KR20030035611A - Boiler control device and method by operation priority of main and sub remote controller - Google Patents

Boiler control device and method by operation priority of main and sub remote controller Download PDF

Info

Publication number
KR20030035611A
KR20030035611A KR1020010067727A KR20010067727A KR20030035611A KR 20030035611 A KR20030035611 A KR 20030035611A KR 1020010067727 A KR1020010067727 A KR 1020010067727A KR 20010067727 A KR20010067727 A KR 20010067727A KR 20030035611 A KR20030035611 A KR 20030035611A
Authority
KR
South Korea
Prior art keywords
boiler
room
main
unit
sub
Prior art date
Application number
KR1020010067727A
Other languages
Korean (ko)
Other versions
KR100418051B1 (en
Inventor
이황의
권기출
박대우
Original Assignee
린나이코리아 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 린나이코리아 주식회사 filed Critical 린나이코리아 주식회사
Priority to KR10-2001-0067727A priority Critical patent/KR100418051B1/en
Publication of KR20030035611A publication Critical patent/KR20030035611A/en
Application granted granted Critical
Publication of KR100418051B1 publication Critical patent/KR100418051B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1066Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D23/00Control of temperature
    • G05D23/19Control of temperature characterised by the use of electric means
    • G05D23/1902Control of temperature characterised by the use of electric means characterised by the use of a variable reference value
    • G05D23/1904Control of temperature characterised by the use of electric means characterised by the use of a variable reference value variable in time
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1015Arrangement or mounting of control or safety devices for water heating systems for central heating using a valve or valves
    • F24D19/1018Radiator valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/02Fluid distribution means
    • F24D2220/0207Pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/02Fluid distribution means
    • F24D2220/0235Three-way-valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/02Fluid distribution means
    • F24D2220/0271Valves

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

PURPOSE: A boiler control device and method by operation priority of main and sub remote controller are provided to allow controlling on/off of the boiler in each of rooms. CONSTITUTION: A boiler control device comprises a main remote controller(1) setting running of a boiler and temperature; a main control part(2) installed in a boiler main body(6) to control running and stopping of the boiler; a room control part(3) opening and closing a valve for each room; and a plurality of sub remote controllers(4) installed in the rooms to allow a user to operate and set for heating.

Description

메인 및 서브 리모콘 조작우선 순위에 의한 보일러의 제어장치 및 그 방법{Boiler Control Device and Method by Operation Priority of Main and Sub Remote Controller}Boiler Control Device and Method by Operation Priority of Main and Sub Remote Control Priority {Boiler Control Device and Method by Operation Priority of Main and Sub Remote Controller}

본 발명은 메인 및 서브 리모콘 조작우선 순위에 의한 보일러의 제어장치 및 그 방법에 관한 것으로 더욱 상세히는, 하나의 보일러에 전체를 제어할 수 있는 메인 리모콘과 각실의 온수/난방온도를 제어할 수 있는 수개의 서브 리모콘이 구비된 온수/난방 시스템에서 각 리모콘의 조작에 부응하는 우선순위를 주어 각실에서 보일러를 제어할 수 있고, 또 보일러 본체에서도 각실을 제어할 수 있도록 하여 별도의 보일러 조작에 따른 불편함을 없 앨수 있도록 함은 물론 비등에 대해 안정성을 확보할 수 있고, 또한 이러한 조작의 표시를 리모콘들에 표시하여 사용자가 보일러의 가동상태 여부 및 밸브의 개폐 여부를 편리하게 인지할 수 있도록 발명한 것이다.The present invention relates to a control device and method of the boiler according to the main and sub remote control operation priority, more specifically, the main remote control that can control the whole in one boiler and hot water / heating temperature of each room can be controlled In the hot water / heating system equipped with several sub-remote controllers, the boilers can be controlled in each room by giving priority to the operation of each remote controller, and the boiler body can also be controlled in the boiler body. In addition, it is possible to ensure the stability of boiling, as well as to display the operation of the display on the remote controllers so that the user can easily recognize whether the operation of the boiler and whether the valve is open or closed. will be.

최근들어 하나의 보일러를 이용하여 여러개의 객실에 대한 난방/온수를 실시할 수 있도록 온수/난방 시스템이 개발되어 널리 사용되고 있는데, 이와같은 보일러는 통상 멀티 리모콘으로써 메인 리모콘은 난방/온수 조작 및 설정을 포함한 표시가 가능하고, 그 밖에 부엌이나 타 방 등에 설치되는 다수개의 서브 리모콘들은 난방에 대한 조작 및 설정을 포함한 표시가 가능하며, 보일레내 메인 제어부와 각 실의 서브 리모콘에는 각실의 난방배관과 보일러 본체의 난방수 출구 사이에 설치되어 있는 수개의 밸브들에 대한 개폐와, 리모콘들 사이의 상태를 송수신하기 위한 각실 제어부가 설치된 구성되어 있다.Recently, a hot water / heating system has been developed and widely used to perform heating / hot water for several rooms using a single boiler. Such a boiler is a multi-remote control, and the main remote control is used for heating / hot water operation and setting. In addition, a number of sub-remote controllers installed in the kitchen or other rooms can be displayed including operation and setting for heating.The main control unit in the boiler and the sub-remote control unit in each room have heating pipes and boilers in each room. Opening and closing of several valves provided between the heating water outlets of the main body, and each chamber control unit for transmitting and receiving the state between the remote control is provided.

따라서, 사용자는 메인 리모콘을 통해 전체에 대한 난방/온수의 ON/OFF 및 온도 설정등이 가능하고, 또 메인 리모콘이 온상태를 유지하는 상태에서 각 실의 서브 리모콘을 통해서는 해당 실에서의 난방을 임의적으로 설정 및 온/오프 제어할 수 있다.Therefore, the user can turn on / off and set the temperature of the heating / hot water for the whole through the main remote control, and the heating in the corresponding room through the sub remote control of each room while the main remote control is kept on. Can be arbitrarily set and on / off control.

그런데, 종래 이와같은 온수/난방 시스템은 필히 메인 리모콘을 통해 보일러를 온시켜 놓은 상태에서만 각실 서브 리모콘으로 각방에 대한 온수/난방을 온/오프시킬 수 있는 문제점이 있고(즉, 메인 리모콘을 통해 보일러를 오프시킨 상태에서는 각실 서브 리모콘으로 보일러를 가동시킬 수 없는 문제점이 있고), 또 각실 서브 리모콘을 통해 보일러를 온/오프시켰을 때 서브 리모콘에 아무런 표시가 없어 실제 보일러가 온 또는 오프되는지를 알 수 없는 문제점이 있으며, 또한 수개의 서브 리모콘 중 어느 하나만 온되어 있어도 보일러가 가동되므로 외출시 보일러의 가동을 정지시키기 위해서는 각실에 설치되어 있는 모든 서브 리모콘을 오프모드로 작동시켜야 하는 불편함이 있는 한편, 보일러 에러정보를 각실 서브 리모콘에서는 받을 수 없어 각실에서 보일러의 이상상태를 알 수 없는 문제점이 있다.However, the conventional hot water / heating system has a problem in that the hot water / heating for each room can be turned on / off by the sub-remote remote control only when the boiler is turned on through the main remote controller (that is, the boiler via the main remote controller). Has a problem that the boiler cannot be operated by the sub-remote control room of the room), and when the boiler is turned on / off by the sub-remote control room of the room, there is no indication on the sub-remote controller to see whether the actual boiler is on or off. In addition, since the boiler is operated even if only one of several sub-remote controllers is turned on, in order to stop the operation of the boiler when going out, it is inconvenient to operate all sub-remote controllers installed in each room in the off mode. Boiler error information is not available in each room sub remote control. There is a problem that the abnormal state of the boiler is unknown.

뿐만 아니라, 보일러와는 별도로 각실 제어부에서 각실의 밸브만을 온/오프 제어하도록 구성되어 있어 보일러의 작동여부를 재조작해야하는 문제가 있고, 또한 각실의 밸브가 모두 닫혀 있어도 메인 리모콘이 온될시 보일러가 가동되도록 구성되어 있어 보일러의 비등 문제로 인한 안정성에도 문제가 있다.In addition, it is configured to control ON / OFF valves of each chamber separately from the boiler control unit separately from the boiler, and there is a problem that the boiler needs to be re-operated. It is configured so that there is a problem in stability due to boiler boiling problems.

본 발명은 이와같은 종래의 제반 문제점을 해결하기 위하여 안출한 것으로, 각실 서브 리모콘과 보일러 본체간 연동을 위한 통신선을 구비시켜 조작 우선순위를 갖도록 하는 방식을 통해 각실에서도 보일러의 온/오프 제어를 실시할 수 있고, 또 보일러 본체에 연결된 메인 리모콘에서도 각방 제어를 실시할 수 있도록 하여 별도의 보일러 조작에 따른 불편함을 해결할 수 있으며, 비등에 대한 안정성도 확보할 수 있고, 또한 이러한 조작의 표시를 각각의 리모콘에 구비된 표시부에 표시하여 보일러의 가동 여부 및 밸브의 개폐 상태를 사용자가 편리하게 인지할 수 있는 메인 및 서브 리모콘 조작우선 순위에 의한 보일러의 제어장치 및 그 방법을 제공하는데 그 목적이 있다.The present invention has been made to solve the above-mentioned conventional problems, and the boiler on / off control in each room through a method of having a communication line for interworking between each room sub-remote remote control and the boiler main body to have an operation priority. In addition, it is possible to control each room from the main remote control connected to the boiler main body to solve the inconvenience caused by the separate boiler operation, to ensure the stability against boiling, and also to display each of these operations. It is an object of the present invention to provide a control device and a method of controlling a boiler according to a priority order of main and sub remote control, which can be conveniently recognized by a user by displaying on a display unit provided in a remote controller. .

상기한 본 발명의 목적은, 각실에 설치되어 있는 서브 리모콘 중 어느 하나에서라도 운전지시가 있으면 메인 리모콘의 오프상태와 무관하게 해당실의 밸브를 개방하고 보일러를 해당 서브 리모콘의 설정모드 및 설정온도에 부응하여 작동시키되, 상기와 같은 보일러의 작동 중 보일러의 운전 오프신호가 입력되거나 모든 실에 대한 운전 오프지시가 이루어지면 각실의 서브 리모콘을 모두 오프시키고, 보일러를 오프시킨 후 밸브를 모두 닫아주므로써 달성할 수 있다.The above object of the present invention is to open the valve of the room and the boiler to the setting mode and the setting temperature of the corresponding sub-remote control unit when the operation instruction is given in any of the sub-remote controllers installed in each room, regardless of the off state of the main remote control unit. In response to the operation of the boiler, when the boiler's operation off signal is input or when the operation off instruction is given to all rooms, the sub remote control of each room is turned off, the boiler is turned off, and the valves are closed. Can be achieved.

따라서, 각실에서도 보일러의 온/오프 제어를 실시할 수 있고, 보일러 본체에 연결된 메인 리모콘에서도 각방 제어를 실시할 수 있으며, 비등에 대한 안정성도 확보할 수 있고, 각각의 리모콘을 통해 보일러의 가동 여부 및 밸브의 개폐 상태를 사용자가 편리하게 인지할 수 있는 것이다.Therefore, the on / off control of the boiler can be performed in each room, the control of each room can be performed from the main remote control connected to the boiler body, the stability against boiling can be secured, and whether the boiler can be operated through each remote control. And the user can conveniently recognize the opening and closing state of the valve.

도 1은 본 발명 장치의 블럭 구성도.1 is a block diagram of an apparatus of the present invention.

도 2는 본 발명 방법을 설명하기 위한 플로우챠트.2 is a flowchart for explaining the method of the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 메인 리모콘2 : 메인 제어부1: main remote controller 2: main controller

3 : 각실 제어부4 : 서브 리모콘3: each room control unit 4: sub remote control

5 : 난방배관6 ; 보일러 본체5: heating piping 6; Boiler body

7 : 밸브11,41 : 운전지시 입력부7: valve 11,41: operation instruction input unit

12,24,34,42 : 제 1 내지 제 4 중앙처리부12,24,34,42: first to fourth central processing unit

13,43 : 메인 및 서브 표시부13,43: main and sub display

14,21,22,31,32,44 : 제 1 내지 제 6 송수신부14, 21, 22, 31, 32, 44: first to sixth transceiver

23 : 출탕온도 검출부25 : 전장품 구동부23: tapping temperature detection unit 25: electronics drive unit

33 : 밸브 구동부35 : 데이타 기억부33: valve drive unit 35: data storage unit

45 : 온도검출부45: temperature detector

이하, 본 발명의 바람직한 실시예를 첨부된 도면에 의거하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명 장치에 대한 블럭 구성도를 나타낸 것이다.Figure 1 shows a block diagram of the device of the present invention.

이에 따르면, 사용자가 난방 및 온수운전에 따른 각종 키신호를 입력할 수 있는 운전지시 입력부(11)와, 소정 프로그램을 수행하여 사용자의 키입력신호에 부응하는 각종 운전지시를 포함하여 각종 상태 표시신호등을 출력하는 제 1 중앙처리부(12), 상기 제 1 중앙처리부(12)의 출력신호에 부응하여 보일러의 온/오프상태와 설정온도 및 출탕온도 등을 표시하는 메인 표시부(13) 및, 메인 제어부(2)와의 데이타를 송수신하는 제 1 송수신부(14)를 구비하고 전체 난방/온수에 따른 보일러 가동 및 온도 등을 설정할 수 있는 메인 리모콘(1)과;Accordingly, various status display signals, including a driving instruction input unit 11 which allows a user to input various key signals according to heating and hot water operation, and various driving instructions corresponding to the user's key input signal by executing a predetermined program. The first central processing unit 12 for outputting the output, the main display unit 13 for displaying the on / off state, the set temperature and tapping temperature, etc. of the boiler in response to the output signal of the first central processing unit 12, and the main control unit (2) a main remote controller (1) having a first transceiver (14) for transmitting and receiving data to and from which boiler operation and temperature according to the total heating / hot water can be set;

상기 메인 리모콘(1) 및 각실 제어부(3)와의 데이타 통신을 위한 제 2 및 제 3 송수신부(21)(22)와, 난방수의 출탕온도를 검출하는 난방수 출탕온도 검출부(23), 각부로 부터 입력되는 각종 데이타를 이용하여 소정 프로그램을 수행하여 보일러 가동 및 정지에 따른 모든 제어기능을 수행하는 제 2 중앙처리부(24) 및, 상기 제 2 중앙처리부(24)의 출력신호에 부응하여 버너, 삼방변, 펌프 등 보일러내 전장품들에 대한 직접적인 제어기능을 수행하는 전장품 구동부(25)를 구비하고 보일러 본체(6)내에 설치되는 메인 제어부(2)와;Second and third transceiving units 21 and 22 for data communication with the main remote controller 1 and the room control unit 3, a heating water tapping temperature detector 23 for detecting a tapping temperature of heating water, and each part Burner in response to the output signal of the second central processing unit 24 and the second central processing unit 24 to perform all the control functions according to the boiler start and stop by executing a predetermined program using a variety of data input from the A main control unit (2) having an electric appliance driving unit (25) for directly controlling the electric appliances in the boiler such as a three-way valve and a pump, and installed in the boiler body (6);

상기 메인 제어부(2) 및 각실 서브 리모콘(4)들과의 데이타 통신을 위한 제 4 및 제 5 송수신부(31)(32)와, 각부로 부터 입력되는 각종 데이타를 이용하여 소정 프로그램을 수행한 후 그 결과에 따라 밸브 구동부(33)에 소정의 제어신호를 발생하는 제 3 중앙처리부(34), 상기 제 3 중앙처리부(34)의 출력신호에 부응하여 보일러 본체와 각실의 난방배관(5) 사이에 설치되어 있는 밸브(7)들의 개폐기능을 수행하는 밸브 구동부(33) 및, 상기 제 3 중앙처리부(34)를 통해 입력되는 각실의 이전정보(예를들어 보일러 온/오프 상태, 설정온도 및 타이머 동작여부 등)를 기억하고 있다가 필요시 출력해주는 데이타 기억부(35)를 구비하고 각실의 밸브에 대한 개폐기능을 수행하는 각실 제어부(3)와;Fourth and fifth transmission and reception units 31 and 32 for data communication with the main control unit 2 and the respective room sub-remote controllers 4 and various data inputted from each unit are used to perform a predetermined program. Then, the heating pipe 5 of the boiler body and each chamber in response to the output signal of the third central processing unit 34 and the third central processing unit 34 generating a predetermined control signal to the valve driving unit 33 according to the result. The valve driving unit 33 performing the opening and closing functions of the valves 7 installed therebetween, and previous information of each chamber input through the third central processing unit 34 (for example, a boiler on / off state and a set temperature). And each room control unit (3) having a data storage unit (35) for storing the timer operation, etc., and outputs when necessary, and performs the opening and closing function for the valve of each room;

사용자가 해당 실에 대한 난방 및 온수운전에 따른 각종 키신호를 입력할 수 있는 운전지시 입력부(41)와, 소정 프로그램을 수행하여 사용자의 키입력신호에 부응하는 각종 운전지시를 포함하여 각종 상태 표시신호등을 출력하는 제 4 중앙처리부(42), 상기 제 4 중앙처리부(42)의 출력신호에 부응하여 보일러의 온/오프상태와 각실 설정온도, 밸브의 온/오프 상태 및 타이머 작동 등을 표시하는 서브 표시부(43), 각실 제어부(3)와의 데이타를 송수신하는 제 6 송수신부(44) 및, 각실내의 온도를 검출하는 온도검출부(45)를 구비하고 부엌이나 각 방 등지에 설치되어 사용자가 임의로 난방에 대한 조작 및 설정을 할 수 있도록 하는 수개의 서브 리모콘(4)으로 구성한 것을 특징으로 한다.Various status indications, including an operation instruction input unit 41 which allows a user to input various key signals according to heating and hot water operation for the corresponding room, and various operation instructions corresponding to the user's key input signal by executing a predetermined program. In response to the output signal of the fourth central processing unit 42 and the fourth central processing unit 42 outputting a traffic light, the on / off state of the boiler, the set temperature of each chamber, the on / off state of the valve, the timer operation, and the like are displayed. The sub display section 43, the sixth transmission and reception section 44 for transmitting and receiving data to and from each room control section 3, and the temperature detection section 45 for detecting the temperature in each room and is installed in the kitchen, each room, etc. It is characterized by consisting of several sub-remote controllers 4 which can arbitrarily operate and set heating.

도 2는 본 발명 방법을 설명하기 위한 플로우챠트를 나타낸 것이다.2 shows a flowchart for explaining the method of the present invention.

이에 따르면, 메인 제어부(2)내 제 2 중앙처리부(24)에서 각실 서브 리모콘(4)들의 입력신호를 받아 그 중 어느 하나에서라도 보일러 운전지시가 있는지를 검출하는 단계와;According to this, the second central processing unit 24 in the main control unit 2 receives the input signals of the sub-control rooms 4 of each room and detects whether there is a boiler operation instruction in any of them;

상기에서 검출한 결과 어느 하나에서도 운전지시가 없으면 메인 리모콘(1)에서 보일러 운전지시신호가 입력되는지를 계속 검출하는 단계와;Continuously detecting whether a boiler operation instruction signal is input from the main remote controller 1 when there is no operation instruction as a result of the detection;

상기에서 검출한 결과 메인 리모콘(1)으로부터 운전지시가 있으면 각실 제어부(3)내 제 3 중앙처리부(34)에서 데이타 기억부(35)의 출력신호를 입력받아 보일러가 오프되기 이전에 각실 중 어느 한실에서라도 온상태에 있었는지를 검출하는 단계와;As a result of the above detection, if there is an operation instruction from the main remote controller 1, an output signal of the data storage unit 35 is input from the third central processing unit 34 in each room control unit 3 before any boiler is turned off. Detecting whether it is in an on state even in a cold room;

상기에서 검출한 결과 각실 서브 리모콘(4)들 중 어느 하나에서라도 보일러 운전지시가 있거나, 이전에 어느 한실에서라도 온상태에 있었으면 해당실의 서브 리모콘(4)에 설치되어 있는 온도검출부(45)를 통해 각 실내의 온도를 검출하여 각실내의 온도가 설정온도 이상인지를 검출하는 단계와;As a result of the above detection, when any one of the sub-remote controllers 4 in each room has a boiler operation instruction or is in an on state in any one of the chambers, the temperature detection unit 45 installed in the sub-remote controller 4 in the corresponding chamber is used. Detecting a temperature of each room to detect whether a temperature in each room is equal to or higher than a set temperature;

상기에서 검출한 결과 현재의 해당 실내온도가 설정온도 이상이면 해당실의 밸브를 폐쇄시키고 그 미만이면 해당실의 밸브를 개방시키는 단계와;Closing the valve of the chamber and opening the valve of the chamber if the current room temperature is above the set temperature as a result of the detection;

상기에서 해당실의 밸브가 개방되면 상기 메인 제어부(2)에서 전장품 구동부(25)를 통해 버너에 점화를 실시하는 보일러 가동을 실시한 후 난방설정온도와 출탕온도를 비교하며 버너의 온/오프 제어를 통한 난방온도를 자동 조절하는 단계와;When the valve of the room is opened, the main control unit 2 performs the boiler operation to ignite the burner through the electric appliance driving unit 25, and compares the heating set temperature with the tapping temperature and controls the burner on / off. Automatically adjusting the heating temperature;

상기와 같이 보일러가 가동되고 있는 중 메인 리모콘(1)에서 보일러 운전 오프지시가 입력되는지를 검출하여 만약 있으면, 각실 제어부(3)에서는 각실의 서브 리모콘(4)을 모두 오프시키고, 메인 제어부(2)에서는 보일러의 가동을 중지시키고, 이어서 상기 각실 제어부(3)에서는 각실의 밸브(7)를 모두 폐쇄하고 대기하는 단계와;As described above, when the boiler operation off instruction is input from the main remote controller 1 while the boiler is operating, if any, the chamber controller 3 turns off all the sub-remote controllers 4 of each chamber, and the main controller 2 ) Stops the operation of the boiler, and then in the chamber control unit (3) to close and wait all the valves (7) of each chamber;

상기에서 검출한 결과 메인 리모콘(1)에서 보일러 운전 오프지시가 없으면 각실 서브 리모콘(4)에서 모두 운전 오프지시가 입력되는지를 검출하여 만약 있으면, 각실 제어부(3)에서는 각실의 서브 리모콘(4)을 모두 오프시키고, 메인 제어부(2)에서는 보일러의 가동을 중지시킨 후 상기 각실 제어부(3)에서 다시 각실의 밸브(7)를 모두 폐쇄하고 대기하는 단계;로 이루어진 것을 특징으로 한다.As a result of the above detection, if there is no boiler operation off instruction from the main remote control unit 1, the sub-remote control unit 4 of each room detects whether an operation off instruction is input. All of the off, the main control unit 2, after stopping the operation of the boiler in the chamber control unit 3 again closing all the valves 7 of each room and waiting; characterized in that consisting of.

이와같은 구성 및 단계로 이루어진 본 발명의 작용효과를 설명하면 다음과 같다.Referring to the effect of the present invention made of such a configuration and steps as follows.

먼저, 사용자가 메인 리모콘(1)의 운전지시 입력부(11)를 통해 난방 및 온수운전에 따른 각종 키신호를 입력하면 이 신호는 제 1 중앙 처리부(12)를 통해 메인 표시부(13)에 표시됨과 동시에 제 1 송수신부(14)를 거쳐 메인 제어부(2) 및 각실 제어부(3)로 전달되어 보일러 및 밸브의 가동 및 개폐 제어가 이루어지게 된다.First, when a user inputs various key signals according to heating and hot water operation through the operation instruction input unit 11 of the main remote controller 1, the signals are displayed on the main display unit 13 through the first central processing unit 12. At the same time, it is transmitted to the main control unit 2 and each chamber control unit 3 via the first transmission / reception unit 14 to control the operation and opening and closing of the boiler and the valve.

이때, 상기 메인 리모콘(1)의 메인 표시부(13)에는 전술한 사용자 키 입력신호는 물론 각실 제어부(3) 및 메인 제어부(2)를 통해 전달되는 보일러의 온/오프상태와 설정온도 및 출탕온도 등도 표시된다.At this time, the main display unit 13 of the main remote controller 1, the on / off state, the set temperature and the tapping temperature of the boiler transmitted through each room control unit 3 and the main control unit 2 as well as the user key input signal described above. And the like.

또한, 상기 메인 제어부(2)의 제 2 및 제 3 송수신부(21)(22)에서는 상기 메인 리모콘(1) 및 각실 제어부(3)와의 데이타 통신을 원할히 수행하고, 출탕온도 검출부(23)에서는 도시 생략된 온도센서를 통해 입력되는 난방수의 출탕온도를 검출하며, 각부로 부터 입력되는 각종 데이타를 이용하여 소정 프로그램을 수행하여 보일러 가동 및 정지에 따른 모든 제어기능을 수행하는 제 2 중앙처리부(24)의 제어를 받는 전장품 구동부(25)에서는 보일러의 가동 및 정지를 위한 전장품인 버너, 삼방변, 펌프 등의 구동을 직접적으로 제어하게 된다.In addition, the second and third transceivers 21 and 22 of the main controller 2 smoothly perform data communication with the main remote controller 1 and each room controller 3, and the tapping temperature detector 23 The second central processing unit detects the tapping temperature of the heating water input through the temperature sensor, not shown, and performs all control functions according to the boiler starting and stopping by executing a predetermined program using various data inputted from each part ( In the electric appliance driving unit 25 under the control of 24), the electric appliances such as burners, three-way valves, and pumps, which are electric appliances for starting and stopping the boiler, are directly controlled.

또, 각실 제어부(3)내의 제 4 및 제 5 송수신부(31)(32)는 상기 메인 제어부(2) 및 각실 서브 리모콘(4)들과의 데이타 통신이 원할히 이루어지게 하고, 각부로 부터 입력되는 각종 데이타를 이용하여 소정 프로그램을 수행한 후 그 결과에 따라 소정의 제어신호를 발생하는 제 3 중앙처리부(34)의 제어를 받는 밸브 구동부(33)에서는 상기 제 3 중앙처리부(34)의 출력신호에 부응하여 보일러 본체와 각실의 난방배관(5) 사이에 설치되어 있는 밸브(7)들의 개폐기능을 수행하게 된다.In addition, the fourth and fifth transmitting and receiving units 31 and 32 in each room control unit 3 facilitate data communication with the main control unit 2 and each room sub-remote controller 4, and input from each unit. The output of the third central processing unit 34 is performed by the valve driving unit 33 under the control of the third central processing unit 34 which generates a predetermined control signal according to the result after executing a predetermined program using various data. In response to the signal to perform the opening and closing function of the valve (7) installed between the boiler body and the heating pipe (5) of each room.

한편, 상기 각실 제어부(4)내의 데이타 기억부(35)에서는 상기 제 3 중앙처리부(34)를 통해 입력되는 각실의 서브 리보콘(4)들에 대한 이전정보인 보일러 온/오프 상태, 설정온도, 밸브 개폐여부 및 타이머 동작여부 등를 기억하고 있다가 제 3 중앙처리부(34)의 요청이 있을시 해당 데이타를 출력시켜 난방 및 온수 운전에 이용할 수 있도록 한다.On the other hand, the data storage unit 35 in each chamber control unit 4, the boiler on / off state, the set temperature that is the previous information on the sub-ribocon (4) of each chamber input through the third central processing unit 34 It stores the valve opening and closing, the timer operation, and the like, and outputs the data when the third central processing unit 34 requests it to be used for heating and hot water operation.

그리고, 사용자가 각실에 설치되어 있는 서브 리모콘(4)의 운전지시 입력부(41)를 통해 해당실의 난방 및 온수운전에 따른 각종 키신호를 입력하면 이 신호는 제 4 중앙 처리부(42)를 통해 서브 표시부(43)에 표시됨과 동시에 제 6 송수신부(44)를 거쳐 각실 제어부(3) 및 메인 제어부(2)로 전달되어 보일러 및 밸브의 가동 및 개폐 제어가 이루어지게 된다.Then, when the user inputs various key signals according to the heating and hot water operation of the corresponding room through the operation instruction input unit 41 of the sub remote controller 4 installed in each room, the signal is transmitted through the fourth central processing unit 42. Simultaneously displayed on the sub display unit 43, the sub-display unit 43 is transferred to the chamber control unit 3 and the main control unit 2 via the sixth transceiver unit 44 to control the operation and opening and closing of the boiler and the valve.

또한, 상기 서브 리모콘(4)내의 온도검출부(45)에서는 각 실내의 온도를 검출하여 제 4 중앙 처리부(42)를 통해 서브 표시부(43)에 표시함과 동시에 제 6 송수신부(44)를 거쳐 각실 제어부(3) 및 메인 제어부(2)로 전달하여 보일러의 가동시 온도비교를 통한 보일러 및 밸브의 가동 및 개폐 제어가 이루어도록 한다.In addition, the temperature detector 45 in the sub-remote controller 4 detects the temperature of each room and displays the temperature on the sub display unit 43 through the fourth central processing unit 42 and passes through the sixth transmission / reception unit 44. Transfer to each control unit (3) and the main control unit (2) to control the operation and opening and closing of the boiler and the valve through the temperature comparison during operation of the boiler.

이때, 상기 서브 리모콘(4)의 서브 표시부(43)에는 보일러의 온/오프상태와 각실 설정온도, 실내온도, 밸브의 온/오프 상태 및 타이머 작동 등이 표시된다.At this time, the sub display unit 43 of the sub remote controller 4 displays the on / off state of the boiler, the set temperature of each room, the room temperature, the on / off state of the valve, and the timer operation.

한편, 상기 메인 제어부(2)내 제 2 중앙처리부(24)에서는 통상시(보일러의 작동 정지중) 각실 제어부(2)를 통해 각실 서브 리모콘(4)들의 출력신호들을 입력받아 그 중 어느 하나에서라도 보일러 운전지시 신호가 입력되는지(즉, 사용자가 각실에 설치되어 있는 수개의 서브 리모콘(4)중 어느 하나를 조작하여 보일러를 가동코자 하는지)를 계속해서 검출하게 된다.On the other hand, the second central processing unit 24 in the main control unit 2 receives the output signals of the respective room sub-remote controllers 4 through the respective room control unit 2 during normal operation (while the boiler is not operating). It continuously detects whether a boiler operation instruction signal is input (that is, the user wants to operate the boiler by operating one of several sub-remote controllers 4 installed in each room).

이와같이 검출한 결과 서브 리모콘(4)들 중 어느 하나에서도 운전지시가 없으면 이번에는 메인 리모콘(1)을 통해 보일러 운전지시신호가 입력되는지를 계속해서 검출하게 된다.If there is no operation instruction in any of the sub-remote controllers 4 as a result of the detection as described above, it is continuously detected whether the boiler operation instruction signal is input through the main remote controller 1.

이와같이 상기 메인 제어부(2)에서 메인 리모콘(1)의 출력상태를 확인한 결과 사용자가 메인 리모콘(1)을 통해 운전지시를 내린 상태이면, 상기 메인 제어부(2)에서 이를 각실 제어부(3)로 전송시켜 주므로, 상기 각실 제어부(3)내 제 3 중앙처리부(34)에서 이를 인식하고 데이타 기억부(35)의 출력신호를 입력받아 보일러가 오프되기 이전에 각실 중 어느 한실에서라도 온상태에 있었는지를 확인하게 된다.As such, when the user confirms the operation state through the main remote controller 1 as a result of checking the output state of the main remote controller 1 by the main control unit 2, the main control unit 2 transmits it to each room control unit 3. Since it is recognized by the third central processing unit 34 in the chamber control unit 3 and receives the output signal of the data storage unit 35, whether it was in the on state in any of the chambers before the boiler was turned off. You will be confirmed.

이와같이 확인한 결과 이전에 어느 한실도 온된 상태가 없으면 비록 메인 리모콘(1)에서 운전지시가 입력되었다 하더라도 보일러의 가동을 실시하지 않고 대기상태로 돌입하는데, 이는 각실의 모든 밸브(7)가 닫혀 있는 상태에서 보일러를 가동시키면 보일러 본체에서 비등이 발생하게 되므로 이를 방지하기 위함이다.As a result of this check, if none of the chambers were previously turned on, even if the operation instruction was input from the main remote controller 1, the boiler enters the standby state without starting the boiler, which means that all the valves 7 in each chamber are closed. This is to prevent the boiler because boiling occurs in the boiler body when the boiler is operated in.

한편, 상기에서 검출한 결과 각실 서브 리모콘(4)들 중 어느 하나에서라도 보일러 운전지시가 있거나, 메인 리모콘(1)으로부터 운전지시가 이루어진 상태에서 이전의 서브 리모콘(4)들에 대한 상태를 검출한 결과 어느 한실에서라도 온상태에 있었으면 상기 메인 제어부(2)에서는 해당실의 서브 리모콘(4)에 설치되어 있는 온도검출부(45)의 출력신호를 전송받아 각 실내의 현재온도가 각실내의 설정온도 이상인지를 검출하게 된다.On the other hand, as a result of the above detection, any one of the sub-remote controllers 4 in each room has a boiler operation instruction or the state of the previous sub-remote controllers 4 is detected in a state in which the operation instruction is made from the main remote controller 1. As a result, if any room is in the ON state, the main control unit 2 receives the output signal of the temperature detector 45 installed in the sub remote control 4 of the room, and the present temperature of each room is higher than the set temperature of each room. Awareness is detected.

이와같이 검출한 결과 현재의 해당 실내온도가 설정온도 이상이면 난방이 충분히 이루어진 상태이므로 해당실의 밸브를 폐쇄시키고 그 미만이면 해당실의 밸브를 개방시킨 다음 전장품 구동부(25)를 통해 버너에 점화를 실시하는 보일러 가동을 실시한 후 사용자에 의해 설정된 난방설정온도와 출탕온도 검출부(23)를 통해 검출되는 난방수의 출탕온도를 상호 비교하며 버너의 온/오프 제어를 실시하여 난방온도가 설정온도에 이르도록 연소 및 소화동작을 반복 실시하게 된다.As a result of the detection, if the current room temperature is above the set temperature, the heating is sufficiently performed. If the room temperature is less than that, the valve of the chamber is closed. If the chamber temperature is less than that, the valve of the chamber is opened. After the boiler is operated, the heating set temperature set by the user and the tapping temperature of the heating water detected by the tapping temperature detector 23 are compared with each other, and the burner is turned on / off to control the heating temperature to reach the set temperature. Combustion and extinguishing will be repeated.

또한, 상기와 같이 보일러가 가동되고 있는 중 메인 제어부(2)에서는 상기 메인 리모콘(1)에서 보일러 운전 오프지시가 입력되는지를 계속 검출하게 되는데, 만약 사용자가 보일러의 운전을 정지시키기 위해 운정 오프키를 조작한 경우이면, 일차적으로 각실 제어부(3)에서 각실의 서브 리모콘(4)을 모두 오프시키고, 이어서 메인 제어부(2)에서는 보일러의 가동을 중지시킨 다음, 상기 각실 제어부(3)에서 다시 각실의 밸브(7)를 모두 폐쇄하게 된다.In addition, while the boiler is operating as described above, the main controller 2 continuously detects whether the boiler operation off instruction is input from the main remote controller 1, but if the user stops the operation of the boiler, In the case of the operation, first, the sub-control unit 4 of each room is turned off by the respective room control unit 3, and then the main control unit 2 stops the operation of the boiler, and then the respective room control unit 3 again. The valve 7 of all will be closed.

한편, 상기에서 검출한 결과 메인 리모콘(1)을 통한 사용자의 보일러 운전 오프지시가 없으면, 사용자가 각실 서브 리모콘(4)들을 모두 오프시킴으로 인해 모든 서브 리모콘(4)에서 운전 오프지시가 입력되는지를 검출하게 된다.On the other hand, if there is no boiler operation off instruction of the user through the main remote control 1 as a result of the detection as described above, it is determined whether the operation off instruction is input from all the sub remote control 4 because the user turns off all the sub-remote controllers 4 in each room. Will be detected.

그 결과 각실 서브 리모콘(4)들에서 모두 운전 오프신호가 입력되었으면 전술과 같이 각실 제어부(3)에서는 각실의 서브 리모콘(4)을 모두 오프시키고, 메인 제어부(2)에서는 보일러의 가동을 중지시키며, 이어서 상기 각실 제어부(3)에서는 다시 각실의 밸브(7)를 모두 폐쇄하게 된다.As a result, when the operation off signal is input to all the sub-remote controllers 4 in each room, the sub-controls 4 in each room are turned off in each chamber control unit 3 and the main control unit 2 stops the operation of the boiler as described above. Subsequently, the chamber control unit 3 again closes all the valves 7 of the chamber.

이상에서 설명한 바와 같이 본 발명에 의하면, 각실 제어에 있어 보일러와 연동하여 각실의 보조 리모콘에서 보일러의 작동을 제어할 수 있고, 또 본체에 연결된 메인 리모콘에서도 각실의 서브 리모콘을 제어할 수 있어 별도 조작에 따른 불변함을 해소시킬 수 있고, 또한 각실 서브 리모콘에서의 제어시와 메인 리모콘에 의한 제어시를 구분하여 표시하므로써 사용의 편리성을 확보할 수 있으며, 각실의 밸브가 모두 잠긴 상태에서 운전지시가 있더라도 보일러의 가동이 차단되므로 비등에 대한 안정성도를 확보할 수 있고, 각각의 리모콘을 통해 보일러의 가동 여부 및 밸브의 개폐 상태를 사용자가 편리하게 인지할 수 있는 등 매우 유용한 발명인 것이다.As described above, according to the present invention, it is possible to control the operation of the boiler from the auxiliary remote control of each room in conjunction with the boiler in each room control, and also to control the sub-remote control of each room from the main remote control connected to the main body. It is possible to solve the invariant according to the control panel. Also, it is possible to secure the convenience of use by distinguishing between the control of each room sub remote controller and the control by the main remote controller. Even if the boiler is shut off because it is possible to ensure the stability of the boiling, it is a very useful invention, such that the user can easily recognize whether the operation of the boiler and the opening and closing state of the valve through each remote control.

Claims (2)

