KR20040001308A - method for forming concavo and convex of stone board - Google Patents

method for forming concavo and convex of stone board Download PDF

Info

Publication number
KR20040001308A
KR20040001308A KR1020020036460A KR20020036460A KR20040001308A KR 20040001308 A KR20040001308 A KR 20040001308A KR 1020020036460 A KR1020020036460 A KR 1020020036460A KR 20020036460 A KR20020036460 A KR 20020036460A KR 20040001308 A KR20040001308 A KR 20040001308A
Authority
KR
South Korea
Prior art keywords
slab
stone board
speed
gradually
stone
Prior art date
Application number
KR1020020036460A
Other languages
Korean (ko)
Other versions
KR100479987B1 (en
Inventor
박애경
Original Assignee
박애경
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박애경 filed Critical 박애경
Priority to KR10-2002-0036460A priority Critical patent/KR100479987B1/en
Publication of KR20040001308A publication Critical patent/KR20040001308A/en
Application granted granted Critical
Publication of KR100479987B1 publication Critical patent/KR100479987B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/26Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by impact tools, e.g. by chisels or other tools having a cutting edge
    • B28D1/265Scabbling machines or scabbling tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C1/00Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C3/00Abrasive blasting machines or devices; Plants
    • B24C3/08Abrasive blasting machines or devices; Plants essentially adapted for abrasive blasting of travelling stock or travelling workpieces
    • B24C3/083Transfer or feeding devices; Accessories therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C3/00Abrasive blasting machines or devices; Plants
    • B24C3/08Abrasive blasting machines or devices; Plants essentially adapted for abrasive blasting of travelling stock or travelling workpieces
    • B24C3/10Abrasive blasting machines or devices; Plants essentially adapted for abrasive blasting of travelling stock or travelling workpieces for treating external surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Finishing Walls (AREA)

Abstract

PURPOSE: A method for forming prominence and depression on stone board for building is provided to improve design characteristics of building when the stone board is used as an interior or exterior material by varying thickness of a stone board on the surface of which prominence and depression are formed periodically and gradually. CONSTITUTION: The method comprises the steps of obtaining a stone board material(1) by cutting raw stone of granite or marble to a proper thickness; moving the stone board cut to a proper thickness in one direction in such a way that moving speed of the stone board is varied periodically and gradually; forming prominence(1b) and depression(1a) on the surface of the stone board by increasing a quantity of the shot balls used in such a way that the slower the moving speed of the stone board is compared to the reference speed, the stronger metallic shot balls having a proper size hit the surface of the stone board moved in one direction in such a way that the moving speed of the stone board is varied periodically and gradually if a reference speed is the fastest moving speed of the stone board; cutting a stone board on the surface of which prominence and depression are formed to a required specification; and cleanly treating the surface of the stone board cut to the required specification.

Description

건축용 석판재의 요철 형성방법{method for forming concavo and convex of stone board}Method for forming concavo-convex in building slab {method for forming concavo and convex of stone board}

본 발명은 건축용으로 사용되는 석판재 분야에 관련된 것으로서, 좀더 구체적으로는 화강암이나 대리석을 판상으로 가공함에 따라 얻어진 석판재의 표면에 요철을 형성시켜 상기 표면이 거칠어지도록 한 건축용 석판재의 요철 형성방법에 관한 것이다.The present invention relates to the field of slabs used for construction, and more particularly, to a method of forming irregularities in building slabs for which the surface is roughened by forming irregularities on the surface of the slab obtained by processing granite or marble into a plate shape. will be.

일반적으로 화강암이나 대리석 등은 일반 암석에 비해 단단하면서도 윤기가 있어 건축물의 내외장재로 아주 적합하게 사용되는 암석이다.In general, granite and marble are harder and more polished than ordinary rocks, and are suitable for interior and exterior materials of buildings.

상기한 화강암이나 대리석을 건축용 내외장재로 사용하기 위해서는 원석을 일정한 두께로 가공하여 석판재(1)를 얻어야 하는 선행 과정을 거쳐야 하는데, 이 과정에서 얻어진 석판재는 그 표면이 매끄러울 수 밖에 없다.In order to use the granite or marble as an interior and exterior material for building, the raw material must be processed to a predetermined thickness to obtain a slab (1), and the slab obtained in this process must have a smooth surface.

하지만 표면이 매끄러운 석판재(1)는 그대로 사용하기도 하지만 때에 따라서는 자연미를 살리거나 기타 다른 이유에 의해 그 매끄러운 표면을 다시 거칠게 처리하는 이차적인 과정을 거치는데, 상기 표면을 거칠게 처리하기 위해서는 요철을 형성하고 있음이 보편적이다.However, the smooth slab 1 may be used as it is, but sometimes it undergoes a secondary process of roughening the smooth surface again for natural beauty or for some other reason. Forming is universal.

즉, 석판재(1)를 바닥이나 벽의 마감재로 사용하고자 할 경우 때에 따라서는 자연미를 최대한 살려 보는 사람으로 하여금 편안하고 안정감을 갖도록 할 필요가 있고, 또한 석판재(1)를 계단의 답판으로 사용하고자 할 경우에는 신발이 미끄러지는 것을 방지할 필요가 있으므로 이때에는 석판재(1)의 표면에 요철을 형성시켜야 함은 이해 가능한데, 상기 석판재의 표면에 요철을 형성하는 방법은 여러가지가 제공되고 있으나 통상적으로는 도 1과 같이 석판재를 롤러(2)에 회전에 의해 어느 한방향으로 이동시키면서 그 표면을 향해 금속재의 쇼트볼(3)을 임펠라(4)로서 강하게 입사시켜 상기 쇼트볼(3)이 석판재(1)의 표면을 타격함에 따라 요철이 형성되게 하는 방법을 대부분 이용하고 있고, 상기 방법에 의해 석판재의 표면에 요철을 형성하기 위해서는 관련된 기계장치도 반드시 필요하게 됨은 이해 가능하다.In other words, if you want to use the slab (1) as a finishing material of the floor or wall, it is necessary to make people who take full advantage of natural beauty to have a comfortable and stable, and also to replace the slab (1) as a step of the stairs If you want to use it is necessary to prevent the slipping of the shoe at this time it is understood that the irregularities should be formed on the surface of the slab (1), there are various ways to form the irregularities on the surface of the slab In general, while moving the slab in one direction by rotation to the roller (2) as shown in Fig. 1, the shot ball (3) of the metal material is strongly incident toward the surface as the impeller (4), Most of the methods are used to cause the unevenness to be formed by hitting the surface of the slab 1, in order to form the unevenness on the surface of the slab by the above method It is to be understood that the mechanism is also necessary.

그럼 여기서 건축용 석판재의 표면에 요철을 형성시키는 종래 방법을 먼저 살펴보기로 하면 다음과 같다.So, here's a look at the conventional method of forming irregularities on the surface of the building slab first.

종래에는 화강암이나 대리석의 원석을 적정한 두께로 잘라 석판재(1)를 얻어내는 단계와, 상기 적정한 두께로 잘라진 석판재를 어느 한 방향을 향해 계속해서 동일한 속도로 이동시키는 단계와, 상기 어느 한방향을 향해 계속해서 동일한 속도로 이동되는 석판재(1)의 표면에 적정한 크기의 금속재 쇼트볼(3)을 동일한 속도 및 량으로 입사시켜 타격에 의해 요철을 형성시키는 단계와, 상기 표면에 요철이 형성된 석판재(1)를 필요한 규격으로 절단하는 단계와, 상기 적정 규격으로 절단된 석판재의 표면을 깨끗하게 처리하는 단계가 순차적으로 수행되어 진다.Conventionally, a step of obtaining granite or marble by cutting the granite or marble to an appropriate thickness to obtain the slab 1, and continuing to move the slab cut to the appropriate thickness in either direction at the same speed, and the one direction Injecting metal shotballs 3 of a suitable size to the surface of the slab 1 continuously moving at the same speed toward the same speed and amount to form unevenness by hitting, and the unevenness formed on the surface The step of cutting the ash (1) to the required specification, and the step of cleanly treating the surface of the slab cut to the appropriate specification is performed sequentially.

따라서 화강암이나 대리석의 원석을 석재 절단기를 이용해 그 두께가 적정하게 유지되도록 절단하여 판상의 석판재(1)를 얻은 다음 상기 얻어진 석판재를 롤러(2)위에 올려 상기 롤러의 회전시 석판재(1)가 일방향을 향해 이동되도록 하는데, 이때 상기 롤러(2)의 회전에 의한 석판재(1)의 일방향 이동을 분당 100∼200㎝ 정도의 속도로 계속해서 동일하게 유지시킨다.Therefore, the stone of granite or marble is cut using a stone cutting machine to maintain the thickness thereof properly to obtain a plate-like slab (1), and then the obtained slab is placed on the roller (2). ) Is moved in one direction, in which the one-way movement of the slab 1 by the rotation of the roller 2 is continuously maintained at the speed of about 100 to 200 cm per minute.

한편 상기 석판재(1)가 롤러(2)의 회전에 의해 동일 속도를 유지하면서 일방향으로 계속 이동할 때 임펠라(4)가 모터의 구동력을 받아 고속으로 회전하면서1mm 내외의 크기인 금속재 쇼트볼(3)을 상기 이동되는 석판재(1)의 표면을 향해 강하게 입사시키면 어느 순간 상기 쇼트볼(3)이 석판재(1)의 표면에 부딪히면서 표면을 파내게 되므로 결국 석판재의 표면에 수많은 요철이 불규칙하게 형성되는데, 이때 상기 임펠라(4)의 회전속도는 계속적으로 동일함은 물론 입사되는 쇼트볼(3)의 사용량도 계속적으로 동일하다.Meanwhile, when the slab 1 continues to move in one direction while maintaining the same speed by the rotation of the roller 2, the impeller 4 rotates at a high speed under the driving force of the motor, and is a metal short ball 3 having a size of about 1 mm. ) Is strongly inclined toward the surface of the moving slab 1, at which point the short ball 3 hits the surface of the slab 1 and digs out the surface, resulting in numerous irregularities on the surface of the slab. In this case, the rotation speed of the impeller 4 is continuously the same as well as the amount of use of the shot ball 3 is continuously the same.

이후 표면에 요철이 형성된 석판재(1)를 석재 절단기를 이용하여 필요한 크기로 절단한 다음 상기 필요 크기로 절단된 석판재의 표면으로 물을 분사시키거나 공기를 분사시키면 요철부분에 남아 있는 먼지나 조각편 등이 깨끗하게 처리되면서 석판재의 표면에 요철이 형성 완료되는 것이다.Thereafter, the slab (1) having irregularities formed on the surface is cut to a required size using a stone cutter, and then sprayed with water or sprayed with air on the surface of the slab cut to the required size to remove dust or fragments remaining on the uneven portion. As the back is clean, irregularities are formed on the surface of the slab.

상기 종래 방법에 의해 석판재(1)의 표면에 요철이 형성되는 과정에서는 상기 석판재의 일방향 이동이 계속해서 동일한 속도로 이루어지고 있고, 상기 일방향으로 이동되는 석판재의 표면으로 쇼트볼(3)을 입사시키기 위한 임펠라(4)의 회전속도 및 상기 입사되는 쇼트볼(3)의 사용량이 계속적으로 동일함을 감안할 때 상기 요철이 형성되고 난 후의 석판재(1) 두께는 도 3과 같이 전부분이 동일하게 됨은 이해 가능하다.In the process of forming irregularities on the surface of the slab 1 by the conventional method, the one-way movement of the slab continues at the same speed, and the shot ball 3 is incident on the surface of the slab that is moved in one direction. Considering that the rotational speed of the impeller 4 and the usage amount of the incident shotball 3 are continuously the same, the thickness of the slab 1 after the unevenness is formed is the same as in FIG. 3. Can be understood.

그러나 종래 방법에 의해 건축용 석판재의 표면에 요철을 형성하는 과정에서는 석판재의 일방향 이동이 계속해서 동일한 속도로 이루어지고, 상기 일방향으로 이동되는 석판재의 표면으로 쇼트볼(3)을 입사시키기 위한 임펠라(4)의 회전속도가 계속해서 동일함은 물론 상기 입사되는 쇼트볼(3)의 사용량이 계속적으로 동일하므로 요철이 형성되고 난 후의 석판재 두께가 전부분 동일함에 따라 전체적인 형상이매우 단조로울 수 밖에 없고, 이에 따라 표면에 요철이 형성된 석판재(1)를 내외장재로 사용할 경우 건축물의 디자인성이 떨어져 건축물의 값어치가 올라가지 못하는 문제점이 있었다.However, in the process of forming the unevenness on the surface of the building slab by the conventional method, the one-way movement of the slab is continuously made at the same speed, and the impeller (4) for injecting the shot ball 3 into the surface of the slab moved in the one direction (4). Since the rotational speed of) is the same, as well as the amount of use of the incident shotballs 3 is the same, the overall shape is very monotonous as the thickness of the slab after the unevenness is formed is the same. Accordingly, when the slab (1) having irregularities formed on the surface is used as interior and exterior materials, there is a problem in that the design value of the building is poor and the value of the building does not rise.

본 발명은 상기한 종래의 문제점을 해결하기 위하여 안출한 것으로서, 석판재의 일방향 이동시 그 이동속도를 주기적 또는 점진적으로 달리하고, 상기 석판재의 이동속도에 따라 쇼트볼을 입사시키기 위한 임펠라의 회전속도 및 상기 쇼트볼의 사용량을 달리하여 석판재의 표면에 요철이 형성된 상태에서는 상기 석판재의 두께가 주기적 또는 점진적으로 달라지도록 함에 따라 전체적인 형상의 변화가 매우 다양해지면서 조화로워지도록 하는데 그 목적이 있다.The present invention has been made in order to solve the above-mentioned conventional problems, and the movement speed of the one-way movement of the slab periodically or gradually different, the rotational speed of the impeller for injecting the shot ball according to the movement speed of the slab In the state where the unevenness is formed on the surface of the slab by varying the amount of the shotball, the thickness of the slab is periodically or gradually changed so that the overall shape change becomes very diverse and harmonious.

도 1은 건축용 석판재의 요철성형기중 요철 형성부분 구성을 참고적으로 나타낸 개략도1 is a schematic view showing the configuration of the uneven portion forming part of the uneven molding machine of the building slab for reference

도 2는 종래 방법에 의한 건축용 석판재의 요철 형성 과정을 순서적으로 나타낸 플로우챠트Figure 2 is a flow chart showing the process of forming the irregularities of the building slab for construction according to the conventional method

도 3은 종래 방법에 의해 요철이 형성된 건축용 석판재의 사시도Figure 3 is a perspective view of a building slab with irregularities formed by a conventional method

도 4는 본 발명에 의한 건축용 석판재의 요철 형성 과정을 순서적으로 나타낸 플로우챠트Figure 4 is a flow chart showing the process of forming the irregularities of the building stone material according to the present invention in sequence

도 5는 본 발명 방법에 의해 요철이 형성된 건축용 석판재를 일 실시예로 나타낸 사시도Figure 5 is a perspective view showing an embodiment of the building slab with irregularities formed by the present invention

도 6은 본 발명 방법에 의해 요철이 형성된 건축용 석판재를 다른 실시예로 나타낸 사시도Figure 6 is a perspective view showing another embodiment of the building slab with irregularities formed by the method of the present invention

도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings

1. 석판재 3. 쇼트볼1. Slabs 3. Shortball

상기 목적을 달성하기 위한 본 발명 형태에 따르면, 화강암이나 대리석의 원석을 적정한 두께로 잘라 석판재를 얻어내는 단계와, 상기 적정한 두께로 잘라진 석판재를 어느 한 방향을 향해 주기적 또는 점진적으로 그 속도가 다르게 이동시키는 단계와, 상기 어느 한방향을 향해 주기적 또는 점진적으로 그 속도가 다르게 이동되는 석판재의 표면에 상기 석판재의 이동속도중 가장 빠른 속도를 기준속도라 할 때 그 기준속도 보다 느릴수록 적정 크기의 금속재 쇼트볼을 강하게 타격시키면서 상기 쇼트볼의 사용량을 많게하여 석판재의 표면에 요철을 형성시키는 단계와, 상기 표면에 요철이 형성된 석판재를 필요한 규격으로 절단하는 단계와, 상기 적정 규격으로 절단된 석판재의 표면을 깨끗하게 처리하는 단계가 순차적으로 수행되어진 건축용 석판재의 요철 형성방법이 제공된다.According to the aspect of the present invention for achieving the above object, the step of cutting the granite or marble stone to an appropriate thickness to obtain a slab, and the speed of the slab cut to the appropriate thickness periodically or gradually toward one direction The step of moving differently, and the fastest speed of the moving speed of the slab on the surface of the slab periodically or gradually differently moving in any one direction when the reference speed is slower than the reference speed of the metal material of the appropriate size Forming an unevenness on the surface of the slab by increasing the amount of the shortball while hitting the shotball strongly, cutting the slab formed with the unevenness on the surface to a required standard, and Building slabs in which the steps to clean the surface are carried out sequentially The roughening of the method is provided.

이하 본 발명을 첨부된 도 4에 의해 구체적으로 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to FIG. 4.

첨부된 도 4는 본 발명에 의한 건축용 석판재의 요철 형성 과정을 순서적으로 나타낸 플로우챠트로서, 화강암이나 대리석의 원석을 적정한 두께로 잘라 석판재(1)를 얻어내는 단계와, 상기 적정한 두께로 잘라진 석판재를 어느 한 방향을 향해 주기적 또는 점진적으로 그 속도가 다르게 이동시키는 단계와, 상기 어느 한방향을 향해 주기적 또는 점진적으로 그 속도가 다르게 이동되는 석판재(1)의 표면에 상기 석판재의 이동속도중 가장 빠른 속도를 기준속도로 할 때 그 기준속도 보다 느릴수록 적정 크기의 금속재 쇼트볼(3)을 강하게 타격시키면서 상기 쇼트볼의 사용량을 많게하여 석판재(1)의 표면에 요철을 형성시키는 단계와, 상기 표면에 요철이 형성된 석판재(1)를 필요한 규격으로 절단하는 단계와, 상기 적정 규격으로 절단된 석판재(1)의 표면을 깨끗하게 처리하는 단계가 순차적으로 수행되어 진다.4 is a flowchart showing the process of forming the unevenness of the building slab according to the present invention in order, and cutting the granite or marble to an appropriate thickness to obtain the slab 1 and cut to the appropriate thickness. A step of moving the slab periodically or gradually differently in one direction, and the moving speed of the slab on the surface of the slab 1 which is periodically or gradually moved differently in the one direction. The step of forming the unevenness on the surface of the slab (1) by increasing the amount of use of the short ball while hitting the metal short ball (3) of the appropriate size when the slowest than the reference speed at the fastest speed; Cutting the slab (1) having irregularities formed on the surface to the required standard, and the surface of the slab (1) cut to the appropriate standard The step of processing the fives are performed sequentially.

이와 같은 각 단계가 순차적으로 수행됨에 따라 석판재(1)의 표면에 요철이 형성되는 과정을 구체화하면 다음과 같다.As each of these steps is performed in sequence, the process of forming the irregularities on the surface of the slab 1 is as follows.

화강암이나 대리석의 원석을 석재 절단기를 이용해 그 두께가 적정하게 유지되도록 절단하여 판상의 석판재(1)를 얻은 다음 상기 얻어진 석판재를 롤러(2)위에 올려 상기 롤러의 회전에 의해 석판재(1)가 일방향을 향해 이동되도록 하는데, 이때 상기 롤러(2)의 작동에 의한 석판재(1)의 일방향 이동속도를 적정속도 범위 내에서 주기적 또는 점진적으로 다르게 계속해서 유지시킨다.Stone of granite or marble is cut using a stone cutter to maintain the thickness thereof properly to obtain a plate-like slab (1), and then the obtained slab is placed on the roller (2) to rotate the slab (1). ) Is moved in one direction, in which the one-way moving speed of the slab 1 by the operation of the roller 2 is continuously maintained differently periodically or gradually within an appropriate speed range.

한편 상기 석판재(1)가 롤러(2)의 회전에 의해 적정속도를 주기적 또는 점진적으로 다르게 유지하면서 일방향으로 계속 이동할 때 임펠라(4)가 고속으로 회전하면서 1mm 내외의 크기인 금속재의 쇼트볼(3)을 상기 이동되는 석판재(1)의 표면을 향해 강하게 입사시키면 어느 순간 상기 쇼트볼(3)이 석판재(1)에 부딪히면서 표면을 파내게 되므로 결국 상기 석판재의 표면에 불규칙적으로 수많은 요철이 형성되게 되는데, 이때 상기 임펠라(4)의 회전속도는 석판재(1)의 일방향 이동속도에 따라 다르게 함은 물론 입사되는 쇼트볼(3)의 사용량도 석판재(1)의 일방향 이동속도에 따라 다르게 하므로 상기 석판재의 표면에 요철이 형성된 상태에서의 석판재 두께가 전부분에 걸쳐 주기적 또는 점진적으로 달라지게 된다.On the other hand, when the slab 1 continues to move in one direction while maintaining the proper speed periodically or gradually differently by the rotation of the roller 2, the impeller 4 rotates at a high speed and is about 1 mm in size. When 3) is strongly incident toward the surface of the moving slab 1, the shot ball 3 hits the slab 1 at a certain moment and digs out the surface, so that a large number of irregularities irregularly appear on the surface of the slab. In this case, the rotational speed of the impeller 4 varies depending on the one-way moving speed of the slab 1 as well as the usage amount of the incident shot ball 3 according to the one-way moving speed of the slab 1. Since differently, the thickness of the slab in the uneven state formed on the surface of the slab is periodically or gradually changed over the entire portion.

이후 표면에 요철이 형성된 석판재(1)를 석재 절단기를 이용하여 필요한 크기로 절단한 다음 상기 필요 크기로 절단된 석판재의 표면으로 물을 분사시키거나 공기를 분사시키면 요철부분에 남아 있는 먼지나 조각편 등이 깨끗하게 처리되면서 석판재의 표면에 요철이 형성 완료되는 것이다.Thereafter, the slab (1) having irregularities formed on the surface is cut to a required size using a stone cutter, and then sprayed with water or sprayed with air on the surface of the slab cut to the required size to remove dust or fragments remaining on the uneven portion. As the back is clean, irregularities are formed on the surface of the slab.

상기 본 발명 방법에 의해 석판재(1)의 표면에 요철이 형성되는 과정에서는 상기 석판재의 일방향 이동속도가 주기적 또는 점진적으로 다르게 계속해서 이루어지고 있고, 상기 일방향으로 이동되는 석판재의 표면으로 쇼트볼(3)을 입사시키기 위한 임펠라(4)의 회전속도 및 상기 입사되는 쇼트볼(3)의 사용량도 상기 석판재(1)의 이동속도에 따라 계속적으로 달아짐을 감안할 때 상기 요철이 형성되고 난 후의 석판재(1) 두께는 도 5 및 도 6과 같이 주기적 또는 점진적으로 서로 다르게 됨은 이해 가능하다.In the process of forming the irregularities on the surface of the slab 1 by the method of the present invention, the one-way movement speed of the slab continues to be made periodically or gradually differently, and the shot ball (the ball to the surface of the slab moved in one direction) 3) The slab after the unevenness is formed in consideration of the rotational speed of the impeller 4 for making the incident and the amount of the shotball 3 incident thereon also vary continuously according to the moving speed of the slab 1. It is understood that the thickness of the ash 1 may be periodically different from each other, as shown in FIGS. 5 and 6.

실시예 1Example 1

롤러(2)의 회전에 의한 석판재(1)의 일방향 이동을 분당 200㎝를 최고속도로, 분당 100㎝를 최저속도로 하여 최고속도를 10초 동안 수행후 다시 최저속도를 20초 동안 수행함을 반복하였다.The one-way movement of the slab 1 by the rotation of the roller 2 is performed at a maximum speed of 200 cm per minute and a minimum speed of 100 cm per minute for a maximum speed of 10 seconds, and then again a minimum speed of 20 seconds. It was.

상기 석판재(1)가 분당 200㎝의 최고속도로 이동될 때는 임펠러(4)를 3000RPM으로 하면서 상기 임펠라의 회전에 의해 입사되는 쇼트볼(3)의 량을 분당 3000개 정도로 하고, 석판재(1)가 분당 100㎝의 최저속도로 이동될 때는 임펠라(4)를 5000RPM으로 하면서 상기 임펠라의 회전에 의해 입사되는 쇼트볼(3)의 사용량을 분당 4000개 정도로 하였다.When the slab 1 is moved at a maximum speed of 200 cm per minute, while the impeller 4 is set at 3000 RPM, the amount of the shot balls 3 incident by the rotation of the impeller is about 3000 pieces per minute, and the slab 1 ) Was used at a minimum speed of 100 cm per minute, while the impeller 4 was set at 5000 RPM, and the amount of the shot balls 3 incident by the rotation of the impeller was about 4000 pieces per minute.

따라서 석판재(1)의 이동속도가 분당 200㎝이고, 임펠라(4)의 회전이 3000RPM이며, 쇼트볼(3)의 량이 분당 3000개 일 경우가 10초 동안 유지되는 상태에서는 적은량의 쇼트볼(3)을 빠른속도로 석판재(1)에 입사시키는 상태가 되므로 상기 석판재의 표면에 요철이 형성될 때의 깊이가 얕아지지만 상기 석판재(1)의 이동속도가 분당 100㎝이고, 임펠라(4)의 회전이 5000RPM이며, 쇼트볼(3)의 사용량이 분당 4000개 일 경우가 20초 동안 유지되는 상태에서는 많은량의 쇼트볼(3)을 빠른속도로 석판재(1)에 입사시키는 상태가 되므로 상기 석판재의 표면에 요철이 형성될 때의 깊이가 깊어짐에 따라 결국 도 5와 같은 형태의 석판재(1)를 얻을 수 있는데, 이때에는 표면에 요철이 형성된 석판재(1)의 상기 요철 형성면에 요입홈(1a) 및 돌출편(1b)이 동일한 폭을 갖고 복수개 형성됨은 이해 가능하다.Therefore, when the moving speed of the slab 1 is 200 cm per minute, the impeller 4 is rotated at 3000 RPM, and the amount of the short balls 3 is 3000 per minute, a small amount of short balls ( 3) is brought into the slab 1 at a high speed, so the depth when the unevenness is formed on the surface of the slab becomes shallow, but the moving speed of the slab 1 is 100 cm per minute, and the impeller 4 ) Is rotated at 5000 RPM, and when the amount of the short balls 3 is 4000 per minute is maintained for 20 seconds, a large amount of the short balls 3 is incident on the slab 1 at a high speed. Therefore, as the depth when the unevenness is formed on the surface of the slab becomes deeper, it is possible to finally obtain the slab 1 having a shape as shown in FIG. 5, in which the unevenness of the slab 1 having the unevenness formed on the surface thereof is formed. A plurality of recessed grooves 1a and protruding pieces 1b are formed on the surface with the same width Understanding is possible.

실시예 2Example 2

롤러(2)의 회전에 의한 석판재(1)의 일방향 이동을 분당 200㎝를 최고속도로, 분당 100㎝를 최저속도로 하여 상기 최고속도에서 부터 최저속도까지 10초 동안에 걸쳐 점진적으로 느려지게 하다가 다시 최저속도에서 최고속도까지 10초 동안에 걸쳐 점진적으로 빨라지게 하였다.The one-way movement of the slab 1 by the rotation of the roller 2 is gradually slowed over 10 seconds from the maximum speed to the minimum speed at 200 cm per minute at the maximum speed and 100 cm per minute at the minimum speed, and then again. The speed was gradually increased over 10 seconds from the lowest speed to the highest speed.

상기 석판재(1)가 분당 200㎝의 최고속도로 이동될 때는 임펠러(4)를 3000RPM으로 하면서 상기 임펠라의 회전에 의해 입사되는 쇼트볼(3)의 량을 분당 3000개 정도로 하다가 상기 석판재(1)가 점진적으로 분당 100㎝의 최저속도로 이동될 때까지 임펠라(4)의 회전수를 점점더 늘려 최종적으로 5000RPM이 되게 하면서 상기 임펠라의 회전에 의해 입사되는 쇼트볼(3)의 사용량도 점점더 늘려 최종적으로 분당 4000개 정도 되게 하였다.When the slab 1 is moved at a maximum speed of 200 cm per minute, while the impeller 4 is set at 3000 RPM, the amount of the shot balls 3 incident by the rotation of the impeller is about 3000 pieces per minute, and the slab 1 ) And gradually increase the number of revolutions of the impeller 4 until it is gradually moved to the minimum speed of 100 cm per minute so as to finally reach 5000 RPM, and also the amount of the shot ball 3 incident by the rotation of the impeller gradually increases. The final increase was about 4000 pieces per minute.

따라서 석판재(1)의 이동속도는 분당 200㎝를 최고점으로 하여 최저점인 분당 100㎝가 될 때까지 10초 동안에 걸쳐 점진적으로 느려지다가 다시 10초 동안에 걸쳐 최고점인 분당 200㎝가 될 때까지 점진적으로 빨라짐을 반복하고, 임펠라(4)의 회전은 상기 석판재(1)의 이동속도가 최고점인 분당 200㎝일 때 3000RPM이었다가 최저점인 분당 100㎝일 때까지 점진적으로 5000RPM으로 빨라지다가 상기 최저점에서 다시 최고점인 분당 200㎝일 때까지 점진적으로 3000RPM으로 느려짐을 반복하며, 쇼트볼(3)의 사용량은 상기 석재판(1)의 이동속도가 최고점인 분당 200㎝일 때 3000개 이었다가 최저점인 분당 100㎝일 때까지 점진적으로 4000개로 늘어나다가 상기 최저점에서 다시 최고점인 분당 200㎝일 때까지 점진적으로 3000개로 줄어듬을 반복하므로 상기 쇼트볼(3)이 석판재(1)의 표면에 입사됨에 의해 요철이 형성될 때의 깊이가 깊어졌다 얕아졌다를 반복함에 따라 결국 도 6과 같은 형태의석판재(1)를 얻을 수 있는데, 이때에는 표면에 요철이 형성된 석판재(1)의 상기 요철 형성면에 요입홈(1a) 및 돌출편(1b)이 물결모양을 이루면서 복수개 형성됨은 이해 가능하다.Therefore, the moving speed of the slab 1 gradually decreases over 10 seconds until it reaches a maximum of 200 centimeters per minute and reaches a maximum of 100 centimeters per minute, and then gradually reaches a maximum of 200 centimeters per minute for 10 seconds. The speed is repeated, and the rotation of the impeller 4 gradually increases to 3000 RPM when the moving speed of the slab 1 is 200 cm / min, which is the highest point, and then gradually increases to 5000 RPM until the lowest point is 100 cm / min, and then again at the lowest point. Gradually slows down to 3000RPM until the highest point is 200cm per minute, and the amount of shotball (3) is 3000 when the moving speed of the stone plate (1) is 200cm per minute, which is the highest point. The shortball 3 is gradually increased to 4,000 until it reaches ㎝ and then gradually decreases to 3,000 until it reaches 200 cm per minute, which is the highest point from the lowest point again. As the depth of the unevenness becomes deeper and shallower by incidence on the surface, the slab 1 having the same shape as that of FIG. 6 can be obtained. In this case, the uneven surface of the slab 1 having unevenness is formed. It is understood that a plurality of recessed grooves 1a and protruding pieces 1b are formed in a wave shape on the uneven surface.

그러므로 본 발명 방법을 이용하여 석판재의 표면에 요철을 형성하게 되면 상기 요철이 형성된 석판재는 그 두께가 주기적 또는 점진적으로 달라지므로 전체적인 형상의 변화가 매우 다양해지면서 조화로워 지고, 이에 따라 상기 본 발명 방법에 의해 표면에 요철이 형성된 석판재를 내외장재로 사용할 경우에는 건축물의 디자인성이 향상되어 건축물의 값어지가 올라가는 효과가 있다.Therefore, when the irregularities are formed on the surface of the slab by using the method of the present invention, since the thickness of the unevenly formed slab is changed periodically or gradually, the overall shape becomes very diverse and harmonious, and thus, the method of the present invention Therefore, when using the slab with the irregularities formed on the surface as an interior and exterior material, the design of the building is improved, thereby increasing the value of the building.

Claims (1)

화강암이나 대리석의 원석을 적정한 두께로 잘라 석판재를 얻어내는 단계와,Cutting the granite or marble stone to an appropriate thickness to obtain a slab, 상기 적정한 두께로 잘라진 석판재를 어느 한 방향을 향해 주기적 또는 점진적으로 그 속도가 다르게 이동시키는 단계와,Moving the slab cut to the appropriate thickness periodically or gradually in different directions toward one direction; 상기 어느 한방향을 향해 주기적 또는 점진적으로 그 속도가 다르게 이동되는 석판재의 표면에 상기 석판재의 이동속도중 가장 빠른 속도를 기준속도라 할 때 그 기준속도 보다 느릴수록 적정 크기의 금속재 쇼트볼을 강하게 타격시키면서 상기 쇼트볼의 사용량을 많게하여 석판재의 표면에 요철을 형성시키는 단계와,When the reference speed is the fastest speed among the moving speeds of the slab on the surface of the slab which is periodically or gradually moved differently toward the one direction, while hitting the metal shortball of an appropriate size strongly, Forming an unevenness on the surface of the slab by increasing the amount of the shot ball used; 상기 표면에 요철이 형성된 석판재를 필요한 규격으로 절단하는 단계와,Cutting the slab formed with irregularities on the surface to a required standard; 상기 적정 규격으로 절단된 석판재의 표면을 깨끗하게 처리하는 단계가 순차적으로 수행되어 지는 것을 특징으로 하는 건축용 석판재의 요철 형성방법.The method for forming irregularities in a building slab for building, characterized in that the step of cleanly processing the surface of the slab cut to the appropriate standard is performed sequentially.
KR10-2002-0036460A 2002-06-27 2002-06-27 method for forming concavo and convex of stone board KR100479987B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0036460A KR100479987B1 (en) 2002-06-27 2002-06-27 method for forming concavo and convex of stone board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0036460A KR100479987B1 (en) 2002-06-27 2002-06-27 method for forming concavo and convex of stone board

Publications (2)

Publication Number Publication Date
KR20040001308A true KR20040001308A (en) 2004-01-07
KR100479987B1 KR100479987B1 (en) 2005-03-30

Family

ID=37313074

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0036460A KR100479987B1 (en) 2002-06-27 2002-06-27 method for forming concavo and convex of stone board

Country Status (1)

Country Link
KR (1) KR100479987B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100698872B1 (en) * 2006-09-06 2007-03-22 노찬호 Device and method for knobbing of stone board
KR102467084B1 (en) * 2021-06-28 2022-11-14 영진스톤주식회사 Method of Surface-Treating Building Stone

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5721266A (en) * 1980-07-15 1982-02-03 Toru Watabe Pattern machining process for surface of stone material
JPS5810459A (en) * 1981-07-11 1983-01-21 Toru Watabe Front and rear pattern processing equipment of stone material
KR100219774B1 (en) * 1997-02-24 1999-09-01 김영창 Stone plate cutting method
KR100309112B1 (en) * 1999-05-19 2001-09-29 남덕현 A Processing Methode of Uneven Suface on A Stone Pannel
KR200293257Y1 (en) * 2002-06-28 2002-10-30 박애경 device for discharging stone bits in concavo and convex forming machine for manufacturing stone board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100698872B1 (en) * 2006-09-06 2007-03-22 노찬호 Device and method for knobbing of stone board
KR102467084B1 (en) * 2021-06-28 2022-11-14 영진스톤주식회사 Method of Surface-Treating Building Stone

Also Published As

Publication number Publication date
KR100479987B1 (en) 2005-03-30

Similar Documents

Publication Publication Date Title
US5586925A (en) Apparatus and method for processing marble
US20050145300A1 (en) Block splitting assembly and method
KR100309112B1 (en) A Processing Methode of Uneven Suface on A Stone Pannel
KR100479987B1 (en) method for forming concavo and convex of stone board
CA2685410C (en) Aging apparatus for aging an artificial stone
US20050247003A1 (en) Product of a method for manufacturing non-seamed stone corners for veneer stone surfaces
KR102467084B1 (en) Method of Surface-Treating Building Stone
CN106670946B (en) A kind of polishing mechanism of skin carving decorative panel
AU2010203007B2 (en) Dry cast block with burnished surface and methods
DE102005004930A1 (en) Water-permeable artificial stone slab
KR100278014B1 (en) Stone tiles, methods for their manufacture and apparatus used in the methods
JPH0329749B2 (en)
JP4189999B2 (en) ALC panel surface processing equipment
EP1785537A2 (en) Decorative load bearing blocks
JP4036366B2 (en) ALC panel surface processing equipment
JP2004100264A (en) Alc panel and method of manufacturing the same
JP2000117724A (en) Decorative alc panel and manufacture thereof
KR20240008004A (en) Processing method of flagstone
JP2608154B2 (en) Cosmetic ALC panel and manufacturing method thereof
KR20090016907A (en) Unevenness surface processing method of stone place
KR100698872B1 (en) Device and method for knobbing of stone board
CN105644263A (en) Metal-imitating stone product and manufacturing method thereof
Ciccu et al. Waterjet Rough finishing of stone surface
US20140083039A1 (en) Dry cast block with burnished surface and methods
KR200325217Y1 (en) Pebble stone bonding structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090324

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee