KR20040051056A - Head cover for concrete pile and construction method of pile foundation structure using that - Google Patents

Head cover for concrete pile and construction method of pile foundation structure using that Download PDF

Info

Publication number
KR20040051056A
KR20040051056A KR1020020078888A KR20020078888A KR20040051056A KR 20040051056 A KR20040051056 A KR 20040051056A KR 1020020078888 A KR1020020078888 A KR 1020020078888A KR 20020078888 A KR20020078888 A KR 20020078888A KR 20040051056 A KR20040051056 A KR 20040051056A
Authority
KR
South Korea
Prior art keywords
concrete pile
pile
concrete
head cover
hole
Prior art date
Application number
KR1020020078888A
Other languages
Korean (ko)
Other versions
KR100480018B1 (en
Inventor
안선희
Original Assignee
(주) 대호바콘텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 대호바콘텍 filed Critical (주) 대호바콘텍
Priority to KR10-2002-0078888A priority Critical patent/KR100480018B1/en
Publication of KR20040051056A publication Critical patent/KR20040051056A/en
Application granted granted Critical
Publication of KR100480018B1 publication Critical patent/KR100480018B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/226Protecting piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

PURPOSE: A head cover for a concrete pile is provided to shorten a period of construction for a concrete pile footing structure, to cut down the construction expenses of a concrete pile footing structure and to improve the work efficiency. CONSTITUTION: The head cover for a concrete pile comprises: and a circular cap(110), whose both sections are formed in the L-shape to couple the upper parts of an exposed pile on the ground to the upper side of a concrete pile which is cut off using a grinder, provided with a central through hole(112) corresponding to a hole of the concrete pile; many primary steel wires(120) welded to a central through hole(112) of the cap(110) at regular intervals; and a circular metal plate(130) welded parallel to an upper plane(110a) of the cap(110) on the lower end of the primary steel wire(120) and interposed to a hole formed along the concrete pile.

Description

콘크리트 말뚝용 헤드커버 및 그를 이용한 말뚝 기초 구조물의 시공방법{HEAD COVER FOR CONCRETE PILE AND CONSTRUCTION METHOD OF PILE FOUNDATION STRUCTURE USING THAT}HEAD COVER FOR CONCRETE PILE AND CONSTRUCTION METHOD OF PILE FOUNDATION STRUCTURE USING THAT}

본 발명은 콘크리트 말뚝용 헤드커버 및 그를 이용한 말뚝 기초 구조물의 시공방법에 관한 것으로서, 특히 말뚝 기초 구조물의 시공 기간을 줄이고, 시공단가를 절감할 수 있음과 동시에. 시공 능률을 향상시킬 수 있는 콘크리트 말뚝용 헤드커버 및 그것을 사용한 말뚝 기초 구조물의 시공방법에 관한 것이다.The present invention relates to a construction method of a head cover for a pile and a pile foundation structure using the same, in particular, while reducing the construction period of the pile foundation structure, and can reduce the construction cost. The present invention relates to a head cover for a concrete pile capable of improving construction efficiency and a construction method of a pile foundation structure using the same.

이와 같은 종류의 종래의 강관말뚝의 두부 보호용 구조물의 시공방법 및 그 구조물로서는 한국 공개특허공보 특2002-007902호(공개일;2002년 10월 19일)에 개시되어 있다.As a method for constructing a head protection structure of a conventional steel pipe pile of this kind and its structure, it is disclosed in Korean Laid-Open Patent Publication No. 2002-007902 (published date; October 19, 2002).

상기 한국 공개특허공보 특2002-007902호에 개시되어 있는 강관 말뚝의 두부 보호용 구조물의 시공방법 및 그 구조물은 도1 및 도 2에 도시한 바와 같이 지면(53)에 박혀진 강관말뚝(50)의 두부(51)를 수용할 수 있도록 강관말뚝(50)의 외경 크기를 가지는 수용홈(56)을 형성한 헤드 커버(57)를 구비하고, 상기 헤드 커버(57)의 상면에는 다수개의 보강철근(58,59)을 원형이 되도록 등간격으로 용접고정하여 헤드 커버(57)와 일체가 되도록 구비하고, 상기 보강철근(58,59)의 종 방향으로는 띠철근(60,61)을 배치하여 구성한다.The construction method of the head protection structure of the steel pipe pile disclosed in Korean Patent Laid-Open Publication No. 2002-007902 and its structure are as shown in FIGS. 1 and 2 of the steel pipe pile 50 embedded in the ground 53. The head cover 57 is formed with a receiving groove 56 having an outer diameter of the steel pipe pile 50 so as to accommodate the head 51, and the upper surface of the head cover 57 includes a plurality of reinforcing bars ( 58 and 59 are welded and fixed at regular intervals so as to be circular, so as to be integral with the head cover 57, and the band bars 60 and 61 are arranged in the longitudinal direction of the reinforcing bars 58 and 59. do.

상기 헤드 커버(57)는 강관말뚝(50)의 두부(51)를 수용한 상태에서 용접(65)에 의하여 고정되어 있다.The head cover 57 is fixed by welding 65 in a state in which the head 51 of the steel pipe pile 50 is accommodated.

이와 같이 구성된 종래의 강관말뚝의 두부 보호용 구조물의 시공방법 및 그 구조물은 기초 구조물을 설치할 지반에 지지력 보강을 위하여 등간격으로 강관말뚝(50)을 박아넣고, 강관말뚝(50)의 박아넣는 작업시에 불균일 하게 박힌 강관말뚝(50)의 두부 부분을 균일한 치수로 절단한 상태에서 띠철근(60,61)을 가지는 보강철근(58,59)을 용접하여 일체화한 헤드 커버(57)를 강관말뚝(50)의 두부(51)에 씌우면, 헤드커버(57)의 수용홈(56)이 강관말뚝(50)의 두부(51)를 수용한 상태가 된다.The construction method of the head protection structure of the conventional steel pipe pile configured as described above, and the structure injects the steel pipe pile 50 at equal intervals to reinforce the bearing force on the ground on which the foundation structure is to be installed, and in the operation of driving the steel pipe pile 50 at the same time. The head cover 57, which is integrally formed by welding the reinforcing bars 58 and 59 having the band reinforcing bars 60 and 61, is cut in a state in which the head portion of the steel pipe pile 50 unevenly embedded in the tube is cut to uniform dimensions. When the cover 51 is placed on the head 51 of the head 50, the receiving groove 56 of the head cover 57 is in a state in which the head 51 of the steel pipe pile 50 is accommodated.

상기와 같이 강관말뚝(50)에 헤드 커버(57)를 씌운 상태에서 헤드커버(57)의하단면과 강관말뚝(50)을 용접(65)시켜서 강관말뚝(50)에 헤드 커버(57)를 일체화시키는 것이다.The head cover 57 is integrated with the steel pipe pile 50 by welding 65 the lower end surface of the head cover 57 and the steel pipe pile 50 while the head cover 57 is covered with the steel pipe pile 50 as described above. It is to let.

그런데, 이와 같이 구성된 종래의 강관말뚝의 두부 보호용 구조물의 시공방법 및 그 구조물은 강관말뚝과 두부 보호용 구조물의 이탈을 방지하기 위하여 작업 현장에서 강관말뚝(50)에 헤드 커버(57)를 씌운 상태에서 헤드커버(57)의 하단면과 강관말뚝(50)을 용접(65) 고정하여야 하므로서, 숙련된 용접공에 의한 용접작업으로 말뚝기초를 형성하는 비용이 증대되며, 따라서 작업 능률을 향상시킬 수 없다는 문제가 있을 뿐만 아니라, 콘크리트 말뚝에는 헤드커버(57)를 용접 고정할 강재 부분이 없으므로 콘크리트 말뚝에는 상기 발명을 적용시킬 수 없다는 문제점이 있었다.However, the construction method of the head protection structure of the conventional steel pipe pile configured as described above and the structure of the steel pipe pile and the head protection structure to prevent the separation of the steel pipe pile and the head protection structure in the state in which the head cover (57) Since the bottom surface of the head cover 57 and the steel pipe pile 50 are to be welded (65) fixed, the cost of forming the pile foundation by the welding work by skilled welders is increased, and thus the work efficiency cannot be improved. In addition, there is a problem in that the concrete pile can not be applied to the invention because there is no steel part to weld fixed to the head cover (57).

본 발명은 상기 문제점을 감안해서 이루어진 것으로써, 본 발명의 목적은 콘크리트 말뚝 기초 구조물의 시공 시간을 줄일 수 있는 콘크리트 말뚝용 헤드커버 및 그를 이용한 말뚝 기초 구조물의 시공방법을 제공하는 데 있다.The present invention has been made in view of the above problems, and an object of the present invention is to provide a head cover for a concrete pile that can reduce the construction time of the concrete pile foundation structure and a construction method of the pile foundation structure using the same.

본 발명의 다른 목적은 콘크리트 말뚝 기초 구조물의 시공 단가를 절감할 수 있는 콘크리트 말뚝용 헤드커버 및 그를 이용한 말뚝 기초 구조물의 시공방법을 제공하는 데 있다.Another object of the present invention is to provide a construction method for the pile pile head cover and the pile foundation structure using the same can reduce the construction cost of the concrete pile foundation structure.

본 발명의 또 다른 목적은 콘크리트 말뚝 기초 구조물의 시공 작업의 능률을 향상시킬 수 있는 콘크리트 말뚝용 헤드커버 및 그를 이용한 말뚝 기초 구조물의시공방법을 제공하는 데 있다.It is another object of the present invention to provide a head cover for a concrete pile and a method of constructing a pile foundation structure using the same that can improve the efficiency of the construction work of the concrete pile foundation structure.

상기 목적을 달성하기 위하여 본 발명의 콘크리트 말뚝용 헤드커버는 다수개의 콘크리트 말뚝의 선단부가 암반층(또는 자갈층)까지 닿도록 박아넣은 후, 지면상에 노출된 상단부를 그라인더를 이용해 일정한 높이로 절단한 콘크리트 말뚝의 상부 외주면에 감합되어 결합되도록 양측 단면이 ㄱ자 형상을 이루며, 중앙에 상기 콘크리트 말뚝의 중앙에 형성된 구멍과 대체로 같은 크기의 중앙 관통구멍이 형성된 원형의 캡과, 상기 캡에 형성된 중앙 관통구멍의 내주면에 일정 간격을 두고 용접고착되는 다수개의 제1 강선과, 상기 제1 강선의 하부 끝에 상기 캡의 상부면에서 일정거리(L)를 두고 평행하게 용접 고착되며, 상기 콘크리트 말뚝의 길이 방향을 따라 중앙에 형성된 구멍에 삽입되는 원형 금속판과, 내진력을 증가시킬수 있도록 상기 원형 금속판의 중앙에 수직으로 상부를 향해 뻗도록 하부가 용접에 의해 고착되는 뭉쳐진 다수개의 제2 강선으로 구성되어 있는 것을 특징으로 한다.In order to achieve the above object, the head cover for the concrete pile of the present invention is driven to the end of the plurality of concrete piles to reach the rock layer (or gravel layer), the concrete cut to a certain height using a grinder exposed to the ground surface Both sides of the cross-section form an L-shape to fit the upper outer peripheral surface of the pile, a circular cap having a central through hole of the same size as a hole formed in the center of the concrete pile in the center, and the central through hole formed in the cap A plurality of first steel wires welded to the inner circumferential surface at regular intervals, and are welded and held in parallel at a lower end of the first steel wire at a predetermined distance L from the upper surface of the cap, along the longitudinal direction of the concrete pile. A circular metal plate inserted into a hole formed at the center, and the circular metal plate to increase the seismic force; Characterized in that the lower portion so as to extend toward the top in the vertical at the center is composed of a plurality of second wire united are fixed by welding.

또한, 본 발명의 콘크리트 말뚝용 헤드커버는 다수개의 콘크리트 말뚝의 선단부를 암반층(또는 자갈층)까지 닿도록 박아 넣고, 지면상에 노출된 그 상단부를 일정한 높이로 절단한 콘크리트 말뚝의 상부 외주면에 감합되어 결합되도록 양측 단면이 ㄱ자 형상을 이루며, 중앙에 상기 콘크리트 말뚝에 형성된 구멍과 대체로 같은 크기의 중앙 관통구멍이 형성된 원형의 캡과, 상기 캡에 형성된 중앙 관통구멍의 내주면에 서로 일정 간격을 두고 상단부가 용접 고착되는 다수개의 제3 강선과, 상기 제3 강선의 하부 끝에 상기 캡의 상부면에 대해 일정거리(L)를 두고 평행하게 용접 고착되며, 상기 콘크리트 말뚝의 길이 방향을 따라 중앙에 형성된 관통구멍에 삽입되는 원형 금속판과, 내진력을 증가시키도록 상기 원형 금속판의 중앙에 상기 원형 금속판에 대해 수직으로 상부를 향해 뻗도록 하부가 용접에 의해 고착되는 뭉쳐진 다수개의 제4 강선과, 상기 캡의 상부면 중앙부에 하단부가 서로 일정 간격을 두고 용접 고착됨과 동시에, 상부를 향해서 수직으로 뻗는 다수개의 제5 강선으로 구성되어 것을 특징으로 한다.In addition, the head cover for the concrete pile of the present invention is driven so as to hit the front end of the plurality of concrete piles to the rock layer (or gravel layer), is fitted to the upper outer peripheral surface of the concrete pile cut the upper end exposed on the ground to a certain height Both sides of the cross section form an L-shape, a circular cap having a central through hole of the same size as a hole formed in the concrete pile at the center, and an upper end portion with a predetermined distance from each other on the inner circumferential surface of the central through hole formed in the cap. A plurality of third steel wires that are welded and welded in parallel with a predetermined distance (L) with respect to the upper surface of the cap at the lower end of the third steel wire, and through holes formed in the center along the longitudinal direction of the concrete pile A circular metal plate inserted in the center, and the circular metal plate in the center of the circular metal plate to increase the seismic force; A plurality of fourth steel wires, the lower portion of which is fixed by welding so as to vertically extend upward, and the lower portions are welded to the center of the upper surface of the cap at regular intervals and at the same time, It is characterized by consisting of a fifth steel wire.

또한, 본 발명의 콘크리트 말뚝용 헤드커버를 이용한 말뚝 기초구조물의 시공방법은 연약 지반의 지반 보강을 위하여 콘크리트 말뚝의 선단부를 자갈층 또는 암반층까지 박아넣는 콘크리트 말뚝 박는 공정과, 지반에 박아 넣은 말뚝에서 지면상에 노출된 콘크리트 말뚝의 헤드측을 지면으로 부터 일정 높이(10-15cm)가 노출되도록 그라인더로 절단하는 콘크리트 말뚝 절단공정과, 지면으로 부터 일정 높이 노출된 콘크리트 말뚝의 헤드부 상부에 본 발명의 헤드커버를 씌우는 헤드커버 결합공정과, 상기 헤드커버 내의 구멍에 콘크리트를 부어넣어 콘크리트 말뚝과 헤드커버를 고정하고 양생하는 공정으로 이루어진 말뚝기초구조물의 시공방법인 것을 특징으로 한다.In addition, the construction method of the pile foundation structure using the head cover for the concrete pile of the present invention is a concrete pile driving step of injecting the tip of the concrete pile to the gravel layer or rock layer for reinforcing the ground of the soft ground, and the pile driven into the ground The concrete pile cutting process of cutting the head side of the concrete pile exposed on the surface with a grinder to expose a certain height (10-15 cm) from the ground, and the upper portion of the head portion of the concrete pile exposed to a certain height from the ground It is characterized in that the construction method of the pile foundation structure consisting of the head cover coupling step of covering the head cover, and the process of fixing the concrete pile and the head cover and curing by pouring concrete into the hole in the head cover.

도 1은 종래의 강관말뚝의 두부보호용 구조물을 개략적으로 도시한 사시도1 is a perspective view schematically showing the structure for protecting the head of a conventional steel pipe pile

도 2는 도 1에 도시한 강관말뚝의 두부보호용 구조물을 사용하여 강관말뚝에 적용한 상태를 도시한 종단면도Figure 2 is a longitudinal cross-sectional view showing a state applied to the steel pipe pile using the structure for protecting the head of the steel pipe pile shown in FIG.

도 3은 본 발명의 제1실시예에 의한 콘크리트 말뚝용 헤드커버를 개략적으로 도시한 사시도3 is a perspective view schematically showing a head cover for a concrete pile according to a first embodiment of the present invention

도 4는 도 3의 종단면도4 is a longitudinal cross-sectional view of FIG.

도 5는 도 3의 A-A선 단면도5 is a cross-sectional view taken along the line A-A of FIG.

도 6은 본 발명의 제1실시예에 의한 콘크리트 말뚝용 헤드커버를 사용해서 콘크리트 말뚝에 결합하여 시공한 상태를 도시한 종단면도Figure 6 is a longitudinal cross-sectional view showing a state of construction by coupling to the concrete pile using the head cover for concrete piles according to the first embodiment of the present invention

도 7은 본 발명의 제2 실시예에 의한 콘크리트 말뚝용 헤드커버를 개략적으로 도시한 사시도Figure 7 is a perspective view schematically showing a head cover for a concrete pile according to a second embodiment of the present invention

도 8은 도 7의 종단면도8 is a longitudinal cross-sectional view of FIG.

도 9는 도 7의 B-B선 단면도9 is a cross-sectional view taken along the line B-B of FIG.

도 10은 본 발명의 제2 실시예에 의한 콘크리트 말뚝용 헤드커버를 사용해서 콘크리트 말뚝에 결합하여 시공한 상태를 도시한 종단면도10 is a longitudinal sectional view showing a state in which the construction is coupled to the concrete pile using the head cover for concrete piles according to the second embodiment of the present invention

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

90:지면 100:헤드커버90: ground 100: head cover

105:콘크리트 말뚝 105a:구멍105: concrete pile 105a: hole

110:캡 110a:상부면110: Cap 110a: Upper surface

112:캡 120:제1 강선112: Cap 120: First steel wire

130:원형 금속판 140:제2 강선130: circular metal plate 140: second steel wire

200:헤드커버 210:캡200: head cover 210: cap

210a:상부면 212:중앙 관통구멍210a: upper surface 212: center through hole

220:제3 강선 230:원형 금속판220: third steel wire 230: circular metal plate

240:제4 강선 250:제5 강선240: fourth steel wire 250: fifth steel wire

이하, 본 발명의 실시예에 따른 콘크리트 말뚝용 헤드커버에 대하여 첨부도면을 참조하면서 상세히 설명한다.Hereinafter, a concrete cover head cover according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 3은 본 발명의 제1 실시예에 의한 콘크리트 말뚝용 헤드커버를 개략적으로 도시한 사시도이고, 도 4는 도 3의 종단면도이고, 도 5는 도 3의 A-A선 단면도,도 6은 본 발명의 제1 실시예에 의한 콘크리트 말뚝용 헤드커버를 이용해서 콘크리트 말뚝에 결합한 상태를 도시한 종단면도이다.3 is a perspective view schematically showing a head cover for a concrete pile according to a first embodiment of the present invention, Figure 4 is a longitudinal cross-sectional view of Figure 3, Figure 5 is a cross-sectional view taken along line AA of Figure 3, the present invention The longitudinal cross-sectional view which shows the state couple | bonded with the concrete pile using the head cover for concrete piles which concerns on 1st Example of FIG.

도 3 내지 도 6에 도시한 바와 같이 본 발명의 제1 실시예에 의한 콘크리트 말뚝용 헤드커버(100)는 콘크리트 말뚝(105)의 선단부가 암반층(또는 자갈층)까지 닿도록 박아 넣은 후, 지면(90)상에 노출된 그 상단부를 일정한 높이로 그라인더를 이용해 절단한 콘크리트 말뚝(105)의 상부 외주면에 감합되어 결합되도록 그 양측 단면이 ㄱ자 형상을 이루며, 중앙에 상기 콘크리트 말뚝(105)에 형성된 구멍(105a)과 대체로 같은 크기의 중앙 관통구멍(112)이 형성된 원형의 캡(110)과, 상기 캡(110)에 형성된 중앙 관통구멍(112)의 내주면에 일정 간격을 두고 용접 고착되는 다수개의 제1 강선(120)과, 상기 제1 강선(120)의 하부 끝에 상기 캡(110)의 상부면(110a)에 대해 일정거리(L)를 두고 평행하게 용접 고착되며, 상기 콘크리트 말뚝(105)의 길이 방향을 따라 중앙에 형성된 구멍(105a)에 삽입되는 원형 금속판(130)과, 내진력을 증가시키도록 상기 원형 금속판(130)의 중앙에 수직으로 상부를 향해 뻗도록 하부가 용접에 의해 고착되는 뭉쳐진 다수개의 제2 강선(140)으로 구성되어 있다.As shown in FIGS. 3 to 6, the head cover 100 for the concrete pile according to the first embodiment of the present invention is driven so that the front end portion of the concrete pile 105 reaches the rock layer (or gravel layer), and then the ground ( 90 and the upper end portion exposed to the upper surface of the concrete pile 105 cut using a grinder to a certain height, the cross-section of both sides forms a L-shape, the hole formed in the concrete pile 105 in the center A circular cap 110 having a central through hole 112 having the same size as 105a, and a plurality of agents welded to the inner circumferential surface of the central through hole 112 formed in the cap 110 at regular intervals. 1 steel wire 120 and the lower end of the first steel wire 120 is welded and fixed in parallel with a predetermined distance (L) with respect to the upper surface (110a) of the cap 110, of the concrete pile 105 Hole formed centrally along the longitudinal direction (10 Circular metal plate 130 inserted into 5a), and a plurality of second steel wires 140, in which a lower portion is fixed by welding so as to extend upwardly perpendicularly to the center of the circular metal plate 130 so as to increase the seismic force. It consists of.

상기에서 콘크리트 말뚝(105)의 길이 방향을 따라 중앙에 형성된 구멍(105a)에 삽입되는 헤드커버(100)의 원형 금속판(130)은 콘크리트 말뚝(105)과 헤드커버(100)를 고정하기 위해서 콘크리트 말뚝(105)의 상부 구멍(105a)에 콘크리트를 부어 넣을 때 콘크리트가 콘크리트 말뚝의 하부로 흘러내리지 않도록 차단판 역할을 하여 용이하게 콘크리트를 타설 하므로서 콘크리트를 절약할 수 있고, 또한원형 금속판(130)에 용접된 제1 강선의 하부와 함께 말뚝의 구멍 내에서 콘크리트에 의해 고화 되므로 헤드커버(100)가 콘크리트 말뚝에 견고하게 고정되는 것이다.The circular metal plate 130 of the head cover 100 inserted into the hole 105a formed in the center along the longitudinal direction of the concrete pile 105 is concrete to fix the concrete pile 105 and the head cover 100. When pouring concrete into the upper hole (105a) of the pile (105) serves to block the concrete so that the concrete does not flow down to the lower portion of the concrete pile to easily put the concrete can be saved, and also the circular metal plate (130) The head cover 100 is firmly fixed to the concrete pile because it is solidified by the concrete in the hole of the pile together with the lower portion of the first steel wire welded to.

상기 원형 금속판(130)의 중앙에 수직으로 상부를 향해 뻗도록 하부가 용접에 의해 고착되는 뭉쳐진 다수개의 제2 강선(140)은 상부 철근 콘크리트 기둥 구조물 내에 삽입되어 전체 구조물에 대한 내진력을 발휘하게 되는 것이다.The aggregated second steel wires 140, the lower portion of which is fixed by welding so as to extend upwardly perpendicularly to the center of the circular metal plate 130, are inserted into the upper reinforced concrete column structure to exert a seismic force on the entire structure. Will be.

상기 제1 및 제2 강선(120,140)은 콘크리트와의 결합력을 향상시키도록 외주면에 나선형상의 홈이 형성되고 인장력이 큰 PC강선을 사용하는 것이 바람직하지만 철근을 사용할 수도 있다.The first and second steel wires (120, 140) is preferably formed of a spiral groove on the outer circumferential surface to improve the bonding force with the concrete and use a PC steel wire having a high tensile strength, but may be used as a reinforcing bar.

그리고 상기 헤드커버(100)의 제1 강선(120)들의 외측에 상하로 일정 길이를 두고 띠철근(150)으로 체결할 수도 있다.In addition, the outer side of the first steel wires 120 of the head cover 100 may be fastened with a band reinforcing bar 150 with a predetermined length up and down.

다음에, 본 발명의 제2 실시예에 의한 콘크리트 말뚝용 헤드커버에 대하여 도면을 참조하면서 상세히 설명한다.Next, a concrete cover head cover according to a second embodiment of the present invention will be described in detail with reference to the drawings.

도 7은 본 발명의 제2 실시예에 의한 콘크리트 말뚝용 헤드커버를 개략적으로 도시한 사시도이고, 도 8은 도 7의 종단면도이고, 도 9는 도 7의 B-B선 단면도이고, 도 10은 본 발명의 제2 실시예에 의한 콘크리트 말뚝용 헤드커버를 사용해서 콘크리트 말뚝에 결합하여 시공한 상태를 도시한 종단면도이다. 도 7 내지 도 10에 있어서 도 3 내지 도 6에 도시한 부분과 동일한 부분에 대해서는 동일한 부호를 붙이고, 중복되는 설명은 생략한다.7 is a perspective view schematically showing a head cover for a concrete pile according to a second embodiment of the present invention, FIG. 8 is a longitudinal sectional view of FIG. 7, FIG. 9 is a sectional view taken along line BB of FIG. 7, and FIG. It is a longitudinal cross-sectional view showing a state in which the construction is coupled to the concrete pile using the head cover for concrete piles according to the second embodiment of the present invention. 7-10, the same code | symbol is attached | subjected about the part same as the part shown in FIGS. 3-6, and the overlapping description is abbreviate | omitted.

도 7 내지 도 10에 도시한 바와 같이, 본 발명의 제2 실시예에 의한 콘크리트 말뚝용 헤드커버(200)는 콘크리트 말뚝(105)의 선단부가 암반층(또는 자갈층)까지 닿도록 박아 넣은 후, 지면(90)상에 노출된 말뚝의 상단부를 일정한 높이(지면으로 부터 10-15cm)로 절단한 콘크리트 말뚝(105)의 상부 외주면에 감합되어 결합되도록 양측 단면이 ㄱ자 형상을 이루며, 중앙에 상기 콘크리트 말뚝(105)의 중앙에 형성된 구멍(105a)과 대체로 같은 크기의 중앙 관통구멍(212)이 형성된 원형의 캡(210)과, 상기 캡(210)에 형성된 중앙 관통구멍(212)의 내주면에 서로 일정 간격을 두고 상단부가 용접 고착되는 다수개의 제3 강선(220)과, 상기 제3 강선(220)의 하부 끝에 상기 캡(210)의 상부면(210a)에 대해 일정거리(L)를 두고 평행하게 용접 고착되며, 상기 콘크리트 말뚝(105)의 길이 방향을 따라 중앙에 형성된 구멍(105a)에 삽입되는 원형 금속판(230)과, 내진력을 증가시키도록 상기 원형 금속판(230)의 중앙에 상기 원형 금속판(230)에 대해 수직으로 상부를 향해 뻗도록 하부가 용접에 의해 고착되는 뭉쳐진 다수개의 제4 강선(240)과, 상기 캡(210)의 상부면(210a) 중앙부에 하단부가 서로 일정 간격을 두고 용접 고착됨과 동시에 상부를 향해서 수직으로 뻗는 다수개의 제5 강선(250)으로 구성되어 있다.As shown in Figure 7 to 10, the head cover 200 for concrete piles according to the second embodiment of the present invention is driven so that the front end portion of the concrete pile 105 to reach the rock layer (or gravel layer), the ground Both sides of the cross section form a L-shape so as to be fitted to the upper outer peripheral surface of the concrete pile 105 cut to the upper end portion of the pile exposed to the (90) to a constant height (10-15cm from the ground), the concrete pile in the center A circular cap 210 having a central through hole 212 having a substantially same size as the hole 105a formed in the center of the 105 is fixed to the inner circumferential surface of the central through hole 212 formed in the cap 210. A plurality of third steel wire 220 is welded and fixed to the upper end at intervals and parallel to the upper surface 210a of the cap 210 at a lower end of the third steel wire 220 at a predetermined distance (L) Welding is fixed, the longitudinal direction of the concrete pile 105 The lower metal plate 230 is inserted into the hole 105a formed at the center thereof, and the lower portion thereof extends upwardly perpendicularly to the circular metal plate 230 at the center of the circular metal plate 230 so as to increase the seismic force. A plurality of aggregated fourth steel wires 240 fixed by welding, and a plurality of fifths extending vertically toward the top at the same time as the lower ends are welded to each other at a predetermined distance from the center of the upper surface 210a of the cap 210. The steel wire 250 is comprised.

상기 제3,4,5 강선(220,240,250)은 콘크리트와의 결합력을 향상시키도록 외주면에 나선형상의 홈이 형성된 PC강선을 사용하는 것이 바람직하지만 이형 철근을 사용할 수도 있다.The third, fourth, and fifth steel wires 220, 240, and 250 are preferably PC steel wires having spiral grooves formed on the outer circumferential surface of the steel wires 220, 240, and 250 so as to improve bonding strength with concrete.

본 발명의 제2 실시예에서는 캡(210)에 용접 고착된 다수개의 제5 강선(250)이 콘크리트 말뚝의 헤드부에 의해 지지되므로 제1 실시예에서 보다 상부의 하중을 콘크리트 말뚝에 더 잘 전달할 수 있는 것이다.In the second embodiment of the present invention, the plurality of fifth steel wires 250 welded to the cap 210 are supported by the head of the concrete pile, so that the load of the upper portion can be better transmitted to the concrete pile than in the first embodiment. It can be.

이와 같이 구성된 본 발명의 실시예에 따른 콘크리트 말뚝용 헤드커버를 사용해서 콘크리트 말뚝 구조물의 시공방법에 대하여 설명한다.The construction method of the concrete pile structure using the concrete cover head cover according to the embodiment of the present invention configured as described above will be described.

말뚝 기초구조물의 시공방법은 먼저, 연약 지반의 지반 보강을 위하여 콘크리트 말뚝(105)의 선단부를 암반층 또는 자갈층까지 박아넣는 콘크리트 말뚝 박는 공정과,The construction method of the pile foundation structure, first, the concrete pile driving step of driving the tip of the concrete pile 105 to the rock layer or gravel layer to reinforce the ground of the soft ground,

상기 콘크리트 말뚝 박는 공정에서 지반에 박아넣은 말뚝에서 지면(90)상에 노출된 콘크리트 말뚝(105)의 헤드측을 지면(90)으로 부터 일정 높이가 노출되도록 그라인더로 절단하는 콘크리트 말뚝 절단공정과,A concrete pile cutting process of cutting the head side of the concrete pile 105 exposed on the ground 90 with a grinder to expose a predetermined height from the ground 90 in the pile driven into the ground in the concrete pile driving process;

상기 콘크리트 말뚝 절단공정에서 지면(90)으로 부터 일정 높이 노출된 콘크리트 말뚝(105)의 헤드부 상부에 상기 제1항 또는 제2항의 헤드커버(100,200)를 씌우는 헤드커버 결합공정과,A head cover coupling step of covering the head cover (100,200) of claim 1 or 2 on the upper part of the head of the concrete pile 105 exposed to a certain height from the ground (90) in the concrete pile cutting process;

상기 헤드커버 내의 구멍에 콘크리트를 부어넣어 헤드커버와 콘크리트 말뚝을 일체화 하고 양생하는 공정으로 이루어지는 말뚝 기초 구조물 시공방법이므로, 콘크리트 말뚝 기초 구조물의 시공 시간을 줄일 수 있고, 콘크리트 말뚝 기초 구조물의 시공 단가를 절감할 수 있으며, 또한 콘크리트 말뚝 기초 구조물의 시공 작업의 능률을 향상시킬 수 있다.Since the pile foundation structure construction method comprising the step of pouring concrete into the hole in the head cover to integrate and cure the head cover and the concrete piles, it is possible to reduce the construction time of the concrete pile foundation structure, the construction cost of the concrete pile foundation structure It can reduce and also improve the efficiency of the construction work of the concrete pile foundation structure.

상기 설명에 있어서, 특정 실시예를 들어서 도시하고 설명하였으나, 본 발명은 이에 한정되는 것은 아니며, 예를 들면 강관 말뚝에도 사용할 수 있으며 본 발명의 개념을 이탈하지 않는 범위내에서 이 기술 분야의 통상의 지식을 가진 자에 의해 여러가지로 설계변경할 수 있음은 물론이다.In the above description, although illustrated and described with reference to specific embodiments, the present invention is not limited to this, for example, can also be used in steel pipe piles and within the scope not departing from the concept of the present invention Of course, a person with knowledge can change the design in various ways.

앞에서 설명한 바와 같이 본 발명의 콘크리트 말뚝용 헤드커버를 이용한 말뚝 기초 구조물의 시공방법에 의하면, 연약 지반의 지반 보강을 위하여 콘크리트 말뚝의 선단부를 자갈층 또는 암반까지 박아 넣은 후, 지면상에 노출된 콘크리트 말뚝의 헤드측을 지면으로 부터 일정 높이(10-15cm)가 노출되도록 그라인더로 절단하고, 지면상에 노출된 콘크리트 말뚝의 헤드부에 헤드커버로 씌운 후, 헤드커버 내에 콘크리트를 부어서 헤드커버를 콘크리트 말뚝에 고정시키는 말뚝 기초 구조물을 구축하는 구조로 되어 있으므로, 콘크리트 말뚝 기초 구조물의 시공 시간을 줄일 수 있고, 콘크리트 말뚝 기초 구조물의 시공 단가를 절감할 수 있으며, 또한 콘크리트 말뚝 기초 구조물의 시공 작업의 능률을 향상시킬 수 있는 매우 뛰어난 효과가 있다.As described above, according to the construction method of the pile foundation structure using the head cover for concrete piles of the present invention, the concrete pile exposed to the ground after driving the tip of the concrete pile to the gravel layer or rock for reinforcing the ground of soft ground The head side of the cutting machine is cut with a grinder so that a certain height (10-15 cm) is exposed from the ground, the head cover of the concrete pile exposed on the ground is covered with the head cover, and then the concrete is poured into the head cover to cover the concrete pile. Since the construction of the pile foundation structure fixed to the structure can reduce the construction time of the concrete pile foundation structure, reduce the construction cost of the concrete pile foundation structure, and improve the efficiency of the construction work of the concrete pile foundation structure There is a very good effect that can be improved.

Claims (4)

콘크리트 말뚝(105)의 선단부가 암반층에 닿도록 박아 넣은 후, 지면(90)상에 노출된 말뚝의 상단부를 일정한 높이로 그라인더를 이용해 절단한 콘크리트 말뚝(105)의 상부 외주면에 감합되어 결합되도록 그 양측 단면이 ㄱ자 형상을 이루며, 중앙에 상기 콘크리트 말뚝(105)에 형성된 구멍(105a)과 대체로 같은 크기의 중앙 관통구멍(112)이 형성된 원형의 캡(110)과; 상기 캡(110)에 형성된 중앙 관통구멍(112)의 내주면에 일정 간격을 두고 용접 고착되는 다수개의 제1 강선(120)과; 상기 제1 강선(120)의 하부 끝에 상기 캡(110)의 상부면(110a)에 대해 일정거리(L)를 두고 평행하게 용접 고착되며, 상기 콘크리트 말뚝(105)의 길이 방향을 따라 중앙에 형성된 구멍(105a)에 삽입되는 원형 금속판(130)으로 구성된 것을 특징으로 하는 콘크리트 말뚝용 헤드커버.After the tip of the concrete pile 105 is driven into the rock layer, the upper end of the pile exposed on the ground 90 is fitted to the upper outer circumferential surface of the concrete pile 105 cut with a grinder to a certain height so as to be coupled thereto. A circular cap 110 having a cross-section at both sides and having a central through hole 112 having a size substantially the same as a hole 105a formed in the concrete pile 105 at a center thereof; A plurality of first steel wires 120 welded to the inner circumferential surface of the central through hole 112 formed in the cap 110 at predetermined intervals; The lower end of the first steel wire 120 is welded and fixed in parallel with a predetermined distance (L) with respect to the upper surface (110a) of the cap 110, formed in the center along the longitudinal direction of the concrete pile 105 Concrete cover head cover, characterized in that consisting of a circular metal plate 130 is inserted into the hole (105a). 콘크리트 말뚝(105)의 선단부가 암반층까지 닿도록 박아 넣은 후, 지면(90)상에 노출된 말뚝의 상단부를 일정한 높이로 절단한 콘크리트 말뚝(105)의 상부 외주면에 감합되어 결합되도록 양측 단면이 ㄱ자 형상을 이루며, 중앙에 상기 콘크리트 말뚝(105)의 중앙에 형성된 구멍(105a)과 대체로 같은 크기의 중앙 관통구멍(212)이 형성된 원형의 캡(210)과; 상기 캡(210)에 형성된 중앙 관통구멍(212)의 내주면에 서로 일정 간격을 두고 상단부가 용접 고착되는 다수개의 제3 강선(220)과; 상기 제3 강선(220)의 하부 끝에 상기 캡(210)의 상부면(210a)에 대해 일정거리(L)를 두고 평행하게 용접 고착되며, 상기 콘크리트 말뚝(105)의 길이 방향을 따라 중앙에 형성된 구멍(105a)에 삽입되는 원형 금속판(230)과; 상기 캡(210)의 상부면(210a) 중앙부에 하단부가 서로 일정 간격을 두고 용접 고착됨과 동시에 상부를 향해서 수직으로 뻗는 다수개의 제5 강선(250)으로 구성된 것을 특징으로 하는 콘크리트 말뚝용 헤드커버.After the end of the concrete pile 105 is driven to reach the rock layer, both sides of the cross-section so as to fit and join the upper outer peripheral surface of the concrete pile 105 cut to a constant height the upper end of the pile exposed on the ground 90 A circular cap 210 having a shape and having a central through hole 212 having a size substantially equal to that of a hole 105 a formed at the center of the concrete pile 105; A plurality of third steel wires 220 having upper ends welded to the inner circumferential surface of the central through hole 212 formed in the cap 210 at predetermined intervals from each other; The lower end of the third steel wire 220 is welded and fixed in parallel with a predetermined distance (L) with respect to the upper surface (210a) of the cap 210, formed in the center along the longitudinal direction of the concrete pile 105 A circular metal plate 230 inserted into the hole 105a; Concrete cover head, characterized in that the lower portion is formed by a plurality of fifth steel wires (250) extending vertically toward the top at the same time welded to each other at a predetermined distance to the center portion of the upper surface (210a) of the cap (210). 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 내진력을 증가시키도록 상기 원형 금속판(130)(230)의 중앙에는 수직으로 상부를 향해 뻗도록 하부가 용접에 의해 고착되는 뭉쳐진 다수개의 강선이 구비되어 있는 것을 특징으로 하는 콘크리트 말뚝용 헤드커버.The center of the circular metal plate 130, 230 to increase the seismic force, the head cover for a concrete pile, characterized in that a plurality of agglomerated steel wire is provided with a lower portion is fixed by welding so as to extend vertically upward. 연약 지반의 지반 보강을 위하여 콘크리트 말뚝(105)의 선단부를 암반층 또는 자갈층까지 박아넣는 콘크리트 말뚝 박는 공정과,A concrete pile driving step of driving the tip of the concrete pile 105 to a rock layer or a gravel layer to reinforce the ground of the soft ground; 상기 콘크리트 말뚝 박는 공정에서 지반에 박아 넣은 말뚝에서 지면(90)상에 노출된 콘크리트 말뚝(105)의 헤드측을 지면(90)으로 부터 일정 높이가 노출되도록 그라인더로 절단하는 콘크리트 말뚝 절단공정과,A concrete pile cutting process of cutting the head side of the concrete pile 105 exposed on the ground 90 with a grinder to expose a predetermined height from the ground 90 in the pile driven into the ground in the concrete pile driving process; 상기 콘크리트 말뚝 절단공정에서 지면(90)으로 부터 일정 높이 노출된 콘크리트 말뚝(105)의 헤드부 상부에 상기 제1항 내지 제3항 중 어느하나의 헤드커버(100,200)를 씌우는 헤드커버 결합공정과,The head cover coupling process of covering the head cover (100,200) of any one of claims 1 to 3 in the upper portion of the head of the concrete pile 105 exposed to a certain height from the ground 90 in the concrete pile cutting process; , 상기 헤드커버(100,200)의 구멍 내에 콘크리트를 부어넣어 콘크리트 말뚝과 헤드커버를 일체화하고 양생하는 공정으로 이루어지는 것을 특징으로 하는 콘크리트 말뚝용 헤드커버를 이용한 말뚝 기초 구조물의 시공방법.The method of constructing a pile foundation structure using a head cover for concrete piles, characterized in that the concrete cover and the head cover by pouring concrete into the hole of the head cover (100,200).
KR10-2002-0078888A 2002-12-11 2002-12-11 Head cover for concrete pile and construction method of pile foundation structure using that KR100480018B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0078888A KR100480018B1 (en) 2002-12-11 2002-12-11 Head cover for concrete pile and construction method of pile foundation structure using that

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0078888A KR100480018B1 (en) 2002-12-11 2002-12-11 Head cover for concrete pile and construction method of pile foundation structure using that

Publications (2)

Publication Number Publication Date
KR20040051056A true KR20040051056A (en) 2004-06-18
KR100480018B1 KR100480018B1 (en) 2005-03-31

Family

ID=37345057

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0078888A KR100480018B1 (en) 2002-12-11 2002-12-11 Head cover for concrete pile and construction method of pile foundation structure using that

Country Status (1)

Country Link
KR (1) KR100480018B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100742540B1 (en) * 2006-04-12 2007-07-25 (주) 대호바콘텍 Head cover of concrete pile for using footing foundation structure
KR100761758B1 (en) * 2005-10-28 2007-09-28 (주) 대호바콘텍 Head cover for concrete pile and construction methodof foundation structure using that

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100819521B1 (en) 2006-12-05 2008-04-07 홍원철 Head reforcement apparatus of concreat pipe piles for foundation work
KR102230953B1 (en) 2019-10-24 2021-03-24 현대건설주식회사 Cast in place concrete pile using styrofoam
MX2022011932A (en) 2020-03-26 2022-10-20 Univ Kagawa Nat Univ Corp Novel l-rhamnose isomerase.

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08333744A (en) * 1995-06-07 1996-12-17 Nissei Kk Pile head reinforcing bar
KR100394072B1 (en) * 2000-10-24 2003-08-09 주식회사삼안건설기술공사 The connectors for steel pile head embedded in concrete footing and thereof structure
KR100423933B1 (en) * 2000-12-06 2004-03-24 비비엠코리아(주) Head rein forced apparatus for steel pipe piles
JP4345951B2 (en) * 2001-01-22 2009-10-14 サンロード・スチール株式会社 Pile head reinforcement unit
KR20010044822A (en) * 2001-03-29 2001-06-05 이형범 A pile head reinforcement structure of precast concrete pile
KR20020079082A (en) * 2001-04-13 2002-10-19 구일건설(주) Structure method of head cover for steel tube file and its structure
KR200282684Y1 (en) * 2002-04-16 2002-07-22 비비엠코리아(주) Head reinforced apparatus for steel pipe piles reinforced with assembled cover plates
KR200290315Y1 (en) * 2002-06-14 2002-09-26 조영구 Reinforcing bar support structure of steel pipe for base construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100761758B1 (en) * 2005-10-28 2007-09-28 (주) 대호바콘텍 Head cover for concrete pile and construction methodof foundation structure using that
KR100742540B1 (en) * 2006-04-12 2007-07-25 (주) 대호바콘텍 Head cover of concrete pile for using footing foundation structure

Also Published As

Publication number Publication date
KR100480018B1 (en) 2005-03-31

Similar Documents

Publication Publication Date Title
KR200441567Y1 (en) Composite pile combined PHC pile and steel pile
KR100720946B1 (en) Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure
KR101328695B1 (en) Assembling-type pier
KR100480018B1 (en) Head cover for concrete pile and construction method of pile foundation structure using that
KR100786360B1 (en) Concrete pile using in complex pile
KR102069419B1 (en) Composite pile internally reinforced by steel tube
KR100773110B1 (en) Combination pile of phc pile and steel pipe attached concrete pile, constructing method therefor and temporary pile used therein
JP3802996B2 (en) Construction method of flat slabs using steel pipe concrete columns
CN101105077A (en) Method for connecting reinforced concrete structures
KR100761758B1 (en) Head cover for concrete pile and construction methodof foundation structure using that
KR101075178B1 (en) Joint for connecting a Complex pile
JP4451699B2 (en) Pile head joint structure
CN208184748U (en) Wear the ruggedized construction of building in a kind of shield tunnel short distance side
JP4350462B2 (en) Segment manufacturing method
CN111827094A (en) Cluster grouting corrugated pipe assembling pier connected with prefabricated bearing platform and construction method
KR100661123B1 (en) Concrete Pile with an Extended Head Using Reinforcing Plate
KR200315919Y1 (en) Head cover for a concrete pile
JP4105566B2 (en) Foundation-column connection structure and construction method
CN212561128U (en) Pier is assembled to grout bellows tied in a bundle that links to each other with prefabricated cushion cap
CN220414680U (en) Improved split heads muscle
CN213418241U (en) Cement cushion block
JP4451697B2 (en) Pile head joint structure
KR101126278B1 (en) Method for connecting pile and pile used in the same
KR100742540B1 (en) Head cover of concrete pile for using footing foundation structure
JPH1060884A (en) Connecting pile structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J204 Request for invalidation trial [patent]
J206 Request for trial to confirm the scope of a patent right
J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20060221

Effective date: 20060830

Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20060221

Effective date: 20060830

J2X1 Appeal (before the patent court)

Free format text: INVALIDATION

EXTG Extinguishment
J122 Written withdrawal of action (patent court)