KR200444846Y1 - Signed a construction site installation conclusion tool - Google Patents

Signed a construction site installation conclusion tool Download PDF

Info

Publication number
KR200444846Y1
KR200444846Y1 KR2020090002226U KR20090002226U KR200444846Y1 KR 200444846 Y1 KR200444846 Y1 KR 200444846Y1 KR 2020090002226 U KR2020090002226 U KR 2020090002226U KR 20090002226 U KR20090002226 U KR 20090002226U KR 200444846 Y1 KR200444846 Y1 KR 200444846Y1
Authority
KR
South Korea
Prior art keywords
band
hook
support shaft
fastening band
hooks
Prior art date
Application number
KR2020090002226U
Other languages
Korean (ko)
Inventor
김규배
Original Assignee
주식회사 금호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 금호 filed Critical 주식회사 금호
Priority to KR2020090002226U priority Critical patent/KR200444846Y1/en
Application granted granted Critical
Publication of KR200444846Y1 publication Critical patent/KR200444846Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B5/00Joining sheets or plates, e.g. panels, to one another or to strips or bars parallel to them
    • F16B5/06Joining sheets or plates, e.g. panels, to one another or to strips or bars parallel to them by means of clamps or clips
    • F16B5/0607Joining sheets or plates, e.g. panels, to one another or to strips or bars parallel to them by means of clamps or clips joining sheets or plates to each other

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

본 고안은 공사현장 둘레에 합성수지제 다공판으로 된 가림판을 설치할 때 가림막을 지주에 부착하기 위해 사용하는 체결구에 관한 것으로 보다 구체적인 것은 " U " 형상으로 된 체결밴드(1)의 연결부 중앙정점에 나사구멍(1a)이 형성되어 고정볼트(1b)가 나사조립되고 체결밴드의 개방부측 양단에 각각 집게장치부(1c)를 형성하여 지지축(2)을 관통시킨 다음 집게장치부에는 하단에 내측으로 절곡부(3a)(4a)가 형성되고 상단에 지지축관(3b)(4b)이 형성되어 집게장치부(1c) 바닥을 사이에 두고 양측 걸고리의 상단 지지축관(3b)(4b)이 지지축(2)에 끼워지도록 되는 집게형상의 걸고리(3)(4)를 장치하여 두 걸고리(3)(4)의 상단 지지부에 코일스프링(5)을 끼워 코일스프링의 양단부(5a)(5b)가 감기는 방향으로 걸고리 외면에 접촉되게하여 양측 집게형 걸고리가 내향으로 탄력이 축적되게 하고 벌어지는 걸고리의 측면에 작동돌편(4c)을 형성하여 그 내면에 체결밴드(1)에 결합시킨 작동밴드(7)의 개방부측에 형성시킨 작동돌기(7c)가 접촉되게하며 작동밴드(7)는 작동돌기 상측에서 작동돌기 반대측으로 지지부(7a)를 형성하여 체결밴드에 고정시킨 회전축(6)에 끼워지고 상단부에 손잡이(7b)를 형성하여서 작동밴드(7)의 작동돌기가 집게형 걸고리의 일측 걸고리를 벌리고 스프링의 복원에 따라 오므려지게 한 공사장 가림막 설치용 체결구이다.The present invention relates to a fastener used to attach a screen to a support when installing a screening plate made of a synthetic resin porous plate around a construction site, and more specifically, a center point of a connection part of a fastening band (1) having a "U" shape. The screw holes 1a are formed in the fixing bolts 1b, and the fixing bolts 1b are screw-assembled, and each of the clamping device portions 1c is formed at both ends of the opening part side of the fastening band to penetrate the support shaft 2, Bending portions 3a and 4a are formed inwardly, and support shaft tubes 3b and 4b are formed at the upper end, so that the upper support shaft tubes 3b and 4b of both hooks are disposed with the bottom of the tongs unit 1c interposed therebetween. Clamp-shaped hooks (3) and (4) to be fitted to the support shaft (2) are fitted so that the coil springs (5) are fitted to the upper support portions of the two hooks (3) and (4), and both ends 5a and 5b of the coil springs. ) In the direction of winding so that both sides of the hook-type hook inwards The elasticity is accumulated and the operation protrusion piece 4c is formed on the side of the hook which is opened, and the operation protrusion 7c formed on the open side of the operation band 7 coupled to the fastening band 1 is contacted on the inner surface thereof. The band 7 is formed on the rotating shaft 6 fixed to the fastening band by forming a support portion 7a from the upper side of the operating protrusion to the opposite side of the operating protrusion, and forming a handle 7b at the upper end thereof so that the operating protrusion of the operating band 7 is formed. It is a fastener for installation of construction screens, which opens one side of the clip-type hook and retracts according to the restoration of the spring.

체결밴드, 나사구멍, 고정볼트, 집게장치부 Fastening band, screw hole, fixing bolt, tong device

Description

공사장 가림막 설치용 체결구{Signed a construction site installation conclusion tool}Signed a construction site installation conclusion tool}

본 고안은 공사현장 둘레에 합성수지제 다공판으로 된 가림판을 설치할 때 가림막을 지주에 부착하기 위해 사용하는 체결구에 관한 것으로 보다 구체적인 것은 지주외면에 결합하는 체결밴드의 개방부 양단에 각각 스프링에 의하여 일정각도 범위에서 신축되는 집게형상의 걸고리를 장치하고 체결밴드에 포개어져 작동하도록 작동밴드를 장치하고 작동밴드의 개방부 양단에 걸고리 작동돌기를 형성하여 체결밴드에 장치된 일측걸고리를 벌리고 오므릴 수 있게 함으로써 간편하게 걸고리가 개폐되어 가림막의 부착부를 가림막 설치용 지주에 결합시킬 수 있는 원터치형 체결구를 얻는 것이다.The present invention relates to a fastener used for attaching a screen to a support when installing a screening plate made of a synthetic resin porous plate around a construction site. More specifically, each spring is connected to both ends of an opening of a fastening band which is coupled to an outer surface of the support. It is equipped with a clamp-shaped hook that is stretched in a certain angle range, and the operating band is arranged to operate by being superimposed on the fastening band, and the hooking protrusion is formed at both ends of the opening of the operating band to open and retract one side hook mounted on the fastening band. It is possible to obtain a one-touch fastener capable of easily opening and closing the hook and coupling the attachment portion of the screen to the support for installing the screen.

종래의 가림막은 지주와 가림막을 결착기구로 하나하나 결착시킴으로 작업이 불편하여 설치와 해체에 많은 인력과 시간이 걸리는 불편이 있어서 비능률적인 결점이 있었다.Conventional screening has been inconvenient because it takes a lot of manpower and time to install and dismantle because the operation is inconvenient by binding the support and the screen as a binding mechanism one by one.

본 고안은 위와 같은 종래의 결점을 개선하기 위하여 개발한 것이다.The present invention has been developed to improve the above conventional drawbacks.

본 고안은 체결밴드(1)의 개방부 외면에 집게형 걸고리(3)(4)를 부착하고 체결밴드(1)에 중첩되게 작동밴드를 장치하여 그 개방부에 작동돌기를 만들어서 작동돌기가 집게형걸고리를 벌려주고 걸고리 사이에 장치된 스프링힘으로 오므려지게하여 지주와 가림막을 간편하게 체결할 수 있게 한 것이다.The present invention is attached to the clamping hook (3) (4) on the outer surface of the opening of the fastening band (1) and the operating band is installed so as to overlap the fastening band (1) to make the working projection in the opening to the working projection clamp Opening the hook and closing it with the spring force installed between the hook, so that it is easy to fasten the prop and the screen.

이와 같이 된 본 고안은 체결밴드(1)를 지주(8) 외면에서 씌워서 체결밴드(1) 개방부에 장치된 집게형 걸고리(3)(4)가 가림막 쪽으로 향하도록 밀착시켜서 가림막(9)의 결합홈(9a)에 일측 걸고리(3)의 절곡부(3a)가 먼저 투입되게 하고 그 상태에서 작동밴드(7), 손잡이(7b)를 눌러 작동밴드의 지지부(7a)가 회전축(6)을 중심으로 회전하면 작동돌기(7c)가 타측 걸고리(4)의 작동돌편(4c)을 내측에서 외측으로 밀어 외측으로 벌려서 걸고리 내측에 타측 가림막(10)의 결합홈(10a)이 삽입되게 한 다음 작동밴드(7)를 놓으면 코일스프링(5)의 탄력으로 두 걸고리(3)(4)가 오므려지면서 그 사이에 가림막(9)(10)의 결합홈(9a)(10a)이 개입되어 가림막의 결합부가 밀착되게 된다.In this way, the present invention covers the fastening band (1) on the outer surface of the support (8) so that the clip-shaped hooks (3) (4) mounted on the fastening band (1) opening part are brought into close contact with the screen toward the screen. The bent portion 3a of one hook 3 is inserted into the coupling groove 9a first, and then the operating band 7 and the handle 7b are pressed to support the rotating shaft 6 by pressing the operating band 7 and the handle 7b. When it rotates to the center, the operation protrusion 7c pushes the operation protrusion 4c of the other hook 4 from the inside to the outside to open the coupling groove 10a of the other screen 10 in the hook, and then operates When the band 7 is released, the two hooks 3 and 4 are retracted by the elasticity of the coil spring 5, and the coupling grooves 9a and 10a of the screen 9 and 10 are interposed therebetween. The coupling portion will be in close contact.

이때, 체결밴드 정점의 나사구멍(1a)에 나사조립된 고정볼트(1b)를 조여서 체결밴드(1)가 지주(8)에 고정되게 함으로써 체결작업이 종료되어 가림막을 지주에 밀착 고정시킬 수 있게 된다.At this time, by tightening the fixing bolt (1b) screwed into the screw hole (1a) of the fastening band apex so that the fastening band (1) is fixed to the support (8), the fastening work is finished to be able to close the fixed screen to the support do.

따라서 가림막(9)(10)을 지주(8)에 부착시키는 고정작업이 원터치로 간편하게 이루어지고 지렛대의 원리에 입각하여 작은 힘으로 집게형걸고리를 작동시켜 벌리고 오므릴 수 있게 되므로 작업이 간편하게 되며 해체시에는 고정시의 역순으로 체결밴드(1)의 고정볼트(1b) 풀고 작동밴드(7) 손잡이를 쥐고 가압하여 작동밴드의 작동돌기(7c)가 일측걸고리(4)를 벌려서 일측 가림막의 결합홈에서 분리되게 하면 가림막이 지주에서 이완되어 해체가 가능케되고 작동밴드(7)는 코일스프링(5)의 복원력으로 원상 복귀하여 다음 작동에 대비하므로 편리하게 사용할 수 있는 이점이 있다.Therefore, the fixing work for attaching the screen (9) and (10) to the support (8) is made simple by one touch, and it is easy to open and retract by operating the tong-type hook with a small force based on the principle of the lever. In the reverse order of fixing, loosen the fixing bolt 1b of the fastening band 1, press the handle of the operating band 7 and pressurize it so that the operating protrusion 7c of the operating band spreads one hook 4 to open the coupling groove of one side screen. If the separation from the screen is loosened from the strut to enable disassembly and the operating band (7) has the advantage that can be conveniently used for the next operation to return to the original by the restoring force of the coil spring (5).

본 고안은 " U " 형상으로 된 체결밴드(1)의 연결부 중앙정점에 나사구멍(1a)이 형성되어 고정볼트(1b)가 나사조립되고 체결밴드의 개방부측 양단에 각각 집게장치부(1c)를 형성하여 지지축(2)을 관통시킨 다음 집게장치부에는 하단에 내측으로 절곡부(3a)(4a)가 형성되고 상단에 지지축관(3b)(4b)이 형성되어 집게장치부(1c) 바닥을 사이에 두고 양측 걸고리의 상단지지축관(3b)(4b)이 지지축(2)에 끼워지도록 되는 집게형상의 걸고리(3)(4)를 장치하여 두 걸고리(3)(4)의 상단 지지부에 코일스프링(5)을 끼워 코일스프링의 양단부(5a)(5b)가 감기는 방향으로 걸고 리 외면에 접촉되게하여 양측 집게형 걸고리가 내향으로 탄력이 축적되게 하고 벌어지는 걸고리의 측면에 작동돌편(4c)을 형성하여 그 내면에 체결밴드(1)에 결합시킨 작동밴드(7)의 개방부측에 형성시킨 작동돌기(7c)가 접촉되게하며 작동밴드(7)는 작동돌기 상측에서 작동돌기 반대측으로 지지부(7a)를 형성하여 체결밴드에 고정시킨 회전축(6)에 끼워지고 상단부에 손잡이(7b)를 형성하여서 작동밴드(7)의 작동돌기가 집게형 걸고리의 일측 걸고리(4)를 벌리고 스프링의 복원에 따라 오므려지게 한 구성이다.The present invention is a screw hole (1a) is formed at the center of the connection portion of the fastening band (1) of the "U" shape, the fixing bolt (1b) is screw-assembled, each of the clamping device (1c) on both ends of the open side of the fastening band The support shaft (2) is formed and then the torsion device portion is formed with bent portions (3a) and (4a) inwardly at the lower end and the support shaft tube (3b) (4b) is formed at the upper end to the forceps device portion (1c) The upper ends of the two hooks (3) and (4) are equipped with clip-shaped hooks (3) and (4) so that the upper support shaft pipes (3b) and (4b) of both hooks are fitted to the support shafts (2). Insert the coil spring 5 into the supporting part so that both ends 5a and 5b of the coil spring are hooked and contact the outer surface of the coil spring so that both clamp-type hooks accumulate inward and the working stone piece is held on the side of the hook. (4c) formed and formed on the open side of the operating band (7) coupled to the fastening band (1) on its inner surface. The projections 7c are brought into contact with each other, and the operation band 7 is fitted to the rotating shaft 6 fixed to the fastening band by forming the support portion 7a from the upper side of the operation protrusion to the opposite side of the operation protrusion, and forming a handle 7b at the upper end thereof. The actuating protrusion of the actuating band 7 is configured to open one side hook 4 of the tong-type hook and retract according to the restoration of the spring.

도 1은 본 고안의 사시도1 is a perspective view of the present invention

도 2는 본 고안의 단면도2 is a cross-sectional view of the present invention

도 3은 본 고안의 측면도3 is a side view of the present invention

도 4는 본 고안의 작동밴드 단면 예시도4 is a cross-sectional view of the operating band of the present invention

도 5는 본 고안의 사용상태 평면도이다.5 is a plan view of a state of use of the present invention.

* 도면의 주요부분에 대한 부호설명* Explanation of symbols on the main parts of the drawings

1 : 체결밴드 1a : 나사구멍1: Fastening band 1a: Screw hole

1b : 고정볼트 1c : 집게장치부1b: fixing bolt 1c: clamping unit

2 : 지지축 3,4 : 걸고리2: support shaft 3,4 hook

3a,4a : 절곡부 3b,4b : 지지축관3a, 4a: bend 3b, 4b: support shaft pipe

5 : 코일스프링 5a,5b : 코일스프링양단부 6 : 회전축 7 : 작동밴드 7a : 지지부 7b : 손잡이5: coil spring 5a, 5b: coil spring both ends 6: rotation shaft 7: operating band 7a: support 7b: handle

7c : 작동돌기7c: Operation protrusion

Claims (1)

" U " 형상으로 된 체결밴드(1)의 연결부 중앙정점에 나사구멍(1a)이 형성되어 고정볼트(1b)가 나사조립되고 체결밴드의 개방부측 양단에 각각 집게장치부(1c)를 형성하여 지지축(2)을 관통시킨 다음 집게장치부에는 하단에 내측으로 절곡부(3a)(4a)가 형성되고 상단에 지지축관(3b)(4b)이 형성되어 집게장치부(1c) 바닥을 사이에 두고 양측 걸고리의 상단 지지축관(3b)(4b)이 지지축(2)에 끼워지도록 되는 집게형상의 걸고리(3)(4)를 장치하여 두 걸고리(3)(4)의 상단 지지부에 코일스프링(5)을 끼워 코일스프링의 양단부(5a)(5b)가 감기는 방향으로 걸고리 외면에 접촉되게하여 양측 집게형 걸고리가 내향으로 탄력이 축적되게 하고 벌어지는 걸고리의 측면에 작동돌편(4c)을 형성하여 그 내면에 체결밴드(1)에 결합시킨 작동밴드(7)의 개방부측에 형성시킨 작동돌기(7c)가 접촉되게하며 작동밴드(7)는 작동돌기 상측에서 작동돌기 반대측으로 지지부(7a)를 형성하여 체결밴드에 고정시킨 회전축(6)에 끼워지고 상단부에 손잡이(7b)를 형성하여서 작동밴드(7)의 작동돌기가 집게형 걸고리의 일측 걸고리를 벌리고 스프링의 복원에 따라 오므려지게 한 공사장 가림막 설치용 체결구A screw hole 1a is formed at the center apex of the connection band 1 having a "U" shape, and the fixing bolt 1b is screw-assembled, and the clamping device parts 1c are formed at both ends of the opening side of the fastening band, respectively. After passing through the support shaft (2), the tongs section is formed inwardly bent portion (3a) (4a) at the lower end and the support shaft tube (3b) (4b) is formed at the upper end between the bottom of the tongs device (1c) To the upper support shaft of the two hooks (3) and (4) by attaching the hook-shaped hooks (3) and (4) so that the upper support shaft tubes (3b) and (4b) of both hooks are fitted to the support shaft (2). The spring 5 is inserted so that both end portions 5a and 5b of the coil spring are in contact with the outer surface of the hook in such a way that the coil spring is in contact with the hook. The actuating projection 7c formed on the open side of the actuating band 7 which is formed and coupled to the fastening band 1 on its inner surface is The operating band 7 is fitted into the rotary shaft 6 fixed to the fastening band by forming a support portion 7a from the upper side of the operating protrusion to the opposite side of the operating protrusion, and forming a handle 7b at the upper end of the operating band 7. Fasteners for construction work screens in which the working projection of the hook opens one hook of the clip-type hook and is retracted according to the restoration of the spring.
KR2020090002226U 2009-02-27 2009-02-27 Signed a construction site installation conclusion tool KR200444846Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020090002226U KR200444846Y1 (en) 2009-02-27 2009-02-27 Signed a construction site installation conclusion tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020090002226U KR200444846Y1 (en) 2009-02-27 2009-02-27 Signed a construction site installation conclusion tool

Publications (1)

Publication Number Publication Date
KR200444846Y1 true KR200444846Y1 (en) 2009-06-10

Family

ID=41349620

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020090002226U KR200444846Y1 (en) 2009-02-27 2009-02-27 Signed a construction site installation conclusion tool

Country Status (1)

Country Link
KR (1) KR200444846Y1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101224543B1 (en) * 2010-07-12 2013-01-22 (주)하나기업 Clamp for assembling fences
KR200466071Y1 (en) * 2012-11-14 2013-03-27 명진산업개발 주식회사 clip joiner for installing shading fence for construction site
CN104015249A (en) * 2014-06-13 2014-09-03 富于安(福建)环保模板有限公司 Fast assembly and disassembly clamp for fixing pipes used for concrete formworks
KR20170003109U (en) * 2016-02-26 2017-09-05 김생연 Fixing device for shielding plates

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101224543B1 (en) * 2010-07-12 2013-01-22 (주)하나기업 Clamp for assembling fences
KR200466071Y1 (en) * 2012-11-14 2013-03-27 명진산업개발 주식회사 clip joiner for installing shading fence for construction site
CN104015249A (en) * 2014-06-13 2014-09-03 富于安(福建)环保模板有限公司 Fast assembly and disassembly clamp for fixing pipes used for concrete formworks
CN104015249B (en) * 2014-06-13 2017-03-29 富于安(福建)环保模板有限公司 A kind of quick despatch fixture between concrete blinding fixing pipe
KR20170003109U (en) * 2016-02-26 2017-09-05 김생연 Fixing device for shielding plates

Similar Documents

Publication Publication Date Title
KR200444846Y1 (en) Signed a construction site installation conclusion tool
RU2361142C2 (en) Hose clip
JP5060161B2 (en) Roof repair bracket and roof repair structure using the same
JP4002992B2 (en) Expansion ring assembly
KR100808545B1 (en) Pipe joint
HUE031124T2 (en) Profile clamp with seal element
KR200411822Y1 (en) Clamp for tightening pipe
JP5663405B2 (en) Roof mounting fixture
KR101645922B1 (en) Pipe Hanger
KR20160024301A (en) Building finishing composition
KR20210003036A (en) Standing Tube Fixture
KR101006072B1 (en) Manhole Fixing
KR200444847Y1 (en) Signed a construction site installation conclusion tool
KR101219991B1 (en) Side hanger
KR20120110296A (en) Pipe connector in greenhouse
CN106786121B (en) Wire clamp installation tool
KR100892784B1 (en) Fixing device for drain pipe
JP5637941B2 (en) Roof mounting fixture
JP5230029B2 (en) Mounting structure for roof mounting fixture
JP5588791B2 (en) Roof mounting fixture
JP2009102810A (en) Pipe material supporting implement and pipe material supporting method using it
KR101783028B1 (en) A pipe hanger
KR200445969Y1 (en) fastener for construction place screen installation
JP5637940B2 (en) Roof mounting fixture
JP2012149682A (en) Pipe member gripping implement

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20130603

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140602

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20150622

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170710

Year of fee payment: 9

EXPY Expiration of term