KR200464104Y1 - Steel reinforcing bar insulator for concrete track - Google Patents

Steel reinforcing bar insulator for concrete track Download PDF

Info

Publication number
KR200464104Y1
KR200464104Y1 KR2020110004831U KR20110004831U KR200464104Y1 KR 200464104 Y1 KR200464104 Y1 KR 200464104Y1 KR 2020110004831 U KR2020110004831 U KR 2020110004831U KR 20110004831 U KR20110004831 U KR 20110004831U KR 200464104 Y1 KR200464104 Y1 KR 200464104Y1
Authority
KR
South Korea
Prior art keywords
cable
tie
concrete
reinforcing
body portion
Prior art date
Application number
KR2020110004831U
Other languages
Korean (ko)
Inventor
임채현
Original Assignee
임채현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임채현 filed Critical 임채현
Priority to KR2020110004831U priority Critical patent/KR200464104Y1/en
Application granted granted Critical
Publication of KR200464104Y1 publication Critical patent/KR200464104Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/20Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups of material other than metal or with only additional metal parts, e.g. concrete or plastics spacers with metal binding wires
    • E04C5/201Spacer blocks with embedded separate holding wire or clips
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/04Clamping or clipping connections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

본 고안은 콘크리트 도상용 철근 절연 간격재에 관한 것으로, 보다 상세하게는 상부면과 하부면에 상호 교차하는 방향으로 철근안착홈이 요입 형성된 육면체 형상의 몸체부와, 상기 철근안착홈에 안착된 철근을 동시에 감싸는 케이블부와, 상기 케이블부와 결합되는 타이부를 일체로 수지를 사출하여 성형함으로써 심플하면서도 별도의 추가 부재 없이 현장에서 철근을 고정하는 것이 가능하여 철근 고정작업에 소요되는 시간을 줄일 수 있는 콘크리트 도상용 철근 절연 간격재에 관한 것이다.
본 고안에 따른 콘크리트 도상용 철근 절연 간격재는, 콘크리트 도상 구간에서 상호 교차되는 철근의 절연성 확보를 위해 상기 철근을 상호 이격시켜 지지하는 콘크리트 도상용 철근 절연 간격재에 있어서, 상부면과 하부면에 각각 상호 교차하는 방향으로 상부철근안착홈과 하부철근안착홈이 요입 형성된 육면체 형상의 몸체부와; 상기 몸체부의 일측에서 외측방향으로 길게 연장 형성되되, 상기 상부철근안착홈 및 상기 하부철근안착홈에 각각 안착된 철근을 동시에 감싸는 것이 가능한 길이로 형성되고, 내측면에는 길이방향을 따라 소정의 간격으로 걸림돌기가 형성된 유연한 재질의 케이블부와; 상기 케이블부와 결합되도록 상기 몸체부의 일측에는 유연한 재질의 타이줄기가 외측방향으로 길게 연장 형성되고, 상기 타이줄기의 선단에는 상기 케이블부의 삽입이 가능한 헤드가 형성되며, 상기 헤드로 상기 케이블부가 삽입되는 경우 상기 걸림돌기와 마찰되며 상기 케이블부가 삽입되는 것은 가능하도록 하되 삽입방향과 반대방향으로 이탈되는 것은 방지하는 폴이 형성된 타이부를; 포함하되, 상기 몸체부와, 상기 케이블부와, 상기 타이부는 일체로 수지를 사출하여 성형되는 것을 특징으로 한다.
The present invention relates to a reinforcement spacer for concrete roofing, and more particularly, a body portion having a hexahedron shape in which reinforcing seat grooves are recessed in a direction intersecting the upper and lower surfaces, and reinforcing bars seated in the reinforcing seat grooves. By simultaneously injecting the resin part and the cable part surrounding the cable part and the tie part combined with the molded part, it is possible to fix the rebar in the field without additional additional members, which is simple but can reduce the time required for rebar fixing work The present invention relates to a reinforcement spacer for concrete roofing.
The reinforced concrete insulation spacer for concrete phase according to the present invention is a reinforced concrete insulation spacer for concrete reinforcement spaced apart from each other in order to secure the insulation of reinforcing bars mutually intersected in the concrete phase section, respectively, in the upper and lower surfaces, respectively. A hexahedron-shaped body portion in which upper reinforcing seating recesses and lower reinforcing seating recesses are recessed in mutually crossing directions; It is formed to extend in an outer direction from one side of the body portion, is formed to a length capable of simultaneously wrapping the reinforcing bars respectively seated in the upper rebar seating groove and the lower rebar seating groove, the inner surface at a predetermined interval along the longitudinal direction A cable part of a flexible material having a locking protrusion formed thereon; One side of the body portion to be coupled to the cable portion is formed with a long ties of flexible material extending in the outward direction, the head of the cable stem is formed at the front end of the tie stem is inserted, the cable portion is inserted into the head A tie portion in which a pawl is formed to be rubbed with the locking projection and to allow the cable portion to be inserted but to prevent the cable portion from being separated from the insertion direction; Including, the body portion, the cable portion, and the tie portion is characterized in that molded by injecting resin integrally.

Description

콘크리트 도상용 철근 절연 간격재{STEEL REINFORCING BAR INSULATOR FOR CONCRETE TRACK} Reinforced insulation spacer for concrete phases {STEEL REINFORCING BAR INSULATOR FOR CONCRETE TRACK}

본 고안은 콘크리트 도상용 철근 절연 간격재에 관한 것으로, 보다 상세하게는 상부면과 하부면에 상호 교차하는 방향으로 철근안착홈이 요입 형성된 육면체 형상의 몸체부와, 상기 철근안착홈에 안착된 철근을 동시에 감싸는 케이블부와, 상기 케이블부와 결합되는 타이부를 일체로 수지를 사출하여 성형함으로써 심플하면서도 별도의 추가 부재 없이 현장에서 철근을 고정하는 것이 가능하여 철근 고정작업에 소요되는 시간을 줄일 수 있는 콘크리트 도상용 철근 절연 간격재에 관한 것이다. The present invention relates to a reinforcement spacer for concrete roofing, and more particularly, a body portion having a hexahedron shape in which reinforcing seat grooves are recessed in a direction intersecting the upper and lower surfaces, and reinforcing bars seated in the reinforcing seat grooves. By simultaneously injecting the resin part and the cable part surrounding the cable part and the tie part combined with the molded part, it is possible to fix the rebar in the field without additional additional members, which is simple but can reduce the time required for rebar fixing work The present invention relates to a reinforcement spacer for concrete roofing.

콘크리트 도상 구간에는 강도의 유지를 위해 통상 철근이 상호 교차되도록 배근되는데 특히, 콘크리트 침목을 지지하는 도상 콘크리트는 유지관리의 편리성과 환경오염원의 차단을 위해 자갈 도상 대체용으로 현재 사용되고 있다.Reinforcement bars are usually arranged to intersect with each other in order to maintain strength in concrete concrete sections. Particularly, concrete for supporting concrete sleepers is currently used as a substitute for gravel beds for convenience of maintenance and blocking of environmental pollution sources.

상기 도상 콘크리트는 주행중인 열차의 차륜과 레일간의 마찰에 의하여 발생되는 철도궤도의 진동과 소음을 콘크리트 침목을 통해 전달받아 지반에 전가하고 있기 때문에, 진동에 견디기 위해 소정의 강도가 요구되고 있다.Since the in-concrete concrete receives vibration and noise of railroad tracks generated by friction between wheels and rails of a running train through the concrete sleepers and transfers the noise to the ground, a predetermined strength is required to withstand the vibration.

이러한 도상 콘크리트의 강도를 유지하고 콘크리트의 건조 수축에 의한 균열을 방지하기 위해 횡철근과 종철근이 상호 교차하는 형태로 도상 콘크리트내에 배근되고 있다.In order to maintain the strength of the concrete and prevent cracking due to dry shrinkage of the concrete, the transverse reinforcement and the longitudinal reinforcing bars are arranged in the concrete in the form of crosses.

한편, 레일 궤도상에 흐르는 전류 또는 자기장은 콘크리트 침목을 통하여 콘크리트 도상에 매입된 철근을 통해 흐를 수 있는 위험이 항시 상존하고 있다.On the other hand, there is always a risk that the current or magnetic field flowing on the rail track can flow through the reinforcing bars embedded in the concrete through the sleepers.

상기 콘크리트 도상을 통해 전류가 흐르게 되면, 철도의 신호체계에 간섭을 발생시켜 열차의 운행을 방해할 우려가 있을 뿐만 아니라, 상기 철근을 전극으로 한 전기분해 작용에 의해 전식현상이 발생하게 된다.When the current flows through the concrete phase, not only may interfere with the signal system of the railroad to interfere with the operation of the train, but also electrolysis occurs due to electrolysis using the reinforcing bars as electrodes.

따라서, 상기 도상 콘크리트를 구축할 때, 종철근과 횡철근이 항상 일정한 전기 절연저항으로 유지되도록 절연시공을 하거나 상기 종철근과 횡철근이 교차하는 부위에 절연재를 부가하여 절연되도록 도상 콘크리트 설계에 반영하고 있고, 이를 실현하기 위하여 도 1에 도시한 바와 같은 절연블록이 제안된 바 있다.Therefore, when constructing the concrete, it is reflected in the design of the concrete so that the longitudinal construction and the transverse reinforcement are always maintained with a constant electrical insulation resistance or the insulation is added to the site where the longitudinal and transverse rebars are intersected. In order to realize this, an insulating block as shown in FIG. 1 has been proposed.

상기 절연블록(2)은 플라스틱과 같은 절연소재로 제작되고, 종방향 및 횡방향 철근(1a, 1b)이 구비되는 철근안착부가 각각 형성되고, 절연소재로 된 케이블타이(3)를 이용하여 고정된다.The insulating block 2 is made of an insulating material such as plastic, and each of the rebar seats having longitudinal and transverse rebars 1a and 1b are formed, and fixed using a cable tie 3 made of an insulating material. do.

하지만, 상기 도 1에 도시한 종래기술은 철근교차점마다 상기 절연블록(2)과 별도로 상기 케이블타이(3)를 구비하여 상기 절연블록(2)과 상기 철근(1a, 1b)를 일체로 감싸도록 묶은 후 고정하여야 함으로써 작업시간이 길어지고, 정확한 고정이 어려워 구조적 안전성을 저해하며, 개통 후 열차 운행 시의 높은 동하중 및 진동에 의해 내구성 및 사용수명이 낮아지는 문제점이 있었다.However, the prior art illustrated in FIG. 1 includes the cable tie 3 separately from the insulating block 2 at each rebar intersection to integrally surround the insulating block 2 and the reinforcing bars 1a and 1b. By fixing after binding, the working time is long, accurate fixing is difficult, and structural safety is hindered, and durability and service life are lowered due to high dynamic load and vibration during train operation after opening.

본 고안은 상기와 같은 종래기술의 문제점을 해결하기 위하여 안출된 것으로, 본 고안의 목적은 상부면과 하부면에 상호 교차하는 방향으로 철근안착홈이 요입 형성된 육면체 형상의 몸체부와, 상기 철근안착홈에 안착된 철근을 동시에 감싸는 케이블부와, 상기 케이블부와 결합되는 타이부를 일체로 수지를 사출하여 성형함으로써 심플하면서도 별도의 추가 부재 없이 현장에서 철근을 고정하는 것이 가능하여 철근 고정작업에 소요되는 시간을 줄일 수 있는 콘크리트 도상용 철근 절연 간격재를 제공하는 데에 있다.The present invention is devised to solve the problems of the prior art as described above, an object of the present invention is a body portion of the hexahedral shape in which the rebar seating grooves are recessed in the direction intersecting the upper and lower surfaces, and the rebar seating By reinforcing the cable part and the tie part combined with the cable part at the same time by molding the resin integrally in the groove, it is possible to fix the rebar in the field without additional additional members, which is required for fixing the rebar. It is to provide a reinforcement spacer for concrete phase which can save time.

상기와 같은 목적을 달성하고자 본 고안에 따른 콘크리트 도상용 철근 절연 간격재는, 콘크리트 도상 구간에서 상호 교차되는 철근의 절연성 확보를 위해 상기 철근을 상호 이격시켜 지지하는 콘크리트 도상용 철근 절연 간격재에 있어서, 상부면과 하부면에 각각 상호 교차하는 방향으로 상부철근안착홈과 하부철근안착홈이 요입 형성된 육면체 형상의 몸체부와; 상기 몸체부의 일측에서 외측방향으로 길게 연장 형성되되, 상기 상부철근안착홈 및 상기 하부철근안착홈에 각각 안착된 철근을 동시에 감싸는 것이 가능한 길이로 형성되고, 내측면에는 길이방향을 따라 소정의 간격으로 걸림돌기가 형성된 유연한 재질의 케이블부와; 상기 케이블부와 결합되도록 상기 몸체부의 일측에는 유연한 재질의 타이줄기가 외측방향으로 길게 연장 형성되고, 상기 타이줄기의 선단에는 상기 케이블부의 삽입이 가능한 헤드가 형성되며, 상기 헤드로 상기 케이블부가 삽입되는 경우 상기 걸림돌기와 마찰되며 상기 케이블부가 삽입되는 것은 가능하도록 하되 삽입방향과 반대방향으로 이탈되는 것은 방지하는 폴이 형성된 타이부를; 포함하되, 상기 몸체부와, 상기 케이블부와, 상기 타이부는 일체로 수지를 사출하여 성형되는 것을 특징으로 한다.In order to achieve the above object, the concrete insulation reinforcement spacer according to the present invention, in the concrete insulation reinforcement spacer for supporting the reinforcement spaced apart from each other in order to ensure the insulation of the reinforcing bars mutually in the concrete phase section, A hexahedron-shaped body portion in which upper reinforcing seating recesses and lower reinforcing seating recesses are recessed in directions intersecting the upper and lower surfaces, respectively; It is formed to extend in an outer direction from one side of the body portion, is formed to a length capable of simultaneously wrapping the reinforcing bars respectively seated in the upper rebar seating groove and the lower rebar seating groove, the inner surface at a predetermined interval along the longitudinal direction A cable part of a flexible material having a locking protrusion formed thereon; One side of the body portion to be coupled to the cable portion is formed with a long ties of flexible material extending in the outward direction, the head of the cable stem is formed at the front end of the tie stem is inserted, the cable portion is inserted into the head A tie portion in which a pawl is formed to be rubbed with the locking projection and to allow the cable portion to be inserted but to prevent the cable portion from being separated from the insertion direction; Including, the body portion, the cable portion, and the tie portion is characterized in that molded by injecting resin integrally.

또한, 본 고안에 따른 콘크리트 도상용 철근 절연 간격재는, 상기 케이블부와 상기 타이부는 상호 교차하는 방향으로 형성되도록 상기 몸체부의 상부면과 하부면에서 각각 상기 상부철근안착홈 및 상기 하부철근안착홈의 길이방향과 평행한 일측 모서리에 형성되고, 상기 타이부는, 상기 케이블부와 결합되는 경우 상기 헤드의 위치가 상기 하부철근안착홈에 안착된 철근의 중앙부를 넘어서지 않도록 상기 타이줄기의 길이가 형성되는 것을 특징으로 한다. In addition, the reinforced concrete insulation spacer for the concrete phase according to the present invention, the upper portion and the lower surface of the upper reinforcement seating groove and the lower reinforcing seating grooves on the upper surface and the lower surface of the body portion so as to be formed in the direction cross each other Is formed at one side edge parallel to the longitudinal direction, when the tie portion is coupled to the cable portion, the length of the tie stem is formed so that the position of the head does not exceed the center of the reinforcing bar seated in the lower reinforcing groove It features.

상기와 같은 구성에 의하여 본 고안에 따른 콘크리트 도상용 철근 절연 간격재는 수지를 사출하여 몸체부와, 케이블부와, 타이부가 일체로 성형함으로써 별도의 고정부재 없이 현장에서 철근을 고정하는 것이 가능하여 철근 고정작업에 소요되는 시간을 줄일 수 있음은 물론, 일체로 형성되어 철근을 확고하게 고정함으로써 구조적 안정성을 담보할 수 있는 장점이 있다.Reinforcement spacer for concrete phase according to the present invention by the configuration as described above is molded into the body portion, the cable portion, the tie portion integrally by injecting the resin, it is possible to fix the rebar in the field without a separate fixing member In addition to reducing the time required for the fixing operation, it is formed integrally and has the advantage of ensuring structural stability by firmly fixing the rebar.

도 1은 종래기술에 따른 콘크리트 도상용 철근 절연 간격재의 사용 상태도
도 2는 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재의 사시도
도 3은 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재의 사용 상태도
도 4는 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재의 측면도
도 5는 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재의 평면도
1 is a state diagram used in the concrete insulation reinforcement spacer according to the prior art
Figure 2 is a perspective view of a reinforced concrete insulation spacer for concrete phase according to an embodiment of the present invention
3 is a state diagram using the concrete insulation reinforcement spacer according to an embodiment of the present invention
Figure 4 is a side view of the reinforced concrete insulation spacer for concrete phase according to an embodiment of the present invention
5 is a plan view of a reinforced concrete insulating spacer for concrete phase according to an embodiment of the present invention

이하에서는 도면에 도시된 실시예를 참조하여 본 고안에 따른 콘크리트 도상용 철근 절연 간격재를 보다 상세하게 설명하기로 한다.Hereinafter, with reference to the embodiment shown in the drawings will be described in detail the concrete insulation reinforcement spacer according to the present invention.

도 2는 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재의 사시도이고, 도 3은 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재의 사용 상태도이며, 도 4는 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재의 측면도이고, 도 5는 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재의 평면도이다.2 is a perspective view of the reinforced concrete insulation spacer for concrete in accordance with an embodiment of the present invention, Figure 3 is a state diagram of the use of reinforced concrete insulation spacer for concrete in accordance with an embodiment of the present invention, Figure 4 is one of the present invention 5 is a side view of the reinforced concrete insulation spacer for concrete according to an embodiment, and FIG. 5 is a plan view of the reinforced insulation spacer for concrete according to an embodiment of the present invention.

도면을 살펴보면 본 고안의 일실시예에 따른 콘크리트 도상용 철근 절연 간격재는 몸체부(10)와, 케이블부(20)와, 타이부(30)를 포함하여 구성된다.Looking at the drawings is a reinforced concrete insulation spacer for concrete according to an embodiment of the present invention is configured to include a body portion 10, a cable portion 20, and a tie portion (30).

상기 몸체부(10)는 상호 교차되는 횡방향의 철근(1a)과 종방향의 철근(1b)이 상호 이격되도록 하는 스페이서 역할을 구성으로 육면체 형상으로 형성되어 상부면과 하부면에 각각 상호 교차하는 방향으로 상부철근안착홈(11a)과 하부철근안착홈(11b)이 요입 형성되어 있다.The body portion 10 is formed in a hexahedron shape to form a spacer to allow the rebars 1a and the rebars 1b in the longitudinal direction to cross each other to be formed to be hexahedral to cross each other on the upper and lower surfaces, respectively. The upper reinforcing seating recess 11a and the lower reinforcing seating recess 11b are recessed in the direction.

상기 케이블부(20)는 절곡되거나 및 비틀어지는 것이 가능하도록 유연한 재질로 이루어져 상기 몸체부(10)의 일측에 형성되는데, 본 발명의 일실시예에서는 상기 몸체부(10)의 상부면 상기 상부철근안착홈(11a)의 길이방향과 평행한 일측 모서리에서 외측방향으로 길게 연장 형성되고, 상기 상부철근안착홈(11a) 및 상기 하부철근안착홈(11b)에 각각 안착된 철근(1a, 1b)을 동시에 감싸는 것이 가능한 길이로 형성되며, 내측면에는 길이방향을 따라 소정의 간격으로 걸림돌기(21)가 형성된다.The cable portion 20 is made of a flexible material to be bent and twisted is formed on one side of the body portion 10, in one embodiment of the present invention the upper surface of the body portion 10 the upper reinforcement Reinforcing bars (1a, 1b) formed to extend in the outer direction in one side edge parallel to the longitudinal direction of the seating groove (11a), respectively seated in the upper reinforcing seating groove (11a) and the lower reinforcing seating groove (11b) At the same time it is formed to a length that can be wrapped, the inner side is formed with a locking projection 21 at a predetermined interval along the longitudinal direction.

상기 타이부(30)는 상기 케이블부(20)와 결합되도록 상기 몸체부(10)의 일측에 형성되는데, 본 발명의 일실시예에서는 상기 몸체부(10)의 하부면 상기 하부철근안착홈(11b)의 길이방향과 평행한 일측 모서리에 유연한 재질의 타이줄기(31)가 외측방향으로 길게 연장 형성되고, 상기 타이줄기(31)의 선단에는 상기 케이블부(20)의 삽입이 가능한 헤드(32)가 형성되며, 상기 헤드(32)로 상기 케이블부(20)가 삽입되는 경우 상기 걸림돌기(21)와 마찰되며 상기 케이블부(20)가 삽입되는 것은 가능하도록 하되 삽입방향과 반대방향으로 이탈되는 것은 방지하는 폴(33)이 형성되어 있다.The tie portion 30 is formed on one side of the body portion 10 to be coupled to the cable portion 20, in the embodiment of the present invention the lower surface of the lower portion of the body portion 10 seating recess ( A tie stem 31 of a flexible material is formed to extend in an outer direction at one side edge parallel to the longitudinal direction of 11b), and the head 32 capable of inserting the cable part 20 at the tip of the tie stem 31. ) Is formed, and when the cable part 20 is inserted into the head 32, it is possible to be rubbed with the locking projection 21 and the cable part 20 can be inserted, but is separated in the opposite direction to the insertion direction. The pole 33 which prevents it from becoming is formed.

본 고안의 일실시예에서는 상기 케이블부(20)와 상기 타이부(30)는 상호 교차하는 방향으로 형성되는데, 도 3에 도시된 바와 같이 상기 케이블부(20)가 절곡됨과 동시에 비틀리며 상기 철근(1a, 1b)을 감싸고, 상기 케이블부(20)가 상기 타이부(30)의 헤드(32)에 삽입되며 고정되는 것이다.In one embodiment of the present invention, the cable portion 20 and the tie portion 30 is formed in the direction crossing each other, as shown in Figure 3 the cable portion 20 is bent and twisted at the same time as the reinforcement It surrounds (1a, 1b), the cable portion 20 is inserted into the head 32 of the tie portion 30 and is fixed.

한편, 상기 타이부(30)는 상기 케이블부(20)와 결합되는 경우 상기 헤드(32)의 위치가 상기 하부철근안착홈(11b)에 안착된 철근(1b)의 중앙부를 넘어서지 않도록 상기 타이줄기(31)의 길이가 형성되는데, 상기와 같은 위치관계로 인하여 상기 케이블부(20)를 상기 타이부(30)의 헤드(32)에 삽입시킨 후 상기 철근(1a, 1b)을 조이기 위해 상기 케이블부(20)를 잡아당기는 경우 상기 헤드(32)가 상기 철근(1b)에 밀착되며 보다 현장에서 원터치로 확고하게 조이는 것이 가능하게 되는 것이다.On the other hand, the tie portion 30 is the tie stem so that the position of the head 32 when coupled with the cable portion 20 does not exceed the central portion of the reinforcing bar (1b) seated in the lower rebar seating groove (11b) A length of 31 is formed, and due to the positional relationship as described above, the cable part 20 is inserted into the head 32 of the tie part 30 and then the cable is tightened to tighten the reinforcing bars 1a and 1b. When pulling the part 20, the head 32 is in close contact with the reinforcing bar (1b), it is possible to be firmly tightened with one-touch in the field.

또한, 도 5의 평면도에서 실선으로 도시된 바와 같이 상기 케이블부(20)와 상기 타이부(30)가 상기 몸체부(10)와 직교하는 방향으로 형성되도록 구성할 수도 있고, 도 5의 평면도에서 점선으로 도시된 바와 같이 상기 철근(1a, 1b)을 감싸기 위해 상기 케이블부(20)와 상기 타이부(30)가 비틀리는 정도를 고려하여 상기 몸체부(10)와 소정의 경사각을 이루도록 형성할 수도 있다 할 것이다.In addition, the cable portion 20 and the tie portion 30 may be configured to be formed in a direction orthogonal to the body portion 10, as shown by the solid line in the top view of FIG. As shown by the dotted line to form the predetermined angle of inclination with the body portion 10 in consideration of the degree of twisting the cable portion 20 and the tie portion 30 to surround the reinforcing bars (1a, 1b). You may have to.

나아가, 도면에서는 상기 케이블부(20)와 상기 타이부(30)가 상기 몸체부(10)의 중앙 부근에 형성되도록 도시하였으나, 상기 케이블부(20)와 상기 타이부(30)가 비틀리는 정도를 고려하여 상기 몸체부(10)의 일측에 치우치도록 형성할 수도 있다 할 것이다.Furthermore, in the drawing, the cable portion 20 and the tie portion 30 are shown to be formed near the center of the body portion 10, but the degree of twisting of the cable portion 20 and the tie portion 30 It may be formed to be biased to one side of the body portion 10 in consideration of.

앞에서 설명되고 도면에 도시된 콘크리트 도상용 철근 절연 간격재는 본 고안을 실시하기 위한 하나의 실시예에 불과하며, 본 고안의 기술적 사상을 한정하는 것으로 해석되어서는 안된다. 본 고안의 보호범위는 이하의 실용신안등록청구범위에 기재된 사항에 의해서만 정하여지며, 본 고안의 요지를 벗어남이 없이 개량 및 변경된 실시예는 본 고안이 속하는 기술분야에서 통상의 지식을 가진 자에게 자명한 것인 한 본 고안의 보호범위에 속한다고 할 것이다.The reinforced insulating spacer for concrete drawing described above and shown in the drawings is only one embodiment for carrying out the present invention, and should not be construed as limiting the technical idea of the present invention. The scope of protection of the present invention is determined only by the matters set forth in the claims of utility model registration below, and embodiments modified or modified without departing from the gist of the present invention are not limited to those of ordinary skill in the art to which the present invention belongs. It is within the scope of protection of this invention.

1a, 1b 철근
10 몸체부
11 상부철근안착홈
12 하부철근안착홈
20 케이블부
21 걸림돌기
30 타이부
31 타이줄기
32 헤드
33 폴
1a, 1b rebar
10 Body
11 Reinforcing Bar
12 Lower Reinforcing Bar
20 cable section
21 Jamming
30 Thais
31 Tie
32 head
33 pole

Claims (2)

콘크리트 도상 구간에서 상호 교차되는 철근의 절연성 확보를 위해 상기 철근을 상호 이격시켜 지지하는 콘크리트 도상용 철근 절연 간격재에 있어서,
상부면과 하부면에 각각 상호 교차하는 방향으로 상부철근안착홈과 하부철근안착홈이 요입 형성된 육면체 형상의 몸체부와;
상기 몸체부의 일측에서 외측방향으로 길게 연장 형성되되, 상기 상부철근안착홈 및 상기 하부철근안착홈에 각각 안착된 철근을 동시에 감싸는 것이 가능한 길이로 형성되고, 내측면에는 길이방향을 따라 소정의 간격으로 걸림돌기가 형성된 유연한 재질의 케이블부와;
상기 케이블부와 결합되도록 상기 몸체부의 일측에는 유연한 재질의 타이줄기가 외측방향으로 길게 연장 형성되고, 상기 타이줄기의 선단에는 상기 케이블부의 삽입이 가능한 헤드가 형성되며, 상기 헤드로 상기 케이블부가 삽입되는 경우 상기 걸림돌기와 마찰되며 상기 케이블부가 삽입되는 것은 가능하도록 하되 삽입방향과 반대방향으로 이탈되는 것은 방지하는 폴이 형성된 타이부를; 포함하되,
상기 몸체부와, 상기 케이블부와, 상기 타이부는 일체로 수지를 사출하여 성형되는 것을 특징으로 하는 콘크리트 도상용 철근 절연 간격재.
In the concrete insulation reinforcement spacer for supporting the reinforcement to be spaced apart from each other in order to ensure the insulation of the reinforcing bars cross each other in the concrete phase section,
A hexahedron-shaped body portion in which upper reinforcing seating recesses and lower reinforcing seating recesses are recessed in directions intersecting the upper and lower surfaces, respectively;
It is formed to extend in an outer direction from one side of the body portion, is formed to a length capable of simultaneously wrapping the reinforcing bars respectively seated in the upper rebar seating groove and the lower rebar seating groove, the inner surface at a predetermined interval along the longitudinal direction A cable part of a flexible material having a locking protrusion formed thereon;
One side of the body portion to be coupled to the cable portion is formed with a long ties of flexible material extending in the outward direction, the head of the cable stem is formed at the front end of the tie stem is inserted, the cable portion is inserted into the head A tie portion in which a pawl is formed to be rubbed with the locking projection and to allow the cable portion to be inserted but to prevent the cable portion from being separated from the insertion direction; Including,
The body portion, the cable portion, and the tie portion is reinforced concrete insulation material for the concrete phase, characterized in that molded by injecting resin integrally.
제1항에 있어서,
상기 케이블부와 상기 타이부는 상호 교차하는 방향으로 형성되도록 상기 몸체부의 상부면과 하부면에서 각각 상기 상부철근안착홈 및 상기 하부철근안착홈의 길이방향과 평행한 일측 모서리에 형성되고,
상기 타이부는, 상기 케이블부와 결합되는 경우 상기 헤드의 위치가 상기 하부철근안착홈에 안착된 철근의 중앙부를 넘어서지 않도록 상기 타이줄기의 길이가 형성되는 것을 특징으로 하는 콘크리트 도상용 철근 절연 간격재.
The method of claim 1,
The cable part and the tie part are formed at one side edge parallel to the longitudinal direction of the upper reinforcing seating groove and the lower reinforcing seating groove, respectively, on the upper surface and the lower surface of the body portion so as to be formed in the direction crossing each other,
When the tie portion is coupled with the cable portion, the length of the tie stem is characterized in that the length of the tie stem is formed so that the position of the head does not exceed the center portion of the reinforcing bar seated in the lower rebar seating groove.
KR2020110004831U 2011-06-01 2011-06-01 Steel reinforcing bar insulator for concrete track KR200464104Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020110004831U KR200464104Y1 (en) 2011-06-01 2011-06-01 Steel reinforcing bar insulator for concrete track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020110004831U KR200464104Y1 (en) 2011-06-01 2011-06-01 Steel reinforcing bar insulator for concrete track

Publications (1)

Publication Number Publication Date
KR200464104Y1 true KR200464104Y1 (en) 2012-12-11

Family

ID=53676380

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020110004831U KR200464104Y1 (en) 2011-06-01 2011-06-01 Steel reinforcing bar insulator for concrete track

Country Status (1)

Country Link
KR (1) KR200464104Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016153257A1 (en) * 2015-03-23 2016-09-29 지엘기술주식회사 Hoop fixing member, one-touch coupling hoop, and hoop fixing structure for reinforced concrete member

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10115048A (en) 1996-10-11 1998-05-06 Tokai Shiiranto Kogyo Kk Reinforcing bar connector

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10115048A (en) 1996-10-11 1998-05-06 Tokai Shiiranto Kogyo Kk Reinforcing bar connector

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016153257A1 (en) * 2015-03-23 2016-09-29 지엘기술주식회사 Hoop fixing member, one-touch coupling hoop, and hoop fixing structure for reinforced concrete member

Similar Documents

Publication Publication Date Title
KR20140028048A (en) Rail-fastening system
JP2014005604A (en) Restraining structure for track slab, restraining tool and method for forming restraining structure of track slab
KR200464104Y1 (en) Steel reinforcing bar insulator for concrete track
US20130075486A1 (en) Rail sleeper
KR101200935B1 (en) Steel reinforcing bar insulator for concrete track
KR101266111B1 (en) Sleeper having elastic member shear fixing apparatus for asphalt roadbed, and constructing method for the same
KR200450314Y1 (en) Rebar Insulation Material for Concrete
US3515347A (en) Rail fastenings
RU2414557C1 (en) Insulator for reinforced concrete railway sleepers (versions)
EA200602075A1 (en) REINFORCED CONCRETE CROSS
KR101809820B1 (en) insulation apparatus for iron reinforcing rods of concrete for railroad
KR102397976B1 (en) Insulated fasteners for rebars used in fixed tracks for railways
CN204803750U (en) Waterproof type bridge expansion joint
KR101673957B1 (en) Steel-Concrete Composite Sleeper and Railway Ballasted Track using such Composite Sleeper
KR100512696B1 (en) Insulating spacer used in concrete for railroad
CN203684004U (en) Limiting device of trapezoid sleeper
KR101415360B1 (en) Insulation and fixing device of steel for fixed tracks
KR102268499B1 (en) Concrete slab track for preventing voltage drop phenomenon railway of track circuit
KR200406622Y1 (en) insulator to use in concrete for railroad
KR20130041458A (en) Wangja type tie for railroad
KR200342448Y1 (en) Improvement In Device For Fixing Rail On Concrete Tie Bar
KR20140013493A (en) A spacer for reinforcing rod
RU164035U1 (en) RAILWAY REINFORCED CONCRETE STRESSED
KR200460029Y1 (en) insulation apparatus for iron reinforcing rods of concrete for railroad
KR20020064623A (en) R.C Railroad Tie Assembly

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20160219

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170105

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20171219

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee