KR20030054599A - Method for uniforming congelation speed of cast slab surface in continuous casting - Google Patents

Method for uniforming congelation speed of cast slab surface in continuous casting Download PDF

Info

Publication number
KR20030054599A
KR20030054599A KR1020010084794A KR20010084794A KR20030054599A KR 20030054599 A KR20030054599 A KR 20030054599A KR 1020010084794 A KR1020010084794 A KR 1020010084794A KR 20010084794 A KR20010084794 A KR 20010084794A KR 20030054599 A KR20030054599 A KR 20030054599A
Authority
KR
South Korea
Prior art keywords
nozzles
series
cast
width direction
cooling water
Prior art date
Application number
KR1020010084794A
Other languages
Korean (ko)
Other versions
KR100843920B1 (en
Inventor
원영목
임창희
Original Assignee
주식회사 포스코
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 포스코 filed Critical 주식회사 포스코
Priority to KR1020010084794A priority Critical patent/KR100843920B1/en
Publication of KR20030054599A publication Critical patent/KR20030054599A/en
Application granted granted Critical
Publication of KR100843920B1 publication Critical patent/KR100843920B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/124Accessories for subsequent treating or working cast stock in situ for cooling
    • B22D11/1246Nozzles; Spray heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/128Accessories for subsequent treating or working cast stock in situ for removing
    • B22D11/1287Rolls; Lubricating, cooling or heating rolls while in use
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/22Controlling or regulating processes or operations for cooling cast stock or mould

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

PURPOSE: A method for controlling solidification speed of the shell of cast slab during continuous casting is provided to prevent quality defects at both edge parts of the cast slab by properly controlling distance between nozzles and the upper surface of the cast slab, position of the nozzles and spray amount of cooling water. CONSTITUTION: In a method for cooling cast slab passing through a plurality of rolls mounted at both sides of continuous caster segments in continuous casting process using cooling water, the method comprises the processes of spraying cooling water onto the front of the cast slab using first series of nozzles(30) of odd number rows installed in a width direction between the rolls mounted at both sides of the cast slab; and spraying cooling water onto the front of the cast slab using second series of nozzles(40) of even number rows installed at a higher position than the first series of nozzles(30) in a width direction between the rolls mounted at both sides of the cast slab so that difference of solidification rate between the central part and both side parts of the cast slab is minimized, wherein the second series of nozzles(40) are spaced apart from the cast slab as much as 1.3α when the first series of nozzles(30) are spaced apart from the cast slab as much as α, wherein the second series of nozzles(40) are arranged between the first series of nozzles(30) in a width direction of the cast slab, and wherein spray angle(18) of cooling water of the first and second series of nozzles(30,40) is approximately from 100 to 120 degrees.

Description

연속주조시 주편의 표면응고속도 균일화방법{METHOD FOR UNIFORMING CONGELATION SPEED OF CAST SLAB SURFACE IN CONTINUOUS CASTING}METHOD FOR UNIFORMING CONGELATION SPEED OF CAST SLAB SURFACE IN CONTINUOUS CASTING}

본 발명은 연속주조공정에서 생산되는 주편을 노즐들로부터 분사되는 냉각수로 냉각시키는 과정에서, 상기 노즐들이 상기 주편상면부터 이격되는 거리와 위치및 분사되는 냉각수 분사량을 적절히 조절함으로써, 상기 주편의 폭방향으로 발생되는 표면응고속도의 차이를 최소화시켜 상기 주편의 양가장자리부에 품질결함이 발생되는 것을 방지하기 위한 연속주조시 주편의 표면응고속도 균일화방법에 관한 것이다.The present invention, in the process of cooling the cast steel produced in the continuous casting process with the cooling water injected from the nozzles, by appropriately adjusting the distance and position of the nozzles from the upper surface of the cast steel and the injection amount of cooling water sprayed, the width direction of the cast steel It relates to a method of uniformity of the surface solidification rate of the cast during continuous casting to minimize the difference in the surface solidification rate generated by the quality defect in the two edges of the cast.

도 1은 종래의 연속주조공정 과정의 개략도이다.1 is a schematic diagram of a conventional continuous casting process.

도 1을 참조하면, 연속주조공정은 용강이 턴디시에서 수냉식 동제 주형(1)으로 공급되어 1차로 응고층이 형성된 후, 다수의 롤(2)로 구성된 연주기 세그먼트 (50)를 통과하면서 롤간에 설치된 노즐(3)에서 분사되는 냉각수에 의해 2차로 응고가 진행되어 완전히 응고되는 과정이며, 응고된 주편은 세그먼트 말단부에서 절단기(5)로 일정한 길이로 절단된다.Referring to FIG. 1, in the continuous casting process, molten steel is supplied from a tundish to a water-cooled copper mold 1 to form a solidification layer first, and then passes through a player segment 50 composed of a plurality of rolls 2. The solidification proceeds to the secondary by the cooling water sprayed from the installed nozzle (3) and is completely solidified, and the solidified slab is cut into a predetermined length by the cutter 5 at the segment end.

상기 연주기 세그먼트(50)는 상기 주형(1)으로부터 하부로 갈수록 세그먼트 1에서 세그먼트 9까지 배치된다. 세그먼트 1(풋롤(foot roll)부)(6)은 상기 주형(1)과 일체화된 부분이고, 세그먼트 2(벤더부)(7)는 수직부와 그 하단부에서 주편이 휨응력을 받는 부분이며, 세그먼트 3~5(캐스팅 보우(casting bow)부)(8)는 휘어진 주편 부분에 해당하고, 세그먼트 7(직선부)(9)은 주편이 펴지는 교정응력이 작용하는 부분이다. 펴진 주편(25)이 최종적으로 응고되어 나가는 부분이 세그먼트 8~10(수평부)(10)에 해당한다.The player segment 50 is arranged from segment 1 to segment 9 downward from the mold 1. Segment 1 (foot roll part) 6 is a part integrated with the mold 1, segment 2 (bender part) 7 is a part in which the slab is subjected to bending stress in the vertical part and its lower end part, 3 to 5 (casting bow) 8 correspond to the bent cast portion, and segment 7 (straight portion) 9 is the portion to which the straightening stress is applied. The portion where the cast slab 25 is finally solidified corresponds to segments 8 to 10 (horizontal portion) 10.

도 2는 상기 연주기 세그먼트(50)를 거쳐 생산된 주편(25)의 중앙부와 가장자리부를 도시한다. 상기 연주기 세그먼트(50)를 거쳐 생산된 주편(25)의 내부품질은 도 2에 도시된 바와 같이, 주편위치에 따라 차이가 발생한다. 즉, 상기 주편(25)의 중앙부에는 중심 편석대의 발생율이 크지 않으나 그 가장자리부에는 중심 편석대의 발생율이 높다.2 shows the center and the edge of the slab 25 produced via the player segment 50. As shown in FIG. 2, the internal quality of the cast steel 25 produced through the player segment 50 is different depending on the cast steel position. That is, the incidence rate of the center segregation zone is not large in the center portion of the cast piece 25, but the incidence rate of the center segregation zone is high in the edge portion thereof.

한편, 도 3은 종래의 주편의 폭방향 온도 측정결과도로서, 상기 세그먼트 1~10에 해당하는 주편(25)의 2차 냉각대에서 상기 주편(25)의 폭방향에 따른 온도측정결과를 도시한다.On the other hand, Figure 3 is a width measurement result of the conventional slab, the temperature measurement results along the width direction of the slab 25 in the secondary cooling zone of the slab 25 corresponding to the segments 1 to 10 shown. do.

도 3에 도시된 바와 같이, 대략 좌측부터 1280mm에 해당하는 주편의 중앙부를 기준으로 양측 400 mm지점에서 주편(25)의 온도가 가장 높게 나타나고, 상기 주편(25) 가장자리로부터 대략 250 mm 지점에서 응고지연부가 발생하며, 이에 따라 상기 주편(25)의 가장자리에서는 최종응고직전의 농화된 용강이 모여서 심한 중심편석대를 형성하게 된다. 여기서, 상기 주편(25)의 가장자리 끝단에 온도가 크게 감소하는 이유는 압연롤이 3 분할롤이기 때문에 롤과 롤 사이에 포켓이 존재하기 때문이다.As shown in FIG. 3, the temperature of the cast steel 25 is the highest at 400 mm on both sides with respect to the center of the cast steel corresponding to 1280 mm from the left, and solidified at a point approximately 250 mm from the edge of the cast steel 25. The delay portion is generated, and thus the thickened molten steel immediately before the final solidification gathers at the edge of the cast piece 25 to form a severe central segregation zone. Here, the reason why the temperature is greatly reduced at the edge end of the cast piece 25 is that the rolling roll is a three-part roll, so that a pocket exists between the roll and the roll.

한편, 상기 주편(25)은 몰드로부터 초기응고를 시작하여 이동하고, 상기 2차 냉각대를 거쳐 완전응고하게 된다. 그런데, 상기 2차 냉각대의 주편(25) 폭방향으로 냉각수 분포량이 다르다면, 상기 주편(25)의 중심부와 가장자리부의 응고속도에 차이가 발생되므로 전체적으로 불균일 응고가 발생하여 상기 주편(25) 내부품질에 차이를 유발할 수 있다.On the other hand, the cast piece 25 starts to move from the mold to initial solidification and moves to complete solidification through the secondary cooling zone. By the way, if the distribution of the cooling water in the width direction of the slab 25 of the secondary cooling stand is different, there is a difference in the solidification speed of the central portion and the edge portion of the slab 25 so that the overall non-uniform solidification occurs, the internal quality of the slab 25 Can cause differences.

도 4는 종래의 2차 냉각대의 노즐배열개략도이다.4 is a schematic view of a nozzle arrangement of a conventional secondary cooling stand.

도 4를 참조하면, 종래에 적용되어 왔던 2차 냉각대에서의 노즐들은 상기 주편(25)이 통과되는 연주기 세그멘트(50)의 양측방에 장착된 롤러들(2) 사이에 장착된 홀수열에 해당하는 제 1계열 노즐들(30)과 짝수열에 해당하는 제 2계열 노즐들(40)로 이루어진다.Referring to FIG. 4, nozzles in the secondary cooling stand that have been conventionally applied correspond to odd rows mounted between rollers 2 mounted on both sides of the player segment 50 through which the cast piece 25 passes. The first series nozzles 30 and the second series nozzles 40 corresponding to even numbers are formed.

상기 제 1계열 노즐들(30)은 5개이고, 상기 제 2계열 노즐들(40)은 4개이다. 여기서, 상기 제 1, 2계열 노즐들(30)(40)은 모두 상기 주편(25)으로부터의 선단거리(15)가 대략 220 ~ 240 mm 이격된 위치에 설치되고, 보다 바람직하게는 230mm 이격된 위치에 설치된다. 또한, 상기 제 1, 2계열 노즐들(30)(40)은 서로 노즐간 리(16)가 대략 380 ~ 400 mm, 보다 바람직하게는 390mm 씩 이격되어 설치된다.또한, 각 노즐당 비수거리(17)인 접촉면 거리는 대략 725 mm이고, 각 노즐의 냉각수분사각도(18)는 대략 110도이다.The first series nozzles 30 are five, and the second series nozzles 40 are four. Here, the first and second series nozzles 30 and 40 are all installed at a position where the tip distance 15 from the slab 25 is approximately 220 to 240 mm apart, and more preferably 230 mm apart. Is installed in position. In addition, the first and second series nozzles 30 and 40 are installed with the nozzles 16 spaced apart from each other by approximately 380 to 400 mm, more preferably 390 mm. 17) the contact surface distance is approximately 725 mm, and the cooling water spray angle 18 of each nozzle is approximately 110 degrees.

도 5는 도 4에 도시된 종래의 2차 냉각대의 노즐배열을 사용하여 냉각수를 분사하여 냉각작용을 실시한 경우, 2차 냉각대에서 주편(25)의 폭방향으로 냉각수 분사량을 측정한 결과도이다.5 is a result of measuring the amount of cooling water sprayed in the width direction of the slab 25 in the secondary cooling stand when the cooling action is performed by spraying the cooling water using the nozzle arrangement of the conventional secondary cooling stand shown in FIG. .

도 5를 참조하면, 상기 2차 냉각대에서 분사되는 주편(25)의 폭방향 냉각수 분사량 측정한 결과 비교적 균일한 분포를 나타내었다. 따라서, 상기 주편(25)의 응고지연부 발생에 따른 표면응고속도의 불균일 현상은 단순히 2차 냉각대에서의 폭방향 냉각수 분사량에 의한 결과는 아니라는 것을 알 수 있다.Referring to FIG. 5, as a result of measuring the widthwise cooling water injection amount of the slab 25 injected from the secondary cooling zone, it showed a relatively uniform distribution. Therefore, it can be seen that the non-uniformity of the surface solidification speed caused by the solidification delay of the slab 25 is not simply a result of the injection of the widthwise cooling water in the secondary cooling zone.

도 6은 주편 상의 수증기 이동도이다.6 is the water vapor mobility on the cast steel.

도 6을 참조하면, 2차 냉각대에서 분사되는 냉각수는 고온상태인 주편 표면(21)과 반응하여 자연적으로 기화되며, 기화된 수증기는 연주기 자체에 설치된 고압의 환풍구을 통하여 방출된다. 이 때, 기화된 수증기의 방출경로는 상기 노즐들(30)(40)에서 분사되는 압력에 근거하여 고압상태에서 저압상태로 이동함에 따라 상기 주편(25)의 폭방향 중앙부에서 압력이 낮은 가장자리부로 이동하게 되며, 이러한 수증기의 경로(22)에 의해 상기 냉각노즐들(30)(40)로 분사된 냉각수(20)는 상기 주편(25)의 가장자리부에서 방해를 받게 되어 실제로 상기 주편(25)에 도달되어 냉각작용에 사용되는 냉각수량이 적어진다.Referring to FIG. 6, the cooling water injected from the secondary cooling zone is naturally vaporized in response to the slab surface 21 at a high temperature, and the vaporized water vapor is discharged through the high pressure vent installed in the player itself. At this time, the discharge path of the vaporized water vapor is moved from the high pressure state to the low pressure state based on the pressure injected from the nozzles 30 and 40 from the widthwise center portion of the slab 25 to the low pressure edge portion. The cooling water 20 injected into the cooling nozzles 30 and 40 by the path 22 of the water vapor is disturbed at the edge of the cast steel 25 so that the cast steel 25 is actually moved. Is reached, the amount of cooling water used for cooling is reduced.

따라서, 상기 주편(25)의 가장자리부로 갈수록 수증기의 방해가 커짐에 따라 도 3에 도시된 바와 같이, 상기 주편(25)의 가장자리부가 냉각작용을 덜 받게 되어 상기 주편(25)의 가장자리부위의 표면온도가 높아지고, 이에 따라 상기 주편(25)의 가장자리부에 응고지연부가 발생하게 되어 상기 중앙부와의 응고속도와의 차이를 발생시키게 되며, 그 결과 전체적으로 주편(25)의 내부품질을 악화시키는 문제점이 있다.Therefore, as the interference of water vapor increases toward the edge portion of the slab 25, as shown in FIG. 3, the edge portion of the slab 25 is subjected to less cooling action and thus the surface of the edge portion of the slab 25. As the temperature increases, a solidification delay occurs at the edge of the slab 25, causing a difference from the solidification speed with the central portion. As a result, there is a problem of deteriorating the internal quality of the slab 25 as a whole. have.

본 발명은 상기와 같은 종래의 문제점을 해소하기 위하여 제안된 것으로서,연속주조공정에서 생산되는 주편을 노즐들로부터 분사되는 냉각수로 냉각시키는 과정에서, 상기 노즐들이 상기 주편상면부터 이격되는 거리와 위치 및 분사되는 비사량을 최적화하여, 주편의 폭방향으로 발생되는 표면응고속도의 차이를 최소화시켜 주편의 양측 가장자리부에 품질결합이 발생되는 것을 방지하기 위한 연속주조시 주편의 표면응고속도 균일화방법을 제공하는 것에 그 목적이 있다.The present invention has been proposed in order to solve the above conventional problems, in the process of cooling the slabs produced in the continuous casting process with the cooling water sprayed from the nozzles, the distance and position of the nozzles spaced apart from the upper surface of the slab and It provides a method of uniformizing the surface coagulation speed of the slab during continuous casting to optimize the sprayed shot to minimize the difference in surface coagulation speed generated in the width direction of the slab to prevent quality coupling from occurring at both edges of the slab. There is that purpose.

도 1은 종래의 연속주조공정 과정의 개략도;1 is a schematic diagram of a conventional continuous casting process;

도 2는 연주주편의 중앙부와 가장자리부의 품질상태도;2 is a quality state diagram of the center portion and the edge portion of the playing cast;

도 3은 종래의 주편의 폭방향 온도 측정결과도;3 is a width measurement result of the conventional cast steel;

도 4는 종래의 2차 냉각대의 노즐배열개략도;4 is a schematic view of the nozzle arrangement of a conventional secondary cooling stage;

도 5는 종래의 2차 냉각대에서 주편의 폭방향 냉각수 분사량 측정도;5 is a view of measuring the injection direction of the cooling water in the width direction of the slab in the conventional secondary cooling zone;

도 6은 주편 상의 수증기 이동도;6 is the vapor mobility on the cast steel;

도 7은 일정량으로 냉각수 분사시 주편의 표면온도분포의 실측정결과와 계산결과의 비교도;Figure 7 is a comparison of the actual measurement results and the calculation results of the surface temperature distribution of the cast when spraying the cooling water in a certain amount;

도 8은 일정량으로 냉각수 분사시 주편상의 기화된 수증기의 간섭에 따른 냉각수량 분포도;8 is a coolant amount distribution according to the interference of the vaporized water vapor on the slab during the cooling water injection in a certain amount;

도 9는 주편상의 기화된 수증기를 고려시 주편의 표면온도분포의 실측정결과와 계산결과 비교도;9 is a comparison between actual measurement results and calculation results of the surface temperature distribution of cast steels in consideration of vaporized vapor on cast steels;

도 10은 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법에서의 2차 냉각대의 노즐배열개략도;10 is a schematic view of the nozzle arrangement of the secondary cooling stage in the method of uniformizing the surface solidification rate of the cast during continuous casting according to the present invention;

도 11은 도 10에 따라 노즐들을 배치한 경우에서 노즐분사작업을 실시한 경우의 주편의 폭방향 냉각수 분사량 측정 결과도;FIG. 11 is a result of measuring the widthwise cooling water injection amount of the cast steel when the nozzle spraying operation is performed when the nozzles are arranged in accordance with FIG. 10; FIG.

도 12는 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법에서 2차 냉각대 내 주편의 폭방향의 표면온도분포의 실측정결과와 계산결과 비교도; 및12 is a comparison between actual measurement results and calculation results of the surface temperature distribution in the width direction of the cast steel in the secondary cooling zone in the method of uniformizing the surface solidification rate of the cast steel during continuous casting according to the present invention; And

도 13은 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법에서의 주편의 중앙부와 가장자리부의 품질상태도이다.13 is a quality state diagram of the center portion and the edge portion of the cast in the method of uniformizing the surface solidification rate of the cast during continuous casting according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 .... 수냉식 동제 주형 2 .... 롤들1 .... water cooled copper mold 2 .... rolls

3 .... 노즐 4 .... 환원철 배출스크류3 .... Nozzle 4 .... Reduced iron discharge screw

25 .... 주편30 .... 제 1계열 노즐들25 .... Cast 30 .... The first series of nozzles

40 .... 제 2계열 노즐들50 .... 연주기 세그먼트40 .... Second nozzles 50 .... Player segment

상기와 같은 목적을 달성하기 위한 기술적인 구성으로써 본 발명은, 연속주조공정의 연주기 세그먼트 양측에 장착된 다수의 롤들 사이로 통과되는 주편을 냉각수로 냉각시키는 방법에 있어서, 상기 주편 양측의 롤들 사이의 폭방향으로 설치된 홀수열의 제 1계열 노즐들로 상기 주편 전면에 냉각수를 분사하고, 상기 주편 양측의 롤들 사이의 폭방향으로 상기 제 1계열 노즐들보다 높게 설치된 짝수열의제 2계열노즐들로 상기 주편 전면에 냉각수를 분사하여, 상기 주편의 중앙부와 양측부의 응고속도의 차이를 최소화시킴을 특징으로 하는 연속주조시 주편의 표면응고속도 균일화방법를 마련함에 의한다.As a technical configuration for achieving the above object, the present invention provides a method for cooling a cast piece passed between a plurality of rolls mounted on both sides of a player segment in a continuous casting process with cooling water, the width between the rolls on both sides of the cast piece. Cooling water is sprayed on the front surface of the cast steel by the first row nozzles in the odd-numbered rows installed in the direction, and the front surface of the cast steel by the even-numbered second series nozzles installed in the width direction between the rolls on both sides of the cast steel. By spraying the cooling water to minimize the difference in the solidification rate of the central portion and the side portion of the cast steel by providing a method of uniformizing the surface solidification speed of the cast during continuous casting.

본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법은, 연속주조공정의 연주기 세그먼트 양측에 장착된 다수의 롤들(2) 사이로 통과되는 주편(25)을 냉각수로 냉각시키는 방법에 있어서, 상기 주편(25) 양측의 롤들(2) 사이의 폭방향으로 설치된 홀수열의 제 1계열 노즐들(30)로 상기 주편(25) 전면에 냉각수를 분사하고, 상기 주편(25) 양측의 롤들(2) 사이의 폭방향으로 상기 제 1계열 노즐들(30)보다 높게 설치된 짝수열의 제 2계열노즐들(40)로 상기 주편(25) 전면에 냉각수를 분사하여, 상기 주편(25) 중앙부와 양측부의 응고속도의 차이를 최소화시킨 것이다.In the method of uniformizing the surface solidification speed of the cast during continuous casting according to the present invention, in the method of cooling the slab 25 passed between a plurality of rolls 2 mounted on both sides of the machine segment of the continuous casting process with a cooling water, (25) Cooling water is sprayed on the entire surface of the cast steel (25) with the first series nozzles (30) in odd rows provided in the width direction between the rolls (2) on both sides, and between the rolls (2) on both sides of the cast steel (25). Cooling water is sprayed on the entire surface of the cast steel (25) with even-numbered second series nozzles (40) installed higher than the first series nozzles (30) in the width direction of the solidification rate of the central portion and both sides of the cast steel (25) Minimize the difference.

여기서, 상기 제 1계열 노즐들(30)은 홀수열당 상기 주편(25) 폭방향으로 5개씩 설치되게 하고, 상기 제 2계열 노즐들(40)은 짝수열당 상기 주편(25) 폭방향으로 4개씩 설치되게 한 뒤에 분사작업을 실시한다.Here, the first series nozzles 30 are provided five in the width direction of the slab 25 per odd row, and the second series nozzles 40 in the width direction of the slab 25 per even row. After installation, perform spraying work.

또한, 상기 제 2계열 노즐들(40)은 상기 제 1계열 노즐들(30)이 상기 주편 (25)으로부터 거리 a만큼 이격되어 설치될 때, 상기 주편(25)으로부터 1.3a만큼 이격되어 설치되어 상기 주편(25) 전면에 분사작업을 실시한다.In addition, the second series nozzles 40 are installed to be spaced apart from the cast piece 25 by 1.3 a when the first series nozzles 30 are spaced apart from the cast piece 25 by a distance a. Spraying is performed on the front surface of the cast steel (25).

또한, 상기 제 2계열 노즐들(40)은 각각 상기 주편(25)의 폭방향으로 상기 제 1계열 노즐들(30) 사이에 배치되게 설치되어 상기 주편(25) 전면에 분사작업을실시한다.In addition, the second series nozzles 40 are respectively disposed to be disposed between the first series nozzles 30 in the width direction of the slab 25 to spray the entire surface of the slab 25.

한편, 상기 제 1, 2계열 노즐들(30)(40)은 상기 주편(25)의 폭방향으로 양측단에 설치된 노즐들이 각각 내측으로 그 다음에 설치된 노즐과 서로 대략 b만큼 이격되어 설치될 때, 상기 제 1, 2계열 노즐들(30)(40)의 양측단에 설치된 노즐들 사이에 배치된 노즐들은 서로 폭방향으로 대략 1.63b만큼 이격설치되게 한 뒤, 상기 주편(25) 전면에 분사작업을 실시한다.On the other hand, the first and second series nozzles (30, 40) when the nozzles provided at both ends in the width direction of the slab 25 are respectively installed inwardly spaced apart from each other next to the nozzles installed next The nozzles disposed between the nozzles disposed at both ends of the first and second series nozzles 30 and 40 are spaced apart from each other by about 1.63b in the width direction, and then sprayed onto the front surface of the cast steel 25. Do the work.

그리고, 상기 제 1, 2계열 노즐들(30)(40)의 냉각수 분사각은 대략 100 ~ 120 도를 유지한 상태에서 냉각수의 분사작업을 실시하고, 보다 바람직하게는 110 도에서 분사작업을 실시한다.In addition, the coolant spray angles of the first and second series nozzles 30 and 40 are sprayed with coolant while maintaining approximately 100 to 120 degrees, and more preferably, sprayed at 110 degrees. do.

아울러, 상기 제 1, 2계열 노즐들(30)(40)은 상기 주편(25) 폭방향의 중앙부에 배치된 노즐들로부터 분사되는 냉각수량보다 상기 주편(25) 폭방향의 양측방에 배치된 노즐들로부터 대략 20 ~ 30 % 많게 냉각수가 분사되도록 한다.In addition, the first and second series nozzles 30 and 40 are disposed on both sides of the slab 25 in the width direction than the amount of cooling water injected from the nozzles disposed in the center portion of the slab 25 in the width direction. Allow approximately 20 to 30% more coolant spray from the nozzles.

이하, 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법을 도면과 실시예에 따라서 보다 상세히 설명한다.Hereinafter, the method of uniformizing the surface solidification rate of the cast during continuous casting according to the present invention will be described in more detail according to the drawings and embodiments.

<실시예><Example>

도 7은 일정량으로 냉각수 분사시 주편의 표면온도분포의 실측정결과와 계산결과의 비교도이다. 즉, 도 7은 상기 주편(25) 폭방향으로 2차 냉각대에서 냉각수가 일정한 양으로 분사된다고 가정할 때, 열전달 응고모델을 이용한 계산결과와 측정치를 함께 나타낸 것이다.Figure 7 is a comparison of the actual measurement results and the calculation results of the surface temperature distribution of the cast steel when spraying a certain amount of cooling water. That is, FIG. 7 shows the calculation result and the measured value using the heat transfer coagulation model assuming that the cooling water is injected in a constant amount in the secondary cooling zone in the slab 25 width direction.

도 7을 참조하면, 열전달 응고모델을 이용한 경우에는 상기 주편(25) 중앙부나 가장자리부의 온도는 884도로 균일한 분포를 나타내어, 실험측정치와 상당히 다른 경향을 보여주고 있다. 따라서 상기 주편(25)으로 냉각수 분사량이 일정하게 균등히 분사된다는 조건은 실제 주편(25)에서 발생되는 불균일 응고에 의한 응고지연부 현상 및 주편(25)의 내부품질에 영향을 주지 못한다.Referring to FIG. 7, when the heat transfer coagulation model is used, the temperature of the center portion or the edge portion of the slab 25 is uniformly distributed at 884 degrees, which is quite different from the experimental measurement. Therefore, the condition that the cooling water injection amount is uniformly injected into the cast steel 25 does not affect the internal coagulation delay phenomenon and the internal quality of the cast steel 25 due to the uneven solidification generated in the actual cast steel 25.

앞서 가정과는 달리, 2차 냉각대에서 분사되는 냉각수 분사량이 불균일하게 분사된다고 가정하였다. 도 8은 일정량으로 냉각수를 분사시 주편(25) 상의 기화된 수증기에 따른 냉가수량 분포도이다. 도 8을 참조하면, 기화된 수증기에 따른 2차 냉각대에서 분사되는 냉각수량의 간섭정도는 그림 8에서와 같이 사인곡선을 갖으며 냉각수량의 간섭정도는 주편(25)의 양측방에서 25% 감소한다고 가정하였다.Unlike the previous assumption, it is assumed that the amount of cooling water injected from the secondary cooling zone is unevenly injected. 8 is a distribution diagram of the amount of cold water according to vaporized water vapor on the slab 25 when spraying the cooling water in a predetermined amount. Referring to FIG. 8, the degree of interference of the amount of cooling water injected from the secondary cooling zone according to the vaporized water vapor has a sinusoidal curve as shown in FIG. 8, and the degree of interference of the amount of cooling water is 25% on both sides of the slab 25. It is assumed to decrease.

이 때, 열전달 응고모델을 이용하여 계산한 결과는 도 9에 도시된다. 도 9는 주편상의 기화된 수증기를 고려시 주편의 표면온도분포의 실측정결과와 계산결과 비교도이다. 도 9에 도시된 바와 같이, 열전달 응고모델을 이용한 계산결과와 실험을 통한 실측정결과가 잘 일치함을 알 수 있다. 따라서, 상기 주편(25) 표면의 불균일 응고에 의해 발생되는 응고지연부를 해소하기 위해 열전달 응고모델을 이용한 계산결과를 기초로 하여 상기 주편(25)의 양쪽가장자리부에 냉각수가 20 ~ 30% 더 많이 분사되게, 바람직하게는 25% 정도 더 많이 분사되게 하는 실험을 실시하였다.At this time, the results calculated using the heat transfer coagulation model is shown in FIG. Figure 9 is a comparison of the actual measurement results and the calculation results of the surface temperature distribution of the cast steel in consideration of vaporized water vapor on the cast steel. As shown in FIG. 9, it can be seen that the calculation result using the heat transfer coagulation model and the actual measurement result through the experiment are in good agreement. Accordingly, 20 to 30% more cooling water is provided at both edges of the cast piece 25 based on the calculation result using the heat transfer solidification model to solve the coagulation delay caused by uneven solidification of the surface of the cast piece 25. Experiments were conducted to spray, preferably 25% more.

상기 주편(25)의 양쪽 가장자리부에 2차 냉각대의 폭방향 냉각수량 분포를 25% 로 증가시키기 위해서, 상기 제 1계열 노즐들(30)과 제 2계열 노즐들(40)의 설치위치를 변화시켰다.In order to increase the width distribution of the coolant in the width direction of the secondary cooling zone to 25% at both edges of the slab 25, the installation positions of the first series nozzles 30 and the second series nozzles 40 are changed. I was.

도 10은 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법에서의 2차 냉각대의 노즐배열개략도이다. 도 10을 참조하면, 2차 냉각대에서 본 발명에 따른 새로운 노즐배열은 제 1계열 노즐들(30)이 상기 연주기 세그먼트(50) 양측방에서 홀수열에 각각 상기 주편(5)의 폭방향으로 5개씩 설치되게 하였고, 짝수열에 각각 상기 주편(5)의 폭방향으로 각각 4개씩 설치되게 하였다.10 is a schematic view of the nozzle arrangement of the secondary cooling stage in the method of uniformizing the surface solidification rate of the cast during continuous casting according to the present invention. Referring to FIG. 10, a new nozzle arrangement in accordance with the present invention in the secondary cooling zone is characterized in that the first series nozzles 30 are arranged in the width direction of the slab 5 in odd rows on both sides of the player segment 50, respectively. The dogs were installed one by one, and four dogs were installed in even rows in the width direction of the cast piece 5, respectively.

또한, 상기 제 1계열 노즐들(30)은 상기 주편(25)의 선단거리(15)가 대략 220 ~ 240 mm 로 이격된 지점에 설치되게 하였고, 보다 바람직하게는 230 mm 로 이격된 지점에 설치되게 하였다. 그리고, 상기 제 2계열 노즐들(40)은 상기 주편(25)의 선단거리(15)가 대략 290 ~ 310 mm 로 이격된 지점에 설치되게 하였고, 보다 바람직하게는 300 mm 로 이격된 지점에 설치되게 하였다.In addition, the first series nozzles 30 are installed at a point where the distal end distance 15 of the slab 25 is separated by approximately 220 to 240 mm, and more preferably, at a point separated by 230 mm. It was made. In addition, the second series nozzles 40 are installed at a point where the distal end distance 15 of the slab 25 is spaced approximately 290 to 310 mm, and more preferably installed at a point spaced 300 mm. It was made.

또한, 상기 제 1계열 노즐들(30)과 제 2계열 노즐들(40)의 배치는 모두 양측단에 설치된 노즐들이 내측으로 그 다음에 배치된 노즐과는 거리(16)가 대략 290 ~ 310 mm 이격된 위치로 설치되게 하였고, 상기 양측단에 설치된 노즐들의 사이에 배치된 노즐들 사이의 간격은 대략 480 ~ 500 mm 으로 이격설치되게 하였다.In addition, the arrangement of the first series nozzles 30 and the second series nozzles 40 is approximately 290 to 310 mm in distance 16 from the nozzles in which nozzles disposed at both ends are disposed inward. It was to be installed in a spaced apart position, the interval between the nozzles disposed between the nozzles installed on both sides are to be spaced apart by approximately 480 ~ 500 mm.

또한, 상기 제 1계열 노즐들(30)과 제 2계열 노즐들(40)의 배치는 보다 바람직하게는 모두 양측단에 설치된 노즐들이 내측으로 그 다음에 배치된 노즐과는 거리(16)가 300 mm 이격된 위치로 설치되게 하였고, 상기 양측단에 설치된 노즐들의 사이에 배치된 노즐들 사이의 간격은 490 mm 으로 이격설치되게 하였다.Further, the arrangement of the first series nozzles 30 and the second series nozzles 40 is more preferably a distance 16 between the nozzles disposed at both ends of the first series nozzles 30 and the second array nozzles 40. It was set to be spaced apart by mm, and the distance between the nozzles disposed between the nozzles installed at both ends is to be spaced apart by 490 mm.

한편, 상기 제 1계열 노즐들(30)은 각 노즐당 비수거리(17a)가 대략 725mm이고, 이에 반해 상기 제 2계열 노즐들(40)은 각 노즐당 비수거리(17b)가 대략 875mm이다.On the other hand, the first series nozzles 30 have a specific distance 17a of each nozzle about 725 mm, while the second series nozzles 40 have a specific distance 17b of each nozzle approximately 875 mm.

그리고, 상기 제 1, 2계열 노즐들(30)(40)은 모두 각 노즐들의 냉각수 분사각도(18)를 110도롤 동일하게 설정한 뒤, 냉각수 분사작업을 실시하였다.In addition, the first and second series nozzles 30 and 40 all set the cooling water injection angle 18 of the nozzles equal to 110 degrees, and then performed the cooling water spraying operation.

상기와 같이 설치한 뒤, 제 1, 2계열의 노즐들(30)(40)로부터 냉각수를 분사시킨 후의 결과는 도 11에 도시된다. 도 11을 참조하면, 상기와 같이 제 1, 2계열의 노즐들(30)(40)을 배치한 상태에서 노즐분사작업을 실시하면, 상기 주편(25)의 양측부에서의 냉각수 분사량이 중앙부보다 대략 25% 가량 증가된 것을 알 수 있다.After the installation as described above, the result after spraying the cooling water from the nozzles 30 and 40 of the first and second series is shown in FIG. Referring to FIG. 11, when the nozzle spraying operation is performed in a state in which the nozzles 30 and 40 of the first and second series are arranged as described above, the amount of cooling water injected from both sides of the cast steel 25 is greater than that of the center portion. It can be seen that the increase is about 25%.

상기와 같이 제 1, 2 노즐들(30)(40)을 배치시킨 뒤, 상기 주편(25)의 폭방향에 따른 냉각수 분사량의 분포를 연주기에 적용하여 주편(25)을 생산하는 과정에서 주편의 표면온도를 측정하였고, 이와 동시에 동일시스템에 대해서 열전달 응고모델을 이용하여 계산하였다.After arranging the first and second nozzles 30 and 40 as described above, in the process of producing the cast steel 25 by applying the distribution of the cooling water injection in the width direction of the cast steel 25 to the machine Surface temperature was measured and at the same time calculated using the heat transfer coagulation model for the same system.

도 12는 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법에서 2차 냉각대 내 주편의 폭방향의 표면온도분포의 실측정결과와 계산결과 비교도이다.12 is a comparison between actual measurement results and calculation results of the surface temperature distribution in the width direction of the slab in the secondary cooling zone in the method of uniformizing the surface solidification rate of the cast during continuous casting according to the present invention.

도 12를 참조하면, 기화된 수증기의 간섭을 고려여 냉각수가 상기 주편(25) 가장자리부에 20~30% 더 많이 분사되도록 한 경우, 상기 주편(25)의 표면온도는 균일한 분포를 나타내고 있으며, 계산결과도 비슷한 양상으로 예측되었다. 또한, 도 3과 비교해 볼 때, 상기 주편(25)의 표면온도는 불균일응고에 의한 응고지연부가 현저히 저감되었다.Referring to FIG. 12, when cooling water is sprayed 20 to 30% more on the edge of the slab 25 in consideration of the interference of vaporized water vapor, the surface temperature of the slab 25 shows a uniform distribution. As a result, the calculations were predicted in a similar fashion. In addition, compared with FIG. 3, the surface temperature of the slab 25 was significantly reduced in the solidification delay portion due to non-uniform solidification.

도 13은 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법에서의 주편의 중앙부와 가장자리부의 품질상태도이다.13 is a quality state diagram of the center portion and the edge portion of the cast in the method of uniformizing the surface solidification rate of the cast during continuous casting according to the present invention.

도 13을 참조하면, 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법을 사용한 뒤에 응고지연부가 저감되었고, 이에 따라 상기 주편(25)의 중심편석대 및 중앙부와 가장자리부의 표면응고속도의 차이가 크게 감소하였다.Referring to FIG. 13, the solidification delay was reduced after using the method of uniformizing the surface solidification speed of the cast steel during continuous casting according to the present invention, and thus the difference between the surface segregation speed of the center segregation zone and the center portion and the edge portion of the cast steel 25 was reduced. Decreased significantly.

상술한 바와 같이 본 발명에 따른 연속주조시 주편의 표면응고속도 균일화방법에 의하면, 연속주조공정에서 생산되는 주편을 노즐들로부터 분사되는 냉각수로 냉각시키는 과정에서, 상기 노즐들이 상기 주편상면부터 이격되는 거리와 위치및 분사되는 냉각수 분사량을 적절히 조절하여 상기 주편의 폭방향으로 발생되는 표면응고속도의 차이를 최소화시키고, 이에 따라 상기 주편의 양가장자리부에 품질결합이 발생되는 것을 방지하는 유용한 효과가 있다.As described above, according to the method of uniformizing the surface solidification speed of the cast during continuous casting according to the present invention, in the process of cooling the cast produced in the continuous casting process with cooling water injected from the nozzles, the nozzles are spaced apart from the upper surface of the cast. By appropriately adjusting the distance, the position and the amount of sprayed coolant to minimize the difference in the surface solidification rate generated in the width direction of the cast steel, there is a useful effect of preventing the quality coupling is generated in both edges of the cast steel .

본 발명은 특정한 실시예에 관련하여 도시하고 설명하였지만, 이하의 청구범위에 의해 마련되는 본 발명의 정신이나 분야를 벗어나지 않는 한도내에서 본 발명이 다양하게 개조 및 변화될수 있다는 것을 당업계에서 통상의 지식을 가진자는 용이하게 알수 있음을 밝혀두고자 한다.While the invention has been shown and described with respect to specific embodiments thereof, it will be apparent to those skilled in the art that various changes and modifications can be made without departing from the spirit or scope of the invention as set forth in the claims below. I would like to clarify that knowledge is easy to know.

Claims (7)

연속주조공정의 연주기 세그먼트 양측에 장착된 다수의 롤들 사이로 통과되는 주편을 냉각수로 냉각시키는 방법에 있어서,In the method of cooling the cast steel passing between a plurality of rolls mounted on both sides of the machine segment of the continuous casting process with a coolant, 상기 주편(25) 양측의 롤들(2) 사이의 폭방향으로 설치된 홀수열의 제 1계열 노즐들(30)로 상기 주편(25) 전면에 냉각수를 분사하고, 상기 주편(25) 양측의 롤들(2) 사이의 폭방향으로 상기 제 1계열 노즐들보다 높게 설치된 짝수열의 제 2계열노즐들(40)로 상기 주편 전면에 냉각수를 분사하여, 상기 주편(25)의 중앙부와 양측부의 응고속도의 차이를 최소화시킴을 특징으로 하는 연속주조시 주편의 표면응고속도 균일화방법.Cooling water is injected onto the entire surface of the cast steel 25 by the first series nozzles 30 in an odd-numbered row installed in the width direction between the rolls 2 on both sides of the cast steel 25, and the rolls 2 on both sides of the cast steel 25. Cooling water is sprayed on the entire surface of the cast steel by the even-numbered second series nozzles 40 installed higher than the first series nozzles in the width direction between the first and second series nozzles. Uniformity of surface coagulation rate of cast steel during continuous casting characterized by minimization. 제 1항에 있어서,The method of claim 1, 상기 제 2계열 노즐들(40)은 상기 제 1계열 노즐들(30)이 상기 주편(25)으로부터 거리 a만큼 이격되어 설치될 때, 상기 주편(25)으로부터 1.3a만큼 이격되어 설치됨을 특징으로 하는 연속주조시 주편의 표면응고속도 균일화방법.The second series nozzles 40 may be installed to be spaced apart from the cast piece 25 by 1.3 a when the first series nozzles 30 are spaced apart from the cast piece 25 by a distance a. Uniformity of surface solidification rate of cast steel during continuous casting 제 1항에 있어서,The method of claim 1, 상기 제 2계열 노즐들(40)은 각각 상기 주편(25)의 폭방향으로 상기 제 1계열 노즐들(30)의 사이에 배치되게 설치됨을 특징으로 하는 연속주조시 주편의 표면응고속도 균일화방법.The second series nozzles (40) are respectively installed so as to be disposed between the first series nozzles (30) in the width direction of the slab (25) characterized in that the surface solidification rate uniformity of the cast during continuous casting. 제 1항에 있어서,The method of claim 1, 상기 제 1, 2계열노즐들(30)(40)은 상기 주편(25)의 폭방향으로 양측단에 설치된 노즐들이 각각 내측으로 그 다음에 설치된 노즐과 서로 대략 b만큼 이격되어 설치될 때, 상기 제 1, 2계열 노즐들(30)(40)의 양측단에 설치된 노즐들 사이에 배치된 노즐들은 서로 폭방향으로 대략 1.63b만큼 이격설치되게 함을 특징으로 하는 연속주조시 주편의 표면응고속도 균일화방법.The first and second series nozzles 30 and 40 are each provided with nozzles installed at both ends in the width direction of the slab 25 inwardly spaced apart from each other by the next nozzles. The surface coagulation rate of the cast during continuous casting, characterized in that the nozzles disposed between the nozzles provided at both ends of the first and second series nozzles 30 and 40 are spaced apart by about 1.63b from each other in the width direction. Homogenization method. 제 1항에 있어서,The method of claim 1, 상기 제 1, 2계열 노즐들(30)(40)의 냉각수 분사각은 대략 100 ~ 120 도임을 특징으로 하는 연속주조시 주편의 표면응고속도 균일화방법.Cooling water injection angle of the first, second series nozzles (30) (40) is approximately 100 ~ 120 degrees, the surface solidification rate uniformity method of the cast during continuous casting. 제 1항에 있어서,The method of claim 1, 상기 제 1, 2계열 노즐들(30)(40)은 상기 주편(25) 폭방향의 중앙부에 배치된 노즐들로부터 분사되는 냉각수량보다 상기 주편(25) 폭방향의 양측방에 배치된 노즐들로부터 대략 20 ~ 30 % 많게 냉각수가 분사되도록 함을 특징으로 하는 연속주조시 주편의 표면응고속도 균일화방법.The first and second series nozzles 30 and 40 are nozzles disposed on both sides of the slab 25 in the width direction than the amount of cooling water injected from the nozzles disposed in the center portion of the slab 25 in the width direction. Method for homogenizing the surface solidification rate of the cast during continuous casting, characterized in that about 20 ~ 30% more cooling water is injected from the. 제 1항에 있어서,The method of claim 1, 상기 제 1계열 노즐들(30)은 홀수열당 상기 주편(25) 폭방향으로 5개씩 설치되고, 상기 제 2계열 노즐들(40)은 짝수열당 상기 주편(25) 폭방향으로 4개씩 설치됨을 특징으로 하는 연속주조시 주편의 표면응고속도 균일화방법.Each of the first series nozzles 30 is installed in the width direction of the cast steel 25 per odd row, and the second series nozzles 40 are installed in the width direction of the cast steel 25 per even row. Uniformity of surface coagulation rate of cast steel during continuous casting.
KR1020010084794A 2001-12-26 2001-12-26 Method for uniforming congelation speed of cast slab surface in continuous casting KR100843920B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010084794A KR100843920B1 (en) 2001-12-26 2001-12-26 Method for uniforming congelation speed of cast slab surface in continuous casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010084794A KR100843920B1 (en) 2001-12-26 2001-12-26 Method for uniforming congelation speed of cast slab surface in continuous casting

Publications (2)

Publication Number Publication Date
KR20030054599A true KR20030054599A (en) 2003-07-02
KR100843920B1 KR100843920B1 (en) 2008-07-03

Family

ID=32213232

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010084794A KR100843920B1 (en) 2001-12-26 2001-12-26 Method for uniforming congelation speed of cast slab surface in continuous casting

Country Status (1)

Country Link
KR (1) KR100843920B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102303107A (en) * 2011-09-22 2012-01-04 首钢总公司 Secondary cooling nozzle arrangement method for straight arc plate blank continuous casting machine
WO2014098490A1 (en) * 2012-12-21 2014-06-26 (주)포스코 Hybrid cooling nozzle apparatus, and method for controlling cooling nozzle of continuous casting equipment using same
KR101499432B1 (en) * 2012-06-28 2015-03-09 현대제철 주식회사 Realignment method for spray nozzles of cooling water on continuous casting process
CN114641356A (en) * 2019-10-29 2022-06-17 杰富意钢铁株式会社 Secondary cooling method for continuous casting cast piece

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101344899B1 (en) 2012-02-29 2013-12-26 현대제철 주식회사 Realignment method for spray nozzles of cooling water on continuous casting process

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62144857A (en) * 1985-12-19 1987-06-29 Nippon Kokan Kk <Nkk> Cooling water spray controlling method for continuous casting slab
JP2845117B2 (en) * 1993-12-30 1999-01-13 日本鋼管株式会社 Cooling method for continuous cast slab
KR100405907B1 (en) * 1999-12-27 2003-11-14 주식회사 포스코 Cooling pattern of continuous casting slab for the decrease of center segregation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102303107A (en) * 2011-09-22 2012-01-04 首钢总公司 Secondary cooling nozzle arrangement method for straight arc plate blank continuous casting machine
KR101499432B1 (en) * 2012-06-28 2015-03-09 현대제철 주식회사 Realignment method for spray nozzles of cooling water on continuous casting process
WO2014098490A1 (en) * 2012-12-21 2014-06-26 (주)포스코 Hybrid cooling nozzle apparatus, and method for controlling cooling nozzle of continuous casting equipment using same
CN114641356A (en) * 2019-10-29 2022-06-17 杰富意钢铁株式会社 Secondary cooling method for continuous casting cast piece
CN114641356B (en) * 2019-10-29 2024-04-05 杰富意钢铁株式会社 Secondary cooling method for continuous casting cast sheet

Also Published As

Publication number Publication date
KR100843920B1 (en) 2008-07-03

Similar Documents

Publication Publication Date Title
CN110666125B (en) Method for eliminating warping of continuous casting billet
CN107414049B (en) Refining control method for metallographic structure of surface layer of corner of continuous casting slab
KR101252645B1 (en) Continuous Casting Method and Continuous Casting Apparatus
KR100843920B1 (en) Method for uniforming congelation speed of cast slab surface in continuous casting
JP2003094106A (en) Method and device for cooling steel plate
KR100817171B1 (en) Method and device for continuous casting and subsequent forming of a steel billet, especially a billet in the form of an ingot or a preliminary section
JP3293794B2 (en) Cooling system for continuous casting machine
JP3287254B2 (en) Method and apparatus for cooling high-temperature steel sheet
JP3747546B2 (en) Method and apparatus for cooling high temperature steel sheet
KR101353630B1 (en) Hot Plate Cooling Apparatus
JPH0839222A (en) Apparatus for uniformizing temperature in width direction of cast slab in twin roll continuous caster
JP2007203317A (en) Thermal crown control device, rolling mill, and metal strip manufacturing method using the rolling mill
KR100406381B1 (en) Apparatus for supplying the shieding gas to cooling roll in twin roll strip casting machine
KR20150075571A (en) Apparatus for producing bar of continuous casting process
JP3617448B2 (en) Steel plate draining method and apparatus
JP3794085B2 (en) High temperature steel plate cooling device
JPH09201661A (en) Method for secondary-cooling continuously cast slab
JPH10314826A (en) Method for cooling high-temperature steel sheet
JP7356016B2 (en) Method for rolling rectangular cross-section steel billets, continuous casting and rolling equipment, and rolling equipment
KR20120074747A (en) Method and apparatus for preventing hole type defect of piece
JP3173574B2 (en) High temperature steel plate cooling system
JPH09150249A (en) Roll for secondary cooling zone in continuous caster and continuous casting method
JPH1157836A (en) Method of and device for cooling steel plate
CN112743054A (en) Crystallizer device for inhibiting size of original austenite grains at corner of continuous casting slab
JPH0919746A (en) Continuous casting method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130603

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140623

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150626

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160627

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170628

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180626

Year of fee payment: 11