KR200459446Y1 - Improvement assembly type pipe supporting tool - Google Patents
Improvement assembly type pipe supporting tool Download PDFInfo
- Publication number
- KR200459446Y1 KR200459446Y1 KR2020090015060U KR20090015060U KR200459446Y1 KR 200459446 Y1 KR200459446 Y1 KR 200459446Y1 KR 2020090015060 U KR2020090015060 U KR 2020090015060U KR 20090015060 U KR20090015060 U KR 20090015060U KR 200459446 Y1 KR200459446 Y1 KR 200459446Y1
- Authority
- KR
- South Korea
- Prior art keywords
- insert plate
- vertical
- vertical frame
- bracket
- frame
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/22—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
- F16L3/223—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
Abstract
본 고안의 목적은 천정면에 매설되는 인서트 플레이트의 하부측에 상기 수직프레임이 연결되는 연결브라켓을 용접작업에 의해 일체로 형성하여 구성함으로써, 작업현장에서의 작업효율성 향상을 기대할 수 있고, 보관 및 운반이 용이하도록 할 뿐만 아니라, 상기 연결브라켓에 수직프레임이 결합되되 수직프레임의 위치를 가변시킬 수 있도록 2개의 체결면을 형성함으로써, 서로 대응되게 설치되는 2개의 수직프레임의 설치가 용이하고 2개의 수직프레임의 간격을 필요에 따라 가변시켜 설치할 수 있도록 한 개량 배관지지가대를 제공하는 데 있다.An object of the present invention is to form a connection bracket which is connected to the vertical frame to the lower side of the insert plate embedded in the ceiling surface by integrally formed by welding, thereby improving the work efficiency in the work site, storage and In addition to making it easy to carry, the vertical bracket is coupled to the connecting bracket, but by forming two fastening surfaces to change the position of the vertical frame, it is easy to install two vertical frames installed correspondingly It is to provide an improved piping support base that can be installed by varying the vertical frame spacing as needed.
상기 목적을 달성하기 위하여 본 고안은 콘크리트 타설에 의해 형성된 천정면(11)에 매설되는 인서트 플레이트(10)와, 상기 인서트 플레이트(10)의 하부측에 위치되는 연결브라켓(20)과, 상기 연결브라켓(20)의 내측에 상부가 인입되어 볼트(B)와 너트(N)에 의해 체결되어 연결되는 2개의 수직프레임(30)(30)과, 상기 2개의 수직프레임(30)(30)의 하부 양측에 양측단이 각각 연결되어 볼트(B)와 너트(N)에 의해 체결되는 수평프레임(40)으로 구성되는 배관지지가대에 있어서, 상기 연결브라켓(20)은, 상기 인서트 플레이트(10)의 하면에 상부가 밀착되어 용접작업에 의해 형성되는 용착부(21)에 의해 용착되어 상기 인서트 플레이트(10)와 일체로 구성되고, 상기 수직프레임(30)의 상부가 내측으로 인입되어 체결될 때 상기 수직프레임(30)의 위치가 가변되도록 2개의 체결면(22)(23)이 형성되며, 상기 2개의 체결면(22)(23)에는 상기 수직프레임(30)의 결합공(31)에 대응되는 체결공(24)(25)이 각각 통공되어 있는 것을 특징으로 한다.In order to achieve the above object, the present invention includes an insert plate 10 embedded in a ceiling surface 11 formed by concrete pouring, a connection bracket 20 located at a lower side of the insert plate 10, and the connection. An upper portion of the bracket 20 is inserted into the upper portion of the two vertical frames 30 and 30 which are fastened and connected by the bolt B and the nut N, and the two vertical frames 30 and 30 In the pipe support frame consisting of a horizontal frame 40 is connected to both ends of the lower both sides are fastened by a bolt (B) and the nut (N), the connection bracket 20, the insert plate 10 When the upper part is in close contact with the upper surface is welded by the welding portion 21 is formed by the welding operation is composed integrally with the insert plate 10, when the upper part of the vertical frame 30 is drawn in and fastened to the inside Two fastening surfaces 2 so that the position of the vertical frame 30 is variable. 2) and 23 are formed, and the two fastening surfaces 22 and 23 are provided with fastening holes 24 and 25 corresponding to the coupling holes 31 of the vertical frame 30, respectively. It features.
배관지지가대, 배관지지장치, 배관지지클램프 Piping Support Base, Piping Support Device, Piping Support Clamp
Description
본 고안은 배관지지가대에 관한 것으로서, 더욱 상세하게는 배관이 지지되는 수평지지프레임을 천정면으로부터 고정하는 수직지지프레임과, 천정면에 설치되는 인서트플레이트와의 사이에 연결브라켓을 더 구성하되, 상기 연결브라켓에 2개의 체결면을 형성하여 연결되는 수직지지프레임들의 간격을 조절할 수 있을 뿐만 아니라, 연결브라켓과 인서트플레이트를 용접작업에 의해 용착하여 일체로 구성함으로써 설치작업성 향상을 기대할 수 있는 개량 배관지지가대에 관한 것이다.The present invention relates to a pipe support rack, and more particularly, a connection bracket is further provided between the vertical support frame for fixing the horizontal support frame on which the pipe is supported from the ceiling surface, and the insert plate installed on the ceiling surface. Improved installation work can be expected by forming two fastening surfaces on the connection brackets to adjust the spacing of the vertical support frames connected to each other, as well as welding and connecting the connection bracket and the insert plate by welding. Relates to a pipe support.
일반적으로, 재래식 배관 시공법은 일반 형강류인 "ㄱ"형, "ㄷ"형, "I"형, "H"형 등의 형강류를 작업 현장에서 산소절단 또는 스피드 커터(Speed Cutter) 등으로 절단하여 용접한 뒤 이를 배관 지지대로 사용하였다.In general, the conventional pipe construction method is to cut the general steel, such as "a" type, "c" type, "i" type, "h" type, etc. by cutting oxygen or speed cutter at the work site. After welding it was used as a pipe support.
그러나, 이와 같은 시공법은 기존의 형강류를 현장에 반입하여 녹막이 도장을 실시하는 것으로 해서 완성단계인 보온공사까지 다단계의 공정을 거쳐야만 함으로써 작업자가 현장에서 배관지지가대를 조립 시 작업시간의 증대와 조립성이 떨어진다는 문제점이 있었다.However, this construction method is to bring the existing section steel into the site and to carry out rust coating to complete the multi-step process until the insulation work is completed. There was a problem of poor assembly.
또한, 종래의 용접에 의한 시공법은 환경오염은 물론 전기 감전사고의 염려가 있고, 시공 공정이 많아 작업기피 현상과 함께 화재발생의 우려가 있으며, 공기지연과 현장의 자재소모 및 공구류의 낭비가 심하고, 원가상승을 유발하는 문제점이 있었다.In addition, the conventional welding method may cause environmental pollution as well as an electric shock accident, and there are many construction processes, which may lead to work evasion and fire, and also delay air consumption, waste of materials and tools. There was a problem that caused a cost increase.
이에 따라, 볼트와 너트를 이용하여 프레임을 연결하여 천정면에 고정하는 배관지지가대가 안출되어 있다.Accordingly, a pipe support frame for connecting the frame using bolts and nuts to secure the ceiling surface is provided.
이러한 배관지지가대의 일예로서, 특허등록 제10-0780079호에 일체형 천장 배관 가대가 안출된 바 있으며, 이는 상단이 인서트 플레이트 및 브래킷에 의해 건축물의 천장에 결속되는 찬넬과, 상기 찬넬 상에 배관지지를 위해 설치되는 클램프 슈로 이루어진 천장형 배관 가대로써, 상기 찬넬은 배관이 지지되는 수평부와, 상기 수평부의 양쪽으로부터 일체로 상향 절곡되어 천장에 결속되는 수직부로 구성되어 있다.As an example of such a pipe support, an integrated ceiling pipe mount has been devised in Patent Registration No. 10-0780079, which has an upper panel coupled to the ceiling of a building by insert plates and brackets, and supports the pipe support on the channel. A ceiling pipe mount consisting of a clamp shoe installed for the purpose, the channel is composed of a horizontal portion on which the pipe is supported, and a vertical portion that is integrally bent up from both sides of the horizontal portion and bound to the ceiling.
다른 예로서, 특허등록 제10-0807826호에 천장형 배관 가대가 안출된 바 있으며, 이는 상단이 인서트 플레이트 및 브래킷에 의해 건축물의 천장에 결속되는 한 쌍의 수직찬넬과, 상기 수직찬넬의 하단에 이음구에 의해 조립되는 수평찬넬과, 상기 수평찬넬 상에 배관지지를 위해 설치되는 클램프 슈로 이루어진 천장형 배관 가대로써, 상기 수직찬넬 및 수평찬넬 일부 또는 전면에 오목 또는 볼록한 엠보싱부를 형성하고; 상기 이음구는 상기 수평찬넬을 지지하는 수평요소와 상기 수직찬넬을 지지하는 수직요소를 ㄱ자 형태로 용접하여 구성하되, 수평요소와 수직요소의 일부 또는 전면에 오목 또는 볼록한 엠보싱부를 형성함과 함께 상기 수직요소에 상기 수직찬넬의 개구부에 인입되어 개구부의 간격을 유지하기 위한 스페이서를 구비하며 상기 브래킷의 일부 또는 전면에 오목 또는 볼록한 엠보싱부가 형성되어 있다.As another example, Patent No. 10-0807826 has been introduced ceiling ceiling mount, which is a pair of vertical channels, the top of which is bound to the ceiling of the building by the insert plate and bracket, and at the bottom of the vertical channel A ceiling tubing pedestal comprising a horizontal channel assembled by a joint and a clamp shoe mounted on the horizontal channel to support a pipe, wherein the vertical channel and the horizontal channel form a concave or convex embossed portion; The joint is formed by welding a horizontal element for supporting the horizontal channel and a vertical element for supporting the vertical channel in an L-shape, and forming a concave or convex embossed portion on the part or the front of the horizontal element and the vertical element, and vertically. An element is provided in the opening of the vertical channel and has a spacer for maintaining the gap of the opening, and a concave or convex embossed portion is formed on part or the front of the bracket.
그러나, 이러한 종래 기술들은 볼트와 너트를 이용하여 수평프레임과 수직프레임을 조립하여 설치함에 따른 작업효율성은 기대할 수 있는 반면에, 천정면에 설치되는 인서트 플레이트와 수직프레임을 연결하는 연결브라켓이 서로 볼트와 너트에 의해 결합되도록 각각의 구성요소들이 분리되어 있기 때문에, 보관 및 운반성 저하를 가져오는 문제점이 있에다.However, these conventional techniques can be expected to work efficiency by assembling and installing the horizontal frame and vertical frame using bolts and nuts, while the connection bracket connecting the vertical plate and the insert plate installed on the ceiling surface bolts Since each of the components are separated to be coupled by and the nut, there is a problem that leads to a decrease in storage and transportability.
또한, 현장에서 천정면에 매설된 상기 인서트 플레이트에 연결브라켓을 작업자가 볼트와 너트로 조립하여 설치하는 과정에서 높게 설치된 인서트 플레이트에 의해 작업시간이 지연되고 작업성이 크게 떨어지는 문제점이 있에다.In addition, there is a problem in that the work time is delayed and workability is greatly reduced by the insert plate installed in the process of assembling the installation bracket with the bolt and nut on the insert plate embedded in the ceiling surface in the field.
뿐만 아니라, 종래 기술들의 경우 수평프레임을 지지하기 위해 2개의 수직프레임이 서로 대응되도록 설치되어 연결브라켓에 의해 인서트 플레이트에 연결되어 지지되는 바, 종래 연결브라켓의 경우에 결합되는 수직프레임의 위치를 가변시킬 수 없어 작업여건에 따라 2개의 수직프레임의 간격을 변경하고자 할 경우, 천정면에 설치된 인서트 플레이트의 위치를 가변시켜 재설치해야 하는 문제점이 있다.In addition, in the case of the prior art, two vertical frames are installed to correspond to each other to support a horizontal frame, and are connected to and supported by the insert plate by a connecting bracket, so that the position of the vertical frame coupled to the conventional connecting bracket is variable. If you do not want to change the distance between the two vertical frames according to the working conditions, there is a problem that you need to reinstall by changing the position of the insert plate installed on the ceiling surface.
실질적으로 천정면을 형성하기 위해 타설되는 콘크리트 내부에 상부측이 매설된 인서트 플레이트를 재설치하기 어렵기 때문에, 천정면에 매설된 인서트 플레이트는 그대로 두고, 새로운 인서트 플레이트를 앙카볼트등으로 천정면에 설치하는 또 다른 작업을 하여야 하므로 작업시간의 지연과 함께 작업효율성이 크게 떨어지는 문제점이 있에다.Since it is difficult to reinstall the insert plate with the upper side embedded in the concrete to form the ceiling surface, the insert plate embedded in the ceiling surface is left as it is, and a new insert plate is installed on the ceiling surface with an anchor bolt, etc. Since there is another work to be done, there is a problem that the work efficiency is greatly reduced with the delay of the work time.
본 고안은 종래 배관지지가대가 지닌 문제점을 해결하기 위해 안출된 것으로서, 천정면에 매설되는 인서트 플레이트의 하부측에 상기 수직프레임이 연결되는 연결브라켓을 용접작업에 의해 일체로 형성하여 구성함으로써, 작업현장에서의 작업효율성 향상을 기대할 수 있고, 보관 및 운반이 용이할 뿐만 아니라, 상기 연결브라켓에 수직프레임이 결합되되 수직프레임의 위치를 가변시킬 수 있도록 2개의 체결면을 형성함으로써, 서로 대응되게 설치되는 2개의 수직프레임의 설치가 용이하고 2개의 수직프레임의 간격을 필요에 따라 가변시켜 설치할 수 있는 개량 배관지지가대를 제공함에 그 목적이 있다.The present invention was devised to solve the problems of the conventional pipe support, by forming a connection bracket which is connected to the vertical frame to the lower side of the insert plate embedded in the ceiling surface by integrally formed by welding, work site It can be expected to improve the work efficiency in, and not only easy to store and transport, but also coupled to each other by forming two fastening surfaces so that the vertical frame is coupled to the connecting bracket to change the position of the vertical frame It is an object of the present invention to provide an improved pipe support that can be easily installed with two vertical frames and can be installed by varying the distance between the two vertical frames.
상기 목적을 달성하기 위한 수단으로 본 고안인 개량 배관지지가대는, 콘크리트 타설에 의해 형성된 천정면에 매설되는 인서트 플레이트와, 상기 인서트 플레이트의 하부측에 위치되는 연결브라켓과, 상기 연결브라켓의 내측에 상부가 인입되어 볼트와 너트에 의해 체결되어 연결되는 2개의 수직프레임과, 상기 2개의 수직프레임의 하부 양측에 양측단이 각각 연결되어 볼트와 너트에 의해 체결되는 수평프레임으로 구성되는 배관지지가대에 있어서, 상기 연결브라켓은 상기 인서트 플레이트의 하면에 상부가 밀착되어 용접작업에 의해 형성되는 용착부에 의해 용착되어 상기 인서트 플레이트와 일체로 구성되고, 상기 수직프레임의 상부가 내측으로 인입되어 체결될 때 상기 수직프레임의 위치가 가변되도록 2개의 체결면이 형성되며, 상기 2개의 체결면에는 상기 수직프레임의 결합공에 대응되는 체결공이 각각 통공되어 있는 것을 특징으로 한다.The improved piping support according to the present invention as a means for achieving the above object, the insert plate embedded in the ceiling surface formed by the concrete casting, the connection bracket located on the lower side of the insert plate, and the upper side of the connection bracket In the pipe support rack consisting of two vertical frames are inserted and connected by fastening by bolts and nuts, and a horizontal frame connected to both ends of the lower sides of the two vertical frames, respectively, and fastened by bolts and nuts. The connecting bracket is integrally formed with the insert plate by being welded by a welding part formed by welding by an upper part closely contacting a lower surface of the insert plate, and when the upper part of the vertical frame is inserted into and fastened to the inside of the insert plate. Two fastening surfaces are formed so that the position of the vertical frame is variable, the two fastening The fastening holes corresponding to the coupling holes of the vertical frame are characterized in that the through-holes.
본 고안의 개량 배관지지가대는 천정면에 매설되는 인서트 플레이트의 하면에 연결브라켓이 구성되되, 상기 연결브라켓이 인서트 플레이트의 하면에 용접작업에 의해 형성된 용착부에 의해 용착되어 상기 인서트 플레이트와 연결브라켓이 일체로 형성되어 있기 때문에, 인서트 플레이트를 천정면에 체결하는 작업에 의해 연결브라켓이 동시에 설치됨으로써 작업효율성을 가져오고 작업시간을 크게 단축시킬 수 있을 뿐만 아니라, 상기 연결브라켓에 2개의 체결면이 형성되어 있음에 따라 수직프레임의 간격을 임의적으로 가변시켜 설치할 수 있음으로써 작업여건 또는 필요에 의해 수직프레임의 간격을 가변시켜 설치함으로써 설치작업성 향상을 기대할 수 있다.In the improved pipe support according to the present invention, the connecting bracket is formed on the lower surface of the insert plate embedded in the ceiling surface, and the connecting bracket is welded to the lower surface of the insert plate by welding to form the welding plate. Since it is integrally formed, the connection bracket is installed at the same time by fastening the insert plate to the ceiling surface, thereby bringing work efficiency and greatly shortening the working time, and forming two fastening surfaces on the connection bracket. As it can be installed by varying the interval of the vertical frame arbitrarily, the installation work can be expected to improve the installation work by varying the interval of the vertical frame according to the working conditions or needs.
이하, 본 고안의 구성 및 작용을 첨부된 도면에 의거하여 좀 더 구체적으로 설명한다. 본 고안을 설명함에 있어서, 본 명세서 및 청구범위에 사용된 용어나 단어는 고안자가 그 자신의 고안을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 고안의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Hereinafter, the structure and operation of the present invention will be described in more detail with reference to the accompanying drawings. In describing the present invention, the terminology or words used in the present specification and claims are based on the principle that the inventor can properly define the concept of the term in order to best explain his or her design in the best way. It should be interpreted as meanings and concepts corresponding to the technical idea of
도 1은 본 고안의 일실시예에 따른 개량 배관지지가대를 개략적으로 도시한 정면도이고, 도 2는 본 고안의 일실시예에 따른 개량 배관지지가대를 개략적으로 도시한 측면도이고, 도 3은 본 고안의 제2 실시예에 따른 개량 배관지지가대를 개략적으로 도시한 정면도이고, 도 4는 본 고안의 제2 실시예에 따른 개량 배관지지가대를 개략적으로 도시한 측면도이고, 도 5는 본 고안의 각 실시예에 따른 개량 배관지지가대에 적용되는 연결브라켓을 개략적으로 도시한 사시도이고, 도 6은 도 5의 정면도이고, 도 7은 도 1의 다른 설치예를 개략적으로 도시한 정면도이며, 도 8은 도 3의 또 다른 설치예를 개략적으로 도시한 정면도이다.1 is a front view schematically showing an improved piping support according to an embodiment of the present invention, Figure 2 is a side view schematically showing an improved piping support according to an embodiment of the present invention, Figure 3 4 is a front view schematically showing an improved pipe support according to a second embodiment of the present invention, and FIG. 4 is a side view schematically showing an improved pipe support according to a second embodiment of the present invention, and FIG. FIG. 6 is a perspective view schematically illustrating a connection bracket applied to an improved pipe supporter according to each embodiment, FIG. 6 is a front view of FIG. 5, and FIG. 7 is a front view schematically showing another installation example of FIG. 1, and FIG. 8. 3 is a front view schematically showing another example of installation of FIG. 3.
도시된 바와 같이 본 고안의 제1실시예에 따른 개량 배관지지가대는 콘크리트 타설에 의해 형성된 천정면(11)에 매설되는 인서트 플레이트(10)와, 상기 인서트 플레이트(10)의 하부측에 위치되는 연결브라켓(20)과, 상기 연결브라켓(20)의 내측에 상부가 인입되어 볼트(B)와 너트(N)에 의해 체결되어 연결되는 2개의 수직프레임(30)(30)과, 상기 2개의 수직프레임(30)(30)의 하부 양측에 양측단이 각각 연결되어 볼트(B)와 너트(N)에 의해 체결되는 수평프레임(40)으로 구성되어 있다. 상기 연결브라켓(20)은 상기 인서트 플레이트(10)의 하면에 상부가 밀착되어 용접작업에 의해 형성되는 용착부(21)에 의해 용착되어 상기 인서트 플레이트(10)와 일체로 설치되고, 상기 수직프레임(30)의 상부가 내측으로 인입되어 체결될 때 상기 수직프레임(30)의 위치가 가변되도록 2개의 체결면(22)(23)이 형성되며, 상기 2개의 체결면(22)(23)에는 상기 수직프레임(30)의 결합공(31)에 대응되는 체결공(24)(25)이 각각 통공되어 있다.As shown in the improved pipe support according to the first embodiment of the present invention, the
상기 연결브라켓(20)은, 상기 인서트 플레이트(10)의 하면에 상부측이 용접작업에 의해 형성된 용착부(21)에 의해 용착되어 있음에 따라, 상기 인서트 플레이트(10)와 일체로 설치되어 있기 때문에, 종래 배관지지가대의 인서트 플레이트와 연결브라켓이 별도로 볼트와 너트체결방식에 의해 서로 체결함에 따라 야기되는 작업효율성 저하 및 작업시간 지연에 따른 문제점이 해결된다.The connecting
또한, 상기 인서트 플레이트(10)와 연결브라켓(20)이 서로 분리되지 않고, 용착부(21)에 의해 상기 인서트 플레이트(10)와 연결브라켓(20)이 한 몸체 즉, 일체로 설치되어 있으므로, 인서트 플레이트(10)와 연결브라켓(20)의 운반이 용이하고, 인서트 플레이트(10)와 연결브라켓(20)을 연결하여 체결하는 볼트와 너트가 필요치 않음으로써, 다수의 볼트와 너트를 구비하지 않아도 되어 운반성 및 보관성이 크게 향상된다.In addition, since the
도 1 및 도 2는 본 고안의 제1 실시예에 따른 개량 배관지지가대가 클램프 타입(clamp type)으로 설치되는 것이다.1 and 2 is an improved pipe support according to the first embodiment of the present invention is installed in a clamp type (clamp type).
도시된 바와 같이 클램프 타입의 경우에는 천정면(11)에 각각 상기 연결브라켓(20)이 일체로 설치되는 2개의 인서트 플레이트(10)를 설치하고 상기 2개의 인서트 플레이트(10)의 하면에 위치되는 상기 2개의 연결브라켓(20)의 내측에 2개의 수직프레임(30)(30)의 상부를 인입하면서 상기 연결브라켓(20)의 체결면(22)에 형성된 체결공(24)과 상기 수직프레임(30)에 형성된 결합공(31)을 일치시킨 다음, 볼트(B)와 너트(N)를 이용하여 상기 연결브라켓(20)과 수직프레임(30)을 체결하여 연결한다.As shown in the case of the clamp type, two
또한, 상기 2개의 수직프레임(30)(30)의 하부측에 수평프레임(40)의 양단을 위치시킨 다음, 보조브라켓(41)(41)을 이용하여 상기 수직프레임(30)과 수평프레임(40)을 볼트(B)와 너트(N)를 체결하여 연결한다.In addition, by placing both ends of the
이와 같이 연결된 상기 수평프레임(40)의 상단에 배관(101)이 지지되는 클램프 슈(102)를 설치하면 되는 것으로, 상기 클램프 슈(102)는 필요에 따라 여러 가지 구조로 제조할 수 있다.What is necessary is just to install the
도 3 및 도 4는 본 고안의 제2 실시예에 따른 개량 배관지지가대가 밴딩 타입(banding type)으로 설치되는 것을 개략적으로 각각 도시한 정면도 및 측면도이다.3 and 4 is a front view and a side view schematically showing that the improved pipe support according to the second embodiment of the present invention is installed in a banding type (banding type), respectively.
도시된 바와 같이 밴딩 타입의 경우에는, 천정면(11)에 각각 상기 연결브라켓(20)이 일체로 설치되는 2개의 인서트 플레이트(10)를 설치하고 상기 2개의 인서트 플레이트(10)의 하면에 위치되는 상기 2개의 연결브라켓(20)의 내측에 2개의 수직프레임(30)(30)의 상부를 인입하면서 상기 연결브라켓(20)의 체결면(22)에 형성된 체결공(24)과 상기 수직프레임(30)에 형성된 결합공(31)을 일치시킨 다음, 볼트(B)와 너트(N)를 이용하여 상기 연결브라켓(20)과 수직프레임(30)을 체결하여 연결한다.As shown, in the case of the bending type, two
이 때, 밴딩 타입의 경우 상기 2개의 수직프레임(30)(30)의 하부측에 수평프레임(40)의 양단이 절곡되어 연결되어 있음에 따라 수평프레임(40)을 설치하기 위한 별도의 작업은 생략된다.At this time, in the case of the bending type, since the two ends of the
이와 같이 연결된 상기 수평프레임(40)의 상단에 배관(101)이 지지되는 클램프 슈(102)를 설치하면 되는 것으로, 상기 클램프 슈(102)는 필요에 따라 여러 가지 구조로 제조할 수 있다.What is necessary is just to install the
본 고안인 개량 배관지지가대는, 상기 연결브라켓(20)에 2개의 체결면(22)(23)과 이들 2개의 체결면(22)(23)에 각각 체결공(24)(25)들이 더 통공되어 있음에 따라, 도 7 및 도 8에 도시된 바와 같이 인서트 플레이트(10)와 연결브라켓(20)들의 위치가 고정된 상태에서 상기 수직프레임(30)들을 연결브라켓(20)의 2개의 체결면(22)(23)들 중 어느 하나의 체결면에 위치시켜 설치할 수 있음에 따라, 작업여건이나 필요에 의해 수직프레임(30)의 위치를 달리하여 설치할 수 있어 설치 작업성 및 작업효율성이 더욱 향상된다.The improved piping support according to the present invention, two fastening surfaces (22) and 23 and two fastening holes (24) and (25) through the two fastening surfaces (22) and (23), respectively. As shown in FIG. 7 and FIG. 8, the two fastening surfaces of the
이에 따라 종래 기술의 경우 수직프레임의 위치를 달리할 경우, 설치고정된 인서트 플레이트와는 달리 또 다른 인서트 플레이트를 천정면에 추가적으로 설치한 다음, 수직프레임의 위치를 달리하여 설치하였으나, 본 고안의 실시예에 따른 개량 배관지지가대의 경우 연결브라켓(20)에 2개의 체결면(22)(23)들이 형성되어 있기 때문에 추가적으로 인서트 플레이트를 설치하지 않아도 되어 작업성 및 작업시간의 단축과 함께 작업효율성의 향상을 가져올 수 있다.Accordingly, in the case of the prior art, when the position of the vertical frame is changed, another insert plate is additionally installed on the ceiling surface, unlike the insert plate which is fixed to the installation, and then the position of the vertical frame is installed differently, but the implementation of the present invention In the case of the improved pipe support according to the example, since two
이와 같이 본 고안은 다양하게 변형실시가 가능한 것으로 본 고안의 바람직한 실시예를 들어 설명하였으나, 본 고안은 이러한 실시예에 한정되는 것이 아니고, 상기 실시예들을 기존의 공지기술과 단순히 조합적용한 실시예와 함께 본 고안의 청구범위와 상세한 설명에서 본 고안이 속하는 기술분야의 당업자가 변형하여 이용할 수 있는 기술은 본 고안의 기술범위에 당연히 포함된다고 보아야 할 것이다.While the present invention has been described in connection with what is presently considered to be preferred embodiments, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, It is to be understood that the technical scope of the present invention includes all of the techniques that can be used by those skilled in the art to which the present invention belongs.
도 1은 본 고안의 제1 실시예에 따른 개량 배관지지가대를 개략적으로 도시한 정면도이다.1 is a front view schematically showing an improved piping support mount according to a first embodiment of the present invention.
도 2는 본 고안의 제1 실시예에 따른 개량 배관지지가대를 개략적으로 도시한 측면도이다.Figure 2 is a side view schematically showing an improved piping support mount according to a first embodiment of the present invention.
도 3은 본 고안의 제2 실시예에 따른 개량 배관지지가대를 개략적으로 도시한 정면도이다.Figure 3 is a front view schematically showing an improved piping support mount according to a second embodiment of the present invention.
도 4는 본 고안의 제2 실시예에 따른 개량 배관지지가대를 개략적으로 도시한 측면도이다.Figure 4 is a side view schematically showing an improved piping support mount according to a second embodiment of the present invention.
도 5는 본 고안의 각 실시예에 따른 개량 배관지지가대에 적용되는 연결브라켓을 개략적으로 도시한 사시도이다.5 is a perspective view schematically showing a connection bracket applied to the improved pipe support according to each embodiment of the present invention.
도 6은 도 5의 정면도이다.6 is a front view of FIG. 5.
도 7은 도 1의 다른 설치예를 개략적으로 도시한 정면도이다.7 is a front view schematically showing another example of installation of FIG.
도 8은 도 3의 또 다른 설치예를 개략적으로 도시한 정면도이다.8 is a front view schematically showing another example of installation of FIG.
<도면의 주요부분에 대한 부호의 설명>Description of the Related Art
10 : 인서트 플레이트 11 : 천정면10 insert plate 11: ceiling surface
20 : 연결브라켓 21 : 용착부20: connecting bracket 21: welding part
22, 23 : 체결면 24, 25 : 체결공22, 23: fastening
30 : 수직프레임 31 : 결합공30: vertical frame 31: coupling hole
40 : 수평프레임 B : 볼트 N : 너트40: horizontal frame B: bolt N: nut
삭제delete
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020090015060U KR200459446Y1 (en) | 2009-11-20 | 2009-11-20 | Improvement assembly type pipe supporting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020090015060U KR200459446Y1 (en) | 2009-11-20 | 2009-11-20 | Improvement assembly type pipe supporting tool |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090012642U KR20090012642U (en) | 2009-12-09 |
KR200459446Y1 true KR200459446Y1 (en) | 2012-03-27 |
Family
ID=47625918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020090015060U KR200459446Y1 (en) | 2009-11-20 | 2009-11-20 | Improvement assembly type pipe supporting tool |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200459446Y1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101403385B1 (en) | 2013-03-27 | 2014-06-03 | 장규철 | Fixing bracket for construction pipe supporting tool |
KR20210056005A (en) | 2019-11-08 | 2021-05-18 | 성화시스템챤넬(주) | A fixing structure for bracket and channel |
KR20210056006A (en) | 2019-11-08 | 2021-05-18 | 성화시스템챤넬(주) | A fixing structure for bracket and channel |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101160065B1 (en) * | 2010-07-23 | 2012-06-26 | 삼성중공업 주식회사 | operating apparatus for service piping within the ship |
KR101969080B1 (en) * | 2018-04-26 | 2019-04-15 | 주식회사 도헌 | Ceiling plumbing cradle with earthquake resistant function |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010080782A (en) * | 2001-06-15 | 2001-08-25 | 이문수 | pipe line supporting device by non-welding assembly |
KR20070000647U (en) * | 2007-05-09 | 2007-06-04 | 김대식 | Union structure of pipe supporting tool |
KR20070080855A (en) * | 2007-07-24 | 2007-08-13 | 김대식 | Assembly type pipe supporting tool |
-
2009
- 2009-11-20 KR KR2020090015060U patent/KR200459446Y1/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010080782A (en) * | 2001-06-15 | 2001-08-25 | 이문수 | pipe line supporting device by non-welding assembly |
KR20070000647U (en) * | 2007-05-09 | 2007-06-04 | 김대식 | Union structure of pipe supporting tool |
KR20070080855A (en) * | 2007-07-24 | 2007-08-13 | 김대식 | Assembly type pipe supporting tool |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101403385B1 (en) | 2013-03-27 | 2014-06-03 | 장규철 | Fixing bracket for construction pipe supporting tool |
KR20210056005A (en) | 2019-11-08 | 2021-05-18 | 성화시스템챤넬(주) | A fixing structure for bracket and channel |
KR20210056006A (en) | 2019-11-08 | 2021-05-18 | 성화시스템챤넬(주) | A fixing structure for bracket and channel |
Also Published As
Publication number | Publication date |
---|---|
KR20090012642U (en) | 2009-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101813068B1 (en) | Building integrated photovoltaic in wall | |
KR200459446Y1 (en) | Improvement assembly type pipe supporting tool | |
CN202007967U (en) | Machine frame installing structure for air showering equipment | |
CN102367704A (en) | Concrete pouring construction method for steel plate embedded part | |
KR20130034669A (en) | Connection structure between of aluminum window frame | |
KR20100003653U (en) | Assembly type pipe support tool | |
KR20100035640A (en) | Insert plate of assembly type pipe support tool | |
KR20070000647U (en) | Union structure of pipe supporting tool | |
CN209780318U (en) | prefabricated component installation bearing structure | |
KR101997643B1 (en) | Solar module and, structure having the same | |
KR200473612Y1 (en) | deck plate with channel connection part | |
KR101778060B1 (en) | Connection bracket for exterior panel support pipe | |
JP3181079U (en) | Base plate support bracket for solar panel installation | |
KR20100003654U (en) | Assembly type pipe support tool | |
KR101144666B1 (en) | Cable tray | |
CN210867045U (en) | Support frame for cable bridge | |
JP2018188913A (en) | Reinforcing fitting for sound insulation panel and method for reinforcing sound insulation panel | |
KR200456971Y1 (en) | Assembly type pipe supporting tool with up and down control part | |
KR100915075B1 (en) | Assembly type pipe supporting tool | |
JP5437758B2 (en) | Panel mounting structure and panel mounting method | |
JP2009035955A (en) | Sound-absorbing structure and protective fence with the same | |
KR101641334B1 (en) | Assembly round form and, method for constructing concrete building using this same | |
KR200275103Y1 (en) | fixing structure of slab support pipe for building | |
KR101614302B1 (en) | Apparatus for supporting block | |
KR101273087B1 (en) | Method for installing alc panel to concrete slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20151211 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20161207 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |