KR200454741Y1 - Spiral Multi Rebar Nail - Google Patents
Spiral Multi Rebar Nail Download PDFInfo
- Publication number
- KR200454741Y1 KR200454741Y1 KR2020100012522U KR20100012522U KR200454741Y1 KR 200454741 Y1 KR200454741 Y1 KR 200454741Y1 KR 2020100012522 U KR2020100012522 U KR 2020100012522U KR 20100012522 U KR20100012522 U KR 20100012522U KR 200454741 Y1 KR200454741 Y1 KR 200454741Y1
- Authority
- KR
- South Korea
- Prior art keywords
- reinforcement
- shear
- spiral
- deformed
- nail
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/14—Geometrical or physical properties resilient or elastic
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1671—Shapes helical or spiral
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Abstract
본 고안은 나선형 다철근 네일에 관한 것으로, 지중으로 천공된 천공홀에 삽입하는 이형철근(110)과, 상기 이형철근(110)에 양단을 결합하여 상호 평행되게 하되 양단부를 밴딩하여 코일형상의 나선탄성부(121)를 형성한 전단보강부재(120), 및 상기 이형철근(110)을 중앙부에 관통시켜 결합하되 외주연에 전단보강부재(120)를 지지하는 삽입홈(131)을 형성한 간격유지구(130)로 구성하므로, 절개사면이나 굴착공사의 사면보강공사 또는 흙막이공 보강공사 등에 적용하여 전단보강부재가 결합된 앵커체로 전단력이 큰 예상파괴면에 하나 또는 복수로 사용함으로써 지반의 파괴유형이나 특성에 적절히 대응하여 사면, 굴착수직벽이나 터널의 안정성을 증대시킬 수 있도록 하는 효과가 있다. The present invention relates to a spiral multi-bar reinforcing nail, a deformed reinforcement (110) inserted into a perforated hole drilled into the ground, and coupled to both ends of the deformed reinforcement (110) to be parallel to each other while bending both ends of the coil-shaped spiral Shear reinforcement member 120 having an elastic portion 121, and the reinforcing reinforcing bar 110 through the center portion is coupled to the gap formed by the insertion groove 131 for supporting the shear reinforcement member 120 on the outer periphery Since it consists of a holding tool 130, it is applied to an incline slope or excavation slope reinforcement work or earth reinforcement reinforcement work, such as anchor reinforcement combined with shear reinforcement member used in one or more of the expected fracture surface with a large shear force to destroy the ground Appropriately corresponding to the type and characteristics there is an effect to increase the stability of the slope, excavated vertical wall or tunnel.
Description
본 고안은 나선형 다철근 네일에 관한 것으로, 보다 상세하게는 전단저항력을 증가시킬 뿐만 아니라 필요에 간편하게 설치할 있도록 하는 나선형 다철근 네일에 관한 것이다.
The present invention relates to a spiral multi-bar nail, and more particularly to a spiral multi-bar nail to increase the shear resistance as well as to easily install as needed.
일반적으로 사면의 보강공법으로는 네일링공법이나 앵커공법을 주로 사용하였으며, 록볼트공법과 네일링공법은 이형철근이나 강봉을 지중에 삽입하고 공벽과 보강재 사이의 공간을 주입재로 그라우팅하여 설치하는 것으로, 설치 후 발생되는 지중변위가 지압판에 전달되어 보강재의 인장력이나 전단력으로 저항하게 하는 구조이다.In general, the reinforcing method of slope is mainly used nailing method or anchoring method, and rock bolt method and nailing method are installed by inserting a deformed reinforcing bar or steel bar into the ground and grouting the space between the ball wall and the reinforcement with injection material. The underground displacement generated after installation is transmitted to the pressure plate to resist the tensile or shear force of the reinforcement.
여기서 앵커공법은 인장재로 강봉이나 강연선을 주로 사용하고 정착구간의 주입재와 앵커체 또는 앵커체를 포함한 주입재와 공벽과의 마찰저항력을 이용하여 외부에서 인장력을 도입하고 자유구간에 설치된 인장재로 인장하중을 지압판에 전달시켜 사면이나 수직굴착면의 안정성을 증가시키는 공법이다.Here, anchor method mainly uses steel bar or strand as tension material, and introduces tensile force from outside by using friction material between injection material of anchorage section and injection material including anchor body or anchor body and hollow wall and tension load with tension material installed in free section. It is a method to increase the stability of slope or vertical excavation surface by transferring to the pressure plate.
이러한 앵커공법은 정착구간내의 마찰저항의 작용에 따라 마찰형과 지압형으로 대별되고, 마찰형앵커는 다시 마찰형과 압축형으로 구분된다. The anchor method is roughly divided into friction type and acupressure type according to the action of frictional resistance in the fixing section, and the friction type anchor is divided into friction type and compression type.
나아가 네일링공법이나 앵커공법은 단순히 정착구간내에서 마찰저항이나Furthermore, the nailing method or anchoring method is simply used to
지압력과 보강재나 인장재의 인장력이나 전단력을 이용하고 있다.The bearing force and the tension or shear force of the reinforcement and tension member are used.
그러나 기존의 록볼트공법 또는 네일링공법이나 앵커공법에서 붕괴가 발생된 경우를 살펴보면, 토질정수의 불확실성, 예상파괴면에서의 부적절한 예측, 부적당한 설치간격, 인장재료나 보강재의 부적절한 선택, 정착장 계산의 부적합, 과도한 지하수압의 작용 등의 여러 가지 원인이 하나 또는 복합적으로 작용되어 재붕괴가 발생되는 것으로, 특히 대부분의 붕괴사고를 살펴보면 예상파괴면의 전단저항력 부족으로 보강재의 파단 또는 과도한 휨현상이 발생되는 점을 감안하면 붕괴 방지를 위한 전단력의 보강이 시급한 실정이다.
However, in the case of the collapse of the existing rock bolt method, nailing method or anchor method, the uncertainty of soil constant, inadequate prediction in predicted fracture surface, inadequate installation interval, inadequate selection of tensile material or reinforcement, anchorage One or a combination of reasons, such as inadequate calculation and excessive groundwater pressure, may cause re-decay. In particular, most collapses result in the failure of shear resistance or excessive bending due to the lack of shear resistance at the expected fracture surface. Considering the fact that it is necessary to reinforce the shear force to prevent collapse.
따라서 본 고안의 주 목적은 이형철근에 간편하고 편리하게 전단보강부재를 결합하여 현장 지반여건이나 절개면이나 굴착면의 파괴형태 등을 감안하여 효과적으로 전단력을 보강할 수 있도록 하는 나선형 다철근 네일을 제공하는 데 있다.
Therefore, the main purpose of the present invention is to provide a spiral multi-bar nail to effectively reinforce the shear force in consideration of site ground conditions, fracture shape of the incision surface or excavation surface by combining shear reinforcement members with ease and convenience to the deformed rebar. There is.
이러한 목적을 달성하기 위하여 본 고안의 나선형 다철근 네일은 지중으로 천공된 천공홀에 삽입하는 이형철근과, 상기 이형철근에 양단을 결합하여 상호 평행되게 하되 양단부를 밴딩하여 코일형상의 나선탄성부를 형성한 전단보강부재, 및 상기 이형철근을 중앙부에 관통시켜 결합하되 외주연에 전단보강부재를 지지하는 삽입홈을 형성한 간격유지구로 구성함을 그 기술적 구성상의 기본 특징으로 한다.
In order to achieve the above object, the spiral multi-bar rebar nail of the present invention is combined with both ends of the reinforcing bar inserted into the perforated hole in the ground, and the both ends of the reinforcing bar are parallel to each other to form a coil-shaped spiral elastic part by bending both ends. It consists of a shear reinforcing member, and the spacing retaining member is formed by inserting the reinforcing reinforcing bar through the center portion and the insertion groove for supporting the shear reinforcing member on the outer periphery.
이러한 본 고안의 나선형 다철근 네일은 절개면이나 굴착면의 지중으로 이형철근을 설치하되 이형철근의 상하부에 전단보강부재의 나선탄성부를 조립하는 것으로, 절개사면이나 굴착공사의 사면보강공사 또는 흙막이공 보강공사 등에 적용하여 전단보강부재가 결합된 앵커체로 전단력이 큰 예상파괴면에 하나 또는 복수로 사용함으로써 지반의 파괴유형이나 특성에 적절히 대응하여 사면, 굴착수직벽이나 터널의 안정성을 증대시킬 수 있도록 하는 효과가 있다.
The spiral multi-rebar nail of the present invention is to install the reinforcing bar into the ground of the incision surface or the excavation surface, but to assemble the spiral elastic part of the shear reinforcing member on the upper and lower parts of the reinforcing bar, the slope reinforcement work or the earth screening work of the cutting slope or the excavation work. Applied to reinforcement, such as anchor body combined with shear reinforcing member, one or more used in the anticipated fracture surface with high shear force, so that the stability of slope, excavation vertical wall or tunnel can be increased in response to the failure type and characteristics of the ground. It is effective.
도 1 은 본 고안에 따른 나선형 다철근 네일을 설명하기 위해 나타낸 분해 사시도.
도 2 는 본 고안에 따른 나선형 다철근 네일을 설명하기 위해 나타낸 사시도.
도 3 은 본 고안에 따른 나선형 다철근 네일을 설명하기 위해 나타낸 정면도.
도 4 는 본 고안에 따른 나선형 다철근 네일을 설명하기 위해 설치상태를 나타낸 정면도.
도 5 는 본 고안에 따른 나선형 다철근 네일을 설명하기 위해 나타낸 분해 사시도.
도 6 은 본 고안에 따른 나선형 다철근 네일을 설명하기 위해 나타낸 사시도.
도 7 은 본 고안에 따른 나선형 다철근 네일을 설명하기 위해 나타낸 분해 정면도.1 is an exploded perspective view showing a spiral multi-bar nail according to the present invention.
Figure 2 is a perspective view showing to explain a spiral multi-bar nail according to the present invention.
Figure 3 is a front view showing to explain the spiral multi-bar nail according to the present invention.
Figure 4 is a front view showing an installation state to explain the spiral multi-bar nail according to the present invention.
5 is an exploded perspective view illustrating the spiral multi-bar nail according to the present invention.
Figure 6 is a perspective view for explaining the spiral multi-bar nail according to the present invention.
7 is an exploded front view showing a spiral multi-bar nail according to the present invention.
이하, 첨부된 도면을 참조하면서 본 고안의 실시 예를 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention with reference to the accompanying drawings as follows.
도 1 내지 도 7 에 나타낸 바와 같이, 본 고안의 나선형 다철근 네일(100)은 지중으로 천공된 천공홀에 삽입하여 이형철근(110)과, 상기 이형철근(110)에 양단을 결합하여 상호 평행되게 하되 양단부를 밴딩하여 코일형상의 나선탄성부(121)를 형성한 전단보강부재(120), 및 상기 이형철근(110)을 중앙부에 관통시켜 결합하되 외주연에 전단보강부재(120)를 지지하는 삽입홈(131)을 형성한 간격유지구(130)로 구성한다.As shown in Figures 1 to 7, the spiral
상기 이형철근(110)은 절개사면이나 굴착면에 구멍을 천공한 천공홀에 삽입한다.The deformed
상기 전단보강부재(120)는 강봉으로 형성하고 양단을 밴딩하여 코일 형상으로 형성하되 이형철근(110)의 외경보다 코일 부분의 내경을 약간 작게 형성하여 삽입할 때 이형철근(110)의 엇갈리는 마디마디에 자체탄성으로 통과할 수 있도록 형성함이 바람직하다.The
상기 간격유지구(130)는 중앙을 이형철근(110)에 관통시켜 적정간격으로 다수개 설치하되 외주연 한 개 이상의 삽입홈(131)을 형성하여 천공홀의 내주연과 이형철근(110)의 간격을 일정하게 유지할 수 있도록 한다.The
이러한 본 고안의 나선형 다철근 네일은 절개면이나 굴착면의 지중으로 이형철근(110)을 설치하되 이형철근(110)의 상하부에 전단보강부재(120)의 나선탄성부(121)를 조립한다.The spiral multi-rebar nail of the present invention is to install the
여기서 이형철근(110)에 적정간격으로 결합된 간격유지구(130)의 삽입홈(131)에 전단보강부재(120)의 삽입하여 지지하므로 이형철근(110)과 일정간격을 유지하도록 함과 동시에 천공홀의 내주연과도 적정한 간격을 유지 할 수 있도록 한다.Here, the
나아가, 이형철근(110)의 외경보다 나선탄성부(121)의 코일 내경을 약간 작게 형성하므로 전단보강부재(120)를 나선탄성부(121)를 이형철근(110)에 삽입할 때 이형철근(110)의 엇갈리는 마디마디에 차체탄성으로 통과시켜 결합시키는 것으로 결합 후 외부충격에도 쉽게 분리하지 않도록 한다,Furthermore, since the coil inner diameter of the spiral
특히, 본 고안의 네일(100)은 절개사면이나 굴착공사의 사면보강공사 또는 흙막이공 보강공사 등에 적용하여 전단보강부재(120)가 결합된 네일(100)로 전단력이 큰 예상파괴면에 하나 또는 복수로 사용함으로써 지반의 파괴유형이나 특성에 적절히 대응하여 사면, 굴착수직벽이나 터널의 안정성을 증대시킬 수 있도록 하는 것이다.
In particular, the
100 : 네일 110 : 이형철근
120 : 전단보강부재 121 : 나선탄성부
130 : 간격유지구 131 : 삽입홈
140 : 정착두부 150 : 지압판부 100: nail 110: deformed rebar
120: shear reinforcing member 121: spiral elastic portion
130: spacing 131: insertion groove
140: fixing head 150: acupressure plate
Claims (2)
상기 이형철근(110)에 양단을 결합하여 상호 평행을 유지하도록 하고 양단부를 밴딩하여 코일 형상의 나선탄성부(121)를 형성하되 나선탄성부(121)의 코일부분 내경을 이형철근(110)의 외경보다 작게 형성하여 삽입할 때 이형철근(110)의 엇갈리는 마디마디에 나선탄성부(121)의 자체탄성으로 통과할 수 있도록 하는 전단보강부재(120), 및
상기 이형철근(110)을 중앙부에 관통시켜 결합하되 외주연에 전단보강부재(120)를 지지하는 삽입홈(131)을 형성한 간격유지구(130)로 구성한 것을 특징으로 하는 나선형 다철근 네일.Deformed steel reinforcing bar 110 to be inserted into the drilled hole in the ground,
Both ends are coupled to the deformed reinforcement 110 to maintain parallel to each other, and both ends are bent to form a coil-shaped spiral elastic part 121, but the inner diameter of the coil portion of the spiral resilient part 121 may be changed. Shear reinforcing member 120 to pass through the self-elasticity of the spiral elastic portion 121 in the staple node of the deformed reinforcement 110 when inserted and formed smaller than the outer diameter, and
The spiral rebar nail, characterized in that consisting of a gap retaining hole 130 is formed by inserting the groove 131 for supporting the shear reinforcing member 120 on the outer periphery of the reinforcing bar 110 through the center portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020100012522U KR200454741Y1 (en) | 2010-12-03 | 2010-12-03 | Spiral Multi Rebar Nail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020100012522U KR200454741Y1 (en) | 2010-12-03 | 2010-12-03 | Spiral Multi Rebar Nail |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200454741Y1 true KR200454741Y1 (en) | 2011-07-22 |
Family
ID=49299632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020100012522U KR200454741Y1 (en) | 2010-12-03 | 2010-12-03 | Spiral Multi Rebar Nail |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200454741Y1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101201829B1 (en) * | 2012-03-13 | 2012-11-15 | 박주봉 | Micropile |
KR101444225B1 (en) | 2013-12-27 | 2014-09-29 | 거명산업개발(주) | Micropile |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000328716A (en) * | 1999-05-20 | 2000-11-28 | Tokyo Tekko Co Ltd | Reinforcement connecting device and reinforcement connecting method |
KR100741506B1 (en) * | 2006-02-22 | 2007-07-20 | 김영호 | Reinforcement for civil engineering works |
-
2010
- 2010-12-03 KR KR2020100012522U patent/KR200454741Y1/en not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000328716A (en) * | 1999-05-20 | 2000-11-28 | Tokyo Tekko Co Ltd | Reinforcement connecting device and reinforcement connecting method |
KR100741506B1 (en) * | 2006-02-22 | 2007-07-20 | 김영호 | Reinforcement for civil engineering works |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101201829B1 (en) * | 2012-03-13 | 2012-11-15 | 박주봉 | Micropile |
KR101444225B1 (en) | 2013-12-27 | 2014-09-29 | 거명산업개발(주) | Micropile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100749012B1 (en) | Wedge-point-tip permanent anchor sets | |
KR100918771B1 (en) | Micro pile setting apparatus and settling method using the same | |
US20100054866A1 (en) | Method and apparatus for creating soil or rock subsurface support | |
JP6634219B2 (en) | Ground anchor installation method | |
KR100956879B1 (en) | Stress dispersion type microfile | |
KR100966148B1 (en) | Ground adhering soil nailing structure and ground reinforcement method using the same | |
KR200454741Y1 (en) | Spiral Multi Rebar Nail | |
KR100963682B1 (en) | Anchor assembly, method for reinforcing slope using anchor assembly | |
KR101175112B1 (en) | Multipurpose nailing anchor and construction method thereof | |
KR20100022767A (en) | A rock bed extension type ground anchor | |
KR20110098597A (en) | Guide frame for h-steel | |
KR101241351B1 (en) | The nail with high anchorage and the nailing construction method thereof | |
KR200449724Y1 (en) | Rock bolt for underground hole | |
KR20120102480A (en) | Phc pile with improved end bearing capacity and piling method of phc pile using the same | |
WO2014179828A1 (en) | Apparatus and methods for stabilising rock | |
KR20110018160A (en) | Nail fixing unit for slope reinforcement | |
KR100892322B1 (en) | A soil-nail structure using bamboo | |
KR101202845B1 (en) | Hybrid ground reinforcing method by earth anchor and soil nail | |
KR20130029906A (en) | An expanding device of frictional force | |
KR100951872B1 (en) | The ground reinforcement apparatus and ground reinforcement method | |
KR100741506B1 (en) | Reinforcement for civil engineering works | |
KR101065619B1 (en) | Tiebolt construction method between tunnel section | |
KR20150085602A (en) | Foundation structure and construction method thereof | |
KR20060122381A (en) | Swelling reinforced material | |
KR100903407B1 (en) | Soil nail anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20140428 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20150629 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20170718 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |