KR200354792Y1 - The fiber complex foam for underwater file reinforcement - Google Patents
The fiber complex foam for underwater file reinforcement Download PDFInfo
- Publication number
- KR200354792Y1 KR200354792Y1 KR20-2004-0008518U KR20040008518U KR200354792Y1 KR 200354792 Y1 KR200354792 Y1 KR 200354792Y1 KR 20040008518 U KR20040008518 U KR 20040008518U KR 200354792 Y1 KR200354792 Y1 KR 200354792Y1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- fiber composite
- composite formwork
- formwork
- tube
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/226—Protecting piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Revetment (AREA)
Abstract
본 고안은 수중에 잠긴 파일의 표면을 보호함과 동시에 지지력을 강화시키는 섬유복합체 거푸집을 파일의 둘레에 설치하여, 내하력을 보존할 수 있도록 한 수중파일 보강용 섬유복합체 거푸집 및 그의 시공방법을 제공하는데 그 목적이 있다.The present invention provides a fiber composite formwork for reinforcing underwater piles and a method of constructing the fiber composite formwork which protects the surface of the pile submerged in water and strengthens the bearing capacity. The purpose is.
본 고안에 따른 수중파일 보강용 섬유복합체 거푸집은 수중 또는 비말대 부분의 강관파일 또는 콘크리트파일의 표면에 각종 섬유재에 에폭시를 함침시켜 파일의 형상에 맞게 형성된 섬유복합체 거푸집을 상기 파일의 표면에 덮어 씌워서 섬유복합체 거푸집의 양단 결합부를 서로 결합시켜 연결하고, 상기 파일과 섬유복합체 거푸집과의 사이에 주입관과 확인관을 설치하며, 상기 주입관과 확인관을 이용하여 섬유복합체 거푸집과 파일과의 사이를 에폭시로 충전하여 파일을 보수 보강함을 특징으로 한다.Fiber composite formwork for reinforcing pile piles according to the present invention is to cover the surface of the pile of the fiber composite form formed in accordance with the shape of the pile by impregnating epoxy in various fiber materials on the surface of the steel pipe pile or concrete pile of the water or splash portion Cover and connect both ends of the fiber composite formwork to each other, and install an injection tube and a confirmation tube between the pile and the fiber composite formwork, and between the fiber composite formwork and the pile using the injection tube and the confirmation tube. It is characterized in that the pile is repaired and reinforced with epoxy.
또한, 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집 시공방법은 수중 또는 비말대 부분의 강관파일 또는 콘크리트파일의 표면에 각종 섬유재에 에폭시를 함침시켜 파일의 형상에 맞게 섬유복합체 거푸집을 제작하는 단계; 상기 파일의 표면에 섬유복합체 거푸집의 양단 결합부를 서로 결합시켜 섬유복합체 거푸집을 고정 설치하는 단계; 상기 파일과 섬유복합체 거푸집과의 사이에 주입관과 확인관을 설치하는 단계; 상기 확인관에 진공펌프를 연결하여 섬유복합체 거푸집과 파일과의 사이의 공기를 흡입하고, 주입관에 에폭시를 연결하여 확인관에 의하여 흡입된 공기가 빠져나가 진공상태가 되고, 상기 섬유복합체 거푸집과 파일과의 사이에 에폭시가 주입되면서 확인관으로 에폭시를 배출시키는 단계; 상기 파일과 섬유복합체 거푸집과의 사이에 에폭시 충전이 완료되면, 주입관과 확인관을 제거하고, 그 제거된 부위를 실링 처리하는 단계로 이루어짐을 특징으로 한다.In addition, the method of construction of fiber composite formwork for reinforcing pile piles according to the present invention is to impregnate various fiber materials on the surface of steel pipe piles or concrete piles in water or splashes to produce fiber composite formwork according to the shape of piles ; Fixing the fiber composite formwork by coupling the both ends of the fiber composite formwork to each other on the surface of the pile; Installing an injection tube and a confirmation tube between the pile and the fiber composite formwork; A vacuum pump is connected to the check tube to suck air between the fiber composite formwork and the pile, and an epoxy is connected to the injection tube so that the air sucked by the check tube is evacuated to become a vacuum state. Discharging the epoxy into the confirmation tube while the epoxy is injected into the pile; When the epoxy filling is completed between the pile and the fiber composite formwork, the injection tube and the confirmation tube are removed, and the removed portion is characterized in that the step of sealing the process.
Description
본 고안은 수중파일 보강용 섬유복합체 거푸집 및 그의 시공방법에 관한 것으로, 특히 수중에 잠긴 파일의 표면을 보호하면서 지지력을 강화시키는 섬유복합체 거푸집을 파일의 둘레에 설치하여, 파일의 내하력을 보존할 수 있도록 한 수중파일 보강용 섬유복합체 거푸집 및 그의 시공방법에 관한 것이다.The present invention relates to a fiber composite formwork for reinforcing pile piles and a construction method thereof, and in particular, by installing a fiber composite formwork around the pile to enhance the bearing capacity while protecting the surface of the pile submerged in water, to preserve the load capacity of the pile The present invention relates to a fiber composite formwork for reinforcing underwater piles and a construction method thereof.
일반적으로 강관파일은 시공상 간편하고, 강도면에서 유리한 장점이 있으나, 부식면에서는 취약한 단점이 있다.In general, the steel pipe pile is easy in construction and has an advantage in terms of strength, but a weak point in corrosion.
여기서, 상기한 강관파일이 시공되는 해양의 수직환경은 크게 해수의 작용에 따라 해양환경부, 비말대, 간만부, 해중부 및 해저토중부 등으로 나누어진다.Here, the vertical environment of the ocean in which the steel pipe pile is constructed is largely divided into a marine environment part, a splash zone, a tidal part, a sea part, and a subsea soil part according to the action of sea water.
이중에서 이중 비말작용으로 얇은 해수막이 존재하는 비말부와 접하는 강관파일의 비말대는 해수막을 통해 산소가 충분히 공급되므로 부식속도가 가장 빠르다.In the double droplets, the steel pipe pile, which is in contact with the droplets where the thin sea film exists, has the highest corrosion rate because oxygen is sufficiently supplied through the sea film.
따라서, 상기한 바와 같은 강관파일의 부식을 해결하기 위해 종래에는 수중에 설치된 강관파일 또는 콘크리트파일로 이루어진 파일의 표면을 수중에서 직접 에폭시를 도장하거나 섬유를 부착하는 작업으로 보수 및 보강작업을 하였다.Accordingly, in order to solve the corrosion of the steel pipe pile as described above, the surface of the steel pipe pile or concrete pile made of water in the prior art was repaired and reinforcement work by applying epoxy directly or attaching fibers in the water.
그러나, 상기한 바와 같은 수중 에폭시 작업은 수중에 잠긴 구조물에 견실한 도포작업이 이루어지지 않을 뿐만 아니라 수행하더라도 구조물에 하자가 많이 발생되어, 후속 공정에 지장을 초래하는 문제가 상존하였다.However, the above-described underwater epoxy operation is not only a reliable coating operation to the submerged structure, but also a lot of defects in the structure even if performed, there is a problem that causes problems in subsequent processes.
또한, 상기한 에폭시 작업은 부식 복구대상 부분의 파일 표면을 막고, 물을 배수한 후에 파일에 에폭시 등의 작업을 수행함으로써, 실질적인 공사비 외에 부수적으로 공사비가 증가될 뿐만 아니라 지속적인 파일관리에 따른 유지보수에 많은 어려움이 있었다.In addition, the above-mentioned epoxy work prevents the pile surface of the corrosion recovery part and drains water, and then performs work such as epoxy on the pile, thereby increasing the construction cost incidentally in addition to the actual construction cost and maintaining the file according to continuous file management. There was a lot of difficulty.
이에, 본 고안은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로써, 수중에 잠긴 파일의 표면을 보호함과 동시에 지지력을 강화시키는 섬유복합체 거푸집을 파일의 둘레에 설치하여, 파일의 내하력을 보존할 수 있도록 한 수중파일 보강용 섬유복합체 거푸집 및 그의 시공방법을 제공하는데 그 목적이 있다.Therefore, the present invention has been devised to solve the above problems, by installing a fiber composite formwork around the pile to protect the surface of the pile submerged in water and at the same time to strengthen the bearing capacity, The object of the present invention is to provide a fiber composite formwork for reinforcing underwater piles and a construction method thereof, which can be preserved.
도 1은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집을 도시한 사시도,1 is a perspective view showing a fiber composite formwork for reinforcing underwater piles according to the present invention,
도 2는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집을 도시한 평면도,Figure 2 is a plan view showing a fiber composite formwork for underwater pile reinforcement according to the present invention,
도 3은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집을 도시한 단면도,Figure 3 is a cross-sectional view showing a fiber composite formwork for underwater pile reinforcement according to the present invention,
도 4는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집의 실시예를 도시한 예시도1,Figure 4 is an exemplary view showing an embodiment of the fiber composite formwork for underwater pile reinforcement according to the present invention,
도 5는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집의 실시예를 도시한 예시도2,5 is an exemplary view showing an embodiment of the fiber composite formwork for underwater pile reinforcement according to the present invention;
도 6은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집의 실시예를 도시한 예시도3,6 is an exemplary view showing an embodiment of a fiber composite formwork for reinforcing pile piles according to the present invention;
도 7 내지 도 19는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집을 이용하여 손상된 수중파일을 보수 보강하는 공정을 도시한 예시도로서,7 to 19 is an exemplary view showing a process for repairing a damaged underwater pile using the fiber composite formwork for underwater pile reinforcement according to the present invention,
도 7은 손상된 파일상태를 도시한 예시도,7 is an exemplary view showing a damaged file state;
도 8은 손상된 파일에 우산살 앵커가 설치된 상태를 도시한 예시도,8 is an exemplary view showing a state in which the umbrella anchor is installed on the damaged file,
도 9는 도 8의 확대 단면도,9 is an enlarged cross-sectional view of FIG. 8;
도 10은 손상된 파일을 우산살 앵커로 보강한 후 파일의 외주면을 섬유복합체 거푸집의 외부에서 스프레이노즐을 이용하여 파일의 표면에 단면처리제를 도포하는 상태를 도시한 예시도,10 is an exemplary view showing a state in which a cross-sectional treatment agent is applied to the surface of a pile using a spray nozzle on the outer circumferential surface of the pile after reinforcing the damaged pile with an umbrella anchor;
도 11은 섬유복합체와 파일과의 사이에 주입관 및 확인관을 설치한 후 에폭시를 충전하는 상태를 도시한 예시도,11 is an exemplary view showing a state in which an epoxy is filled after installing an injection tube and a confirmation tube between a fiber composite and a pile;
도 12는 손상된 파일을 우산살 앵커로 보강한 후 파일의 외주면을 섬유복합체 거푸집으로 감싼 상태를 도시한 예시도,12 is an exemplary view showing a state in which a fiber composite formwork is wrapped around the outer circumferential surface of the file after reinforcing the damaged file with an umbrella anchor;
도 13은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집이 파일에 설치된 상태를 도시한 사시도,Figure 13 is a perspective view showing a state installed in the pile pile fiber composite for underwater pile reinforcement according to the present invention,
도 14는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집이 파일에 설치된 상태를 도시한 정면도,14 is a front view showing a state in which the fiber composite formwork for pile pile reinforcement according to the present invention,
도 15는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집이 수중파일에 상하로 연결된 상태를 도시한 사시도,Figure 15 is a perspective view showing a state in which the fiber composite formwork for underwater pile reinforcement according to the present invention is connected to the underwater pile up and down,
도 16은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집이 수중파일에 상하로 연결된 상태를 도시한 정면도,16 is a front view showing a state in which the fiber composite formwork for underwater pile reinforcement according to the present invention is connected to the underwater pile up and down,
도 17은 단면 결손이나 균열로 인한 파일을 섬유복합체 거푸집으로 보강하는 상태를 도시한 분리 사시도,17 is an exploded perspective view showing a state in which a pile due to cross-sectional defects or cracks is reinforced with a fiber composite formwork;
도 18은 단면 결손이나 균열로 인한 파일을 섬유복합체 거푸집으로 보강한 상태를 도시한 평면도1,18 is a plan view showing a state in which a pile due to cross-sectional defects or cracks is reinforced with a fiber composite formwork;
도 19은 단면 결손이나 균열로 인한 파일을 섬유복합체 거푸집으로 보강한 상태를 도시한 평면도2.19 is a plan view showing a state in which a pile due to cross-sectional defects or cracks is reinforced with a fiber composite formwork;
-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing
10 : 파일 12 : 천공홀10 file 12 drill hole
14 : 단면결손부 20 : 섬유복합체 거푸집14: section defect 20: fiber composite formwork
22 : 결합부 22a : 요부22: coupling portion 22a: main portion
22b : 철부 24 : 요철부22b: Convex portion 24: Uneven portion
30 : 주입관 32 : 확인관30: injection tube 32: confirmation tube
40 : 우산살앵커 42 : 중앙지지봉40: umbrella anchor 42: center support rod
44 : 지지너트 46 : 우산살44: support nut 46: umbrella
50 : 스프레이노즐 60 : 비닐50: spray nozzle 60: vinyl
상기한 목적을 달성하기 위한 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집은 수중 또는 비말대 부분의 강관파일 또는 콘크리트파일의 표면에 각종 섬유재에 에폭시를 함침시켜 파일의 형상에 맞게 형성된 섬유복합체 거푸집을 상기 파일의 표면에 덮어 씌워서 섬유복합체 거푸집의 양단 결합부를 서로 결합시켜 연결하고, 상기 파일과 섬유복합체 거푸집과의 사이에 주입관과 확인관을 설치하며, 상기 주입관과 확인관을 이용하여 섬유복합체 거푸집과 파일과의 사이를 에폭시로 충전하여 파일을 보수 보강함을 특징으로 한다.Fiber composite formwork for underwater pile reinforcement according to the present invention for achieving the above object is impregnated with epoxy in various fiber materials on the surface of the steel pipe pile or concrete pile of the underwater or splash portion to form the fiber composite form Cover the surface of the pile and connect the coupling parts of both ends of the fiber composite formwork to each other, and install an injection tube and a confirmation tube between the pile and the fiber composite formwork, and the fiber using the injection tube and the confirmation tube It is characterized in that the pile is repaired and reinforced by filling the epoxy between the formwork and the pile.
또한, 상기한 목적을 달성하기 위한 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집 시공방법은 수중 또는 비말대 부분의 강관파일 또는 콘크리트파일의 표면에 각종 섬유재에 에폭시를 함침시켜 파일의 형상에 맞게 섬유복합체 거푸집을 제작하는 단계; 상기 파일의 표면에 섬유복합체 거푸집의 양단 결합부를 서로 결합시켜 섬유복합체 거푸집을 고정 설치하는 단계; 상기 파일과 섬유복합체 거푸집과의 사이에 주입관과 확인관을 설치하는 단계; 상기 확인관에 진공펌프를 연결하여섬유복합체 거푸집과 파일과의 사이의 공기를 흡입하고, 주입관에 에폭시를 연결하여 확인관에 의하여 흡입된 공기가 빠져나가 진공상태가 되고, 상기 섬유복합체 거푸집과 파일과의 사이에 에폭시가 주입되면서 확인관으로 에폭시를 배출시키는 단계; 상기 파일과 섬유복합체 거푸집과의 사이에 에폭시 충전이 완료되면, 주입관과 확인관을 제거하고, 그 제거된 부위를 실링 처리하는 단계로 이루어짐을 특징으로 한다.In addition, the fiber composite formwork method for reinforcing underwater piles according to the present invention for achieving the above object is impregnated with epoxy in various fiber materials on the surface of the steel pipe pile or concrete pile of the underwater or splash portion to fit the shape of the pile Preparing a fiber composite formwork; Fixing the fiber composite formwork by coupling the both ends of the fiber composite formwork to each other on the surface of the pile; Installing an injection tube and a confirmation tube between the pile and the fiber composite formwork; A vacuum pump is connected to the check tube to suck air between the fiber composite formwork and the pile, and an epoxy is connected to the injection tube so that the air sucked by the check tube is evacuated to become a vacuum state. Discharging the epoxy into the confirmation tube while the epoxy is injected into the pile; When the epoxy filling is completed between the pile and the fiber composite formwork, the injection tube and the confirmation tube are removed, and the removed portion is characterized in that the step of sealing the process.
이하, 본 고안을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings of the present invention will be described in detail.
도 1은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집을 도시한 사시도이며, 도 2는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집을 도시한 평면도이며, 도 3은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집을 도시한 측단면도이며, 도 4는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집의 실시예를 도시한 예시도1이며, 도 5는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집의 실시예를 도시한 예시도2이며, 도 6은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집의 실시예를 도시한 예시도3이다.1 is a perspective view showing the fiber composite formwork for underwater pile reinforcement according to the present invention, Figure 2 is a plan view showing the fiber composite formwork for underwater pile reinforcement according to the present invention, Figure 3 is a underwater pile reinforcement according to the present invention Figure 4 is a side cross-sectional view showing a fiber composite formwork for the present invention, Figure 4 is an exemplary view showing an embodiment of the fiber composite formwork for reinforcing the underwater pile according to the present invention, Figure 5 is a fiber composite formwork for underwater pile reinforcement according to the present invention Figure 2 is an exemplary view showing an embodiment of Figure 6, Figure 6 is an exemplary view showing an embodiment of the fiber composite formwork for underwater pile reinforcement according to the present invention.
이들 도면에 도시된 바와 같이, 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집은 수중 또는 비말대 부분의 강관파일 또는 콘크리트파일(10)의 표면에 각종 섬유재에 에폭시를 함침시켜 파일(10)의 형상에 맞게 형성된 섬유복합체 거푸집(20)을 상기 파일(10)의 표면에 덮어 씌워서 섬유복합체 거푸집(20)의 양단 결합부(22)를 서로 결합시켜 연결하고, 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 주입관(30)과 확인관(32)을 설치하며, 상기 주입관(30)과 확인관(32)을이용하여 섬유복합체 거푸집(20)과 파일(10)과의 사이를 에폭시로 충전하여 파일(10)을 보수 보강하는 것이다.As shown in these figures, the fiber composite formwork for underwater pile reinforcement according to the present invention is impregnated with epoxy in various fiber materials on the surface of the steel pipe pile or concrete pile 10 in the water or splash portion portion of the pile 10 Covering the surface of the pile (10) to form a fiber composite formwork 20 formed in accordance with the shape to connect the both ends coupling portion 22 of the fiber composite formwork 20 to each other, the pile 10 and the fiber composite formwork An injection tube 30 and a confirmation tube 32 are installed between the 20 and the fiber composite form 20 and the pile 10 by using the injection tube 30 and the confirmation tube 32. Filling the gap with epoxy to repair and reinforce the pile (10).
여기서, 상기 섬유복합체 거푸집(20)은 전체적으로 사각판상으로 이루어지되, 상기 사각판의 양단에 결합부(22)가 형성되며, 상기 결합부(22)의 요부(22a)에 철부(22b)가 끼워지거나, 또는 상기 사각판상이 두 개로 분리되며, 분리된 양단에 각각 결합부(22)가 형성되며, 상기 결합부(22)의 요부(22a)에 철부(22b)가 끼워지도록 하는 겹침 이음식 구조이다.Here, the fiber composite formwork 20 is formed in a rectangular plate as a whole, the coupling portion 22 is formed on both ends of the square plate, the convex portion 22b is fitted into the recessed portion (22a) of the coupling portion 22 Or, the rectangular plate shape is divided into two, the coupling portion 22 is formed on each of the two ends separated, overlapping food structure so that the convex portion (22b) is fitted to the recessed portion (22a) of the coupling portion 22. .
즉, 상기 섬유복합체 거푸집(20)은 내부공간의 밀폐를 용이하게 하기 위해 1개로 함이 바람직하며, 필요에 따라 상기 섬유복합체 거푸집(20)을 2내지 3개로 하여 연결하여 사용할 수도 있다.That is, the fiber composite formwork 20 is preferably one in order to facilitate the sealing of the internal space, and may be used by connecting two to three of the fiber composite formwork 20 as necessary.
또한, 상기 섬유복합체 거푸집(20)은 파일(10)의 형상에 맞게 단면형상이 원형, 사각형, 다각형 형상으로 형성되며, 그 섬유복합체 거푸집(20)의 내측에는 돌기, 요철부(24), 선회부가 형성되며, 외측에는 자외선 코팅층이 형성된 구조이다.In addition, the fiber composite formwork 20 is formed in a circular, rectangular, polygonal cross-sectional shape in accordance with the shape of the pile 10, the projections, concave-convex portion 24, the inside of the fiber composite formwork 20 The addition is formed, the outer surface is a structure formed with an ultraviolet coating layer.
이는 충전재인 에폭시와 섬유복합체 거푸집(20)의 일체화 접착을 위해 내부를 요철상태로 하여 부착력을 증대시키도록 하기 위함이며, 섬유복합체 거푸집(20)이 산화되는 것을 방지토록 하기 위함이다.This is to increase the adhesion to the inside of the concave-convex state for the unified adhesion of the epoxy and the fiber composite formwork 20 as a filler, and to prevent the fiber composite formwork 20 from being oxidized.
여기서, 상기 섬유복합체 거푸집(20)의 재질은 에폭시와 섬유의 복합재질로서 일정한 강도를 발휘할 수 있다.Here, the material of the fiber composite formwork 20 can exhibit a certain strength as a composite material of epoxy and fiber.
또한, 상기 섬유복합체 거푸집(20)의 단부처리는 섬유복합체 거푸집(20)의 충전재와 같은 강도를 갖는 수중 에폭시를 사용하여 단부를 처리하고, 고정한다.Further, the end treatment of the fiber composite formwork 20 uses an epoxy in water having the same strength as the filler of the fiber composite formwork 20 to fix and fix the end portion.
즉, 상기 섬유복합체 거푸집(20)은 내부로 에폭시를 충전하기 위한 장치로서, 충전재인 에폭시와 일체로 밀착되어, 파일(10)을 보강하기 위한 강도를 발휘하는 것이다.That is, the fiber composite formwork 20 is a device for filling the epoxy into the interior, is integrally in close contact with the epoxy as a filler, and exhibits strength for reinforcing the pile 10.
특히, 상기 섬유복합체 거푸집(20)은 에폭시와 섬유의 복합재질로 제작되고 내부 충전재와 일체로 되어 외부 충격에 견딜 뿐만 아니라, 내축하중의 보강용으로도 사용할 수 있음을 밝혀두는 바이다.In particular, the fiber composite formwork 20 is made of a composite material of epoxy and fiber and integrated with the internal filler to withstand external shocks, as well as can be used for reinforcement of internal load.
한편, 상기 파일(10)의 표면에는 샌드브라스트 등을 이용하여 요철부를 형성시킬 수 있다.On the other hand, the surface of the pile 10 can be used to form the uneven portion by using sand blast.
이는 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이를 에폭시로 충전시 파일의 표면에 에폭시가 긴밀하게 부착되도록 하기 위함이다.This is to allow the epoxy to adhere closely to the surface of the pile when the pile 10 and the fiber composite formwork 20 are filled with epoxy.
그리고, 상기 섬유복합체 거푸집(20)과 파일(10)이 만나는 상하부 사이에는 일정량의 실링재가 설치되어, 상기 섬유복합체 거푸집(20)과 파일(10) 사이에 설치된 주입관(30)에서 공기흡입시 진공상태가 되도록 하여, 확인관(32)에 연결된 에폭시가 진공에 의하여 흡입되도록 구성한다.In addition, a predetermined amount of sealing material is installed between the fiber composite formwork 20 and the pile 10 to meet each other, and at the time of inhaling air from the injection tube 30 installed between the fiber composite formwork 20 and the pile 10. It is configured to be in a vacuum state, the epoxy connected to the confirmation tube 32 is configured to be sucked by the vacuum.
여기서, 상기 파일(10)의 파손부위나 단면결손부(14)에는 다수개의 천공홀(12)을 형성하고, 상기 천공홀(12)에 우산살앵커(40)를 삽입 설치하여, 파일(10)의 부착력이 증대되도록 한다.Here, a plurality of perforation holes 12 are formed in the damaged portion or the cross-sectional defect portion 14 of the pile 10, and an umbrella rib anchor 40 is inserted into the perforation hole 12 to install the pile 10. ) To increase the adhesion.
특히, 상기 우산살앵커(40)는 전체길이에 걸쳐서 나사산이 형성된 중앙지지봉(42)과 상기 중앙지지봉(42)의 주위에 일정 개수의 지지너트(44)가 나사 결합되며, 상기 지지너트(44)의 주위에 우산살(46)이 다수개 설치된 구조이다.In particular, the umbrella anchor anchor 40 has a predetermined number of support nuts 44 screwed around the central support rods 42 and the central support rods 42 having threads formed over the entire length thereof, and the support nuts 44 Umbrella (46) is installed around a plurality of structures.
여기서, 상기 파일(10)은 강관파일 또는 콘크리트파일로 이루어진 것으로서, 수중에 잠겨 있어 열화 또는 부식되거나 또는 파일(10)과 수표면이 접촉하는 파일(10)의 비말대 부분의 수위가 수시로 변하면서 파일(10)의 표면이 공기와 물에 잠기는 것이 반복됨으로 인하여 파일(10)의 표면이 열화 되거나 또는 부식되는 현상으로 인하여 파일(10)의 강도가 저하되는 것을 방지하기 위해 에폭시를 충전하거나 별도의 우산살앵커(40)를 설치하여 파일(10)의 강도를 보강토록 한다.Here, the pile 10 is made of a steel pipe pile or concrete pile, submerged in water or corroded, or the water level of the splash portion of the pile 10 in contact with the pile 10 and the water surface changes frequently. The surface of the pile 10 is repeatedly submerged in air and water, so that the surface of the pile 10 is deteriorated or corroded, so that the strength of the pile 10 is lowered. The umbrella anchor anchor 40 is installed to reinforce the strength of the pile 10.
또한, 상기 섬유복합체 거푸집(20)은 그 재료가 각종 섬유재에 에폭시를 함침시켜 섬유복합체 거푸집(20)을 제작한 후, 이 섬유복합체 거푸집(20)으로 파일(10)의 표면을 감싸도록 한 것이다.In addition, the fiber composite formwork 20 is the material is impregnated with various kinds of fabric material epoxy to produce a fiber composite formwork 20, the fiber composite formwork 20 to wrap the surface of the pile 10 will be.
여기서, 상기 섬유복합체 거푸집(20)을 구성하는 각종 섬유재는 물 또는 공기에 매우 강한 재질이며, 또한 이와 같은 섬유재를 외부의 충격에 의해서도 쉽게 파손되지 않게 에폭시를 함침시킴으로써, 방수와 파일(10)의 강도 및 파일(10)의 표면을 보호하는 효과를 가져온다.Here, the various fiber materials constituting the fiber composite formwork 20 is a material that is very resistant to water or air, and also impregnated such a fiber material not easily damaged by an external impact, waterproofing and pile 10 The effect of protecting the strength and the surface of the pile 10.
한편, 상기 우산살앵커(40)는 전체길이에 걸쳐 나사산이 형성된 중앙지지봉(42)의 주위에 일정개수의 지지너트(44)를 나사 결합되면서 지지너트(44)의 주위에 우산살(46)이 다수개 설치된 구조로서, 파일(10)의 천공홀(12)에 우산살앵커(40)가 삽입 설치되고, 우산살앵커(40)의 중앙지지봉(42)의 외측에는 섬유복합체 거푸집(20)이 설치된다.On the other hand, the umbrella anchor anchor 40 is screwed around the support nut 44 while a certain number of support nuts 44 are screwed around the central support rod 42 is formed threaded over the entire length of the umbrella stem 46 As a structure provided with a plurality of them, the umbrella anchor anchor 40 is inserted into the drilling hole 12 of the pile 10, the fiber composite formwork 20 to the outside of the central support rod 42 of the umbrella anchor anchor 40 This is installed.
이와 같은 우산살앵커(40)는 수중에 설치된 파일(10)이 단면 결손이나 균열로 인하여 강도가 떨어질 경우에 강도를 보강할 뿐만 아니라 부착력을 증대시키기위해 설치하는 것이다.Such an umbrella anchor 40 is to install not only to reinforce the strength, but also to increase the adhesion when the pile (10) installed in the water drops due to cross-sectional defects or cracks.
또한, 상기 우산살앵커(40)는 상기 파일(10)과 섬유복합체 거푸집(20) 사이에 형성된 간격을 유지시켜 요구되는 강도의 단면을 얻기 위한 간격재의 역할과 상기 섬유복합체 거푸집(20)과 파일(10) 사이에 충전되는 충전재가 긴밀하게 부착될 수 있도록 하는 역할을 동시에 수행하기 위함이다.In addition, the umbrella anchor anchor 40 serves to maintain the gap formed between the pile 10 and the fiber composite formwork 20 to obtain a cross section of the required strength and the fiber composite formwork 20 and the pile This is to simultaneously perform the role of allowing the filler to be closely packed between the (10).
여기서, 상기 우산살앵커(40)를 구성하는 우산살(46)의 개수와 지지너트(44)의 개수는 요구되는 응력에 따라 가감하여 설치할 수 있음을 밝혀둔다.Here, the number of the umbrella meat 46 and the number of support nuts 44 constituting the umbrella meat anchor 40 is to be found that can be added or subtracted according to the required stress.
이하, 상기한 바와 같은 구성으로 이루어진 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집 시공에 대해 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings for the construction of the fiber composite formwork for underwater pile reinforcement according to the present invention made of a configuration as described above will be described in detail.
도 7 내지 도 19는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집을 이용하여 손상된 수중파일을 보수 보강하는 공정을 도시한 예시도로서, 도 7은 손상된 파일상태를 도시한 예시도이며, 도 8은 손상된 파일에 우산살 앵커가 설치된 상태를 도시한 예시도이며, 도 9는 도 8의 확대 단면도이며, 도 10은 손상된 파일을 우산살 앵커로 보강한 후 파일의 외주면을 섬유복합체 거푸집의 외부에서 스프레이노즐을 이용하여 파일의 표면에 단면처리제를 도포하는 상태를 도시한 예시도이며, 도 11은 섬유복합체와 파일과의 사이에 주입관 및 확인관을 설치한 후 에폭시를 충전하는 상태를 도시한 예시도, 도 12는 손상된 파일을 우산살 앵커로 보강한 후 파일의 외주면을 섬유복합체 거푸집으로 감싼 상태를 도시한 예시도이며, 도 13은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집이 파일에 설치된 상태를 도시한 사시도이며, 도 14는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집이 파일에설치된 상태를 도시한 정면도이며, 도 15는 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집이 수중파일에 상하로 연결된 상태를 도시한 사시도이며, 도 16은 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집이 수중파일에 상하로 연결된 상태를 도시한 정면도이다.7 to 19 is an exemplary view showing a process for repairing a damaged underwater pile using the fiber composite formwork for underwater pile reinforcement according to the present invention, Figure 7 is an exemplary view showing a damaged pile state, Figure 8 Is an exemplary view showing a state in which the umbrella anchor is installed on the damaged file, Figure 9 is an enlarged cross-sectional view of Figure 8, Figure 10 is a reinforcement of the damaged file with an umbrella anchor anchor the outer peripheral surface of the pile from the outside of the fiber composite formwork FIG. 11 is a view illustrating a state in which a cross-sectional treatment agent is applied to a surface of a pile by using a spray nozzle, and FIG. 11 is a state in which an epoxy is filled after installing an injection tube and a confirmation tube between the fiber composite and the pile. FIG. 12 is an exemplary view showing a state in which a fiber composite formwork is wrapped around the outer circumferential surface of the file after reinforcing the damaged file with an umbrella anchor, and FIG. 13 is an underwater wave according to the present invention. Reinforcing fiber composite formwork is a perspective view showing a state installed in the pile, Figure 14 is a front view showing a state of the fiber pile formwork for reinforcement is installed in the pile, Figure 15 is an underwater pile according to the present invention Reinforcing fiber composite formwork is a perspective view showing a state connected to the underwater pile up and down, Figure 16 is a front view showing a state in which the fiber composite formwork for reinforcing underwater piles according to the present invention is connected to the underwater pile up and down.
이들 도면에 도시된 바와 같이, 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집 시공방법은 수중 또는 비말대 부분의 강관파일 또는 콘크리트파일(10)의 표면에 각종 섬유재에 에폭시를 함침시켜 파일(10)의 형상에 맞게 섬유복합체 거푸집(20)을 제작하는 단계; 상기 파일(10)의 표면에 섬유복합체 거푸집(20)의 양단 결합부(22)를 서로 결합시켜 섬유복합체 거푸집(20)을 고정 설치하는 단계; 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 주입관(30)과 확인관(32)을 설치하는 단계; 상기 확인관(32)에 진공펌프를 연결하여 섬유복합체 거푸집(20)과 파일(10)과의 사이의 공기를 흡입하고, 주입관(30)에 에폭시를 연결하여 확인관(32)에 의하여 흡입된 공기가 빠져나가 진공상태가 되고, 상기 섬유복합체 거푸집(20)과 파일(10)과의 사이에 에폭시가 주입되면서 확인관(32)으로 에폭시를 배출시키는 단계; 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 에폭시 충전이 완료되면, 주입관(30)과 확인관(32)을 제거하고, 그 제거된 부위를 실링 처리하는 단계로 이루어진다.As shown in these drawings, the fiber composite formwork construction method for reinforcing underwater piles according to the present invention is impregnated with epoxy in various fiber materials on the surface of the steel pipe pile or concrete pile (10) in the water or splash portion (10) Producing a fiber composite formwork 20 according to the shape of; Fixing the fiber composite formwork (20) by coupling both ends of the fiber composite formwork (20) to each other on the surface of the pile (10); Installing an injection tube (30) and a confirmation tube (32) between the pile (10) and the fiber composite formwork (20); A vacuum pump is connected to the check tube 32 to suck air between the fiber composite formwork 20 and the pile 10, and an epoxy is connected to the injection tube 30 to suck the air through the check tube 32. Discharging the epoxy into the confirmation tube (32) while the air is discharged to become a vacuum state and the epoxy is injected between the fiber composite formwork (20) and the pile (10); When the epoxy filling is completed between the pile 10 and the fiber composite formwork 20, the injection tube 30 and the confirmation tube 32 are removed, and the removed portion is sealed.
여기서, 상기 섬유복합체 거푸집(20)을 파일(10)에 연속적으로 연결하여 설치하되, 상기 파일(10)의 표면을 감싸서 섬유복합체 거푸집(20)의 양단부의 결합부(22)를 결합시켜 고정 설치하고, 상기 섬유복합체 거푸집(20)의 하단부 일정부분에 겹쳐서 타 섬유복합체 거푸집(20)을 순차적으로 설치한다.Here, the fiber composite formwork 20 is installed to be connected to the pile 10 continuously, the surface of the pile 10 is wrapped around the coupling portion 22 of both ends of the fiber composite formwork 20 fixedly installed Then, the other fiber composite formwork 20 is sequentially installed by overlapping a lower portion of the fiber composite formwork 20.
이때, 상기 결합부(22)에는 고정핀을 삽입하여 결합부(22)의 결속력이 증가되도록 한다.At this time, the coupling portion 22 is inserted into the fixing pin so that the binding force of the coupling portion 22 is increased.
또한, 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에는 주입관(30)과 확인관(32)을 설치하고, 상기 주입관(30)을 통해 수중 에폭시 퍼터, 수중 몰탈, 수중 콘크리트를 이용하여 밀실하게 실링한다.In addition, between the pile 10 and the fiber composite formwork 20 is provided with an injection tube 30 and the confirmation tube 32, through the injection tube 30, underwater epoxy putter, underwater mortar, underwater concrete Seal tightly using.
여기서, 상기 내부충전재는 강도 보강용이므로 에폭시가 사용되며, 물과 파일의 접촉을 피하는 수단뿐만 아니라 내축하중 보강을 위한 강도발휘의 수단으로 사용된다.In this case, the internal filler is used for strength reinforcement, and thus epoxy is used, as well as a means for avoiding contact between the water and the pile, as well as a means for strength reinforcement for internal load bearing.
이어서, 상기 확인관(32)을 밀폐시킨 후 진공펌프에 연결하여 펌핑하여 진공상태를 유지시켜 균열부 습기를 제거함과 동시에 파일(10)의 표면을 건조시킨다.Subsequently, the check tube 32 is sealed and then connected to a vacuum pump to be pumped to maintain a vacuum to remove cracks and to dry the surface of the pile 10.
이는 후속공정인 주입관(30)을 통하여 주입하는 에폭시가 파일(10)과 섬유복합체 거푸집(20) 사이를 견고하게 밀착시키도록 하기 위함이다.This is to ensure that the epoxy injected through the injection tube 30, which is a subsequent process, firmly adheres between the pile 10 and the fiber composite formwork 20.
한편, 필요에 따라 상기 파일(10)을 우산살앵커(40)로 보강한 후, 우산살앵커(40)의 외측에 섬유복합체 거푸집(20)을 설치한 후, 파일(10)의 외주면을 섬유복합체 거푸집(20)의 외부에서 스프레이노즐(50)을 이용하여 파일(10)을 건조시키도록 한다.On the other hand, after reinforcing the pile 10 with an umbrella flesh anchor 40 as needed, after installing the fiber composite formwork 20 on the outer side of the umbrella flesh anchor 40, the outer peripheral surface of the pile 10 is fiber The pile 10 is dried using the spray nozzle 50 outside the composite formwork 20.
즉, 상기한 바와 같이 파일(10)과 섬유복합체 거푸집(20)와의 사이를 주입관(30)과 확인관(32)을 이용하여 건조시키거나 또는 우산살앵커(40)나 비닐(60)로 파일(10)의 단면을 보수보강한 후, 상기 파일(10)과 섬유복합체거푸집(20)과의 사이를 에폭시로 충전한다.That is, as described above, the pile 10 and the fiber composite formwork 20 are dried by using the injection tube 30 and the confirmation tube 32 or by the umbrella anchor anchor 40 or the vinyl 60. After repairing and reinforcing the cross section of the pile 10, the space between the pile 10 and the fiber composite formwork 20 is filled with epoxy.
또한, 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 설치된 주입관(30)과 확인관(32)을 통해 에폭시를 주입 충전하는 바, 상기 주입관(30)에 에폭시를 주입함과 동시에 진공펌프로 펌핑하여 파일(10)과 섬유복합체 거푸집(20)과의 사이에 에폭시가 밀실하게 충전되어 확인관(32)으로 에폭시가 배출될 때까지 주입한다.In addition, the injection of the epoxy through the injection tube 30 and the confirmation tube 32 installed between the pile 10 and the fiber composite formwork 20, the epoxy is injected into the injection tube 30 At the same time, the pump is pumped with a vacuum pump and the epoxy is tightly filled between the pile 10 and the fiber composite formwork 20 until the epoxy is discharged into the check tube 32.
즉, 에폭시 주입시 주입관(30)으로 에폭시를 주입하는 것은 하부에서 압력주입이 이루어지므로 파일(10)과 섬유복합체 거푸집(20) 사이의 공간부내에 에폭시 충전이 완전하게 이루어진 상태로 하여 확인관(32)을 통하여 에폭시가 배출될 때까지 충분한 시간을 확보하고 주입하기 위함이다.That is, injecting epoxy into the injection tube 30 during the epoxy injection is pressure injection is made from the bottom, so that the epoxy filling is completely made in the space between the pile 10 and the fiber composite formwork 20, the confirmation tube This is to secure and inject sufficient time until the epoxy is discharged through (32).
그리고, 상기 주입관(30)을 통하여 주입된 에폭시가 압력에 의하여 파일(10)과 섬유복합체 거푸집(20) 간을 완전히 감싼 상태로 진공상태에서 주입하며, 주입이 중단되면 확인관(32)을 열어 에폭시 분출을 확인하도록 하기 위함이다.Then, the epoxy injected through the injection pipe 30 is injected in a vacuum state completely wrapped between the pile 10 and the fiber composite formwork 20 by the pressure, and when the injection is stopped, the confirmation tube 32 This is to confirm the epoxy ejection by opening.
따라서, 상기 파일(10)과 섬유복합체 거푸집(20)간은 에폭시에 의해 밀착 접착되어 수분 및 외부의 온도변화에도 저항할 수 있으면서 외부의 충격으로부터 파일(10)을 보호 및 보강하고 파일(10)의 지지력을 강화시킬 수 있다.Accordingly, the pile 10 and the fiber composite formwork 20 are tightly bonded by epoxy to protect and reinforce the pile 10 from external impact while being able to resist moisture and external temperature changes, and to pile the pile 10. It can strengthen your support.
이어서, 상기 섬유복합체 거푸집(20)의 좌우측에 설치된 주입관(30)과 확인관(32)을 제거시킨 후, 상기 주입관(30)과 확인관(32)이 제거된 부위를 실링재를 주입하여 평활하게 마감 처리한다.Subsequently, after removing the injection tube 30 and the confirmation tube 32 provided on the left and right sides of the fiber composite formwork 20, the sealing material is injected into a portion where the injection tube 30 and the confirmation tube 32 are removed. Finish smoothly.
한편, 상기 섬유복합체 거푸집(20)의 시공상 그 길이가 짧을 경우에는 섬유복합체 거푸집(20)간을 서로 연결할 때 섬유복합체 거푸집(20)을 파일(10)의 하단부에 먼저 설치하고, 이어서 상기 섬유복합체 거푸집(20)의 상부 외주면에 다른 섬유복합체 거푸집(20)을 상술한 바와 같은 방법으로 설치하면 섬유복합체 거푸집(20)간을 연결할 수 있다.On the other hand, when the length of the fiber composite formwork 20 is short in construction, when the fiber composite formwork 20 is connected to each other, the fiber composite formwork 20 is first installed at the lower end of the pile 10, and then the fiber If the other fiber composite formwork 20 is installed on the upper circumferential surface of the composite formwork 20 in the manner described above, the fiber composite formwork 20 can be connected.
이와 같이, 상기 섬유복합체 거푸집(20)을 파일(10)의 표면 하단부에서 상향으로 연결하여 설치하는 이유는 주입관(30)을 통하여 주입되는 에폭시가 파일(10)과 섬유복합체 거푸집(20)간을 긴밀하게 밀착 접착되도록 하기 위함이다.As such, the reason why the fiber composite formwork 20 is connected upward from the lower surface of the pile 10 is to install epoxy between the pile 10 and the fiber composite formwork 20 injected through the injection pipe 30. This is to closely adhere to the adhesive.
여기서, 상술한 수중파일은 통상적인 원형파일(10)에만 편의상 한정하여 설명하였으나, 사각형 파일(10)에도 본 고안을 적용함에 있어서 특별한 기술적 어려움은 없으므로 사각형 파일(10)에도 용이하게 실시함이 가능함으로 어느 특정한 파일(10)의 형상에만 본 고안을 한정하지 않음을 밝혀두는 바이다.Here, the above-described underwater file has been described for convenience only to the conventional circular file 10, but there is no special technical difficulty in applying the present invention to the rectangular file 10, it is possible to easily implement the rectangular file 10. It is to be understood that the present invention is not limited only to the shape of any particular pile 10.
여기서, 상기한 바와 같은 수중파일 보강용 섬유복합체 거푸집 시공은 파일(10)의 표면이 열화되거나 단면이 손상된 곳을 보수보강하는데는 바람직하다.Here, the construction of the fiber composite formwork for reinforcing the underwater pile as described above is preferable to repair and reinforce the damaged surface or the cross section of the pile (10).
그러나, 상기한 파일(10) 이외의 부분인 파일(10)이 균열이나 파손으로 인하여 파일(10의 중심 내외부가 관통되어 있는 경우에는 주입관(30) 및 확인관(32)의 설치가 불가능하고, 또한 굴곡진 부분이나 급격하게 파인 구조물인 경우에는 섬유복합체 거푸집(20)의 설치가 사실상 불가능하며, 또한 대상 구조물에 건조 및 밀봉이 실제상으로 불가능한 경우에는 상기한 방법은 지양하고 아래와 같은 변형된 시공방법을 이용하여 수중파일을 보강하는 것이 보다 더 바람직스럽다.However, when the pile 10, which is a part other than the pile 10 described above, penetrates inside and outside the center of the pile 10 due to cracking or damage, it is impossible to install the injection tube 30 and the confirmation tube 32. In addition, in the case of a curved portion or a sharply dug structure, the installation of the fiber composite formwork 20 is virtually impossible, and in the case where drying and sealing are practically impossible on the target structure, the above-described method is avoided. It is even more desirable to reinforce the underwater pile using the construction method.
즉, 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집 시공방법은 단면 결손이나 균열로 인하여 내외부가 관통되어 있는 경우나 밀봉 및 건조가 불가능한 수중 또는 비말대 부분에 설치된 강관파일 또는 콘크리트파일(10)의 표면에 각종 섬유재에 에폭시를 함침시켜 파일(10)의 형상에 맞게 섬유복합체 거푸집(20)을 제작하는 단계;That is, the fiber composite formwork construction method for reinforcing underwater piles according to the present invention is the case of the steel pipe pile or concrete pile (10) installed in the inner or outer parts that are not sealed and dry or penetrated through the inside and outside due to cross-sectional defects or cracks Impregnating various fiber materials with epoxy on the surface to produce a fiber composite formwork 20 in accordance with the shape of the pile 10;
상기 파일(10)의 표면에 비닐(60)을 부착 설치함과 동시에 섬유복합체 거푸집(20)의 양단 결합부(22)를 서로 결합시켜 섬유복합체 거푸집(20)을 고정 설치하는 단계;Fixing the fiber composite formwork 20 by attaching the vinyl 60 to the surface of the pile 10 and simultaneously coupling the both ends of the fiber composite formwork 20 to each other;
상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 작은 주입관(30)을 삽입한 후 그 내부를 건조시키는 단계;Inserting a small injection tube (30) between the pile (10) and the fiber composite formwork (20) and drying the interior thereof;
상기 주입관(32)에 에폭시를 주입하여 파일(10)의 균열 및 단면결손부(14)를 보수 보강하는 단계;Repairing and reinforcing cracks and cross-sectional defects 14 of the pile 10 by injecting epoxy into the injection tube 32;
상기 단면이 보수보강된 파일(10)에서 섬유복합체 거푸집(20)을 해체함과 동시에 상기 비닐(60)이 부착된 파일(10)에 섬유복합체 거푸집(20)을 2차로 고정 설치하는 단계;Disassembling the fiber composite formwork 20 from the pile 10 in which the cross-section is reinforced, and simultaneously fixing the fiber composite formwork 20 to the pile 10 to which the vinyl 60 is attached;
상기 비닐(60)과 섬유복합체 거푸집(20)과의 사이에 주입관(30)과 확인관(32)을 설치하는 단계;Installing an injection tube (30) and a confirmation tube (32) between the vinyl (60) and the fiber composite formwork (20);
상기 확인관(32)에 진공펌프를 연결하여 섬유복합체 거푸집(20)과 파일(10)과의 사이의 공기를 흡입하고, 주입관(30)에 에폭시를 연결하여 확인관(32)에 의하여 흡입된 공기가 빠져나가 진공상태가 되고, 상기 섬유복합체 거푸집(20)과 파일(10)과의 사이에 에폭시가 주입되면서 확인관(32)으로 에폭시를 배출시키는 단계;A vacuum pump is connected to the check tube 32 to suck air between the fiber composite formwork 20 and the pile 10, and an epoxy is connected to the injection tube 30 to suck the air through the check tube 32. Discharging the epoxy into the confirmation tube (32) while the air is discharged to become a vacuum state and the epoxy is injected between the fiber composite formwork (20) and the pile (10);
상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 에폭시 충전이 완료되면, 주입관(30)과 확인관(32)을 제거하고, 그 제거된 부위를 실링 처리하는 단계를 순차적으로 시행하여, 에폭시 충전으로 손상된 파일(10)의 단면을 증대시켜 파일(10)의 강도를 보강함을 특징으로 한다.When the epoxy filling is completed between the pile 10 and the fiber composite formwork 20, the injection tube 30 and the confirmation tube 32 are removed, and the removed portion is subjected to sealing. Thus, the cross section of the pile 10 damaged by epoxy filling is increased to reinforce the strength of the pile 10.
여기서, 상기 섬유복합체 거푸집(20)을 파일(10)에 연속적으로 연결하여 설치하되, 상기 파일(10)의 표면을 감싸서 섬유복합체 거푸집(20)의 양단부의 결합부(22)를 결합시켜 고정 설치하고, 상기 섬유복합체 거푸집(20)의 하단부 일정부분에 겹쳐서 타 섬유복합체 거푸집(20)을 순차적으로 설치한다.Here, the fiber composite formwork 20 is installed to be connected to the pile 10 continuously, the surface of the pile 10 is wrapped around the coupling portion 22 of both ends of the fiber composite formwork 20 fixedly installed Then, the other fiber composite formwork 20 is sequentially installed by overlapping a lower portion of the fiber composite formwork 20.
특히, 상기 파일(10)에 내하력을 부여할 경우에는 상기 파일(10)의 표면에 천공홀(12)을 형성하고, 상기 천공홀(12)에 우산살앵커(40)를 설치하여 파일(10)의 단면을 보수보강하는 단계를 추가하여 시공하는 것이다.In particular, in the case of applying load-bearing force to the pile 10, the drilling hole 12 is formed on the surface of the pile 10, and the umbrella anchor anchor 40 is installed in the drilling hole 12 to pile 10. Construction is by adding a step to repair and reinforce the cross section.
또한, 상기 섬유복합체 거푸집(20의 외부에 스프레이노즐(50)을 설치하며, 상기 스프레이노즐(50)에 의하여 파일(10)을 세척하거나, 파일(10)에 화학처리제를 주입하거나, 파일(10)을 건조시키는 단계를 추가하여 시공하는 것이다.In addition, the spray nozzle 50 is installed on the outside of the fiber composite formwork 20, and the pile 10 is washed by the spray nozzle 50, a chemical treatment agent is injected into the pile 10, or the pile 10 is provided. ) Is added to the drying step.
즉, 수중에 설치된 콘크리트파일(10)이 단면 결손이나 균열로 인하여 내외부가 관통되어 있는 경우나 밀봉 및 건조가 불가능할 경우에는 도 17 내지 도 19에 도시된 바와 같이, 균열이나 단면결손부(14)가 있는 수중 콘크리트파일(10)과 직경이 같은 섬유복합체 거푸집(20)을 별도로 제작한 후, 그 거푸집(20)의 내부에 비닐(60)을 부착한 후, 비닐(60)이 부착(60)된 섬유복합체 거푸집(20)을 파일(10)에 밀착 설치한 후, 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 작은 주입관을 삽입한 후, 작은 주입관을 통해 내부를 건조시킨 후, 상기 주입관(32)에 에폭시를 주입하여 파일(10)의 균열 및 단면결손부(14)를 보수 보강하며, 상기 단면이 보수보강된 파일(10)에서 섬유복합체 거푸집(20)을 해체함과 동시에 상기 비닐(60)이 부착된 파일(10)에 섬유복합체 거푸집(20)을 2차로 고정 설치하며, 상기 비닐(60)과 섬유복합체 거푸집(20)과의 사이에 주입관(30)과 확인관(32)을 설치하고, 상기 확인관(32)에 진공펌프를 연결하여 섬유복합체 거푸집(20)과 파일(10)과의 사이의 공기를 흡입하고, 주입관(30)에 에폭시를 연결하여 확인관(32)에 의하여 흡입된 공기가 빠져나가 진공상태가 되고, 상기 섬유복합체 거푸집(20)과 파일(10)과의 사이에 에폭시가 주입되면서 확인관(32)으로 에폭시를 배출시킨 후, 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 에폭시 충전이 완료되면, 주입관(30)과 확인관(32)을 제거하고, 그 제거된 부위를 실링 처리를 순차적으로 시행하여, 에폭시 충전으로 손상된 파일(10)의 단면을 증대시켜 파일(10)의 강도를 보강하는 것이다.That is, when the concrete pile 10 installed in water penetrates the inside and the outside due to the cross-sectional defect or crack, or when sealing and drying is impossible, as shown in FIGS. 17 to 19, the crack or the cross-sectional defect portion 14 After manufacturing the fiber composite formwork 20 having the same diameter as the underwater concrete pile 10, and then attach the vinyl 60 to the interior of the form 20, the vinyl 60 is attached (60) After the fibrous composite formwork 20 is installed in close contact with the pile 10, a small injection tube is inserted between the pile 10 and the fiber composite formwork 20, and the interior is dried through the small injection tube. After the injection, epoxy is injected into the injection pipe 32 to repair and reinforce the cracks and cross-sectional defects 14 of the pile 10, and the fiber composite formwork 20 is formed from the pile 10 to which the cross-section is repaired. Simultaneously dismantle the fiber composite formwork 20 to the pile 10 to which the vinyl 60 is attached. Fixed installation, and the injection tube 30 and the confirmation tube 32 is installed between the vinyl 60 and the fiber composite formwork 20, and connected to a vacuum pump to the confirmation tube 32, the fiber composite The air between the die 20 and the pile 10 is sucked, an epoxy is connected to the injection pipe 30, and the air sucked by the confirmation pipe 32 is discharged into a vacuum state, and the fiber composite die is After the epoxy is discharged into the confirmation tube 32 while the epoxy is injected between the 20 and the pile 10, when the epoxy filling is completed between the pile 10 and the fiber composite formwork 20, The injection tube 30 and the confirmation tube 32 are removed, and the removed portion is subjected to a sealing treatment sequentially to increase the cross section of the pile 10 damaged by epoxy filling to reinforce the strength of the pile 10. will be.
여기서, 상기한 바와 같이, 수중에 설치된 파일(10)이 단면 결손이나 균열로 인하여 부착력을 증대시킬 필요가 있을 때는, 상기 파일(10)에 일정한 간격마다 천공홀(12)을 형성하고, 상기 천공홀(12)에 전체길이에 걸쳐 나사산이 형성된 중앙지지봉(42)의 주위에 일정개수의 지지너트(44)를 나사 결합하면서 지지너트(44)의 주위에 우산살(46)이 다수개 설치된 우산살앵커(40)를 삽입 설치하여 파일(10)의 단면을 보수 보강토록 한다.Here, as described above, when the pile 10 installed in the water needs to increase the adhesion force due to cross-sectional defects or cracks, the drilling holes 12 are formed in the pile 10 at regular intervals, and the drilling is performed. Umbrella in which a plurality of umbrella bars 46 are installed around the support nut 44 while screwing a certain number of support nuts 44 around the central support rods 42 with threads formed in the holes 12 over the entire length. Insert and install the flesh anchor 40 to repair and reinforce the cross section of the pile (10).
이어서, 상기한 바와 같이, 파일(10)의 단면결손부를 우산살앵커(40)로 보수 보강한 후, 2차로 섬유복합체 거푸집(20)을 제작하여 파일(10)에 설치하고, 상기 파일(10)과 섬유복합체 거푸집(20)과의 사이에 에폭시를 충전하여 양생시키면 파일(10)의 보수보강은 완료된다.Subsequently, as described above, after repairing and reinforcing the cross-sectional defects of the pile 10 with the umbrella flesh anchor 40, a fiber composite formwork 20 is secondarily manufactured and installed in the pile 10, and the pile 10 ) And the reinforcing reinforcement of the pile 10 is completed when the epoxy is filled and cured with the fiber composite formwork 20.
상기한 바와 같은 구성 및 시공으로 이루어지는 본 고안에 따른 수중파일 보강용 섬유복합체 및 그의 시공방법은 기본적인 구조물인 원형파일(10)에만 편의상 한정하여 설명하였으나, 기타 형상이 다른 콘크리트 구조물에도 용이하게 실시할 수 있으므로 어느 특정한 형상의 구조물에만 국한하여 본 고안을 적용하지 아니하며, 범용적으로 다양한 형상의 콘크리트 구조물에 적용할 수 있음을 밝혀두는 바이다.The fiber composite for underwater pile reinforcement and the construction method according to the present invention made of the configuration and construction as described above was limited to only the circular pile 10 which is a basic structure for convenience, but can be easily performed on other concrete structures with different shapes. Therefore, the present invention is not limited to any specific shape structure, and it can be found that it can be applied to concrete structures of various shapes in general.
이상에서 설명한 바와 같이, 본 고안에 따른 수중파일 보강용 섬유복합체 거푸집 및 그의 시공방법은 다음과 같은 효과가 있다.As described above, the fiber composite formwork for the underwater pile reinforcement and its construction method according to the present invention has the following effects.
첫째, 본 고안은 수중에 설치된 파일의 주변이 물에 의하여 부식 또는 열화 손상되어 파일의 지지력이 저하되는 현상을 방지하기 위하여, 파일의 표면을 보호하면서 지지력을 강화시키는 섬유복합체 거푸집을 파일에 견실하게 접착되게 둘러쌈으로써 확실한 파일의 피복효과를 가져옴과 동시에 파일의 표면을 보호할 뿐만 아니라 파일의 강도가 증대되는 이점이 있다.Firstly, in order to prevent the surroundings of piles installed in water from being corroded or deteriorated by water and deteriorating the bearing capacity of the piles, the present invention provides a fiber composite formwork that protects the pile surface and strengthens the pile capacity. The adhesive enveloping has the advantage of not only protecting the surface of the pile but also increasing the strength of the pile, as well as providing a reliable covering effect of the pile.
둘째, 본 고안은 파일과 섬유복합체 거푸집 사이에 설치된 우산살앵커를 이용하여 노후 또는 열화된 파일의 하중 지지력을 증가시킴으로써, 섬유복합체 거푸집에 의하여 보수보강을 하여 섬유복합체 거푸집의 설치시간이 단축되며, 공사비가 절감될 뿐만 아니라 부착력이 뛰어난 보수 보강효과가 매우 탁월한 이점이 있다.Secondly, the present invention increases the load bearing capacity of old or degraded piles by using an umbrella flesh anchor installed between the pile and the fiber composite formwork, thereby reducing the installation time of the fiber composite formwork by repairing and strengthening the fiber composite formwork. Not only the construction cost is reduced, but the reinforcing effect with excellent adhesion is very excellent.
셋째, 본 고안은 수중에 설치된 콘크리트파일의 균열이나 단면결손으로 인하여 밀봉이나 건조가 안되는 부분에는 섬유복합체 거푸집을 두차레에 걸쳐 파일에 밀착 설치하여 파일의 균열 및 단면결손부를 수중 그라우트로 충전함으로써, 파일의 중심부 균열부분이나 단면결손부를 용이하게 보수보강할 수 있는 이점이 있다.Third, the present invention is to install the fiber composite formwork close to the pile over the pile in the part not sealed or dried due to the crack or cross-sectional defect of the concrete pile installed in the water by filling the crack and cross-sectional defect of the pile with the underwater grout, There is an advantage in that it is easy to reinforce the cracks or section defects in the central portion of the pile.
넷째, 본 고안은 다양한 형상의 콘크리트 구조물의 보수보강을 용이하게 실시할 수 있는 이점이 있다.Fourth, the present invention has an advantage that can be easily performed to reinforce the concrete structure of various shapes.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0008518U KR200354792Y1 (en) | 2004-03-27 | 2004-03-27 | The fiber complex foam for underwater file reinforcement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0008518U KR200354792Y1 (en) | 2004-03-27 | 2004-03-27 | The fiber complex foam for underwater file reinforcement |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040020976A Division KR20040034650A (en) | 2004-03-27 | 2004-03-27 | The fiber complex foam for underwater file reinforcement, and it's construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200354792Y1 true KR200354792Y1 (en) | 2004-07-01 |
Family
ID=49432912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0008518U KR200354792Y1 (en) | 2004-03-27 | 2004-03-27 | The fiber complex foam for underwater file reinforcement |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200354792Y1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101250865B1 (en) | 2012-08-21 | 2013-04-05 | (주)대명엔지니어링 | Construction method for foundation structure using pile assembly for reducing negative skin friction |
-
2004
- 2004-03-27 KR KR20-2004-0008518U patent/KR200354792Y1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101250865B1 (en) | 2012-08-21 | 2013-04-05 | (주)대명엔지니어링 | Construction method for foundation structure using pile assembly for reducing negative skin friction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101503881B (en) | Method for reinforcing underwater structure by fiber-reinforced composite material grid ribs | |
US9476212B2 (en) | System and method for structural rehabilitation and enhancement | |
JP2837385B2 (en) | Manhole lining material and manhole lining method | |
JP2008522116A5 (en) | ||
US7267507B2 (en) | Method of reinforcing an embedded cylindrical pipe | |
KR20040034650A (en) | The fiber complex foam for underwater file reinforcement, and it's construction method | |
JP2007009482A (en) | Reinforcing structure and reinforcing method of concrete structure | |
KR100982241B1 (en) | Repairing method of steel pipe and concrete pile | |
KR200354792Y1 (en) | The fiber complex foam for underwater file reinforcement | |
KR102102184B1 (en) | Apparatus for Repairing Crack and Repairing Method for using the Same | |
US9303382B2 (en) | Collar for marine pile repair and method of using the same | |
KR100777795B1 (en) | Reinforcement assembly of concrete and construction method thereof | |
KR100405033B1 (en) | Rehabilitation of Concrete Structures with Composites by Vacuum Bag Method | |
KR100686964B1 (en) | Encasement method for repairing or reinforcing structures in the water and a repairing or reinforcing member used therein | |
CN109322253A (en) | The method and device of impaired pier stud repairing and reinforcement | |
KR100353575B1 (en) | Rehabilitation of Steel Structures by Carbon Fiber Composites with Vacuum Bag Method | |
KR100469292B1 (en) | Waterproofing method of concrete | |
KR100429845B1 (en) | Fiber complex mold for protecting the surface of poles installed under the water and construction method using the mold | |
KR960005718Y1 (en) | Anchoring-bolt structure with provisions for grouting | |
KR200469296Y1 (en) | Coating structure for water tank | |
KR100585035B1 (en) | Form and it's construction method for underwater pile reinforcement | |
CN209099205U (en) | The device of impaired pier stud repairing and reinforcement | |
KR200314879Y1 (en) | Fiber complex mold for protecting the surface of poles installed under the water | |
KR200338070Y1 (en) | Form for underwater pile reinforcement | |
KR100665207B1 (en) | Reinforcement jacket and method for reinforcing structural column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
U107 | Dual application of utility model | ||
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
FPAY | Annual fee payment |
Payment date: 20120522 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20130711 Year of fee payment: 10 |
|
EXPY | Expiration of term |