KR200433916Y1 KR2020060026751U KR20060026751U KR200433916Y1 KR 200433916 Y1 KR200433916 Y1 KR 200433916Y1 KR 2020060026751 U KR2020060026751 U KR 2020060026751U KR 20060026751 U KR20060026751 U KR 20060026751U KR 200433916 Y1 KR200433916 Y1 KR 200433916Y1
Authority
KR
South Korea
Prior art keywords
gangform
wall
coupling
fixing
support cone
Prior art date
Application number
KR2020060026751U
Other languages
Korean (ko)
Inventor
권종규
Original Assignee
주식회사 근하기공
권종규
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 근하기공, 권종규 filed Critical 주식회사 근하기공
Priority to KR2020060026751U priority Critical patent/KR200433916Y1/en
Application granted granted Critical
Publication of KR200433916Y1 publication Critical patent/KR200433916Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0651One-piece elements
    • E04G17/0654One-piece elements remaining completely or partially embedded in the cast material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3219Means supported by the building wall, e.g. security consoles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

본 고안은 고층 건물의 벽체를 시공할 때 사용하는 갱폼의 낙하를 방지할 수 있도록 하기 위하여 커플링을 이용하도록 하는 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조를 개시한다.The present invention discloses a gangform drop prevention structure for wall construction using the coupling of the buried support cone to use the coupling to prevent the fall of the gangform used when constructing the wall of the high-rise building.

본 고안은 갱폼을 타워 크레인에 의하여 인상시키는 경우를 제외한 어떤 경우에도 벽체를 시공하기 위한 갱폼이 낙하되지 않도록 하기 위한 것이다. 이를 위하여 본 고안은 갱폼 및 내측 거푸집에 의하여 형성된 공간에 콘크리트를 타설하여 양생하는 과정에서 벽체에 매립한 앵커볼트 및 지지콘과, 이에 체결되는 고정 볼트 및 사각 와셔를 구비하며, 갱폼에 설치되어 외벽에 접하는 강판에 커플링의 외측면으로 돌출되는 돌출부가 삽입될 수 있도록 한 고정공을 형성하여서 된 것이며, 필요에 따라 돌출부의 외경에 경사부가 형성되도록 하거나 돌출부의 선단에 걸림턱이 형성될 수 있도록 하여서 된 것이다. The present invention is to ensure that the gangform for the construction of the wall does not fall in any case except for lifting the gangform by the tower crane. To this end, the present invention is provided with anchor bolts and support cones embedded in the wall in the process of pouring concrete into the space formed by the gang foam and the inner formwork, and fixing bolts and square washers fastened thereto, and are installed on the gang foam and the outer wall. It is made by forming a fixing hole for inserting the projection projecting to the outer surface of the coupling in the steel plate in contact with, so that the inclined portion is formed in the outer diameter of the projection or, if necessary, so that the locking step can be formed at the tip of the projection. It was done.

이러한 본 고안은 커플링의 돌출부가 벽체의 외측으로 돌출 되도록 하여 벽체에 매립된 지지콘의 내부에 고정시키고 벽체내부에 매립된 앵커볼트와 일체로 체결되며, 벽체의 외측으로 돌출된 돌출부가 갱폼의 강판에 형성된 고정공 삽입구에 삽입된 상태가 되도록 갱폼을 설치한 다음 고정볼트를 이용하여 커플링의 돌출부에 형성된 나사공에 결합시켜 체결함으로써 갱폼을 고정한 상태에서 구조물의 성형을 위하여 내측에 거푸집을 대고 콘크리트를 타설하여 양생할 수 있게 되는 것이다.The present invention is such that the protrusion of the coupling to protrude to the outside of the wall is fixed to the inside of the support cone embedded in the wall and integrally fastened with the anchor bolt embedded in the wall, the protrusion protruding out of the wall of the gangform Install the gang form so that it is inserted into the fixing hole insertion hole formed in the steel plate, and then fasten by fastening by joining to the screw hole formed in the protrusion of the coupling by using the fixing bolts. It will be able to cure by pouring concrete.

이에 따라 본 고안은 갱폼을 설치하여 벽체를 시공하는 동안은 물론 시공을 완료하여 갱폼을 고정하고 있는 고정 볼트를 풀어서 제거하더라도 갱폼의 낙하가 방지되어 갱폼의 추락으로 인한 귀중한 인명과 재산상의 손실을 방지할 수 있게 되는 유용한 효과가 있는 것이다.Accordingly, the present invention prevents the fall of the gang form while preventing the loss of valuable life and property due to the fall of the gang form, even if the gang form is installed and the walls are installed, as well as the completion of construction to loosen and remove the fixing bolts fixing the gang form. There is a useful effect that can be done.

Description

매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조 {Gangform Falling Prevention Structure for Wall Construction Using Filling Supporting Corn}Gangform Falling Prevention Structure for Wall Construction Using Filling Supporting Corn}

도1은 종래의 갱폼 고정 장치의 구조를 보인 분해 사시도.1 is an exploded perspective view showing the structure of a conventional gangform fixing device.

도2는 종래의 갱폼 고정 장치의 구조를 보인 확대 단면도.Figure 2 is an enlarged cross-sectional view showing the structure of a conventional gangform fixing device.

도3은 본 고안의 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조의 구조를 보인 분해 사시도.Figure 3 is an exploded perspective view showing the structure of the gangform drop prevention structure for wall construction using the coupling of the buried support cone of the present invention.

도4는 본 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조을 보인 확대 단면도.Figure 4 is an enlarged cross-sectional view showing a gangform drop prevention structure for wall construction using the coupling of the buried support cone.

도5는 본 고안의 다른 실시 예를 보인 단면 확대도.Figure 5 is an enlarged cross-sectional view showing another embodiment of the present invention.

도6은 본 고안의 또 다른 실시 예를 보인 단면 확대도.Figure 6 is an enlarged cross-sectional view showing another embodiment of the present invention.

*도면의 주요 부분에 대한 부호의 설명* * Description of the symbols for the main parts of the drawings *

100 : 벽체 102 : 앵커볼트100: wall 102: anchor bolt

103 : 지지콘 104 : 강판103: support cone 104: steel sheet

105 : 수평 고정부재 106 : 수직 고정부재105: horizontal holding member 106: vertical holding member

109 : 사각와셔 110 : 갱폼109: square washer 110: gang foam

300 : 너트부 301 : 돌출부300: nut part 301: protrusion

302 : 커플링 303 : 고정볼트302: coupling 303: fixing bolt

304 : 고정공 305 : 걸림턱304: fixing hole 305: locking jaw

본 고안은 고층 건물의 벽체를 시공할 때 갱폼을 벽체에 고정하기 위한 수단으로 사용하는 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조의 구조에 관한 것으로서, 더욱 상세히는 건물의 벽체를 시공하기 위하여 벽체에 앵커볼트와 커플링과 지지콘을 매립 고정한 다음 갱폼을 벽체에 대고 고정볼트를 사용하여 커플링에 체결함으로서 벽체를 타설 및 양생하는 공정 중이거나 양생이 완료된 다음 작업자의 실수로 갱폼을 타워 크레인과 연결하기 전에 고정볼트를 풀어서 제거하여도 갱폼이 낙하하지 않도록 함으로서 안전사고를 미연에 방지할 수 있는 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조에 관한 것이다.The present invention relates to a structure of a gangform drop prevention structure for wall construction using a coupling of a buried support cone used as a means for fixing a gangform to a wall when constructing a wall of a high-rise building. For installation, anchor bolts, couplings, and support cones are embedded in the wall, and the gang forms are fastened to the wall using fastening bolts to the couplings. It is related to the construction of the gang foam fall prevention structure for wall construction using the coupling of the buried support cone to prevent the gang foam falls even if the fixing bolt is released by removing the fixing bolt before connecting to the tower crane.

일반적인 종래의 벽면 시공용 갱폼 낙하방지를 위한 고정 장치의 구조를 첨부된 도면 도1 내지 도2에 도시 하였다. 이에서 보는 바와 같이 외벽(100)의 시공과 함께 고정되고 그 일측에 나사부(101)를 형성한 앵커볼트(102)와, 그 끝단에 고 정되는 지지콘(103)과, 외벽(100)에 접하는 강판(104)과, 상기 강판(104)의 배면에 콘크리트 타설시에 가해지는 압력으로부터 갱폼(110)의 형상이 변형되지 않도록 고정되는 수평, 수직 고정부재(105,106)와, 수직고정부재(106)의 배면에 설치되고 그 중앙에 타이로드(107)가 삽입되는 통공(108)을 형성하며 이 통공(108)으로부터 소정 거리만큼의 중앙부부분이 배면으로 돌출된 돌출부가 형성된 사각와셔(109)와, 상기 앵커볼트(102)의 나사부(101)에 체결되는 체결홈부(111)를 일측에 형성하고 그 체결홈부(111)로부터 소정의 직경으로 연장된 타측에 볼트머리(112)를 일체로 형성한 타이로드(107)로 이루어진다.The structure of the fixing device for preventing the fall of the conventional conventional gangform wall construction is shown in Figures 1 to 2 attached. As seen from the anchor bolt 102 is fixed with the construction of the outer wall 100 and the threaded portion 101 formed on one side thereof, the support cone 103 fixed to the end thereof, and the outer wall 100 The steel plate 104 and the horizontal, vertical fixing members 105 and 106 fixed to prevent the shape of the gang form 110 from being deformed from the pressure applied to the back surface of the steel sheet 104 and the concrete, and the vertical fixing member 106. And a square washer 109 formed at the back of the bottom surface and having a through hole 108 into which the tie rod 107 is inserted, and a protrusion having a central portion protruded to the rear by a predetermined distance from the through hole 108. In one embodiment, a fastening groove 111 to be fastened to the threaded portion 101 of the anchor bolt 102 is formed on one side, and the bolt head 112 is integrally formed on the other side extending from the fastening groove 111 to a predetermined diameter. Tie rod 107.

상기 타이로드(107)는 사각와셔(109)의 통공(108)에 삽입되어 회전 및 수평 이동이 용이하게 삽입되고, 타이로드(107)의 체결홈부(111) 또는 볼트머리(112) 중 어느 하나를 용접시키거나 소성 또는 단조 시켜 성형하도록 된 것이다.The tie rod 107 is inserted into the through hole 108 of the square washer 109 is easily inserted into the rotation and horizontal movement, any one of the fastening groove 111 or the bolt head 112 of the tie rod 107. It is to be molded by welding or firing or forging.

상기와 같은 구성으로 이루어진 갱폼(110)을 고정하기위한 구조는 외벽(100)의 시공시에 건물의 층간 하부 소정 위치에 콘크리트 타설시 앵커볼트(102) 및 지지콘(103)을 다수개 고정시켜 양생 후 그 위치에서 견고하게 고정된다. 그러므로 앵커볼트(102) 및 지지콘(103)은 건물의 높이에 따라 시공되는 층간마다 고정된다. 이러한 외벽(100)에 사각와셔(109), 수직고정부재(106), 수평고정부재(105) 및 강판(104)으로 이루어진 갱폼(110)을 밀접The structure for fixing the gangform 110 made of the above configuration by fixing a plurality of anchor bolts 102 and the support cone 103 at the time of concrete placement in a predetermined position between the lower floors of the building at the time of construction of the outer wall 100 After curing, it is firmly fixed in place. Therefore, the anchor bolt 102 and the support cone 103 is fixed per floor to be constructed according to the height of the building. The gangform 110 made of a square washer 109, a vertical fixing member 106, a horizontal fixing member 105 and a steel plate 104 to the outer wall 100 closely.

시키고 사각와셔(109)를 관통한 타이로드(107)의 체결홈부(111)가 앵커볼트(102)의 나사부(101)에 체결되도록 돌려 고정시킨다.The fixing groove 111 of the tie rod 107 penetrating the square washer 109 is fastened to the threaded portion 101 of the anchor bolt 102 to be fixed.

이와 같이 하여 갱폼(110)의 설치 후 그 내측에 내부폼을 설치하여 형성된 공간에 콘크리트를 타설하여 양생시켜 건물의 상부층에 해당하는 외벽(100)의 시공이 완료되도록 한 후 갱폼(110)을 해체할 시에는 전동 또는 수동공구를 사용하여 타이로드(107)를 회전시켜 앵커볼트(102)로부터 결합상태를 해제하게 되면 갱폼(110)의 해체가 완료되며, 갱폼(110)의 해체 후 보관 하였다가 전술한 방법으로 반복 실시하여 재사용할 수 있게 된다.In this way, after the installation of the gang foam 110, the inner foam is installed on the inside of the concrete formed in the space formed by curing, the construction of the outer wall 100 corresponding to the upper floor of the building to complete the construction of the gang foam 110 after dismantling When disengaging the coupling state from the anchor bolt 102 by rotating the tie rods 107 using electric or manual tools, the dismantling of the gangform 110 is completed and stored after dismantling the gangform 110. The method described above can be repeatedly used and reused.

이러한 종래의 구조는 앵커볼트(102)와 타이로드(107)가 체결되면서 갱폼(110)을 벽면에 밀착 고정되게 하여 안전하게 콘크리트를 타설하고 양생할 수 있도록 하는 효과는 있으나, 양생이 완료된 다음 작업자의 실수로 타워 크레인에 갱폼(110)의 인양 고리를 체결하지 못한 상태에서 타이로드(107)와 앵커볼트(102)의 체결상태를 풀었을 시 갱폼(110)을 지지하기 위한 수단이 없으므로 갱폼(110)은 지상으로 낙하하게 되어 인근의 작업자나 보행자 또는 시설물이나 차량에 타격을 가하여 인명과 재산상의 심대한 손실을 야기 시키는 문제가 있는 것이다. This conventional structure has the effect that the anchor bolt 102 and the tie rod 107 is fastened to the gang form 110 to be tightly fixed to the wall to securely pour concrete and curing, but the curing is completed after the worker's If the accidentally loosened the tie rod 107 and the anchor bolt 102 in a state in which the lifting crane of the gangform 110 is not fastened to the tower crane, there is no means for supporting the gangform 110, so the gangform 110 ) Falls to the ground, causing damage to nearby workers, pedestrians, facilities or vehicles, causing serious loss of life and property.

본 고안의 목적은 상기한 바와 같은 문제점을 해결하기 위하여,The purpose of the present invention is to solve the problems as described above,

갱폼을 타워 크레인에 의하여 인상시키는 경우를 제외한 어떤 경우에도 벽체를 시공하기 위한 갱폼이 낙하되지 않도록 한 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조을 제공하기 위한 것이다.Except for raising the gangform by a tower crane in any case to provide a gangform fall prevention structure for wall construction using the coupling of the buried support cone so that the gangform for the construction of the wall does not fall.

본 고안은 이러한 문제점을 해결하기 위하여 갱폼 및 내, 외측의 거푸집에 의하여 형성된 공간에 콘크리트를 타설하여 양생하는 과정에서 매립한 앵커볼트, 지지콘, 사각와셔, 및 고정볼트로 구성된 종래의 갱폼 고정용 앵커에 있어서, 커플링의 외측면에 돌출되는 돌출부를 형성하며, 돌출된 돌출부가 갱폼의 고정공을 통과하도록 하여서 된 것이며, 필요에 따라 돌출부의 외경부는 경사 각도가 형성되도록 하거나 돌출부의 선단에 걸림턱이 형성될 수 있도록 하여서 된 것이다. The present invention for fixing the conventional gangform consisting of anchor bolts, support cones, square washers, and fixing bolts embedded in the process of pouring concrete in the space formed by the gangform and the inner and outer formwork to solve this problem. In the anchor, a protrusion is formed on the outer surface of the coupling, and the protrusion is made to pass through the fixing hole of the gangform, and if necessary, the outer diameter of the protrusion is such that an inclination angle is formed or caught at the tip of the protrusion. The jaw is made to be formed.

이에 따라 본 고안은 콘크리트를 타설하고 양생하는 동안에는 갱폼을 벽면에 안전하게 고정할 수 있음은 물론이며, 양생이 완료된 다음 갱폼을 타워 크레인과 체결하기 전에 커플링으로부터 고정볼트를 풀어서 제거하여도 커플링에서 돌출되어 형성된 돌출부에 걸려 있음으로 인해 갱폼의 낙하를 방지할 수 있게 되므로 인명과 재산의 손실을 방지할 수 있게 되는 유용한 효과가 있는 것이다.Accordingly, the present invention not only secures the gangform to the wall during the casting and curing of concrete, but also after removing the fixing bolts from the coupling before removing the gangform with the tower crane after curing is completed. Hanging on the protruding part formed by the protruding, it is possible to prevent the fall of the gangform has a useful effect that can prevent the loss of life and property.

이러한 본 고안의 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조에 관한 실시 예를 도3 내지 도4에 의해서 상세히 설명하면 다음과 같다.An embodiment of a gangform drop prevention structure for wall construction using the coupling of the buried support cone of the present invention is described in detail with reference to FIGS. 3 to 4 as follows.

이에서 보는 바와 같이 외벽(100)에 접하는 강판(104)과, 강판(104)의 형상이 변하지 않도록 지지하는 수평 고정부재(105) 및 수직 고정부재(106) 등으로 이루어진 갱폼(110)과, 내, 외측의 거푸집에 의하여 형성된 공간에 콘크리트를 타설하여 양생하는 과정에서 매립되며 일단은 견고하게 고정 상태를 유지할 수 있도록 하기 위하여 90도 정도로 구부러지며 타단은 나사부(101)가 형성된 앵커볼트(102)와, 앵커볼트(102)를 감싸고 있는 지지콘(103)과, 중앙에 고정볼트 통과구(108)가 있는 사각와셔(109)로 된 공지의 벽면 시공용 갱폼 낙하방지를 위한 고정 장치에 있어서,As shown therein, the gangform 110 made of a steel plate 104 in contact with the outer wall 100, a horizontal fixing member 105 and a vertical fixing member 106 supporting the shape of the steel plate 104 so as not to change, and In the process of pouring concrete into the space formed by the inner and outer formwork is embedded in the curing process, one end is bent to about 90 degrees so as to maintain a firmly fixed state and the other end is an anchor bolt 102 formed with a threaded portion (101) And, in the fixing device for preventing the fall of the gangform for wall construction of the known cone consisting of a support cone 103 surrounding the anchor bolt 102 and a square washer 109 having a fixing bolt through hole 108 in the center,

상기의 갱폼(110) 및 내. 외측의 거푸집에 의하여 형성된 공간에 콘크리트를 타설하여 양생하는 과정에서 상기 벽체(100)에 매립된 상기의 앵커볼트(102)와 상기의 지지콘(103) 내에서 체결되며, 중심부는 너트부(300)가 관통되어 형성되며 외측면으로는 돌출부(301)가 돌출되어 형성된 커플링(302)과, 커플링(302)의 중심부에 형성된 너트부(300)의 일단에 체결되어 상기 갱폼(110)을 지지하게 되는 고정볼트(303)를 구비하여서 된 것이다.Gangform 110 and the above. The anchor bolt 102 and the support cone 103 embedded in the wall 100 are fastened in the curing process by pouring concrete into the space formed by the outside formwork, and the nut part 300 ) Is formed to penetrate the outer surface and the protrusion 301 is formed to protrude from the coupling 302 and the nut portion 300 formed at the center of the coupling 302 is fastened to the gangform 110 It is to have a fixing bolt 303 to support.

또한 도5는 전술한 커플링(302)에서 돌출되는 돌출부(301)가 외측면으로 경사지게 돌출되어 형성됨을 보여 주는 것이며, In addition, Figure 5 shows that the protrusion 301 protruding from the above-described coupling 302 is formed to protrude obliquely to the outer surface,

아울러, 도6은 전술한 커플링(302)에서 돌출되는 돌출부(301)의 선단에 걸림턱(305)이 형성됨을 보여 주는 것이다.In addition, FIG. 6 shows that the locking step 305 is formed at the tip of the protrusion 301 protruding from the coupling 302 described above.

상기와 같은 구성으로 이루어진 갱폼(110)을 고정 하기위한 구조의 작용상태를 설명하면 다음과 같다. 외벽(100)의 시공 시에 건물의 층간 하부 소정 위치에 콘크리트 타설시 앵커볼트(102) 및 지지콘(103)을 다수개 고정시켜 양생을 완료한 후 그 위치에서 견고하게 고정되게 된다. 그러므로 앵커볼트(102) 및 지지콘(103)은 건물의 높이에 따라 시공되는 층간마다 다수개가 고정 설치되는 것이며, 앵커볼트(102)의 선단에 형성된 나사부(101)가 커플링(302)의 중심부에 형성된 너트부(300)에 고정되도록 랜치나 기타 공구를 사용하여 체결한다. 이러한 앵커볼트(102)와 지지콘(103)과 커플링(302)이 고정되어 설치된 외벽(100)에 사각와 셔(109), 수직고정부재(106), 수평고정부재(105) 및 강판(104)으로 이루어진 갱폼(110)에서 강판(104)에는 커플링(302)에서 돌출된 돌출부(301)의 위치와 일치하며 돌출부(301)가 들어갈 수 있을 정도의 크기로 된 고정공(304)를 뚫어서 이에 돌출부(301)가 삽입되도록 하여 갱폼을 벽면에 밀접 시키고 사각와셔(109)를 관통한 고정볼트(303)를 돌출부(301)의 중심부에 형성된 너트부(300)에 체결 되도록 돌려 고정시킴으로서 커플링(302)은 외벽(100)의 내부로는 앵커볼트(102)의 체결에 의해 외벽(100)에 고정된 상태가 되며, 외부로는 고정볼트(303)의 체결에 의해 갱폼(110)이 고정되게 할 수 있게 되는 것이다.Referring to the operation state of the structure for fixing the gangform 110 made of the above configuration as follows. At the time of construction of the outer wall 100 is fixed to a plurality of anchor bolts 102 and the support cone 103 when the concrete is placed in a predetermined position between the lower floors of the building is completely fixed at that position after completion of curing. Therefore, a plurality of anchor bolts 102 and the support cones 103 are fixedly installed for each floor to be constructed according to the height of the building, and the threaded portion 101 formed at the tip of the anchor bolts 102 is the center of the coupling 302. Fasten using a wrench or other tool to be fixed to the nut 300 formed in the. A square washer 109, a vertical fixing member 106, a horizontal fixing member 105 and a steel plate 104 on the outer wall 100 is fixed to the anchor bolt 102, the support cone 103 and the coupling 302 is fixed In the gangform 110 made of), the steel sheet 104 is drilled through the fixing hole 304 that matches the position of the protrusion 301 protruding from the coupling 302 and is large enough to accommodate the protrusion 301. The protrusion 301 is inserted to close the gangform to the wall, and the fixing bolt 303 penetrating the square washer 109 is rotated to be fixed to the nut part 300 formed at the center of the protrusion 301 to fix the coupling. 302 is in the state of the outer wall 100 is fixed to the outer wall 100 by the fastening of the anchor bolt 102, the gangform 110 is fixed by the fastening of the fixing bolt 303 to the outside It will be possible.

이와 같이 하여 갱폼(110)을 설치한 후 그 내측에 내부폼을 설치하여 형성된 공간에 콘크리트를 타설하여 양생시켜 건물의 상부층에 해당하는 외벽(100)의 시공이 완료되도록 한 후 갱폼(110)을 상층으로 인양하기 위해 해체하게 되는데, 이때에는 갱폼(110)을 타워크레인과 연결하여 낙하하지 못하도록 예방조치를 선행한 후 전동 또는 수동공구를 사용하여 고정볼트(303)를 역회전시켜 커플링(302)으로부터 결합상태를 해체하면 갱폼(110)의 해체가 완료되며, 해체된 갱폼(110)은 타워 크레인에 인양되어 상층으로 이동 가능하게 되는 것이다. 이때에는 반드시 타워 크레인을 조작하는 운전자와 갱폼(110)의 고정볼트(303)를 해체하는 작업자 간에 긴밀한 협조체제 아래 갱폼(110)이 타워 크레인과 연결이 되지 않은 상태에서는 절대로 갱폼(110)의 고정볼트(303)를 해체할 수 없도록 하여야 하는 것이 일반적이었으나, 본 고안에 의하면, 갱폼(110) 설치 시 강판(104)에 형성된 고정공(304)에 커플링(302)에서 돌출된 돌출부(301)가 삽입되어 걸쳐져 있는 상태이므로 갱폼(110)이 타워 크레인과 연결되어 있지 않은 상태에서 고정볼트(303)를 해체하게 되어도 갱폼(110)은 지상으로 낙하하지 않게 되는 것이다.In this way, after the gang foam 110 is installed, the inner foam is installed inside, and the concrete is poured into the formed space so that the construction of the outer wall 100 corresponding to the upper floor of the building is completed. It is to be dismantled to lift to the upper floor, in this case, the gang form 110 is connected to the tower crane, and the precautionary measures are prevented from falling, and then the rotating bolt 303 is reversely rotated using an electric or manual tool for coupling 302. When dismantling the combined state from the gang form 110, the dismantling is completed, the dismantled gang form 110 is lifted by the tower crane is to be movable to the upper floor. At this time, the gangform 110 is never fixed in a state in which the gangform 110 is not connected to the tower crane under close coordination between the operator operating the tower crane and the worker dismantling the fixing bolt 303 of the gangform 110. In general, the bolt 303 should not be disassembled, but according to the present invention, the protrusion 301 protruding from the coupling 302 to the fixing hole 304 formed in the steel plate 104 when the gangform 110 is installed. Since the gang form 110 is not inserted into the gang form 110 is not connected to the tower crane, even if the fixing bolt 303 is dismantled, the gang form 110 will not fall to the ground.

이러한 본 고안에 의해 고정볼트(303)를 풀기 전은 물론이며 풀고난 후에도 안전하게 갱폼(110)을 해체한 후 보관 하였다가 전술한 방법으로 반복 실시하여 재사용할 수 있게 된다.According to the present invention, as well as before releasing the fixing bolt 303, the gangform 110 can be safely dismantled and stored even after unpacking, and can be repeatedly used and reused.

이러한 본 고안의 다른 실시 예에 따르면 도5로 도시한 바와 같이 커 플링(302)에서 돌출되는 돌출부(301)가 외측면으로 외경이 커지면서 경사지게 돌출되는 경사부(306)가 형성됨으로서 강판(104)의 무게가 경사면을 따라 커플링(302)의 안쪽으로 쏠리게 되어 안전성을 더욱 확보할 수 있는 것이며,According to another embodiment of the present invention as shown in FIG. 5 as the protrusion 301 protruding from the coupling 302 is formed with an inclined portion 306 protruding obliquely as the outer diameter increases to the outer side surface steel plate 104 The weight of the is to be inclined toward the inside of the coupling 302 along the inclined surface to ensure more safety,

아울러, 본 고안의 또 다른 실시 예에 따르면 도6으로 도시한 바와 같이 커플링(302)에서 돌출되는 돌출부(301)의 선단에 걸림턱(305)이 형성되어 있으므로 강판(104)이 걸림턱(305)에 걸리도록 하여 이탈되는 것을 방지하고 있기 때문에 더욱 향상된 안전성을 확보할 수 있게 되는 것이다.In addition, according to another embodiment of the present invention, as shown in Figure 6, because the locking jaw 305 is formed at the tip of the protrusion 301 protruding from the coupling 302, the steel sheet 104 is a locking jaw ( It is possible to ensure more improved safety because it is prevented from being separated by the 305).

아울러, 전술한 커플링(302)은 도6에서 보는 바와 같이 돌출되는 돌출부(301)의 선단에 걸림턱(305)이 형성됨을 보여 주는 것이다.In addition, the coupling 302 described above shows that the locking step 305 is formed at the tip of the protruding portion 301 as shown in FIG.

이와 같이 하여 본 고안은 타워 크레인에 매달린 갱폼이 상승하는 시간을 제외한 모든 경우에 갱폼을 구성하고 있는 강판에 형성된 고정공에 커플링에서 돌출 된 돌출부가 삽입되어 걸쳐져 있게 되어서 갱폼의 낙하를 방지할 수 있게 되므로, 갱폼의 낙하로 인한 인명과 재산의 손실을 방지할 수 있게 됨은 물론 작업자에게 안정감을 주게 되어 작업 능률을 향상시키게 되는 유용한 효과가 있는 것이다. In this way, the present invention can prevent the fall of the gang form by the protrusions projecting from the coupling is inserted into the fixing hole formed in the steel plate constituting the gang form in all cases except the time when the gang form hanging on the tower crane rises. Since it is possible to prevent the loss of life and property due to the fall of the gang form, as well as to give a sense of stability to the worker has a useful effect to improve the work efficiency.

Claims (4)

외벽(100)에 접하는 강판(104), 수평 고정부재(105), 수직 고정부재(106) 등으로 이루어진 갱폼(110)과, 앵커볼트(102)와, 지지콘(103)과, 갱폼(110)과 지지콘(103)이 사각와셔(109)와 고정볼트(303)에 의하여 고정될 수 있도록 한 공지의 벽면 시공용 갱폼 고정 장치에 있어서,Gang form 110, anchor bolt 102, support cone 103, gang form 110 made of a steel plate 104, a horizontal fixing member 105, a vertical fixing member 106 and the like in contact with the outer wall 100 In the well-known wall construction gangform fixing device so that the support cone 103 and the support cone 103 can be fixed by the square washer 109 and the fixing bolt 303, 벽체(100)에 매립된 상기의 앵커볼트(102)와 상기의 지지콘(103) 내에 고정된 커플링(302)과, 상기 갱폼(110)을 구성하고 있는 상기 강판(104)의 고정공(304)에 커플링(302)의 전방을 돌출시켜서 된 돌출부(301)가 결합되도록 함을 특징으로 하는 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조.The anchor bolt 102 embedded in the wall 100 and the coupling 302 fixed in the support cone 103 and the fixing hole of the steel plate 104 constituting the gangform 110 ( The gangform drop prevention structure for wall construction using the coupling of the buried support cone, characterized in that the protrusion 301 is formed by protruding the front of the coupling 302 to the 304. 청구항 1에 있어서,The method according to claim 1, 전술한 커플링(302)의 돌출부(301)는 외측면으로 경사진 경사부(306)가 구비됨을 특징으로 하는 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조.The above-described protrusion 301 of the coupling 302 is a gangform drop prevention structure for wall construction using the coupling of the buried support cone, characterized in that the inclined portion 306 is inclined toward the outer surface. 청구항 1에 있어서,The method according to claim 1, 전술한 커플링(302)은 외측면에 돌출되어 형성된 돌출부(301)의 선단에 걸림 턱(305)이 형성됨을 특징으로 하는 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조.The above-mentioned coupling 302 is a gang foam drop prevention structure for wall construction using the coupling of the buried support cone, characterized in that the locking jaw 305 is formed at the tip of the protrusion 301 formed to protrude on the outer surface. 청구항 1에 있어서,The method according to claim 1, 전술한 커플링(302)의 일단은 앵커볼트(102)가 체결되며, 타단은 고정볼트(303)가 체결되도록 하기 위하여 중심부를 관통하는 너트부(300)가 형성됨을 특징으로 하는 매립 지지콘의 커플링을 이용한 벽면 시공용 갱폼 낙하 방지 구조.One end of the above-mentioned coupling 302 is anchor bolt 102 is fastened, the other end of the buried support cone, characterized in that the nut portion 300 penetrating through the center is formed so that the fixing bolt 303 is fastened Gang foam drop prevention structure for wall construction using coupling.
KR2020060026751U 2006-09-29 2006-09-29 Gangform Falling Prevention Structure for Wall Construction Using Filling Supporting Corn KR200433916Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060026751U KR200433916Y1 (en) 2006-09-29 2006-09-29 Gangform Falling Prevention Structure for Wall Construction Using Filling Supporting Corn

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060026751U KR200433916Y1 (en) 2006-09-29 2006-09-29 Gangform Falling Prevention Structure for Wall Construction Using Filling Supporting Corn

Publications (1)

Publication Number Publication Date
KR200433916Y1 true KR200433916Y1 (en) 2006-12-13

Family

ID=41782242

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060026751U KR200433916Y1 (en) 2006-09-29 2006-09-29 Gangform Falling Prevention Structure for Wall Construction Using Filling Supporting Corn

Country Status (1)

Country Link
KR (1) KR200433916Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100822712B1 (en) 2007-01-12 2008-04-17 주식회사 근하기공 Construction method for gang form falling protection and construction structure thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100822712B1 (en) 2007-01-12 2008-04-17 주식회사 근하기공 Construction method for gang form falling protection and construction structure thereof

Similar Documents

Publication Publication Date Title
US9861190B2 (en) Wood gang form and method for constructing concrete building using same
KR100822712B1 (en) Construction method for gang form falling protection and construction structure thereof
EP3077607B1 (en) Handrail system and method of installation
KR20070043743A (en) Construction supporting post
KR20070062683A (en) Device for reinforcing ground mounted telegraph pole and method thereof
KR100767645B1 (en) Gang form level and vertical adjust apparatus
JP6764667B2 (en) Safety fence base
KR200412991Y1 (en) Pipe support for construction
KR200433916Y1 (en) Gangform Falling Prevention Structure for Wall Construction Using Filling Supporting Corn
KR200413527Y1 (en) Gang form falling prevention apparatus
KR200282684Y1 (en) Head reinforced apparatus for steel pipe piles reinforced with assembled cover plates
JP5406698B2 (en) Connecting tool for PC formwork
JP6166870B2 (en) Pillar standing method and pillar
KR100835613B1 (en) Apparatus for preventing a crashing of gang-form buit-in type
KR100812262B1 (en) Device for preventing falling of gangform and method for constructing reinforced concrete structure using the same
KR20200011063A (en) Fixing apparatus for mold panel
KR101587908B1 (en) Pulling up Locking Device of a Mold
KR100660426B1 (en) Gang form falling prevention apparatus
JP3977400B2 (en) Concrete structure construction method
KR200375139Y1 (en) Lower Part Fixing Structure of Gang Form
JP4154488B2 (en) Concrete block removal tool
KR100458323B1 (en) The upper part reinforcement structure of a steel pipe for base construction
KR102185977B1 (en) Concrete form fixing device having improved stability
KR100916807B1 (en) Locker fixing apparatus for adjusting height of a mold
KR20240066623A (en) Lifting lug for concrete piles, concrete piles with lifting lug, and lifting device for concrete piles

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20121130

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140107

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20141201

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee