KR200397595Y1 - a joint for a mold - Google Patents

a joint for a mold Download PDF

Info

Publication number
KR200397595Y1
KR200397595Y1 KR20-2005-0021301U KR20050021301U KR200397595Y1 KR 200397595 Y1 KR200397595 Y1 KR 200397595Y1 KR 20050021301 U KR20050021301 U KR 20050021301U KR 200397595 Y1 KR200397595 Y1 KR 200397595Y1
Authority
KR
South Korea
Prior art keywords
connecting rod
groove
formwork
fastening structure
support tube
Prior art date
Application number
KR20-2005-0021301U
Other languages
Korean (ko)
Inventor
홍춘희
Original Assignee
홍춘희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍춘희 filed Critical 홍춘희
Priority to KR20-2005-0021301U priority Critical patent/KR200397595Y1/en
Application granted granted Critical
Publication of KR200397595Y1 publication Critical patent/KR200397595Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
    • E04G17/0728Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts
    • E04G17/0735Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts fully recoverable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/075Tying means, the tensional elements of which are fastened or tensioned by other means
    • E04G17/0755Tying means, the tensional elements of which are fastened or tensioned by other means the element consisting of several parts
    • E04G17/0757Tying means, the tensional elements of which are fastened or tensioned by other means the element consisting of several parts fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 고정판의 지지관상에 연결봉이 슬라이드이송가능하게 구비되어 세파타이와 함께 거푸집을 일정한 간격으로 유지시키는 거푸집 체결구조에 관련된다. 구성에 특징을 살펴보면, 중앙에 보강홈(10a)이 형성되고, 양단에 보조판(12)이 돌출되는 고정판(10); 상기 고정판(10)의 보조판(12)에 회동가능하게 설치되고, 탄성부(20a)와 함께 걸림턱(20b)이 형성되는 고정바(20); 상기 고정판(10)의 중앙위치에 설치되고, 외주면에 절개홈(30a)이 형성되어 판스프링(32)이 개재되는 지지관(30); 및 상기 지지관(30)에 삽입되어 절개홈(30a)에 대응하게 각홈(40a)이 형성되는 연결봉(40);을 포함하여 이루어지는 것을 특징으로 한다.The present invention relates to a form fastening structure for maintaining the formwork at regular intervals with the sepatie connecting rod is provided on the support tube of the fixed plate to be slideable. Looking at the features of the configuration, the reinforcing groove (10a) is formed in the center, the fixing plate 10 protruding at both ends of the auxiliary plate (12); A fixing bar 20 rotatably installed on the auxiliary plate 12 of the fixing plate 10 and having a locking jaw 20b formed together with the elastic part 20a; A support tube 30 installed at a central position of the fixing plate 10 and having a cutting groove 30a formed on an outer circumferential surface thereof so that the leaf spring 32 is interposed therebetween; And a connecting rod 40 inserted into the support tube 30 so that each groove 40a is formed to correspond to the incision groove 30a.

이에 따라, 콘크리트 구조물을 시공하기 위해 설치되는 기존의 거푸집 체결구조를 개선하여 판스프링에 의해 연결봉의 이송을 단속함에 따라 조작이 간편하여 거푸집의 설치 및 분리작업이 신속하게 이루어지는 효과가 있다.Accordingly, by improving the existing form fastening structure is installed to construct a concrete structure by intermittent transfer of the connecting rod by the leaf spring, the operation is easy, there is an effect that the installation and detachment of the formwork is quickly performed.

Description

거푸집 체결구조{a joint for a mold}Formwork for a mold {a joint for a mold}

본 고안은 거푸집 체결구조에 관한 것으로서, 보다 상세하게는 콘크리트 구조물을 시공하기 위해 설치되는 기존의 거푸집 체결구조를 개선하여 판스프링에 의해 연결봉의 이송을 단속함에 따라 조작이 간편하여 거푸집의 설치 및 분리작업이 신속하게 이루어지는 거푸집 체결구조에 관한 것이다.The present invention relates to a form fastening structure, and more particularly, to improve the existing form fastening structure installed for the construction of concrete structures, the operation of the formwork is easy and easy to install and remove the formwork as the spring is interrupted by the connecting rod. It relates to a form fastening structure that works quickly.

통상 콘크리트 구조물은 일정한 간격으로 유지되는 거푸집사이에 콘크리트를 타설하여 양생되면 거푸집을 분리 후 상층으로 이동시켜 다시 일정한 간격이 유지되도록 체결하여 콘크리틀 타설하는 방식을 반복적으로 수행하여 건축물을 시공한다. 이때 거푸집은 세파타이와 연결봉에 의해 일정한 간격으로 설치/고정되어 콘크리트를 타설후 양생되면 세파타이는 콘크리트에 매립된 상태로 유지되고, 연결봉은 분리되어 거푸집과 함께 상층으로 이송된다. 이에 근자에는 거푸집의 설치 및 분리에 따른 작업성과 함께 공사기간을 단축하기 위해 거푸집의 체결구조 개발이 꾸준히 이루어지고 있다. In general, a concrete structure is constructed by placing concrete between the molds maintained at regular intervals, and curing the concrete to reposition the mold to be separated to form a constant interval by repeatedly moving to the upper floor. At this time, the formwork is installed / fixed at regular intervals by the Sepha Tie and connecting rods, and after curing the concrete, the Sepha Tie remains embedded in concrete, and the connecting rods are separated and transferred to the upper layer together with the formwork. In recent years, in order to shorten the construction period along with workability due to the installation and detachment of formwork, development of fastening structure of formwork is steadily being made.

도 1은 종래의 거푸집 체결구조를 나타내는 구성도이다. 1 is a configuration diagram showing a conventional form fastening structure.

도 1에서, 종래의 거푸집 체결구조는 세파타이(1)의 선단에 구멍(1a)을 형성하여 에지핀(도시 생략)을 꽂아 거푸집(4')을 고정하고, 후단에 고정너트(3)를 개재하여 연결봉(2)이 장착된다. 연결봉(2)은 일단이 고정너트(3)에 장착된 상태로 타단에 형성된 볼트부(2a)에 받침판링(5a)과 윙너트(5)를 체결하여 거푸집(4)이 고정된다. In Fig. 1, the conventional form fastening structure forms a hole 1a at the front end of the Sepha Tie 1, inserts an edge pin (not shown) to fix the form 4 ', and secures the fixing nut 3 at the rear end. The connecting rod 2 is mounted therebetween. The connecting rod 2 is fixed to the die 4 by fastening the support plate ring 5a and the wing nut 5 to the bolt portion 2a formed at the other end with one end mounted on the fixing nut 3.

사용상에 있어서, 세파타이(1)와 연결봉(2)에 의해 일정한 간격으로 유지되는 거푸집(4)(4')사이에 콘크리트를 타설하여 양생되면 거푸집(4)(4')을 탈거하는 바, 이때 거푸집(4')은 세파타이(1)상에 에지핀을 제거하여 분리하고, 거푸집(4)은 연결봉(2)의 볼트부(2a)에 체결된 윙너트(5)를 분리하여 받침판링(5a)과 연결봉(2)을 제거 후 분리한다. 이처럼 거푸집(4)(4')을 설치 및 분리시 볼트부(2a)에 나사 결합된 윙너트(5)를 일일이 회동시켜 풀고 조여야함으로 조립성 및 작업성이 저하되어 공사기간이 지연되는 폐단이 따른다. In use, when the concrete is poured between the dies 4 and 4 ', which are held at regular intervals by the Sepha Tie 1 and the connecting rods 2, the dies 4 and 4' are removed. At this time, the die (4 ') is separated by removing the edge pin on the sepatie (1), the die (4) is separated from the wing nut (5) fastened to the bolt portion (2a) of the connecting rod (2) supporting plate ring Remove (5a) and connecting rod (2) and remove. Thus, when installing and removing the formwork (4) (4 '), the wing nut (5) screwed to the bolt (2a) must be rotated and loosened one by one, so assembling and workability is reduced, resulting in delayed construction period. Follow.

이에, 본 출원인은 대한민국 특허출원 출원번호 10-2004-94633호(명칭: 거푸집 체결구조), 실용신안 등록번호 제 380719호(명칭: 거푸집 체결구조)에서 고정판을 통하여 거푸집에 설치되는 지지관에 연결봉을 슬라이드이송가능하게 삽입하되, 서로 맞물리도록 스톱홈과 볼플런지를 구비하여 연결봉의 이송을 단속하므로 거푸집의 분해ㆍ조립이 신속하게 이루어짐은 물론 작업성이 우수하여 공사기간이 크게 단축되는 거푸집 체결구조의 기술을 선출원한 바 있다.Accordingly, the present applicant is connected to the support pipe installed in the formwork through the fixing plate in the Republic of Korea Patent Application No. 10-2004-94633 (name: form fastening structure), Utility Model Registration No. 380719 (name: form fastening structure) Inserting slide-movable, but with stop groove and ball plunger to interlock with each other to interlock the transfer of connecting rods, the formwork fastening structure is greatly reduced due to disassembly and assembly of the formwork and excellent workability. He has previously filed a technique.

하지만, 연결봉이 볼플런지에 개재된 탄성스프링의 가압력에 의해 위치고정되어 거푸집을 일정한 간격으로 유지시킴에 따라 비교적 약한 충격에도 거푸집의 간격이 쉽게 변동되고, 또한 거푸집 체결구조를 설치하기 위해서는 거푸집상에 고정판을 일일이 고정볼트로 장착해야하는 번거로운 단점이 따른다.However, as the connecting rod is fixed by the pressing force of the elastic spring interposed in the ball plunge to keep the form at regular intervals, the spacing of the form is easily changed even in the case of relatively weak impact, and in order to install the form fastening structure The cumbersome disadvantage of having to mount the fixing plate with fixing bolts one by one.

이에 따라 본 고안은 상기한 단점을 해결하기 위한 것으로서, 콘크리트 구조물을 시공하기 위해 설치되는 기존의 거푸집 체결구조를 개선하여 판스프링에 의해 연결봉의 이송을 단속함에 따라 조작이 간편하여 거푸집의 설치 및 분리작업이 신속하게 이루어지는 거푸집 체결구조를 제공하는 것을 그 목적으로 한다.Accordingly, the present invention is to solve the above-mentioned shortcomings, by improving the existing formwork fastening structure installed for the construction of the concrete structure by intermittent transfer of the connecting rod by the plate spring, the operation is easy to install and remove the formwork The object is to provide a form fastening structure in which work is quickly performed.

이러한 목적을 달성하기 위해 본 고안은 고정판의 지지관상에 연결봉이 슬라이드이송가능하게 구비되어 세파타이와 함께 거푸집을 일정한 간격으로 유지시키는 거푸집 체결구조에 있어서: 중앙에 보강홈(10a)이 형성되고, 양단에 보조판(12)이 돌출되는 고정판(10); 상기 고정판(10)의 보조판(12)에 회동가능하게 설치되고, 탄성부(20a)와 함께 걸림턱(20b)이 형성되는 고정바(20); 상기 고정판(10)의 중앙위치에 설치되고, 외주면에 절개홈(30a)이 형성되어 판스프링(32)이 개재되는 지지관(30); 및 상기 지지관(30)에 삽입되어 절개홈(30a)에 대응하게 각홈(40a)이 형성되는 연결봉(40);을 포함하여 이루어지는 것을 특징으로 한다.In order to achieve the above object, the present invention provides a die-coupling structure in which a connecting rod is slidably transported on a support tube of a fixed plate to maintain formwork at regular intervals together with a septum: a reinforcement groove 10a is formed at the center, Fixing plate 10 protruding at both ends of the auxiliary plate 12; A fixing bar 20 rotatably installed on the auxiliary plate 12 of the fixing plate 10 and having a locking jaw 20b formed together with the elastic part 20a; A support tube 30 installed at a central position of the fixing plate 10 and having a cutting groove 30a formed on an outer circumferential surface thereof so that the leaf spring 32 is interposed therebetween; And a connecting rod 40 inserted into the support tube 30 so that each groove 40a is formed to correspond to the incision groove 30a.

이때, 상기 각홈(40a)은 연결봉(40)의 외주면에 서로 대응하는 한 쌍의 홈을 형성하거나 단면형상이 사각, 육각, 팔각 등과 같이 다각형으로 형성되는 것을 특징으로 한다.At this time, the angular groove (40a) is formed on the outer circumferential surface of the connecting rod 40, a pair of grooves or cross-sectional shape is characterized in that formed in a polygon, such as square, hexagon, octagon.

또한, 상기 체결수단(J)을 통하여 나사결합되는 연결봉(40)과 세파타이(1)의 암ㆍ수나사부(50)(50')를 2줄 또는 3줄의 나사산을 가진 나사부로 형성되는 것을 특징으로 한다.In addition, the connecting rod 40 is screwed through the fastening means (J) and the female and male threaded portion (50) (50 ') of the Sepha Tie (1) is formed of a screw thread having two or three threaded threads It features.

이하, 첨부된 도면을 참조하여 본 고안에 따른 바람직한 실시예를 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment according to the present invention.

도 2는 본 고안에 따른 거푸집 체결구조를 분해하여 나타내는 사시도이고, 도 3은 본 고안에 따른 거푸집 체결구조의 설치상태를 나타내는 단면예시도이다. Figure 2 is a perspective view showing the decomposition of the form fastening structure according to the present invention, Figure 3 is a cross-sectional view showing an installation state of the form fastening structure according to the present invention.

본 고안은 고정판의 지지관상에 연결봉이 슬라이드이송가능하게 구비되어 세파타이와 함께 거푸집을 일정한 간격으로 유지시키는 거푸집 체결구조에 에 관련된다. 본 고안의 거푸집 체결구조는 고정판(10), 고정바(20), 판스프링(32)이 개재되는 지지관(30), 각홈(40a)이 형성되는 연결봉(40) 등을 전체적인 구성의 특징으로 한다. 본 고안의 거푸집 체결구조는 거푸집(4)상에 장착되어 세파타이(1)와 함께 거푸집(4)(4')을 일정한 간격으로 설치/고정한다. The present invention relates to a form fastening structure for maintaining a formwork at regular intervals with the sepatie connecting rod is provided on the support tube of the fixed plate to be slideable. The form fastening structure of the present invention is characterized in that the fixing plate 10, the fixing bar 20, the support pipe 30 is interposed between the plate spring 32, the connecting rod 40 is formed in each groove 40a and the like as a whole configuration do. Formwork fastening structure of the present invention is mounted on the formwork (4) to install / fix the formwork (4) (4 ') at regular intervals with the Sepha tie (1).

본 고안에 따른 고정판(10)은 중앙에 보강홈(10a)이 형성되고, 양단에 보조판(12)이 돌출된다. 고정판(10)은 중앙에 보강홈(10a)이 오목하게 함몰되고, 양단에 보조판(12)이 일체로 절곡된다. 보조판(12)은 한 쌍의 판형태로 구비되고, 서로 대향하는 위치에 체결공(12a)이 연통된다. 체결공(12a)은 후술하는 고정바(20)의 절곡부(20c)가 체결되는 구멍으로서, 고정바(20)를 수용한 상태로 회동가능하게 지지한다.Fixing plate 10 according to the present invention is a reinforcement groove 10a is formed in the center, the auxiliary plate 12 protrudes at both ends. Reinforcing groove 10a is recessed in the center of the fixing plate 10, and the auxiliary plate 12 is integrally bent at both ends. The auxiliary plate 12 is provided in the form of a pair of plates, and the fastening holes 12a communicate with each other at positions facing each other. The fastening hole 12a is a hole to which the bent portion 20c of the fixing bar 20 to be described later is fastened, and is rotatably supported in a state in which the fixing bar 20 is accommodated.

이때, 본 고안에 따른 고정바(20)는 고정판(10)의 보조판(12)에 회동가능하게 설치되고, 탄성부(20a)와 함께 걸림턱(20b)이 형성된다. 고정바(20)는 일단에 절곡부(20c)가 형성되어 보조판(12)상에 회동가능하게 설치되고, 타단에 탄성부(20a)와 걸림턱(20b)이 일체로 형성된다. 탄성부(20a)는 고정바(20)의 걸림턱(20b)이 소정의 폭만큼 탄성변형 폭을 가지도록 라운드형상으로 절곡되는 바, 이때 걸림턱(20b)은 거푸집프레임(4a)을 수용할 수 있도록 고리형상으로 절곡된다. At this time, the fixing bar 20 according to the present invention is rotatably installed on the auxiliary plate 12 of the fixing plate 10, the locking step 20b is formed with the elastic portion 20a. The fixing bar 20 has a bent portion 20c formed at one end thereof so as to be rotatable on the auxiliary plate 12, and an elastic portion 20a and a locking step 20b are integrally formed at the other end thereof. The elastic portion 20a is bent in a round shape so that the locking jaw 20b of the fixing bar 20 has an elastic deformation width by a predetermined width. In this case, the locking jaw 20b may accommodate the formwork frame 4a. It is bent in a ring shape so that it can be

이에, 상기 고정판(10)을 거푸집(4)에 설치 시, 체결공(12a)을 축으로 회동되는 고정바(20)를 거푸집프레임(4a)에 압착시키면 탄성부(20a)의 탄성변형에 의해 걸림턱(20b)이 소폭으로 휘어져 거푸집프레임(4a)상에 용이하게 체결됨은 물론 고정판(10)을 탈거 시에도 탄성부(20a)의 휨에 의해 걸림턱(20b)이 쉽게 분리되는 이점이 있다.Accordingly, when the fixing plate 10 is installed in the formwork 4, the fixing bar 20, which is pivoted about the fastening hole 12a, is squeezed to the formwork frame 4a, thereby causing elastic deformation of the elastic portion 20a. The locking jaw 20b is slightly bent so that the locking jaw 20b can be easily separated by the bending of the elastic part 20a even when the fixing plate 10 is removed. .

또한, 본 고안에 따른 지지관(30)은 고정판(10)의 중앙위치에 설치되고, 외주면에 절개홈(30a)이 형성되어 판스프링(32)이 개재된다. 지지관(30)은 내부가 빈 중공의 파이프형태로 제작되고, 고정판(10)의 중앙위치에 연통되도록 형성된다. 지지관(30)은 후술하는 연결봉(40)이 슬라이드이송가능하게 삽입되고, 외주면에 절개홈(30a)이 형성된다. 절개홈(30a)은 지지관(30)의 내부로 연통되도록 서로 대응하는 위치에 한 쌍으로 절개되어 판스프링(32)이 개재된다. 판스프링(32)은 적당히 열처리한 강철이나, 인청동(燐靑銅), 니켈합금 등의 금속판을 "ㄷ"자 형태로 절곡하여 제작되고, 지지관(30)의 절개홈(30a)에 삽입된 상태로 후술하는 각홈(40a)에 맞물려 연결봉(40)의 이송을 단속한다.In addition, the support pipe 30 according to the present invention is installed at the central position of the fixed plate 10, the incision groove (30a) is formed on the outer circumferential surface is interposed the leaf spring (32). The support tube 30 is made in the form of a hollow hollow pipe and is formed to communicate with the central position of the fixed plate 10. The support tube 30 is inserted into the connecting rod 40 to be described later slide-movable, the incision groove (30a) is formed on the outer peripheral surface. The cutting groove 30a is cut in pairs at positions corresponding to each other so as to communicate with the inside of the support tube 30, and the leaf spring 32 is interposed therebetween. The leaf spring 32 is formed by bending a metal plate such as steel, phosphor bronze, nickel alloy, or the like that has been properly heat-treated into a "c" shape, and is inserted into the cutout groove 30a of the support pipe 30. In the state engaged with the groove 40a to be described later to interrupt the transfer of the connecting rod (40).

이때, 상기 판스프링(32)은 지지관(30)의 절개홈(30a)에 삽입이 용이함은 물론 삽입된 상태로 위치고정되어 이탈이 방지되도록 양끝단에 "V"자 형태의 절곡홈(32a)을 형성하는 것이 바람직하다. At this time, the leaf spring 32 is easy to be inserted into the cutting groove 30a of the support pipe 30 as well as the position is fixed in the inserted state is bent in the "V" shaped bent groove 32a at both ends to prevent separation Is preferably formed.

또한, 본 고안에 따른 연결봉(40)은 지지관(30)에 삽입되어 절개홈(30a)에 대응하게 각홈(40a)이 형성된다. 연결봉(40)은 선단에 체결수단(J)이 구비되어 세파타이(1)에 나사결합되고, 후단에 나사부(B)와 함께 고정너트(N)가 체결되어 거푸집(4)(4')을 일정한 간격으로 설치/고정하는 바, 이때 연결봉(40)은 지지관(30)상에 슬라이드이송가능하게 삽입되고, 외주면에 각홈(40a)이 형성된다. 각홈(40a)은 지지관의 판스프링에 맞물리도록 연결봉(40)의 단면형상이 각봉형태로 가공되므로 지지관(30)의 판스프링(32)에 맞물려 연결봉(40)이 위치고정됨은 물론 도 3의 확대도와 같이 연결봉(40)을 회동시켜 각홈(40a)의 모서리에 의해 판스프링(32)이 벌어진 상태로 이송이 이루어지는 바, 이에 따른 각홈(40a)의 상세한 설명은 후술하는 도 4a 내지 4d를 참조한다.In addition, the connecting rod 40 according to the present invention is inserted into the support tube 30 is formed in each groove 40a to correspond to the incision groove (30a). The connecting rod 40 is provided with a fastening means (J) at the front end and screwed to the sepatie (1), and the fixing nut (N) is fastened together with the threaded part (B) at the rear end to form the die (4) (4 '). Bars are installed / fixed at regular intervals. In this case, the connecting rods 40 are slidably inserted into the support pipes 30, and the groove 40a is formed on the outer circumferential surface thereof. Each groove 40a is processed into a cross-section of the rod 40 so as to engage with the leaf spring of the support tube in the form of an angular rod, so that the engagement rod 40 is fixed by engaging the leaf spring 32 of the support pipe 30 as well as FIG. 3. As the enlarged view of the connecting rod 40 is rotated by the edge of the groove 40a, the plate spring 32 is transported in the open state, and thus the detailed description of the groove 40a will be described later with reference to FIGS. 4a to 4d. See.

한편, 상기 도 2 내지 3에서 도시된 각홈(40a)은 연결봉(40)이 전방으로 이송된 상태로 판스프링(32)에 맞물려 거푸집(4)(4')이 일정한 간격으로 위치고정되는 구성을 전술하지만, 이에 국한되지 않고 연결봉(40)의 전방위치뿐만 아니라 후방에서도 위치고정되도록 각홈(40a)을 일정한 간격으로 더 구비하는 구성도 가능하다.On the other hand, the angular groove 40a shown in FIGS. 2 to 3 has a configuration in which the dies 4 and 4 ′ are fixed at regular intervals by engaging the leaf spring 32 with the connecting rod 40 moved forward. As described above, the present invention is not limited thereto, and the concave groove 40a may be further provided at regular intervals so as to be fixed not only at the front position but also at the rear of the connecting rod 40.

도 4a 내지 4d는 본 고안의 각홈을 나타내는 구성도이다.4a to 4d is a block diagram showing the angular groove of the present invention.

도 4a 내지 4d에서, 상기 각홈(40a)은 연결봉(40)의 외주면에 서로 대응하는 한 쌍의 홈을 형성하거나 단면형상이 사각, 육각, 팔각 등과 같이 다각형으로 형성된다. 도 4a는 각홈(40a)이 연결봉(40)의 외주면에 대향하도록 한 쌍으로 형성된 구성을 나타내고, 도 4b 내지 4d는 연결봉(40)의 단면형상이 사각, 육각, 팔각의 각봉형태로 가공된 구성이 도시된다. 이때 각홈(40a)은 판스프링(32)의 폭을 고려하여 보다 건실하게 맞물려 유동이 최소화되도록 일반공차로 가공된다. 4A to 4D, the angular grooves 40a form a pair of grooves corresponding to each other on the outer circumferential surface of the connecting rod 40, or the cross-sectional shape is formed in a polygon such as square, hexagon, octagon, or the like. 4a shows a configuration in which the grooves 40a are formed in a pair so as to face the outer circumferential surface of the connecting rod 40, and FIGS. 4b to 4d illustrate a cross-sectional shape of the connecting rod 40 that is processed into square, hexagonal, and octagonal angular bar shapes. This is shown. At this time, the groove 40a is machined with a general tolerance so as to minimize the flow by engaging more firmly in consideration of the width of the leaf spring (32).

그리고, 상기 도 4a 내지 4d에 도시된 바와 같이 연결봉(40)의 각홈(40a)이 다각형의 여러 실시예로 제작은 가능하나, 판스프링(32)에 맞물려 위치고정되는 결속력을 고려하면 사각형태의 각홈(40a)을 적용하는 것이 바람직하다.4A to 4D, the groove 40a of the connecting rod 40 may be manufactured in various embodiments of the polygon, but considering the binding force that is fixed by being engaged with the leaf spring 32, It is preferable to apply the angular groove 40a.

도 5는 본 고안에 따른 연결봉과 세파타이의 체결수단을 나타내는 구성도이다.Figure 5 is a block diagram showing a fastening means of the connecting rod and the Sepha Tie according to the present invention.

도 5에서, 상기 체결수단(J)을 통하여 나사결합되는 연결봉(40)과 세파타이(1)의 암ㆍ수나사부(50)(50')를 2줄 또는 3줄의 나사산을 가진 나사부로 형성된다. In FIG. 5, the female and male threaded portions 50 and 50 'of the connecting rod 40 and the Sepha Tie 1, which are screwed through the fastening means J, are formed as two or three threaded threads. do.

연결봉(40)은 고정판(10)과 지지관(30)을 통하여 일단의 거푸집(4)에 설치되고, 상기 연결봉(40)의 체결수단(J)에 세파타이(1)가 나사결합되어 타단의 거푸집(4')을 일정한 간격으로 위치고정되는 바, 이때 나사결합으로 연결되는 체결수단(J)과 세파타이(1)의 암ㆍ수나사부(50)(50')를 2줄 또는 3줄의 나사산으로 가공된다. 이에 연결봉(40)과 세파타이(1)를 나사결합시 리드(예컨대, 나사가 한바퀴 돌 때 축방향으로 움직인 거리) 즉, 연결봉(40) 또는 세파타이(1)의 회전당 축방향 이송거리가 2줄나산을 가진 나사부의 경우 1줄나사산을 가진 나사부에 비해 2배정도 증가되고, 3줄나사산을 가진 나사부의 경우 3배정도로 증가됨에 따라 거푸집을 분해/조립에 따른 작업성이 크게 향상되는 이점이 따른다.The connecting rod 40 is installed on one end of the formwork 4 through the fixing plate 10 and the support tube 30, and the sephaties 1 are screwed to the fastening means J of the connecting rod 40 to be connected to the other end. The formwork 4 'is fixed at regular intervals, in which two or three lines of female and male threaded portions 50 and 50' of the fastening means J and Sepha Tie 1 are connected by screwing. It is threaded. Therefore, when connecting the connecting rod 40 and the Sepha Tie 1 with the lead (for example, the distance moved in the axial direction when the screw is turned), that is, the axial feed distance per rotation of the connecting rod 40 or Sepha Tie 1 In the case of the thread part with 2 rows of thread, it is about twice as much as the thread part with 1 thread, and the thread part with 3 threads is increased by about 3 times, so the workability is greatly improved by disassembling / assembling the formwork. This follows.

한편, 상기 도 5에서 연결봉(40)의 체결수단(J)에 암나사부(50)를 형성하고, 세파타이(1)에 수나사부(50')를 가공한 상태를 도시하지만, 이에 국한되지 않고 반대로 체결수단(J)에 수나사부(50')를 형성함은 물론 세파타이(1)에 암나사부(50)를 가공하는 구성도 가능하다. Meanwhile, in FIG. 5, the female threaded portion 50 is formed on the fastening means J of the connecting rod 40, and the male threaded portion 50 ′ is processed on the Sepha Tie 1, but is not limited thereto. On the contrary, the male screw portion 50 'may be formed on the fastening means J, and the female thread portion 50 may be processed on the sepatie 1.

사용상에 있어서, 우선 거푸집(4)에 고정판(10)을 밀착시킨 상태로 고정바(20)를 회동시켜 걸림턱(20b)이 거푸집프레임(4a)에 체결하면 장착이 완료되다. 이어서 연결봉(10)의 체결수단(J)에 세파타이(1)를 나사결합한 후, 세파타이(1)에 소정의 힘을 가하여 당기면 연결봉(30)이 전방으로 이송되고, 이때 각홈(40a)이 판스프링(32)에 맞물려 위치고정된다. 이어서 세파타이(1)의 선단에 에지핀(도시생략)을 끼워 거푸집(4')을 고정하고, 연결봉(40)의 나사부(B)에 고정너트(N)를 체결하면 거푸집(4)(4')이 일정한 간격으로 위치된다.In use, first, the fixing bar 20 is rotated in a state in which the fixing plate 10 is brought into close contact with the formwork 4, and the locking jaw 20b is fastened to the formwork frame 4a. Subsequently, after screwing the sepatie 1 to the fastening means J of the connecting rod 10, when the sepatie 1 is pulled by applying a predetermined force, the connecting rod 30 is transferred to the front, where the angular groove 40a is The position is fixed by engaging the leaf spring (32). Then, the edge 4 (not shown) is fixed to the tip of the Sepha Tie 1 to fix the form 4 ', and the fixing nut N is fastened to the threaded portion B of the connecting rod 40 to form the form 4 or 4. ') Are placed at regular intervals.

이어서, 거푸집(4)(4')사이에 콘크리트를 타설 후 양생되면 연결봉(40)을 회동시켜 세파타이(1)를 분리함과 동시에 후방으로 당기면 각홈(40a)의 모서리에 의해 판스프링(32)이 벌어진 상태로 이송된다. 그리고 분리된 거푸집(4)(4')은 상층으로 이동되어 상기에 전술한 작업공정을 반복적으로 수행하여 콘크리트 구조물이 시공된다.Subsequently, when the concrete is placed between the dies 4 and 4 'and cured, the connecting rod 40 is rotated to separate the Sepha Tie 1 and pulled backward to form a leaf spring 32 by the corner of the groove 40a. ) Is transferred in the open state. And the separated formwork (4) (4 ') is moved to the upper floor to perform the above-described work process repeatedly to construct a concrete structure.

한편, 상기 연결봉(40)이 각홈(40a)과 판스프링(32)의 간단한 구성에 의해 위치고정 및 전후이송이 단속됨으로 거푸집(4)(4')의 분해조립작업이 신속하게 이루어지므로 공사기간이 단축되는 효과가 따른다. On the other hand, since the connecting rod 40 is fixed by the simple configuration of the angular groove 40a and the leaf spring 32, the position fixing and the front and rear conveyance are intermittent, so the disassembly and assembly work of the formwork (4) (4 ') is performed quickly, This is followed by a shortening effect.

본 고안은 기재된 실시예에 한정되는 것은 아니고, 본 고안의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형할 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명하며, 따라서 그러한 변형예 또는 수정예들은 본 고 안의 실용신안등록청구범위에 속한다 해야 할 것이다.The present invention is not limited to the embodiments described, and it is apparent to those skilled in the art that various modifications and variations can be made without departing from the spirit and scope of the present invention, and therefore such modifications or Amendments should fall within the scope of the utility model registration claims in this paper.

본 고안의 구성 및 작용에 따르면, 콘크리트 구조물을 시공하기 위해 설치되는 기존의 거푸집 체결구조를 개선하여 판스프링에 의해 연결봉의 이송을 단속함에 따라 조작이 간편하여 거푸집의 설치 및 분리작업이 신속하게 이루어지는 효과가 있다.According to the configuration and operation of the present invention, by improving the existing form fastening structure installed for the construction of the concrete structure by intermittent transfer of the connecting rod by the leaf spring, the operation is easy to install and detach the formwork It works.

도 1은 종래의 거푸집 체결구조를 나타내는 구성도.1 is a block diagram showing a conventional form fastening structure.

도 2는 본 고안에 따른 거푸집 체결구조를 분해하여 나타내는 사시도.Figure 2 is a perspective view showing the decomposition of the formwork fastening structure according to the present invention.

도 3은 본 고안에 따른 거푸집 체결구조의 설치상태를 나타내는 단면예시도.Figure 3 is an exemplary cross-sectional view showing an installation state of the formwork fastening structure according to the present invention.

도 4a 내지 4d는 본 고안에 따른 연결봉의 각홈을 나타내는 구성도.Figure 4a to 4d is a block diagram showing the angular groove of the connecting rod according to the present invention.

도 5는 본 고안에 따른 연결봉과 세파타이의 체결수단을 나타내는 구성도.Figure 5 is a block diagram showing a fastening means of the connecting rod and Sepha Thai in accordance with the present invention.

* 도면의 주요 부분에 대한 부호 설명 *Explanation of symbols on the main parts of the drawings

10: 고정판 12: 보조판10: fixed plate 12: auxiliary plate

12a: 체결공 20: 고정바12a: fastener 20: fixing bar

20a: 탄성부 20b: 걸림턱20a: elastic portion 20b: locking jaw

20c: 절곡부 30: 지지관20c: bend 30: support tube

30a: 절개홈 32: 판스프링30a: Incision groove 32: Leaf spring

40: 연결봉 40a: 각홈 40: connecting rod 40a: square groove

Claims (3)

고정판의 지지관상에 연결봉이 슬라이드이송가능하게 구비되어 세파타이와 함께 거푸집을 일정한 간격으로 유지시키는 거푸집 체결구조에 있어서:In the form of fastening structure in which the connecting rod is provided on the support tube of the fixed plate so as to be slide-movable to maintain the formwork at regular intervals together with the Sepha Tie: 중앙에 보강홈(10a)이 형성되고, 양단에 보조판(12)이 돌출되는 고정판(10);Reinforcing groove (10a) is formed in the center, the fixing plate 10 protruding the auxiliary plate 12 at both ends; 상기 고정판(10)의 보조판(12)에 회동가능하게 설치되고, 탄성부(20a)와 함께 걸림턱(20b)이 형성되는 고정바(20);A fixing bar 20 rotatably installed on the auxiliary plate 12 of the fixing plate 10 and having a locking jaw 20b formed together with the elastic part 20a; 상기 고정판(10)의 중앙위치에 설치되고, 외주면에 절개홈(30a)이 형성되어 판스프링(32)이 개재되는 지지관(30); 및A support tube 30 installed at a central position of the fixing plate 10 and having a cutting groove 30a formed on an outer circumferential surface thereof so that the leaf spring 32 is interposed therebetween; And 상기 지지관(30)에 삽입되어 절개홈(30a)에 대응하게 각홈(40a)이 형성되는 연결봉(40);을 포함하여 이루어지는 것을 특징으로 하는 거푸집 체결구조.Forming fastening structure characterized in that it comprises a; connecting rod 40 is inserted into the support tube 30 is formed in each groove (40a) corresponding to the incision groove (30a). 제 1항에 있어서,The method of claim 1, 상기 각홈(40a)은 연결봉(40)의 외주면에 서로 대응하는 한 쌍의 홈으로 형성하거나 단면형상이 사각, 육각, 팔각 등과 같이 다각형으로 형성되는 것을 특징으로 하는 거푸집 체결구조.The groove 40a is formed in a pair of grooves corresponding to each other on the outer circumferential surface of the connecting rod 40 or formwork fastening structure, characterized in that the cross-sectional shape is formed in a polygon, such as square, hexagon, octagon. 제 1항에 있어서,The method of claim 1, 상기 체결수단(J)을 통하여 나사결합되는 연결봉(40)과 세파타이(1)의 암ㆍ수나사부(50)(50')를 2줄 또는 3줄의 나사산을 가진 나사부로 형성되는 것을 특징으로 하는 거푸집 체결구조.The connecting rod 40 which is screwed through the fastening means J and the female and male threaded portions 50, 50 'of the Sepha Tie 1 are formed of two or three threaded threads. Formwork fastening structure.
KR20-2005-0021301U 2005-05-14 2005-07-21 a joint for a mold KR200397595Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2005-0021301U KR200397595Y1 (en) 2005-05-14 2005-07-21 a joint for a mold

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR2020050013620 2005-05-14
KR20-2005-0021301U KR200397595Y1 (en) 2005-05-14 2005-07-21 a joint for a mold

Publications (1)

Publication Number Publication Date
KR200397595Y1 true KR200397595Y1 (en) 2005-10-05

Family

ID=43698681

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0021301U KR200397595Y1 (en) 2005-05-14 2005-07-21 a joint for a mold

Country Status (1)

Country Link
KR (1) KR200397595Y1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100855379B1 (en) 2007-07-25 2008-09-04 박해대 Concrete sheeting for fastening
KR100860630B1 (en) 2007-07-28 2008-09-29 미래테크(주) Concrete sheeting for fastening
KR100864235B1 (en) 2007-07-06 2008-10-17 정형화 A clamping apparatus for a concrete formr
KR100887750B1 (en) 2007-06-14 2009-03-12 홍춘희 The joint for building cast
KR101709634B1 (en) * 2016-04-18 2017-02-23 고의환 Through sleeve for wall retaining wall with multi-threaded threads
KR101841361B1 (en) * 2016-10-07 2018-03-22 배용웅 Mold fixing unit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100887750B1 (en) 2007-06-14 2009-03-12 홍춘희 The joint for building cast
KR100864235B1 (en) 2007-07-06 2008-10-17 정형화 A clamping apparatus for a concrete formr
KR100855379B1 (en) 2007-07-25 2008-09-04 박해대 Concrete sheeting for fastening
KR100860630B1 (en) 2007-07-28 2008-09-29 미래테크(주) Concrete sheeting for fastening
KR101709634B1 (en) * 2016-04-18 2017-02-23 고의환 Through sleeve for wall retaining wall with multi-threaded threads
KR101841361B1 (en) * 2016-10-07 2018-03-22 배용웅 Mold fixing unit

Similar Documents

Publication Publication Date Title
KR200397595Y1 (en) a joint for a mold
JP6010359B2 (en) Assembled concrete column and method for manufacturing the same
JP2009263878A (en) Separator for maintaining spacing between forms, form tie, and structure for maintaining spacing between forms
GB2443728A (en) Moldboard positioning assembly and use there of
KR101320699B1 (en) A maintain distance device of concrete mold using one piece type bolt
JP3186865U (en) Formwork fasteners for concrete molding
KR200344123Y1 (en) Strut Preloading Jack and Structure for Supporting Strut using thereof
JP5796940B2 (en) Method for joining concrete members
KR101057551B1 (en) Pillar formwork
JP2023096614A (en) Form fastener
JP5185634B2 (en) Anchor bolt setting jig and anchor bolt setting method
KR20080114300A (en) The joint for building cast
CN112775899A (en) Bearing dismounting device and dismounting method
KR100887750B1 (en) The joint for building cast
KR100698508B1 (en) A joint for a mold
KR101859406B1 (en) Building construction method using exposed concrete wall
KR200357637Y1 (en) a joint for a mold
WO2014139228A1 (en) Concrete form locking and fastening device
KR100588943B1 (en) Strut Preloading Jack and Structure for Supporting Strut using thereof
CN110936476A (en) Connecting and positioning structure and prefabricated part forming die thereof
KR102446331B1 (en) Sepatie fixing device for formwork
CN210798286U (en) Steel column base grouting formwork
CN109667819B (en) Detachable expansion bolt sleeve
JP3223743U (en) Fixing tool for supporting member fixing means for formwork, and concrete casting mold formed using this fixing tool
CN211873839U (en) Elevator calling button box hole reserving tool

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20110928

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee