KR200492533Y1 - Jig for installation of through flanged pipe - Google Patents

Jig for installation of through flanged pipe Download PDF

Info

Publication number
KR200492533Y1
KR200492533Y1 KR2020200000093U KR20200000093U KR200492533Y1 KR 200492533 Y1 KR200492533 Y1 KR 200492533Y1 KR 2020200000093 U KR2020200000093 U KR 2020200000093U KR 20200000093 U KR20200000093 U KR 20200000093U KR 200492533 Y1 KR200492533 Y1 KR 200492533Y1
Authority
KR
South Korea
Prior art keywords
flange pipe
frame
hole
flange
jig
Prior art date
Application number
KR2020200000093U
Other languages
Korean (ko)
Inventor
김창식
Original Assignee
주식회사 현대미포조선
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 현대미포조선 filed Critical 주식회사 현대미포조선
Priority to KR2020200000093U priority Critical patent/KR200492533Y1/en
Application granted granted Critical
Publication of KR200492533Y1 publication Critical patent/KR200492533Y1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/60Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by the use of specific tools or equipment; characterised by automation, e.g. use of robots
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
    • B25B11/02Assembly jigs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions

Abstract

본 고안은 내부에 사각형의 관통공이 형성된 사각프레임과, 상기 사각프레임 중 상측프레임에서 가로 길이방향으로 형성되고, 플랜지파이프의 볼트공에 고정하는 제1고정부와, 상기 사각프레임 중 좌측프레임에서 세로 길이방향으로 형성되고, 플랜지파이프의 볼트공에 고정하는 제2고정부와, 상기 사각프레임 중 관통공의 중앙에서 상, 하측으로 형성된 손잡이부, 및 상기 사각프레임의 상측프레임, 좌측프레임, 하측프레임 중 어느 한 측프레임의 주변에 결합하여, 정렬 정도를 측정하는 수평계를 포함하여, 해당 선각 홀에 설치되는 관통 플랜지파이프에 설치되어, 선각 홀에 설치되는 플랜지파이프를 올바르게 정렬된 상태로 설치되도록 하는 관통 플랜지파이프 설치용 지그를 제공한다.The present invention includes a rectangular frame having a rectangular through-hole formed therein, a first fixing portion formed in the horizontal and length direction from the upper frame of the rectangular frame and fixed to the bolt hole of the flange pipe, and the vertical frame in the left frame of the rectangular frame. A second fixing part formed in the longitudinal direction and fixed to the bolt hole of the flange pipe, the handle part formed upward and downward from the center of the through hole among the square frames, and the upper frame, the left frame, and the lower frame of the square frame It is attached to the periphery of one of the side frames and is installed on the through flange pipe installed in the hull hole, including a level that measures the degree of alignment, so that the flange pipe installed in the hull hole is installed in a correctly aligned state. Provides a jig for installing through flange pipes.

Description

관통 플랜지 파이프 설치용 지그{Jig for installation of through flanged pipe}Jig for installation of through flanged pipe

본 고안은 관통 플랜지 파이프 설치용 지그에 관한 것으로, 더욱 상세하게는 해당 선각 홀에 설치되는 관통 플랜지파이프에 설치되어, 선각 홀에 설치되는 플랜지파이프를 올바르게 정렬된 상태로 설치되도록 하는 관통 플랜지 파이프 설치용 지그에 관한 것이다.The present invention relates to a through-flange pipe installation jig, and more specifically, a through-flange pipe installation jig that is installed on the through-flange pipe installed in the hull hole, so that the flange pipe installed in the hull hole is installed in a correctly aligned state. It is about.

일반적으로 선박블록을 제작함에 있어 유체의 이송이나 전선류의 설치를 위하여 각종 파이프가 설치되고 있으며, 이러한 파이프의 대부분은 선박블록을 구성하는 격벽을 관통하여 목적으로 하는 장소로 연장되게 구성된다.In general, in manufacturing a ship block, various pipes are installed for transporting fluid or installing electric wires, and most of these pipes are configured to extend to a target place through the bulkhead constituting the ship block.

한편, 하나의 파이프라인을 구성함에 있어서, 길이가 긴 하나의 파이프를 이용할 수도 있으나, 수많은 격벽이나 각종 구조물이 설치된 선박블록의 내부에서 하나의 파이프를 이용하여 파이프라인을 구성하는 것은 사실상 불가능하므로 소정의 길이를 갖는 여러개의 파이프들을 상호 연결하여 하나의 파이프라인을 구성하게 된다.On the other hand, in constructing one pipeline, one long pipe may be used, but it is practically impossible to construct a pipeline using one pipe inside a ship block in which numerous bulkheads or various structures are installed. Several pipes having a length of are connected to each other to form a single pipeline.

상기와 같이 여러 개의 파이프를 이용하여 선박블록의 내부에 파이프라인을 구성할 경우, 일부 파이프는 격벽을 관통하는 구조로 설치되며, 이처럼 격벽을 관통하도록 파이프를 설치함에 있어 파이프의 끝단에 구비된 플랜지의 볼트홀이 정해진 위치에 정확하게 위치해야지만 다른 파이프와의 연결작업을 원활하게 할 수 있게 되므로, 파이프를 격벽에 용접하기 전 플랜지의 볼트홀 위치를 정렬하는 작업을 하게 된다.When configuring a pipeline inside the ship block using multiple pipes as described above, some pipes are installed in a structure that penetrates the bulkhead, and when installing the pipe to penetrate the bulkhead, a flange provided at the end of the pipe The bolt hole of the flange must be accurately positioned at the specified position, but since the connection work with other pipes can be performed smoothly, the work to align the bolt hole position of the flange before welding the pipe to the bulkhead is performed.

종래에는 작업자가 플랜지의 볼트홀을 육안으로 확인하는 방식으로 작업을 진행하고 있다. 보다 구체적으로, 파이프가 용접될 격벽에는 플랜지의 볼트홀 위치 정렬을 위한 기준이 되는 마킹라인이 그려지게 되며, 이러한 마킹라인은 주변의 또 다른 격벽 또는 용접선을 기준으로 하여 작업자가 사전에 그려놓게 된다.Conventionally, the operator is performing work in a manner that visually checks the bolt hole of the flange. More specifically, on the bulkhead where the pipe is to be welded, a marking line that serves as a reference for aligning the bolt hole position of the flange is drawn, and this marking line is drawn in advance by the operator based on another bulkhead or welding line around it. .

한편 작업자는 별도의 도구를 이용하여 파이프를 격벽에 임의로 고정한 상태에서 플랜지의 볼트홀과 마킹라인의 정렬상태를 육안으로 확인하여 플랜지의 정렬상태가 올바른 판단하게 되며, 판단결과에 따라 플랜지의 위치를 조절하게 된다.Meanwhile, the operator visually checks the alignment of the bolt hole of the flange and the marking line while fixing the pipe to the bulkhead using a separate tool, and determines the alignment of the flange correctly. Will be adjusted.

종래 기술에 따른 파이프 플랜지 정렬은 작업자의 숙련도에 따라 측정작업의 정확도가 달라지는 문제가 있다. Pipe flange alignment according to the prior art has a problem that the accuracy of the measurement operation varies depending on the skill of the operator.

이에 따라, 종래 기술에 따른 파이프 플랜지 정렬공정은 측정작업에 오차가 발생하여 상기 파이프 플랜지의 위치에 오차가 발생하고, 이로 인해 신뢰도가 저하되는 문제가 있다.Accordingly, in the pipe flange alignment process according to the prior art, an error occurs in the measurement operation, and an error occurs in the position of the pipe flange, thereby reducing reliability.

선행기술로는 공개실용신안 제20-2014-0005547호(2014.10.28)를 참조할 수 있다.As a prior art, reference may be made to Public Utility Model No. 20-2014-0005547 (October 28, 2014).

본 고안은 해당 선각 홀에 설치되는 관통 플랜지파이프에 설치되어, 선각 홀에 설치되는 플랜지파이프를 올바르게 정렬된 상태로 설치되도록 하는 관통 플랜지 파이프 설치용 지그를 제공하는 것을 그 목적으로 한다.An object of the present invention is to provide a through-flange pipe installation jig that is installed on a through flange pipe installed in a corresponding hull hole, so that the flange pipe installed in the hull hole is installed in a properly aligned state.

본 고안에 따른 관통 플랜지파이프 설치용 지그는 내부에 사각형의 관통공이 형성된 사각프레임과, 상기 사각프레임 중 상측프레임에서 가로 길이방향으로 형성되고, 플랜지파이프의 볼트공에 고정하는 제1고정부와, 상기 사각프레임 중 좌측프레임에서 세로 길이방향으로 형성되고, 플랜지파이프의 볼트공에 고정하는 제2고정부와, 상기 사각프레임 중 관통공의 중앙에서 상, 하측으로 형성된 손잡이부, 및 상기 사각프레임의 상측프레임, 좌측프레임, 하측프레임 중 어느 한 측프레임의 주변에 결합하여, 정렬 정도를 측정하는 수평계를 포함한다.The jig for installing a through flange pipe according to the present invention includes a rectangular frame having a rectangular through hole formed therein, a first fixing portion formed in a horizontal length direction from an upper frame of the rectangular frame and fixed to the bolt hole of the flange pipe, and the A second fixing part formed in the vertical length direction from the left frame of the square frame and fixed to the bolt hole of the flange pipe, the handle part formed upward and downward from the center of the through hole among the square frames, and the upper side of the square frame It is coupled to the periphery of any one of the frame, the left frame, and the lower frame, and includes a horizontal meter to measure the degree of alignment.

이때 본 고안에 따른 상기 제1고정부는 상기 상측프레임의 가로길이방향을 따라 형성된 제1가이드장공과, 상기 제1가이드장공을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프의 볼트공에 체결되는 한 쌍의 제1고정부재를 포함한다.At this time, the first fixing portion according to the present invention is provided to be selectively movable along the first guide long hole formed along the transverse length direction of the upper frame, the first guide long hole, and as long as it is fastened to the bolt hole of the flange pipe. It includes a pair of first fixed goods.

그리고 본 고안에 따른 상기 제2고정부는 상기 좌측프레임의 세로길이방향을 따라 형성된 제2가이드장공과, 상기 제2가이드장공을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프의 볼트공에 체결되는 한 쌍의 제2고정부재를 포함한다.And the second fixing part according to the present invention is provided so as to be selectively movable along the second guide long hole formed along the longitudinal length direction of the left frame, the second guide long hole, and fastened to the bolt hole of the flange pipe. Includes a pair of second fixed goods.

또한, 본 고안에 따른 관통 플랜지파이프 설치용 지그는 상기 사각프레임 중 하측에서 가로 길이방향을 따라 이동 가능하게 형성되고, 플랜지파이프의 볼트공에 고정하는 제3고정부를 포함한다.In addition, the jig for installing the through flange pipe according to the present invention is formed to be movable along the transverse longitudinal direction from the lower side of the square frame, and includes a third fixing portion fixed to the bolt hole of the flange pipe.

이때 본 고안에 따른 상기 제3고정부는 상기 하측프레임의 가로길이방향을 따라 형성된 제3가이드장공과, 상기 제3가이드장공을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프의 볼트공에 체결되는 한 쌍의 제3고정부재를 포함한다.At this time, the third fixing part according to the present invention is provided to be selectively movable along the third guide long hole formed along the horizontal length direction of the lower frame and the third guide long hole, and as long as it is fastened to the bolt hole of the flange pipe. Includes a pair of third fixed goods.

더불어 본 고안에 따른 상기 사각프레임은 그 모서리들의 배면에 구비되고, 플랜지파이프의 플랜지가 설치되는 선각 벽면과 일정 거리를 유지하도록 하는 간격유지부재를 포함한다.In addition, the square frame according to the present invention is provided on the rear surface of the corners, and includes a gap maintaining member to maintain a predetermined distance from the hull wall surface of the flange pipe flange is installed.

본 고안에 따른 관통 플랜지파이프 설치용 지그에 의해 나타나는 효과는 다음과 같다.The effects exhibited by the through-flange pipe installation jig according to the present invention are as follows.

선각 홀에 설치되는 관통 플랜지파이프에 설치되어, 정렬 정도 맞춤 및 생산 효율이 월등히 높아지는 효과를 가진다.It is installed in the through flange pipe installed in the hull hole, and has the effect of remarkably increasing the alignment accuracy and production efficiency.

도 1은 본 고안의 일 실시 예에 따른 관통 플랜지파이프 설치용 지그를 보인 예시도이다.
도 2는 본 고안의 일 실시 예에 따른 관통 플랜지파이프 설치용 지그를 보인 예시도이다.
도 3은 본 고안의 일 실시 예에 따른 관통 플랜지파이프 설치용 지그를 플랜지 파이프에 설치한 상태를 보인 예시도이다.
1 is an exemplary view showing a jig for installing a through flange pipe according to an embodiment of the present invention.
2 is an exemplary view showing a jig for installing a through flange pipe according to an embodiment of the present invention.
3 is an exemplary view showing a state in which a through-flange pipe installation jig according to an embodiment of the present invention is installed on a flange pipe.

이하, 첨부된 도면을 참조하여 본 고안에 따른 바람직한 실시 예를 상세히 설명하기로 한다. 이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 고안자는 그 자신의 고안을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여, 본 고안의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Hereinafter, exemplary embodiments according to the present invention will be described in detail with reference to the accompanying drawings. Prior to this, terms or words used in the specification and claims should not be construed as being limited to their usual or dictionary meanings, and the designer should properly explain the concept of terms in order to explain his own design in the best way. Based on the principle that it can be defined, it should be interpreted as a meaning and concept consistent with the technical idea of the present invention.

따라서 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 고안의 가장 바람직한 실시 예에 불과할 뿐이고, 본 고안의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들은 대체할 수 있는 균등한 변형 예들이 있을 수 있음을 이해하여야 한다.Therefore, the embodiments described in the present specification and the configurations shown in the drawings are only the most preferred embodiments of the present invention, and do not represent all the technical ideas of the present invention, so at the time of the present application, they are equivalent to It should be understood that there may be variations.

본 고안은 해당 선각 홀에 설치되는 관통 플랜지파이프에 설치되어, 선각 홀에 설치되는 플랜지파이프를 올바르게 정렬된 상태로 설치되도록 하는 관통 플랜지파이프 설치용 지그에 관한 것으로, 도면을 참조하여 더욱 상세하게 살펴보면 다음과 같다.The present invention relates to a jig for installing a through flange pipe that is installed on a through flange pipe installed in a corresponding hull hole so that the flange pipe installed in the hull hole is installed in a correctly aligned state. Same as

도 1 내지 도 3을 참조한 본 고안의 일 실시 예에 따른 관통 플랜지파이프 설치용 지그(100)는 사각프레임(110)과, 제1고정부(120)와, 제2고정부(130)와, 손잡이부(140)와, 수평계(300)를 포함하는데, 먼저 사각프레임(110)는 판 상의 프레임으로 내부에 사각형의 관통공(111)을 형성하여, 상측, 좌측, 우측, 하측에 상측프레임, 좌측프레임, 우측프레임, 하측프레임을 갖는 사각형의 틀을 이룬다.The through-flange pipe installation jig 100 according to an embodiment of the present invention with reference to FIGS. 1 to 3 includes a square frame 110, a first fixing part 120, a second fixing part 130, and a handle It includes a part 140 and a leveling system 300. First, the square frame 110 is a plate-shaped frame and has a rectangular through hole 111 formed therein, so that the upper frame and the left side are upper, left, right It forms a rectangular frame with a frame, a right frame and a lower frame.

이때 상기 사각프레임(110) 중 상측프레임에는 가로 길이방향으로 제1고정부(120)를 형성하는데, 상기 제1고정부(120)는 플랜지파이프(P)의 볼트공(P1)에 고정되어, 상기 지그(100)가 플랜지파이프(P)에 취부되도록 한다.At this time, a first fixing part 120 is formed on the upper frame of the square frame 110 in the horizontal and length direction, and the first fixing part 120 is fixed to the bolt hole P1 of the flange pipe P, The jig 100 is to be attached to the flange pipe (P).

상기 제1고정부(120)를 보다 상세하게 살펴보면, 상기 제1고정부(120)는 상기 상측프레임의 가로길이방향을 따라 형성된 제1가이드장공(121)과, 상기 제1가이드장공(121)을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프(P)의 볼트공(P1)에 체결(나사 체결, 핀 체결 등)되는 한 쌍의 제1고정부재(210)를 포함한다.Looking in more detail at the first fixing part 120, the first fixing part 120 includes a first guide long hole 121 formed along the horizontal length direction of the upper frame, and the first guide long hole 121 It is provided to be selectively movable along the line, and includes a pair of first fixing members 210 that are fastened (screw fastened, pin fastened, etc.) to the bolt hole P1 of the flange pipe P.

따라서 해당 선각 홀에 관통 플랜지파이프(P)를 설치할 시, 해당 선각 홀에 플랜지파이프(P)를 가결합한 후, 상기 지그(100)의 사각프레임(110) 중 상기 제1고정부(120)의 제1고정부재(210) 한 쌍을 상기 상측프레임의 가로길이방향을 따라 형성된 제1가이드장공(121)을 따라 이동시켜, 플랜지파이프(P)의 볼트공(P1)에 대응하는 위치에 위치하도록 조절한 후, 상기 플랜지파이프(P)의 볼트공(P1)에 대응하는 위치에 위치한 한 쌍의 제1고정부재(210)를 플랜지파이프(P)의 볼트공(P1)에 각각 고정하는 것으로 상기 지그(100)가 플랜지파이프(P)에 취부된다.Therefore, when installing the through flange pipe (P) in the hull hole, after temporarily coupling the flange pipe (P) to the hull hole, the first fixing part 120 of the square frame 110 of the jig 100 A pair of first fixing members 210 are moved along the first guide hole 121 formed along the horizontal length direction of the upper frame, so that it is located at a position corresponding to the bolt hole P1 of the flange pipe P. After adjustment, the pair of first fixing members 210 located at positions corresponding to the bolt holes P1 of the flange pipe P are fixed to the bolt holes P1 of the flange pipe P, respectively. The jig 100 is attached to the flange pipe P.

이때 한 쌍의 제1고정부재(210)는 플랜지파이프(P)의 볼트공(P1)에 볼트로 체결되는 것이 바람직하다.At this time, it is preferable that the pair of first fixing members 210 are fastened with bolts to the bolt hole P1 of the flange pipe P.

이렇게 상기 플랜지파이프(P)에 취부된 상기 사각프레임(110)의 상측프레임 주변에 수평계(300)를 결합한 후, 상기 수평계(300)를 통해 플랜지파이프(P)의 정렬 정도를 측정하면서, 플랜지파이프(P)를 시계방향으로 회전시키거나, 반시계방향으로 회전시켜, 상기 플랜지파이프(P)가 수평이 정렬시킨 후, 상기 플랜지파이프(P) 주변을 용접하여 상기 플랜지파이프(P)를 선각 홀에 설치한다.In this way, after coupling the leveler 300 around the upper frame of the square frame 110 attached to the flange pipe P, while measuring the degree of alignment of the flange pipe P through the leveler 300, the flange pipe After (P) is rotated clockwise or counterclockwise to align the flange pipe (P) horizontally, the flange pipe (P) is welded around the flange pipe (P) to form a hull hole. To install.

여기서 상기 플랜지파이프(P)의 수평은 상기 플랜지파이프(P)의 사방으로 형성된 4개의 볼트공(P1) 중 가로선상으로 배열된 2개를 볼트공(P1)에 통해 상기 지그(100)가 취부되고 상기 플랜지파이프(P)의 정렬 정도를 가늠할 수 있는 척도가 된다. Here, the horizontal of the flange pipe (P) is the jig (100) is mounted through the bolt hole (P1) two of the four bolt holes (P1) formed in all directions of the flange pipe (P) arranged in a horizontal line. It becomes a measure by which the degree of alignment of the flange pipe P can be determined.

그리고 본 고안의 일 실시 예에 따른 관통 플랜지파이프 설치용 지그(100)는 가로선상으로 형성된 제1고정부(120)뿐만 아니라 세로 선상으로는 제2고정부(130)를 형성하는데, 상기 제2고정부(130)는 상기 사각프레임(110) 중 좌측프레임에서 세로 길이방향으로 형성되고, 플랜지파이프(P)의 볼트공(P1)에 고정된다.And the through-flange pipe installation jig 100 according to an embodiment of the present invention forms not only the first fixing portion 120 formed in a horizontal line, but also a second fixing portion 130 in a vertical line, the second high The top portion 130 is formed in the vertical length direction in the left frame of the square frame 110, and is fixed to the bolt hole P1 of the flange pipe (P).

상기 제2고정부(130)를 보다 상세하게 살펴보면, 상기 제2고정부(130)는 상기 좌측프레임의 세로길이방향을 따라 형성된 제2가이드장공(131)과, 상기 제2가이드장공(131)을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프(P)의 볼트공(P1)에 체결되는 한 쌍의 제2고정부재(220)를 포함한다.Looking at the second fixing part 130 in more detail, the second fixing part 130 includes a second guide hole 131 formed along the vertical length direction of the left frame, and the second guide hole 131 It is provided to be selectively movable along the line, and includes a pair of second fixing members 220 fastened to the bolt hole (P1) of the flange pipe (P).

따라서 상기 제2고정부(130) 역시, 해당 선각 홀에 관통 플랜지파이프(P)를 설치할 시, 해당 선각 홀에 플랜지파이프(P)를 가결합한 후, 상기 지그(100)의 사각프레임(110) 중 상기 제2고정부(130)의 제2고정부재(220) 한 쌍을 상기 좌측프레임의 세로길이방향을 따라 형성된 제2가이드장공(131)을 따라 이동시켜, 플랜지파이프(P)의 볼트공(P1)에 대응하는 위치에 위치하도록 조절한 후, 상기 플랜지파이프(P)의 볼트공(P1)에 대응하는 위치에 위치한 한 쌍의 제2고정부재(220)를 플랜지파이프(P)의 볼트공(P1)에 각각 고정하는 것으로 상기 지그(100)가 플랜지파이프(P)에 취부된다.Therefore, the second fixing part 130 also, when installing the through flange pipe (P) in the hull hole, after temporarily coupling the flange pipe (P) to the hull hole, the square frame 110 of the jig (100) Among them, a pair of the second fixing members 220 of the second fixing part 130 is moved along the second guide long hole 131 formed in the longitudinal direction of the left frame, and the bolt hole of the flange pipe P After adjusting to be located at a position corresponding to (P1), a pair of second fixing members 220 located at a position corresponding to the bolt hole (P1) of the flange pipe (P) is bolted to the flange pipe (P). Each of the jig 100 is attached to the flange pipe P by fixing it to the hole P1.

이때 한 쌍의 제2고정부재(220)는 플랜지파이프(P)의 볼트공(P1)에 볼트로 체결되는 것이 바람직하다.At this time, it is preferable that the pair of second fixing members 220 are bolted to the bolt hole P1 of the flange pipe P.

이렇게 상기 플랜지파이프(P)에 취부된 상기 사각프레임(110)의 좌측프레임 주변에 수평계(300)를 결합한 후, 상기 수평계(300)를 통해 플랜지파이프(P)의 정렬 정도를 측정하면서, 플랜지파이프(P)를 시계방향으로 회전시키거나, 반시계방향으로 회전시켜, 상기 플랜지파이프(P)가 수평이 정렬시킨 후, 상기 플랜지파이프(P) 주변을 용접하여 상기 플랜지파이프(P)를 선각 홀에 설치한다.In this way, after coupling the leveler 300 around the left frame of the square frame 110 attached to the flange pipe P, while measuring the degree of alignment of the flange pipe P through the level meter 300, the flange pipe After (P) is rotated clockwise or counterclockwise to align the flange pipe (P) horizontally, the flange pipe (P) is welded around the flange pipe (P) to form a hull hole. To install.

여기서 상기 플랜지파이프(P)의 수평은 상기 플랜지파이프(P)의 사방으로 형성된 4개의 볼트공(P1) 중 세로선상으로 배열된 2개를 볼트공(P1)에 통해 상기 지그(100)가 취부되고 상기 플랜지파이프(P)의 정렬 정도를 가늠할 수 있는 척도가 된다. Here, the horizontal of the flange pipe (P) is the jig 100 is mounted through the bolt hole (P1) two of the four bolt holes (P1) formed in all directions of the flange pipe (P) arranged in a vertical line. It becomes a measure by which the degree of alignment of the flange pipe P can be determined.

또한, 본 고안의 일 실시 예에 따른 관통 플랜지파이프 설치용 지그(100)는 상기 제1고정부(120) 및 제2고정부(130)뿐만 아니라 가로 선상으로 제3고정부(150)를 더 형성하는데, 상기 제3고정부(150)는 상기 사각프레임(110) 중 하측프레임에서 가로 길이방향으로 형성되고, 플랜지파이프(P)의 볼트공(P1)에 고정된다.In addition, the jig 100 for installing a through flange pipe according to an embodiment of the present invention further forms a third fixing part 150 in a horizontal line as well as the first fixing part 120 and the second fixing part 130 However, the third fixing part 150 is formed in the horizontal length direction from the lower frame of the square frame 110 and is fixed to the bolt hole P1 of the flange pipe P.

상기 제3고정부(150)를 보다 상세하게 살펴보면, 상기 제3고정부(150)는 상기 하측프레임의 가로길이방향을 따라 형성된 제3가이드장공(151)과, 상기 제3가이드장공(151)을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프(P)의 볼트공(P1)에 체결되는 한 쌍의 제3고정부재(230)를 포함한다.Looking at the third fixing part 150 in more detail, the third fixing part 150 includes a third guide hole 151 formed along the horizontal length direction of the lower frame, and the third guide hole 151 It is provided to be selectively movable along the way, and includes a pair of third fixing member 230 fastened to the bolt hole (P1) of the flange pipe (P).

따라서 상기 제3고정부(150) 역시, 해당 선각 홀에 관통 플랜지파이프(P)를 설치할 시, 해당 선각 홀에 플랜지파이프(P)를 가결합한 후, 상기 지그(100)의 사각프레임(110) 중 상기 제3고정부(130)의 제3고정부재(230) 한 쌍을 상기 하측프레임의 가로길이방향을 따라 형성된 제3가이드장공(151)을 따라 이동시켜, 플랜지파이프(P)의 볼트공(P1)에 대응하는 위치에 위치하도록 조절한 후, 상기 플랜지파이프(P)의 볼트공(P1)에 대응하는 위치에 위치한 한 쌍의 제3고정부재(230)를 플랜지파이프(P)의 볼트공(P1)에 각각 고정하는 것으로 상기 지그(100)가 플랜지파이프(P)에 취부된다.Therefore, when the through flange pipe P is installed in the hull hole, the third fixing part 150 also temporarily couples the flange pipe P to the hull hole, and then the square frame 110 of the jig 100 Among them, a pair of the third fixing members 230 of the third fixing part 130 is moved along the third guide long hole 151 formed along the horizontal length direction of the lower frame, and the bolt hole of the flange pipe P After adjusting to be located at a position corresponding to (P1), a pair of third fixing members 230 located at a position corresponding to the bolt hole P1 of the flange pipe P are attached to the bolt of the flange pipe P. Each of the jig 100 is attached to the flange pipe P by fixing it to the hole P1.

이때 한 쌍의 제3고정부재(230)는 플랜지파이프(P)의 볼트공(P1)에 볼트로 체결되는 것이 바람직하다.At this time, it is preferable that the pair of third fixing members 230 are bolted to the bolt hole P1 of the flange pipe P.

이렇게 상기 플랜지파이프(P)에 취부된 상기 사각프레임(110)의 좌측프레임 주변에 수평계(300)를 결합한 후, 상기 수평계(300)를 통해 플랜지파이프(P)의 정렬 정도를 측정하면서, 플랜지파이프(P)를 시계방향으로 회전시키거나, 반시계방향으로 회전시켜, 상기 플랜지파이프(P)가 수평이 정렬시킨 후, 상기 플랜지파이프(P) 주변을 용접하여 상기 플랜지파이프(P)를 선각 홀에 설치한다.In this way, after coupling the leveler 300 around the left frame of the square frame 110 attached to the flange pipe P, while measuring the degree of alignment of the flange pipe P through the level meter 300, the flange pipe After (P) is rotated clockwise or counterclockwise to align the flange pipe (P) horizontally, the flange pipe (P) is welded around the flange pipe (P) to form a hull hole. To install.

여기서 상기 플랜지파이프(P)의 수평은 상기 플랜지파이프(P)의 사방으로 형성된 4개의 볼트공(P1) 중 가로선상으로 배열된 2개를 볼트공(P1)에 통해 상기 지그(100)가 취부되고 상기 플랜지파이프(P)의 정렬 정도를 가늠할 수 있는 척도가 된다. Here, the horizontal of the flange pipe (P) is the jig (100) is mounted through the bolt hole (P1) two of the four bolt holes (P1) formed in all directions of the flange pipe (P) arranged in a horizontal line. It becomes a measure by which the degree of alignment of the flange pipe P can be determined.

본 고안의 일 실시 예에 따른 상기 수평계(300)는 상기 사각프레임(110)의 상측프레임, 좌측프레임, 하측프레임 중 어느 한 측프레임의 주변에 결합하여, 정렬 정도를 측정한다.The leveler 300 according to an embodiment of the present invention is coupled to the periphery of any one of the upper frame, the left frame, and the lower frame of the rectangular frame 110 to measure the degree of alignment.

그리고 상기 사각프레임(110) 중 관통공(111)의 중앙에는 손잡이부(140)를 형성하는데, 상기 손잡이부(140)는 상기 사각프레임(110) 중 관통공(111)의 중앙에서 상, 하측프레임을 연결하여 작업자가 손으로 파지할 수 있도록 한다.And a handle portion 140 is formed in the center of the through hole 111 of the square frame 110, the handle portion 140 is the upper and lower sides of the center of the through hole 111 of the square frame 110 The frame is connected so that the operator can hold it by hand.

또한, 본 고안의 일 실시 예에 따른 상기 사각프레임(110)은 그 모서리들 각각의 배면에는 간격유지부재(160)를 구비하는데, 상기 간격유지부재(160)는 플랜지파이프(P)의 플랜지가 설치되는 선각 벽면과 일정 거리를 유지하도록 한다.In addition, the square frame 110 according to an embodiment of the present invention includes a gap maintaining member 160 on the rear surface of each of the corners, the gap maintaining member 160 is a flange of the flange pipe (P) Keep a certain distance from the hull wall to be installed.

이때 상기 간격유지부재(160)는 해당 길이별로 교체 가능하도록, 설계조건에 따라 달리 교체하여 사용 가능하도록 할 수 있다.At this time, the gap maintaining member 160 may be replaced according to a design condition so as to be replaceable for each corresponding length.

본 고안은 도면에 도시된 실시 예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시 예가 가능하다는 점을 이해할 것이다. 따라서 본 고안의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다.Although the present invention has been described with reference to the embodiments shown in the drawings, these are merely exemplary, and those of ordinary skill in the art will understand that various modifications and equivalent other embodiments are possible therefrom. Therefore, the true technical protection scope of the present invention should be determined by the technical spirit of the appended claims.

100: 관통 플랜지파이프 설치용 지그
110: 사각프레임
111: 사각형의 관통공
120: 제1고정부
121: 제1가이드장공
130: 제2고정부
131: 제2가이드장공
140: 손잡이부
150: 제3고정부
151: 제3가이드장공
160: 간격유지부재
210: 제1고정부재
220: 제2고정부재
230: 제3고정부재
300: 수평계
P: 플랜지파이프
P1: 볼트공
100: jig for installing through flange pipe
110: square frame
111: square through hole
120: the first fixed government
121: first guide chief
130: the second fixed government
131: 2nd guide chief
140: handle
150: the third fixed government
151: 3rd guide chief
160: gap maintaining member
210: first fixed government goods
220: second fixed government goods
230: The third fixed government goods
300: level
P: flange pipe
P1: bolt hole

Claims (6)

내부에 사각형의 관통공(111)이 형성된 사각프레임(110);
상기 사각프레임(110) 중 상측프레임에서 가로 길이방향으로 형성되고, 플랜지파이프(P)의 볼트공(P1)에 고정하는 제1고정부(120);
상기 사각프레임(110) 중 좌측프레임에서 세로 길이방향으로 형성되고, 플랜지파이프(P)의 볼트공(P1)에 고정하는 제2고정부(130);
상기 사각프레임(110) 중 관통공(111)의 중앙에서 상, 하측으로 형성된 손잡이부(140); 및
상기 사각프레임(110)의 상측프레임, 좌측프레임, 하측프레임 중 어느 한 측프레임의 주변에 결합하여, 정렬 정도를 측정하는 수평계(300)를 포함하는 관통 플랜지파이프 설치용 지그.
A rectangular frame 110 having a rectangular through hole 111 formed therein;
A first fixing part 120 formed in the upper frame of the square frame 110 in the transverse direction and fixed to the bolt hole P1 of the flange pipe P;
A second fixing part 130 formed in the left frame of the square frame 110 in the vertical and longitudinal direction and fixed to the bolt hole P1 of the flange pipe P;
A handle portion 140 formed upward and downward from the center of the through hole 111 of the square frame 110; And
A jig for installing a through-flange pipe including a leveler 300 for measuring the degree of alignment by being coupled to the periphery of any one of the upper frame, the left frame, and the lower frame of the square frame 110.
청구항 1에 있어서,
상기 제1고정부(120)는
상기 상측프레임의 가로길이방향을 따라 형성된 제1가이드장공(121)과;
상기 제1가이드장공(121)을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프(P)의 볼트공(P1)에 체결되는 한 쌍의 제1고정부재(210);를 포함하는 관통 플랜지파이프 설치용 지그.
The method according to claim 1,
The first fixing part 120 is
A first guide long hole 121 formed along the horizontal length direction of the upper frame;
A pair of first fixing members 210 provided to be selectively movable along the first guide long hole 121 and fastened to the bolt hole P1 of the flange pipe P; for installing a through flange pipe including Jig.
청구항 1에 있어서,
상기 제2고정부(130)는
상기 좌측프레임의 세로길이방향을 따라 형성된 제2가이드장공(131)과;
상기 제2가이드장공(131)을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프(P)의 볼트공(P1)에 체결되는 한 쌍의 제2고정부재(220);를 포함하는 관통 플랜지파이프 설치용 지그.
The method according to claim 1,
The second fixing part 130 is
A second guide long hole 131 formed along the longitudinal direction of the left frame;
For installation of a through flange pipe including a pair of second fixing members 220 provided to be selectively movable along the second guide hole 131 and fastened to the bolt hole P1 of the flange pipe P. Jig.
청구항 1에 있어서,
상기 사각프레임(110) 중 하측에서 가로 길이방향을 따라 이동 가능하게 형성되고, 플랜지파이프(P)의 볼트공(P1)에 고정하는 제3고정부(150);를 포함하는 관통 플랜지파이프 설치용 지그.
The method according to claim 1,
A through-flange pipe installation jig including; a third fixing part 150 formed to be movable from the lower side of the square frame 110 in the transverse longitudinal direction and fixed to the bolt hole P1 of the flange pipe P .
청구항 4에 있어서,
상기 제3고정부(150)는
상기 하측프레임의 가로길이방향을 따라 형성된 제3가이드장공(151)과;
상기 제3가이드장공(151)을 따라 선택적으로 이동 가능하게 구비되고, 플랜지파이프(P)의 볼트공(P1)에 체결되는 한 쌍의 제3고정부재(230);를 포함하는 관통 플랜지파이프 설치용 지그.
The method of claim 4,
The third fixing part 150 is
A third guide long hole 151 formed along the horizontal length direction of the lower frame;
For installation of a through flange pipe including a pair of third fixing members 230 provided to be selectively movable along the third guide hole 151 and fastened to the bolt hole P1 of the flange pipe P. Jig.
청구항 1에 있어서,
상기 사각프레임(110)은
그 모서리들의 배면에 구비되고, 플랜지파이프(P)의 플랜지가 설치되는 선각 벽면과 일정 거리를 유지하도록 하는 간격유지부재(160)를 포함하는 관통 플랜지파이프 설치용 지그.
The method according to claim 1,
The square frame 110 is
A jig for installing a through-flange pipe, which is provided on the rear surfaces of the corners, and includes a gap maintaining member 160 to maintain a predetermined distance from the hull wall on which the flange of the flange pipe P is installed.
KR2020200000093U 2020-01-08 2020-01-08 Jig for installation of through flanged pipe KR200492533Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020200000093U KR200492533Y1 (en) 2020-01-08 2020-01-08 Jig for installation of through flanged pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020200000093U KR200492533Y1 (en) 2020-01-08 2020-01-08 Jig for installation of through flanged pipe

Publications (1)

Publication Number Publication Date
KR200492533Y1 true KR200492533Y1 (en) 2020-11-02

Family

ID=73197533

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020200000093U KR200492533Y1 (en) 2020-01-08 2020-01-08 Jig for installation of through flanged pipe

Country Status (1)

Country Link
KR (1) KR200492533Y1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100054926A (en) * 2008-11-17 2010-05-26 현대중공업 주식회사 Apparatus for aligning flange bolt hole of pipe which penetrate internal partition of ship block
KR20130006055U (en) * 2012-04-10 2013-10-21 현대중공업 주식회사 Adjusting jig for hatch hole cover
KR20140005402U (en) * 2013-04-10 2014-10-20 현대중공업 주식회사 Alignment Device For Pipe Flange
CN204250308U (en) * 2014-10-30 2015-04-08 中船钢构工程股份有限公司 A kind of jacking apparatus of hatch cover

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100054926A (en) * 2008-11-17 2010-05-26 현대중공업 주식회사 Apparatus for aligning flange bolt hole of pipe which penetrate internal partition of ship block
KR20130006055U (en) * 2012-04-10 2013-10-21 현대중공업 주식회사 Adjusting jig for hatch hole cover
KR20140005402U (en) * 2013-04-10 2014-10-20 현대중공업 주식회사 Alignment Device For Pipe Flange
CN204250308U (en) * 2014-10-30 2015-04-08 中船钢构工程股份有限公司 A kind of jacking apparatus of hatch cover

Similar Documents

Publication Publication Date Title
US20160298344A1 (en) Assembling and dismantling-beforehand structural template system and construction method thereof
CN203270600U (en) Fixed support for installing embedded bolts of high-precision equipment
CN105383642A (en) Vertical guide rail mounting and welding method
CN104527922B (en) Accurate positioning method of anchor bolt hole of marine main engine
CN105672539A (en) Stone back bolt pendant and using method thereof
CN103418815B (en) Box steel beam column bolt hole group's axial location method
WO2019000752A1 (en) Method for installing foundation beams of cabin storage system
CN104805817B (en) Self-elevating ocean platform and immersible pump tower thereof
CN102937402B (en) A kind of parallelogram web member hole group's detection method
KR200492533Y1 (en) Jig for installation of through flanged pipe
KR101266700B1 (en) Apparatus for aligning flange bolt hole of pipe which penetrate internal partition of ship block
KR20140145405A (en) Pipe Alignment Assist Device With A Spirit Level
CN110617937B (en) Wind tunnel test device for synchronously testing static vehicles and bridge models
CN111139808B (en) Method for carrying cantilever beam of self-elevating drilling platform
KR0132561B1 (en) Method of installing ritting on a module frame
CN114735155B (en) Installation method of corner guide rail of container ship
CN114152172A (en) Adjustable jointed board inspection device and inspection method for ship construction stage
EP3475139B1 (en) Method of assembling a ceiling framework to a roof structure of a vehicle body of a rail vehicle
CN112900740A (en) Girder segment and method for manufacturing girder segment
CN113909823B (en) Method for machining upright column flange of quayside container crane
CN114799252B (en) Manufacturing method of folding arm gooseneck type shore bridge girder
CN113184132B (en) Method for additionally installing container guide rail on multipurpose ship
CN110330220B (en) Integrated online cutting platform for automobile glass production line
CN114750892B (en) Wired broadside water gauge investigation tool and method
CN211661425U (en) Plate workpiece welding and fixing tool

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
REGI Registration of establishment