KR20040097052A - A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby - Google Patents

A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby Download PDF

Info

Publication number
KR20040097052A
KR20040097052A KR1020040084356A KR20040084356A KR20040097052A KR 20040097052 A KR20040097052 A KR 20040097052A KR 1020040084356 A KR1020040084356 A KR 1020040084356A KR 20040084356 A KR20040084356 A KR 20040084356A KR 20040097052 A KR20040097052 A KR 20040097052A
Authority
KR
South Korea
Prior art keywords
nail
artificial wall
artificial
fixing
composition method
Prior art date
Application number
KR1020040084356A
Other languages
Korean (ko)
Other versions
KR100473880B1 (en
Inventor
정성필
Original Assignee
주식회사 오륙개발
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 오륙개발 filed Critical 주식회사 오륙개발
Priority to KR10-2004-0084356A priority Critical patent/KR100473880B1/en
Publication of KR20040097052A publication Critical patent/KR20040097052A/en
Application granted granted Critical
Publication of KR100473880B1 publication Critical patent/KR100473880B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: A composition method for an artificial wall using a soil nail and the artificial wall are provided to heighten economical efficiency and to shorten a period of construction by using a nail and filler for the ground stabilization. CONSTITUTION: The composition method for an artificial wall using a soil nail comprises the steps of: perforating a fitting hole of the proper diameter and depth on the appointed site of an excavation plane; inserting a nail(50) to each fitting hole to make the front projected from the surface of the excavation plane; grouting filler(60) to each fitting hole; after hardening the filler(60), arranging a footing bar(201) by folding up in the shape of an artificial wall on the front of the nail(50); and finishing by spraying finishing materials(205) on the footing bar(201).

Description

소일 네일을 이용한 인공벽 조성공법 및 이에 의해 조성된 인공벽{A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby}A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby}

본 발명은 소일 네일을 이용한 인공벽 조성공법 및 이에 의해 조성된 인공벽에 관한 것으로써, 특히 간단한 구조로서 시공이 간편하여 공기가 단축되고 인공벽의 임의 지점에 녹화가 가능하며 현장환경에 부합하는 암반조경을 가능하게 한 소일 네일을 이용한 인공벽 조성공법 및 이에 의해 조성된 인공벽에 관한 것이다.The present invention relates to an artificial wall composition method using a soil nail and an artificial wall formed by the same, in particular, a simple structure, the construction is easy to shorten the air and can be recorded at any point of the artificial wall and meet the site environment The present invention relates to an artificial wall composition method using a soil nail that enables rock landscaping and an artificial wall formed thereby.

일반적으로 산업이 발달하면서 신도시의 건설이나 단지의 조성등으로 급경사지의 개간이 불가피한 것이 현실이다.In general, as the industry develops, the reclamation of steep slopes is inevitable due to the construction of new towns and the construction of complexes.

따라서 토지의 이용효율을 높이고 주거단지의 안정성이나 쾌적성을 확보하는 것과 동시에 시공성,경제성 및 환경보전성을 충족할 수 있는 사면(斜面)안정대책 공법의 확립이 요구된다.Therefore, it is required to establish slope stabilization measures to improve the land use efficiency, secure the stability and comfort of residential complexes, and satisfy the constructability, economic feasibility and environmental preservation.

주거단지의 쾌적성을 위한 일예의 공법이 도 1에 도시되어 있다. 이는 한국특허등록 제0340023호에 개시된 일반적인 인공벽체의 공법으로서, 경사지를 굴착한 후 굴착면(1)에 시멘트등을 이용한 옹벽(6)을 형성하고, 웅벽(6)에 철골구조물(10)을 앵커볼트(8)로 고정설치한 후, 자연석의 느낌을 주도록 GFRC(glass fiber reinforced cement)재질로 형성된 인공암(4)을 철골구조물(10)에 설치한 공법이다.An example construction method for the comfort of the residential complex is shown in FIG. This is a general artificial wall method disclosed in Korean Patent Registration No. 0340023, after excavating the slopes to form the retaining wall (6) using cement or the like on the excavation surface (1), the steel structure (10) on the uneven wall (6) After fixing the anchor bolt (8), the artificial rock (4) formed of GFRC (glass fiber reinforced cement) material to give a feeling of natural stone is a method of installing the steel structure (10).

이는 인공벽체에 폭포(瀑布) 및 식재(植栽)등을 통하여 주거단지의 자연환경을 조성할 수 있는 이점을 가진다.This has the advantage of creating a natural environment of a residential complex through waterfalls and planting on artificial walls.

그러나 이러한 공법은 굴착면(1)의 안정을 위하여 옹벽(6)을 설치하고 있지만 외적요소(외부공사에 의한 진동, 지진등에 의한 지반의 유동등)에 의한 지반의 전단작용에 의하여 옹벽(6)에 크랙(crack) 또는 파손이 발생되고 이에 따라 인공암(4)이 연쇄적으로 크랙 또는 파손되는 문제점이 있다.However, in this method, the retaining wall 6 is installed to stabilize the excavation surface 1, but the retaining wall 6 is caused by the shear action of the ground due to external factors (vibration caused by external construction, ground flow due to an earthquake, etc.). There is a problem that cracks or breakages occur in the artificial arm 4 so that the artificial arm 4 is cracked or broken in series.

또한, 이러한 인공벽의 공법은 인공암(4)을 설치하기 위하여 다량의 철골들을 준비하고 이들을 용접하여 철골구조물(10)을 시공하여야 하는 번거로움이 있다.In addition, the construction of the artificial wall is a hassle to prepare a large amount of steel frame in order to install the artificial rock (4) and weld them to construct the steel structure (10).

따라서 쾌적한 주거단지를 조성할 수 있음에도 불구하고 굴착지반의 불안정으로 인하여 안전사고등이 발생하는 문제점이 있다.Therefore, despite the possibility of creating a pleasant residential complex, there is a problem that safety accidents occur due to instability of the excavation ground.

이를 위해서 최근에는 굴착지반의 안정성을 도모하면서 수목의 식재등 녹화(綠化)가 가능한 PEM(Pre stressed Earth Method)공법이 이용되고 있다.To this end, the PEM (Pre stressed Earth Method) method, which is capable of planting trees and planting trees, has been used in recent years to improve the stability of the excavated ground.

이 공법은 도 2에 도시된 바와 같이, 원지반(20)으로부터 절토한 절취사면(20a)에 소정간격마다 앵커구멍들을 수평하게 천공하는 단계와, 천공된 앵커구멍에 앵커볼트(30)들을 긴장되게 관입하여 앵커볼트를 매립하는 단계와, 절취사면(20a)의 바닥에 기초블럭(41)을 설치하는 단계와, PC블럭(40)을 기초블럭(41)으로부터 쌓으면서 절취사면(20a)외부로 노출된 앵커볼트(30)의 자유단부에 PC블럭(40)을 연결하는 단계와, PC블럭(40)과 절취사면(20a) 사이의 공간에 토사(21)를 뒷채움하여 다지는 단계로 이루어진다.As shown in FIG. 2, the anchor holes 30 are horizontally drilled at predetermined intervals on the cut surface 20a cut from the base 20, and the anchor bolts 30 are tensioned in the drilled anchor holes. Embedding the anchor bolt by penetration, installing the foundation block 41 at the bottom of the cutting slope 20a, and stacking the PC block 40 from the foundation block 41 to the outside of the cutting slope 20a. Comprising the step of connecting the PC block 40 to the free end of the exposed anchor bolt 30, the step of backfilling the earth and sand 21 in the space between the PC block 40 and the cutting slope 20a.

조성하고자 하는 지반이 높은 경우 도 3에 도시된 바와 같이, 상부에 조성된 PC블럭 옹벽으로부터 단차부(45)를 확보하면서 하부로 굴착하고 상기와 같은 단계를 거쳐 하부 PC블럭 옹벽을 시공한다.When the ground to be formed is high, as shown in Figure 3, the excavation to the lower while securing the stepped portion 45 from the PC block retaining wall formed on the upper and through the above steps to construct the lower PC block retaining wall.

이와 같이 상/하옹벽 시공이 완료된 후에 단차부(45)에 식재등을 통하여 녹화(綠化)시공한다.In this way, after the top and bottom wall construction is completed, the stepped portion 45 is planted by planting or the like.

그러나 상기와 같은 PEM공법을 통한 녹화시공은 단차부(45)를 통하여서만 식재가 가능하다. 따라서 녹화시공을 위하여는 적어도 하나의 단차부(45)를 조성하여야 하므로 녹화에는 한계가 있다.However, the greening construction through the PEM method as described above can be planted only through the step 45. Therefore, at least one step 45 must be formed for greening, so there is a limit to greening.

또한, 단차부(45)의 시공을 위하여 상부 PC블럭 옹벽을 시공한 후에 하부 지반을 굴착시 지반침하로 인하여 이미 시공된 상부 PC블럭 옹벽이 무너질 위험이 있다. 이에 따라서 지반침하 방지를 위한 별도의 시공이 요구된다.In addition, after the construction of the upper PC block retaining wall for the construction of the step 45, there is a risk that the upper PC block retaining wall already constructed due to ground subsidence when excavating the lower ground. Accordingly, a separate construction is required to prevent ground subsidence.

또한, PC블럭(40)의 제작크기에는 한계가 있으며 이들 PC블럭(40)들을 각 해당 앵커볼트(30)에 조립하여 시공하므로 공기단축에는 한계가 있다.In addition, there is a limit to the manufacturing size of the PC block 40 and the air block is limited because these PC blocks 40 are assembled to each of the anchor bolts 30 and constructed.

또한, PC블럭(40)과 절취사면(20a) 사이에 토사(21)를 뒷채움하고 다지는 공정에서 다짐압력에 의해 PC블럭(40)의 조립위치가 변형되거나 파손되는 등의 문제점이있다.In addition, there is a problem such that the assembly position of the PC block 40 is deformed or damaged by the compaction pressure in the process of backfilling and compacting the soil sand 21 between the PC block 40 and the cutting slope 20a.

본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로써, 다음과 같은 목적을 가진다.The present invention was created to solve the above problems, and has the following object.

첫째, 지반의 안정성을 확보하면서 간단한 구조로 인공벽의 조성이 가능한 소일 네일을 이용한 인공벽 조성공법 및 이에 의해 조성된 인공벽을 제공하는 데 그 목적이 있다.First, it is an object of the present invention to provide an artificial wall composition method using a soil nail, which is capable of composition of artificial walls with a simple structure while securing the stability of the ground, and the artificial walls formed thereby.

둘째, 임의 위치에 폭포 또는 식재등의 녹화(綠化)가 가능하고 주변환경에 부합하는 암반면의 조성이 가능하도록 한 소일 네일을 이용한 인공벽 조성공법 및이에 의해 조성된 인공벽을 제공하는 데 있다.Second, to provide artificial wall construction method using Soil Nail and artificial wall created by it, which allows the planting of waterfall or planting at any location, and the formation of rock surface suitable for the surrounding environment. have.

세째, 신속한 시공이 가능하고 경제적으로 시공이 가능한 소일 네일을 이용한 인공벽 조성공법 및 이에 의해 조성된 인공벽을 제공하는 데 있다.Third, there is provided an artificial wall composition method using a small nail capable of rapid construction and economical construction and an artificial wall formed thereby.

도 1은 종래 인공벽의 시공상태를 나타낸 개략 단면도,1 is a schematic cross-sectional view showing a construction state of a conventional artificial wall,

도 2 및 도 3은 지반 안정화 및 식재등의 녹화시공 상태를 설명하기 위한 개략도,2 and 3 are schematic diagrams for explaining the state of greening construction such as ground stabilization and planting,

도 4는 본 발명 공법에 의해 시공된 인공벽의 시공상태를 나타낸 단면도,Figure 4 is a cross-sectional view showing the construction state of the artificial wall constructed by the present invention method,

도 5는 도 4의 요부를 발췌하여 나타낸 부분 단면 사시도,5 is a partial cross-sectional perspective view showing the main portion of Figure 4,

도 6a 내지 도 6d는 본 발명 조성공법을 설명하기 위한 공정도,6a to 6d is a process chart for explaining the composition method of the present invention,

도 7은 본 발명 공법 및 인공벽의 다른 실시예를 나타낸 단면도이다.7 is a cross-sectional view showing another embodiment of the present invention method and artificial wall.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

50...네일 51...스페이서50 ... nail 51 ... spacer

52...호스 60...충진제52 Hose 60 Filler

61,62...1,2차숏크리트 80...지압판61,62 ... 1,2 shotcrete 80 ... Acupressure plate

90...지지봉 95...커플러90 Support rod 95 Coupler

100...지반 200...인공벽100 ... ground 200 ... artificial wall

201...기초근 205...마감재201 ... Basic Root ... 205

상기 목적을 달성하는 본 발명 소일 네일을 이용한 인공벽 조성공법은 굴착면의 적정 위치에 적정 직경 및 깊이의 삽입홀을 천공하는 단계와; 상기 굴착면의 표면으로부터 그 선단이 돌출되도록 상기 각 삽입홀에 네일을 삽입하는 단계와; 상기 각 삽입홀에 충진재를 그라우팅하는 단계와; 상기 충진재가 경화된 후 상기 각 네일의 선단에 소망하는 인공벽의 형상대로 절곡하여 기초근을 배근하여 고정하는 단계와; 상기 배근된 기초근에 마감재를 도포하여 마감하는 단계;를 포함하여 된 것을 특징으로 한다.Artificial wall composition method using the present invention nail nail achieving the above object comprises the steps of drilling a hole of the appropriate diameter and depth at the appropriate position of the excavation surface; Inserting a nail into each of the insertion holes such that its tip protrudes from the surface of the excavation surface; Grouting a filler in each of the insertion holes; After the filler is hardened, bending to the shape of the desired artificial wall at the tip of each nail to fix the root muscles; It characterized in that it comprises a; step of applying a finishing material to the reinforcement basic muscles to finish.

또한, 본 발명 조성공법은 상기 기초근의 고정전에 상기 각 네일의 선단에 커플러를 이용하여 길이가 다른 지지봉을 각각 결합하고, 각 지지봉의 자유단부에 상기 기초근이 고정지지되는 지지판을 고정시키는 단계를 더 포함한다.In addition, the composition method of the present invention is a step of coupling the support rods of different lengths using a coupler to the front end of each nail before fixing the basic muscle, and fixing the support plate on which the basic muscle is fixed to the free end of each support rod It further includes.

또한, 본 발명 조성공법은 상기 기초근의 고정후에 상기 기초근에 기초용 와이어 메쉬를 고정시키고 상기 마감재를 도포하여 1차 마감한 후에, 1차 마감된 마감재의 표면에 보강용 와이어 메쉬를 고정시킨 후 상기 마감재를 도포하여 마감하는 것을 특징으로 한다.In addition, the composition method of the present invention is to fix the wire mesh for the foundation to the foundation root after the fixing of the basic root and after applying the finishing material to the first finish, fixing the reinforcing wire mesh on the surface of the first finished finish material After finishing the coating by applying the finishing material.

상기 마감재는 섬유가 보강된 시멘트모르타르 또는 폴리머콘크리트중 어느 하나가 사용될 수 있다.The finish may be any one of fiber-reinforced cement mortar or polymer concrete.

또한, 본 발명 조성공법은 상기 굴착면에 1차숏크리트를 타설하고 상기 삽입홀을 천공하며, 상기 삽입홀에 네일을 삽입하면서 네일이 삽입홀의 중앙에 위치하도록 스페이서를 결합시키고, 상기 그라우팅 단계 후에 1차숏크리트면에 와이어 메쉬 및 상기 네일을 고정시키는 지압판을 설치하고 2차숏크리트를 타설하는 단계를 더 포함할 수 있다.In addition, the composition method of the present invention is to pour the primary shotcrete on the excavation surface and to drill the insertion hole, and to combine the spacer so that the nail is located in the center of the insertion hole while inserting the nail into the insertion hole, after the grouting step 1 The method may further include installing a wire mesh and an acupressure plate to fix the nail on the secondary shotcrete surface and pouring the secondary shotcrete.

한편, 상기 목적을 달성하는 본 발명 인공벽은 상기 조성공법으로 조성된 것을 특징으로 한다.On the other hand, the artificial wall of the present invention to achieve the above object is characterized by the composition method.

상기 본 발명의 특징에 의하면, 본 발명 인공벽의 조성공법 및 인공벽은 굴착면으로부터 네일을 삽입하여 지반의 안정성을 확보하고 지반에 삽입 고정된 네일에 인공벽을 설치함으로써 구조가 간단하다.According to the characteristics of the present invention, the composition method and the artificial wall of the artificial wall of the present invention is simple in structure by inserting a nail from the excavation surface to secure the stability of the ground and to install the artificial wall on the nail fixed to the ground.

또한, 인공벽의 형상을 소망하는 형상으로 형성이 가능하므로 임의 위치에 폭포 또는 식재등의 녹화(綠化)가 가능하다.In addition, since the shape of the artificial wall can be formed into a desired shape, greening such as a waterfall or planting can be performed at an arbitrary position.

이하 첨부된 도면을 참조하면서 본 발명에 따른 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명 인공벽 조성공법 및 인공벽은 단지의 조성등으로 굴착된 지반을 소일 네일링(soil nailing)공법으로 안정화시키면서 굴착면에 인공폭포 또는 식재(植栽)등을 통하여 주거단지의 쾌적한 자연환경을 조성할 수 있으며, 주변환경에 부합하는 암반면의 조성이 가능하도록 한다.The artificial wall composition method and the artificial wall of the present invention stabilizes the ground excavated by the composition of the complex by a soil nailing method, and the pleasant natural environment of the residential complex through artificial waterfall or planting on the excavated surface. It is possible to create and to allow the formation of rock surface in accordance with the surrounding environment.

본 발명 실시예의 인공벽 조성공법 및 이에 의해 시공된 인공벽은 먼저 도 6a에 도시된 바와 같이 굴착면이 자립할 수 있는 안정한 높이로 지반(100)을 굴착하고 굴착면에 1차 숏크리트(shot crete;61)를 타설하여 굴착면의 붕괴등으로부터 보호시키고, 삽입홀(101)을 적정 깊이 및 간격으로 천공한다.The artificial wall composition method and the artificial wall constructed by the embodiment of the present invention first excav the ground 100 to a stable height that the excavation surface can stand as shown in Figure 6a and the first shotcrete on the excavation surface (shot crete) ; 61) is placed and protected from collapse of the excavation surface and the like, and the insertion hole 101 is drilled at an appropriate depth and spacing.

이때 소일 네일링 공법에서는 굴착면이 본체 구조물로서 사용되는 경우가 많기 때문에 정확한 위치와 형상을 고려하여 굴착한다.At this time, since the excavation surface is often used as the main body structure in the Soil nailing method, excavation is considered in consideration of the exact position and shape.

천공작업은 천공기(boring machine)를 이용하여 유체(공기,물,시멘트 그라우트,벤토나이트)를 투입하면서 천공할 수 있다.The drilling operation may be performed by introducing a fluid (air, water, cement grout, bentonite) using a boring machine.

이어서 도 6b에 도시된 바와 같이, 굴착면의 표면으로부터 네일(50)의 선단이 돌출되도록 각 삽입홀(101)에 네일(50)을 삽입하고, 충진재를 투입시키기 위한 호스(52)를 함께 삽입시킨다. 이때 충진제의 최소두께를 확보하기 위하여 네일(50)이 삽입홀(101)의 중앙에 위치하도록 스페이서(51)를 설치한다.Subsequently, as shown in FIG. 6B, the nail 50 is inserted into each insertion hole 101 so that the tip of the nail 50 protrudes from the surface of the excavation surface, and the hose 52 for inserting the filler is inserted together. Let's do it. At this time, the spacer 51 is installed so that the nail 50 is located at the center of the insertion hole 101 in order to secure the minimum thickness of the filler.

또한, 네일(50)이 영구 구조물로서 이용되는 경우 부식을 고려하여 부식방지처리한다.In addition, in the case where the nail 50 is used as a permanent structure, corrosion treatment is performed in consideration of corrosion.

이어서 도 6c에 도시된 바와 같이, 호스(52)를 통하여 상기 각 삽입홀(101)에 충진재(60)를 그라우팅(grouting)하고, 1차숏크리트(61)면에 와이어 메쉬(70) 및 상기 네일(50)을 고정시키는 지압판(80)을 설치한다.Subsequently, as shown in FIG. 6C, the fillers 60 are grouted into the respective insertion holes 101 through the hoses 52, and the wire mesh 70 and the nail are formed on the surface of the primary shotcrete 61. An acupressure plate 80 for fixing the 50 is installed.

상기와 같은 공정은 네일(50) 및 충진재(60)에 의해서 지반(100) 자체의 전단강도를 증대시켜 공사 완료후에 예상되는 지반(100)의 변위를 최대한 억제시킨다.The process as described above is to increase the shear strength of the ground (100) itself by the nail 50 and the filler material 60 to suppress the displacement of the ground (100) expected after the completion of the construction.

특히, 굴착면의 대체 구조물이 PC블록 옹벽 및 현장 타설 콘크리트벽체등의 다른 공법에 비하여 저렴한 비용으로 시공이 가능하고 지진등의 동적하중에도 큰변위가 없고 저항능력을 충분히 발휘할 수 있게 한다.In particular, the alternative structure of the excavation surface can be installed at a lower cost than other construction methods such as the PC block retaining wall and the site-cast concrete wall, and there is no large displacement even in the dynamic load such as the earthquake, and can sufficiently exhibit the resistance ability.

이와 같은 네일(50)을 이용한 지반 안정화 공정은 소일 네일(soil nal)에 의하여 보강되는 영역의 지반(100)이 일체의 옹벽으로서 작용하게 하며 경사지반에 대해서도 안정을 유지한다.The ground stabilization process using the nail 50 allows the ground 100 of the area reinforced by the soil nail to function as an integral retaining wall and maintains stability even on the sloped ground.

상기와 같이 지반(100)의 안정화 공정 후에 도 6d에 도시된 바와 같이, 1차숏크리트(61) 표면으로 돌출된 각 네일(50)의 선단에 커플러(95)를 이용하여 지지봉(90)을 연결시킨다. 이때 각 지지봉(90)은 인공벽의 설계형상에 따라 그 길이가 다양하다.As shown in FIG. 6D after the stabilization process of the ground 100 as described above, the support rod 90 is connected to the tip of each nail 50 protruding to the surface of the primary shotcrete 61 using the coupler 95. Let's do it. At this time, the length of each support rod 90 varies depending on the design shape of the artificial wall.

상기 커플러(95)는 네일(50)의 선단에 나사결합됨으로써 지압판(80)을 가압하여 네일(50)을 고정시키는 역할도 한다.The coupler 95 is also screwed to the tip of the nail 50 serves to press the pressure plate 80 to fix the nail 50.

상기 커플러(95)는 나사결합 또는 소켓식등 다양한 형태로 네일(50)과 지지봉(90)을 연결시킬 수 있다. 또한 네일(50)과 지지봉(90)은 상호 용접으로 연결될 수도 있다.The coupler 95 may connect the nail 50 and the support rod 90 in various forms such as screwed or socket type. In addition, the nail 50 and the support rod 90 may be connected to each other by welding.

이와 같이 지지봉(90) 및 커플러(95)의 시공이 완료된 후에는 1차숏크리트(61), 와이어 메쉬(70) 및 지압판(80)의 표면에 2차 숏크리트(62)를 타설하여 굴착면을 마감한다.After the construction of the support rod 90 and the coupler 95 is completed, the second shotcrete 62 is poured on the surface of the primary shotcrete 61, the wire mesh 70, and the pressure plate 80 to finish the excavation surface. do.

이어서 도 4 및 도 5에 도시된 바와 같이, 각 지지봉(90)의 선단에 소망하는 인공벽(200)의 설계형상대로 절곡하여 기초근(201)을 배근하여 고정시키고, 상기 배근된 기초근(201)에 마감재(205)를 살포하여 마감함으로써 인공벽(200)을 형성한다.Subsequently, as shown in FIGS. 4 and 5, at the tip of each support rod 90, the desired shape of the artificial wall 200 is bent to reinforce and fix the basic muscle 201. The artificial wall 200 is formed by spraying the finish 205 on 201 to finish.

기초근(201)의 배근시 시공후 인공폭포의 설치 또는 식재등을 위하여 오목한 부분이 요구되는 경우를 고려하여 기초근(201)을 절곡하여 다양한 형상으로 배근한다.Considering the case where a concave part is required for installation or planting of an artificial waterfall after the construction of the root of the basic muscle 201, the basic muscle 201 is bent and placed into various shapes.

한편, 시공된 인공벽(200)의 안정성을 고려하여 기초근(201)에 다양한 보강재료가 설치될 수 있다.Meanwhile, various reinforcement materials may be installed in the basic muscle 201 in consideration of the stability of the constructed artificial wall 200.

즉, 상기 기초근(201)의 배근시 각 지지봉(90)에의 용접고정 작업을 원할하게 하기 위하여 각 지지봉(90)의 선단에 지지판(91)을 설치하는 것이 바람직하다.That is, in order to smooth the welding fixing operation to the supporting rods 90 at the time of reinforcement of the basic muscles 201, it is preferable to install the supporting plate 91 at the tip of each supporting rod 90.

또한, 상기 기초근(201)을 지지판(91)에 고정시킨 후에 기초근(201)에 기초용 와이어 메쉬(202)(203)를 고정시키고 상기 마감재(205)를 살포하여 1차 마감한 후에, 1차 마감된 마감재(205)의 표면에 보강용 와이어 메쉬(204)를 고정시킨 후 상기 마감재(205)를 살포하여 최종 마감시킨다.In addition, after fixing the basic muscle 201 to the support plate 91, and then fixed the basic wire mesh 202, 203 to the basic muscle 201 and after the first finish by spraying the finish material 205, After fixing the reinforcing wire mesh 204 on the surface of the first finished finish 205, the finish 205 is sprayed to the final finish.

상기 마감재(205)는 섬유가 보강된 시멘트모르타르 또는 폴리머콘크리트(polymer concrete)중 어느 하나가 사용될 수 있다.The finishing material 205 may be any one of fiber-reinforced cement mortar or polymer concrete.

특히, 폴리머콘크리트(polymer concret)는 시멘트에 유기고분자화합물인 폴리머로 모래·자갈 등의 골재를 결합시켜 콘크리트를 제조한 것으로서, 압축강도가 우수하고 방수성과 수밀성(水密性)이 우수하여 인공폭포 또는 식재(植栽)등의 환경조성작업에 유리하다. 따라서 본 발명의 실시예에서는 마감재(205)로서 폴리머콘크리트(polymer concret)를 사용하였다.In particular, the polymer concrete (polymer concrete) is an organic polymer compound in the cement and is made of concrete by combining aggregates such as sand and gravel, and has excellent compressive strength, excellent waterproofness and water tightness, and thus, artificial waterfall or It is advantageous for the environmental composition work such as planting. Therefore, in the embodiment of the present invention, a polymer concrete was used as the finishing material 205.

상기 기초용 와이어 메쉬(202)(203)는 상기 마감재(205)를 스프레이 살포하는 경우 부착이 용이하도록 입도(粒度)가 큰 것(조밀한 것)을 사용하였다.The foundation wire mesh 202, 203 used a large particle size (density) for easy attachment when spraying the finishing material 205.

본 발명의 실시예에서는 와이어메쉬(202)는 50×50 mm 를 사용하였으며, 와이어 메쉬(203)은 와이어 메쉬(202)보다 입도가 조밀한 메쉬망을 사용하였다.In the embodiment of the present invention, the wire mesh 202 is used 50 × 50 mm, the wire mesh 203 is used a mesh of a finer particle size than the wire mesh 202.

상기와 같이 마감재(205)를 도포하여 마감한 후에는 마감재(205)의 표면을 다듬거나 주위환경에 적합한 색채로 페인트를 도색할 수 있다.After coating and finishing the finish 205 as described above, the surface of the finish 205 may be polished or paint may be painted in a color suitable for the surrounding environment.

한편, 커플러(95) 및 지지봉(90)을 시공하는 공정은 도 7에 도시된 바와 같이, 각 네일(50)의 길이를 달리함으로써 생략될 수 있다. 즉, 상기 기초근(201)의 배근은 각 네일(50)의 선단에 용접고정될 수 있다.On the other hand, the process of constructing the coupler 95 and the support bar 90 can be omitted by varying the length of each nail 50, as shown in FIG. That is, the back muscles of the basic muscle 201 may be welded to the tip of each nail (50).

또한, 굴착면에 시공되는 1,2차 숏크리트(61)(62) 및 와이어메쉬(70)는 굴착면의 안정도에 따라 시공을 생략할 수 있다.In addition, the first and second shotcrete 61 and 62 and the wire mesh 70 to be installed on the excavation surface can be omitted depending on the stability of the excavation surface.

상술한 바와 같은 네일을 이용한 인공벽의 조성공법 및 인공벽은 지반(100)의 안정화를 확보하면서 인공벽(200)의 임의 지점에 인공폭포 또는 식재등을 가능하게 하고, 주변환경에 부합하는 암반면(굴착면)의 조성을 가능하게 한다.Artificial wall composition method and artificial wall using the nail as described above enables the artificial waterfall or planting at any point of the artificial wall 200 while ensuring the stability of the ground (100), cancer corresponding to the surrounding environment On the other hand, the composition of the excavation surface is possible.

상술한 바와 같은 본 발명은 상기 본원의 정신과 범위를 이탈함이 없이 상기 실시예에 한정되지 아니하고 많은 변형을 가하여 실시될 수 있다.The present invention as described above is not limited to the above embodiments without departing from the spirit and scope of the present application can be practiced with a number of modifications.

상술한 바와 같은 본 발명 소일 네일을 이용한 인공벽 조성공법 및 이에 의해 시공된 인공벽은 다음과 같은 이점을 가진다.As described above, the artificial wall composition method using the soil nail of the present invention and the artificial wall constructed thereby have the following advantages.

첫째, 지반의 안정성을 확보를 위하여 네일(50) 및 충진재(60)를 사용하는 네일링 공법을 채용함으로써 경제시공이 가능하고 공기단축에 유리하다.First, by adopting a nailing method using the nail 50 and the filler 60 to secure the stability of the ground, economic construction is possible and is advantageous for shortening the air.

또한 네일의 연장단부를 이용하여 인공벽(200)을 시공하므로 구조가 간단하고 종래 공법보다 공기단축을 가능하게 한다.In addition, since the artificial wall 200 is constructed using the extended end of the nail, the structure is simple, and the air is shortened than the conventional method.

둘째, 굴착면의 마감시공후 굴착면 전방위치에 네일의 연장단부에 기초근 및 마감재를 통하여 인공벽을 설치함으로써 소망하는 형상의 인공벽 시공이 가능하여 임의 위치에 폭포 또는 식재등의 녹화(綠化)가 가능하고 주변환경에 부합하는 암반면(굴착면)의 조성이 가능하다. 따라서 단지조성후 쾌적한 환경조성작업에 유리하다.Second, after the completion of the excavation surface, the artificial walls can be installed in the desired shape by installing artificial walls through the foundation root and the finishing material at the extension end of the nail at the front position of the excavation surface. It is possible to create rock surface (excavation surface) that matches the surrounding environment. Therefore, it is advantageous to work on pleasant environment after the construction.

Claims (6)

굴착면의 적정 위치에 적정 직경 및 깊이의 삽입홀(101)을 천공하는 단계와;Drilling an insertion hole 101 having a proper diameter and depth at a proper position of the excavation surface; 상기 굴착면의 표면으로부터 그 선단이 돌출되도록 상기 각 삽입홀(101)에 네일(50)을 삽입하는 단계와;Inserting a nail (50) into each of the insertion holes (101) so that its tip protrudes from the surface of the excavation surface; 상기 각 삽입홀(101)에 충진재(60)를 그라우팅하는 단계와;Grouting a filler (60) in each of the insertion holes (101); 상기 충진재(60)가 경화된 후 상기 각 네일(50)의 선단에 소망하는 인공벽의 형상대로 절곡하여 기초근(201)을 배근하여 고정하는 단계와;After the filler 60 is cured, bending to the shape of the desired artificial wall at the tip of each nail 50 to reinforce and fix the basic muscle 201; 상기 배근된 기초근(201)에 마감재(205)를 살포하여 마감하는 단계;를 포함하여 된 것을 특징으로 하는 소일 네일을 이용한 인공벽 조성공법.Spraying the finishing material 205 to the reinforcement basic muscle 201 and finishing; Artificial wall composition method using a nail nail, characterized in that it comprises a. 제 1 항에 있어서, 상기 기초근(201)의 고정전에 상기 각 네일(50)의 선단에 커플러(95)를 이용하여 길이가 다른 지지봉(90)을 각각 결합하고, 각 지지봉(90)의 자유단부에 상기 기초근(201)이 고정지지되는 지지판(91)을 고정시키는 단계를 더포함한 것을 특징으로 하는 소일 네일을 이용한 인공벽 조성공법.According to claim 1, Before the fixing of the basic muscle 201, using a coupler (95) to the front end of each of the nail (50), each of the supporting rods 90 of different lengths, respectively, free of each supporting rod 90 Fixing the support plate 91 is fixed to the base root 201 to the end of the artificial wall composition method using a nail nail, characterized in that it further comprises. 제 2 항에 있어서, 상기 기초근(201)의 고정후에 상기 기초근(201)에 기초용 와이어 메쉬(202)(203)를 고정시키고 상기 마감재(205)를 살포하여 1차 마감한 후에, 1차 마감된 마감재(205)의 표면에 보강용 와이어 메쉬(204)를 고정시킨 후 상기 마감재(205)를 살포하여 마감하는 것을 특징으로 하는 소일 네일을 이용한 인공벽 조성공법.The method of claim 2, after fixing the foundation root 201 to the foundation wire mesh 202 and the foundation wire mesh 202, 203 after the first finish by spraying the finish material 205, 1 After fixing the reinforcing wire mesh 204 on the surface of the finished finishing material 205, the artificial wall composition method using a soy nail, characterized in that to finish by spraying the finishing material (205). 제 1 항 내지 제 3 항중 어느 한 항에 있어서, 상기 마감재(205)는 섬유가 보강된 시멘트모르타르 또는 폴리머콘크리트중 어느 하나를 사용하는 것을 특징으로 하는 소일 네일을 이용한 인공벽 조성공법.The method according to any one of claims 1 to 3, wherein the finishing material (205) uses any one of fiber-reinforced cement mortar or polymer concrete. 제 4 항에 있어서, 상기 굴착면에 1차숏크리트(61)를 타설하고 상기 삽입홀(101)을 천공하며,The method according to claim 4, wherein the primary shotcrete 61 is poured into the excavation surface and the insertion hole 101 is drilled. 상기 삽입홀(101)에 네일(50)을 삽입하면서 네일(50)이 삽입홀(101)의 중앙에 위치하도록 스페이서(51)를 결합시키고,While the nail 50 is inserted into the insertion hole 101, the spacer 51 is coupled so that the nail 50 is located at the center of the insertion hole 101, 상기 그라우팅 단계 후에 1차숏크리트(61)면에 와이어 메쉬(70) 및 상기 네일(50)을 고정시키는 지압판(80)을 설치하고 2차숏크리트(62)를 타설하는 것을 특징으로 하는 소일 네일을 이용한 인공벽 조성공법.After the grouting step, using a soil nail, the secondary shotcrete 62 is installed by installing a pressure plate 80 fixing the wire mesh 70 and the nail 50 on the first shotcrete 61 surface. Artificial wall composition method. 제 1 항 내지 제 3 항중 어느 한 항의 인공벽 조성공법에 의하여 시공된 것을 특징으로 하는 인공벽.An artificial wall, which is constructed by the artificial wall composition method of any one of claims 1 to 3.
KR10-2004-0084356A 2004-10-21 2004-10-21 A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby KR100473880B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2004-0084356A KR100473880B1 (en) 2004-10-21 2004-10-21 A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2004-0084356A KR100473880B1 (en) 2004-10-21 2004-10-21 A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby

Publications (2)

Publication Number Publication Date
KR20040097052A true KR20040097052A (en) 2004-11-17
KR100473880B1 KR100473880B1 (en) 2005-03-14

Family

ID=37375512

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2004-0084356A KR100473880B1 (en) 2004-10-21 2004-10-21 A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby

Country Status (1)

Country Link
KR (1) KR100473880B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100689078B1 (en) * 2005-03-18 2007-03-08 주식회사 오륙개발 A method for construction an artificial wall
CN114606940A (en) * 2022-03-30 2022-06-10 山西路桥第七工程有限公司 Soil nailing wall ecological frame protection structure at soil adverse side slope and construction process thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100689078B1 (en) * 2005-03-18 2007-03-08 주식회사 오륙개발 A method for construction an artificial wall
CN114606940A (en) * 2022-03-30 2022-06-10 山西路桥第七工程有限公司 Soil nailing wall ecological frame protection structure at soil adverse side slope and construction process thereof

Also Published As

Publication number Publication date
KR100473880B1 (en) 2005-03-14

Similar Documents

Publication Publication Date Title
KR100788623B1 (en) Top-down method using precast-concrete colum
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
KR100914158B1 (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
KR20140013497A (en) Method for constructing block type reinforced retaining wall in cut site
KR20110041391A (en) Pile structure
KR100689078B1 (en) A method for construction an artificial wall
KR20080077721A (en) The method of constructing bloclk for wall
KR20070052578A (en) Construction establishment method and the structure for underground tunnel formation
KR100995815B1 (en) Shortcrete retaining wall construction method
KR100473880B1 (en) A method for construction an artificial wall using a soil nail and the artificial wall constructed threrby
KR100553979B1 (en) Construction establishment method and the structure for underground tunnel formation
KR100687496B1 (en) Construction method of pile for building
KR200407437Y1 (en) Construction establishment method and the structure for underground tunnel formation
JP5773755B2 (en) Pile foundation structure of exterior structure and construction method of pile foundation structure of exterior structure
KR20080059951A (en) Underground outer wall construction method using temporary retaining wall and connecting member strengthening shearing force therefor
KR100795849B1 (en) Nature stone engineering method use self drilling nail
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR101339571B1 (en) Steel jointing structure
KR100521345B1 (en) Construction establishment method and the structure for underground tunnel formation
KR100429283B1 (en) Construction Method using Precast Concrete for Diaphragm Wall
JP6393352B2 (en) Repair method for existing waterways
KR101035411B1 (en) Retaining wall structure and method thereof
KR102657300B1 (en) Panel type retaining wall construction method using color panel and retaining wall
KR100689080B1 (en) A method of construction for reinforcement and landscape architecture to an incline plane
KR101524302B1 (en) Construction method for underground structure without temporary structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20110221

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee