KR200337285Y1 - The bridge pier using sheet pile - Google Patents

The bridge pier using sheet pile Download PDF

Info

Publication number
KR200337285Y1
KR200337285Y1 KR20-2003-0029337U KR20030029337U KR200337285Y1 KR 200337285 Y1 KR200337285 Y1 KR 200337285Y1 KR 20030029337 U KR20030029337 U KR 20030029337U KR 200337285 Y1 KR200337285 Y1 KR 200337285Y1
Authority
KR
South Korea
Prior art keywords
steel sheet
bridge
sheet pile
well
pile
Prior art date
Application number
KR20-2003-0029337U
Other languages
Korean (ko)
Inventor
송충호
이성열
Original Assignee
주식회사 경한
대원이엔시 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 경한, 대원이엔시 주식회사 filed Critical 주식회사 경한
Priority to KR20-2003-0029337U priority Critical patent/KR200337285Y1/en
Application granted granted Critical
Publication of KR200337285Y1 publication Critical patent/KR200337285Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

본 고안은 강널말뚝을 이용하여 교량의 우물통이나 교각을 시공할 경우 강널말뚝의 항타와 동시에 하중을 재하할 수 있고, 강널말뚝 자체가 물막이벽, 흙막이벽 및 기초말뚝, 콘크리트구조체의 기능을 대체할 수 있으며, 공사관리 및 품질관리 측면에서 매우 유리하고, 공사기간을 대폭적으로 단축시킬 수 있으며, 공사비를 절감할 수 있는 경제적이고, 환경친화적인 강널말뚝을 이용한 교각을 제공하는데 그 목적이 있다.The present invention can be loaded at the same time as the driving of the steel sheet pile when constructing the well or the bridge of the bridge using the steel sheet pile, and the steel sheet pile itself replaces the functions of the water barrier wall, the earth wall and the foundation pile, and the concrete structure. It is possible to provide a bridge using economical and environmentally friendly steel sheet piles, which is very advantageous in terms of construction management and quality control, can greatly shorten the construction period, and reduce construction costs.

본 고안은 다수개의 강널말뚝이 수직으로 대상지반에 소정의 깊이로 항타 관입됨과 동시에 상기 각각의 강널말뚝들이 서로 결합되어 일정한 형상의 우물통이 형성되고, 상기 우물통내에 콘크리트를 타설함과 동시에 양생시켜 교각이 형성됨으로써, 강널말뚝 자체가 수평, 수직하중을 지지할 수 있으므로 별도의 가시설이나 기초말뚝공정을 생략할 수 있어 공기가 단축되며, 품질관리 및 공정관리가 용이한 장점이 있다.According to the present invention, a plurality of steel sheet piles are vertically penetrated into the target ground at a predetermined depth, and the respective steel sheet piles are combined with each other to form a well shaped container, and at the same time, the concrete is poured into the well bucket and cured. As the bridge is formed, the steel sheet pile itself can support the horizontal and vertical loads, so that additional provisional facilities or foundation pile processes can be omitted, and the air is shortened, and quality control and process management are easy.

Description

강널말뚝을 이용한 교각{The bridge pier using sheet pile}The bridge pier using sheet pile}

본 고안은 강널말뚝을 이용한 교각에 관한 것으로, 특히 강널말뚝을 이용하여 교량의 우물통 또는 교각을 시공할 경우 흙막이 또는 물막이공정 및 기초말뚝공정을 생략할 수 있어, 공정의 단순화를 통하여 공사기간을 대폭 단축시킬 수 있을 뿐만 아니라 공사비를 절감시킬 수 있도록 한 강널말뚝을 이용한 교각에 관한 것이다.The present invention relates to a pier using a steel sheet pile, and in particular, when constructing a well or a bridge of a bridge using a steel sheet pile, it is possible to omit a soil wall or a water blocking process and a foundation pile process, thereby simplifying the construction period. It is about a pier using a steel sheet pile that can not only drastically reduce but also reduce construction costs.

교량공사에 있어서, 종래의 교각은 철근콘크리트 구조물로 시공되고 있으며, 상부의 하중을 지지하기 위한 하부우물통을 형성하기 위하여 물막이, 흙막이 공정 및 지지력을 확보하기 위한 기초말뚝공정, 철근콘크리트 우물통을 형성하기 위한 철근조립, 거푸집조립, 콘크리트 타설, 양생 및 거푸집제거공정 등의 복잡한 공정을 통해 시공된다.In the bridge construction, conventional bridge piers are constructed of reinforced concrete structures, and the foundation piling process, reinforced concrete well bucket to secure the supporting force, and the water piling process to form the lower well for supporting the load of the upper, and reinforced concrete well It is constructed through complex processes such as rebar assembly, form assembly, concrete pouring, curing and form removal process to form.

즉, 도 1a 및 1b는 종래의 철근콘크리트구조체를 이용하여 교량의 우물통(W)이나 교대를 시공하는 상태를 도시한 예시도로서, 물막이 또는 흙막이용 가시설을 설치하고, 강관말뚝 또는 원심력 철근콘크리트말뚝을 활용하여 기초말뚝을 시공하고, 콘크리트구조체를 시공한 형태이다.That is, Figures 1a and 1b is an exemplary view showing a state of constructing the well (W) or the alternating bridge of the bridge by using a conventional reinforced concrete structure, installing a temporary facility for water barrier or mud wall, steel pipe pile or centrifugal reinforced concrete The foundation pile is constructed by using piles, and the concrete structure is constructed.

상기한 바와 같은 공법은 공정이 복잡하고, 각 공정의 품질관리가 까다롭고, 공사기간이 매우 길며, 공사비면에서도 경제적이지 못한 문제점이 있다.The method as described above has a problem that the process is complicated, the quality control of each process is difficult, the construction period is very long, and the cost of construction is not economical.

이에, 본 고안은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로써, 강널말뚝을 이용하여 교량의 우물통이나 교각을 시공할 경우 강널말뚝 항타 단일공정으로 강널말뚝의 항타와 동시에 하중을 재하할 수 있으며, 강널말뚝 자체가 물막이벽, 흙막이벽 및 기초말뚝, 콘크리트구조체의 기능을 대체할 수 있어, 공사관리 및 품질관리 측면에서 매우 유리하고, 공사기간을 대폭 단축할 수 있으며, 공사비를 절감할 수 있는 경제적이고, 환경친화적인 강널말뚝을 이용한 교각을 제공하는데 그 목적이 있다.Therefore, the present invention was devised to solve the problems as described above, when constructing the well or the bridge of the bridge using the steel sheet piles, the pile pile driving single load to simultaneously load the steel pile piles to load Steel sheet pile itself can replace the function of water wall, earth wall and foundation pile, concrete structure, so it is very advantageous in terms of construction management and quality control, can greatly shorten the construction period and reduce construction cost The purpose is to provide bridges using economical and environmentally friendly steel piling.

도 1a 및 1b는 종래의 철근콘크리트구조체를 이용하여 교량의 우물통이나Figure 1a and 1b is a well of the bridge using a conventional reinforced concrete structure

교대를 시공하는 상태를 도시한 예시도,An example showing the state of constructing shifts,

도 2는 본 고안에 따른 강널말뚝을 이용하여 교각을 시공하는 상태를 도시한Figure 2 illustrates a state of constructing the piers using the steel sheet pile according to the present invention

예시도1,Example 1,

도 3은 본 고안에 따른 강널말뚝을 이용하여 교각을 시공하는 상태를 도시한3 is a view showing a state of constructing a piers using a steel sheet pile according to the present invention

예시도2.Example 2.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10 : 강널말뚝 P : 기초10: steel sheet pile P: foundation

W : 우물통W: well

상기한 목적을 달성하기 위한 본 고안에 따른 강널말뚝을 이용한 교각은 다수개의 강널말뚝이 수직으로 대상지반에 소정의 깊이로 항타 관입됨과 동시에 상기 각각의 강널말뚝들이 서로 결합되어 일정한 형상의 우물통이 형성되고, 상기 우물통내에 콘크리트를 타설함과 동시에 양생시켜 교각이 형성됨을 특징으로 한다.In the piers using the steel sheet piles according to the present invention for achieving the above object, a plurality of steel sheet piles are vertically penetrated into the target ground at a predetermined depth and the respective steel sheet piles are combined with each other to form a well. It is formed, it is characterized in that the bridge is formed by curing at the same time as pouring concrete in the well.

이하, 본 고안을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings of the present invention will be described in detail.

도 2는 본 고안에 따른 강널말뚝을 이용하여 교각을 시공하는 상태를 도시한 예시도1이며, 도 3은 본 고안에 따른 강널말뚝을 이용하여 교각을 시공하는 상태를 도시한 예시도2이다.2 is an exemplary view showing a state of constructing a pier using a steel sheet pile according to the present invention, Figure 3 is an exemplary view showing a state of constructing a pier using a steel sheet pile according to the present invention.

이들 도면에 도시된 바와 같이, 본 고안에 따른 강널말뚝을 이용한 교각은 다수개의 강널말뚝(10)이 수직으로 대상지반에 소정의 깊이로 항타 관입됨과 동시에 상기 각각의 강널말뚝(10)들이 서로 결합되어 일정한 형상의 우물통(W)이 형성되고, 상기 우물통(W)내에 철근이 배근됨과 동시에 콘크리트가 타설, 양생되어 교각(P)이 형성된 구조이다.As shown in these drawings, the piers using the steel plate piles according to the present invention are a plurality of steel pile piles 10 are vertically penetrated into the target ground at a predetermined depth and the respective steel sheet piles 10 are coupled to each other. As a result, a well tub W having a predetermined shape is formed, and reinforcing bars are disposed in the well tub W, and concrete is poured and cured to form a piers P.

즉, 본 고안에 따른 강널말뚝을 이용한 교각은 강널말뚝(10)을 연결하여 우물통(W)을 형성하고, 이 우물통(W)을 교각(P)과 일체로 형성하여 교량의 하부구조체를 형성하거나, 우물통(W)상에 별도로 교각(P)을 형성함을 본 고안의 기술적 사상의 특징으로 한다.That is, the bridge piers using the steel plate pile according to the present invention is connected to the steel plate pile 10 to form a well (W), and the well tube (W) is formed integrally with the bridge (P) to form a substructure of the bridge Forming, or forming a piers (P) separately on the well (W) is a feature of the technical idea of the present invention.

여기서, 상기 우물통(W)은 다수개의 강널말뚝(10)이 일체로 결합됨과 동시에 그 결합된 단면형상은 폐합형 또는 벽체형으로 이루어진다.Here, the well (W) is a plurality of steel sheet pile 10 is integrally coupled with the combined cross-sectional shape is made of a closed or wall shape.

이하, 상기한 바와 같은 구성으로 이루어진 본 고안에 따른 강널말뚝을 이용한 교각의 시공에 대해 설명한다.Hereinafter, the construction of the piers using the steel sheet pile according to the present invention made of the configuration as described above.

본 고안에 따른 강널말뚝을 이용한 교각 시공방법은 다수개의 강널말뚝(10)을 수직으로 지반에 소정의 깊이로 항타 관입하고, 상기 각각의 강널말뚝(10)들을 서로 결합시켜 일정한 형상의 우물통(W)을 형성하는 단계와; 상기 우물통(W)내에 철근을 배근하고, 콘크리트를 타설 양생시켜 교각(P)을 형성하는 단계로 이루어진다.Pier construction method using a steel sheet pile according to the present invention is a vertical penetration of a plurality of steel sheet pile 10 to the ground at a predetermined depth, by combining the respective steel sheet piles 10 with each other a well-shaped bucket ( Forming W); Reinforcing the reinforcing bar in the well (W), the step of curing the concrete is made of a step of forming a bridge (P).

즉, 본 고안에 강널말뚝을 이용한 교각 시공방법은 우물통(W)과 교각(P)을 일체로 하여 교량의 하부구조체를 형성하거나, 우물통(W)상에 교각(P)을 별도로 설치하는 것이다.That is, the bridge construction method using the steel sheet pile in the present invention to form a substructure of the bridge integrally with the well (W) and the pier (P), or to separately install the pier (P) on the well (W) will be.

이때, 상기 우물통(W)은 다수개의 강널말뚝(10)을 결합시켜 소정의 크기 및 형상을 갖는 폐합형으로 시공한다.At this time, the well (W) is constructed in a closed type having a predetermined size and shape by combining a plurality of steel sheet pile (10).

즉, 기존의 항타장비를 활용하여 대상지반에 강널말뚝(10)을 직접 항타하여 지지력을 확보하고, 강널말뚝(10)의 항타와 동시에 그 강널말뚝(10)의 내부를 양질의 자갈이나 토사로 채움하여, 하중을 재하할 수 있도록 한다.That is, by using the existing driving equipment to directly drive the steel sheet pile (10) to the target ground to secure the support force, at the same time as the driving of the steel sheet pile (10) to the inside of the steel sheet pile (10) with high-quality gravel or earth and sand Fill it so that it can be loaded.

상기 강널말뚝(10)의 배치형태는 크게 벽체형과 폐합형으로 구분되며, 교량의 종류 및 지역적 특성에 따라 선택적으로 적용하여 사용할 수 있음을 밝혀둔다.The arrangement of the steel sheet pile 10 is largely divided into a wall type and a closed type, and it can be found that it can be selectively applied according to the type and regional characteristics of the bridge.

즉, 상기 강널말뚝(10)의 배치형태가 벽체형인 경우에는 주로 소규모 교량에 적용할 수 있으며, 폐합형인 경우에는 대규모 교량이나 수심이 깊은곳에 구분하여 적용할 수 있다.That is, when the arrangement of the steel sheet pile 10 is a wall type, it may be mainly applied to a small bridge, and in the case of a closed type, it may be applied to a large bridge or a deep depth.

한편, 교량의 기초는 크게 우물통(W)과 교각(P)으로 구성되는 바, 우물통(W)의 시공에는 강널말뚝(10)을 활용하고, 교각(P)의 시공에는 우물통(W)내에 철근배근 및 콘크리트를 타설하여 철근콘크리트구조체를 활용하여 시공한다.On the other hand, the foundation of the bridge is largely composed of the well (W) and the pier (P) bar, the construction of the well (W) using the steel sheet pile (10), the construction of the bridge (P) to the well (W) Reinforcement of reinforcement and concrete in the inside of the building shall be constructed using the reinforced concrete structure.

이때, 상기 우물통(W)은 수직 및 수평하중을 지지할 수 있도록 교량의 영구구조물로 사용할 수도 있음을 밝혀둔다.At this time, it is noted that the well (W) can also be used as a permanent structure of the bridge to support the vertical and horizontal loads.

이상에서 설명한 바와 같이, 본 고안에 따른 강널말뚝을 이용한 교각은 다음과 같은 효과가 있다.As described above, the piers using the steel sheet pile according to the present invention has the following effects.

첫째, 본 고안에 따른 강널말뚝을 이용한 교각은 강널말뚝 자체가 수평, 수직하중을 지지할 수 있으므로 별도의 가시설이나 기초말뚝공정을 생략하고 바로 교각을 시공할 수 있어, 교량공사의 공기가 단축되며, 품질관리 및 공정관리가 용이한 장점이 있다.First, the bridge piers using the steel plate piles according to the present invention can support horizontal and vertical loads, so that the bridges can be constructed immediately by omitting additional temporary facilities or foundation pile processes, and the air of the bridge construction is shortened. This has the advantage of easy quality control and process control.

둘째, 본 고안에 따른 강널말뚝을 이용한 교각은 공장에서 제작된 강널말뚝을 사용함으로 인하여 제품의 질이 균질함과 동시에 품질관리가 용이한 이점이 있다.Second, the pier using the steel sheet pile according to the present invention has the advantage that the quality of the product is homogeneous and easy to quality control by using the steel sheet pile produced in the factory.

셋째, 본 고안에 따른 강널말뚝을 이용한 교각은 별도의 추가장비 없이 기존 교량의 시공장비를 널리 활용할 수 있으므로 시공성이 양호한 이점이 있다.Third, the bridge piers using the steel sheet pile according to the present invention has a good workability because the construction equipment of the existing bridge can be widely used without additional equipment.

넷째, 본 고안에 따른 강널말뚝을 이용한 교각은 강널말뚝을 항타와 동시에 즉시 하중을 재하할 수 있으므로 전체적인 공기단축이 가능하며, 각종 방식 재료를 활용하여 강널말뚝의 부식에 대처할 수 있는 장점이 있다.Fourth, the piers using the steel plate pile according to the present invention can be loaded immediately at the same time as the steel pile piles, so that the overall air shortening is possible, there is an advantage that can cope with the corrosion of the steel sheet pile by using various anticorrosive materials.

다섯째, 본 고안에 따른 강널말뚝을 이용한 교각은 신규 교각뿐만 아니라, 기존교각의 보강공사에도 강널말뚝을 연결한 우물통으로 널리 활용할 수 있는 장점이 있다.Fifth, the piers using the steel piling according to the present invention has the advantage that can be widely used as wells connecting the steel piling in the reinforcement work of the existing piers as well as new piers.

여섯째, 본 고안에 따른 강널말뚝을 이용한 교각은 다양한 배치 형태로 강널말뚝을 항타할 수 있음으로 주위환경과 어울림과 동시에 미관을 양호하게 시공할 수 있으며, 강널말뚝 자체도 대상지반 및 교량의 규모에 따라 다양하게 선택하여 활용할 수 있는 이점이 있다.Sixth, the piers using the steel plate piles according to the present invention can drive the steel pile piles in various arrangements so that they can be constructed well with the surrounding environment and at the same time, the steel sheet pile itself can be applied to the scale of the ground and bridge. There is an advantage that can be utilized by various choices.

일곱째, 본 고안에 따른 강널말뚝을 이용한 교각은 간단하고 빠르며, 저렴한 비용으로 교량의 우물통이나 교각을 형성할 수 있는 이점이 있다.Seventh, the pier using the steel sheet pile according to the present invention is simple and fast, there is an advantage that can form a well or pier of the bridge at low cost.

Claims (1)

다수개의 강널말뚝(10)이 수직으로 대상지반에 소정의 깊이로 항타 관입됨과 동시에 상기 각각의 강널말뚝(10)들이 서로 결합되어 일정한 형상의 우물통(W)이 형성되고, 상기 우물통(W)내에 콘크리트를 타설함과 동시에 양생시켜 교각(P)이 형성됨을 특징으로 하는 강널말뚝을 이용한 교각.A plurality of steel sheet piles 10 are vertically penetrated into the target ground at a predetermined depth, and at the same time, the respective steel sheet piles 10 are coupled to each other to form a well-shaped well bucket W, and the well bucket W The piers using steel plate piles, characterized in that the piers (P) are formed by pouring concrete and curing them at the same time.
KR20-2003-0029337U 2003-09-16 2003-09-16 The bridge pier using sheet pile KR200337285Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2003-0029337U KR200337285Y1 (en) 2003-09-16 2003-09-16 The bridge pier using sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2003-0029337U KR200337285Y1 (en) 2003-09-16 2003-09-16 The bridge pier using sheet pile

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020030064018A Division KR20050027664A (en) 2003-09-16 2003-09-16 The bridge pier using sheet pile, and it's construction method

Publications (1)

Publication Number Publication Date
KR200337285Y1 true KR200337285Y1 (en) 2004-01-03

Family

ID=49341784

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0029337U KR200337285Y1 (en) 2003-09-16 2003-09-16 The bridge pier using sheet pile

Country Status (1)

Country Link
KR (1) KR200337285Y1 (en)

Similar Documents

Publication Publication Date Title
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
CN108193642B (en) Revetment reinforcing facility and construction method thereof
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
JP2012117209A (en) Caisson method and equipment for caisson method
CN203411993U (en) Simple and fast retaining wall
CN110206039B (en) Construction method of Larsen steel sheet pile in pit under complex geological conditions
KR100617949B1 (en) Pile Groups Construction Method of Weak Bedding Bone Using Caission
KR100949597B1 (en) Method for enhancing bearing power of existing bridges using the a pile
KR20060106159A (en) The engineering-works structure using composite pile and steel sheet pile, and it's construction method
KR100496735B1 (en) Abutment and pier using composite pile and sheet pile of a bridge, and it's construction method
KR200337285Y1 (en) The bridge pier using sheet pile
JP2001329545A (en) Bridge pier foundation construction method and floor slab for bridge pier
JP6806465B2 (en) Construction method of foundation structure
KR20130073336A (en) Pile structure and construction methods
CN110093945B (en) Pit with elevator steel structure
KR100493516B1 (en) Micro pile and assembly foundation reinforcement structure member and its method for pier
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
JP2011241605A (en) Self-weight-settling caisson construction method and underground structure constructed by the same
KR20050027664A (en) The bridge pier using sheet pile, and it's construction method
KR200224758Y1 (en) Structure of caisson soil protection four concret caisson
KR101131769B1 (en) Method for constructing abutment using concrete filled tube
KR200291370Y1 (en) Concrete caisson structure for earth and sand guard of pier's basis
JP3832845B2 (en) Steel sheet pile combined direct foundation and construction method of steel sheet pile combined direct foundation
KR100722198B1 (en) Strut system of temporary retaining wall and subgrade external wall construction method utilizing the same
KR200219236Y1 (en) A mold assembly for reinforced concrete girders execution

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20101213

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee