KR200380455Y1 - preventing overflows equipment for embankment in river - Google Patents

preventing overflows equipment for embankment in river Download PDF

Info

Publication number
KR200380455Y1
KR200380455Y1 KR20-2004-0034653U KR20040034653U KR200380455Y1 KR 200380455 Y1 KR200380455 Y1 KR 200380455Y1 KR 20040034653 U KR20040034653 U KR 20040034653U KR 200380455 Y1 KR200380455 Y1 KR 200380455Y1
Authority
KR
South Korea
Prior art keywords
river
levee
overflow
connecting member
embankment
Prior art date
Application number
KR20-2004-0034653U
Other languages
Korean (ko)
Inventor
최한순
Original Assignee
주식회사 경기기술단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 경기기술단 filed Critical 주식회사 경기기술단
Priority to KR20-2004-0034653U priority Critical patent/KR200380455Y1/en
Application granted granted Critical
Publication of KR200380455Y1 publication Critical patent/KR200380455Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/102Permanently installed raisable dykes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/205Barrages controlled by the variations of the water level; automatically functioning barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/50Floating gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Revetment (AREA)

Abstract

본 고안은 부력에 의해 하천 제방의 높이를 가변시켜 줄 수 있도록 한 하천 제방용 월류 방지장치에 관한 것이다.The present invention relates to a riverbank overflow prevention device that can vary the height of the riverbank by buoyancy.

특히, 양측과 상부가 개구되어 있어 내측에 가이드 공간부가 구비되어 있되, 일측 전면에는 연결돌기가 형성되어 있고, 타측 전면에는 연결홈이 형성되어 있으며, 상부 후방으로 절곡 연장된 수평 설치면에는 길이 방향에 걸쳐 등간격을 취하는 고정공이 수개 형성되어 있는 제방 연결부재와; 상기, 제방 연결부재의 고정공에 삽입을 취해 설치시 이 제방 연결부재와 제방 구조물간의 결속을 다지는 연결 막대와; 상기, 제방 연결부재의 가이드 공간부에 삽입 설치되되, 상단 양측에 힌지 연결구가 형성되어 있는 월류 방지판과; 내측이 비어있는 반구체 형상을 취하고 있되, 상기, 월류 방지판의 힌지 연결구에 힌지 연결을 취할 수 있는 힌지공이 상단 양측에 형성되어 있고, 일측 외표면과 외측면 상부 표면에는 러버 마감재가 접착된 회동 부구를 일체로 포함하여 이루어져 있어 하천수가 급상승하는 비상사태가 발생시에는 부력에 의한 회동 상향 이동 동작을 취해 하천 제방의 높이를 단계적으로 증대시켜 하천수의 월류 범람을 방지할 수 있고, 하천 수위가 일정 수위로 되돌아 갈 경우에는 자중에 의한 회동 하향 이동 동작을 취해 제방의 내측면에 위치함과 더불어 상부에 화단과 난간을 조성시킬 수 있어 하천의 월류 범람과 같은 홍수 재해를 방지할 수 있고, 하천 경관과 안전 향상을 도모할 수 있도록 한 것이다.In particular, both sides and the upper portion is open, the guide space is provided on the inside, one side is formed with a connecting projection on the front, the other side is formed with a connecting groove, the horizontal installation surface is bent and extended to the rear in the longitudinal direction A dike connecting member having a plurality of fixing holes formed at equal intervals over the bank; A connecting rod for inserting into the fixing hole of the levee connecting member to stiffen the bond between the levee connecting member and the levee structure; And, the overflow prevention plate is inserted into the guide space of the levee connection member, the hinge connector is formed on both sides of the upper end; The inner side has a hollow hemispherical shape, but hinge holes are formed on both sides of the upper end of the hinge connector of the overflow preventing plate, and a rubber finish is bonded to one outer surface and an outer surface upper surface thereof. In case of emergencies in which the river water is rapidly rising, it is possible to increase the height of the river banks step by step to prevent the overflow of the river water and to maintain the water level at a certain level. In case of returning to the center, it can be rotated downwardly by its own weight to be located on the inner side of the embankment and to create flower beds and railings on the upper side to prevent flood disasters such as overflowing rivers. It is intended to improve safety.

Description

하천 제방용 월류 방지장치{preventing overflows equipment for embankment in river}Preserving overflows equipment for embankment in river}

본 고안은 부력에 의해 하천 제방의 높이를 가변시켜 줄 수 있도록 한 하천 제방용 월류 방지장치에 관한 것으로, 더욱 상세하게는 하천수가 급상승하는 비상사태가 발생시에는 부력에 의한 회동 상향 이동 동작을 취해 하천 제방의 높이를 단계적으로 증대시켜 하천수의 월류 범람을 방지할 수 있고, 하천 수위가 일정 수위로 되돌아 갈 경우에는 자중에 의한 회동 하향 이동 동작을 취해 제방의 내측면에 위치함과 더불어 상부에 화단과 난간을 조성시킬 수 있어 하천의 월류 범람과 같은 홍수 재해를 방지할 수 있고, 하천 경관과 안전 향상을 도모할 수 있도록 한 하천 제방용 월류 방지장치에 관한 것이다.The present invention relates to a river bank overflow prevention device that can change the height of the river bank by buoyancy, and more specifically, in the event of an emergency in which the river water rapidly rises, it takes a rotational upward movement by the buoyancy. By increasing the height of the dike step by step, it is possible to prevent the overflow of river water.When the water level returns to a certain level, it rotates downward by its own weight and is located on the inner side of the dike. It is possible to create a railing to prevent flood disasters such as overflowing of the overflow of the river, and to prevent the overflow of the river bank for preventing river landscape and safety.

일반적으로 해변과 강가 그리고 하천 등에 인접되게 시공되어 있는 제방은 태풍 및 악천후와 같은 천재지변에 의해 갑자기 불어난 해수 또는 강물 및 하천수에 의해 직간접적으로 여러 가지의 수해를 자주 입게 된다.In general, embankments that are constructed adjacent to beaches, rivers, and rivers are frequently indirectly and indirectly damaged by seawater or river and river waters suddenly blown up by natural disasters such as typhoons and bad weather.

특히, 지형적으로 강의 지류를 형성하고 있는 하천은 그 양측의 호안이 낮게 형성된데 반해, 그 주변의 논밭이나 주거지는 하천 바닥보다 더 낮게 위치하는 천정천이 대부분이므로 우기에 하천수의 범람이 자주 발생되는 곳이다.In particular, the rivers that form the tributaries of the rivers have low lakesides on both sides, whereas the surrounding rice fields and dwellings are mostly located below the river floor, so flooding of river waters occurs frequently during the rainy season. to be.

이와 같은 천정천은 하천 바닥이 세월이 갈수록 퇴적물로 인하여 높아지는데 반해, 양측 경계로 한 육상지역은 농사 목적이나 주거지 개량 등으로 차츰 표고 높이가 낮게 인위적으로 변형된다.While the ceiling of rivers is higher due to sediments, the land areas on both sides of the ceiling are gradually transformed to lower elevations due to farming purposes or improved housing.

그러므로, 천정천의 주변에 형성된 제방은 이러한 문제점을 해결하기 위하여 주기적으로 제방의 높이를 하천 바닥 높이의 상승에 맞춰 복돋워 나가는 하천 정비 사업을 취하고 있다.Therefore, in order to solve this problem, the levees formed around the ceiling are taking river maintenance projects that periodically revise the heights of the levees in accordance with the height of the river bottom.

즉, 하천 정비 사업 중에 제방의 일정 부위에 0.6 ~ 1m 높이의 제방 여유고를 축조하여 홍수 파랑과 하천수의 범람에 대응하고 있다.In other words, during the river maintenance project, dike margins of 0.6 to 1 m are built at certain parts of the banks to cope with flood wave and flooding.

그러나, 이 방법은 막대한 예산을 조성하여 주기적으로 제방을 높게 축조해야 하는 비경제적인 문제점이 있었고, 특히 시간이 지날수록 높게 축조되는 제방 여유고에 의해 주변 경관의 조망권이 크게 훼손되는 문제점이 있었으며, 태풍 및 악천후와 같은 천재지변에 의해 갑자기 하천수가 급상승하는 경우가 발생시에는 대응을 효과적으로 취하지 못해 월류하는 하천수에 의한 제방 붕괴 및 유실이 초래되어 해마다 막대한 수해 복구 예산을 낭비하는 문제점은 물론이고, 심지어는 많은 인명 인명 재해를 야기시키는 현상을 초래하였다.However, this method has an uneconomic problem that requires a huge budget to periodically build a high levee periodically, particularly a problem that the view of the surrounding landscape is greatly damaged by the dike reserves that build high over time, typhoons In case of sudden sudden increase of river water due to natural disasters such as bad weather and the bad weather, it is not possible to take effective response, resulting in bank collapse and loss caused by overflowing river water, which wastes huge flood recovery budget every year. It caused a phenomenon causing human life disaster.

이에 따라 최근에는 하천수의 급상승 시기에만 부력에 의한 대응 동작을 취해 월류 현상을 방지할 수 있도록 하는 여러 기술들이 개발(부력을 이용한 제방 월류 방지장치(한국등록번호20-0215949호),월류 방지용 호안부재(대한민국 출원번호 20-2001-0035809호))되어 있다.Accordingly, recently, various technologies have been developed to prevent the overflow phenomenon by taking a buoyant response only during the rapid rise of river waters. (A levee prevention system using buoyancy (Korean Registered No. 20-0215949) (Korean Application No. 20-2001-0035809).

그러나 이와 같은 종래의 기술들은 여러 가지의 문제점이 있었다.However, these conventional techniques have various problems.

이를 순서에 의거하여 구체적으로 나열 설명하면 다음과 같다.This is described in detail based on the order as follows.

첫째, 예측이 불가한 태풍 및 악천후와 같은 천재지변에 효과적으로 대응할 수 없는 비안전한 문제점이 있었다.First, there was an unsafe problem that could not effectively cope with natural disasters such as unpredictable typhoons and bad weather.

즉, 제방의 높이를 상승하는 하천수를 수용할 수 있도록 가변시킬 수 있다고는 하나 실제적으로 그 가변 높이가 그다지 높지 않아 예측한 이상의 하천수가 급상승할 경우에는 대응을 전혀 취할 수 없는 구조상의 문제점이 있었기 때문이다.In other words, although the height of the dike can be changed to accommodate the rising river water, the variable height is not so high that there is a structural problem that can not be taken at all when the expected river water suddenly rises. to be.

둘째, 월류 방지 기능만을 중시한 형태를 취하고 있으므로 실사용시 하천 경관에 악영향을 초래하는 문제점이 있었다.Second, since it takes a form that focuses solely on the prevention of overcurrent, there was a problem of causing adverse effects on the river landscape during actual use.

셋째, 일정기간이 경과하면 부력 작용에 의한 상승 동작을 원할히 취할 수 없어 상승하는 하천수에 반응하여 효과적인 월류 방지 기능을 제공할 수 없는 문제점이 있었다.Third, after a certain period of time, there is a problem that can not take the rising action by the buoyancy action to provide an effective overflow prevention function in response to the rising river water.

즉, 부력 수단의 승,하강 동작을 가이드 하여 주는 부재가 외부 또는 물에 노출된 형태를 취하고 있어 일정 기간이 경과하면 다량의 이물질이 끼어 부력 작용에 의한 상승 동작에 장애를 제공하였기 때문이다. That is, since the member guiding the lifting and lowering operation of the buoyancy means takes the form exposed to the outside or water, a large amount of foreign substances are stuck after a certain period of time to provide an obstacle to the rising operation by the buoyancy action.

본 고안은 상술한 바와 같은 종래의 문제들을 감안하여 이를 해결하고자 안출한 것으로, 그 목적은 하천수가 급상승하는 비상사태가 발생시에는 부력에 의한 회동 상향 이동 동작을 취해 하천 제방의 높이를 단계적으로 증대시켜 하천수의 월류 범람을 방지할 수 있고, 하천 수위가 일정 수위로 되돌아 갈 경우에는 자중에 의한 회동 하향 이동 동작을 취해 제방의 내측면에 위치함과 더불어 상부에 화단과 난간을 조성시킬 수 있어 하천의 월류 범람과 같은 홍수 재해를 방지할 수 있고, 하천 경관과 안전 향상을 도모할 수 있도록 한 하천 제방용 월류 방지장치를 제공하는데 있다.The present invention has been devised to solve this problem in view of the conventional problems as described above, and its purpose is to increase the height of the river banks step by step by rotating upward movement by buoyancy in the event of an emergency in which the river water rapidly rises. Overflow of river water can be prevented, and when the water level returns to a certain level, it can be rotated downward by its own weight to be located on the inner side of the embankment and to create flower beds and railings on the upper part of the river. In order to prevent flood disasters such as overflowing the overflow, and to improve the river landscape and safety, it is to provide an overflow prevention device for river banks.

상기의 목적을 달성하기 위한 본 고안의 구체적인 수단은,Specific means of the present invention for achieving the above object,

양측과 상부가 개구되어 있어 내측에 가이드 공간부가 구비되어 있되, 일측 전면에는 연결돌기가 형성되어 있고, 타측 전면에는 연결홈이 형성되어 있으며, 상부 후방으로 절곡 연장된 수평 설치면에는 길이 방향에 걸쳐 등간격을 취하는 고정공이 수개 형성되어 있는 제방 연결부재와;Both sides and the upper part are opened, and the guide space is provided on the inside, and one side is formed with a connecting protrusion on the front side, and the other side is formed with a connecting groove, and the horizontal installation surface bent and extended to the rear in the longitudinal direction A dike connecting member having a plurality of fixing holes at equal intervals;

상기, 제방 연결부재의 고정공에 삽입을 취해 설치작업시 이 제방 연결부재와 제방 구조물간의 결속을 다지는 연결 막대와;A connecting rod which inserts into the fixing hole of the levee connecting member and solidifies the bond between the levee connecting member and the levee structure during the installation operation;

상기, 제방 연결부재의 가이드 공간부에 삽입 설치되되, 상단 양측에 힌지 연결구가 형성되어 있는 월류 방지판과;And, the overflow prevention plate is inserted into the guide space of the levee connection member, the hinge connector is formed on both sides of the upper end;

내측이 비어있는 반구체 형상을 취하고 있되, 상기, 월류 방지판의 힌지 연결구에 힌지 연결을 취할 수 있는 힌지공이 상단 양측에 형성되어 있고, 일측 외표면과 외측면 상부 표면에는 러버 마감재가 접착된 회동 부구를 일체로 포함하여 구성됨을 그 특징으로 한다.The inner side has a hollow hemispherical shape, but hinge holes are formed on both sides of the upper end of the hinge connector of the overflow preventing plate, and a rubber finish is bonded to one outer surface and an outer surface upper surface thereof. It is characterized by being configured to include an integral part.

이하, 본 고안의 구성을 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, the configuration of the present invention in detail with reference to the drawings as follows.

도 1은 본 고안에 따른 하천 제방용 월류 방지장치의 구성 상태를 도시한 분해 사시도이고, 도 2는 본 고안에 따른 하천 제방용 월류 방지장치의 설치 상태를 도시한 측단면도이며, 도 3은 본 고안에 따른 하천 제방용 월류 방지장치의 연결 설치된 상태를 도시한 정면도이다.Figure 1 is an exploded perspective view showing a configuration of the river bank overflow prevention device according to the present invention, Figure 2 is a side cross-sectional view showing the installation state of the river bank overflow prevention device according to the present invention, Figure 3 It is a front view showing the installed state of the riverbank overflow prevention device according to the invention.

참고로, 본 고안을 설명함에 있어 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 고안의 요지를 불필요하게 흐릴 수 있다고 판단될 경우에는 그 상세한 설명을 생략하였다.For reference, in describing the present invention, when it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof is omitted.

또한, 후술되는 용어들은 본 고안에서의 기능을 고려하여 정의된 용어들로서 이는 사용자와 운영자의 의도 또는 관례 등에 따라 달라질 수 있다.In addition, terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators.

그러므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Therefore, the definition should be made based on the contents throughout the specification.

도시된 바와 같이 양측과 상부가 개구되어 있어 내측에 가이드 공간부(11)가 구비되어 있되, 일측 전면에는 연결 돌기(12)가 형성되어 있고, 타측 전면에는 연결홈(13)이 형성되어 있으며, 상부 후방으로 절곡 연장된 수평 설치면(14)에는 길이 방향에 걸쳐 등간격을 취하는 고정공(15)이 수개 형성되어 있는 제방 연결부재(10)가 제방(1)에 연결 설치되어 있다.As shown, both sides and the upper portion is opened so that the guide space portion 11 is provided on the inner side, the connecting projection 12 is formed on one front surface, and the connecting groove 13 is formed on the other front surface. On the horizontal mounting surface 14 which is bent and extended to the upper rear, a levee connecting member 10 having a plurality of fixing holes 15 formed at equal intervals in the longitudinal direction is connected to the levee 1.

그리고, 상기, 제방 연결부재(10)의 고정공(15)에는 상단에 러버 지지구(21)가 설치된 연결 막대(20)가 삽입을 취해 제방 연결부재(10)와 제방(1) 구조물간의 결속을 다지고 있다.In addition, the fixing rod 15 of the levee connecting member 10 is inserted into the connecting rod 20 provided with a rubber support 21 at the upper end thereof, thereby binding the levee connecting member 10 and the levee 1 structure. Is chopping up.

또한, 상기, 제방 연결부재(10)의 가이드 공간부(11)에는 상단 양측에 힌지 연결구(31)가 형성되어 있는 월류 방지판(30)이 삽입 설치되어 있고, 상기 월류 방지판(30)에는 내측이 비어있는 반구체 형상을 취하고 있되, 일측 외표면과 외측면 상부 표면에는 러버 마감재(42)가 접착된 회동 부구(40)가 상단 양측에 형성된 힌지공(41)을 통해 회동 가능하게 연결 구성되어 있다.In addition, the overflow prevention plate 30 is formed in the guide space portion 11 of the embankment connecting member 10, the hinge connector 31 is formed on both sides of the upper end, the overflow prevention plate 30 The inner side has a hollow hemispherical shape, but one side of the outer surface and the outer surface of the upper surface and the rubber finishing material 42 is bonded to the rotatable opening 40 through the hinge hole (41) formed on both sides of the upper end It is.

한편, 상기 회동 부구(40)의 상부에는 화단을 조성할 수 있는 화단공간부(43)가 형성되어 있고, 측면에는 배수공(44)이 관통 형성되어 있다. On the other hand, the upper portion of the rotating buckle 40 is formed with a flower bed space 43 for forming a flower bed, the drain hole 44 is formed through the side.

이와 같이 구성되어 있는 본 고안의 설치 방법과 작용을 도면을 참조하여 설명하면 다음과 같다.Referring to the installation method and operation of the present invention configured as described above with reference to the drawings as follows.

도 4는 본 고안에 따른 하천 제방용 월류 방지장치의 작동 변화 상태를 도시한 개략도이고, 도 5는 본 고안에 따른 하천 제방용 월류 방지장치의 설치 상태를 도시한 개략도이다.Figure 4 is a schematic diagram showing an operation change state of the river bank overflow prevention device according to the present invention, Figure 5 is a schematic diagram showing an installation state of the river bank overflow prevention device according to the present invention.

먼저, 설치는 다음과 같은 방법으로 이루어진다.First, installation is done in the following way.

즉, 태풍 및 악천후와 같은 천재지변시 하천수의 월류 범람이 우려되는 제방(1) 구간에 상기 제방 연결부재(10)를 거치 연결한 후 연결 막대(20)를 상기, 제방 연결부재(10)의 고정공(15)에 삽입하여 제방 연결부재(10)와 제방(1) 구조물간의 결속을 다지면 된다.That is, after connecting the levee connecting member 10 to the levee section 1 where the overflow of the river water is feared during a natural disaster such as typhoon and bad weather, the connecting rod 20 is connected to the levee connecting member 10. Inserted into the fixing hole 15, the coupling between the levee connecting member 10 and the levee (1) structure.

그리고, 상기 제방 연결부재(10)의 가이드 공간부(11)에 월류 방지판(30)을 삽입 시킨 후 이 월류 방지판(30)의 상단 양측에 형성되어 있는 힌지 연결구(31)에 회동 부구(40)의 힌지공(41)을 위치시켜 힌지 연결하면 설치 작업이 완료된다. Then, after inserting the overflow prevention plate 30 in the guide space 11 of the embankment connecting member 10 to the hinge connector (31) formed on both sides of the upper end of the overflow prevention plate (30) Positioning the hinge hole 41 of the hinge 40 to connect the installation is completed.

이렇게 설치된 본 고안은 실사용시 하천수가 급상승하는 비상사태가 발생시에는 부력에 의한 회동 상향 이동 동작을 취해 하천 제방의 높이를 단계적으로 증대시켜 하천수의 월류 범람을 방지할 수 있게 된다.The present invention installed in this way, when an emergency occurs in which the river water rapidly rises, it is possible to prevent the overflow of the river water by increasing the height of the river bank step by step to increase the height of the river bank by buoyancy.

즉, 하천수가 상승하게 되면 이에 부력 반응을 하여 회동 부구(40)가 상승 이동을 하게 된다.That is, when the river water rises in response to the buoyancy response, the rotating floats 40 are moved up.

이때 이 회동 부구(40)는 월류 방지판(30)과 힌지 연결된 힌지점을 중심으로 회동을 취하며 상승하는 가운데 1차적으로 제방(1)의 높이를 높혀 월류를 방지하다가 일정 지점 이상에 위치한 이후에는 가이드 공간부(11)에 삽입 설치되어 있던 월류 방지판(30)을 승강 이동시키며 2차적으로 제방(1) 높이를 추가로 높혀 월류를 방지하게 된다.At this time, the pivot ball (40) is rotated around the hinge point connected to the overflow prevention plate 30 and hinged to increase the height of the embankment (1) to prevent the overflow while being located above a certain point. The elevating and moving the overflow prevention plate 30 that is inserted into the guide space 11, the secondary to further increase the height of the embankment (1) to prevent the overflow.

참고로 상기 회동 부구(40)는 월류 방지판(30)을 최상의 높이까지 승강 이동시키면 상기 연결 막대(20)에 상단에 설치된 러버 지지구(21)에 지지되어 하천의 반대편 방향으로 젖혀지게 되는 현상이 방지되게 된다.For reference, the rotation buoy 40 is supported by the rubber support 21 installed on the upper end of the connecting rod 20 when the lifting and lowering the overflow plate 30 to the highest height, the phenomenon is to be flipped in the opposite direction of the river This will be prevented.

그리고, 하천 수위가 일정 수위로 되돌아 갈 경우에는 자중에 의한 회동 하향 이동 동작을 취해 초기 위치로 위치하게 된다.When the river level returns to a certain level, the river level is moved to the initial position by rotating downward movement by the weight.

즉, 하천수가 감소하게 되면 이에 부력 반응을 하여 회동 부구(40)가 하강 이동을 하게 된다. In other words, when the river water is reduced, the buoyancy response to the rotational floats 40 is moved downward.

이때 이 회동 부구(40)는 월류 방지판(30)과 힌지 연결된 힌지점을 중심으로 회동을 취하며 하강하는 가운데 1차적으로 월류 방지판(30)을 가이드 공간부(11) 내로 하강 삽입시켜 제방 높이를 낮추게 되고, 이러한 월류 방지판(30)의 하강 동작을 마무리한 이후에도 지속적인 회동 하강 동작을 취하며 초기 위치로 복귀하게 된다.At this time, the pivot ball 40 rotates around the hinge point connected to the overflow prevention plate 30 and hinges, and descends into the guide space 11 to insert the overflow prevention plate 30 into the guide space 11. The height is lowered, and even after finishing the descent operation of the overflow prevention plate 30 takes a continuous rotation descent operation to return to the initial position.

이에 따라 강수량의 예측이 불가한 태풍 및 악천후와 같은 천재지변에도 좀더 효과적인 대응을 취할 수 있게 된다.As a result, more effective responses can be taken against natural disasters, such as typhoons and bad weather, in which precipitation is unpredictable.

그리고, 상기 회동 부구(40)의 측면에는 배수공(44)이 관통 형성되어 있어, 평상시의 하천 상태에서는 부력작용을 안하고, 초기 상태를 취하게 되는 회동 부구(40)에 의해 하천수의 배수 행정에 차질을 주는 문제를 최소화할 수 있게 된다.Then, the drain hole 44 is formed in the side surface of the rotational buckle 40, the buoyancy action does not act in the usual state of the river, it is disrupted in the drainage stroke of the river water by the rotational buoy 40 to take the initial state. This can minimize problems.

또한, 상기 회동 부구(40)의 상부에는 화단을 조성할 수 있는 화단 공간부(43)가 형성되어 있어, 하천 경관을 미려하게 개선할 수 있게 된다.In addition, the upper portion of the rotating buckle 40 is formed with a flower bed space 43 for creating a flower bed, it is possible to improve the river landscape beautifully.

한편, 상기 연결 막대(20)를 이용하여 안전 난간을 손쉽게 설치할 수 있음으로 제방(1) 주변의 안전 시설을 확충하는데 있어서의 편리성과 경제성을 향상시켜 줄 수 있게 된다. On the other hand, it is possible to easily install a safety rail using the connecting rod 20 can improve the convenience and economics in expanding the safety facilities around the embankment (1).

참고로 본 고안은 다양하게 변형 실시될 수 있고, 여러 가지의 형태를 취할 수 있으나 상기 고안의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다.For reference, the present invention may be variously modified and may take various forms, but the detailed description of the present invention has been described only with respect to specific embodiments thereof.

그러므로, 본 고안은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 인정되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 고안의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.Therefore, it is to be understood that this invention is not to be limited to the specific forms referred to in the description, but rather includes all modifications, equivalents, and substitutions within the spirit and scope of the invention as defined by the appended claims. It must be understood.

이상에서 살펴 본 바와 같이 본 고안은 하천수가 급상승하는 비상사태가 발생시에는 부력에 의한 회동 상향 이동 동작을 취해 하천 제방의 높이를 단계적으로 증대시켜 하천수의 월류 범람을 방지할 수 있고, 하천 수위가 일정 수위로 되돌아 갈 경우에는 자중에 의한 회동 하향 이동 동작을 취해 제방의 내측면에 위치함과 더불어 상부에 화단과 난간을 조성시킬 수 있어 하천의 월류 범람과 같은 홍수 재해를 효과적으로 방지할 수 있고, 하천 경관과 안전 향상을 도모할 수 있도록 한 효과 등이 있다.As described above, the present invention takes a rotational upward movement by buoyancy in the event of an emergency in which the river water rises, thereby increasing the height of the river bank stepwise to prevent overflow of the river water, and the river water level is constant. In case of returning to the water level, it can be rotated downward by its own weight to be located on the inner side of the embankment, and to create flower beds and railings on the upper side, which can effectively prevent flood disasters such as overflowing rivers. There is an effect to improve the landscape and safety.

도 1은 본 고안에 따른 하천 제방용 월류 방지장치의 구성 상태를 도시한 분해 사시도.1 is an exploded perspective view showing the configuration of the riverbank embankment prevention device according to the present invention.

도 2는 본 고안에 따른 하천 제방용 월류 방지장치의 설치 상태를 도시한 측단면도.Figure 2 is a side cross-sectional view showing an installation state of the overflow prevention device for river embankment according to the present invention.

도 3은 본 고안에 따른 하천 제방용 월류 방지장치의 연결 설치된 상태를 도시한 정면도.Figure 3 is a front view showing a connection installed state of the riverbank embankment prevention device according to the present invention.

도 4는 본 고안에 따른 하천 제방용 월류 방지장치의 작동 변화 상태를 도시한 개략도.Figure 4 is a schematic diagram showing an operation change state of the overflow prevention device for river embankment according to the present invention.

도 5는 본 고안에 따른 하천 제방용 월류 방지장치의 설치 상태를 도시한 개략도.Figure 5 is a schematic diagram showing an installation state of the overflow prevention device for river embankment according to the present invention.

<도면중 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 제방1: dike

10 :제방 연결 부재 11 : 가이드 공간부10: bank connection member 11: guide space portion

12 : 연결 돌기 13 : 연결홈12: connection projection 13: connection groove

14 : 수평 설치홈 15 : 고정공14: horizontal installation groove 15: fixing hole

20 : 연결 막대 21 : 러버 지지구20: connecting rod 21: rubber support

30 : 월류 방지판 31 : 힌지 연결구30: overflow prevention plate 31: hinge connector

40 : 회동 부구 41 : 힌지공40: rotation ball 41: hinge

42 : 러버 마감재 43 : 화단 공간부42: rubber finish 43: flower bed space

44 : 배수공44: drain hole

Claims (2)

하천수의 급상승시 부력에 의한 대응 동작을 취해 월류 현상을 방지할 수 있도록 한 것에 있어서,In order to prevent the overflow phenomenon by taking a buoyancy action when the river water is rapidly rising, 양측과 상부가 개구되어 있어 내측에 가이드 공간부(11)가 구비되어 있되, 일측 전면에는 연결 돌기(12)가 형성되어 있고, 타측 전면에는 연결홈(13)이 형성되어 있으며, 상부 후방으로 절곡 연장된 수평 설치면(14)에는 길이 방향에 걸쳐 등간격을 취하는 고정공(15)이 수개 형성되어 있는 제방 연결부재(10)와;Both sides and the upper part is open, so that the guide space 11 is provided on the inner side, the connecting projection 12 is formed on one front surface, the connecting groove 13 is formed on the other front surface, and bent to the upper rear The extended horizontal installation surface 14 and the embankment connecting member 10 is formed with a plurality of fixing holes 15 having equal intervals in the longitudinal direction; 상기, 제방 연결부재(10)의 고정공(15)에 삽입을 취해 설치작업시 이 제방 연결부재(10)와 제방(1) 구조물간의 결속을 다지는 연결 막대(20)와;A connecting rod 20 which inserts into the fixing hole 15 of the levee connecting member 10 and establishes a bond between the levee connecting member 10 and the levee structure during installation; 상기, 제방 연결부재(10)의 가이드 공간부(11)에 삽입 설치되되, 상단 양측에 힌지 연결구(31)가 형성되어 있는 월류 방지판(30)과; And, the overflow prevention plate 30 is inserted into the guide space 11 of the embankment connecting member 10, the hinge connector 31 is formed on both sides of the upper end; 내측이 비어있는 반구체 형상을 취하고 있되, 상기, 월류 방지판(30)의 힌지 연결구(31)에 힌지 연결을 취할 수 있는 힌지공(41)이 상단 양측에 형성되어 있고, 일측 외표면과 외측면 상부 표면에는 러버 마감재(42)가 접착된 회동 부구(40)를 일체로 포함하여 구성됨을 그 특징으로 하는 하천 제방용 월류 방지장치.The inside has an empty hemispherical shape, but hinge holes 41 are formed on both sides of the upper end of the hinge connector 31 in the hinge connector 31 of the overflow prevention plate 30, and the outer surface of one side and the outside. Overflow prevention device for river embankment, characterized in that the upper surface side is composed of a rubber finishing material (42) is integrally attached to the rotating ball 40. 제 1항에 있어서, 상기 회동 부구(40)의 상부에는 화단을 조성할 수 있는 화단공간부(43)가 형성되어 있고, 측면에는 배수공(44)이 관통 형성됨을 특징으로 하는 하천 제방용 월류 방지장치. According to claim 1, wherein the upper portion of the rotating buckle 40 is formed in the flower bed space 43 to form a flower bed, the side of the river embankment, characterized in that through the drain hole 44 is formed through Device.
KR20-2004-0034653U 2004-12-07 2004-12-07 preventing overflows equipment for embankment in river KR200380455Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0034653U KR200380455Y1 (en) 2004-12-07 2004-12-07 preventing overflows equipment for embankment in river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0034653U KR200380455Y1 (en) 2004-12-07 2004-12-07 preventing overflows equipment for embankment in river

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020040103907A Division KR100629725B1 (en) 2004-12-10 2004-12-10 Preventing overflows equipment for embankment in river

Publications (1)

Publication Number Publication Date
KR200380455Y1 true KR200380455Y1 (en) 2005-03-30

Family

ID=43682077

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0034653U KR200380455Y1 (en) 2004-12-07 2004-12-07 preventing overflows equipment for embankment in river

Country Status (1)

Country Link
KR (1) KR200380455Y1 (en)

Similar Documents

Publication Publication Date Title
JP6506906B2 (en) Automatic operation flood guard
EP2659069B1 (en) Self-actuating storm surge barrier
CN202249014U (en) Flood control board of underground garage
KR101284196B1 (en) fish way for movement of fishes with variable water level
KR100865370B1 (en) Overflowing prevention device for better view of river
CN104420499A (en) Water fetching apparatus for adjusting water depth to selectively fetch water
US20200032471A1 (en) Integrated Drain Gate Seawall System
JP2000319857A (en) Tide preventing apparatus
CN213538828U (en) Flood control baffle
KR100629725B1 (en) Preventing overflows equipment for embankment in river
KR101075941B1 (en) Watergate control apparatus
KR200380455Y1 (en) preventing overflows equipment for embankment in river
KR20120065306A (en) A waterproof plate for flooding prevention
KR20140099027A (en) Height variable type block structure
KR200263865Y1 (en) Member of embankment for preventing overflows
KR101849368B1 (en) Hydraulic type moving wall
KR20170062658A (en) Flood prevention apparatus for using pulleys
GB2450875A (en) Flood prevention barrier incorporating a float member
JP2013119746A (en) Flood preventive structure
GB2371324A (en) Pivotable flood barrier
KR100959092B1 (en) Swing bridge for automatically intermittence according to water flow
KR101821293B1 (en) non-powered multi-purpose barrier
KR20100043797A (en) Watergate control apparatus
KR100497818B1 (en) Overflow prevention dam construction for rainwater storage dam
KR200217658Y1 (en) Automatic floodgate

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
EXTG Extinguishment