KR200350302Y1 - Concrete manhole structure of road - Google Patents

Concrete manhole structure of road Download PDF

Info

Publication number
KR200350302Y1
KR200350302Y1 KR20-2004-0003080U KR20040003080U KR200350302Y1 KR 200350302 Y1 KR200350302 Y1 KR 200350302Y1 KR 20040003080 U KR20040003080 U KR 20040003080U KR 200350302 Y1 KR200350302 Y1 KR 200350302Y1
Authority
KR
South Korea
Prior art keywords
manhole
cover
support frame
frame
water
Prior art date
Application number
KR20-2004-0003080U
Other languages
Korean (ko)
Inventor
정태석
Original Assignee
주식회사 대흥종합엔지니어링건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 대흥종합엔지니어링건축사사무소 filed Critical 주식회사 대흥종합엔지니어링건축사사무소
Priority to KR20-2004-0003080U priority Critical patent/KR200350302Y1/en
Application granted granted Critical
Publication of KR200350302Y1 publication Critical patent/KR200350302Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/021Connection of sewer pipes to manhole shaft
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F2005/028Sealing joints between manhole segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

본 고안은 도로 설치용 2단 조립식 콘크리트 맨홀에 관한 것으로서, 특히 기성품으로 맨홀 하부 받침틀과 맨홀 상부 덮개틀으로 제작하여 상·하수도관의 지름에 따라 자유롭게 조정하여 설치할 수 있도록 함과 아울러, 시공성의 정밀도를 향상시킬 수 있도록 하는 도로 설치용 2단 조립식 콘크리트 맨홀 구조에 관한 것이다.The present invention relates to a two-stage prefabricated concrete manhole for road installation. In particular, it is a ready-made product made of a manhole lower support frame and a manhole upper cover frame so that the installation can be freely adjusted according to the diameter of the water and sewage pipes, and the construction accuracy is improved. It relates to a two-stage prefabricated concrete manhole structure for road installation that can be improved.

본 고안은, 맨홀 하부 받침틀, 맨홀 상부 덮개틀, 상·하수도관, 맨홀 뚜껑 커버 받침틀, 및 맨홀 뚜껑이 포함된 조립식 콘크리트 맨홀에 있어서, 맨홀 하부 받침틀(100); 상·하수도관(200); 지수막이 고무 개스킷(300); 맨홀 상부 덮개틀(500); 맨홀 뚜껑 조정 받침틀(600); 맨홀 뚜껑 커버 받침틀(700);로 구성됨을 특징으로 하는 도로 설치용 2단 조립식 콘크리트 맨홀 구조로 구성된다.The present invention is a prefabricated concrete manhole including a manhole lower support frame, a manhole upper cover frame, a water and sewage pipe, a manhole cover cover frame, and a manhole cover, the manhole lower support frame 100; Water and sewage pipes 200; Water stop rubber gasket 300; Manhole upper cover frame 500; Manhole cover adjustment support 600; Manhole cover cover frame 700; is composed of a two-stage prefabricated concrete manhole structure for road installation, characterized in that consisting of.

Description

도로 설치용 2단 조립식 콘크리트 맨홀 구조{CONCRETE MANHOLE STRUCTURE OF ROAD}Two-stage prefabricated concrete manhole structure for road installation {CONCRETE MANHOLE STRUCTURE OF ROAD}

본 고안은 도로 설치용 2단 조립식 콘크리트 맨홀에 관한 것으로서, 특히 기성품으로 맨홀 하부 받침틀과 맨홀 상부 덮개틀으로 제작하여 상·하수도관의 지름에 따라 자유롭게 조정하여 설치할 수 있도록 함과 아울러, 시공성의 정밀도를 향상시킬 수 있도록 하는 도로 설치용 2단 조립식 콘크리트 맨홀 구조에 관한 것이다.The present invention relates to a two-stage prefabricated concrete manhole for road installation. In particular, it is a ready-made product made of a manhole lower support frame and a manhole upper cover frame so that the installation can be freely adjusted according to the diameter of the water and sewage pipes, and the construction accuracy is improved. It relates to a two-stage prefabricated concrete manhole structure for road installation that can be improved.

일반적으로 맨홀은, 도로에 매설되어 지중 구조물로 이용되는데, 상기 맨홀은, 콘크리트 또는 플라스틱을 이용하여 제작된다.In general, the manhole is embedded in the road to be used as an underground structure, the manhole is made of concrete or plastic.

상기 콘크리트 맨홀은, 대부분 일체형으로 형성되어 상·하수도관의 지름에 따라 자유롭게 설치가 미흡할 뿐만 아니라 맨홀과 상·하수도관의 이음부에서 누수 현상이 빈번하게 발생되는 단점을 갖는다.The concrete manhole is mostly formed in one piece, not only free installation is insufficient depending on the diameter of the water and sewage pipes, but also has a disadvantage in that water leakage occurs frequently at the joints of the manhole and the water and sewage pipes.

또한, 다른 콘크리트 맨홀은, 일체형으로 구성되지 않고,In addition, the other concrete manhole is not comprised in one piece,

본 고안은 상술한 문제점을 감안하여, 본 고안은, 맨홀 하부 받침틀과 맨홀 상부 덮개틀으로 제작하여 상·하수도관의 지름에 따라 자유롭게 조정하여 설치할 수 있도록 함과 아울러, 시공성의 정밀도를 향상시킬 수 있도록 하는 도로 설치용 2단 조립식 콘크리트 맨홀 구조를 제공하는 것을 그 목적으로 한다.The present invention, in view of the above-described problems, the present invention is made of a manhole lower support frame and a manhole upper cover frame to be freely adjusted and installed according to the diameter of the water and sewage pipe, and can improve the precision of the workability The purpose is to provide a two-stage prefabricated concrete manhole structure for road installation.

도 1은 본 고안의 도로 설치용 2단 조립식 콘크리트 맨홀의 사시도.1 is a perspective view of a two-stage prefabricated concrete manhole for road installation of the present invention.

도 2는 본 고안의 도로 설치용 2단 조립식 콘크리트 맨홀의 분해 상태를 나타내는 도면.Figure 2 is a view showing an exploded state of the two-stage prefabricated concrete manhole for road installation of the present invention.

도 3은 본 고안의 도로 설치용 2단 조립식 콘크리트 맨홀의 다른 실시예를 나타내는 도면.Figure 3 is a view showing another embodiment of the two-stage prefabricated concrete manhole for road installation of the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

100: 맨홀 하부 받침틀 200: 상·하수도관100: manhole lower support frame 200: water and sewage pipe

300: 지수막이 고무개스킷 400: 맨홀 상부 덮개틀300: water stopper rubber gasket 400: manhole upper cover

600: 맨홀 뚜껑 조정 받침틀 700: 맨홀 뚜껑 커버 받침틀600: manhole cover adjustment support frame 700: manhole cover support frame

800: 맨홀 뚜껑 900: 조립식 콘크리트 맨홀800: manhole cover 900: prefabricated concrete manhole

본 고안은 상술한 목적 달성을 위해, 본 고안은, 맨홀 하부 받침틀, 맨홀 상부 덮개틀, 상·하수도관, 맨홀 뚜껑 커버 받침틀, 및 맨홀 뚜껑이 포함된 조립식 콘크리트 맨홀에 있어서, 맨홀 하부 받침틀; 상·하수도관; 지수막이 고무 개스킷; 맨홀 상부 덮개틀; 맨홀 뚜껑 조정 받침틀; 맨홀 뚜껑 커버 받침틀;을 새롭게 구성된 도로 설치용 2단 조립식 콘크리트 맨홀 구조를 제공한다.The present invention to achieve the above object, the present invention, manhole lower support frame, manhole upper cover frame, water and sewage pipe, manhole cover cover frame, and prefabricated concrete manhole including a manhole cover, manhole lower support frame; Water and sewage pipes; Water stop rubber gasket; Manhole top cover frame; Manhole cover adjustment base; The manhole cover cover frame; provides a newly constructed two-stage prefabricated concrete manhole structure for road installation.

도 1은 본 고안의 도로 설치용 2단 조립식 콘크리트 맨홀의 사시도이고, 도 2는 본 고안의 도로 설치용 2단 조립식 콘크리트 맨홀의 분해 상태를 나타내는 도면이다.1 is a perspective view of a two-stage assembled concrete manhole for road installation of the present invention, Figure 2 is a view showing an exploded state of the two-stage assembled concrete manhole for road installation of the present invention.

조립식 콘크리트 맨홀(900)은, 맨홀 하부 받침틀(100)의 상부에 맨홀 상부 덮개틀(500)이 안착되고, 측면에 상·하수도관(200)이 설치된다.As for the prefabricated concrete manhole 900, the manhole upper cover frame 500 is seated on the upper part of the manhole lower support frame 100, and the water and sewage pipe 200 is provided in the side surface.

즉, 상기 조립식 콘크리트 맨홀(900)은, 맨홀 하부 받침틀(100), 상·하수도관(200), 지수막이 고무 개스킷(300), 맨홀 상부 덮개틀(500), 맨홀 뚜껑 조정 받침틀(600), 맨홀 뚜껑 커버 받침틀(700) 및 맨홀 뚜껑(800)이 순차적으로 연결설치되어 맨홀의 기능을 담당하게 된다.That is, the prefabricated concrete manhole 900, the manhole lower support frame 100, the water and sewer pipe 200, the water stop rubber gasket 300, the manhole upper cover frame 500, the manhole cover adjustment support frame 600, The manhole cover cover frame 700 and the manhole cover 800 are sequentially installed to be in charge of the function of the manhole.

상기 맨홀 하부 받침틀(100)은, 상부가 오픈되고 측면이 오픈되는 형태로, 하부에 플랜지부(110)가 형성되고, 측면에 U자형 형태로 U형 안착부(120)가 형성되어 상·하수도관(200)을 연결하게 된다.The manhole lower support frame 100, the upper portion is open and the side is open, the flange portion 110 is formed on the lower side, the U-shaped seating portion 120 is formed in the U-shape on the side, water and sewerage The pipe 200 is to be connected.

상기 상·하수도관(200)은, 일반적인 흄관과 유사한 형태가 사용되는 관계로 상세한 설명은 생략하지만, 상기 상·하수도관(200)은 길이방향 양측에 연결부가 없는 파이프 형태로 형성되는 한편, 상기 지수막이 고무 개스킷(300)은 상·하수도관(200)과 관경이 크게 형성되어 내측에 상·하수도관(200)의 길이방향 일측이 밀착된다.The water and sewage pipes 200 are similar to those of a general fume pipe, so detailed description thereof will be omitted, but the water and sewage pipes 200 are formed in a pipe shape without connecting parts at both sides in the longitudinal direction. The water stopper rubber gasket 300 has a large diameter of the water and sewage pipes 200 and one side of the water and sewage pipes 200 in close contact with the inner side.

상기 맨홀 상부 덮개틀(500)은, 하부가 오픈되고 상부 중앙에 원형홀(510)이 형성되며, 그 원형홀(510)의 주위에 조정 받침틀 삽입돌부(530)가 형성되어 맨홀 뚜겅 조정 받침틀(600)이 삽입되는 한편, 측면에 U홈부(520)가 형성되어 지수막이고무 개스킷(300)이 밀착된다.The manhole upper cover frame 500, the lower portion is opened and the circular hole 510 is formed in the upper center, the adjustment support frame inserting protrusion 530 is formed around the circular hole 510 is manhole cover adjustment support frame ( While the 600 is inserted, the U groove 520 is formed on the side surface thereof so that the watertight film and the gasket 300 are in close contact with each other.

상기 맨홀 뚜껑 조정 받침틀(600)은, 하부 중앙에 홈부(도면상 미도시됨)가 형성되고, 상부에 원형 돌부(610)가 형성되어 맨홀 뚜껑 커버 받침틀(700)의 내측면과 밀착된다.The manhole cover adjustment frame 600, the groove portion (not shown in the figure) is formed in the lower center, the circular protrusion 610 is formed on the upper side is in close contact with the inner surface of the manhole cover cover frame 700.

상기 맨홀 뚜껑 커버 받침틀(700)은, 맨홀 뚜껑 조정 받침틀(600)에 삽입되고, 중앙에 원형홀이 형성되며, 그 상부에 맨홀 뚜껑(800)이 안착되어 작업자들이 진출입하게 된다.The manhole cover support frame 700 is inserted into the manhole cover adjustment support frame 600, a circular hole is formed in the center, the manhole cover 800 is seated on the upper part of the workers to enter and exit.

도 3은 본 고안의 도로 설치용 2단 조립식 콘크리트 맨홀의 다른 실시예를 나타내는 도면으로서, 맨홀 상부 덮개틀(500)의 상부에 조정 받침틀 삽입돌부가 없고, 맨홀 뚜껑 조정 받침틀(600)이 원형 단면 형태로 형성된다.3 is a view showing another embodiment of the two-stage prefabricated concrete manhole for road installation of the present invention, there is no adjustment support frame inserting protrusion on the upper part of the manhole upper cover frame 500, manhole cover adjustment support frame 600 has a circular cross-sectional shape Is formed.

도 2와 도 3에서 알 수 있듯이, 상기 조립식 콘크리트 맨홀(900)은, 조립식 콘크리트 맨홀(900)은, 맨홀 하부 받침틀(100)의 상부에 맨홀 상부 덮개틀(500)이 안착되고, 그 맨홀 상부 덮개틀(500)의 상부에 맨홀 뚜껑 조정 받침틀(600)과 맨홀 뚜껑 커버 받침틀(700)이 안착된 후, 모르타르가 타설되어 유동을 방지하게 되며, 맨홀 뚜겅 커버 받침틀(700)의 중앙에 맨홀 뚜껑(800)이 안착되어 마감되게 된다.As can be seen in Figures 2 and 3, the prefabricated concrete manhole 900, the prefabricated concrete manhole 900, the manhole upper cover frame 500 is seated on the upper part of the manhole lower support frame 100, the upper manhole After the manhole cover adjustment support frame 600 and the manhole cover support frame 700 is seated on the upper portion of the cover frame 500, mortar is poured to prevent flow, and the manhole cover in the center of the manhole cover cover frame 700 The 800 will be seated and finished.

상술한 본 고안의 구성에 의한 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.

본 고안의 조립식 콘크리트 맨홀은, 맨홀 하부 받침틀과 맨홀 상부 덮개틀으로 제작하여 상·하수도관의 지름에 따라 자유롭게 조정하여 설치할 수 있도록 함과 아울러, 시공성의 정밀도를 향상시킬 수 있는 효과를 갖는다.The prefabricated concrete manhole of the present invention is manufactured by manhole lower support frame and manhole upper cover frame so that it can be freely adjusted and installed according to the diameter of water and sewage pipes, and has the effect of improving the precision of workability.

Claims (1)

맨홀 하부 받침틀, 맨홀 상부 덮개틀, 상·하수도관, 맨홀 뚜껑 커버 받침틀, 및 맨홀 뚜껑이 포함된 조립식 콘크리트 맨홀에 있어서,In the prefabricated concrete manhole including manhole lower support frame, manhole upper cover frame, water and sewage pipe, manhole cover cover frame, and manhole cover, 상부가 오픈되고 측면이 오픈되는 형태로, 하부에 플랜지부(110)가 형성되고, 측면에 U자형 형태로 U형 안착부(120)가 형성되어 상·하수도관(200)을 연결시키는 맨홀 하부 받침틀(100);The upper part is open and the side is open, the flange portion 110 is formed at the lower side, the U-shaped seating portion 120 is formed in the U-shaped form on the lower side of the manhole connecting the water and sewage pipe 200 Support frame 100; 상기 맨홀 하부 받침틀(100)의 U형 안착부(120)에 안착되는 한편, 일반적인 흄관과 유사한 형태로, 길이방향 양측에 연결부가 없는 파이프 형태로 형성된 상·하수도관(200);Water and sewage pipes 200 which are seated on the U-shaped seating portion 120 of the manhole lower support frame 100, in a similar form to a general fume pipe, are formed in a pipe shape without connecting parts on both sides in the longitudinal direction; 상기 상·하수도관(200)의 일측 외부를 둘러싸는 지수막이 고무 개스킷(300);A water stop rubber gasket (300) surrounding one outside of the water supply and sewer pipe (200); 상기 맨홀 하부 받침틀(100)의 상부를 덮는 형태로 설치되는 한편, 하부가 오픈되고 상부 중앙에 원형홀(510)이 형성되며, 그 원형홀(510)의 주위에 조정 받침틀 삽입돌부(530)가 형성되며, 측면에 U홈부(520)가 형성되는 맨홀 상부 덮개틀(500);While installed in the form covering the upper part of the manhole lower support frame 100, the lower part is opened and a circular hole 510 is formed in the upper center, the adjustment support frame insertion protrusion 530 around the circular hole 510 is A manhole upper cover frame 500 having a U groove 520 formed at a side thereof; 상기 맨홀 상부 덮개틀(500)의 원형홀(510)의 주위에 안착되어 모르타르로 고정되는 한편, 하부 중앙에 홈부(도면상 미도시됨)가 형성되고, 상부에 원형 돌부(610)가 형성되는 맨홀 뚜껑 조정 받침틀(600);While seated around the circular hole 510 of the manhole upper cover frame 500 and fixed with mortar, grooves (not shown in the drawing) are formed in the lower center, and circular protrusions 610 are formed in the upper part. Manhole cover adjustment support 600; 상기 맨홀 뚜껑 조정 받침틀(600)의 상부 원형 돌부(610)에 삽입되어 고정되는 맨홀 뚜껑 커버 받침틀(700);로 구성됨을 특징으로 하는 도로 설치용 2단 조립식 콘크리트 맨홀 구조.Two-stage prefabricated concrete manhole structure for road installation, characterized in that consisting of; manhole cover cover frame 700 is inserted and fixed to the upper circular protrusion 610 of the manhole cover adjustment support frame 600.
KR20-2004-0003080U 2004-02-09 2004-02-09 Concrete manhole structure of road KR200350302Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0003080U KR200350302Y1 (en) 2004-02-09 2004-02-09 Concrete manhole structure of road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0003080U KR200350302Y1 (en) 2004-02-09 2004-02-09 Concrete manhole structure of road

Publications (1)

Publication Number Publication Date
KR200350302Y1 true KR200350302Y1 (en) 2004-05-13

Family

ID=49346133

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0003080U KR200350302Y1 (en) 2004-02-09 2004-02-09 Concrete manhole structure of road

Country Status (1)

Country Link
KR (1) KR200350302Y1 (en)

Similar Documents

Publication Publication Date Title
US20200217059A1 (en) Tile floor drain
KR200413252Y1 (en) The water leakage prevention constructure of a Manhole
KR101566229B1 (en) Manufacturing equipment for Manhole using various connecting pipe, manufacturing method for the same and connecting method for the manhole with a connecting pipe
KR200350302Y1 (en) Concrete manhole structure of road
KR100623240B1 (en) Manhole integrated with drainage
KR100528615B1 (en) Structure of drainpipe protection flowing backward
KR200408861Y1 (en) Height control device of manhole using rack gear and sealed ring
KR20150001401A (en) Prefabricated water channel for protecting modification
KR20150029421A (en) Manhole Using Various Connecting Pipe
KR100849527B1 (en) Pipe connection part of manhole
KR200226282Y1 (en) Supplementary Drain Trap for the Prefabricated Bathroom
KR100680871B1 (en) Pipe connector soket one body type Invert manhole
KR20070036101A (en) Manhole with insert connector
KR200396587Y1 (en) Improvement structure of building wall piping protection sleeve
KR200246592Y1 (en) Structural sleeve
KR100642295B1 (en) Connecting pipe of manhole and that coupling struction
KR101836935B1 (en) Concrete formwork for sealing a branch part of the sewage pipe
KR200192083Y1 (en) Sectional manhole
KR200178968Y1 (en) Structure of manhole
KR200348102Y1 (en) Reclamation type waste pipe for washbowl
KR20050092624A (en) Draining-traps of subsidiary for building and the structure
CN210975408U (en) Concatenation combination formula cavity concrete piece with drainage function
KR200390947Y1 (en) Pipe connector soket one body type Invert manhole
KR200397660Y1 (en) mold for connecter of manhole etc and pipe
JP2009133132A (en) Pit connection structure and pit setting method

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20120427

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20130403

Year of fee payment: 10

EXPY Expiration of term