복수개의 고정용 요부로 구성되어 있으며; 상기 상, 하측의 복수의 각 고정용 요부내에 일부가 각각 매설된 고정용 금속편이 각각 구성되어 있는 것을 특징으로 하는 건축물의 계단실의 선 시공방법에 사용되는 피씨부재.The staircase PC member includes: a locking projection formed by projecting an upper half of the upper end portion so as to be mounted on the bottom of the upper or upper portion of the mortar portion of the fixing protrusion of the half-slab PC member for engaging the floor; A plurality of fixing recesses formed at regular intervals on an upper side of the locking protrusion; A catching protrusion formed by protruding from an upper half of an upper end or a lower end so as to be mounted on and supported on a mortar portion laid on an upper surface of a fixing protrusion of the intermediate stepping PC; It consists of a plurality of fixing recesses are formed at regular intervals on the upper side of the locking projection; A PC member for use in the line construction method of a staircase room of a building, wherein fixing metal pieces, each of which is partially embedded in each of the upper and lower fixing recesses, are configured. 중간계단참용 피씨부재는 일측의 하부에 돌출하여 형성되어 있는 고정용 돌기부와; 상기 고정용 돌기부의 일측으로부터 상부의 일측 단부에 일정한 간격을 두고 형성된 복수의 고정용 요부와; 양측에 형성된 복수의 고정용요부와; 상기 복수의 각 고정용 요부내에 일부가 각각 매설된 고정용 금속편이 각각 구성되어 있는 것을 특징으로 하는 건축물의 계단실의 선 시공방법에 사용되는 피씨부재.The intermediate staircase PC member includes a fixing protrusion which protrudes from a lower side of one side; A plurality of fixing recesses formed at regular intervals from one side of the fixing protrusion to one end of the upper portion; A plurality of fixing recesses formed on both sides; A PC member for use in the line construction method of a staircase room of a building, wherein fixing metal pieces, each of which is partially embedded in each of the plurality of fixing recesses, are configured. 좌측의 계단실용 피씨벽부재는 측부에 형성된 상, 하측의 공기 배출구 및 몰탈주입구의 끝단부가 몸체의 외부에 보이도록 소정의 간격을 두고 각각 매설되어 있는 복수개의 슬리브와; 상기 각 슬리브의 상부의 내측으로 하단부가 삽입되어 있고 수직방향으로 매설되어 있으면서 상단부가 상측의 외부로 노출된 노출철근부가 형성되어 있는 수직철근과; 몸체의 후단부의 일측에 돌기부가 형성되면서 타측에 복수의 각 루프바의 일단부의 고리형상부위가 수직방향으로 일정한 간격을 두고 형성된 각 전단변형방지용 요부가 형성된 일측 측면연결부와; 상기 일측 측면연결부의 반대측인 몸체의 타측의 일측면에 돌기부가 수직방향으로 형성되어 있고, 상기 돌기부에 루프바의 일단부의 고리형상부위가 수직방향으로 일정한 간격을 두고 각각 형성된 각 전단변형방지용 요부가 형성되어 있는 타측 측면연결부로 구성된 것에 있어서,The left side PC wall member includes a plurality of sleeves each disposed at predetermined intervals such that the upper and lower ends of the air outlet and the mortar inlet formed on the side are visible to the outside of the body; A vertical reinforcing bar having a lower end inserted into an upper portion of each of the sleeves and having an exposed reinforcing part having an upper end exposed outward while being embedded in a vertical direction; A side connection portion formed at one side of the rear end of the body, wherein each side of the shear deformation preventing recess is formed at regular intervals in a vertical direction at one end of each of the loop bars of the plurality of loop bars; Protrusions are formed in the vertical direction on one side of the other side of the body that is opposite to the one side side connection portion, each of the shear deformation preventing recesses formed at regular intervals in the annular portion of one end of the loop bar in the protrusions In the configuration of the other side connection portion is formed, 상기 몸체의 후단부인 일측 측면연결부에 근접되어 있는 부위인 내면의 상측부에 복수의 고정용 요부가 형성되어 있으면서 그 하측에 지지용 돌기부가 형성되어 있고, 상기 몸체의 선단부의 일측인 타측 측면 연결부의 반대측면에 수직방향으로 유리창틀 고정용 요부가 형성되어 있으며, 상기 유리창틀 고정용 요부로부터 그 내측의 중간부에 형성된 복수의 각 고정용 요부내에 일부가 각각 매설된 고정용 금속편이 각각 형성되어 있으면서 그 하측에 지지용 돌기부가 형성되어 있는 것을 특징으로 하는 건축물의 계단실의 선 시공방법에 사용되는 피씨부재. A plurality of fixing recesses are formed on the upper side of the inner surface, which is a portion adjacent to one side side connecting portion, which is a rear end of the body, and a supporting protrusion is formed on the lower side thereof, and the other side connecting portion which is one side of the front end of the body. The window frame fixing recesses are formed on the opposite side in the vertical direction, and the fixing metal pieces each partially embedded in the plurality of fixing recesses formed in the middle part of the window frame fixing recesses are respectively formed. PC member for use in the pre-construction method of the staircase room of the building, characterized in that the supporting projection is formed on the lower side. 우측의 계단실용 피씨벽부재는 측부에 형성된 상, 하측 공기배출구 및 몰탈주입구의 끝단부가 몸체의 외부에 보이도록 소정의 간격을 두고 각각 매설되어 있는 복수개의 슬리브와; 상기 각 슬리브의 상부의 내측으로 하단부가 삽입되어 있고 수직방향으로 매설되어 있으면서 상단부가 상측의 외부로 노출된 노출철근부가 형성되어 있는 수직철근과; 몸체의 후단부의 내측면의 내측에 돌기부가 수직방향으로 형성되고, 상기 돌기부에 루프바의 일단부의 고리형상부위가 수직방향으로 일정한 간격을 두고 각각 형성된 복수의 각 전단변형방지용 요부가 형성된 일측 측면연결부로 구성된 것에 있어서,The right side staircase PC wall member includes a plurality of sleeves which are respectively embedded at predetermined intervals so that the ends of the upper and lower air outlets and the mortar inlet formed on the side are visible to the outside of the body; A vertical reinforcing bar having a lower end inserted into an upper portion of each of the sleeves and having an exposed reinforcing part having an upper end exposed outward while being embedded in a vertical direction; One side side connection portion having a plurality of projection deformation preventing recesses formed in the vertical direction on the inner side of the rear end of the body, and each of the plurality of shear deformation preventing recesses formed at regular intervals in the vertical direction at one end of the loop bar. In consisting of, 상기 몸체의 후단부인 일측 측면연결부에 근접되어 있는 부위인 내면의 상측부에 형성된 복수의 각 고정용 요부내에 일부가 각각 매설된 고정용 금속편이 각각 형성되어 있으면서 그 하측에 지지용 돌기부가 형성되어 있고, 상기 몸체의 선단부의 일측면의 내측에 수직방향으로 유리창틀 고정용 요부가 형성되어 있으며; 상기 유리창틀 고정용 요부로부터 그 내측의 중간부에 복수의 고정용 요부가 형성되어 있으면서 그 하측에 지지용 돌기부가 형성되어 있는 것을 특징으로 하는 건축물의 계단실의 선 시공방법에 사용되는 피씨부재.Supporting projections are formed on the lower side of each of the fixing metal pieces, each of which is partially embedded in the plurality of fixing recesses formed in the upper portion of the inner surface, which is a portion adjacent to the one side side connecting portion, which is the rear end of the body. A recess for fixing the window frame in a vertical direction is formed inside one side of the front end of the body; PC member for use in the pre-installation method of the staircase room of the building, characterized in that a plurality of fixing recesses are formed in the middle portion of the inner side of the window frame fixing recesses, while supporting protrusions are formed on the lower side thereof. 제 8항 내지 제 12항중 어느 한 항에 있어서, 상기 각 고정용 금속편은 사각형상의 금속판재의 이면에 양측으로 굴곡된 고정대가 용접되어 있고, 일측면을 제외한 상기 고정대를 포함하여 나머지 부위가 해당되는 각 고정용 요부에 매설되어 고정된 것을 특징으로 하는 건축물의 계단실의 선 시공방법에 사용되는 피씨부재.According to any one of claims 8 to 12, wherein each of the fixing metal pieces are fixed to the back of the rectangular metal plate material is bent on both sides is welded, including the rest except one side, the remaining portion is covered PC member used in the line construction method of the staircase room of the building, characterized in that it is embedded and fixed to each fixing recess.
KR1020030082201A 2003-11-19 2003-11-19 Method for pre-constructing staircase in building and pc member therefor KR100583072B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030082201A KR100583072B1 (en) 2003-11-19 2003-11-19 Method for pre-constructing staircase in building and pc member therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030082201A KR100583072B1 (en) 2003-11-19 2003-11-19 Method for pre-constructing staircase in building and pc member therefor

Publications (2)

Publication Number Publication Date
KR20050048298A true KR20050048298A (en) 2005-05-24
KR100583072B1 KR100583072B1 (en) 2006-05-24

Family

ID=37247144

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030082201A KR100583072B1 (en) 2003-11-19 2003-11-19 Method for pre-constructing staircase in building and pc member therefor

Country Status (1)

Country Link
KR (1) KR100583072B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100711800B1 (en) * 2005-12-22 2007-04-30 재단법인 포항산업과학연구원 Assembly for drying construction of stair landing
KR101348383B1 (en) * 2012-08-14 2014-01-07 이영순 The stairs structure for a building
CN112360074A (en) * 2020-09-18 2021-02-12 锦萧建筑科技有限公司 Staircase unit and construction method thereof

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101478611B1 (en) * 2014-05-13 2015-01-02 정도건설 주식회사 Method for pre-constructing staircase in building by using precast concrete column
KR102257029B1 (en) 2019-10-22 2021-05-27 김진곤 Scaffold for stair hall of building

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100226168B1 (en) * 1997-12-19 1999-10-15 이정국 Architecture and method for making a stair using a precast concrete
KR100365138B1 (en) * 1999-10-25 2002-12-16 삼성물산 주식회사 Stairway room construction method use of precast concrete
JP2002146903A (en) 2000-11-17 2002-05-22 Fujita Corp Method for executing stair

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100711800B1 (en) * 2005-12-22 2007-04-30 재단법인 포항산업과학연구원 Assembly for drying construction of stair landing
KR101348383B1 (en) * 2012-08-14 2014-01-07 이영순 The stairs structure for a building
CN112360074A (en) * 2020-09-18 2021-02-12 锦萧建筑科技有限公司 Staircase unit and construction method thereof

Also Published As

Publication number Publication date
KR100583072B1 (en) 2006-05-24

Similar Documents

Publication Publication Date Title
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
EP1992750A1 (en) Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling
KR101389203B1 (en) Method for constructing residential building using precast concrete and modular unit
US20210348377A1 (en) Precast building construction system
KR20200124073A (en) Vertical core structure horizontally assembled and construction method therewith
KR100583072B1 (en) Method for pre-constructing staircase in building and pc member therefor
KR101348383B1 (en) The stairs structure for a building
JP4976938B2 (en) Seismic reinforcement structure
KR102349440B1 (en) Connector for PC slab and connection structure of PC slab using the same
KR102484159B1 (en) Rapid Construction Structure of Core Part Using Multi-Story Precast Wall
JP2004352457A (en) Junction structure for shaft unit in elevator shaft
KR101776783B1 (en) Integrated module block for Building Construction
KR102331979B1 (en) Modularized monolithic joint pc wall and basement outer wall pc construction method
JPH1113189A (en) Half-precast floor slab and floor structure using the same
JP3215670B2 (en) Mounting structure of precast concrete rising wall
CN217601698U (en) Precast beam structure and connecting node of precast beam structure and precast column
KR20060122000A (en) Wall structure unified the finish material
KR920004493B1 (en) Panel for heating system
KR950009611B1 (en) Assembling high apartments joining structure
KR101265579B1 (en) Structural pannel
KR20230109982A (en) PC half-slab construction method for quick construction of precast concrete apartment house
KR101601627B1 (en) Prefabricated construction using half slab
KR100377134B1 (en) Corridor and balcony of ultra higher stories apartment half slab construction method
CN114775850A (en) Partition wall pipeline integrated structure
JPH0635074Y2 (en) Frame structure of multi-storey car park

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130503

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140502

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150430

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee