KR200320116Y1 - Knockdown steel tube utility pole - Google Patents

Knockdown steel tube utility pole Download PDF

Info

Publication number
KR200320116Y1
KR200320116Y1 KR20-2003-0012224U KR20030012224U KR200320116Y1 KR 200320116 Y1 KR200320116 Y1 KR 200320116Y1 KR 20030012224 U KR20030012224 U KR 20030012224U KR 200320116 Y1 KR200320116 Y1 KR 200320116Y1
Authority
KR
South Korea
Prior art keywords
pole element
hole
lower pole
cylinder
pole
Prior art date
Application number
KR20-2003-0012224U
Other languages
Korean (ko)
Inventor
박종태
Original Assignee
제룡산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 제룡산업 주식회사 filed Critical 제룡산업 주식회사
Priority to KR20-2003-0012224U priority Critical patent/KR200320116Y1/en
Application granted granted Critical
Publication of KR200320116Y1 publication Critical patent/KR200320116Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal

Abstract

본 고안은 하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지며, 단면이 다각형을 이룸과 동시에 상부에 원기둥이 일정길이 형성된 하부 전주 엘레멘트와, 외주면에 일정간격을 두고 완철 밴드, 암타이 및 랙크 밴드가 결합되도록 원통체로 이루어지며 상기 하부 전주 엘레멘트의 상부 원기둥의 외주면에 감입되도록 상기 하부 전주 엘레멘트의 상부 원기둥보다 외경이 굵은 관통구멍이 형성된 상부 전주 엘레멘트와, 상기 하부 전주 엘레멘트의 하부에 형성된 관통구멍 내에 상단부가 내감되며, 하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지게 형성된 기초 전주 엘레멘트와, 상기 상부 전주 엘레멘트의 하부에 형성된 관통구멍과 상기 하부 전주 엘레멘트의 원기둥 하부에 형성된 관통구멍을 관통하여 반대측에서 너트와 결합하여 상기 상부 전주 엘레멘트의 흘러내림을 방지하는 제1 체결볼트와, 상기 하부 전주 엘레멘트의 하부에 형성된 관통구멍과 상기 기초 전주 엘레멘트의 상부에 형성된 관통구멍을 관통하여 반대측에서 너트와 결합하여 상기 하부 전주 엘레멘트의 흘러내림을 방지하는 제2 체결볼트로 구성되어 있다.The present invention is tapered to taper as the thickness goes from the bottom to the top, and the lower pole element formed with a constant length of the cylinder at the same time as the polygon in the cross section, and the complete iron band, the arm tie and the rack band at regular intervals on the outer circumference. Is formed of a cylindrical body to be coupled to the upper pole element having a through hole having a larger outer diameter than the upper cylinder of the lower pole element so as to be inserted into the outer circumferential surface of the upper cylinder of the lower pole element, and a through hole formed under the lower pole element. The upper end portion is inner, and the base pole element formed tapered so as to taper as it goes from bottom to top, the through hole formed in the lower portion of the upper pole element and the through hole formed in the lower portion of the cylinder of the lower pole element on the opposite side. In combination with nuts A first fastening bolt which prevents the upper pole element from flowing down, a through hole formed in the lower portion of the lower pole element, and a through hole formed in the upper portion of the base pole element, and coupled with a nut from the opposite side to the lower pole element. It consists of a second fastening bolt to prevent the falling of.

따라서, 본 고안은 과도한 하중에 견딜 수 있도록 하부로 내려감에 따라 굵기가 굵어지는 전주 엘레멘트를 테이퍼 형상으로 형성되면서 각이 형성되어 있고, 현장에서 용이하게 조립 설치할 수 있을 뿐만 아니라, 제조 코스트를 절감할 수 있다.Therefore, the present invention has a tapered shape of the electric pole element with a thick thickness as it descends to withstand excessive load, and is formed in an angle, and can be easily assembled and installed in the field, and also reduce manufacturing cost. Can be.

Description

조립식 강관 전주{KNOCKDOWN STEEL TUBE UTILITY POLE}Prefabricated Steel Pipe Jeon {KNOCKDOWN STEEL TUBE UTILITY POLE}

본 고안은 조립식 강관 전주에 관한 것으로서, 특히 운반이 용이하며, 전주를 설치 작업 현장에서 용이하게 조립할 수 있는 구조가 간단한 조립식 강관 전주에 관한 것이다.The present invention relates to a prefabricated steel pipe pole, in particular, easy to transport, and relates to a prefabricated steel pipe pole having a simple structure that can be easily assembled at the installation site.

종래로 부터 널리 사용되고 있는 조립식 강관 전주로서는 한국 공개실용신안공보의 등록번호 실1982-0001564호에 개시되어 있다.As a prefabricated steel pipe pole which is widely used in the past, it is disclosed in Korean Patent Application Publication No. 1982-0001564.

상기 한국 공개실용신안공보의 등록번호 실1982-0001564호에 개시되어 있는 조립식 강관 전주는 도 1에 도시한 바와 같이 강관으로 이루어진 조립식 전주(1)를 구성함에 있어서 각 소재(2)(2')…의 양단에 지지편(3)에 의해 지지하여 접합후랜지(4)가 상호 접합되어 체결보울트(5)로 체결시키도록 구성되어 있으므로, 운반, 보관시에는 각 소재(2)(2')를 분리시킬 수 있어 그 길이가 짧고 무게도 가벼워 취급 운반이 편리할뿐만 아니라 보관운반 면적을 줄일 수 있다.The prefabricated steel pipe poles disclosed in the Korean Utility Model Publication No. 1982-0001564 are each material (2) (2 ') in constructing the prefabricated poles (1) made of steel pipes as shown in FIG. … The support flanges 3 are supported on both ends of the joint flanges 4 so that the joint flanges 4 are joined to each other to be fastened by the fastening bolts 5. It can be separated, so its length is short and its weight is not only convenient for carrying and handling, but also reducing the storage area.

그런데, 이와 같이 구성된 종래의 조립식 강관 전주(1)는 현장에서 조립할 수 있다는 장점을 있으나, 지지편(3)에 의해 지지된 접합 후랜지(4)를 다수개의 체결볼트(5)에 의해 체결하여 조립하여야 하므로, 제조 코스트를 절감시킬 수 없을 뿐만 아니라, 조립에 많은 인건비가 소요된다는 등의 여러가지 문제점이 있었다.By the way, the conventional prefabricated steel pipe pole (1) configured as described above has the advantage that can be assembled in the field, by fastening the joint flange 4 supported by the support piece 3 by a plurality of fastening bolts (5). Since it is necessary to assemble, not only can not reduce the manufacturing cost, there are various problems, such as a large labor cost for assembly.

따라서, 본 고안은 상기 여러가지 문제점을 해결하기 위하여 이루어진 것으로서, 본 고안의 목적은 과도한 하중에 견딜 수 있도록 하부로 내려감에 따라 굵기가 굵어지는 전주 엘레멘트를 테이퍼 형상으로 형성되면서 각이 진 조립식 강관 전주를 제공하는데 있다.Therefore, the present invention has been made to solve the above various problems, the object of the present invention is to form an angled prefabricated steel pipe pole while forming a tapered shape of the pole pole thickened as it is lowered to withstand excessive load To provide.

본 고안의 다른 목적은 현장에서 용이하게 조립 설치할 수 있는 조립식 강관 전주를 제공하는데 있다.Another object of the present invention is to provide a prefabricated steel pipe pole that can be easily assembled and installed in the field.

본 고안의 또 다른 목적은 제조 코스트를 절감할 수 있는 조립식 강관 전주를 제공하는데 있다.Another object of the present invention is to provide a prefabricated steel pipe pole that can reduce the manufacturing cost.

상기의 목적을 달성하기 위하여 본 고안은 하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지며, 단면이 다각형을 이룸과 동시에 상부에 원기둥이 일정길이 형성된 하부 전주 엘레멘트와, 외주면에 일정간격을 두고 완철 밴드, 암타이 및 랙크 밴드가 결합되도록 원통체로 이루어지며 상기 하부 전주 엘레멘트의 상부 원기둥의 외주면에 감입되도록 상기 하부 전주 엘레멘트의 상부 원기둥보다 외경이 굵은 관통구멍이 형성된 상부 전주 엘레멘트와, 상기 하부 전주 엘레멘트의 하부에 형성된 관통구멍 내에 상단부가 내감되며, 하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지게 형성된 기초 전주 엘레멘트와, 상기 상부 전주 엘레멘트의 하부에 형성된 관통구멍과 상기 하부 전주 엘레멘트의 원기둥 하부에 형성된 관통구멍을 관통하여 반대측에서 너트와 결합하여 상기 상부 전주 엘레멘트의 흘러내림을 방지하는 제1 체결볼트와, 상기 하부 전주 엘레멘트의 하부에 형성된 관통구멍과 상기 기초 전주 엘레멘트의 상부에 형성된 관통구멍을 관통하여 반대측에서 너트와 결합하여 상기 하부 전주 엘레멘트의 흘러내림을 방지하는 제2 체결볼트로 구성되어 있는 것을 특징으로 한다.In order to achieve the above object, the present invention is tapered so that the thickness becomes thinner as it goes from the bottom to the top, and the lower pole pole element having a certain length of the cylinder at the same time as the cross section forms a polygon, and at the outer circumferential surface with a predetermined gap An upper pole element having a through hole having an outer diameter thicker than the upper cylinder of the lower pole element so as to be joined to the outer circumferential surface of the upper cylinder of the lower pole element by a band, an arm tie and a rack band, and the lower pole element An upper end portion is cut into a through hole formed at a lower portion of the lower portion of the upper pole element, and a tapered base pole element is formed to taper as the thickness goes from the lower portion to the upper portion, and a through hole formed in the lower portion of the upper pole element and a lower portion of the cylinder of the lower pole element. Through the formed through-holes The first fastening bolt coupled with the nut on the opposite side to prevent the upper pole element from flowing down, the through hole formed in the lower portion of the lower pole element, and the through hole formed in the upper portion of the base pole element. It is characterized by consisting of a second fastening bolt coupled to prevent the falling of the lower pole element.

도 1은 종래의 조립식 강관전주를 개략적으로 도시한 사시도,1 is a perspective view schematically showing a conventional prefabricated steel pipe pole,

도 2는 본 고안의 일실시예에 의한 조립식 강관 전주의 분해 사시도,2 is an exploded perspective view of a prefabricated steel pipe pole according to an embodiment of the present invention,

도 3은 본 고안의 일실시예에 의한 조립식 강관 전주를 조립한 상태의 전체 사시도이다.3 is an overall perspective view of the assembled prefabricated steel pipe pole according to an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10:하부 전주 엘레멘트 12:원기둥부10: lower pole pole element 12: cylinder

14:관통구멍 16:관통구멍14: Through hole 16: Through hole

20:상부 전주 엘레멘트 22:관통구멍20: upper pole element 22: through hole

30:기초 전주 엘레멘트 32:관통구멍30: basic pole element 32: through hole

40:제1 체결볼트 42:너트40: First tightening bolt 42: Nut

50:제2 체결볼트 52:너트50: 2nd tightening bolt 52: Nut

이하, 본 고안의 일실시예에 의한 조립식 강관 전주에 관하여 첨부 도면에 의거하여 상세히 설명한다.Hereinafter, a prefabricated steel pipe pole according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 고안의 일실시예에 의한 조립식 강관 전주의 분해 사시도이고, 도 3은 본 고안의 일실시예에 의한 조립식 강관 전주를 조립한 상태의 전체 사시도이다.Figure 2 is an exploded perspective view of a prefabricated steel pipe pole according to an embodiment of the present invention, Figure 3 is an overall perspective view of the assembled steel pipe pole according to an embodiment of the present invention.

도 2 및 도 3에 도시한 바와 같이 본 고안의 일실시예에 의한 조립식 강관 전주는 하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지며, 단면이 다각형을 이룸과 동시에 상부에 원기둥(12)이 일정길이 형성된 하부 전주 엘레멘트(10)와, 외주면에 일정간격을 두고 완철 밴드, 암타이 및 랙크 밴드가 결합되도록 원통체로 이루어지며 상기 하부 전주 엘레멘트(10)의 상부 원기둥(12)의 외주면에 감입되도록 상기 하부 전주 엘레멘트(10)의 상부 원기둥(12)보다 외경이 굵은 관통구멍이 형성된 상부 전주 엘레멘트(20)와, 상기 하부 전주 엘레멘트(10)의 하부에 형성된 관통구멍내에 상단부가 내감되며, 하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지게 형성된 기초 전주 엘레멘트(30)와, 상기 상부 전주 엘레멘트(20)의 하부에 형성된 관통구멍(22)과 상기 하부 전주 엘레멘트(10)의 원기둥(12) 하부에 형성된 관통구멍(14)을 관통하여 반대측에서 너트(42)와 결합하여 상기 상부 전주 엘레멘트(20)의 흘러내림을 방지하는 제1 체결볼트(40)와, 상기 하부 전주 엘레멘트(10)의 하부에 형성된 관통구멍(16)과 상기 기초 전주 엘레멘트(30)의 상부에 형성된 관통구멍(32)을 관통하여 반대측에서 너트(52)와 결합하여 상기 하부 전주 엘레멘트(10)의 흘러내림을 방지하는 제2 체결볼트(50)로 구성되어 있다.2 and 3, the prefabricated steel pipe pole according to an embodiment of the present invention tapered so that the thickness becomes thinner as it goes from the bottom to the top, and the cylinder 12 has a polygonal cross section at the same time. The lower pole pole element 10 is formed with a predetermined length, the outer circumferential surface is formed of a cylindrical body coupled to the band, arm tie and rack band at a predetermined interval so as to be indented to the outer peripheral surface of the upper cylinder 12 of the lower pole element 10 An upper end portion is formed in the upper pole element 20 having a through hole having a larger outer diameter than the upper cylinder 12 of the lower pole element 10, and a through hole formed in the lower portion of the lower pole element 10. A base pole element 30 tapered to taper as the thickness goes upward, a through hole 22 formed below the upper pole element 20, and The first fastening bolt for penetrating through the through hole 14 formed in the lower cylinder 12 of the lower pole element 10 to engage with the nut 42 on the opposite side to prevent the upper pole element 20 from flowing down ( 40 through the through hole 16 formed in the lower portion of the lower pole element 10 and the through hole 32 formed in the upper portion of the base pole element 30 to engage with the nut 52 on the opposite side It consists of a second fastening bolt (50) to prevent the falling of the lower pole element (10).

다음에, 이와 같이 구성된 본 고안의 일실시예에 따른 조립식 강관 전주의 작용 및 효과에 대하여 설명한다.Next, the operation and effects of the prefabricated steel pipe pole according to the embodiment of the present invention configured as described above will be described.

먼저, 기초 전주 엘레멘트(30)의 하부를 지하에 매설하고, 상기 하부 전주 엘레멘트(10)의 하부에 형성된 관통구멍내에 상기 기초 전주 엘레멘트(30)의 상부 외측면에 외감시켜서, 상기 기초 전주 엘레멘트(30)와 상기 하부 전주 엘레멘트(10)를 결합시킨다. 이때, 상기 기초 전주 엘레멘트(30)는 하부로 내려감에 따라 굵게 형성되는 테이퍼 형상으로 형성되어 있고, 또한 상기 하부 전주 엘레멘트(10)의 하부에 형성된 관통구멍(16)과 상기 기초 전주 엘레멘트(30)의 상부에 형성된 관통구멍(32)에 제2 체결볼트(50)를 삽입하여 반대측에서 너트(52)와 나합시킴으로서 상기 하부 전주 엘레멘트(10)는 상기 기초 전주 엘레멘트(30)에 위치 고정된다.First, the lower part of the base pole element 30 is buried underground, the outer pole surface of the base pole element 30 in the through hole formed in the lower portion of the lower pole element 10, the outer outer surface, and the base pole element ( 30) and the lower pole element 10 is combined. At this time, the base pole element 30 is formed in a tapered shape that is formed thicker as it is lowered to the bottom, and also the through hole 16 and the base pole element 30 formed in the lower portion of the lower pole element 10 The lower pole element 10 is fixed to the base pole element 30 by inserting the second fastening bolt 50 into the through hole 32 formed in the upper part thereof and engaging the nut 52 on the opposite side.

다음에, 상기 하부 전주 엘레멘트(10)의 상부에 일체적으로 형성된 원기둥부(12)의 외주면에 상기 상부 전주 엘레멘트(20)의 하부에 형성된 관통구멍을 외감시키면, 상기 하부 전주 엘레멘트(10)의 원기둥부(12) 하부에 형성된 단차부(10a)에 의해서 상기 상부 전주 엘레멘트(20)의 하단부가 당접되며, 이때 상기 상부 전주 엘레멘트(20)의 하부에 형성된 관통구멍(22)과 상기 하부 전주 엘레멘트(10)의 원기둥부(12) 하부에 형성된 관통구멍(14)에 제1 체결볼트(40)를 삽입하여 반대측에서 너트(42)와 나합시킴으로서 상기 상부 전주 엘레멘트(20)는 상기 하부 전주 엘레멘트(10)에 위치 고정되어 더 이상 하부로 내려 가지 않고 위치고정된다.Next, when the through hole formed in the lower portion of the upper pole element 20 is wound around the outer circumferential surface of the cylindrical portion 12 integrally formed on the upper portion of the lower pole element 10, the lower pole element 10 The lower end portion of the upper pole element 20 is abutted by the stepped portion 10a formed below the cylindrical portion 12. In this case, the through hole 22 and the lower pole element formed at the lower portion of the upper pole element 20. By inserting the first fastening bolt 40 into the through hole 14 formed in the lower portion of the cylindrical portion 12 and engaging with the nut 42 on the opposite side, the upper pole element 20 is the lower pole element ( 10) It is fixed in position without going down any more.

상술한 바와 같이 본 고안의 조립식 강관 전주를 결합시킨 다음에, 상기 상부 전주 엘레멘트(20)가 원통체로 되어 있으므로, 완철 밴드, 암타이 및 랙크 밴드를 용이하게 결합할 수 있을 뿐만 아니라, 밴드에 의해 완금도 용이하게 설치할 수 있다.After combining the prefabricated steel pipe pole of the present invention as described above, since the upper pole element 20 is a cylindrical body, as well as can easily combine the wrought iron band, arm tie and rack band, by the band It can be installed easily.

따라서, 본 고안은 기초 전주 엘레멘트(30)의 상부 외측면에 하부 전주 엘레멘트(10)의 하부를 끼움과 동시에, 상기 상부 전주 엘레멘트(20)의 하부에 형성된 관통구멍(22)과 상기 하부 전주 엘레멘트(10)의 원기둥부(12) 하부에 형성된 관통구멍(14)에 제1 체결볼트(40)를 삽입하여 반대측에서 너트(42)와 나합시킴으로서 상기 상부 전주 엘레멘트(20)는 상기 하부 전주 엘레멘트(10)에 위치 고정되어 조립 및 설치할 수 있고, 또한 상기 기초 전주 엘레멘트(30)의 상부를 하부 전주 엘레멘트(10)의 하부에 길이 방향을 따라 형성된 관통구멍 내에 삽입시킨 후, 상기 하부 전주 엘레멘트(10)의 하부에 형성된 관통구멍(16)과 상기 기초 전주 엘레멘트(30)의 상부에 형성된 관통구멍(32)에 제2 체결볼트(50)를 삽입하여 반대측에서 너트(52)와 나합시켜서 상기 기초 전주 엘레멘트(30)와 하부 전주 엘레멘트(10)를 용이하게 조립 및 설치할 수 있다.Therefore, the present invention fits the lower portion of the lower pole element 10 to the upper outer surface of the base pole element 30, at the same time, the through hole 22 and the lower pole element formed on the lower portion of the upper pole element 20 By inserting the first fastening bolt 40 into the through hole 14 formed in the lower portion of the cylindrical portion 12 and engaging with the nut 42 on the opposite side, the upper pole element 20 is the lower pole element ( 10 is fixed in position and can be assembled and installed, and the upper pole element 30 is inserted into a through hole formed along the longitudinal direction in the lower portion of the lower pole element 10, and then the lower pole element 10 The second fastening bolt 50 is inserted into the through hole 16 formed in the lower part of the bottom part and the through hole 32 formed in the upper part of the base pole element 30, and then screwed together with the nut 52 on the opposite side. Element (30) and a lower pole element 10 can be easily assembled and installed.

또한 본 고안은 하부 전주 엘레멘트(10), 상부 전주 엘레멘트(20) 기초 전주 엘레멘트(30)의 구조가 단순하고, 심플하므로, 제조 코스트를 절감할 수 있으며, 또한 본 고안은 과도한 하중에 견딜 수 있도록 하부로 내려감에 따라 굵기가 굵어지는 하부 및 기초 전주 엘레멘트가 테이퍼 형상으로 형성되면서 각이 형성되어 있고, 현장에서 용이하게 조립 설치할 수 있을 뿐만 아니라, 제조 코스트를 절감할수 있다.In addition, the present invention is because the structure of the lower pole element 10, the upper pole element 20, the base pole element 30 is simple, simple, can reduce the manufacturing cost, and also the present invention to withstand excessive load As the lower portion and the thickness of the lower portion and the base pole elements are formed in a tapered shape as the lower portion, the angle is formed, not only can be easily installed and installed in the field, it is also possible to reduce the manufacturing cost.

상기 설명에 있어서, 상기 하부 전주 엘레멘트(10)를 상부 전주 엘레멘트(20)와 조립 결합한후, 상기 기초 전주 엘레멘트(30)의 상부에 하부 전주 엘레멘트(10)를 조립 설치하는 것을 예로 들어서 설명하였으나, 본 고안은 이에 한정되는 것은 아니며, 예를 들면 상기 기초 전주 엘레멘트(30)의 상부에 상기 하부 전주 엘레멘트(10)를 결합 고정한 후에, 상기 하부 전주 엘레멘트(10)의 상부에 상부 전주 엘레멘트(20)를 결합 고정해도 본 고안의 개념에 포함되는 것은 물론이다.In the above description, after assembling and combining the lower pole element 10 with the upper pole element 20, it has been described as an example of assembling and installing the lower pole element 10 on top of the base pole element 30, The present invention is not limited thereto. For example, after the lower pole element 10 is fixedly coupled to the upper portion of the base pole element 30, the upper pole element 20 is disposed on the upper pole element 10. Of course, combined and fixed to be included in the concept of the present invention.

상기 설명에 있어서, 특정 실시예를 들어서 도시하고 설명하였으나, 본 고안은 이에 한정되는 것은 아니며, 예를 들면 본 고안의 개념을 이탈하지 않는 범위내에서 이 기술 분야의 통상의 지식을 가진 자에 의해 여러가지로 설계변경할 수 있음은 물론이다.In the above description, although illustrated and described with reference to specific embodiments, the present invention is not limited to this, for example, by those of ordinary skill in the art without departing from the concept of the present invention Of course, the design can be changed in various ways.

앞에서 설명한 바와 같이 본 고안의 조립식 강관 전주에 의하면, 하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지며, 단면이 다각형을 이룸과 동시에 상부에 원기둥이 일정길이 형성된 하부 전주 엘레멘트와, 외주면에 일정간격을 두고 완철 밴드, 암타이 및 랙크 밴드가 결합되도록 원통체로 이루어지며 상기 하부 전주 엘레멘트의 상부 원기둥의 외주면에 감입되도록 상기 하부 전주 엘레멘트의 상부 원기둥보다 외경이 굵은 관통구멍이 형성된 상부 전주 엘레멘트와, 상기 하부 전주 엘레멘트의 하부에 형성된 관통구멍 내에 상단부가 내감되며, 하부에서상부로 감에 따라 굵기가 가늘어지도록 테이퍼지게 형성된 기초 전주 엘레멘트와, 상기 상부 전주 엘레멘트의 하부에 형성된 관통구멍과 상기 하부 전주 엘레멘트의 원기둥 하부에 형성된 관통구멍을 관통하여 반대측에서 너트와 결합하여 상기 상부 전주 엘레멘트의 흘러내림을 방지하는 제1 체결볼트와, 상기 하부 전주 엘레멘트의 하부에 형성된 관통구멍과 상기 기초 전주 엘레멘트의 상부에 형성된 관통구멍을 관통하여 반대측에서 너트와 결합하여 상기 하부 전주 엘레멘트의 흘러내림을 방지하는 제2 체결볼트로 구성되어 있으므로, 과도한 하중에 견딜 수 있도록 하부로 내려감에 따라 굵기가 굵어지는 전주 엘레멘트를 테이퍼 형상으로 형성되면서 각이 형성되어 있고, 현장에서 용이하게 조립 설치할 수 있을 뿐만 아니라, 제조 코스트를 절감할 수 있다는 뛰어난 효과가 있다.As described above, according to the prefabricated steel pipe pole of the present invention, the tapered taper becomes thinner as it goes from the bottom to the top, and the bottom pole element formed with a constant length of the cylinder at the same time as the cross section is a polygon, and a predetermined interval on the outer circumferential surface The upper pole element formed of a cylindrical body to be coupled to the wrought iron band, the arm tie and the rack band and formed with a through hole having a larger outer diameter than the upper cylinder of the lower pole element to be inserted into the outer circumferential surface of the upper cylinder of the lower pole element; An upper end portion is cut into a through hole formed in a lower portion of the lower pole element, and a base pole element formed in a tapered shape so as to become thinner as it goes from the lower portion to the upper portion, and a through hole formed in the lower portion of the upper pole element and the lower pole element. Formed at the bottom of the cylinder A first fastening bolt for engaging the nut on the opposite side through the through hole to prevent the upper pole element from flowing down; a through hole formed in the lower portion of the lower pole element and a through hole formed in the upper portion of the base pole element. It is composed of a second fastening bolt that is coupled to the nut on the opposite side to prevent the lower pole element flows down, so that the thickness of the pole pole is formed in a tapered shape as it descends to the lower portion to withstand excessive load Is formed, and can be easily assembled and installed in the field, and there is an excellent effect that the manufacturing cost can be reduced.

Claims (1)

하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지며, 단면이 다각형을 이룸과 동시에 상부에 원기둥(12)이 일정길이 형성된 하부 전주 엘레멘트(10)와, 외주면에 일정간격을 두고 완철 밴드, 암타이 및 랙크 밴드가 결합되도록 원통체로 이루어지며 상기 하부 전주 엘레멘트(10)의 상부 원기둥(12)의 외주면에 감입되도록 상기 하부 전주 엘레멘트(10)의 상부 원기둥(12)보다 외경이 굵은 관통구멍이 형성된 상부 전주 엘레멘트(20)와, 상기 하부 전주 엘레멘트(10)의 하부에 형성된 관통구멍내에 상단부가 내감되며, 하부에서 상부로 감에 따라 굵기가 가늘어지도록 테이퍼지게 형성된 기초 전주 엘레멘트(30)와, 상기 상부 전주 엘레멘트(20)의 하부에 형성된 관통구멍(22)과 상기 하부 전주 엘레멘트(10)의 원기둥(12) 하부에 형성된 관통구멍(14)을 관통하여 반대측에서 너트(42)와 결합하여 상기 상부 전주 엘레멘트(20)의 흘러내림을 방지하는 제1 체결볼트(40)와, 상기 하부 전주 엘레멘트(10)의 하부에 형성된 관통구멍(16)과 상기 기초 전주 엘레멘트(30)의 상부에 형성된 관통구멍(32)을 관통하여 반대측에서 너트(52)와 결합하여 상기 하부 전주 엘레멘트(10)의 흘러내림을 방지하는 제2 체결볼트(50)로 구성되어 있는 것을 특징으로 하는 조립식 강관 전주.Tapered to taper as the thickness goes from the bottom to the top, and at the same time the cross section forms a polygon, and at the same time, the lower pole element (10) having a constant length (12) with a predetermined length on the upper side, and a wrought iron band, arm tie And an upper portion having a through hole having an outer diameter greater than that of the upper cylinder 12 of the lower pole element 10 so as to fit into the outer circumferential surface of the upper cylinder 12 of the lower pole element 10. The main pole element 30 and the base pole element 30 formed in the through hole formed in the lower portion of the lower pole element 10, tapered to taper as the thickness goes from the bottom to the top, and the upper portion The through hole 22 formed in the lower portion of the pole element 20 and the through hole 14 formed in the lower portion of the cylinder 12 of the lower pole element 10 A first fastening bolt 40 coupled to the nut 42 on the opposite side to prevent the upper pole element 20 from flowing down, a through hole 16 formed below the lower pole element 10, and the base The second fastening bolt 50 which penetrates the through hole 32 formed in the upper portion of the pole element 30 and engages with the nut 52 on the opposite side to prevent the lower pole element 10 from flowing down. Prefabricated steel pipe poles characterized in that.
KR20-2003-0012224U 2003-04-21 2003-04-21 Knockdown steel tube utility pole KR200320116Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2003-0012224U KR200320116Y1 (en) 2003-04-21 2003-04-21 Knockdown steel tube utility pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2003-0012224U KR200320116Y1 (en) 2003-04-21 2003-04-21 Knockdown steel tube utility pole

Publications (1)

Publication Number Publication Date
KR200320116Y1 true KR200320116Y1 (en) 2003-07-12

Family

ID=49410973

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0012224U KR200320116Y1 (en) 2003-04-21 2003-04-21 Knockdown steel tube utility pole

Country Status (1)

Country Link
KR (1) KR200320116Y1 (en)

Similar Documents

Publication Publication Date Title
EP2252749B1 (en) Tower element
KR200420599Y1 (en) Connection structure of a street lamp post that diameter is consisted of other upper,lower part prop
JP2007300826A (en) Method for reinforcing pipe house
KR200320116Y1 (en) Knockdown steel tube utility pole
KR200320117Y1 (en) Knockdown steel tube utility pole
US20060086060A1 (en) Connector for concrete poles
KR20090089232A (en) Telescopic electric pole
KR20010069576A (en) Traffic signal post
KR200267610Y1 (en) A multiplestage lighting pole manufactured by aluminum pipe
KR200227387Y1 (en) Device for fixing a wire to a column
KR200402522Y1 (en) Steel tube utility pole
JPH11150845A (en) Stay block
JPH0631068Y2 (en) Prefabricated carport
KR200398089Y1 (en) Tapered Assembly Steel Pole with Wether Resistance
CN210684766U (en) Submerged steel pipe column base foundation
KR102645328B1 (en) Tubular steel pole and its joint method
KR840001401Y1 (en) Flame for vinyl-house
JP2556351Y2 (en) Long connection pillar
KR890002592Y1 (en) Metal pole
CN212671274U (en) Reinforcing structure of rectangular pipe stand and roof beam connected node in assembled steel construction building
JPS6329797Y2 (en)
JP2950419B1 (en) spiral staircase
KR950001687Y1 (en) Structure for fixing a fence-post
KR200215027Y1 (en) Reinforcing Band of Round Steel Poles
JPH0316361Y2 (en)

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
FPAY Annual fee payment

Payment date: 20120621

Year of fee payment: 10

EXPY Expiration of term