KR200357327Y1 - Wire fixing for concrete form - Google Patents

Wire fixing for concrete form Download PDF

Info

Publication number
KR200357327Y1
KR200357327Y1 KR20-2004-0012142U KR20040012142U KR200357327Y1 KR 200357327 Y1 KR200357327 Y1 KR 200357327Y1 KR 20040012142 U KR20040012142 U KR 20040012142U KR 200357327 Y1 KR200357327 Y1 KR 200357327Y1
Authority
KR
South Korea
Prior art keywords
support
sleeve
formwork
wire
concrete
Prior art date
Application number
KR20-2004-0012142U
Other languages
Korean (ko)
Inventor
이영숙
Original Assignee
이영숙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이영숙 filed Critical 이영숙
Priority to KR20-2004-0012142U priority Critical patent/KR200357327Y1/en
Application granted granted Critical
Publication of KR200357327Y1 publication Critical patent/KR200357327Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 콘크리트 구조물의 슬리부에 수직으로 설치된 수직거푸집이 쓰러지지 않도록 고정한 와이어의 단부를 상기 슬리브에 안정적으로 고정함과 아울러 상기 와이어 및 수직거푸집의 해체가 용이하게 이루어지도록 함으로써 공사의 효율성 향상을 도모할 수 있도록 구성된 수직 콘크리트 거푸집 지지용 와이어 고정구에 관한 것이다.The present invention aims to improve the efficiency of construction by stably fixing the end of the wire fixed in the sleeve to the sleeve of the concrete structure so that the vertical formwork does not fall down on the sleeve and dismantling the wire and the vertical formwork easily. And a wire fixture for supporting vertical concrete formwork.

본 고안의 특징에 따르면, 레미콘이 주입 양생되어 콘크리트 구조물의 슬리브가 성형되도록 하는 수평거푸집에 고정 결합됨과 아울러 상기 슬리브에 부분적으로 매입되는 것으로, 일정두께 및 폭을 갖는 바가 절곡되어 상기 수평거푸집에 안착되는 받침결합부와 상기 슬리부에 부분적으로 매입되도록 상기 받침결합부에서 직교되게 수직으로 연이어지는 지지부가 형성되고, 상기 받침결합부에는 못이나 나사 등이 삽입 체결되는 결합공이 적어도 한 개소 이상 형성되며, 상기 지지부의 양측에는 상기 슬리브의 표면으로 노출된 지지부의 일부가 원활하게 절취되도록 하는 절단홀이 형성되어 상기 절단홀에 의해 지지부가 콘크리트 구조물의 슬리브에 매입되는 매입지지부와 상기 슬리부의 표면으로 노출되는 노출지지부로 구획되고, 상기 노출지지부에는 와이어가 연결 지지되는 연결공이 형성되어 구성된 것을 특징으로 하는 수직 콘크리트 거푸집 지지용 와이어 고정구가 제공된다.According to a feature of the present invention, the ready-mixed concrete ready to be molded and the sleeve of the concrete structure is fixedly coupled with the part is embedded in the sleeve, the bar having a predetermined thickness and width is bent and seated on the horizontal formwork The support coupling portion and the support portion is vertically continuous perpendicular to the support coupling portion to be partially embedded in the sleeve portion is formed, the support coupling portion is formed with at least one or more coupling holes for fastening nails or screws, etc. Cutting holes are formed on both sides of the support to smoothly cut a portion of the support exposed to the surface of the sleeve. The exposure support is divided into, the exposure support Is a vertical concrete forms the support, it characterized in that the wire fixture is configured to form a ball connection that support wire is connected is provided.

Description

수직 콘크리트 거푸집 지지용 와이어 고정구{WIRE FIXING FOR CONCRETE FORM}Wire Fixture for Supporting Vertical Concrete Formwork {WIRE FIXING FOR CONCRETE FORM}

본 고안은 수직 콘크리트 거푸집 지지용 와이어 고정구에 관한 것으로, 보다 상세히는 콘크리트 구조물의 슬리부에 수직으로 설치된 수직거푸집이 쓰러지지 않도록 고정한 와이어의 단부를 상기 슬리브에 안정적으로 고정함과 아울러 상기 와이어 및 수직거푸집의 해체가 용이하게 이루어지도록 함으로써 공사의 효율성 향상을 도모할 수 있도록 구성된 수직 콘크리트 거푸집 지지용 와이어 고정구에 관한 것이다.The present invention relates to a wire fixture for supporting vertical concrete formwork, and more particularly, to secure the end of the wire fixed to the sleeve so that the vertical formwork installed vertically installed on the slits of the concrete structure does not fall down, the wire and the vertical formwork. It is related to the vertical concrete formwork support wire fixture configured to facilitate the dismantling of the construction by improving the efficiency of the construction.

일반적으로 콘크리트 구조물은 도 1에 도시한 바와 같이 슬리브(3)와 벽체(4) 등이 연속적으로 조합되어 이루어지며, 대부분 슬리브(3)가 시공된 후 벽체(4)를 시공하게된다.In general, the concrete structure is made of a combination of the sleeve (3) and the wall (4), as shown in Figure 1, and most of the construction of the wall (4) after the sleeve (3) is constructed.

상기 콘크리트 구조물의 벽체(4) 시공은 레미콘의 양생에 의해 수평으로 미리 성형된 슬리브(3)의 단부나 상면에 수직거푸집(2)이 수직으로 배치되고, 상기 슬리브(3)와 거푸집은 와이어(5)에 그 상태를 유지하게되며, 상기 수직거푸집(2) 내에 레미콘이 주입 후 양생되어 벽체(4)를 형성하게 되는데, 이때 상기 와이어(5)는 그 양단부가 각각 수직거푸집(2)과 상기 슬리브(3)의 형성시 슬리브(3) 내에 미리 매입 고정된 와이어 고정구(10)에 고정 결합되어 상기 슬리브(3)에 수직으로 세워진 수직거푸집(2)을 지지하게된다.In the construction of the wall 4 of the concrete structure, a vertical formwork 2 is vertically disposed at an end or an upper surface of the sleeve 3 preformed horizontally by curing of the ready-mixed concrete, and the sleeve 3 and the formwork are wires ( 5) is maintained in the state, and after the ready-mixed concrete is injected into the vertical formwork (2) to form a wall (4), wherein both ends of the wire (5) and the vertical formwork (2) and the In the formation of the sleeve 3, it is fixedly coupled to the wire fixture 10 pre-buried in the sleeve 3 to support the vertical formwork 2 standing perpendicular to the sleeve 3.

상기 슬리브(3)에 미리 매입 고정되어 와이어(5)의 일단부가 고정되도록 하는 종래의 와이어 고정구(10)는 도 2에 도시한 바와 같이 일정 두께 및 폭의 바가 다단으로 절곡되어 대략 ??형상으로 직교되게 연이어진 결합부(11a) 및 수직부(11b)가 형성되고 상기 수직부(11b)의 단부에는 레미콘이 주입 양생되어 콘크리트 구조물의 슬리브(3)가 성형되도록 하는 수평거푸집(1)에 안착되는 받침부(11c)가 직교되게 연이어 형성되며 상기 받침부(11c)에는 못이나 나사 등이 체결되는 체결공이 형성된 고정절곡바(11)와, 상기 고정절곡바(11)의 결합부(11a)에 고정 결합되며 내부에는 암나사공(12a)이 관통되게 형성된 결합부싱(12)과, 상기 결합부싱(12)의 암나사공(12a) 분리 가능하게 체결되는 수나사(13a)의 단부에 와이어(5)가 끼워져 결합되는 링(13b)이 일체로 고정 결합된 연결고리(13)로 구성된다.In the conventional wire fixture 10, which is pre-buried and fixed to the sleeve 3 to fix one end of the wire 5, as shown in FIG. Orthogonal coupling portions 11a and vertical portions 11b are formed, and at the ends of the vertical portions 11b, the ready-mixed concrete is injected into the horizontal formwork 1 so that the sleeve 3 of the concrete structure is molded. The support portion 11c is formed to be perpendicular to the successive and the support portion (11c) is a fixed bending bar 11 is formed with a fastening hole for fastening nails or screws, and the coupling portion (11a) of the fixed bending bar 11 Fixed to and coupled to the inside of the coupling bushing 12 through which the female threaded hole 12a is penetrated, and the wire 5 at the end of the male screw 13a detachably fastened to the female threaded hole 12a of the coupling bushing 12. Is fixedly coupled to the ring (13b) is fitted It consists of a ring (13).

이와 같은 종래의 와이어 고정구(10)는 먼저 수평거푸집(1)에 레미콘을 주입하여 콘크리트 구조물의 슬리브(3)를 성형하기 전 미리 상기 수평거푸집(1)에 와이어 고정구(10)의 고정절곡바(11)를 못이나 기타 나사 등으로 고정 설치 한 다음 상기 수평거푸집(1)에 레미콘을 주입 양생하여 상기 와이어 고정구(10)의 고정절곡바(11)가 콘크리트 구조물의 슬리브(3)에 매입 고정되도록 한다.Such a conventional wire fixture 10 is first injecting the ready-mixed concrete into the horizontal formwork (1) before forming the sleeve (3) of the concrete structure fixed bending bar of the wire fixture 10 in the horizontal formwork (1) ( 11) fixed with nails or other screws, etc., and then cured by pouring ready-mixed concrete into the horizontal formwork (1) so that the fixing bending bar (11) of the wire fixture (10) is fixed to the sleeve (3) of the concrete structure. do.

이후 상기 슬리브(3)의 단부나 상면에 수직으로 세워진 수직거푸집(2)과 일단부가 연결된 와이어(5)의 타단부를 연결고리(13)에 묶어 결합하면 상기 슬리브(3)에 수직으로 세워진 수직거푸집(2)을 지지하고 있는 와이어(5)의 고정이 완료된다.Then, the other end of the vertical formwork (2) and the one end is connected to the connecting ring 13, which is perpendicular to the end or the upper surface of the sleeve (3) is vertically erected perpendicular to the sleeve (3) The fixing of the wire 5 supporting the formwork 2 is completed.

이후 상기 수직거푸집(2)에 레미콘이 주입 양생되어 벽체(4)가 성형된 후 수직거푸집(2) 및 와이어(5)를 해체한 다음에는 상기 콘크리트 구조물의 슬리브(3) 표면으로 노출된 연결고리(13)를 결합부싱(12)에서 탈거하여 슬리브(3)의 표면을 마감함으로써 상기 와이어 고정구(10)의 이용이 완료된다.After the ready-mixed concrete is injected into the vertical formwork (2), the wall (4) is formed, and then the vertical formwork (2) and the wire (5) are dismantled, and then the connecting ring exposed to the sleeve (3) surface of the concrete structure. The use of the wire fixture 10 is completed by removing the 13 from the coupling bushing 12 to finish the surface of the sleeve 3.

그러나, 이와 같은 종래의 와이어 고정구(10)는 그 구성이 고정절곡바(11)와 결합부싱(12)과 연결고리(13) 등록 구성되어 있음으로 비교적 부품수가 많이며, 상기 고정절곡바(11)의 결합부(11a)에 결합부싱(12)을 일체로 결합할 경우 대부분 용접에 의해 결합이 이루어지게 됨은 물론 상기 결합부싱(12)에 연결고리(13)를 결합해야 하는 등 와이어 고정구(10)의 생산 공정이 많아 상대적으로 와이어 고정구(10)의 단가가 상승되는 등의 문제점이 있었다.However, the conventional wire fixture 10 has a relatively large number of parts because its configuration is configured to register the fixed bending bar 11, the coupling bushing 12 and the connecting ring 13, the fixed bending bar 11 In the case where the coupling bushing 12 is integrally coupled to the coupling part 11a of the wire coupling, the coupling is made by welding, as well as the coupling ring 13 must be coupled to the coupling bushing 12. ), There are many production processes, such that the unit cost of the wire fixture 10 is relatively increased.

또한, 상기 수평거푸집(1)에 와이어 고정구(10)의 고정절곡바(11)가 결합된 상태에서 상기 수평거푸집(1)에 레미콘을 주입 양생하여 슬리브(3)를 성형하는 과정에서 대체적으로 레미콘이 결합부싱(12)과 연결고리(13)의 결합부(11a)위에 묻어 양생되는데, 이러한 상황은 상기 결합부싱(12)에서 연결고리(13)를 탈거할 수 없는 상황이 초래하기 때문에 콘크리트 구조물의 슬리브(3) 마감처리가 불편하였던 문제점이 있었다.In addition, in the process of forming a sleeve (3) by injecting curing and curing the ready-mixed bar (11) of the wire fixture 10 to the horizontal formwork (1) in the horizontal formwork (1) The coupling bushing 12 and buried on the coupling portion 11a of the coupling ring 13 is cured. This situation causes the concrete structure because the connection ring 13 cannot be removed from the coupling bushing 12. There was a problem that the sleeve 3 of the finish was inconvenient.

본 고안은 상기한 바와 같은 문제점에 착안하여 제안된 것으로, 그 목적은 콘크리트 구조물의 슬리부에 수직으로 설치된 수직거푸집이 쓰러지지 않도록 고정한 와이어의 단부를 상기 슬리브에 안정적으로 고정함과 아울러 상기 와이어 와 수직거푸집의 해체 및 슬리브의 마감처리가 원활하게 이루어질 수 있도록 구성된 수직 콘크리트 거푸집 지지용 와이어 고정구를 제공하고자 하는 것이다.The present invention has been proposed in view of the problems described above, and its purpose is to stably fix the end of the wire fixed to the sleeve so that the vertical formwork installed vertically installed on the slits of the concrete structure does not fall down, and is perpendicular to the wire. It is to provide a vertical concrete formwork support wire fixture configured to facilitate the dismantling of the formwork and the finishing of the sleeve.

이와 같은 목적을 달성하기 위한 본 고안의 특징에 따르면, 레미콘이 주입 양생되어 콘크리트 구조물의 슬리브가 성형되도록 하는 수평거푸집에 고정 결합됨과 아울러 상기 슬리브에 부분적으로 매입되는 것으로, 일정두께 및 폭을 갖는 바가 절곡되어 상기 수평거푸집에 안착되는 받침결합부와 상기 슬리부에 부분적으로 매입되도록 상기 받침결합부에서 직교되게 수직으로 연이어지는 지지부가 형성되고, 상기 받침결합부에는 못이나 나사 등이 삽입 체결되는 결합공이 적어도 한 개소 이상 형성되며, 상기 지지부의 양측에는 상기 슬리브의 표면으로 노출된 지지부의 일부가 원활하게 절취되도록 하는 절단홀이 형성되어 상기 절단홀에 의해 지지부가 콘크리트 구조물의 슬리브에 매입되는 매입지지부와 상기 슬리부의 표면으로 노출되는 노출지지부로 구획되고, 상기 노출지지부에는 와이어가 연결 지지되는 연결공이 형성되어 구성된 것을 특징으로 하는 수직 콘크리트 거푸집 지지용 와이어 고정구가 제공된다.According to a feature of the present invention for achieving the above object, the ready-mixed concrete ready to be molded and molded into the sleeve of the concrete structure to be molded, and partially embedded in the sleeve, the bar having a certain thickness and width The support portion is bent and is vertically connected perpendicularly from the support coupling portion to be partially embedded in the support portion is bent and seated on the horizontal formwork, and the support coupling portion is coupled to the nail or screw is inserted and fastened At least one ball is formed, and both sides of the support portion is formed with a cutting hole for smoothly cutting a part of the support portion exposed to the surface of the sleeve buried support portion in which the support portion is embedded in the sleeve of the concrete structure by the cutting hole And exposed exposure exposed to the surface of the sleeve It is divided into parts, the exposed support portion is provided with a vertical concrete formwork support wire fixture, characterized in that the connection hole is formed is formed is connected to the wire support.

도 1은 종래에 수직 콘크리트 거푸집의 설치 상태를 나타낸 구성도.1 is a configuration diagram showing a conventional installation state of vertical concrete formwork.

도 2는 종래에 수직 콘크리트 거푸집 지지용 와이어 고정구를 나타낸 사시도.Figure 2 is a perspective view showing a wire fixture for supporting the vertical concrete formwork in the prior art.

도 3은 본 고안의 실시예에 의한 수직 콘크리트 거푸집 지지용 와이어 고정구를 나타낸 사시도.Figure 3 is a perspective view showing a wire fixture for supporting the vertical concrete formwork according to an embodiment of the present invention.

도 4는 본 고안인 수직 콘크리트 거푸집 지지용 와이어 고정구가 설치된 상태를 나타낸 단면도.Figure 4 is a cross-sectional view showing a state in which the wire fixture for supporting the vertical concrete formwork of the present invention is installed.

도 5는 본 고안의 다른 실시예에 의한 수직 콘크리트 거푸집 지지용 와이어 고정구를 나타낸 사시도.Figure 5 is a perspective view showing a wire fixture for supporting the vertical concrete formwork according to another embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1 : 수평거푸집 2 : 수직거푸집1: horizontal formwork 2: vertical formwork

3 : 슬리브 4 : 벽체3: sleeve 4: wall

5 : 와이어5: wire

100 : 와이어 고정구 110 : 받침결합부100: wire fixture 110: support coupling portion

120 : 지지부 120a : 매입지지부120: support portion 120a: embedded support portion

120b : 노출지지부 121 : 길이조절부120b: exposure support 121: length adjustment unit

122 : 가이드지지부 123 : 볼트122: guide support 123: bolt

130 : 결합공 140 : 절단홀130: coupling hole 140: cutting hole

150 : 연결공150: connector

이하 본 고안인 수직 콘크리트 거푸집 지지용 와이어 고정구를 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings for the vertical concrete formwork supporting wire fixture.

도 3은 본 고안의 실시예에 의한 수직 콘크리트 거푸집 지지용 와이어 고정구를 나타낸 사시도이고, 도 4는 본 고안인 수직 콘크리트 거푸집 지지용 와이어 고정구가 설치된 상태를 나타낸 단면도이다.3 is a perspective view showing a vertical concrete formwork support wire fixture according to an embodiment of the present invention, Figure 4 is a cross-sectional view showing a state in which the vertical concrete formwork support wire fixture is installed.

도시한 바와 같은 본 고안인 수직 콘크리트 거푸집 지지용 와이어 고정구(100)는 레미콘이 주입 양생되어 콘크리트 구조물의 슬리브(3)가 성형되도록 하는 수평거푸집(1)에 고정 결합됨과 아울러 상기 슬리브(3)에 부분적으로 매입되는 것으로, 일정두께 및 폭을 갖는 바가 절곡되어 상기 수평거푸집(1)에 안착되는 받침결합부(110)와 상기 슬리부에 부분적으로 매입되도록 상기 받침결합부(110)에서 직교되게 수직으로 연이어지는 지지부(120)가 형성되고, 상기 받침결합부(110)에는 못이나 나사 등이 삽입 체결되는 결합공(130)이 적어도 한 개소 이상 형성되며, 상기 지지부(120)의 양측에는 상기 슬리브(3)의 표면으로 노출된 지지부(120)의 일부가 원활하게 절취되도록 하는 절단홀(140)이 형성되어 상기 절단홀(140)에 의해 지지부(120)가 콘크리트 구조물의 슬리브(3)에 매입되는 매입지지부(120a)와 상기 슬리부의 표면으로 노출되는 노출지지부(120b)로 구획되고, 상기 노출지지부(120b)에는 와이어(5)가 연결 고정되는 연결공(150)이 형성되어 구성된다.Vertical concrete formwork support wire fixture 100 of the present invention as shown is fixed to the horizontal formwork (1) to be molded and molded into the sleeve (3) of the concrete structure and the concrete concrete mold is fixed to the sleeve (3) It is partially buried, the bar having a predetermined thickness and width is bent and vertically perpendicular to the support coupling portion 110 so as to be partially embedded in the support coupling portion 110 and the slitting portion seated on the horizontal formwork (1) The support portion 120 is formed in succession, and the support coupling portion 110 is formed with at least one or more coupling holes 130 into which nails or screws are inserted and fastened, and both sides of the support portion 120 have the sleeve. A cutting hole 140 is formed to smoothly cut a portion of the supporting part 120 exposed to the surface of the upper part 3 so that the supporting part 120 is formed by the cutting hole 140. Buried in the buried support portion 120a and the exposed support portion 120b exposed to the surface of the sleeve portion, and the exposed support portion 120b is formed by a connection hole 150 to which a wire 5 is connected and fixed. do.

상기 받침결합부(110)에서 수직으로 직교되게 연이어 형성되는 지지부(120)의 높이는 콘크리트 구조물의 슬리브(3) 두께와 같도록 형성하는 것이 바람직하며, 경우에 따라 상기 지지부(120)는 도 5에 도시한 바와 같이 길이조절부(121)와 가이드지지부(122)로 분리 제작되어 볼트(123)에 의해 일체로 결합되도록 함으로써 지지부(120)의 높이를 콘크리트 슬리브(3)의 두께에 따라 가변시킬 수 있도록 구성될수 있다.It is preferable that the height of the support part 120 which is continuously formed perpendicular to the support coupling part 110 in the vertical direction is equal to the thickness of the sleeve 3 of the concrete structure. In some cases, the support part 120 is shown in FIG. 5. As shown in the drawing, the length adjustment part 121 and the guide support part 122 may be separated and manufactured to be integrally coupled by the bolt 123 to change the height of the support part 120 according to the thickness of the concrete sleeve 3. Can be configured to

이와 같이 구성된 본 고안인 수직 콘크리트 거푸집 지지용 와이어 고정구(100)의 설치 및 작용을 설명하면 다음과 같다.Referring to the installation and action of the vertical concrete formwork support wire fixture 100 of the present invention configured as described above are as follows.

본 고안인 수직 콘크리트 거푸집 지지용 와이어 고정구(100)를 이용하여 수직거푸집(2)을 지지한 와이어(5)를 고정할 경우에는 먼저 수평거푸집(1)에 레미콘을 주입하여 콘크리트 구조물의 슬리브(3)를 성형하기 전 미리 상기 수평거푸집(1)에 와이어 고정구(100)의 받침결합부(110)를 안착시키고 상기 받침결합부(110)의 결합공(130)에 못이나 기타 나사 등을 박아 상기 와이어 고정구(100)를 수평거푸집(1)에 고정 설치 한 다음 수평거푸집(1)에 레미콘을 주입 양생하여 상기 와이어 고정구(100)의 받침결합부(110) 및 지지부(120)이 일부분인 매입지지부(120a)가 양생된 콘크리트 구조물의 슬리브(3)에 매입 고정되도록 한다.When fixing the wire (5) supporting the vertical formwork (2) using the vertical concrete formwork support wire fixture 100 of the present invention, the concrete form sleeve (3) by first injecting ready-mixed concrete into the horizontal formwork (1) ) Prior to molding the seat (1) of the support coupling portion 110 of the wire fixture 100 in the horizontal formwork (1) and put a nail or other screws in the coupling hole 130 of the support coupling portion 110 After fixing the wire fixture 100 to the horizontal formwork (1), and then injecting cured concrete into the horizontal formwork (1), the bearing support portion 110 and the support portion 120 of the support coupling portion 110 and the support portion 120 of the wire fixture 100 120a is buried in the sleeve 3 of the cured concrete structure.

이후 상기 슬리브(3)의 단부나 상면에 수직으로 세워지는 수직거푸집(2)에 일단부가 연결된 와이어(5)의 타단부를 지지부(120)의 연결공(150)에 묶어 결합하면 상기 수직거푸집(2)을 지지하고 있는 와이어(5)의 고정이 완료된다.After the other end of the wire (5) connected to one end to the vertical formwork (2) perpendicular to the end or the upper surface of the sleeve (3) by binding to the connection hole 150 of the support portion 120 and the vertical formwork ( Fixing of the wire 5 supporting 2) is completed.

이후 상기 수직거푸집(2)에 레미콘이 주입 양생되어 벽체(4)가 성형된 후 수직거푸집(2) 및 와이어(5)를 해체한 다음에는 상기 콘크리트 구조물의 슬리브(3) 표면으로 노출된 노출지지부(120b)를 망치나 기타 공구 등으로 타격하여 절단홀(140)을 따라 분리시키면 슬리브(3)의 마감처리가 완료된다.After the concrete mold is injected and cured in the vertical formwork 2 and the wall 4 is formed, the vertical formwork 2 and the wire 5 are dismantled, and then the exposed support part exposed to the surface of the sleeve 3 of the concrete structure. When the hammer 120b is hit with a hammer or other tool to separate along the cutting hole 140, the finishing treatment of the sleeve 3 is completed.

이상에서 설명한 바와 같은 본 고안인 수직 콘크리트 거푸집 지지용 와이어 고정구는 종래의 수직 콘크리트 거푸집 지지용 와이어 고정구에 비하여 그 부품수가 적기 때문에 생산단가를 절감할 수 있음으로 와이어 고정구의 가격 경쟁력을 향상시킬 수 있도록 함은 물론 현장에서의 거푸집 및 와이어 설치 작업에 대한 효율성을 향상시킬 수 있도록 하는 효과가 있다.As described above, the vertical concrete formwork supporting wire fixture has less parts than the conventional vertical concrete formwork supporting wire fixture, so that the production cost can be reduced, so that the price competitiveness of the wire fixture can be improved. In addition, it has the effect of improving the efficiency of the formwork and wire installation work in the field.

또한, 본 고안인 와이어 고정구는 수직거푸집 및 와이어의 철거 후 콘크리트 구조물의 슬리브 표면으로 노출된 노출지지부를 망치로 타격하여 상기 노출지지부를 절단홀을 따라 간단하게 분리시킬 수 있음으로 현장에서의 거푸집 및 와이어 철거작업에 대한 효율성을 향상시킬 수 있도록 하는 효과가 있다.In addition, the wire fixture according to the present invention can hit the exposed support part exposed to the sleeve surface of the concrete structure by hammering the vertical formwork and the wire, so that the exposed support part can be easily separated along the cutting hole. There is an effect to improve the efficiency of the wire demolition work.

Claims (2)

레미콘이 주입 양생되어 콘크리트 구조물의 슬리브(3)가 성형되도록 하는 수평거푸집(1)에 고정 결합됨과 아울러 상기 슬리브(3)에 부분적으로 매입되는 것으로, 일정두께 및 폭을 갖는 바가 절곡되어 상기 수평거푸집(1)에 안착되는 받침결합부(110)와 상기 슬리부에 부분적으로 매입되도록 상기 받침결합부(110)에서 직교되게 수직으로 연이어지는 지지부(120)가 형성되고, 상기 받침결합부(110)에는 못이나 나사 등이 삽입 체결되는 결합공(130)이 적어도 한 개소 이상 형성되며, 상기 지지부(120)의 양측에는 상기 슬리브(3)의 표면으로 노출된 지지부(120)의 일부가 원활하게 절취되도록 하는 절단홀(140)이 형성되어 상기 절단홀(140)에 의해 지지부(120)가 콘크리트 구조물의 슬리브(3)에 매입되는 매입지지부(120a)와 상기 슬리부의 표면으로 노출되는 노출지지부(120b)로 구획되고, 상기 노출지지부(120b)에는 와이어(5)가 연결 지지되는 연결공(150)이 형성되어 구성된 것을 특징으로 하는 수직 콘크리트 거푸집 지지용 와이어 고정구.The ready-mixed concrete is fixedly coupled to the horizontal formwork 1 for molding the sleeve 3 of the concrete structure and partially embedded in the sleeve 3, and a bar having a predetermined thickness and width is bent to form the horizontal formwork. The support coupling portion 110 which is vertically connected perpendicularly to the support coupling portion 110 so as to be partially embedded in the support coupling portion 110 to be seated on the (1) is formed, the support coupling portion 110 At least one coupling hole 130 into which nails or screws are inserted and fastened is formed, and both sides of the support part 120 smoothly cut a part of the support part 120 exposed to the surface of the sleeve 3. A cutting hole 140 is formed to allow the support 120 to be embedded in the sleeve 3 of the concrete structure by the cutting hole 140 and the exposed support part 1 exposed to the surface of the slitting part. 20b) is divided into, the exposed support portion (120b) vertical concrete formwork support wire fixture, characterized in that the connection hole 150 is formed is formed is connected to the wire (5). 제 1 항에 있어서, 상기 지지부(120)는 길이조절부(121)와 가이드지지부(122)로 분리 제작되어 볼트(123)에 의해 일체로 결합되도록 함으로써 지지부(120)의 높이를 가변시킬 수 있도록 구성된 것을 특징으로 하는 수직 콘크리트 거푸집 지지용 와이어 고정구.According to claim 1, wherein the support portion 120 is manufactured by separating the length adjusting portion 121 and the guide support portion 122 to be integrally coupled by the bolt 123 to change the height of the support portion 120 Wire fixture for supporting vertical concrete formwork, characterized in that configured.
KR20-2004-0012142U 2004-04-30 2004-04-30 Wire fixing for concrete form KR200357327Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0012142U KR200357327Y1 (en) 2004-04-30 2004-04-30 Wire fixing for concrete form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0012142U KR200357327Y1 (en) 2004-04-30 2004-04-30 Wire fixing for concrete form

Publications (1)

Publication Number Publication Date
KR200357327Y1 true KR200357327Y1 (en) 2004-07-23

Family

ID=49434489

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0012142U KR200357327Y1 (en) 2004-04-30 2004-04-30 Wire fixing for concrete form

Country Status (1)

Country Link
KR (1) KR200357327Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101965728B1 (en) * 2018-07-03 2019-04-04 이조원 Rope Anchor for Landscaping and its Construction Method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101965728B1 (en) * 2018-07-03 2019-04-04 이조원 Rope Anchor for Landscaping and its Construction Method

Similar Documents

Publication Publication Date Title
KR200357327Y1 (en) Wire fixing for concrete form
KR200461661Y1 (en) Fixing structure for handrail
KR20090113476A (en) Insert for concrete slab
KR101866750B1 (en) Building exterior materials bracket production method and hence the building exterior materials are produced by the bracket
KR100447474B1 (en) Insert for concrete slave
KR200442013Y1 (en) A structure of penetration sleeve
KR200400350Y1 (en) Wire fixing for concrete form
KR200352506Y1 (en) Supporting structure of mold
KR101020641B1 (en) Appliance fixing electric cable box in the reinforced concrete
KR100947983B1 (en) The fixture for laying sleeve in wall or slab
KR200323015Y1 (en) Ceiling construction device that performs ceiling panel hanger and slab rebar construction at the same time
KR200491199Y1 (en) Through sleeve for outer wall retaining wall
JP5495703B2 (en) Equipment for forming mounting holes for handrail posts
KR200317282Y1 (en) Separator for concrete form
JP3161599U (en) Rebar fixing method improvement for tie bar holder.
CN214089510U (en) Multifunctional combined type template internal pull rod system
KR200352520Y1 (en) The concrete steel form for disteace regulable structure
KR200352435Y1 (en) The sepatie of a molding flask reclamation
KR20010002009U (en) Linking reinforcement for wall a decoration brick of a concrete revetment
KR20110008782A (en) Penetration sleeve fxing pin
KR200155250Y1 (en) Anchor for fixing balustrade
KR200337181Y1 (en) Cone bolt set
KR20080109133A (en) Construction method of an anchor driving in a window wall of building and structure thereof
KR101332527B1 (en) Elastic device fixing electric box in the slab
KR200379060Y1 (en) Fixing structure of outlet box

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20090707

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee