KR20040098837A - Improved type to be used for various of that work procedure method for the SOILNAILNG ANCHOR=This namely is the SONA and structure shapes - Google Patents
Improved type to be used for various of that work procedure method for the SOILNAILNG ANCHOR=This namely is the SONA and structure shapes Download PDFInfo
- Publication number
- KR20040098837A KR20040098837A KR1020030031128A KR20030031128A KR20040098837A KR 20040098837 A KR20040098837 A KR 20040098837A KR 1020030031128 A KR1020030031128 A KR 1020030031128A KR 20030031128 A KR20030031128 A KR 20030031128A KR 20040098837 A KR20040098837 A KR 20040098837A
- Authority
- KR
- South Korea
- Prior art keywords
- injection
- pipe
- drilling
- milk
- fastening
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
- B66F11/04—Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F17/00—Safety devices, e.g. for limiting or indicating lifting force
- B66F17/006—Safety devices, e.g. for limiting or indicating lifting force for working platforms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60Y—INDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
- B60Y2200/00—Type of vehicle
- B60Y2200/40—Special vehicles
- B60Y2200/49—Movable platforms, Load ramps, e.g. working platforms
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
본 발명은 토목공사 및 건축공사에서 토사지반의 절취,암반사면의 절취,자연사면 산사태발생방지로 인한 각각의 사면(법면)에 대해 사면붕괴예방코져 사면안정대책공법중의 사면활동억지공법에 속하며 기본이 되는 핵심기술은 쏘일네일 앵커공법이다.The present invention belongs to the slope activity suppression method of slope slope prevention measures slope slope prevention method for each slope (surface) due to cutting of soil ground, rock slope slope, natural slope landslide prevention in civil engineering and building construction The core technology underlying is the nail nail anchor method.
현재 국내에서 적용시설되고 있는 앙카공법의 앙카물체는 도로,터널,댐,항만,하천,단지, 주거지역.기타공사에 고강도철근 SD40이상, PC강선 및 PC강연선의 다발관, 고장력봉강SS34이상 FRP관으로써 쏘일네일링,록볼트,록앙카, 등이 시행 설치되고 있다.Anchor objects of the anchor construction method currently applied in Korea include roads, tunnels, dams, ports, rivers, complexes, residential areas and other constructions. Soil nailing, rock bolts, rock anchors, etc. are being implemented as pipes.
이러한 것을 설치코져할 때 종래의 작업은 설계에서 지정된 직경의 천공관에의해 풍화토사, 풍화암 연암, 경암지반내에 천공착공후에 천공관을 인발회수한 다음 지정된 앙카를 그라우팅 PE호스와 일체로 묶어서 천공된 공내에 인력으로 삽입 거치 한다.When installing these, conventional work is carried out by drilling and drilling the weathering pipes after drilling in weathered soil, weathered rock soft rock and hard rock ground by drilling pipes of the diameter specified in the design, and then tie the designated anchors together with the grouting PE hose. Insert into the hole by manpower.
이러한 과정이 진행되기 전에 천공공벽(풍화토사.풍화암.연암.경암)의 붕괴.함몰 및 천공경사각도 하향15도 이상의 경사 기울기이므로 공내에 잔유한 토사 및 암세편이 하향공내 선단부로 굴러 들어가 선단부에 채움되어 공내의 설치 연장의 감소 및 천공시 지반이 연약하여 천공계획직경보다 대구경의 직경과다 형성되는 사례가 빈번하여 표준적작업에 많은 문재점이 있으며 이러한 문제점의 영향으로 인하여 앙카삽입불가로 인한 재시공, 공벽의 확장으로 주입재료의 과다손실, 공벽함몰 재시공으로인한 공사기간지연, 공벽확장으로 공벽 중앙위치 앙카설치 어려움, 설치공정의 재반복으로 무리한 작업 으로인한 안전사고, 그라우팅설계주입량의 불확실성으로인한 공사비손실, 사면안정 실시계획의 불확실성으로인한 신뢰도, 불균질한 혼합지층이 형성된 경우에 적합한 표준시공 적용이 불가하며, 각각의 천공시 마다 지반특성에 적합한 방법을 채택 하므로써 공사기간 지연으로인한 경제적손실이 초래되는 문제점이 발생되는 것이다.Before this process, the breakdown, depression and perforation inclination of perforated wall (weathered sand, weathered rock, soft rock, hard rock) are inclined slope of more than 15 degrees, so the remaining soil and rock fragments in the hole are rolled into the tip of the downhole. In many cases, there are many problems in standard work due to the decrease in the length of the installation in the hole and the ground at the time of drilling. , Due to excessive loss of injection material due to expansion of empty wall, delay of construction period due to reconstruction of hollow wall depression, difficulty in installing central location of empty wall due to expansion of empty wall, safety accident due to excessive work due to repetitive installation process, and uncertainty of grouting design injection volume Loss of construction cost, uncertainty due to uncertainty of slope stability implementation plan, heterogeneous mixed strata By non-standard construction suitable for application when the generated and employing the appropriate method on each soil characteristic at each perforation will be a problem of economic loss due to the construction time delay results in occurrence.
본 발명은 상기와 같은 문제점을 해소하기 위해 시공단계 공정을 단축 개선하여 철근앙카 설치대용으로 천공굴진본관을 쏘일네일앙카로 대체하고 즉시 고강도시멘트밀크 주입으로 완료한다.The present invention is to shorten and improve the construction step process to solve the above problems, replace the drilling drilling main building with a nail nail anchor for the reinforcement anchor installation substitute and immediately complete with high strength cement milk injection.
완료과정은 <제1단계>와 <제2단계>로 진행되는 과정이다.The completion process is a process of <first stage> and <second stage>.
<제1단계> 고장력굴진관(앙카본체)천공은 공기압력식으로 추진할 경우 공내 파쇄분진이 외부로 분출되어 비산먼지 발생되어 환경오염 및 보건환경 오염을 초래하고, 고압력 공기압 굴착으로인한 대기소음환경으로인한 민원이 발생되므로,이러한 과제들을 저감 및 개선하여 공기압력 충격식과 수세식 분사구조로 혼용 단일화하여 작업이 간편토록 발명하였고,<Phase 1> When the high tension drilling pipe (anca main body) drilling is carried out by pneumatic pressure, the crushing dust inside the ball is ejected to the outside, resulting in scattering dust, which causes environmental pollution and health environment pollution, and atmospheric noise environment caused by high pressure pneumatic excavation. Due to the complaints, these problems were reduced and improved, and the invention was made to simplify the operation by combining the air pressure shock type and flush injection structure.
기존작업방법은 굴진관 삭공후 굴진관을 기계동력 장치에 의해 외부로 끌어낸후 고장력철근과 그라우팅주입 맨잭튜브와 함께 결합하여 인력 삽입조치 하는 기존방식을 채택치 않고 발명된 간단한 <제1단계>공정 즉 고장력 철근 대용으로 굴진관을 계획심도까지 추진후 본관을 고장력 앙카본체로 대체하여 앙카화 하는 것으로 기술적 과제를 해결하였다.The existing work method is a simple <first step> process invented without adopting the conventional method of pulling out the excavation pipe to the outside by machine power device and combining it with high-tension reinforcement and grouting injection manjack tube after cutting the excavation pipe. In other words, the technical problem was solved by propelling the excavation pipe to the planned depth by substituting high tensile steel and replacing the main building with high tensile anchor body.
<제2단계> 고강도시멘트밀크압력 그라우팅 주입채움 최후공정은<제1단계><Step 2> The final process of high strength cement milk pressure grouting injection filling is <Step 1>
고장력굴진관(앙카본체)을 천공공내에 존치 완료후 앙카본체 두부에 밀크주입 조임식 결합장치를 즉시 체결후 곧바로 고압력에 의해 고강도시멘트밀크를 공내에 주입확산 채움 하는 단계로 작업 공정단축 및 시공상의 내제 되어있는 문제점을 해결 하였으며, 시공기술 및 안전성에 관한 과제를 해결 하였다.After the high tension drilling tube (anchor main body) is completed in the perforated hole, the milk injection fastening device is immediately fastened to the head of the anchor body, and the high-strength cement milk is injected into the hole by high pressure. It solved the problems that were inherent and solved the problems of construction technology and safety.
상기의 <제1단계> 및 <제2단계>를 단순화하여 기술적사용성 및 안전성에 중점을 두어 개량한 결과 문제점을 해결한 것이 본 발명의 기술적 특징이다.The technical feature of the present invention is to solve the problems as a result of the improvement by focusing on the technical usability and safety by simplifying the first and second steps.
도 1 은 압력회전 충격식 천공굴진 장비에 의해 천공드릴비트체결된 고장력1 is a high-strength drill bit fastened by a pressure rotary impact drill drilling equipment
굴진관(앙카본체) 천공 완료과정을 나타낸 단면도<제1단계>Cross-sectional view showing completion process of drilling pipe (anca body)
도 2 은 천공완료후 고장력 굴진관(앙카본체)을 천공공내에 존치하여 고강도Figure 2 is a high-strength drilling tube (anca body) after drilling is completed in high strength
시멘트 밀크를그라우팅압력으로 주입채움, 완료과정을 나타낸 단면도<제2단계>Cross section showing the process of filling and filling cement milk with grouting pressure <Step 2>
도 3 은 고장력굴진관(앙카본체) 두부에 지압판체결 형태를 나타낸 단면도이 며, 도2의 과정에서 사전체결되어 시공된다.Figure 3 is a cross-sectional view showing the pressure plate fastening form on the head of the high tension drilling tube (anca body), it is pre-fastened in the process of FIG.
도 4 은 본 발명에 사용되는 각 부분 장치의 형상구조도4 is a structural structural diagram of each partial device used in the present invention;
도 4- 1 구조형식: 유공분사형Figure 4-1 Structural Type: Hollow Injection Type
도 4- 2 구조형식: 무공분사형)Fig. 2-2 Structural Type: Non-injection Type)
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
1: 유압식 회전 기어헤드 2: 수세수와 함께 분출토출되는 슬라임1: Hydraulic rotary gear head 2: Slime ejected with flushing water
3: 부착력 증가 돌기마디 4: 고장력 굴진관(앙카본체)3: adhesion force increase projection 4: high-strength drilling tube (anca body)
5: 공삭공 드릴비트 6: 암세편 충격 파쇄장치5: Machining drill bit 6: Female impact impact crusher
7: 공삭공 초경비트 8: 암세편 절삭 파쇄초경비트7: Machinable carbide bit 8: Sand cutting cutting broken carbide bit
9: 주입밀크체움흐름방향 및 선단토출구9: Injection milk stream flow direction and tip discharging outlet
10: 앙카본체관 물분사공 및 시멘트밀크분사공10: water sprayer and cement milk sprayer
11: 앙카본체관에 밀크주입체결 이형관11: Injected milk into Anca Main Building
12: 분리식 밀크주입 이형관(조임식결합장치)12: Separation type milk injection pipe (tightening device)
13: 밀크주입용 고압호스관13: High Pressure Hose Pipe for Milk Injection
14: 앙카두부고정지압판14: anchor tofu fixing plate
15: 지압판 고정조임장치15: Acupressure plate fixed tightening device
16: 공내고강도 시멘트밀크채움부위16: high strength cement milk filling part
17: 지압판지보고강도철근17: Chiropractor reported strength steel bars
18: 회전측과 고장력굴진관체결장치18: Rotating side and high tension drilling tube fastening device
19: 시멘트밀크역류차페압판장치19: cement milk backwash plate presser
20: 시멘트밀크역류배출관20: cement milk backflow discharge pipe
도 5 설치완료 구조도 참조Refer to Figure 5 completed structure
이하 첨부된 도면에 의해 상세히 설명하면 다음과 같다.Hereinafter, described in detail by the accompanying drawings as follows.
<구조구분> (1) 앙카본체관 물분사공 및 시멘트밀크 분사공 존재한 고장 력굴진관(앙카본체)<Structure> (1) Anchor main pipe High tension drilling pipe with water sprayer and cement milk sprayer
(1) 앙카본체관에 물분사공 및 시멘트 밀크분사공 무존재한 고장력 굴진관(앙카본체)(1) High tension drilling pipes (anca body) without water sprayers and cement milk sprayers in the anchor main pipe
<구조형식분류>(1) 고장력굴진관,앙카본체관벽에 물분사공과 시멘트밀크 물 분사공,양용단일겸용, 존재된 분사공형(형식:유공분사형)<Structural Type Classification> (1) Water spray hole and cement milk water spray hole on both high tension drilling pipe and anchor body pipe wall, dual use for single use, existing spray hole type (Model: air hole spray type)
(1) 물분사공과 시멘트밀크분사공 무존재한 천공비트 토출구 분사형(형식: 무공분사형)(1) Water jet hole and cement milk spray hole Drill bit ejection hole injection type (Model: no-air injection type)
< 사용용도> (1) 유공분사형 :경암.연암 풍화암으로 매우 풍화된것으로서 풍화두께깊이가 크고깊으며 연한 역질 토괴로 이루어진 사질풍화토사<Usage> (1) Pore-spray type: It is very weathered by hard rock and soft rock weathered rock.
(1) 무공분사형 : 경암. 연암 풍화도가 낮은 풍화암으로써 경질 부석 및 토괴로 이루어진 경질풍화토사(1) Non-injection type: hard rock. A hard weathered soil composed of hard pumice and ingot as a weathered rock with low soft rock weathering
<설명형식비교> : 모든구조는 동일공통형이며 분사공 존재 및 무존재에 한정하여차이가 있으며 양자가 다음과 같은 이유를 갖고 있다.<Comparison of explanation format>: All structures are the same common type and there is a difference only in the presence and absence of the injection hole, and both have the following reasons.
(1) 무공분사형은 작업안전도가 양호하고 시공성이 안정되어 있으며 작업이 일관 표준적이므로 문제점 도출이 불필요하며 따로 설명기술 하지 않는다.(1) The no-air injection type has good work safety, stable workability, and consistent working standards, so it is not necessary to derive problems and will not be described separately.
(1) 유공분사형은 작업과정에 안전도에 유의 해야할 사항이 있으므로 상세기술 설명하여 본 발명이 목적한 취지를 달성하고 작업에대한 표준방법을 제시하고져 하는데 특징이 있다.(1) Since the hole-injection type has a matter to be noted in the safety process in the working process, the present invention is described in detail to achieve the object of the present invention and to present a standard method for the work.
<설 명> 도1의 <제1단계>(압력충격회전 수세식천공)천공추진굴진삭공장비 유압식회전기어헤드1에 회전축과 고장력 굴진관 체결장치(18)을 수동으로 회전삽입 결합체결후 제조된 (3).(5).(6).(7).(8).(10)의 고장력굴진관(앙카본체)(4)을 회전축과 고장력굴진관체결장치(18)선단에 체결후 계획된 위치에 천공압력을 가하여 천공을 실시한다.<Description> <Step 1> (Pressure shock rotating flush drilling) of Figure 1 Drilling thrust drilling equipment Equipped with a rotating shaft and a high-strength drilling pipe fastening device 18 to the hydraulic rotary gear head 1 manually manufactured after coupling (3). (5). (6). (7). (8). (10) after tightening the high tension tube (anca body) 4 to the end of the rotating shaft and the high tension tube coupling device (18). The drilling is performed by applying drilling pressure to the planned position.
이러한 천공이 실시될 때 천공공벽이 확장되거나 공벽붕괴로 함몰 되지않도록 유압식 회전기어헤드 (1)의 추진속도 및 물분사압력은 공기압력 및 수세수와 함께 분출.토출되는 슬라임 (2)의 외부로 배출되는 배출수상태 및 혼탁성. 등을 육안 및 기타 물리적 기계적으로 신중하게 확인하여 조정.조절 관입토록하여 계획된 깊이 심도까지 천공한후 유압식 회전기어헤드1의 압력 추진을 점제하고 천공공벽내에 미소량 남아있는 슬라임 및 이토물을 완전 외부로 분출토록 고장력 굴진관(앙카본체) (4) 를 물분사하여 공회전 하거나 정지상태에서 물분사하여 완전 분출.토출하여 배출한후 이물질 슬라임 없는 깨끗한 수세수가 외부로 배출 됐을 때 도1의 <제1단계> 공정을 즉시 정지완료한후The propulsion speed and water spray pressure of the hydraulic rotary gear head 1 are blown out and discharged together with the air pressure and the flushing water so that the perforated wall does not expand or collapse when the perforated wall is deformed. And turbidity of the discharged water to the Visually check the back and other physically and mechanically to make adjustments, adjustments, and punctures to the intended depth of depth, and then control pressure propulsion of the hydraulic rotary gear head 1 and completely remove the slime and soils remaining in the perforated wall. When the high-tension drilling pipe (anca main body) (4) is sprayed by water or idling or completely discharged by water spraying at a stationary state, it is ejected and discharged, and then clean water without foreign matter slime is discharged to the outside. Step 1> After stopping the process immediately
<설 명> 도2의 <제2단계>(주입완료)고강도 시멘트밀크압력 그라팅주입체움을 즉시 실시한다<Explanation> Immediately perform the high-strength cement milk pressure grating injection system of <Step 2> (completed injection) of FIG.
이러한 시공방법을 즉시 실시 할 때는 현장장비 및 작업여건을 감안하여 [제1방법] 수동식 체결 주입방법과 [제2방법] 주입관, 본관 체결된 기계식 주입방법중 적합한 것을 선택하여 실시하도록 한다In order to immediately perform such a construction method, in consideration of the field equipment and working conditions, a suitable one should be selected from the [method 1] manual fastening injection method, the [second method] injection pipe and the main mechanical fastening method.
[제1방법] [First Method]
수동식체결주입방법은 유압식회전기어헤드 (1)을 회전축과 고장력,굴진관 체결장치 (18)로부터 기계적 및 물리적으로 역회전 풀어서 속히 제거한 후 밀크주입요 고압호스관 (13)을 분리식 밀크주입 이형관(조임식결합장치) (12)에 삽입고정하여 사전에 준비해놓은 결합구에 곧바로 즉시 앙카본체관에 밀크주입 체결 이형관 (11)를 삽입체결한 후 시멘트밀크교반믹서에 교반된 고강도 시멘트밀크를 고압그라우팅 펌프에의해 고장력 굴진관(앙카본체) (4)를 통하여 선단 토출구 (9) 및 앙카본체관 시멘트밀크 분사공 (10) 분사토출되어 공내부에 분출되도록 하여야 하며, 시멘트밀크가 분사될 때 공내에 채움되는 속도는 천천히 하부로부터 상부에 상승 채움되도록 주입압력 및 속도 조절해야하고 압력분사시 공내에 소량 잔유 되어있는 세입경 슬라임 및 잔류수와 함께 공내에서 시멘트 밀크와 충분히 교반 될 수 있도록 외부에 노출되어 있는 고장력굴진관(앙카본체) (4)의 두부를 임의결속하여 상하 반회전을 가능한 속도로 빨리하여 수동으로 필요한 도구에의해 충분히 혼합교반되도록 흔들어 주어야한다.Manual fastening injection method is to remove the hydraulic rotary gear head (1) from the rotating shaft and the high tension, drilling pipe fastening device (18) by mechanically and physically reverse rotation, and then remove the milk injection high pressure hose pipe (13) separately (Tightening type coupling device) (12) Fasten the milk injection into the anchor body pipe immediately after inserting and fixing it in advance. Insert the fastening pipe (11) and fasten the high-strength cement milk stirred in the cement milk stirring mixer. The grouting pump should be ejected through the high-tension drilling pipe (anchor body) 4 through the tip discharge port 9 and the anchor body cement cement injection hole 10 to be ejected into the ball. The filling speed should be controlled to adjust the injection pressure and speed so that the filling from the lower part to the upper part is slowly filled up. In addition, the head of the high tension drilling tube (anca body) (4), which is exposed to the outside to be sufficiently stirred with cement milk in the ball, is arbitrarily bound, and the upper and lower half rotations are made at a speed as fast as possible and thoroughly mixed by the necessary tools. Shake to stir.
또한 부착력 증가 돌기마디 (3)을 시멘트 밀크가 경화된후 완전 구속할수 있도록 하여야하며, 삭공된 풍화토.풍화암 연암 경암 경계공벽면에 시멘트밀크가 완전하게 충진 체움 부착되도록 시멘트 밀크에 무수축 팽창 혼화재를 첨가 교반하여 그라우팅 체움작업하는 [제1방법]단계.In addition, the adhesive force increase protuberance (3) should be completely restrained after the cement milk has cured.A non-expandable expansion admixture is added to the cement milk so that the cement milk is completely filled with the weathered soil and weathered rock. [First method] step of grouting sieve work by addition stirring.
재료품질관리 및 시멘트밀크의 컨시스텐시. 워어커빌리티.블리딩량. 밀크압축강도.휨강도.인장강도. 신수축량. 부착력. 기타 시험에 대해서 시멘트 밀크 주입전에 배합설계 및 시험배합.시험결과 목표에의해 배합비를 결정한다Material quality control and cement milk consistency. Worker ability. The amount of bleeding. Milk compressive strength, flexural strength, tensile strength. New shrinkage. Adhesion. For other tests, mix design and test mix before cement milk injection. Determine the mix ratio according to the test result target.
고강도 시멘트 밀크 최종 품질관리는 재령기간에대한 압축강도 시험결과에의해 종료한다.High-strength cement milk final quality control is terminated by compressive strength test results for the age of the age.
상기의 이러한 [제1방법] 수동식체결주입방법은 고장력굴진관(앙카본체) 중공내부에 직접 그라우팅 압력주입하여 고장력굴진관을 앙카본체로 대용하기위한 목적으로 발명된 것이 특징이다The above-mentioned [first method] manual fastening injection method is characterized in that it was invented for the purpose of substituting high tension drilling tube as an anchor body by directly injecting grouting pressure into the hollow tube of high tension drilling tube (anchor body).
[제2방법] [Method 2]
주입관.본관체결된 기계식주입방법은 유압식 회전기어헤드 (1)과 고장력굴진관(앙카본체) (4)중간에 회전축과고장력굴진관 체결장치 (18)에 결합되어 회전시에 이중관 공간내에 시멘트 고압주입되어 고장력굴진관(앙카본체) 중공내부를 통하여 회전원심력과 고압분사압력으로 선단 토출구 (9) 및 앙카본체관 시멘트밀크 분사공 (10)을 분출되어 천공공벽공간내에 그라우팅채움되는 [제2방법] 단계The mechanical injection method of the injection pipe and the main pipe is connected to the rotary shaft and the high tension pipe coupling device (18) between the hydraulic rotary gear head (1) and the high tensile pipe (anca body). It is injected with high pressure and ejects the discharging end 9 and the anchor tube cement milk injection hole 10 through the centrifugal centrifugal force and the high pressure injection pressure through the hollow inside of the high tension drilling tube (anca body), and grouting fills in the perforated wall space. 2 method] step
상기의 이러한 [제2방법] 주입관.본관체결된 기계식주입방법은 [제1방법] 보다 공정이 단순. 간편한 목적으로 발명된 것이 특징이다.The above-mentioned [second method] injection tube. The main mechanical fastening method is simpler than the [first method]. It is characterized by the invention for convenience.
고강도시멘트밀크 품질관리 제반사항은 [제1방법]과 동일하다High quality cement milk quality control is same as [the first method].
상기의 이러한 [제1방법] 수동식체결 주입방법 및 [제2방법] 주입과.본관체결된 기계식주입방법은 시공현장에서 설계계획.시공성.안정성.경제성.유지관리에 매우 효과적으로 발명되었으며 작업여건 변화에 즉각 대응.대처할수 있도록 쉽고 간단.편리 용이하게 개선.개량되어 다용도 시공토록 획기적으로 발명된 것이 특징이다.The above-mentioned [First Method] manual fastening injection method and [Second method] injection and main mechanical fastening method were invented very effectively for design plan, workability, stability, economic feasibility and maintenance at construction site, and changed working conditions. It is easy and simple to deal with immediately, and it is easy and convenient to improve and improve.
상기에서 상술 설명한바와 같이 본 발명 쏘나(SONA)은 기존의 복잡한 시공과정 및 문제점을 보완 개량하여 시공성 안전성 경제성 유지관리의 신뢰성에 목적을 두어 개발된 것으로 고강도 철근. PC강선 및 강연선. 고장력본강.고장력관 기타등의 성능 및 구조를 단일형으로 개량하여 표준화코져 발명된 것이며, 형태의 다양화로 사용하기 위하여, 쏘일네일링 룩볼트.록앙카. 강관앙카. 구조물기초앙카파일.마이크로앙카파일. 기타등에대해 단일표준형태로 개량하여 다용도 시공토록 발명 하였으며 한국공업표준규격 KSD3503 일반구조용 압연 강제. 기계적성질 2종 SS41이상의 국내에서 생산된 재질제품으로 개량된 구조 및 시공법으로서 금속관면에 부착력 증가 돌기 마디를 두어 인장력 저항을 증가 하였으며, 선단부 비틀을 앙카근으로하고 앙카본체보다 크게 확대하여 선단부 인장력 최대저항토록 도출근 형상을 다양화 크기로 발명하여 개량 제작된 것이 큰 특징이다.As described above, the present invention SONA is a high-strength reinforcement for the purpose of improving the reliability and maintenance of constructability safety economics by supplementing and improving the existing complex construction process and problems. PC steel wire and stranded wire. High-strength main steel, high-strength pipe, etc. Invented by standardization by improving the performance and structure into a single type, in order to use in the diversification of the shape, soil nailing look bolt. Steel pipe anchor. Structural base anchor pile. Invented for multi-purpose construction by improving to a single standard form for the others. Mechanical property Improved tensile strength resistance by attaching an increase in attachment force on the metal tube and increasing the tensile resistance by using the anchoring part on the metal tube. It is a big feature that it was improved by inventing the derived muscle shape in a variety of sizes to resist.
천공공내 시멘트밀크그라우팅이 단순공정화되어 주입작업이 용이함은 물론 고강성 재질로서 암지반. 암괴 .압력이나 토압에 충분히 지보 돼도록 개량된 것으로 시공 및 사용에 매우 효과적이다.Cement milk grouting in perforation is simple and easy to inject, as well as high strength material. Rock mass Improved to be sufficiently supported by pressure and earth pressure, it is very effective for construction and use.
본 발명된 다용도 개량형 쏘일네일(SONA) 시공법이 국내여건에 상용화되어 국가기술 발전에 효과적으로 기여하고 산악협동연구기관에의해 무한하게 양질 연구보안되어 국내 및 국외에 널리 홍보되어 효과적으로 사용됨은 물론 국가경제 및 기술선진화에 발전이 되었으면 하는 소견이다.The present invention, the multipurpose improved Soil Nail (SONA) construction method is commercialized in domestic conditions, effectively contributes to the development of national technology, and infinitely high-quality research and security by the mountain cooperative research institute, widely promoted domestically and abroad, and effectively used as well as national economy and It is a hope that advancement will be made in technological advancement.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020030031128A KR20040098837A (en) | 2003-05-16 | 2003-05-16 | Improved type to be used for various of that work procedure method for the SOILNAILNG ANCHOR=This namely is the SONA and structure shapes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020030031128A KR20040098837A (en) | 2003-05-16 | 2003-05-16 | Improved type to be used for various of that work procedure method for the SOILNAILNG ANCHOR=This namely is the SONA and structure shapes |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020030015102 Division | 2003-05-16 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20040098837A true KR20040098837A (en) | 2004-11-26 |
Family
ID=37376541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020030031128A KR20040098837A (en) | 2003-05-16 | 2003-05-16 | Improved type to be used for various of that work procedure method for the SOILNAILNG ANCHOR=This namely is the SONA and structure shapes |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20040098837A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105256792A (en) * | 2015-11-03 | 2016-01-20 | 中南勘察设计院(湖北)有限责任公司 | Anchor rod pore-forming construction process for conducting pre-sealing treatment on communicated macrovoid rock-soil body through high-pressure jet grouting piles |
CN107830317A (en) * | 2017-09-13 | 2018-03-23 | 合肥惠科金扬科技有限公司 | A kind of high outdoor minitype display screen of stability |
KR20190108780A (en) | 2018-03-15 | 2019-09-25 | 정성필 | Sd nailing method |
-
2003
- 2003-05-16 KR KR1020030031128A patent/KR20040098837A/en not_active Application Discontinuation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105256792A (en) * | 2015-11-03 | 2016-01-20 | 中南勘察设计院(湖北)有限责任公司 | Anchor rod pore-forming construction process for conducting pre-sealing treatment on communicated macrovoid rock-soil body through high-pressure jet grouting piles |
CN107830317A (en) * | 2017-09-13 | 2018-03-23 | 合肥惠科金扬科技有限公司 | A kind of high outdoor minitype display screen of stability |
KR20190108780A (en) | 2018-03-15 | 2019-09-25 | 정성필 | Sd nailing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100820642B1 (en) | Anchor-nail device for slope-reinforcement-construction and slope stabilization method | |
CN104790873B (en) | Soft rock layer jet is oriented to the integrated drilling method of the anti-collapse hole of pore-forming reaming | |
KR100919821B1 (en) | Ground enhansing apparatus with anchor rod and method thereof | |
KR101987533B1 (en) | A excavation head | |
KR100934274B1 (en) | Soil nail of a ground pressure type and constructing method thereof | |
CN102587366A (en) | Self-drilling type spiral anchor rod and construction process using self-drilling type spiral anchor rod for grouting along with drilling, stirring and curing | |
US5348424A (en) | Reinforcing block for excavation work and method of construction thereof | |
JP4679705B2 (en) | Equipment for constructing mechanically stirred air cement milk mixed pressure feeding method | |
KR100973745B1 (en) | Front Device for Grouting and Grouting Method using the same | |
KR101040040B1 (en) | Method for constructing pile using spray type excavating bit | |
KR100656142B1 (en) | The foundation grouting construction method of having used foundation digging and the equipment for grout material and this | |
CN202482860U (en) | Self-drilling helical anchor rod | |
KR20040098837A (en) | Improved type to be used for various of that work procedure method for the SOILNAILNG ANCHOR=This namely is the SONA and structure shapes | |
KR20180003014U (en) | In-place foundation using reinforced material and injection, grouting | |
JP4626916B2 (en) | Construction method of soil cement composite pile | |
JP2008248488A (en) | Slope stabilizing method and slope construction equipment | |
CN202706022U (en) | Recycled post-tensioned prestressing anchor cable pile | |
JP5875849B2 (en) | Injection stirring ground improvement method | |
CN212671560U (en) | High-pressure jet grouting pile hole guiding construction integrated device | |
KR100974075B1 (en) | Method and automatic stopper unit of horizontal high velocity blast shaking for use in construction of tunnel etc. | |
KR101620876B1 (en) | The device for excavating a ground | |
JP2011252319A (en) | Reinforcement material for natural ground reinforcement earth method and natural ground reinforcement earth method | |
JP4884276B2 (en) | Rotating press pile construction method and slope construction equipment | |
JPH1150443A (en) | Underground consolidated body construction device and construction method thereof | |
CN202626979U (en) | High-pressure rotary jet grouting stiffening pile construction equipment with rib drilling method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A108 | Dual application of patent | ||
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application | ||
E601 | Decision to refuse application |