KR200311596Y1 - Basic reinforcement apparatus preventing upset of pier for bridge - Google Patents

Basic reinforcement apparatus preventing upset of pier for bridge Download PDF

Info

Publication number
KR200311596Y1
KR200311596Y1 KR20-2003-0002847U KR20030002847U KR200311596Y1 KR 200311596 Y1 KR200311596 Y1 KR 200311596Y1 KR 20030002847 U KR20030002847 U KR 20030002847U KR 200311596 Y1 KR200311596 Y1 KR 200311596Y1
Authority
KR
South Korea
Prior art keywords
pile
composite frame
bridge
facility
steel
Prior art date
Application number
KR20-2003-0002847U
Other languages
Korean (ko)
Inventor
김현필
Original Assignee
(주)서경엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)서경엔지니어링 filed Critical (주)서경엔지니어링
Priority to KR20-2003-0002847U priority Critical patent/KR200311596Y1/en
Application granted granted Critical
Publication of KR200311596Y1 publication Critical patent/KR200311596Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

본 고안은 교량 구조물을 보호하기 위하여 교각의 전도방지를 위한 시설에 관한 것으로서, 더욱 상세하게는 홍수 등에 의한 유속으로 교각의 기초가 전도되는 현상을 방지하고 국가 산업의 기반을 확보하고자 하는 홍수 유속에 의한 교각의 전도 방지용 기초 보강시설에 관한 것이다.The present invention relates to a facility for preventing the fall of a bridge to protect the bridge structure, and more specifically, to the flood flow rate to prevent the foundation of the bridge to fall over by the flow of flood, etc. The present invention relates to a foundation reinforcement facility for the fall prevention of bridge piers.

본 고안은, 기초 보강시설은, 다수개의 강합성틀이 원형 형태로 체결되고, 그 강합성틀의 내측에 조립 볼트에 의해 말뚝 설치용의 복합재 가스켓이 체결되며, 상기의 복합재 가스켓을 관통하여 암반에 지지되도록 다수개의 강봉 말뚝이 설치되는 구조로, 상기의 기초 보강시설에는 주위를 둘러싸도록 세굴 방지물이 설치되고, 상기의 강합성틀은, 상부 플랜지, 하부 플랜지 및 라운딩부가 일체로 형성되는 한편, 상기의 라운딩부의 길이의 내측 양측에 체결판이 형성되고 그 체결판에 조립 볼트홀이 형성되어 측면으로 다수개가 체결되며, 상기의 강합성틀에는 상,하부 플랜지에 다수개의 조립 볼트홀이 형성되어 조립 볼트에 의해 다단으로 설치가 가능하며, 상기의 복합재 가스켓은, 강합성틀의 라운딩부와 동일한 형태로, 외측에 소구경의 볼트 체결홀이 형성되고, 내측에 대구경의 말뚝 체결홀이 형성되며, 상기의 강봉 말뚝은, 말뚝 몸체부의 상부에 인장 너트가 형성되고 말뚝 몸체부의 하부가 뾰족하게 형성되는 것을 특징으로 하는 홍수 유속에 의한 교각의 전도 방지용 기초 보강시설을 제공한다.The present invention, the basic reinforcement facility, a plurality of steel composite frame is fastened in a circular form, the composite gasket for the pile installation is fastened by the assembly bolt inside the steel composite frame, and penetrates the composite gasket to the rock A structure in which a plurality of steel rod piles are installed to be supported, and the base reinforcement facility is provided with a scour prevention material so as to surround the surroundings, and the steel composite frame includes an upper flange, a lower flange, and a rounding part integrally formed thereon. Fastening plate is formed on both inner sides of the length of the rounded portion of the assembly bolt holes are formed in the fastening plate is fastened to the side of the plurality, the steel composite frame is formed with a plurality of assembly bolt holes in the upper and lower flanges are assembled bolts It can be installed in multiple stages, and the above-mentioned composite gasket has the same shape as the rounding part of the steel composite frame, and has a small diameter bolting hole on the outside. Is formed, a large diameter pile fastening hole is formed in the inner side, the steel rod pile, the tension nut is formed in the upper portion of the pile body portion, the lower portion of the piling body by the flood flow rate, characterized in that the lower portion of the pile body is formed Provide basic reinforcement facilities for fall prevention.

Description

홍수 유속에 의한 교각의 전도 방지용 기초 보강시설{BASIC REINFORCEMENT APPARATUS PREVENTING UPSET OF PIER FOR BRIDGE}BASIC REINFORCEMENT APPARATUS PREVENTING UPSET OF PIER FOR BRIDGE}

본 고안은 교량 구조물을 보호하기 위하여 교각의 전도방지를 위한 시설에 관한 것으로서, 더욱 상세하게는 홍수 등에 의한 유속으로 교각의 기초가 전도되는 현상을 방지하고 국가 산업의 기반을 확보하고자 하는 홍수 유속에 의한 교각의 전도 방지용 기초 보강시설에 관한 것이다.The present invention relates to a facility for preventing the fall of a bridge to protect the bridge structure, and more specifically, to the flood flow rate to prevent the foundation of the bridge to fall over by the flow of flood, etc. The present invention relates to a foundation reinforcement facility for the fall prevention of bridge piers.

일반적으로 교량이 강 또는 바다에 시공되는 경우, 우물통 기초를 설치하고 그 우물통 기초의 상부에 교각, 코핑, 거더 및 상판 슬래브를 연결하여 교량을 건설하게 되는데, 이때 교량의 하부 구조를 구성함과 아울러 수중에 설치되는 우물통 기초를 견고한 암반에 지지하거나 우물통 기초의 하부에 지지 말뚝을 설치하여 암반에 지지한 상태에서 교량을 건설하게 된다.In general, when a bridge is constructed in a river or sea, a bridge is installed and a bridge is constructed by connecting a pier, a coping, a girder, and a slab to an upper part of the foundation of the well. In addition, the foundation of the well to be installed underwater is supported on a solid rock, or by installing a support pile in the lower part of the well foundation to build a bridge in the state supported on the rock.

도 1은 일반적인 교량이 전도되는 상태를 설명하기 위한 도면으로서, 교량(80)은, 우물통 기초(10)의 중앙 상부에 교각(20)이 설치되고, 그 교각(20)의 상부에 코핑부(30)가 형성되며, 상기의 코핑부(30)에 교좌 장치(40)가 다수개 안착되고, 그 교좌 장치(40)의 상부에 강재 거더(50)가 안착된 상태에서 콘크리트를 타설하여 상판 슬래브(60)가 설치되면 교량(80)이 완성되게 되는 것이다.FIG. 1 is a view for explaining a state in which a general bridge is inverted. In the bridge 80, a pier 20 is provided at a center upper portion of the well base 10, and a coping portion is disposed at an upper portion of the pier 20. 30 is formed, a plurality of seating device 40 is seated on the coping portion 30, the concrete plate is poured in the state where the steel girder 50 is seated on the top of the seating device 40 When the slab 60 is installed, the bridge 80 is completed.

상기의 교량(80)은, 우물통 기초(10)가 연암층(R)에 안착되는 경우가 많은데, 홍수와 같은 자연 재해가 발생되는 경우, 우물통 기초(10)가 연암층에서 미끌어지게 되고, 그로 인하여 도면의 도시와 같이 교량(80)이 전도되는 경우가 발생되게 된다.In the bridge 80, the well basin base 10 is often seated in the soft rock layer R. When a natural disaster such as a flood occurs, the well basin base 10 is slipped in the soft rock layer. As a result, as shown in the drawing, the bridge 80 is caused to fall.

또한, 상기의 우물통 기초(10)에는 하부에 지지 말뚝(도면상 미도시됨)을 시공하여 연암층(R)에 지지하기도 하지만, 현재의 대부분의 교량은 우물통 기초(10)의 하부에 지지 말뚝이 설치되지 않는 경우가 많아 도면과 같이 전도되는 현상이 발생된다.In addition, although the support pile (not shown in the figure) is installed on the bottom of the well base 10 to support the soft rock layer R, most of the current bridges are provided at the bottom of the well base 10. In many cases, the support pile is not installed, so that a phenomenon of conduction occurs as shown in the drawing.

또한, 상기의 우물통 기초(10)에는 그 주위에 FRP(섬유강화플라스틱)를 이용한 기초 보강시설과 함께 FRP 말뚝을 설치하는 경우(도면상 미도시됨)도 있지만, 이러한 FRP를 이용한 기초 보강시설의 경우에는 연약 지반에 설치되는 경우, 보강력이 취약하게 되어 기초 보강시설이 전도되는 단점을 갖는다.In addition, in the well basin 10, there is a case in which FRP piles are installed together with a foundation reinforcement facility using FRP (fibre-reinforced plastic) around it (not shown in the drawing), but the foundation reinforcement facility using such FRP In the case of when installed on the soft ground, the reinforcement is weak and has the disadvantage that the foundation reinforcement facility is conducted.

본 고안은 상술한 문제점을 해결하기 위하여, 본 고안은, 우물통 기초를 견고하게 지지할 수 있도록 강재를 이용한 기초 보강시설을 제공하여 전도를 방지하고, 그 기초 보강시설의 주위에 세굴 방지물을 설치하여 기초 보강시설을 보강하여 최대한 전도를 방지할 수 있는 한편, 강합성틀의 내측에 복합재 가스켓이 설치되고 강봉 말뚝이 설치되는 관계로 암반에 견고하게 우물통 기초를 지지할 수 있는 구조를 가지는 홍수 유속에 의한 교각의 전도 방지용 기초 보강시설을 제공함을 그 목적으로 한다.In order to solve the above problems, the present invention provides a foundation reinforcement facility using steel so as to firmly support the foundation of the well, and prevents fall, and provides a scour prevention material around the foundation reinforcement facility. The installation can reinforce the foundation reinforcement facility to prevent the fall as much as possible, while the composite gasket is installed inside the steel composite frame and the steel rod pile is installed so that the flooding structure can firmly support the foundation of the well bucket on the rock. Its purpose is to provide a foundation reinforcement system for the fall prevention of bridge piers by flow velocity.

도 1은 일반적인 교량이 전도되는 상태를 설명하기 위한 도면.1 is a view for explaining a state in which a general bridge is conducted.

도 2는 본 고안의 교각의 전도 방지용 기초 보강시설을 나타내는 측단면도.Figure 2 is a side cross-sectional view showing the foundation reinforcement facility for the fall prevention piers of the present invention.

도 3은 본 고안의 기초 보강시설의 평면도.Figure 3 is a plan view of the foundation reinforcement facility of the present invention.

도 4는 본 고안의 교각의 전도 방지용 기초 보강시설의 일측 분해상태를 나타내는 도면.Figure 4 is a view showing an exploded state of one side of the foundation reinforcement for preventing fall of the piers of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

100: 교량 110: 우물통 기초100: bridge 110: well base

200: 기초 보강시설 210: 강합성틀200: foundation reinforcement facility 210: steel composite frame

212: 상부 플랜지 214: 라운딩부212: upper flange 214: rounding part

216: 하부 플랜지 217: 체결판216: lower flange 217: fastening plate

218: 조립 볼트홀 220: 복합재 가스켓218: assembled bolt hole 220: composite gasket

222: 볼트 체결홀 224: 말뚝 체결홀222: bolt fastening hole 224: pile fastening hole

230: 강봉 말뚝 232: 인장 너트230: steel rod pile 232: tension nut

234: 말뚝 몸체부 240: 조립 볼트234: pile body 240: assembly bolt

270: 세굴 방지물 272: 네트론 망270: scour prevention material 272: netron network

274: 잡석 300: 채움 콘크리트274: rubble 300: filled concrete

본 고안은 상술한 목적을 달성하기 위하여, 본 고안은, 강 또는 바다에 시공되는 우물통 기초를 지지하는 기초 보강시설에 있어서, 기초 보강시설은, 다수개의 강합성틀이 원형 형태로 체결되고, 그 강합성틀의 내측에 조립 볼트에 의해 말뚝 설치용의 복합재 가스켓이 체결되며, 상기의 복합재 가스켓을 관통하여 암반에 지지되도록 다수개의 강봉 말뚝이 설치되는 구조로, 상기의 기초 보강시설에는 주위를 둘러싸도록 세굴 방지물이 설치되고, 상기의 강합성틀은, 상부 플랜지, 하부 플랜지 및 라운딩부가 일체로 형성되는 한편, 상기의 라운딩부의 길이의 내측 양측에 체결판이 형성되고 그 체결판에 조립 볼트홀이 형성되어 측면으로 다수개가 체결되며, 상기의 강합성틀에는 상,하부 플랜지에 다수개의 조립 볼트홀이 형성되어 조립 볼트에 의해 다단으로 설치가 가능하며, 상기의 복합재 가스켓은, 강합성틀의 라운딩부와 동일한 형태로, 외측에 소구경의 볼트 체결홀이 형성되고, 내측에 대구경의 말뚝 체결홀이 형성되며, 상기의 강봉 말뚝은, 말뚝 몸체부의 상부에 인장 너트가 형성되고 말뚝 몸체부의 하부가 뾰족하게 형성되는 것을 특징으로 하는 홍수 유속에 의한 교각의 전도 방지용 기초 보강시설을 제공한다.The present invention, in order to achieve the above object, the present invention, in the foundation reinforcement facility for supporting the well base installed in the river or the sea, the foundation reinforcement facility, a plurality of steel composite frame is fastened in a circular form, The composite gasket for pile installation is fastened by the assembly bolt inside the steel composite frame, and a plurality of steel rod piles are installed to penetrate the composite gasket to be supported by a rock bed. The scour prevention material is installed, and the steel composite frame includes an upper flange, a lower flange, and a rounding part integrally formed, while fastening plates are formed on both inner sides of the length of the rounding part, and assembly bolt holes are formed in the fastening plate. A plurality of bolts are fastened to the side, and the assembly bolt holes are formed in the upper and lower flanges in the steel composite frame and are assembled by the assembly bolts. The composite gasket may have the same shape as the rounding part of the steel composite frame, and a bolt fastening hole having a small diameter is formed at an outer side, and a pile fastening hole having a large diameter is formed at an inner side thereof. Is, the tension nut is formed on the top of the pile body portion provides a basic reinforcement facility for the fall prevention of piers by flood flow rate, characterized in that the lower portion of the pile body is formed pointed.

이하, 첨부 도면을 참조하여 본 고안의 구성을 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the configuration of the subject innovation.

도 2는 본 고안의 교각의 전도 방지용 기초 보강시설을 나타내는 측단면도이고, 도 3은 본 고안의 기초 보강시설의 평면도이다.Figure 2 is a side cross-sectional view showing a foundation reinforcement for preventing fall of the piers of the present invention, Figure 3 is a plan view of the foundation reinforcement facility of the present invention.

도 2에서 알 수 있듯이, 교량(100)을 구성하는 우물통 기초(110)에는 그 주위를 둘러싸도록 기초 보강시설(200)이 설치되고, 상기의 우물통 기초(110)와 기초 보강시설(200)의 사이에는 수중 채움 콘크리트(300)가 타설된다.As can be seen in Figure 2, the well foundation 110 constituting the bridge 100, the foundation reinforcement facility 200 is installed so as to surround the surrounding, the well basin foundation 110 and the foundation reinforcement facility 200 In between the water filled concrete 300 is poured.

도 3에서 알 수 있듯이, 상기의 기초 보강시설(200)은, 다수개의강합성틀(210)이 원형 형태로 체결되고, 그 강합성틀(210)의 내측에 조립 볼트(240)에 의해 말뚝 설치용의 복합재 가스켓(220)이 체결되며, 상기의 복합재 가스켓(220)을 관통하여 암반에 지지되도록 다수개의 강봉 말뚝(230)이 설치된다.As can be seen in Figure 3, the foundation reinforcement facility 200, a plurality of steel composite frame 210 is fastened in a circular form, the pile by the assembly bolt 240 on the inside of the steel composite frame 210 The composite gasket 220 for installation is fastened, and a plurality of steel rod piles 230 are installed to penetrate the composite gasket 220 and be supported by a rock.

상기의 기초 보강시설(200)에는 주위를 둘러싸도록 세굴 방지물(270)이 설치되는 한편, 상기의 세굴 방지물(270)은 네트론 망(272)의 내측에 잡석(274) 또는 콘크리트 파쇄물, 및 암석과 같은 부재가 삽입된 망 구조물로 구성된다.The base reinforcement facility 200 is provided with a scour prevention material 270 to surround the circumference, while the scour prevention material 270 is rubble 274 or concrete crushed material inside the netron net 272, And a network structure into which a member such as rock is inserted.

상기의 세굴 방지물(270)은 기초 보강시설(200)의 높이와 동일하도록 다단으로 적층된다.The scour prevention material 270 is stacked in multiple stages so as to have the same height as the foundation reinforcement facility 200.

도 4는 본 고안의 교각의 전도 방지용 기초 보강시설의 일측 분해상태를 나타내는 도면으로서, 상기의 기초 보강시설(200)은, 크게 강합성틀(210), 복합재 가스켓(220) 및 강봉 말뚝(230)으로 구성된다.Figure 4 is a view showing the disassembled state of one side of the fall reinforcement foundation reinforcement facility of the present invention, the foundation reinforcement 200 is largely composed of a steel composite frame 210, composite gasket 220 and steel rod pile 230 It is composed of

상기의 강합성틀(210)은, 상부 플랜지(212), 하부 플랜지(216) 및 라운딩부(214)가 일체로 형성되는 한편, 라운딩부(214)의 상,하부에 각각 상부 플랜지(212)와 하부 플랜지(216)가 형성되고 라운딩부(214)가 도시된 바와 같이 굴곡되게 형성되며, 상기의 라운딩부(214)의 길이의 내측 양측에 체결판(217)이 형성되고 그 체결판(217)에 2개의 조립 볼트홀(218)이 형성된다.The steel composite frame 210, the upper flange 212, the lower flange 216 and the rounding portion 214 is integrally formed, while the upper flange 212, the upper and lower portions of the rounding portion 214, respectively And the lower flange 216 is formed and the rounding part 214 is formed to be bent as shown, and the fastening plate 217 is formed on both inner sides of the length of the rounding part 214 and the fastening plate 217 ), Two assembly bolt holes 218 are formed.

상기의 강합성틀(210)은 다수개가 체결판(217)이 밀착된 상태에서 조립 볼트(240)가 체결되어 원형 형태로 제작됨과 아울러 2단으로 설치되는 한편, 상기의 강합성틀(210)에는 상,하부 플랜지(212)(216)에 다수개의 조립 볼트홀(218)이 형성되어 조립 볼트에 의해 다단으로 설치가 가능하며, 도면에서는 2단으로만 도시되었는데, 실제로 다단으로 연결설치가 가능함은 당연하다 할 것이다.The steel composite frame 210 is manufactured in a circular form by fastening the assembly bolts 240 in a state in which a plurality of fastening plates 217 are in close contact with each other, and are installed in two stages. In the upper and lower flanges 212, 216, a plurality of assembly bolt holes 218 are formed, which can be installed in multiple stages by the assembly bolt, and only two stages are shown in the drawing. Will be taken for granted.

상기의 복합재 가스켓(220)은, 강합성틀(210)의 라운딩부(214)와 동일한 형태로 라운딩됨과 아울러 동일한 길이로 형성되고, 상기의 복합재 가스켓(220)은, 평판 형태로 지름이 다른 2개의 관통홀이 다수개 형성된다.The composite gasket 220 is rounded in the same shape as the rounding part 214 of the steel composite frame 210 and is formed in the same length. The composite gasket 220 has a flat plate shape having a different diameter. A plurality of through holes are formed.

즉, 상기의 복합재 가스켓(220)에는, 외측에 소구경의 볼트 체결홀(222)이 형성되고, 내측에 대구경의 말뚝 체결홀(224)이 형성된다.That is, in the composite gasket 220, a bolt fastening hole 222 having a small diameter is formed at an outer side, and a pile fastening hole 224 having a large diameter is formed at an inner side thereof.

상기의 강봉 말뚝(230)은, 인장 너트(232)와 말뚝 몸체부(234)로 형성되는데, 말뚝 몸체부(234)의 상부에 인장 너트(222)가 형성되고 말뚝 몸체부(234)의 하부가 뾰족하게 형성된다.The steel rod pile 230 is formed of a tension nut 232 and the pile body portion 234, the tension nut 222 is formed on the upper portion of the pile body portion 234 and the lower portion of the pile body portion 234 Is sharply formed.

상술한 기초 보강시설(200)은, 그 주위를 둘러싸도록 세굴 방지물(270)이 설치되는 관계로, 기초 보강시설(200)에 대한 보강이 이루어지게 되고, 복합재 가스켓(220)의 말뚝 체결홀(224)에는 강봉 말뚝(230)이 체결되어 암반에 지지되는 구조로 구성되는 관계로 교량(100)을 견고한 상태로 유지할 수 있으며, 특히 교량(100)의 전도 방지를 최대한 확보할 수 있는 관계로 국가 산업 기반의 기저를 튼튼하게 유지할 수 있게 된다.In the above-described basic reinforcement facility 200, since the scour prevention material 270 is installed so as to surround the periphery thereof, the foundation reinforcement facility 200 is reinforced, and the pile fastening hole of the composite gasket 220 is provided. The 224 is a steel rod pile 230 is fastened to the structure consisting of a structure that is supported on the rock can maintain the bridge 100 in a solid state, in particular in relation to ensure the fall prevention of the bridge 100 It will be able to maintain a strong foundation of the national industry base.

상술한 구성에 의한 본 고안의 효과를 설명한다.The effect of this invention by the structure mentioned above is demonstrated.

본 고안의 홍수 유속에 의한 교각의 전도 방지용 기초 보강시설은, 세굴 방지물에 의해 기초 보강시설의 주위를 둘러싸도록 설치하는 관계로 기초 보강시설을 견고하게 지지함과 아울러 교각이 설치된 토사층의 세굴을 방지할 수 있는 효과를얻을 수 있고, 또한 기초 보강시설에는 수중 채움 콘크리트를 타설하기전 강봉 말뚝을 암반에 지지되는 구조로 구성한 관계로 홍수 등과 같은 자연 재해와 선박의 충돌에 의한 사고에도 견고한 교량을 유지할 수 있게 되는 효과를 얻을 수 있다.The foundation reinforcement facility for the fall prevention of bridge piers due to the flood flow rate of the present invention is installed so as to surround the surroundings of the foundation reinforcement facility by the scour prevention material. In addition, the foundation reinforcement facility has a strong bridge against natural disasters such as flooding and accidents due to the ship's structure, since the steel rod pile is supported on the rocks before the water-filled concrete is placed. The effect of being able to maintain is obtained.

그에 따라, 상기의 교각의 전도 방지용 기초 보강시설은, 국가 산업의 체계를 최대한 확보가능하므로 산업 발전에 이바지하는 효과를 얻을 수 있게 된다.Accordingly, the foundation reinforcement facility for the fall prevention of the pier can secure the system of the national industry as much as possible, thereby obtaining the effect of contributing to the industrial development.

Claims (2)

강 또는 바다에 시공되는 우물통 기초를 지지하는 기초 보강시설에 있어서,In the foundation reinforcement facility which supports the well base installed in a river or the sea, 기초 보강시설(200)은, 다수개의 강합성틀(210)이 원형 형태로 체결되고, 그 강합성틀(210)의 내측에 조립 볼트(240)에 의해 말뚝 설치용의 복합재 가스켓(220)이 체결되며, 상기의 복합재 가스켓(220)을 관통하여 암반에 지지되도록 다수개의 강봉 말뚝(230)이 설치되는 구조로,Foundation reinforcement facility 200, a plurality of steel composite frame 210 is fastened in a circular form, the composite gasket 220 for pile installation is fastened by the assembly bolt 240 inside the steel composite frame (210). And, through the composite gasket 220 is a structure in which a plurality of steel rod pile 230 is installed to be supported on the rock, 상기의 기초 보강시설(200)에는 주위를 둘러싸도록 세굴 방지물(270)이 설치되고,The base reinforcement facility 200 is provided with a scour prevention material 270 to surround the surrounding, 상기의 강합성틀(210)은, 상부 플랜지(212), 하부 플랜지(216) 및 라운딩부(214)가 일체로 형성되는 한편, 상기의 라운딩부(214)의 길이의 내측 양측에 체결판(217)이 형성되고 그 체결판(217)에 조립 볼트홀(218)이 형성되어 측면으로 다수개가 체결되며,The rigid composite frame 210 is formed with the upper flange 212, the lower flange 216 and the rounding portion 214 integrally, while the fastening plate (on both sides of the inner side of the length of the rounding portion 214) 217 is formed and the assembling bolt hole 218 is formed in the fastening plate 217 is fastened a plurality of sides, 상기의 강합성틀(210)에는 상,하부 플랜지(212)(216)에 다수개의 조립 볼트홀(218')이 형성되어 조립 볼트에 의해 다단으로 설치가 가능하며,In the steel composite frame 210, a plurality of assembly bolt holes 218 'are formed in the upper and lower flanges 212 and 216, so that they can be installed in multiple stages by assembly bolts. 상기의 복합재 가스켓(220)은, 강합성틀(210)의 라운딩부(214)와 동일한 형태로, 외측에 소구경의 볼트 체결홀(222)이 형성되고, 내측에 대구경의 말뚝 체결홀(224)이 형성되며,The composite gasket 220 has the same shape as the rounding part 214 of the steel composite frame 210, and has a small diameter bolt fastening hole 222 formed at an outer side thereof, and a large diameter pile fastening hole 224 formed at an inner side thereof. ) Is formed, 상기의 강봉 말뚝(230)은, 말뚝 몸체부(234)의 상부에 인장 너트(232)가 형성되고 말뚝 몸체부(234)의 하부가 뾰족하게 형성되는 것을 특징으로 하는 홍수 유속에 의한 교각의 전도 방지용 기초 보강시설.The steel rod pile 230, the tension nut 232 is formed on the upper portion of the pile body portion 234, the lower portion of the pile body portion 234 is characterized in that the conduction of the piers by the flood flow rate Preventive foundation reinforcement facility. 제 1 항에 있어서,The method of claim 1, 상기의 세굴 방지물(270)은, 망 구조물로 네트론 망(272)의 내측에 잡석(274), 콘크리트 파쇄물 및 암석이 삽입되고, 상기의 기초 보강시설(200)의 주위를 둘러싸도록 세굴 방지물(270)이 설치되어 보강되는 한편, 토사층의 세굴을 방지하도록 다단으로 적층되어 기초 보강시설(200)의 높이와 동일하도록 설치되는 것을 특징으로 하는 홍수 유속에 의한 교각의 전도 방지용 기초 보강시설.The scour prevention material 270, the rubble 274, concrete debris and rock is inserted into the netron net 272 to the net structure, and the scour prevention to surround the base reinforcement facility 200 While the water 270 is installed and reinforced, it is laminated in multiple stages to prevent scour of the soil layer is installed so as to be the same as the height of the foundation reinforcement facility 200, the foundation reinforcement for preventing fall of the piers by flood flow rate.
KR20-2003-0002847U 2003-01-29 2003-01-29 Basic reinforcement apparatus preventing upset of pier for bridge KR200311596Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2003-0002847U KR200311596Y1 (en) 2003-01-29 2003-01-29 Basic reinforcement apparatus preventing upset of pier for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2003-0002847U KR200311596Y1 (en) 2003-01-29 2003-01-29 Basic reinforcement apparatus preventing upset of pier for bridge

Publications (1)

Publication Number Publication Date
KR200311596Y1 true KR200311596Y1 (en) 2003-05-01

Family

ID=49333193

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0002847U KR200311596Y1 (en) 2003-01-29 2003-01-29 Basic reinforcement apparatus preventing upset of pier for bridge

Country Status (1)

Country Link
KR (1) KR200311596Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100973090B1 (en) * 2009-11-26 2010-07-30 (주) 선암기술연구소 Construction method and bridge safeguard for vessel guidance apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100973090B1 (en) * 2009-11-26 2010-07-30 (주) 선암기술연구소 Construction method and bridge safeguard for vessel guidance apparatus

Similar Documents

Publication Publication Date Title
KR100704737B1 (en) Precast-underwater prefabricated pier structure
JP6266821B2 (en) Deadline structure and deadline method
US20090110484A1 (en) Storm surge breaker system, barrier system and method of constructing same
JP3928225B2 (en) Temporary deadline structure
KR200401960Y1 (en) Beachcomber and billow prevention tool
KR100531147B1 (en) The bracket device for using the pc house installation at the footing of bridges
KR200311596Y1 (en) Basic reinforcement apparatus preventing upset of pier for bridge
JP4944691B2 (en) Water stop structure and water stop method for temporary closing
JP2002105931A (en) Passing type dam unit and dam
RU53312U1 (en) BRIDGE OF BRIDGE SUPPORT
KR100714234B1 (en) Beachcomber and billow prevention tool
KR200399343Y1 (en) The Bracket Device for Using the PC House Installation at the Footing of Bridges
EP2576918A2 (en) Pre-stressed concrete foundation for a marine building structure
KR101955579B1 (en) Method of constructing base of bridge pier in water and structure thereof
CN214832333U (en) Special reinforced structure of pier concrete structure
KR200255724Y1 (en) Flow thwarting structure of rigid frame pier
JP6298637B2 (en) Tide structure and its construction method
KR200256840Y1 (en) Structure of prevention falling down for the footing of pier
KR20130055512A (en) Water-proof dry-casing work table for repairing pier in the underwater
JP2013241776A (en) Tide structure
KR200411833Y1 (en) A temporary equipment for small river
KR20180137298A (en) Buttress Erosion Dam
JP6266820B2 (en) Wave-absorbing structure
JP2764447B2 (en) Ground structure such as pier support
KR20050000009A (en) Sectional pier wharf

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model