KR200493285Y1 KR2020190005299U KR20190005299U KR200493285Y1 KR 200493285 Y1 KR200493285 Y1 KR 200493285Y1 KR 2020190005299 U KR2020190005299 U KR 2020190005299U KR 20190005299 U KR20190005299 U KR 20190005299U KR 200493285 Y1 KR200493285 Y1 KR 200493285Y1
Authority
KR
South Korea
Prior art keywords
calibration
nipple
fastened
pressure switch
gas heater
Prior art date
Application number
KR2020190005299U
Other languages
Korean (ko)
Inventor
성석제
박보경
김영기
Original Assignee
주식회사 한국가스기술공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한국가스기술공사 filed Critical 주식회사 한국가스기술공사
Priority to KR2020190005299U priority Critical patent/KR200493285Y1/en
Application granted granted Critical
Publication of KR200493285Y1 publication Critical patent/KR200493285Y1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/005Protection or supervision of installations of gas pipelines, e.g. alarm
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L53/00Heating of pipes or pipe systems; Cooling of pipes or pipe systems
    • F16L53/30Heating of pipes or pipe systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L27/00Testing or calibrating of apparatus for measuring fluid pressure
    • G01L27/007Malfunction diagnosis, i.e. diagnosing a sensor defect

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biomedical Technology (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

본 고안은 가스히터의 압력스위치 하측에 마련되는 관이음쇠의 측면 부위에 압력스위치의 교정작업시 벤트 부위에 해체 및 체결작업없이 교정이 가능하도록 그 구조가 개선된 가스히터 압력스위치 교정용 피팅지그에 관한 것이다.
본 고안은 가스 히터 압력스위치의 하측에 마련된 관이음쇠의 벤트부에 체결되는 연결니플과; 일측이 상기 연결니플과 체결되고 타측에 상기 연결니플의 지름이 다른 리듀서니플이 체결되며 밸브 조작시 유로를 개폐하는 교정볼밸브와; 일측이 상기 교정볼밸브의 타측에 체결되고 타측에 원터치 플러그가 나사 체결되는 리듀서니플; 및 일측이 상기 리듀서니플의 타측에 체결되고 타측에 교정용 튜빙호스가 연결되도록 연결구가 마련된 원터치 플러그;를 구비한다.
The present invention is a fitting jig for calibration of gas heater pressure switches with an improved structure so that calibration of the pressure switch on the side of the pipe fitting provided under the pressure switch of the gas heater can be calibrated without disassembling and tightening the vent area. About.
The present invention is a connection nipple that is fastened to the vent portion of the pipe fitting provided on the lower side of the gas heater pressure switch; A calibration ball valve having one side fastened with the connection nipple, a reducer nipple having a different diameter of the connecting nipple on the other side, and opening and closing a flow path when the valve is operated; A reducer nipple whose one side is fastened to the other side of the calibration ball valve and a one-touch plug is screwed to the other side; And a one-touch plug having one side fastened to the other side of the reducer nipple and provided with a connector so that a calibration tubing hose is connected to the other side.

Description

가스히터 압력스위치 교정용 피팅지그{FITTING JIG FOR CALIBRATION OF PRESS SWITCH}Fitting jig for calibration of gas heater pressure switch {FITTING JIG FOR CALIBRATION OF PRESS SWITCH}

본 고안은 가스히터 압력스위치 교정용 피팅지그에 관한 것으로, 더욱 상세하게는 가스히터의 압력스위치 하측에 마련되는 관이음쇠의 측면 부위에 압력스위치의 교정작업시 벤트 부위에 해체 및 체결작업없이 교정이 가능하도록 그 구조가 개선된 가스히터 압력스위치 교정용 피팅지그에 관한 것이다.The present invention relates to a fitting jig for calibration of a gas heater pressure switch, and more particularly, calibration is possible without disassembling and fastening at the vent when calibrating the pressure switch on the side of the pipe fitting provided under the pressure switch of the gas heater. It relates to a fitting jig for calibrating a gas heater pressure switch whose structure is improved to be possible.

일반적으로, 천연가스는 액화된 상태인 액화천연가스(LNG)로 해외의 원산지로부터 운송되어 저장탱크에 저장된다. In general, natural gas is transported from overseas origin as liquefied natural gas (LNG) in a liquefied state and stored in a storage tank.

그리고 이를 높은 압력으로 압축한 후 기화기를 통해 기체 상태로 변환시키고 전국의 각 지역으로 연결된 배관망을 통해 공급관리소를 거쳐 각 도시의 도시가스사 또는 발전소 등으로 공급된다.Then, it is compressed to high pressure, converted into a gaseous state through a vaporizer, and supplied to city gas companies or power plants in each city through a supply management office through a pipe network connected to each region across the country.

그리고 공급관리소에서는 천연가스를 일정한 압력으로 낮추어 공급하게 되는데 이때 압력 강하에 따라 온도가 낮아지게 된다. 그러므로 천연가스의 온도 저하로 인한 설비손상을 방지하고 수요처의 요구조건을 맞추기 위해 천연가스의 온도를 높여주어야 한다.In addition, in the supply management office, the natural gas is supplied by lowering it to a certain pressure. At this time, the temperature decreases according to the pressure drop. Therefore, it is necessary to increase the temperature of natural gas in order to prevent equipment damage due to the temperature drop of natural gas and to meet the requirements of the customer.

이때, 사용되는 것이 바로 가스히터이며 기화된 저온의 천연가스가 가스히터를 통과하며 주변 열전달매체와의 열교환을 통해 온도가 상승된 후 공급관을 통해 수요처로 공급된다.At this time, the gas heater is used, and the vaporized low-temperature natural gas passes through the gas heater, and the temperature rises through heat exchange with the surrounding heat transfer medium, and then is supplied to the customer through a supply pipe.

그런데 가스히터는 사용에 따른 노후화로 인해 작동이 되지 않는 경우가 발생한다. 그리고 작동 불량의 원인들 중 화염이 형성되지 않는 것이 작동 불량의 주요한 원인이며, 이 원인들로는 여러 가지가 있다.However, gas heaters sometimes fail to operate due to aging due to use. And, among the causes of the malfunction, the main cause of the malfunction is that the flame is not formed, and there are various causes.

그중 가스히터의 모든 전자 부품이 정상적으로 동작을 하고 모터들이 정확히 가동 되더라도 화염이 형성되지 않는 경우가 대부분을 차지한다.Among them, even if all the electronic components of the gas heater operate normally and the motors operate correctly, most of the cases do not form a flame.

또한, 전자 부품들은 가스히터의 컨트롤판넬에 별도로 설치되어 있으므로 점검이 용이하고, 고장 시 쉽게 교체를 할 수 있다.In addition, since the electronic components are separately installed on the control panel of the gas heater, it is easy to check and can be easily replaced in case of failure.

전극봉이나 점화 트랜스포머의 경우에는 일일이 확인하기가 어려울 뿐만 아니라, 전극봉의 경우 연료분사노즐과의 접촉상태 등을 확인하기 위해서는 가스히터의 버너에서 전극봉과 트랜스포머를 분해하여 직접 확인해야 하므로 많은 시간과 인력이 필요한 문제점이 있다.In the case of electrodes or ignition transformers, it is difficult to check individually, and in the case of electrodes, it is necessary to disassemble the electrode and transformer in the burner of the gas heater to check the contact status with the fuel injection nozzle and check it directly. There is a necessary problem.

또한, 가스히터의 버너로 공급되는 연료 가스의 압력이 정확하지 않은 경우에도 작동불량이 발생하며, 그 원인으로는 압력스위치 및 압력계의 이상을 들 수 있고 이를 검사하기 위해서는 별도의 점검 장비가 필요하다.In addition, malfunction occurs even when the pressure of the fuel gas supplied to the burner of the gas heater is not correct, and the cause of this may include abnormalities in the pressure switch and pressure gauge, and separate inspection equipment is required to inspect this. .

기존 가스히터 점검장치와 관련된 종래 선행기술로는 한국 실용신안등록공보 제 20-0466468호 "휴대용 가스히터 점검장비"(등록일자 2013년04월11일)에 개시된 바와 같이, 트랜스포머에 전압을 인가하여 버너의 점화 여부를 검사하는 트랜스포머 검사부; 전극봉에 전압을 인가하여 상기 전극봉의 접촉 여부를 검사하는 적어도 하나 이상의 전극봉 검사부; 상기 전극봉 검사부에 연결되어 상기 전극봉의 접촉 여부를 나타내는 인지수단; 압력스위치 및 압력계에 고압 가스를 공급하여 작동 여부를 검사하는 가스압력 검사부; 및 상기 트랜스포머 검사부, 전극봉 검사부, 인지수단 및 가스압력 검사부가 설치되는 패널; 을 포함하여 이루어지는 것이다.As the prior art related to the existing gas heater inspection device, as disclosed in Korean Utility Model Registration Publication No. 20-0466468 "Portable Gas Heater Inspection Equipment" (registration date April 11, 2013), a voltage is applied to the transformer. A transformer inspection unit for checking whether the burner is ignited; At least one electrode inspection unit for applying a voltage to the electrode to check whether the electrode is in contact; A recognition means connected to the electrode inspection unit to indicate whether the electrode is in contact with the electrode; A gas pressure inspection unit for supplying high-pressure gas to the pressure switch and the pressure gauge to check whether it is operating; And a panel on which the transformer inspection unit, the electrode inspection unit, the recognition means, and the gas pressure inspection unit are installed. It is made including.

그런데, 현장 계기류의 건전성 유무를 파악하기 위해서는 압력 스위치를 주기적이고 반복적으로 교정해야 하므로, 교정작업을 수행하기 위해서는 가스배관의 압력 센싱라인에 연결된 관이음쇠(TEE)에 마감 플러그를 해체하고 교정용 피팅 구조체를 연결하여 교정을 한 후에 다시 원상태로 벤트 플러그를 체결한다. However, in order to check the integrity of on-site instruments, the pressure switch needs to be calibrated periodically and repeatedly, so to perform the calibration work, disassemble the closing plug from the TEE connected to the pressure sensing line of the gas pipe and use a fitting for calibration. After calibrating by connecting the structure, fasten the vent plug back to its original state.

상기한 교정작업과 관련되어 마감플러그의 해체와 체결을 반복하는 과정에서 나사산이 마모되기도 하고 체결과정에서 조립이 조금이라도 잘못되면 가스누설이 발생되어 다시 작업을 시행해야 하는 번거로움이 있다.In connection with the above calibration work, the threads may be worn in the process of repeating the disassembly and fastening of the finishing plug, and if any assembly is wrong in the fastening process, gas leakage may occur and there is a trouble of having to perform the work again.

또한, 상기 교정작업과 관련하여 반복적으로 원터치 플러그를 체결하고 해체하는 작업중에 작업자의 부상 위험이 있으며, 대부분 작업 현장의 공간이 협소하므로 장시간 작업시 작업자의 신체 피로도가 증가하게 되고 안전사고의 위험이 있다.In addition, there is a risk of injury to the worker during the work of repeatedly fastening and dismantling the one-touch plug in connection with the calibration work, and since the space in most work sites is narrow, the physical fatigue of the worker increases during a long period of work and the risk of safety accidents. have.

한국 실용신안등록공보 제 20-0466468호 "휴대용 가스히터 점검장비"(등록일자 2013년04월11일)Korean Utility Model Registration Publication No. 20-0466468 "Portable Gas Heater Inspection Equipment" (Registration Date April 11, 2013)

본 고안은 상기한 제반 문제점을 감안하여 이를 해결하고자 창안한 것으로, 그 목적은 가스히터의 압력스위치 하측에 마련되는 관이음쇠의 측면 부위에 압력스위치의 교정작업시 벤트 부위에 해체 및 체결작업없이 교정이 가능하도록 그 구조가 개선된 가스히터 압력스위치 교정용 피팅지그를 제공하는 데 있다.The present invention was devised to solve the above problems in consideration of the above problems, and its purpose is to correct without disassembling and fastening at the vent part when calibrating the pressure switch on the side of the pipe fitting provided under the pressure switch of the gas heater. It is to provide a fitting jig for calibrating a gas heater pressure switch whose structure has been improved to enable this.

상기한 목적을 달성하기 위한 본 고안은 가스 히터 압력스위치의 하측에 마련된 관이음쇠의 벤트부에 체결되는 연결니플과; 일측이 상기 연결니플과 체결되고 타측에 상기 연결니플의 지름이 다른 리듀서니플이 체결되며 밸브 조작시 유로를 개폐하는 교정볼밸브와; 일측이 상기 교정볼밸브의 타측에 체결되고 타측에 원터치 플러그가 나사 체결되는 리듀서니플; 및 일측이 상기 리듀서니플의 타측에 체결되고 타측에 교정용 튜빙호스가 연결되도록 연결구가 마련된 원터치 플러그;를 구비한 것을 특징으로 한다.The present invention for achieving the above object is a connection nipple fastened to the vent portion of the pipe fitting provided on the lower side of the gas heater pressure switch; A calibration ball valve having one side fastened with the connection nipple, a reducer nipple having a different diameter of the connecting nipple on the other side, and opening and closing a flow path when the valve is operated; A reducer nipple whose one side is fastened to the other side of the calibration ball valve and a one-touch plug is screwed to the other side; And a one-touch plug having one side fastened to the other side of the reducer nipple and provided with a connector so that the calibration tubing hose is connected to the other side.

상기 원터치 플러그의 타측에 착탈 가능하게 끼움 결합되고 상기 연결구를 마감하는 캡부재를 더 구비한다.It further includes a cap member that is detachably fitted to the other side of the one-touch plug and closes the connector.

상기 리듀서니플은 일측의 지름이 타측의 지름보다 더 크게 형성된 것이다.The reducer nipple is formed with a diameter of one side larger than that of the other side.

본 고안은 관이음쇠(TEE)의 측면에 마련된 벤트부에 나사 체결방식으로 연결니플과 교정볼밸브가 상시 체결된 상태를 유지하고, 상기 교정볼밸브에 원터치 플러그가 체결되어 있으므로, 평상시에는 캡부재로 원터치 플러그의 연결구를 마감하다가, 교정작업시 캡부재를 분리시키고 원터치 플러그의 연결구에 교정용 튜빙호스를 연결시켜 교정작업을 수행함으로써, 플러그를 해체할 필요없이 교정작업을 수행할 수 있게 되어 불필요한 부품 마모를 줄일 수 있으며 가스 누설을 예방할 수 있는 유용한 이점을 갖는다.The present invention maintains a state in which the connection nipple and the calibration ball valve are always fastened by a screw fastening method to the vent provided on the side of the pipe fitting (TEE), and the one-touch plug is fastened to the calibration ball valve. While closing the connection port of the one-touch plug with the machine, the cap member is separated during calibration, and the calibration work is performed by connecting the calibration tubing hose to the connection port of the one-touch plug, so that the calibration work can be performed without the need to disassemble the plug. It has a useful advantage of reducing component wear and preventing gas leakage.

도 1은 본 고안에 따른 가스히터 압력스위치 교정용 피팅지그를 나타낸 분해 사시도.
도 2는 도 1의 결합상태도.
1 is an exploded perspective view showing a fitting jig for calibrating a gas heater pressure switch according to the present invention.
Figure 2 is a combined state diagram of Figure 1;

이하, 도면을 참조한 실시 예들의 상세한 설명을 통하여 본 고안에 대해 보다 상세하게 기술하기로 한다. Hereinafter, the present invention will be described in more detail through detailed description of embodiments with reference to the drawings.

본 고안에 따른 가스히터 압력스위치 교정용 피팅지그는 도 1 및 도 2에 도시된 바와 같이, 가스 히터 압력스위치(10)의 하측에 마련된 관이음쇠(20)의 벤트부(25)에 체결되는 연결니플(100)과; 일측이 상기 연결니플(100)과 체결되고 타측에 상기 연결니플(100)의 지름이 다른 리듀서니플(300)이 체결되며 밸브 조작시 유로를 개폐하는 교정볼밸브(200)와; 일측이 상기 교정볼밸브(200)의 타측에 체결되고 타측에 원터치 플러그(400)가 나사 체결되는 리듀서니플(300); 및 일측이 상기 리듀서니플(300)의 타측에 체결되고 타측에 교정용 튜빙호스가 연결되도록 연결구(410)가 마련된 원터치 플러그(400);를 포함하여 이루어진다.The fitting jig for calibrating the gas heater pressure switch according to the present invention is a connection that is fastened to the vent part 25 of the pipe fitting 20 provided on the lower side of the gas heater pressure switch 10, as shown in FIGS. 1 and 2 A nipple 100; A calibration ball valve 200 that one side is fastened with the connection nipple 100 and a reducer nipple 300 having a different diameter of the connection nipple 100 is fastened to the other side and opens and closes a flow path when the valve is operated; A reducer nipple 300 whose one side is fastened to the other side of the calibration ball valve 200 and a one-touch plug 400 is screwed to the other side; And a one-touch plug 400 having one side fastened to the other side of the reducer nipple 300 and provided with a connector 410 so that a calibration tubing hose is connected to the other side.

도 1을 참조하면, 상기 관이음쇠(20)(TEE)는 가스히터의 압력스위치(10)의 하측에 연결되고 하부의 연결볼밸브(30) 사이에 배치된다.Referring to FIG. 1, the pipe fittings 20 (TEE) are connected to the lower side of the pressure switch 10 of the gas heater and disposed between the connection ball valves 30 at the lower side.

상기 관이음쇠(20)는 측면 부위에 벤트부(25)가 형성되어 있다.The pipe fitting 20 has a vent portion 25 formed on a side portion thereof.

상기 연결니플(100)은 일측과 타측의 지름이 동일한 크기로 형성되고, 일측과 타측의 외주에 각각 수나사산이 형성되며, 일측과 타측이 개구된 니플 형태로 형성된다.The connection nipple 100 is formed in the same size as the diameter of one side and the other side, male threads are formed on the outer circumferences of one side and the other side, respectively, and is formed in the form of a nipple with one side and the other side open.

상기 연결니플(100)은 관이음쇠(20)의 벤트부(25)와 교정볼밸브(200)를 연통되도록 연결하는 기능을 수행하게 된다.The connection nipple 100 performs a function of connecting the vent part 25 of the pipe fitting 20 and the calibration ball valve 200 to communicate with each other.

상기 교정볼밸브(200)는 연결니플(100)과 리듀서니플(300)(Reducing nipple)을 연결하며, 유로를 개폐하여 벤트 기능을 선택적으로 수행하는 기능을 갖는다.The calibration ball valve 200 connects the connection nipple 100 and the reducing nipple 300, and has a function of selectively performing a vent function by opening and closing a flow path.

상기 리듀서니플(300)은 일측과 타측의 외주에 각각 수나사산이 형성되고, 일측의 지름이 타측의 지름보다 더 크게 형성된 구조를 갖는다.The reducer nipple 300 has a structure in which male threads are formed on the outer peripheries of one side and the other side, respectively, and the diameter of one side is larger than the diameter of the other side.

상기 원터치 플러그(400)는 일측 외주에 상기 리듀서니플(300)의 타측과 나사 체결되도록 수나사산이 형성된 구조를 갖는다.The one-touch plug 400 has a structure in which a male thread is formed so as to be screwed with the other side of the reducer nipple 300 on one outer periphery.

또한, 상기 원터치 플러그(400)는 타측에 교정용 튜빙호스(미도시)가 연결되는 연결구(410)가 형성된다.In addition, the one-touch plug 400 is formed with a connector 410 to which a calibration tubing hose (not shown) is connected to the other side.

그리고 본 발명은 상기 원터치 플러그(400)의 타측에 착탈 가능하게 끼움 결합되고 상기 연결구(410)를 마감하는 캡부재(500)를 더 구비한다.In addition, the present invention further includes a cap member 500 that is detachably fitted to the other side of the one-touch plug 400 and closes the connector 410.

이러한 구성을 갖는 본 고안은 가스히터 압력스위치(10)의 교정작업시 벤트부(25)와 유로 연결된 교정볼밸브(200)를 개방시키면, 압력스위치(10)와 관이음쇠(20)의 가스가 연결니플(100)을 통해 교정볼밸브(200)의 내부로 유입된 후에 상기 리듀서니플(300)과 교정용 튜빙호스를 통해 배출된다.In the present invention having such a configuration, when the calibration ball valve 200 connected to the vent part 25 and the flow path is opened during the calibration work of the gas heater pressure switch 10, the gas of the pressure switch 10 and the pipe fitting 20 After flowing into the inside of the calibration ball valve 200 through the connection nipple 100, it is discharged through the reducer nipple 300 and the calibration tubing hose.

이후에 교정작업이 완료된 후에, 상기 교정볼밸브(200)를 닫으면, 교정볼밸브(200)의 유로가 폐쇄되어 상기 벤트부(25)로 통하는 유로가 차단되어 평상시 관이음쇠(20)의 기능을 수행하게 된다.After the calibration work is completed, when the calibration ball valve 200 is closed, the flow path of the calibration ball valve 200 is closed and the flow path leading to the vent part 25 is blocked, so that the function of the pipe fitting 20 is normally performed. Will perform.

이때, 캡부재(500)는 상기 원터치 플러그(400)의 타측에 마련된 캡부재(500)를 덮을 수 있도록 마감함으로써, 외부 이물질의 유입을 차단하게 된다.At this time, the cap member 500 is closed so as to cover the cap member 500 provided on the other side of the one-touch plug 400, thereby blocking the inflow of external foreign substances.

따라서, 본 고안은 관이음쇠(20)(TEE)의 측면에 마련된 벤트부(25)에 나사 체결방식으로 연결니플(100)과 교정볼밸브(200)가 상시 체결된 상태를 유지하고, 상기 교정볼밸브(200)에 원터치 플러그(400)가 체결되어 있으므로, 도 2에 도시된 바와 같이, 평상시에는 캡부재(500)로 원터치 플러그(400)의 연결구(410)를 마감하다가, 교정작업시 캡부재(500)를 분리시키고 원터치 플러그(400)의 연결구(410)에 교정용 튜빙호스를 연결시켜 교정작업을 수행함으로써, 플러그(400)를 해체할 필요없이 교정작업을 수행할 수 있게 되어 불필요한 부품 마모를 줄일 수 있으며 가스 누설을 예방할 수 있는 유용한 이점을 갖는다.Therefore, the present invention maintains a state in which the connection nipple 100 and the calibration ball valve 200 are always fastened to the vent part 25 provided on the side of the pipe fitting 20 (TEE) by a screw fastening method, and the calibration Since the one-touch plug 400 is fastened to the ball valve 200, as shown in FIG. 2, the connector 410 of the one-touch plug 400 is normally closed with the cap member 500, and then the cap By separating the member 500 and connecting a calibration tubing hose to the connector 410 of the one-touch plug 400 to perform calibration, it is possible to perform calibration work without the need to disassemble the plug 400, and thus unnecessary parts It has a useful advantage of reducing wear and preventing gas leakage.

10 : 압력스위치 20 : 관이음쇠
25 : 벤트부 30 : 연결볼밸브
100 : 연결니플 200 : 교정볼밸브
300 : 리듀서니플 400 : 원터치 플러그
410 : 연결구 500 : 캡부재
10: pressure switch 20: pipe fitting
25: vent part 30: connection ball valve
100: connection nipple 200: calibration ball valve
300: reducer nipple 400: one-touch plug
410: connector 500: cap member

Claims (3)

가스 히터 압력스위치(10)의 하측에 마련된 관이음쇠(20)의 벤트부(25)에 체결되는 연결니플(100)과;
일측이 상기 연결니플(100)과 체결되고 타측에 상기 연결니플(100)의 지름이 다른 리듀서니플(300)이 체결되며 밸브 조작시 유로를 개폐하는 교정볼밸브(200)와;
일측이 상기 교정볼밸브(200)의 타측에 체결되고 타측에 원터치 플러그(400)가 나사 체결되는 리듀서니플(300)과;
일측이 상기 리듀서니플(300)의 타측에 체결되고 타측에 교정용 튜빙호스가 연결되도록 연결구(410)가 마련된 원터치 플러그(400);를 구비한 것을 특징으로 하는 가스히터 압력스위치 교정용 피팅지그.
A connection nipple 100 that is fastened to the vent part 25 of the pipe fitting 20 provided under the gas heater pressure switch 10;
A calibration ball valve 200 that one side is fastened with the connection nipple 100 and a reducer nipple 300 having a different diameter of the connection nipple 100 is fastened to the other side, and opens and closes a flow path when the valve is operated;
A reducer nipple 300 whose one side is fastened to the other side of the calibration ball valve 200 and a one-touch plug 400 is screwed to the other side;
A fitting jig for calibrating a gas heater pressure switch, characterized in that it has a one-touch plug 400 having one side fastened to the other side of the reducer nipple 300 and provided with a connector 410 so that a calibration tubing hose is connected to the other side.
청구항 1에 있어서,
상기 원터치 플러그(400)의 타측에 착탈 가능하게 끼움 결합되고 상기 연결구(410)를 마감하는 캡부재(500)를 더 구비한 것을 특징으로 하는 가스히터 압력스위치 교정용 피팅지그.
The method according to claim 1,
A fitting jig for calibrating a gas heater pressure switch, characterized in that it further comprises a cap member 500 that is detachably fitted to the other side of the one-touch plug 400 and closes the connector 410.
청구항 1에 있어서,
상기 리듀서니플(300)은 일측의 지름이 타측의 지름보다 더 크게 형성된 것을 특징으로 하는 가스히터 압력스위치 교정용 피팅지그.
The method according to claim 1,
The reducer nipple 300 is a fitting jig for calibrating a gas heater pressure switch, characterized in that the diameter of one side is formed larger than the diameter of the other side.
KR2020190005299U 2019-12-27 2019-12-27 Fitting jig for calibration of press switch KR200493285Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020190005299U KR200493285Y1 (en) 2019-12-27 2019-12-27 Fitting jig for calibration of press switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020190005299U KR200493285Y1 (en) 2019-12-27 2019-12-27 Fitting jig for calibration of press switch

Publications (1)

Publication Number Publication Date
KR200493285Y1 true KR200493285Y1 (en) 2021-03-05

Family

ID=74871063

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020190005299U KR200493285Y1 (en) 2019-12-27 2019-12-27 Fitting jig for calibration of press switch

Country Status (1)

Country Link
KR (1) KR200493285Y1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200466468Y1 (en) 2010-12-13 2013-04-17 주식회사 한국가스기술공사 Portable check device for gas heater
KR101449809B1 (en) * 2012-11-20 2014-10-14 주식회사 부산도시가스 Portable testing device of gas pressure and method of using thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200466468Y1 (en) 2010-12-13 2013-04-17 주식회사 한국가스기술공사 Portable check device for gas heater
KR101449809B1 (en) * 2012-11-20 2014-10-14 주식회사 부산도시가스 Portable testing device of gas pressure and method of using thereof

Similar Documents

Publication Publication Date Title
AU672937B2 (en) Crashworthy solenoid actuated valve for CNG powered vehicle
JP5452470B2 (en) Emergency shut-off safety device
US10119623B2 (en) Safety device for installation in a gas-supply system, in particular, an acetylene-supply system
CA2704839C (en) Pressure testing apparatus for gas service delivery systems
US5934304A (en) Apparatus and method for gas meter bypass
US6209562B1 (en) Valve assembly, pressure testing apparatus and testing method for propane tank system
US5992438A (en) Pressure testing assembly and testing method for propane tank systems
KR200493285Y1 (en) Fitting jig for calibration of press switch
JP2014098544A (en) Emergency shutdown safety device
US20110061742A1 (en) Cryogenic liquid cylinder manifold
KR101512803B1 (en) Service valve for outdoor fan of air-conditioner
KR200466468Y1 (en) Portable check device for gas heater
US20110094608A1 (en) Refillable Propane Cylinder and Valve Assembly Therefore
JP5635813B2 (en) Check valve with built-in liquid seal prevention mechanism
JP4969413B2 (en) Valve reinforcement apparatus and method
US2095210A (en) Fluid regulator
CN210068948U (en) Instrument valve
CN105042330A (en) Multifunctional valve of liquefied natural gas cylinder and method for controlling liquid charging and discharging
US6840272B2 (en) Fuel-conditioning device
CN218670716U (en) Gas manual cut-off valve
CN220187909U (en) Pressure gauge joint and pressure gauge
KR102678601B1 (en) Test equipment for gas governor facilities
KR200446481Y1 (en) Sealing test device for pressure regulator
BR202022011562U2 (en) MOLECULAR ORGANIZER FOR EQUIPMENT POWERED BY LPG GAS
KR200204550Y1 (en) Gas pressure test and leakage of confirm equipment

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
REGI Registration of establishment