KR200459161Y1 KR2020090009758U KR20090009758U KR200459161Y1 KR 200459161 Y1 KR200459161 Y1 KR 200459161Y1 KR 2020090009758 U KR2020090009758 U KR 2020090009758U KR 20090009758 U KR20090009758 U KR 20090009758U KR 200459161 Y1 KR200459161 Y1 KR 200459161Y1
Authority
KR
South Korea
Prior art keywords
wedge
support
plate
scaffold
work
Prior art date
Application number
KR2020090009758U
Other languages
Korean (ko)
Other versions
KR20110001102U (en
Inventor
이종하
이승용
이원욱
Original Assignee
현대삼호중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대삼호중공업 주식회사 filed Critical 현대삼호중공업 주식회사
Priority to KR2020090009758U priority Critical patent/KR200459161Y1/en
Publication of KR20110001102U publication Critical patent/KR20110001102U/en
Application granted granted Critical
Publication of KR200459161Y1 publication Critical patent/KR200459161Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

본 고안은 각종 산업현장에서 고소 작업 시 사용하는 작업발판을 지지하는 작업발판 설치대에 관한 것으로서, 작업발판의 고정 및 해체 작업을 신속하게 할 수 있고, 작업발판의 견고한 고정 상태를 보장할 수 있는 작업발판 설치대를 제공코자 하는 것이다.The present invention relates to a work scaffolding mounting stand for supporting a work scaffold used in a high place in various industrial sites, which can quickly fix and dismantle the work scaffold, and ensure a solid fixing state of the work scaffold. To provide a scaffolding mount.

즉, 본 고안은 산업현장에서 사용하는 작업발판 설치대(1)에 있어서, 고정볼트(3)에 의해 가압 고정되는 클램프(2)에 수평방향으로 용접되는 사각 파이프 구성의 지지대(4)와; 상기 지지대(4)에 안치된 작업발판(110)의 양측에 위치하도록 지지대(4) 상면의 클램프(2) 쪽에 설치되는 걸림홈(6a)이 형성된 걸림구(6) 및 걸림구(6)의 반대쪽 지지대(4) 단부 쪽에 설치되며 쐐기(12)에 의해 작동하는 가압판(11)에 의해 클램핑 및 언클램핑되는 클램핑수단(7)을 설치한 것으로서, 작업발판(110) 설치 및 철거가 망치 하나만으로 가능한 것으로서, 설치 및 철거 시간을 대폭 줄이면서도 작업발판(110)을 견고하게 클램핑할 수 있는 것이다. In other words, the present invention is the work scaffold mounting (1) used in the industrial field, the support (4) of the square pipe configuration welded horizontally to the clamp (2) that is fixed by the fixing bolt (3); The catching hole 6 and the catching hole 6 of which the catching groove 6a is formed on the clamp 2 side of the upper surface of the support 4 so as to be located at both sides of the work step 110 which is settled in the support 4. It is installed on the end of the opposite support (4) and the clamping means (7) is clamped and unclamped by the pressure plate (11) actuated by the wedge 12, the work step 110 installation and dismantling only with a hammer As possible, it is possible to firmly clamp the working scaffold 110 while significantly reducing the installation and dismantling time.

작업발판 설치대, 클램프, 걸림구, 클램핑수단, 가압판, 쐐기 Scaffold Mount, Clamp, Hanger, Clamping Means, Pressure Plate, Wedge

Description

작업발판 설치대{Install mount for a scaffold}Work mount for a scaffold}

본 고안은 각종 산업현장에서 고소 작업 시 사용하는 작업발판을 지지하는 작업발판 설치대에 관한 것으로서, 보다 구체적으로는 작업발판의 고정 및 해체 작업을 신속하게 할 수 있고, 작업발판의 견고한 고정 상태를 보장할 수 있는 작업발판 설치대를 제공코자 하는 것이다.The present invention relates to a work scaffolding mounting platform for supporting a work scaffold used in heights in various industrial sites, more specifically, to quickly fix and dismantle the work scaffold, and to ensure a solid fixing state of the work scaffold. To provide a working scaffolding platform that can be done.

각종 산업현장에서 고소 작업 시 사용하는 작업발판은 나무나 쇠파이프를 얽어서 지지되게 한 비계의 상측으로 작업발판을 올려 사용하고 있으며, 조선소에서의 작업발판 설치는 선체(블록) 혹은 선체에 고정된 브래킷에 고정되는 설치대에 작업발판을 안치하여 사용하고 있다.Work scaffolding used in aerial work at various industrial sites is used to raise work scaffolding to the upper side of scaffolding which is entangled with wood or iron pipes, and work scaffolding in shipyard is fixed to hull (block) or hull. It is used by placing the working platform on the mounting bracket fixed to the bracket.

상기에서와 같이 설치대에 작업발판을 안치한 상태에서 설치대와 작업발판의 결합은 통상 철사로 엮어서 고정하게 되는데, 이러한 고정 방법은 설치 및 철거에 따른 시간이 많이 소요되고, 설치 작업마다 대량의 철사를 소비하게 되는 등 경제적 부담도 있었던 바, 업계에서는 이러한 종래 문제점을 해결할 수 있는 신규한 구 성의 작업발판 설치대가 요구되고 있었다.As described above, in the state in which the working platform is placed on the mounting board, the mounting of the mounting board and the working board is usually wired and fixed, and this fixing method takes a lot of time due to installation and dismantling, and consumes a large amount of wire for each installation work. There was also an economic burden, such as the industry was in need of a new scaffold mounting platform to solve these problems.

이에 본 고안자는 상기한 종래 문제점을 해결코자 본 고안을 안출한 것으로서, 본 고안에서는 철사 없이 작업이 가능하고, 작업발판의 고정 및 해체 작업을 신속하게 할 수 있으며, 작업발판의 견고한 고정 상태를 보장할 수 있는 작업발판 설치대를 제공함에 고안의 기술적 과제를 두고 본 고안을 완성한 것이다.Therefore, the present inventors have devised the present invention to solve the above-described problems, and in the present invention, the work can be performed without wires, and the fastening and dismantling of the working scaffold can be promptly ensured and the solid fixing state of the working scaffold is ensured. The present invention has been completed with the technical problem of devising in providing a working scaffolding can.

과제 해결 수단으로 본 고안에서는 산업현장에서 사용하는 작업발판 설치대에 있어서; 고정볼트에 의해 가압 고정되는 클램프에 수평방향으로 용접되는 사각 파이프 구성의 지지대와; 상기 지지대에 안치된 작업발판의 양측에 위치하도록 지지대 상면의 클램프 쪽에 설치되는 걸림홈이 형성된 걸림구 및 걸림구의 반대쪽 지지대 단부 쪽에 설치되며 쐐기에 의해 작동하는 가압판에 의해 클램핑 및 언클램핑되는 클램핑수단을 설치하였다.In the present invention as a means for solving the problem in the working scaffolding installation used in industrial sites; A support of a square pipe configuration welded in a horizontal direction to a clamp fixed by a fixing bolt; Clamping means clamped and unclamped by a clamping plate which is installed on the end of the support on the opposite side of the support and the stopper is formed on the clamp side of the upper surface of the support to be located on both sides of the working scaffold placed on the support and operating by the wedge Installed.

또한 상기 지지대 단부 쪽에 설치되며 쐐기에 의해 작동하는 가압판에 의해 클램핑 및 언클램핑되는 클램핑수단은 지지대의 측면에 고정되는 고정편이 마주보게 배치되는 ㄷ자형의 고정구와, 고정구에 의해 형성된 작동공간에 내입되는 승강판과, 승강판의 상단에 용접 고정된 가압판과, 상기 고정구의 양측 고정편에 형성 된 쐐기결합공과 승강판에 형성된 작동공을 통해서 조립되는 쐐기로 이루어지고; 상기 승강판은 평 단면으로 볼 때 쐐기의 두께 보다 조금 큰 치수의 간격을 두고 평행하게 2개의 수직판이 위치되고, 이들 2개의 수직판 상하단을 경사편으로 연결되게 하여 작동공을 형성하고, 상기 가압판은 2개의 수직판과 평행하게 결합하여 상기 수직판과 쐐기가 평행하게 배열된 상태에서 쐐기의 넓은 쪽을 타압할 때 가압판이 작업발판을 클램핑하고, 반대로 쐐기의 가압력이 해제된 상태에서 수직판과 쐐기를 직각방향으로 배열하여 가압판이 작업발판을 언클램핑하게 하였다.In addition, the clamping means is clamped and unclamped by the pressure plate acting by the wedge is installed on the end of the support is a U-shaped fastener is disposed facing the fixing piece fixed to the side of the support and is embedded in the working space formed by the fastener A lifting plate, a pressure plate welded and fixed to the upper end of the lifting plate, a wedge coupling hole formed at both side fixing pieces of the fixture, and a wedge assembled through an operation hole formed in the lifting plate; The elevating plate has two vertical plates positioned in parallel with a spacing of a dimension slightly larger than the thickness of the wedge when viewed in a flat section, and the upper and lower ends of these two vertical plates are connected to the inclined pieces to form a working hole, and the pressure plate Is coupled to the two vertical plates in parallel with the vertical plate and the wedge in parallel with the pressing plate when pressing the wide side of the wedge, the pressing plate clamps the working plate, on the contrary in the state that the pressing force of the wedge The wedges were arranged at right angles so that the pressure plate unclamped the working platform.

본 고안에서 제공하는 작업발판 설치대에 의하면 작업발판 설치 및 철거가 망치 하나만으로 가능한 것으로서, 설치 및 철거 시간을 대폭 줄이면서도 작업발판을 견고하게 클램핑할 수 있는 것이다. According to the work scaffold mounting stand provided in the present invention, the work scaffolding installation and dismantling is possible with only a hammer, and the work scaffolding can be firmly clamped while significantly reducing installation and dismantling time.

이하에서 첨부된 도면에 의거하여 본 고안의 구성을 설명한다.Hereinafter, the configuration of the present invention based on the accompanying drawings.

도 1은 본 고안에서 제공하는 작업발판 설치대의 바람직한 일 실시예를 보인 사시도를 도시한 것이고, 도 2는 본 고안에 적용된 클램핑수단의 구성을 보이기 위한 확대 사시도를 도시한 것이며, 도 3, 도 4는 본 고안에 적용된 클램핑수단의 클램핑 상태를 도시한 평단면도 및 정단면도, 도 5, 도 6은 본 고안에 적용된 클램핑수단의 언클램핑 상태를 도시한 평단면도 및 정단면도이며, 도 7, 도 8은 본 고안 의 사용상태 정면도를 도시한 것이다.Figure 1 is a perspective view showing a preferred embodiment of the working scaffold mounting provided in the present invention, Figure 2 is an enlarged perspective view for showing the configuration of the clamping means applied to the present invention, Figures 3, 4 5 and 6 are a plan sectional view and a front sectional view showing an unclamping state of the clamping means applied to the present invention, FIGS. 7 and 8 Is a front view showing the state of use of the present invention.

본 고안은 각종 산업현장에서 사용할 수 있으며, 본 고안에서는 이해를 돕기 위해 조선소에서 사용하는 예를 들어서 설명하기로 한다.The present invention can be used in various industrial sites, the present invention will be described by taking an example used in the shipyard for better understanding.

본 고안에서 제공하는 작업발판 설치대(1)는 도시된 바와 같이 선체(블록) 혹은 선체에 고정된 브래킷(100)이 끼워진 상태로 고정볼트(3)에 의해 가압 고정되는 클램프(2)에 수평방향으로 사각 파이프 구성의 지지대(4)를 용접하여 작업발판(110) 등을 안치할 수 있게 한다.The working scaffold mounting 1 provided in the present invention has a horizontal direction to the clamp 2 which is pressed and fixed by the fixing bolt 3 in a state where the hull (block) or the bracket 100 fixed to the hull is fitted as shown. By welding the support (4) of the square pipe configuration to be able to settle the working scaffold 110 and the like.

상기 지지대(4)는 작업발판(110)의 폭보다 긴 길이로 구성되고, 지지대(4)의 단부에는 난간결합공(5)을 상측 방향으로 개구되게 형성하여 난간(120)의 하단을 삽입 고정할 수 있게 한다.The support 4 is formed of a length longer than the width of the working footing 110, the end of the support 4 is formed by opening the handrail coupling hole 5 in the upward direction to insert and fix the lower end of the handrail 120 Make it possible.

상기 클램프(2)와 난간결합공(5) 사이의 지지대(4)에 작업발판(110)이 안치되는데, 본 고안에서는 작업발판(110)의 고정 및 해체 작업을 신속하게 할 수 있고, 작업발판(110)의 견고한 고정 상태를 보장할 수 있게 한 것이다.The working scaffold 110 is placed in the support 4 between the clamp 2 and the handrail coupling hole 5. In the present invention, the fixing and dismantling work of the working scaffold 110 can be quickly performed. It is to ensure a solid fixed state of the (110).

즉, 본 고안에서는 지지대(4) 상면의 클램프(2) 쪽에 걸림구(6)를 설치하여 지지대(4)의 선단 즉, 난간결합공(5) 쪽으로 걸림홈(6a)이 개구되게 하고, 지지대(4) 측면의 난간결합공(5) 쪽에 클램핑수단(7)을 설치한다.That is, according to the present invention, the locking hole 6 is installed on the clamp 2 side of the upper surface of the support 4 so that the locking groove 6a is opened toward the tip of the support 4, that is, the handrail coupling hole 5, (4) Install the clamping means (7) on the side of the handrail coupling hole (5).

상기 클램핑수단(7)은 지지대(4)의 측면에 고정되는 고정편(8a)이 마주보게 배치되는 ㄷ자형의 고정구(8)와, 고정구(8)에 의해 형성된 작동공간(9)에 내입되는 승강판(10)과, 승강판(10)의 상단에 용접 고정된 가압판(11)과, 상기 고정구(8)의 양측 고정편(8a)에 형성된 쐐기결합공(8b)과 승강판(10)에 형성된 작동공(10a)을 통해서 조립되는 쐐기(12)를 포함하는 구성으로 이루어진다.The clamping means (7) is embedded in the working space (9) formed by the U-shaped fastener 8 and the fastener (8) is arranged facing the fixing piece (8a) fixed to the side of the support (4) The elevating plate 10, the pressure plate 11 welded and fixed to the upper end of the elevating plate 10, and the wedge coupling holes 8b and the elevating plate 10 formed on both side fixing pieces 8a of the fastener 8. Consists of a configuration comprising a wedge 12 assembled through the operating hole (10a) formed in.

상기 승강판(10)은 철판을 절곡하여 형성한 것으로서, 평 단면으로 볼 때 쐐기(12)의 두께 보다 조금 큰 치수의 간격을 두고 평행하게 2개의 수직판(10b)이 위치되고, 이들 2개의 수직판(10b) 상하단을 경사편(10c)으로 연결하여 작동공(10a)이 형성되게 하며, 상기 승강판(10) 상단에 용접 고정되어 있는 가압판(11)은 2개의 수직판(10b)과 평행하게 결합한 구성으로 이루어진다.The elevating plate 10 is formed by bending an iron plate, and two vertical plates 10b are positioned in parallel with an interval of a dimension slightly larger than the thickness of the wedge 12 when viewed in a flat cross section. The upper and lower ends of the vertical plate 10b are connected to the inclined piece 10c so that the operation hole 10a is formed, and the pressure plate 11 welded and fixed to the top of the elevating plate 10 includes two vertical plates 10b and Consists of a parallel coupled configuration.

상기 수직판(10b)과 쐐기(12)가 평행하게 배열되면 가압판(11)이 작업발판(110)을 클램핑하게 되고, 반대로 수직판(10b)과 쐐기(12)가 직각방향으로 배열되면 가압판(11)이 작업발판(110)을 언클램핑하게 된다. 또한 하측 경사편(10c)은 가압판(11)이 클램핑 위치에 있을 때 쐐기(12)를 타압함에 따라 쐐기(12)와 면접되면서 승강판(10)을 하향 이동시키게 된다.When the vertical plate 10b and the wedge 12 are arranged in parallel, the pressure plate 11 clamps the work scaffold 110. On the contrary, when the vertical plate 10b and the wedge 12 are arranged at right angles, the pressure plate ( 11) to unclamp the working scaffold (110). In addition, the lower inclined piece 10c moves the lifting plate 10 downward while being interviewed with the wedge 12 as the pressure plate 11 presses the wedge 12 when the pressing plate 11 is in the clamping position.

그리고 상기 쐐기(12)의 선단에는 이탈방지턱(12a)을 형성하여 사용 과정에서 쐐기(12)가 임의 분리되어 분실할 염려가 없도록 한다.And the end of the wedge (12) is formed so that the separation prevention jaw (12a) is formed so that the wedge 12 is randomly separated in the process of use, there is no fear of loss.

본 고안은 상기 설명에서 지지대(4)에 걸림구(6)와 클램핑수단(7)을 단독으로 설치한 예를 설명하였으나, 이들을 2개 이상 복수로 설치할 수 있음은 당연한 것이며, 도 8과 같이 지지대(4)에 복수의 클램핑수단(7)을 구비하여 다양한 폭의 작업발판(110)에 부합되게 하거나, 지지대(4)의 양단에 클램프(2)를 구비하여 고소를 잇는 가교용으로 사용할 수도 있다.The present invention has been described an example in which the locking mechanism 6 and the clamping means 7 are installed alone on the support 4, but it is natural that two or more of them can be installed, as shown in FIG. A plurality of clamping means (7) in the (4) to match the work step 110 of various widths, or may be used for cross-linking the height by providing a clamp (2) at both ends of the support (4). .

도면 중 미설명 부호 120은 난간지지봉을 도시한 것이다.Reference numeral 120 in the drawings shows a handrail support rod.

이상과 같이 구성되는 본 고안을 설치코자 할 시에는 먼저 선체(블록) 혹은 선체에 고정된 브래킷(100)을 클램프(2)에 끼움 상태에서 고정볼트(3)로 고정한다.When the present invention is configured as described above, first to fix the hull (block) or the bracket 100 fixed to the hull with a clamping bolt (3) in the clamped state (2).

상기와 같이 클램프(2)가 고정된 상태에서 클램프(2)에 고정되어 있는 지지대(4) 상측으로 작업발판(110)을 안치한다.As described above, in the state in which the clamp 2 is fixed, the working scaffold 110 is placed above the support 4 which is fixed to the clamp 2.

이때 작업발판(110)은 걸림구(6)와 클램핑수단(7)으로 고정되는 바, 먼저 작업발판(110)의 일측을 걸림구(6)의 걸림홈(6a)에 내입한 상태에서 클램핑수단(7)의 가압판(11)이 작업발판(110) 상측에 위치되게 회동시킨다.At this time, the working scaffold 110 is fastened by the catching means 6 and the clamping means 7. First, one side of the work scaffold 110 is inserted into the catching groove 6a of the catch 6. The pressure plate 11 of (7) is rotated to be positioned above the working scaffold 110.

이때 가압판(11)과 용접 고정되어 있는 승강판(10)이 회동되면서 승강판(10)의 양측 수직판(10b)이 쐐기(12)와 평행하게 배열된다.At this time, the lifting plate 10 is welded and fixed to the pressure plate 11, both vertical plates 10b of the lifting plate 10 is arranged in parallel with the wedge 12.

상기한 상태에서 쐐기(12)의 넓은 쪽을 타압하면 쐐기결합공(8b)을 통해서 내입되는 쐐기(12)가 승강판(10)의 하측 경사편(10c)을 가압하여 가압판(11)을 하향 이동시켜 작업발판(110)을 클램핑 고정하게 되는 것이다.When the wide side of the wedge 12 is pressed in the above state, the wedge 12 inserted through the wedge coupling hole 8b presses the lower inclined piece 10c of the elevating plate 10 to lower the pressure plate 11. By moving it is to clamp the work scaffold 110.

그리고 작업발판(110)을 철거코자 할 시에는 상기와는 반대로 쐐기(12)의 좁은 쪽을 타압하면 된다. 즉, 쐐기(12)의 좁은 쪽을 타압하면 승강판(10)의 하측 경사편(10c)에 가해졌던 가압력이 해제되는데, 이때 가압판(11)을 작업발판(110)과 직각방향으로 회동시키면 되는 것이다.And when you want to remove the working scaffold 110 is to press down the narrow side of the wedge (12) contrary to the above. That is, when the narrow side of the wedge 12 is pressed, the pressing force applied to the lower inclined piece 10c of the elevating plate 10 is released. In this case, the pressing plate 11 may be rotated in a direction perpendicular to the working step 110. will be.

도 1은 본 고안에서 제공하는 작업발판 설치대의 바람직한 일 실시예를 보인 사시도1 is a perspective view showing a preferred embodiment of the working scaffold mounting platform provided in the present invention

도 2는 본 고안에 적용된 클램핑수단의 구성을 보이기 위한 확대 사시도Figure 2 is an enlarged perspective view for showing the configuration of the clamping means applied to the present invention

도 3, 도 4는 본 고안에 적용된 클램핑수단의 클램핑 상태를 도시한 평단면도 및 정단면도3 and 4 are a plan sectional view and a front sectional view showing the clamping state of the clamping means applied to the present invention

도 5, 도 6은 본 고안에 적용된 클램핑수단의 언클램핑 상태를 도시한 평단면도 및 정단면도5 and 6 are a plan sectional view and a front sectional view showing an unclamping state of the clamping means applied to the present invention

도 7은 본 고안의 사용상태 정면도7 is a front view of the use state of the present invention

도 8은 본 고안의 다른 예의 사용상태 정면도8 is a front view of the use state of another example of the present invention

■도면의 주요부분에 사용된 부호의 설명 ■Explanation of symbols used in main part of drawing

1:작업발판 설치대 2:클램프1: working scaffolding mount 2: clamp

3:고정볼트 4:지지대3: fixing bolt 4: support

5:난간결합공 6:걸림구5: handrail mater 6: latch

6a:걸림홈 7:클램핑수단6a: Locking groove 7: clamping means

8:고정구 8a:고정편8: fixture 8a: fixture

8b:쐐기결합공 9:작동공간8b: Wedge joint 9: operating space

10:승강판 10a:작동공10: lifting plate 10a: operator

10b:수직판 10c:경사편10b: Vertical plate 10c: Inclined piece

11:가압판 12:쐐기11: Pressure plate 12: wedge

110:작업발판110: scaffolding

Claims (2)

삭제delete 고정볼트(3)에 의해 가압 고정되는 클램프(2)에 수평방향으로 용접되는 사각 파이프 구성의 지지대(4)와; A support 4 having a square pipe configuration welded in a horizontal direction to the clamp 2 fixed by the fixing bolt 3; 상기 지지대(4)에 안치된 작업발판(110)의 양측에 위치하도록 지지대(4) 상면의 클램프(2) 쪽에 설치되는 걸림홈(6a)이 형성된 걸림구(6) 및 걸림구(6)의 반대쪽 지지대(4) 단부 쪽에 설치되며 쐐기(12)에 의해 작동하는 가압판(11)으로 클램핑 및 언클램핑되는 클램핑수단(7)을 설치하여 구성한 산업현장에서 사용하는 작업발판 설치대(1)에 있어서,The catching hole 6 and the catching hole 6 of which the catching groove 6a is formed on the clamp 2 side of the upper surface of the support 4 so as to be located at both sides of the work step 110 which is settled in the support 4. In the work scaffolding mount (1) for use in an industrial site, which is installed at the end of the opposite support (4) and installed with a clamping means (7) clamped and unclamped by a pressure plate (11) operated by a wedge (12), 상기 클램핑수단(7)은, 지지대(4)의 측면에 고정되는 고정편(8a)이 마주보게 배치되는 ㄷ자형의 고정구(8)와, 고정구(8)에 의해 형성된 작동공간(9)에 내입되는 승강판(10)과, 승강판(10)의 상단에 용접 고정된 가압판(11)과, 상기 고정구(8)의 양측 고정편(8a)에 형성된 쐐기결합공(8b)과 승강판(10)에 형성된 작동공(10a)을 통해서 조립되는 쐐기(12)로 이루어지고,The clamping means (7) is embedded in the working space (9) formed by the U-shaped fastener (8) and the fastener (8) in which the fixing piece (8a) fixed to the side of the support (4) is disposed facing each other. The elevating plate 10, the press plate 11 welded and fixed to the upper end of the elevating plate 10, and the wedge coupling holes 8b and elevating plate 10 formed on both side fixing pieces 8a of the fastener 8. Consists of the wedge 12 is assembled through the operating hole (10a) formed in the), 상기 승강판(10)은 평 단면으로 볼 때 쐐기(12)의 두께보다 큰 치수의 간격을 두고 평행하게 2개의 수직판(10b)이 위치되고, 이들 2개의 수직판(10b) 상하단을 경사편(10c)으로 연결되게 하여 작동공(10a)을 형성하고, 상기 가압판(11)은 2개의 수직판(10b)과 평행하게 결합하여 상기 수직판(10b)과 쐐기(12)가 평행하게 배열된 상태에서 쐐기(12)의 넓은 쪽을 타압할 때 가압판(11)이 작업발판(110)을 클램핑하고, 반대로 쐐기(12)의 가압력이 해제된 상태에서 수직판(10b)과 쐐기(12)를 직각방향으로 배열하여 가압판(11)이 작업발판(110)을 언클램핑하게 한 것을 특징으로 하는 작업발판 설치대.As for the elevating plate 10, two vertical plates 10b are positioned in parallel with an interval of a dimension larger than the thickness of the wedge 12 when viewed in a planar cross section, and the upper and lower ends of the two vertical plates 10b are inclined. It is connected to the (10c) to form the operating hole (10a), the pressing plate 11 is coupled in parallel with the two vertical plate (10b) is the vertical plate 10b and the wedge 12 is arranged in parallel When pressing the wide side of the wedge 12 in the state, the pressure plate 11 clamps the working scaffold 110, and on the contrary, the vertical plate 10b and the wedge 12 are held in a state where the pressing force of the wedge 12 is released. The working scaffolding mounting platform, characterized in that the pressure plate 11 to unclamp the working scaffold 110 arranged in a right angle.
KR2020090009758U 2009-07-24 2009-07-24 Install mount for a scaffold KR200459161Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020090009758U KR200459161Y1 (en) 2009-07-24 2009-07-24 Install mount for a scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020090009758U KR200459161Y1 (en) 2009-07-24 2009-07-24 Install mount for a scaffold

Publications (2)

Publication Number Publication Date
KR20110001102U KR20110001102U (en) 2011-02-01
KR200459161Y1 true KR200459161Y1 (en) 2012-03-21

Family

ID=44206216

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020090009758U KR200459161Y1 (en) 2009-07-24 2009-07-24 Install mount for a scaffold

Country Status (1)

Country Link
KR (1) KR200459161Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102442929B1 (en) * 2021-09-17 2022-09-14 주식회사 현구조기술사사무소 Scaffolding system for the construction work

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102257029B1 (en) * 2019-10-22 2021-05-27 김진곤 Scaffold for stair hall of building

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010083837A (en) * 2001-07-03 2001-09-03 윤종철 footing supporter

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010083837A (en) * 2001-07-03 2001-09-03 윤종철 footing supporter

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102442929B1 (en) * 2021-09-17 2022-09-14 주식회사 현구조기술사사무소 Scaffolding system for the construction work

Also Published As

Publication number Publication date
KR20110001102U (en) 2011-02-01

Similar Documents

Publication Publication Date Title
JP6210453B2 (en) Branch mounting bracket for angle tower
KR101328969B1 (en) Stanchion bar
KR200459161Y1 (en) Install mount for a scaffold
EP3121349B1 (en) Formwork structure for the execution of horizontal castings for the provision of floor slabs
JP4380429B2 (en) Anchor bolt installation method and anchor bolt installation device for steel pipe foundation pile
JP4611184B2 (en) Wall panel mounting method and mounting device
KR200429997Y1 (en) With work construction method
JP2617737B2 (en) Wall formwork support device
JP4703893B2 (en) Gap shielding device for scaffolding board
KR101082666B1 (en) Safety fence device
CN102421971A (en) Method and apparatus for attaching objects on and above a ceiling with unattached ceiling panels and ceiling beams
KR101446010B1 (en) Electric switch box fixing apparatus
CN114075878B (en) Assembled superimposed sheet installation device
JP5800780B2 (en) Sleeper fixture and safety belt support device
KR101284190B1 (en) Joint apparatus for form
CN213294355U (en) Steel wire rope clamping device
CN210216523U (en) Single-pile vertical uplift static load test system suitable for various pile types
KR100769305B1 (en) Joint apparatus for form
JP5129947B2 (en) Catch clamp in scaffold fixing device
KR20120000866U (en) Install equipment for operation to pisibim work
KR101910250B1 (en) A clamp for scaffolding
CN112408182B (en) Caliper for fixing and hoisting in hoisting construction and use method
JP6604650B2 (en) Retaining wall formwork fixed hardware
CN211490536U (en) Auxiliary cutting device for cutting machine
CN216740750U (en) Positioning fixture

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20150302

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160302

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170302

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180302

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190304

Year of fee payment: 8