KR200477823Y1 - Filler form for concrete building and connecting structure using the same - Google Patents

Filler form for concrete building and connecting structure using the same Download PDF

Info

Publication number
KR200477823Y1
KR200477823Y1 KR2020140007145U KR20140007145U KR200477823Y1 KR 200477823 Y1 KR200477823 Y1 KR 200477823Y1 KR 2020140007145 U KR2020140007145 U KR 2020140007145U KR 20140007145 U KR20140007145 U KR 20140007145U KR 200477823 Y1 KR200477823 Y1 KR 200477823Y1
Authority
KR
South Korea
Prior art keywords
filler foam
wall
filler
concrete
foam
Prior art date
Application number
KR2020140007145U
Other languages
Korean (ko)
Inventor
이범수
Original Assignee
서보산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서보산업 주식회사 filed Critical 서보산업 주식회사
Priority to KR2020140007145U priority Critical patent/KR200477823Y1/en
Application granted granted Critical
Publication of KR200477823Y1 publication Critical patent/KR200477823Y1/en

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a filler foam for construction of a concrete structure and to a formwork connection structure using the filler foam, and it is an object of the present invention to provide a filler foam for a concrete building construction, It is intended to construct concrete concrete structures (beams, girders, etc.) without detachment.
The filler foam for constructing a concrete structure according to the present invention has a smaller size than neighboring formworks and is interposed between neighboring formworks so as to cover the space of the formworks to pour concrete without leaking, And an inclined wedge portion formed in an inclined manner in a direction of being gathered toward the opposite side of the poured surface of the peripheral portion corresponding to the neighboring formwork among the peripheral portions of the poured surface and being wedge-connected to the formwork. The filler foam for constructing a concrete structure of the present invention comprises a bottom side paved surface (11) and a pair of wall side paved surfaces (12, 13) standing on both sides in the longitudinal direction of the bottom side paved surface, And gapped wedge parts (12a, 13a) formed on both sides in the width direction of the side wall of the wall and supported by the neighboring beam formers, the gait filler foam (10) being installed between the beam formers. The filler foam for constructing a concrete structure according to the present invention is characterized in that it has a bottom side piercing surface (21), a pair of first wall side piercing surfaces (22) standing on both sides in the longitudinal direction of the bottom side pierting surface, A second wall-side piercing surface (23) formed in a direction orthogonal to each end of the side piercing surface, a second wall-side piercing wall (23) formed at an end of the first and second wall side piercing surfaces, And an inclined wedge portion (24, 25, 26) supported by a beam form and a girder form, and is a filler foil (20) for an inserter installed in an inboard between a beam and a girder orthogonal to the beam.

Description

BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a filler foam for concrete construction,

The present invention relates to a filler mold filling an empty space between dies. More specifically, the filler foam is tied to a mold and a wedge form adjacent to each other by a concrete pouring pressure, The present invention relates to a filler foam for constructing a concrete structure for constructing concrete concrete structures (such as beams, girders, slabs, and inners to which structures are connected), and a mold connection structure using the same.

The concrete structure is constructed by installing the reinforcing steel reinforcement, the formwork and the fitting material (the reinforcing material, the long filling material, etc.) according to the design of the building, and curing the concrete in the formwork.

In recent years, the aesthetic improvement of concrete buildings has resulted in the construction of buildings with creative design, and also the structure of buildings in each building is changing.

Therefore, it is impossible to construct a building using an existing form, and in such a case, a filler foam having a smaller size than the existing form is installed between the existing forms. For example, a filler foam is installed between the beams, between the beam form and the slab form, between the beam and the girder, and between the slab form.

The filler foam is configured to fit the structure of the building, for example, when it is used for the construction of a beam, the filler foam is composed of a wall which is raised on both sides in the longitudinal direction of the bottom portion. Since the filler foam has no structure in connection with the neighboring formwork, the spacing is maintained through the long filling that maintains the spacing of the walls and is installed through a separate support.

The filler foam (finishing plate, slab plywood) is used for the construction of slabs in all of the patent documents 1 and 2 (registered patent application No. 10-0819833, registered utility model No. 20-0378317) Therefore, when the concrete is poured, it is separated from the neighboring mold by the putting pressure when the concrete is poured. In order to prevent this, a long filling material (space retaining material) or a reinforcing material is used There is a problem that installation and demolding are complicated and air is lengthened.

Patent No. 10-0819833 Registration Utility Model No. 20-0378317

The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a filler foam which is not detached from a neighboring mold by a putting pressure when a concrete is poured without providing a long filler in a filler foam provided in a space between the molds, The present invention aims to provide a filler foam for use in the construction of a concrete structure for constructing concrete structures (beams, girders, etc.) and a formwork connection structure using the same.

The filler foam for constructing a concrete structure according to the present invention has a smaller size than neighboring formworks and is interposed between neighboring formworks so as to cover the spaces of the formworks to prevent concrete from leaking. And an inclined wedge portion formed in an inclined manner in a direction of being gathered toward the opposite side of the poured surface of the peripheral portion corresponding to the neighboring formwork among the peripheral portions of the placement surface and being wedgedly coupled to the formwork .

The filler foam for constructing a concrete structure according to the present invention is characterized in that it is a gait filler foam comprising a bottom portion, a pair of wall portions, and an inclined wedge portion formed on the bottom portion and the wall portion.

The filler foam for constructing a concrete structure according to the present invention comprises a bottom portion, a first wall portion that is erected on both sides of the bottom portion and connects with the beam form, a second wall portion extending from the first wall portion at a predetermined angle and connected to the girder formwork And a sloped wedge portion formed on the bottom portion and the first and second wall portions and connected to the girder formwork in a wedge manner.

According to the inventive filler foam for constructing a concrete structure and the formwork connection structure using the filler foam, the filler foam is installed in a wedge form between the formwork, and is separated from the formwork only through the connection structure with the formwork, So that it is possible to reduce the number of working hours and shorten the air due to the use of long settlement.

1 is a perspective view of a filler foam for concrete building construction according to Embodiment 1 of the present invention;
Fig. 2 is a plan view of the installation state of a filler foam for concrete building construction according to Embodiment 1 of the present invention; Fig.
3 is a front view of the installation state of a filler foam for concrete building construction according to Embodiment 1 of the present invention.
4 is a perspective view of a filler foam for concrete building construction according to Embodiment 2 of the present invention.
Fig. 5 is a plan view of the installation state of a filler foam for concrete building construction according to Embodiment 2 of the present invention; Fig.
6 is a front view of the installation state of a filler foam for concrete building construction according to Embodiment 2 of the present invention.

≪ Example 1 >

As shown in Fig. 1, the filler foam 10 for concrete building construction according to the present embodiment has a pair of wall side walls 11 and 12 which are respectively formed on both sides in the longitudinal direction of the bottom side placing surface 11 and the bottom side placing surface 11 2 and 3) formed on the outside of the pouring surface of the filler foam body and formed adjacent to the pillar foam body, Shaped wedge portion.

The floor side paved surface 11 and the wall side paved surface 12 may each have a flat surface on which the concrete is laid, and of course, it may be irregular depending on the structure of the building.

The bottom side mounting surface 11 and the wall side mounting surface 12 may form a direct mounting surface or may be used with a separate mounting plate attached thereto.

The inclined wedge portions 11a, 12a, and 13a are inclined in the direction of collecting each other at both ends in the width direction of the opposite side of the concrete installation side of the bottom side installation surface 11 and the wall side installation side surface 12, And a structure having a predetermined length along the inclination at the bottom side placing surface 11 and the wall side placing side 12 is formed.

Although the wedge-shaped wedge portions 11a, 12a and 13a are shown as a pair extending from the bottom-side placement surface 11 and the wall-side placement surface 12 in the figure, the wedge-shaped wedge portions 11a, 12a and 13a ). ≪ / RTI >

The filler foam 10 having such a structure is made of aluminum and the like and is manufactured by a profile.

Grooves 11b, 12b, and 13b are formed on the form-facing surfaces of the wedge-shaped wedge portions 11a, 12a, and 13a. The protrusions formed on the molds 1 and 2 are coupled to the grooves 11b, 12b and 13b to increase the binding force with the molds 1 and 2.

It is preferable that the end portions of the dies 1 and 2 are formed with inclined support portions at the same angle as the inclined wedge portions 11a, 12a and 13a.

According to the present embodiment, when the molds 1 and 2 are used alone, the voids are formed between the molds 1 and 2 to prevent the concrete from being poured, the filler foam 10 of the present embodiment is molded into molds 1 and 2 ). The filler foam 10 can be installed at the end of one of the molds 1 and 2 between the molds 1 and 2 and is shown as an example between the molds 1 and 2 in the figure.

The molds 1 and 2 are mounted on the ground by means of a support so that the end portions of the molds 1 and 2 which are not adjacent to each other are set to coincide with the other molds (formwork for girders, wall molds, etc.). Therefore, a void space is formed between the molds 1 and 2.

When the filler foam 10 of the present embodiment is sandwiched between the molds 1 and 2, the inclined wedge portions 11a, 12a and 13a of the filler foam 10 are formed on the opposite faces of the molds 1 and 2 And are engaged with each other.

Even if the filler foam 10 is sandwiched between the molds 1 and 2, since the opposite faces of the molds 1 and 2 are spread outside the oblique wedge portions 11a, 12a and 13a, Are not released between the dies (1,2) due to the support of the dies (1,2).

When the concrete is placed in the molds 1 and 2, the concrete pouring pressure in the direction toward the outside is applied to the filler foam 10, and the filler foam 10 is subjected to a force that is caused to spread outward by the pouring pressure, (10) is kept in an installed state without being widened by the inclination of the inclined wedge portions (11a, 12a, 13a) or separated from the molds (1, 2).

When the molds (1,2) are demolded after the curing of the beams, the support base of the filler foam (10) is eliminated, so that the filler foam (10) is easily demoulded.

≪ Example 2 >

As shown in FIG. 4, the filler foam for concrete building construction according to the present embodiment has a pair of first wall-side putting portions 21a and 21b which are respectively installed on both sides of the bottom side placing surface 21 and the bottom side placing surface 21, A second wall side piercing surface 23 formed in a direction orthogonal to the end face of the first wall side piercing surface 22, a width direction of the bottom side piercing surface 21, Shaped wedge portions (24, 25) which are respectively formed at one side end (the end opposite to the brace mold and the girder mold) of the side fitting surfaces (22, 23) and supported by the neighboring brace mold (1) and the girder mold , 26, and is a filler foil 20 for an inserter which is installed in an in-door in which a beam and a girder (direction orthogonal to the beam) are connected.

The filler foams 20 of the bottom side placement surface 21, the first and second wall side placement surfaces 22, 23 and the inclined wedge portions 24, 25, 26 are integrally formed by a profile.

The first wall-side piercing surface 22 serves as a wall of the beam connected to the girder, and the second wall-side piercing surface 23 serves as a bottom wall of the beam. It is responsible for the wall of the girder connected to the beam.

The first and second wall-side facing surfaces 22 and 23 are formed at right angles to each other, and the reinforcing ribs 27 are preferably formed because the first and second wall-side facing surfaces 22 and 23 are deformed due to the concrete placing pressure on the side and girder side.

The reinforcing ribs 27 are connected at their ends to the first and second wall side piling surfaces 22 and 23 so as to be connected at right angles to each other so as to be opposed to the inners of the first and second wall side piling surfaces 22 and 23. [ And is formed in an out-of-corner shape to generate a compressive force against the pushed pressure applied from the beam and the girder.

6, a pair of inclined wedge portions 24 formed on both sides in the width direction of the bottom side placing surface 21 are provided on the upper portions of the bottom portions of the neighboring brace mold 1 and the girder mold 3, do.

5, the inclined wedge portion 25 formed in the vertical direction at the end of the first wall-side putting surface 22 is supported inside the wall portion of the neighboring bracket 1.

An inclined wedge portion (26) formed in the vertical direction at the end of the second wall side surface (23) is supported inside the wall portion of the adjacent girder formwork (3).

The inclined wedge portions 24, 25 and 26 according to the present embodiment are also formed with grooves on the surfaces facing the girder 1 and the girder 3 as in the first embodiment.

It is preferable that the beam forming die 1 and the girder forming die 3 are provided with inclined support portions at the same angle as the inclined wedge portions 24, 25 and 26 at the end portions corresponding to the filler foam 20.

The filler foam 20 according to the present embodiment is used for the construction of the inners where the beams and the mold are connected when the beams and the girders are jointly installed. After the beam form 1 and the girder form 3 are installed, (1) and the girder formwork (3).

In this process, the oblique wedge portions 24, 25, 26 are supported inside the beam form 1 and the girder form 3, respectively, and are not separated from the beam form 1 and the girder form 3.

When the concrete pouring pressure is applied to the filler foam 20 by the concrete, the beams and the girder are installed by pouring the concrete into the pouring die 1 and the girder pouring die 3 and by the respective slanted wedge portions 24, 25, The filler foam 20 is firmly bonded to the neighboring support 1 and the girder 3 so that the filler foam 20 maintains the installed state and therefore the long filler is not used for the filler foam 20 .

1,2,3: Formwork,
10: gait filler foam,
11: bottom side paved surface, 12,13: wall side paved surface
12a, 13a: an inclined wedge portion,
20: Filler foam for incinerator,
21: bottom side laid surface, 22: first wall side laid side
23: second wall-side laid surface, 24, 25, 26: inclined wedge portion

Claims (8)

The filler foam for construction of a concrete structure is made of a smaller size than neighboring molds and is interposed between neighboring molds to prevent the concrete from being leaked by blocking the spaces of the molds.
Wherein the filler foam for constructing a concrete structure is formed to be inclined in a direction to be gathered toward the opposite side of the pouring surface of the circumferential portion corresponding to the adjacent pouring out of the peripheral portions of the pouring surface, Wherein the wedge portion is formed of an inclined wedge.
The filler foam for constructing a concrete structure according to claim 1, wherein the filler foam for constructing a concrete structure comprises a pair of wall-side paved surfaces that are respectively set on the bottom-side paved surface and both longitudinal sides of the bottom- And a sloped wedge portion formed on both sides of the sloped wedge portion and supported by neighboring beam formers. The filler foam is installed between the beam formers. The filler foam according to claim 1, wherein the filler foam for constructing a concrete structure comprises a bottom side paved surface, a pair of first wall side paved surfaces each standing on both sides in the longitudinal direction of the bottom side paved surface, A second wall-side paved surface formed in a direction orthogonal to each of the end portions, and a second wall-side paved surface formed in an inclined manner in the width direction of the bottom-side paved surface and the end portions of the first and second wall- Wherein the filler foam is an inserting filler foam which is formed of an inclined wedge portion and is installed on an inboard between a beam and a girder orthogonal to the beam. The filler foam according to claim 3, wherein an out-corner reinforcing rib is provided between the first and second wall-side pouring surfaces, opposite to the first and second wall-side pouring surfaces. The filler foam according to claim 1, wherein the filler foam for constructing the concrete structure has one pouring surface formed in a straight plate shape so as to have no change in the overall width, a pair of inclined portions formed on both sides in the width direction of the pouring surface, Wherein the filler foam is a slab filler foam comprising a wedge portion. The filler foam according to any one of claims 2 to 5, wherein the filler foam for constructing the concrete structure is a structure formed directly or indirectly with the pouring surface, and the inclined wedge portion is integrally formed by being inclined at a predetermined angle Filler foam for construction of concrete structures. The filler foam according to any one of claims 2 to 5, wherein the inclined wedge portion has a groove formed on a surface facing a neighboring mold. A method of manufacturing a concrete structure, comprising the steps of: connecting at least one formwork for concrete casting of a concrete building with a filler foam for concrete building construction according to claim 1, wherein an inclined support is provided on the opposite face of the formwork corresponding to the inclined wedge part of the filler foam for constructing the concrete structure And the inclined wedge portion of the filler foam for constructing the concrete structure is supported on the inclined support portion of the formwork by inserting the filler foam for constructing the concrete structure from the inside of the formwork. Formwork connection structure using filler foam.
KR2020140007145U 2014-09-30 2014-09-30 Filler form for concrete building and connecting structure using the same KR200477823Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020140007145U KR200477823Y1 (en) 2014-09-30 2014-09-30 Filler form for concrete building and connecting structure using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020140007145U KR200477823Y1 (en) 2014-09-30 2014-09-30 Filler form for concrete building and connecting structure using the same

Publications (1)

Publication Number Publication Date
KR200477823Y1 true KR200477823Y1 (en) 2015-07-27

Family

ID=53872742

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020140007145U KR200477823Y1 (en) 2014-09-30 2014-09-30 Filler form for concrete building and connecting structure using the same

Country Status (1)

Country Link
KR (1) KR200477823Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180089806A (en) * 2017-02-01 2018-08-09 박한웅 Framework for beam bottom
KR102659396B1 (en) 2023-05-08 2024-04-19 양수열 Braket structure and formwork constructing method for making girder using thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200462814Y1 (en) * 2010-10-01 2012-10-02 (주)화인폼 Filler for concrete pouring

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200462814Y1 (en) * 2010-10-01 2012-10-02 (주)화인폼 Filler for concrete pouring

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180089806A (en) * 2017-02-01 2018-08-09 박한웅 Framework for beam bottom
KR101889644B1 (en) * 2017-02-01 2018-08-20 박한웅 Framework for beam bottom
KR102659396B1 (en) 2023-05-08 2024-04-19 양수열 Braket structure and formwork constructing method for making girder using thereof

Similar Documents

Publication Publication Date Title
CA2801735C (en) An apparatus and method for construction of structures utilizing insulated concrete forms
KR101314081B1 (en) Retaining wall and upeer structure connection method for rahmen structure
KR101457077B1 (en) Reformed concrete filled tube column structure
KR200481707Y1 (en) The outer wall for easy construction
KR101301081B1 (en) Wall structure and the construction method therefor
KR101422076B1 (en) Flat tie and method for constructing concrete forms using the same
KR101584070B1 (en) Loop steel bottom mounted precast bridge deck module
DK2630306T3 (en) Assemblable disposable FOR CONSTRUCTION OF MODULAR formwork FOR PRODUCTION OF CONCRETE FOUNDATION
CN104878924A (en) Stair step concrete pouring-molded template and stair cast-in-situ construction method
US8827235B1 (en) Concrete form for building foundation construction with form insert creating recessed sections
KR101638093B1 (en) Rahmen using hinge type pc wall and method for constructing the same
KR101668521B1 (en) A construction method of concrete
KR200477823Y1 (en) Filler form for concrete building and connecting structure using the same
KR101552226B1 (en) Structure of mounting form on the T-typed deckplate for the hollow core slab
KR101098998B1 (en) Recyclable hybrid type connecting device for steel beam to concrete wall and method thereof
KR101588115B1 (en) Prefab double wall using truss deck and manufacturing method thereof
KR200442878Y1 (en) Recyclable Formwork
EP3059350B1 (en) Formwork edge element and method for forming a foundation for a building
KR101440556B1 (en) Floor structure of modular building
KR101824021B1 (en) Structure of bottom of compost
KR101781492B1 (en) Wing Wall With Integrated Structural
KR101372410B1 (en) Slab construction for the block
KR101233120B1 (en) Foundation structure and construction method thereof
KR101187778B1 (en) Form
KR20140130808A (en) The outer wall for easy construction

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20190716

Year of fee payment: 5