KR20050021220A - method of construction of block for terrace - Google Patents

method of construction of block for terrace Download PDF

Info

Publication number
KR20050021220A
KR20050021220A KR1020030059581A KR20030059581A KR20050021220A KR 20050021220 A KR20050021220 A KR 20050021220A KR 1020030059581 A KR1020030059581 A KR 1020030059581A KR 20030059581 A KR20030059581 A KR 20030059581A KR 20050021220 A KR20050021220 A KR 20050021220A
Authority
KR
South Korea
Prior art keywords
block
belt
plate
fixing
blocks
Prior art date
Application number
KR1020030059581A
Other languages
Korean (ko)
Inventor
조용상
Original Assignee
조용상
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조용상 filed Critical 조용상
Priority to KR1020030059581A priority Critical patent/KR20050021220A/en
Publication of KR20050021220A publication Critical patent/KR20050021220A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0051Including fibers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

PURPOSE: An installation method of a fiber belt reinforced concrete blocks is provided to function as a retaining wall with heavy blocks and to construct a retaining wall stably by fixing blocks using a fiber reinforced belt. CONSTITUTION: The installation method of fiber belt reinforced concrete blocks comprises the steps of: pit-excavating on a spot for installing blocks(10), paving, tamping and leveling a rubber layer having excellent draining efficiency on the spot; paving a concrete layer on the footing ground in a thickness of 10 centimeters, installing a footing backing plate(20) on the paved concrete layer and fixing a footing backing plate(20) and a footing backing plate(20) using a fixing pin not to be shaken vertically; installing blocks(10) on the footing backing plate(20) in one stage, attaching a water-stopping plate on the rear of a block, installing a filter(18) of non-woven fabrics on the lower end of the block, paving soils to the middle height of belt hanger units and tamping the paved soils using a roller, fixing a fiber belt or a steel belt on the rear of the block to make one part of the belt hang on the belt hanger units and the other part of the belt fix on a fixing bar located on the tail, then paving the remaining upper part with soils; placing a shock-absorbing plate(16) on the block, piling up blocks in two stages, corresponding holes formed on both sides of the block vertically, then fixing a fastening pin, adding a vinyl water-stopping plate on the rear of a block, paving soils and fixing a fiber belt or a steel belt; and piling up blocks in three stages to construct a retaining wall.

Description

섬유벨트 보강식 콘크리트 블럭의 설치공법{method of construction of block for terrace}Method of construction of block for terrace

본 발명은 내측에 철근이 들어가고 전면은 자연석 무늬 모양을 갖는 콘크리트 블럭 및 그 설치 공법에 관한 것이다. 특히 본 발명은 콘크리트 블럭을 섬유식 벨트로 고정토록 함으로서, 도로의 경사진 옹벽이나 택지조성, 공원묘지의 계단식 옹벽, 논 용ㆍ배수로의 경사면등 경사진 곳에 옹벽을 쉽게 시공할 수가 있도록 한 것이다.The present invention relates to a concrete block having a reinforcing bar inside and having a natural stone pattern, and its installation method. In particular, the present invention is to fix the concrete block with a fiber type belt, so that the retaining wall can be easily installed on the slope, such as the inclined retaining wall of the road or the construction of the land, the stepped retaining wall of the park cemetery, the slope of the rice field and drainage.

원래 경사진 면에 옹벽을 쌓아 축조함에 있어서는 석축을 많이 이용하였다.Originally, stonework was used to build retaining walls on sloped surfaces.

그러나 자연상태의 석축은 가격이 비싸고 축조가 불편하여 요즈음에는 조립식 판넬옹벽을 많이 사용하고 있으며, 현재도 경사면의 각도 및 하중관계등 여러가지 조건에 따라 다양한 종류의 옹벽 구축용 블럭들이 개발되고 있으나 크게 만족할 만한 수준은 아닌 것이다.However, because natural stone is expensive and inconvenient to build, many prefabricated panel retaining walls are used these days. Currently, various kinds of retaining wall building blocks have been developed according to various conditions such as angle of inclined surface and load relationship. It is not at a level.

일반적으로 사용되는 종래의 옹벽용 블럭은 그 크기가 가로 490㎜, 세로 360㎜, 두께 280㎜의 중량 50㎏이며, 이를 축조함에 있어 한칸 한칸 쌓을 때마다 블럭 후면에 사각 섬유망 그물(일명 지오크레이드)을 깔고 보토를 하였으나, 블럭의 중량이 가볍고 사각 섬유망 그물이 약하여 옹벽의 높이가 높아지면 그물이 밀리면서 블럭이 하중을 견디지 못하고 무너질 염려가 발생하게 되는 것이다. 또한 세멘 콘크리트제 블럭을 상ㆍ하로 단순히 적층하다 보니 블럭의 자체 하중으로 말미암아 적층된 블럭의 맞닿은 부분이 깨지게 되어 옹벽의 부실화를 가져왔었다. 또한 콘크리트 블럭 내측에도 철근이 들어 있지 아니하여 균열이 생기는 등 그 안전도에 문제점이 많았다.The conventional retaining wall block generally used is 490 mm in width, 360 mm in length, and 50 kg in weight of 280 mm in thickness. Laid), but the weight of the block is light and the square fiber net is weak, so the height of the retaining wall is high, the net will be pushed, the block will not bear the load and the collapse will occur. In addition, when the cement blocks were simply stacked up and down, the abutting part of the stacked blocks was broken due to the block's own load, resulting in inaccurate retaining walls. In addition, there are many problems in the safety, such as cracks are generated because the reinforcement is not contained inside the concrete block.

본 발명에서 사용되는 블럭은 본 출원인의 고안한 블럭 즉 1995년 실용신안등록출원 제2206호 및 1996년 실용신안등록출원 제2149호, 실용신안등록 제179067호, 실용신안등록 제283013호 등의 블럭중 실용신안등록 제283013호를 개량 발전시킨 것으로, 크기가 대형이고 중량이어서 시공이 간편하고 안정감이 있으며, 또한 배수구 및 부직포 재질의 필터, 비닐재질의 차수판(차토판), 콜크재질의 충격완화방지판등이 형성되어 있어 그 기능이 뛰어나다. The block used in the present invention is a block devised by the applicant, that is, a block of Utility Model Registration Application No. 2206 and Utility Model Registration Application No. 2149, Utility Model Registration No. 179067, Utility Model Registration No. 283013, etc. in 1995. The utility model registration No. 283013 is improved and developed. Its large size and weight make it easy to install, and it has a sense of stability. Also, it is a filter for drainage and non-woven fabric, a water-repellent plate made of vinyl material, and impact relief of cork material. Preventive plate is formed and its function is excellent.

또한 설치공법은 상기 콘크리트 블럭에 맞게끔 축조용 기초받침판을 제작하고, 상기 기초받침판 위에 상기 블럭을 축조토록 함으로서 보다 간편하게 옹벽을 축조할 수 있도록 한것이다.In addition, the installation method is to make the retaining wall more easily by manufacturing the foundation support plate for the construction to fit the concrete block, and to build the block on the foundation support plate.

블럭(10)을 설치할 지점에 기초터파기를 하고 상기 지점에 배수성이 양호한 잡석층(잡석, 쇄석. 양질의 토사 )을 포설하고 다짐 및 고르기를 행하는 1단계;A first step of digging the foundation at the point where the block 10 is to be installed, and installing a rubble layer (rubble, crushed stone, high quality soil) having good drainage at the point, and then compacting and leveling;

상기 기초 지반(42) 위에 약 10㎝ 두께로 콘크리트층(41)을 포설하고, 상기 포설된 콘크리트층 위에 기초 받침판(20)을 설치하되, 기초 받침판(20)과 기초 받침판(20)은 고정핀(24)으로 좌우상하로 흔들리지 않게 단단히 고정하는 2단계;The concrete layer 41 is laid on the foundation ground 42 to a thickness of about 10 cm, and the foundation base plate 20 is installed on the laid concrete layer, but the base base plate 20 and the base base plate 20 are fixed pins. Step 2 of firmly fixing the left and right up and down to 24;

상기 기초 받침판(20) 위에 블럭(10)을 1단으로 나열하여 설치하되, 블럭 배면에는 차수판(15)을 부착하고, 블럭 하단에는 부직포 재질의 필터(18)를 설치한다. 이후 벨트걸이부(13)(13')가 있는 중간높이까지 흙(40)을 포설하고 로울러로 포설한 흙을 다진다. 이후 블럭후면에 섬유벨트(30)나 철판벨트(30')를 고정하되, 벨트의 일측은 블럭 배면에 형성된 벨트걸이부(13)(13')에 걸려지고 타측은 일정거리 후미에 위치한 고정철근에 고정한후 나머지 상단 부분도 흙(40)으로 포설하는 단계;The block 10 is arranged in one stage on the base support plate 20, but the order plate 15 is attached to the bottom of the block, and a nonwoven fabric filter 18 is installed at the bottom of the block. Since the belt hanger (13) (13 ') to the middle height with the soil 40 is laid and the soil laid with rollers. Thereafter, the fiber belt 30 or the steel plate belt 30 'is fixed to the rear surface of the block, and one side of the belt is caught by the belt hangers 13 and 13' formed on the back of the block, and the other side is fixed to the fixed bar located at the rear of the predetermined distance. After fixing the remaining upper portion is also installed in the soil (40);

상기 1단 블럭상단에 콜크재질의 충격 완화 방지판(16)을 올려놓고 2단블럭을 적층하되 블럭 양측에 형성된 구멍(12)을 상ㆍ하로 일치시킨후 고정용 체결핀(17)을 끼워 고정하며, 이후 블럭1단 설치시와 동일하게 블럭 배면에 비닐 재질의 차수판(15)을 덧대고 흙을 포설하며, 섬유벨트나 철편벨트를 고정하는 단계;Place the impact relief plate 16 made of cork material on the upper end of the first step block, and stack the second step block. And then, as in the case of installing the first stage of the block to the back of the block to put a vinyl plate (15) of the material made of soil, and fixing the fiber belt or iron piece belt;

블럭 2단 축조 공법과 동일한 공법을 반복하여 블럭3단 이후의 블럭을 적층토록 함으로서 옹벽을 축조토록 하는 것을 특징으로 하는 섬유벨트 보강식 콘크리트 블럭의 설치공법이다. The construction method of the fiber belt reinforced concrete block is characterized in that the retaining wall is constructed by repeatedly stacking the blocks after the third stage by repeating the same method as the block two-stage construction method.

본 발명 공법에서 사용되는 블럭은, 가로 1240㎜, 세로 590㎜, 두께 250㎜ 크기로 내측에 철근(14)이 삽입된 콘크리트 블럭(10)으로 형성하되 블럭 양측에는 상하로 관통되게 구멍(12)을 형성하며, 블럭 전면에는 자연석 무늬를 형성하되 블럭 상면에는 배수홈(11)을 형성하고, 블럭 배면에는 벨트걸이부(13)(13')를 형성토록 하되, 상기 벨트걸이부(13)에 끼워지도록 절개부(15')를 갖는 차수판(15)이 부착되도록 한 섬유벨트 보강식 철근 콘크리트 대형블럭이다. The block used in the method of the present invention is formed of a concrete block 10 having a reinforcing bar 14 inserted therein, having a width of 1240 mm, a length of 590 mm, and a thickness of 250 mm, but having holes 12 penetrating up and down on both sides of the block. To form a natural stone pattern on the front of the block, but to form a drain groove 11 on the upper surface of the block, to form a belt hanger (13, 13 ') on the back of the block, the belt hanger (13) It is a fiber belt reinforced reinforced concrete large block to which the order plate 15 having the cutout 15 'to be fitted is attached.

본 발명에서 사용되는 블럭(10)은, 그 전체적인 형태를 각지게 구성할 수도 있는 것이므로, 도2에서 보는 바와 같이 그 전면을 라운드되게 구성한 것에 한정하는 것은 아니다. 또한 블럭 후면에 형성된 벨트걸이부(13)는 통상의 섬유벨트(30)를 연결하여 고정토록 한 것으로, 걸이부의 형상은 하나의 금속봉을 구부려서 형상을 갖도록 하였으며, 이는 블럭 내측 중앙에 횡으로 삽입된 철근(14)에 연결되어 고정되는 것이다(도9참조). 한편 블럭(10)을 고정하는 벨트의 종류가 철판벨트(30')인 경우에는 블럭배면에 형성되는 걸이부(13')의 형상도 달라진다. 즉 도14는 통상의 철판 벨트(30')를 걸수 있는 벨트걸이부(13')의 사시도인 바, 그 형상은 사각철편 형상이되 일측은 다수개의 볼트 구멍(13")이 형성되어 있으며, 타측은 하방으로 절곡된 형태를 갖는 것으로서, 이도 역시 블럭 내측 중앙에 삽입된 횡 철근(14)에 연결되어 고정되는 것이다. 한편 철판 벨트(30')는 벨트걸이부(13')의 구멍(13")을 통하여 통상의 볼트와 너트로 연결되어 지게 된다.The block 10 used in the present invention may be configured to have an overall shape of the block 10, and the block 10 is not limited to the round structure of the entire surface as shown in FIG. In addition, the belt hanger 13 formed on the rear of the block is to be fixed by connecting the conventional fiber belt 30, the shape of the hook portion by bending one metal rod It has a shape, which is connected to and fixed to the rebar 14 inserted laterally in the center of the block (see Fig. 9). On the other hand, when the type of the belt which fixes the block 10 is a steel plate belt 30 ', the shape of the hook part 13' formed in the back surface of a block also changes. That is, Fig. 14 is a perspective view of a belt hanger 13 'capable of hanging a conventional iron plate belt 30', the shape of which is a square iron piece, but one side is formed with a plurality of bolt holes 13 ", The other side has a shape bent downward, and the ear canal is also connected to and fixed to a transverse reinforcing bar 14 inserted in the center of the block, while the iron plate belt 30 'is a hole 13 of the belt hanger 13'. ") Is connected to the normal bolt and nut.

또한 흙(40)과 직접 맣닺는 블럭 배면 부위에 비닐 재질의 차수판(15)을 덧대어 흙이 직접 블럭(10)에 닿지 않도록 함으로서, 흙으로부터 흘러 들어오는 물이나 습기로 인해 블럭이 손상되는 것을 방지토록 하였는 바 상기 차수판(15) 중앙에는 절개부(15')가 형성되어 있고, 상기 절개부에 밸트걸이부(13)를 삽입토록 함으로서 보다 완벽하게 차수판이 블럭 배면에 밀착되도록 하였다. 또한 블럭과 블럭 사이에 콜크 재질의 충격 완화 방지판(16)을 삽입하도록 함으로서 적층되는 블럭이 서로 깨지지 않도록 하였다. 또한 블럭 상면에는 배수홈(11)이 형성되어 있어 흘러 들어온 물을 배수토록 하였다.In addition, by applying a vinyl order plate 15 to the back surface of the block 40 directly soiled with soil so that the soil does not directly contact the block 10, the block is damaged by water or moisture flowing from the soil. In order to prevent the bar 15 is formed in the center of the order plate 15, by inserting the belt hook portion 13 in the incision to make the order plate more closely to the back of the block. In addition, by inserting the impact relief plate 16 of the cork material between the block and the block to prevent the stacked blocks from breaking each other. In addition, the drain groove 11 is formed on the upper surface of the block to drain the water flowing in.

또한 블럭 양측에는 상하로 관통되게 구멍(12)이 형성되어 있어, 상기 구멍을 통하여 체결핀(17)을 끼워 넣으면 블럭과 블럭이 서로 견고하게 고정 되는 것이다.In addition, holes 12 are formed on both sides of the block so as to penetrate up and down, and when the fastening pin 17 is inserted through the hole, the block and the block are firmly fixed to each other.

이하 본 발명의 블럭을 축조하는 공법을 상세히 살펴 보면 다음과 같다.Hereinafter, a method for constructing a block of the present invention will be described in detail.

실시예Example

1. 블럭이 설치될 기초지반 조성1. Foundation foundation for block

블럭(10)을 설치할 지점에 기초터파기를 하고 상기 지점에 배수성이 양호한 잡석층(잡석, 쇄석. 양질의 토사 )을 포설하고 다짐 및 고르기를 행한다.A base trench is excavated at the point where the block 10 is to be installed, and a rubble layer (rubble, crushed stone, high quality earth and sand) having good drainage is laid at this point, and compacted and selected.

2. 콘크리트 포설 및 기초 받침판 설치2. Concrete laying and foundation support plate installation

기초 지반(42) 위에 약 10㎝ 두께로 콘크리트층(41)을 포설하고, 상기 포설된 콘크리트층(41) 위에 기초 받침판(20)을 설치하되, 기초 받침판(20)과 기초 받침판(20)은 고정핀(24)으로 좌우상하로 흔들리지 않게 단단히 고정한다.The concrete layer 41 is laid on the foundation ground 42 to a thickness of about 10 cm, and the foundation base plate 20 is installed on the laid concrete layer 41, but the foundation base plate 20 and the foundation base plate 20 are Fix it firmly so that it does not rock left and right and up and down with a fixing pin (24).

3. 블럭1단 설치(도15참조)3. Block 1 installation (see Fig. 15)

기초 받침판(20) 위에 블럭(10)을 1단으로 나열하여 설치하되, 블럭 배면에는 차수판(15)을 부착하고, 블럭 하단에는 부직포 재질의 필터(18)를 설치한다. 이후 벨트걸이부(13)(13')가 있는 중간높이까지 흙(40)을 포설하고 로울러로 포설한 흙을 다진다. 이후 블럭후면에 섬유벨트(30)나 철판벨트(30')를 고정하되, 벨트의 일측은 블럭 배면에 형성된 벨트걸이부(13)(13')에 걸려지고 타측은 일정거리 후미에 위치한 고정철근에 고정한후 나머지 상단 부분도 흙(40)으로 포설한다.On the base support plate 20, the blocks 10 are arranged in one stage, and the order plate 15 is attached to the bottom of the block, and the nonwoven fabric filter 18 is installed at the bottom of the block. Since the belt hanger (13) (13 ') to the middle height with the soil 40 is laid and the soil laid with rollers. Thereafter, the fiber belt 30 or the steel plate belt 30 'is fixed to the rear surface of the block, and one side of the belt is caught by the belt hangers 13 and 13' formed on the back of the block, and the other side is fixed to the fixed bar located at the rear of the predetermined distance. After fixing, the remaining upper part is also laid with soil (40).

4. 블럭2단 설치(도16참조)4. Block 2 stage installation (refer to Figure 16)

1단 블럭상단에 2단블럭을 적층하되 양측에 형성된 구멍(12)을 상ㆍ하로 일치시킨후 체결핀(17)을 끼워 조립하고, 블럭 상ㆍ하 사이에는 콜크재질의 충격 완화 방지판(16)을 삽입한다.Lay a two-stage block on the top of the first-stage block, align the holes 12 formed on both sides up and down, and then insert the fastening pins 17 to assemble them. Insert).

이하 블럭 배면에 비닐 재질의 차수판(15)을 덧대고 흙을 포설하며, 섬유벨트나 철편벨트를 고정하는 방법은 블럭1단 설치시하고 동일하다.The bottom of the block is put on the backing plate of the vinyl material (15) to install the soil, the method of fixing the fiber belt or iron belt is the same as when installing the block 1 stage.

5. 블럭 3단 이후의 축조 방법5. Construction method after 3rd block

블럭 3단이후의 축조방법은 블럭 2단 축조방법과 동일한 방법으로 행한다.The construction method after the three-stage block is performed in the same manner as the two-stage construction method.

상기에 있어, 블럭이 올려지는 기초 받침판(20)에는 재치부(21)가 형성되어 있어, 상기 재치부(21)에 블럭을 끼워서 올려 놓을 경우 안정되게 축조할 수가 있는 것이다. 한편 기초 받침판의 소정 위치에는 배수홈(22)이 형성되어 있어 차수판(15)을 따라 흘러내린 물이나, 블럭에 직접 흘러들어온 물을 배수하게 되는 것이다.In the above, the mounting part 21 is formed in the base support plate 20 on which the block is mounted, and when a block is put on the mounting part 21, it can construct stably. Meanwhile, a drain groove 22 is formed at a predetermined position of the base support plate to drain water that flows along the order plate 15 or water that flows directly into the block.

또한 기초 받침판(20)의 좌우 양측에는 체결홈(23)이 형성되어 있어, 상기 체결홈(23)에 고정핀(24)을 관통시켜 체결할 경우, 고정핀이 콘크리트층(41)까지 관통된 상태로 끼워지기 때문에 콘크리트층(41)이 양생된 후의 기초 받침판(20)은 견고한 상태를 유지할 수가 있게 되는 것이다. In addition, fastening grooves 23 are formed at both left and right sides of the base support plate 20, and when the fixing pins 24 penetrate the fastening grooves 23, the fixing pins penetrate to the concrete layer 41. Since the base support plate 20 after the concrete layer 41 is cured because it is fitted in the state is to be able to maintain a solid state.

또한 블럭 1단 하부에는 부직포 재질의 필터(18)가 부착되어 진다. 따라서 차수판(15)을 따라 흘러 내려온 흙탕물은 필터에 의하여 흙은 걸러지고 물만 빠져 나가게 되는바, 빠져 나온 물은 기초 받침판의 배수홈(22)에 의하여 배수되어 지게 되는 것이다.In addition, a filter 18 made of a non-woven material is attached to the lower end of the block. Accordingly, the muddy water flowing down along the order plate 15 is filtered out of the soil by the filter and only water flows out, and the drained water is drained by the drain groove 22 of the base support plate.

한편 차수판(15)과 차수판(15)이 맞닿는 부위는 도9의 확대 단면도에서 보는 바와 같이, 하부의 차수판이 상부 차수판의 아래로 위치토록 하게 함으로서, 물이 블럭에 직접 닿지 않는 상태로 자연스럽게 위에서 아래로 흘러 내리게 할 수가 있는 것이다.On the other hand, the area where the order plate 15 and the order plate 15 contact each other is as shown in the enlarged cross-sectional view of FIG. 9, so that the lower order plate is positioned below the upper order plate, so that water does not directly contact the block. It can naturally flow from top to bottom.

상기에서 살펴본 바와 같이, 본 발명의 블럭은 가로 1240㎜, 세로 590㎜, 두께 250㎜, 중량 400㎏인 대형블럭으로 구성되어 있어 옹벽을 쌓을때 그 시공을 빨리 끝낼수가 있는 것이며, 블럭 자체의 하중이 무거워 옹벽역할을 보다 더 완벽하게 수행할 수 있으며, 섬유보강벨트로 블럭을 고정하게 되어 보다 안정적으로 옹벽을 축조할 수가 있는 것이다. As described above, the block of the present invention is composed of a large block of 1240 mm wide, 590 mm long, 250 mm thick, 400 kg in weight, so that the construction can be completed quickly when the retaining wall is stacked, and the load of the block itself is increased. It is heavy, and it can perform the retaining wall more completely, and it is possible to construct the retaining wall more stably by fixing the block with the fiber reinforced belt.

또한 블럭을 축조함에 있어서도, 기초 받침판위에 블럭을 축조토록 함으로서 시공이 용이하며, 또한 블럭과 블럭사이에 콜크재질의 충격완화 방지판이 내재되어 있어 블럭과 블럭이 맞닿을때 맞닿는 부분이 깨질 우려가 없는 것이며, 또한 축조된 블럭은 후면에서 블럭 하나 하나마다 섬유벨트로 잡아주되 축조 하단에는 인장강도가 40톤부터 30톤, 상단에는 20톤부터 10톤의 섬유보강벨트가 잡아주고 있어 안전한 옹벽을 쌓을 수 있게 되는 것이다. 또한 본 발명의 블럭 전면에는 자연석 무늬가 형성되어 있어 축조 되었을때 외관이 아주 수려하게 되는 것이다. In addition, when constructing the block, it is easy to construct by constructing the block on the base support plate, and there is no fear of breaking the contact part when the block is in contact with the block due to the built-in impact relief plate of cork material between the block and the block. In addition, the erected blocks are held by fiber belts at the back of each block, but the fiber reinforced belts with 40 to 30 tons of tensile strength at the bottom of the building and 20 to 10 tons at the top of the block can build a safe retaining wall. Will be. In addition, the natural stone pattern is formed on the front of the block of the present invention is very beautiful appearance when constructed.

또한 흙과 직접 맣닺는 블럭 배면 부위에는 비닐 재질의 차수판(차토판)이 덧대어져 있어 흙이 직접 블럭에 닿지 않도록 함으로서, 흙으로부터 흘러들어오는 물이나 습기로 인해 블럭이 손상되는 것을 방지하여 그 수명을 연장시켰으며, 또한 부직포 재질의 필터에 의하여 물만 배수토록 함으로서, 옹벽을 손상시키지 아니하여, 종래 옹벽에 비하여 그 전체적인 효과를 아주 월등하게 향상 시킨 것이다.In addition, the back of the block that is directly rubbed with soil is covered with a vinyl material plate (chatopan), which prevents the soil from directly touching the block, preventing the block from being damaged by water or moisture flowing from the soil. In addition, by only draining the water by the filter of the non-woven fabric, it does not damage the retaining wall, and the overall effect is significantly improved compared to the conventional retaining wall.

도1은 본 발명의 사용상태 부분 사시도.1 is a partial perspective view of a state of use of the present invention.

도2는 본 발명에서 사용되는 블럭의 정면 사시도.Figure 2 is a front perspective view of the block used in the present invention.

도3은 본 발명에서 사용되는 블럭의 배면 사시도.Figure 3 is a rear perspective view of the block used in the present invention.

도4는 본 발명에서 사용되는 차수판의 사용상태 사시도.Figure 4 is a perspective view of the state of use of the order plate used in the present invention.

도5는 본 발명에서 사용되는 블럭의 평면도.5 is a plan view of a block used in the present invention.

도6은 본 발명에서 사용되는 기초 받침판의 사시도.Figure 6 is a perspective view of the base support plate used in the present invention.

도7은 본 발명에서 사용되는 기초 받침판의 부분 사용상태 사시도.7 is a perspective view of a partially used state of the base support plate used in the present invention.

도8은 본 발명에서 사용되는 기초 받침판의 부분 사용상태 단면도.Figure 8 is a partial use state cross-sectional view of the base support plate used in the present invention.

도9는 본 발명의 사용상태를 나타낸 부분 종단면도.Figure 9 is a partial longitudinal cross-sectional view showing a state of use of the present invention.

도10은 본 발명의 사용상태를 나타낸 부분 종단면도.Figure 10 is a partial longitudinal cross-sectional view showing a state of use of the present invention.

도11은 본 발명에서 사용되는 블럭의 또 다른 실시예의 배면 사시도.Figure 11 is a rear perspective view of another embodiment of a block used in the present invention.

도12는 도11에 나타난 블럭의 사용상태를 나타낸 부분 종단면도.Fig. 12 is a partial longitudinal cross-sectional view showing the use state of the block shown in Fig. 11;

도13은 본 발명 블럭에서 사용되는 벨트걸이부의 사시도.Figure 13 is a perspective view of the belt hanger used in the block of the present invention.

도14는 본 발명 블럭에서 사용되는 벨트걸이부의 또 다른 사시도.Figure 14 is another perspective view of the belt hanger used in the block of the present invention.

도15는 본 발명에서 첫번째 블럭 쌓기를 나타낸 사용상태 단면도.Figure 15 is a cross-sectional view of the use state showing the first block stacking in the present invention.

도16은 본 발명에서 두번째 블럭 쌓기를 나타낸 사용 상태 단면도.Figure 16 is a cross-sectional view of the use state showing the second block stacking in the present invention.

도17은 본 발명의 축조 공법을 나타낸 평면도.17 is a plan view showing the construction method of the present invention.

도18은 본 발명의 또 다른 축조 공법을 나타낸 평면도.18 is a plan view showing another construction method of the present invention.

* 부호의 간단한 설명* Short description of the sign

10 : 블럭 11 : 배수홈10: block 11: drain groove

12 : 구멍 13 : 벨트걸이부12: hole 13: belt hanger

13' : 벨트걸이부 13" : 구멍13 ': belt hook 13 ": hole

14 : 철근 15 : 차수판14: reinforcing bar 15: order plate

16 : 충격완화방지판 17 : 체결핀16: shock absorbing prevention plate 17: fastening pin

18 : 필터 18: filter

20 : 기초받침판 21 : 재치부20: base support plate 21: mounting part

22 : 배수홈 23 : 체결홈22: drain groove 23: fastening groove

24 : 고정핀 30 : 섬유벨트24: fixing pin 30: fiber belt

30' : 철판벨트 40 : 흙 30 ': iron plate belt 40: soil

41 : 콘크리트층 42 : 기초지반41: concrete layer 42: foundation ground

Claims (3)

블럭(10)을 설치할 지점에 기초터파기를 하고 상기 지점에 배수성이 양호한 잡석층(잡석, 쇄석. 양질의 토사 )을 포설하고 다짐 및 고르기를 행하는 1단계;A first step of digging the foundation at the point where the block 10 is to be installed, and installing a rubble layer (rubble, crushed stone, high quality soil) having good drainage at the point, and then compacting and leveling; 상기 기초 지반(42) 위에 약 10㎝ 두께로 콘크리트층(41)을 포설하고, 상기 포설된 콘크리트층 위에 기초 받침판(20)을 설치하되, 기초 받침판(20)과 기초 받침판(20)은 고정핀(24)으로 좌우상하로 흔들리지 않게 단단히 고정하는 2단계;The concrete layer 41 is laid on the foundation ground 42 to a thickness of about 10 cm, and the foundation base plate 20 is installed on the laid concrete layer, but the base base plate 20 and the base base plate 20 are fixed pins. Step 2 of firmly fixing the left and right up and down to 24; 상기 기초 받침판(20) 위에 블럭(10)을 1단으로 나열하여 설치하되, 블럭 배면에는 차수판(15)을 부착하고, 블럭 하단에는 부직포 재질의 필터(18)를 설치한다. 이후 벨트걸이부(13)(13')가 있는 중간높이까지 흙(40)을 포설하고 로울러로 포설한 흙을 다진다. 이후 블럭후면에 섬유벨트(30)나 철판벨트(30')를 고정하되, 벨트의 일측은 블럭 배면에 형성된 벨트걸이부(13)(13')에 걸려지고 타측은 일정거리 후미에 위치한 고정철근에 고정한후 나머지 상단 부분도 흙(40)으로 포설하는 단계;The block 10 is arranged in one stage on the base support plate 20, but the order plate 15 is attached to the bottom of the block, and a nonwoven fabric filter 18 is installed at the bottom of the block. Since the belt hanger (13) (13 ') to the middle height with the soil 40 is laid and the soil laid with rollers. Thereafter, the fiber belt 30 or the steel plate belt 30 'is fixed to the rear surface of the block, and one side of the belt is caught by the belt hangers 13 and 13' formed on the back of the block, and the other side is fixed to the fixed bar located at the rear of the predetermined distance. After fixing the remaining upper portion is also installed in the soil (40); 상기 1단 블럭상단에 콜크재질의 충격 완화 방지판(16)을 올려놓고 2단블럭을 적층하되 블럭 양측에 형성된 구멍(12)을 상ㆍ하로 일치시킨후 고정용 체결핀(17)을 끼워 고정하며, 이후 블럭1단 설치시와 동일하게 블럭 배면에 비닐 재질의 차수판(15)을 덧대고 흙을 포설하며, 섬유벨트나 철편벨트를 고정하는 단계;Place the impact relief plate 16 made of cork material on the upper end of the first step block and stack the second step block, and match the holes 12 formed on both sides of the block up and down, and then insert the fastening pin 17 for fixing. And then, as in the case of installing the first stage of the block to the back of the block to put a vinyl plate (15) of the material made of soil, and fixing the fiber belt or iron piece belt; 블럭 2단 축조 공법과 동일한 공법을 반복하여 블럭3단 이후의 블럭을 적층토록 함으로서 옹벽을 축조토록 하는 것을 특징으로 하는 섬유벨트 보강식 콘크리트 블럭의 설치공법.A method for installing a fiber belt-reinforced concrete block, characterized in that the retaining wall is constructed by repeating the same process as the block two-stage construction method so as to stack blocks after the third stage. 제1항에 있어서, 옹벽을 구성하는 블럭(10)은 가로 1240㎜, 세로 590㎜, 두께 250㎜ 크기로 내측에 철근(14)이 삽입된 콘크리트 블럭(10)으로 형성하되 블럭 양측에는 상하로 관통되게 경사진 구멍(12)을 형성하며, 블럭 전면에는 자연석무늬를 형성하되 블럭 상면에는 배수홈(11)을 형성하고, 블럭(10) 배면에는 벨트걸이부(13)(13')를 형성하되, 상기 벨트걸이부(13)에 끼워지도록 절개부(15')를 갖는 차수판(15)이 부착되도록 하는 것을 특징으로 하는 섬유벨트 보강식 콘크리트 블럭의 설치공법.According to claim 1, wherein the block 10 constituting the retaining wall is formed of a concrete block 10 having a reinforcing bar 14 is inserted into the inner side of the width 1240mm, length 590mm, thickness 250mm, and up and down on both sides of the block. A hole 12 is formed to be penetrated, and a natural stone pattern is formed on the front surface of the block, a drain groove 11 is formed on the upper surface of the block, and a belt hook portion 13, 13 'is formed on the rear surface of the block 10. However, the installation method of the fiber belt reinforcement-concrete block, characterized in that for attaching to the belt hanger (13) is attached to the order plate having a cut (15 '). 제1항에 있어서, 기초받침판(20)은 그 중앙에 블럭을 올려 놓을 수 있는 재치부(21)를 형성하고, 상기 재치부(21)의 소정 위치에는 배수홈(22)을 형성하되, 상기 배수홈의 좌우 양측에는 체결홈(23)을 형성토록 하는 것을 특징으로 하는 섬유벨트 보강식 콘크리트 블럭의 설치공법. According to claim 1, The base support plate 20 forms a mounting portion 21 for placing a block in the center thereof, and forming a drain groove 22 in a predetermined position of the mounting portion 21, Installation method of a fiber belt reinforced concrete block, characterized in that to form a fastening groove 23 on both sides of the drain groove.
KR1020030059581A 2003-08-27 2003-08-27 method of construction of block for terrace KR20050021220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030059581A KR20050021220A (en) 2003-08-27 2003-08-27 method of construction of block for terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030059581A KR20050021220A (en) 2003-08-27 2003-08-27 method of construction of block for terrace

Publications (1)

Publication Number Publication Date
KR20050021220A true KR20050021220A (en) 2005-03-07

Family

ID=37229741

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030059581A KR20050021220A (en) 2003-08-27 2003-08-27 method of construction of block for terrace

Country Status (1)

Country Link
KR (1) KR20050021220A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993580A (en) * 2014-05-22 2014-08-20 嘉兴市五丰水泥制品制造有限公司 River way retaining wall
CN110424327A (en) * 2019-06-20 2019-11-08 金华市广和古建筑技术研发有限公司 A kind of precast concrete ecological slope protection construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993580A (en) * 2014-05-22 2014-08-20 嘉兴市五丰水泥制品制造有限公司 River way retaining wall
CN103993580B (en) * 2014-05-22 2016-05-18 嘉兴市五丰水泥制品制造有限公司 A kind of river course barricade
CN110424327A (en) * 2019-06-20 2019-11-08 金华市广和古建筑技术研发有限公司 A kind of precast concrete ecological slope protection construction method

Similar Documents

Publication Publication Date Title
KR101023660B1 (en) Retaining Wall using Anchor and Concrete Panel and its Construction Method
CA2649612A1 (en) Building element for making walls using filling material, particularly earth or the like
KR100660379B1 (en) Plantable reinforced earth wall and its block and construction method of reinforced earth wall
KR100491410B1 (en) Drainage structure of an incline area
JP2017155574A (en) Construction method of retaining wall
KR101235826B1 (en) The method of constructing block for wall
KR20130142465A (en) Retaining wall having natural rock and construction method thereof
CN213014154U (en) Dry-laid lock block revetment
KR20050021220A (en) method of construction of block for terrace
KR101525942B1 (en) Method for slope reinforcement construction using the ground improvement product
JP2000144769A (en) Method of landslide protection work for preparing housing lot
KR200223114Y1 (en) A structure reinforcing for retaining wall for inclined plane which to cut off a rock wall
KR102184291B1 (en) Pavement Block Part for Temporary Reconstructing of Road
KR101300071B1 (en) Concrete reinforced block for satabilization face of slope
KR200179067Y1 (en) Rc block for terrace
KR102249603B1 (en) Retaining wall construction method
CN215715242U (en) Variable cross-section T-shaped pile board wall structure
EP3880888B1 (en) Procedure for the creation of playgrounds and prefabricated reinforced concrete curb for such creation of a playground
KR102285192B1 (en) A Eco-friendly retain wall structure
JPH03156026A (en) Steep-sloped banking equipped with downspout drain outlet, and wall body and wall surface unit therefor
KR100592721B1 (en) Reinforce breast wall of block-type for road
JP5049665B2 (en) Construction method of vertical retaining wall and vertical retaining wall
KR100341856B1 (en) Method of embanking in shore
KR100536429B1 (en) Block structure of inorganic porous material and laying method using that
CN110172984B (en) Roadbed high slope construction method in bedding and landslide complex geological environment

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application