사용자가 난방 및 온수운전에 따른 각종 키신호를 입력할 수 있는 운전지시 입력부(11)와, 소정 프로그램을 수행하여 사용자의 키입력신호에 부응하는 각종 운전지시를 포함하여 각종 상태 표시신호등을 출력하는 제 1 중앙처리부(12), 상기 제 1 중앙처리부(12)의 출력신호에 부응하여 보일러의 온/오프상태와 설정온도 및 출탕온도 등을 표시하는 메인 표시부(13) 및, 메인 제어부(2)와의 데이타를 송수신하는 제 1 송수신부(14)를 구비하고 전체 난방/온수에 따른 보일러 가동 및 온도 등을 설정할 수 있는 메인 리모콘(1)과;The driving instruction input unit 11, which allows the user to input various key signals according to heating and hot water operation, and outputs various status display signals including various driving instructions corresponding to the user's key input signal by executing a predetermined program. A main display unit 13 for displaying an on / off state of the boiler, a set temperature and a tapping temperature, etc. in response to an output signal of the first central processing unit 12 and the first central processing unit 12, and the main control unit 2; A main remote controller (1) having a first transceiver (14) for transmitting / receiving data to and from which boiler operation and temperature according to total heating / hot water are set; 상기 메인 리모콘(1) 및 각실 제어부(3)와의 데이타 통신을 위한 제 2 및 제 3 송수신부(21)(22)와, 난방수의 출탕온도를 검출하는 난방수 출탕온도 검출부(23), 각부로 부터 입력되는 각종 데이타를 이용하여 소정 프로그램을 수행하여 보일러 가동 및 정지에 따른 모든 제어기능을 수행하는 제 2 중앙처리부(24) 및, 상기 제 2 중앙처리부(24)의 출력신호에 부응하여 버너, 삼방변, 펌프 등 보일러내 전장품들에 대한 직접적인 제어기능을 수행하는 전장품 구동부(25)를 구비하고 보일러 본체(6)내에 설치되는 메인 제어부(2)와;Second and third transceiving units 21 and 22 for data communication with the main remote controller 1 and the room control unit 3, a heating water tapping temperature detector 23 for detecting a tapping temperature of heating water, and each part Burner in response to the output signal of the second central processing unit 24 and the second central processing unit 24 to perform all the control functions according to the boiler start and stop by executing a predetermined program using a variety of data input from the A main control unit (2) having an electric appliance driving unit (25) for directly controlling the electric appliances in the boiler such as a three-way valve and a pump, and installed in the boiler body (6); 상기 메인 제어부(2) 및 각실 서브 리모콘(4)들과의 데이타 통신을 위한 제 4 및 제 5 송수신부(31)(32)와, 각부로 부터 입력되는 각종 데이타를 이용하여 소정 프로그램을 수행한 후 그 결과에 따라 밸브 구동부(33)에 소정의 제어신호를 발생하는 제 3 중앙처리부(34), 상기 제 3 중앙처리부(34)의 출력신호에 부응하여 보일러 본체와 각실의 난방배관(5) 사이에 설치되어 있는 밸브(7)들의 개폐기능을 수행하는 밸브 구동부(33) 및, 상기 제 3 중앙처리부(34)를 통해 입력되는 각실의 이전정보를 기억하고 있다가 필요시 출력해주는 데이타 기억부(35)를 구비하고 각실의 밸브에 대한 개폐기능을 수행하는 각실 제어부(3)와;Fourth and fifth transmission and reception units 31 and 32 for data communication with the main control unit 2 and the respective room sub-remote controllers 4 and various data inputted from each unit are used to perform a predetermined program. Then, the heating pipe 5 of the boiler body and each chamber in response to the output signal of the third central processing unit 34 and the third central processing unit 34 generating a predetermined control signal to the valve driving unit 33 according to the result. The valve drive unit 33 which opens and closes the valves 7 installed therebetween, and the data storage unit which stores and transfers the previous information of each chamber input through the third central processing unit 34 when necessary. Each chamber control part 3 which has 35 and performs the opening-closing function with respect to the valve of each chamber; 사용자가 해당 실에 대한 난방 및 온수운전에 따른 각종 키신호를 입력할 수 있는 운전지시 입력부(41)와, 소정 프로그램을 수행하여 사용자의 키입력신호에 부응하는 각종 운전지시를 포함하여 각종 상태 표시신호등을 출력하는 제 4 중앙처리부(42), 상기 제 4 중앙처리부(42)의 출력신호에 부응하여 보일러의 온/오프상태와 각실 설정온도, 밸브의 온/오프 상태 및 타이머 작동 등을 표시하는 서브 표시부(43), 각실 제어부(3)와의 데이타를 송수신하는 제 6 송수신부(44) 및, 각실내의 온도를 검출하는 온도검출부(45)를 구비하고 부엌이나 각 방 등지에 설치되어 사용자가 임의로 온수 및 난방에 대한 조작 및 설정을 할 수 있도록 하는 수개의 서브 리모콘(4)으로 구성한 것을 특징으로 하는 메인 및 서브 리모콘 조작우선 순위에 의한 보일러의 제어장치.Various status indications, including an operation instruction input unit 41 which allows a user to input various key signals according to heating and hot water operation for the corresponding room, and various operation instructions corresponding to the user's key input signal by executing a predetermined program. In response to the output signal of the fourth central processing unit 42 and the fourth central processing unit 42 outputting a traffic light, the on / off state of the boiler, the set temperature of each chamber, the on / off state of the valve, the timer operation, and the like are displayed. The sub display section 43, the sixth transmission and reception section 44 for transmitting and receiving data to and from each room control section 3, and the temperature detection section 45 for detecting the temperature in each room and is installed in the kitchen, each room, etc. A boiler control apparatus according to the priority order of the main and sub remote control, characterized by consisting of several sub-remote controllers (4) for arbitrarily operating and setting hot water and heating. 메인 제어부(2)내 제 2 중앙처리부(24)에서 각실 서브 리모콘(4)들의 입력신호를 받아 그 중 어느 하나에서라도 보일러 운전지시가 있는지를 검출하는 단계와;Receiving, by the second central processing unit (24) in the main control unit (2), an input signal of each sub-remote controller (4) and detecting whether any one of the boiler operation instructions is present; 상기에서 검출한 결과 어느 하나에서도 운전지시가 없으면 메인 리모콘(1)에서 보일러 운전지시신호가 입력되는지를 계속 검출하는 단계와;Continuously detecting whether a boiler operation instruction signal is input from the main remote controller 1 when there is no operation instruction as a result of the detection; 상기에서 검출한 결과 메인 리모콘(1)으로부터 운전지시가 있으면 각실 제어부(3)내 제 3 중앙처리부(34)에서 데이타 기억부(35)의 출력신호를 입력받아 보일러가 오프되기 이전에 각실 중 어느 한실에서라도 온상태에 있었는지를 검출하는 단계와;As a result of the above detection, if there is an operation instruction from the main remote controller 1, an output signal of the data storage unit 35 is input from the third central processing unit 34 in each room control unit 3 before any boiler is turned off. Detecting whether it is in an on state even in a cold room; 상기에서 검출한 결과 각실 서브 리모콘(4)들 중 어느 하나에서라도 보일러 운전지시가 있거나, 이전에 어느 한실에서라도 온상태에 있었으면 해당실의 서브 리모콘(4)에 설치되어 있는 온도검출부(45)를 통해 각 실내의 온도를 검출하여 각실내의 온도가 설정온도 이상인지를 검출하는 단계와;As a result of the above detection, when any one of the sub-remote controllers 4 in each room has a boiler operation instruction or is in an on state in any one of the chambers, the temperature detection unit 45 installed in the sub-remote controller 4 in the corresponding chamber is used. Detecting a temperature of each room to detect whether a temperature in each room is equal to or higher than a set temperature; 상기에서 검출한 결과 현재의 해당 실내온도가 설정온도 이상이면 해당실의 밸브를 폐쇄시키고 그 미만이면 해당실의 밸브를 개방시키는 단계와;Closing the valve of the chamber and opening the valve of the chamber if the current room temperature is above the set temperature as a result of the detection; 상기에서 해당실의 밸브가 개방되면 상기 메인 제어부(2)에서 전장품 구동부(25)를 통해 버너에 점화를 실시하는 보일러 가동을 실시한 후 난방설정온도와 출탕온도를 비교하며 버너의 온/오프 제어를 통한 난방온도를 자동 조절하는 단계와;When the valve of the room is opened, the main control unit 2 performs the boiler operation to ignite the burner through the electric appliance driving unit 25, and compares the heating set temperature with the tapping temperature and controls the burner on / off. Automatically adjusting the heating temperature; 상기와 같이 보일러가 가동되고 있는 중 메인 리모콘(1)에서 보일러 운전 오프지시가 입력되는지를 검출하여 만약 있으면, 각실 제어부(3)에서는 각실의 서브 리모콘(4)을 모두 오프시키고, 메인 제어부(2)에서는 보일러의 가동을 중지시키고, 이어서 상기 각실 제어부(3)에서는 각실의 밸브(7)를 모두 폐쇄하고 대기하는 단계와;As described above, when the boiler operation off instruction is input from the main remote controller 1 while the boiler is operating, if any, the chamber controller 3 turns off all the sub-remote controllers 4 of each chamber, and the main controller 2 ) Stops the operation of the boiler, and then in the chamber control unit (3) to close and wait all the valves (7) of each chamber; 상기에서 검출한 결과 메인 리모콘(1)에서 보일러 운전 오프지시가 없으면각실 서브 리모콘(4)에서 모두 운전 오프지시가 입력되는지를 검출하여 만약 있으면, 각실 제어부(3)에서는 각실의 서브 리모콘(4)을 모두 오프시키고, 메인 제어부(2)에서는 보일러의 가동을 중지시킨 후 상기 각실 제어부(3)에서 다시 각실의 밸브(7)를 모두 폐쇄하고 대기하는 단계;로 이루어진 것을 특징으로 하는 메인 및 서브 리모콘 조작우선 순위에 의한 보일러의 제어방법.As a result of the above detection, if there is no boiler operation off instruction from the main remote controller 1, it is detected whether the operation off instructions are input by each sub-remote control unit 4, and if there is any, the control unit 3 of each room controls the sub remote control 4 of each room. The main control unit 2, the main control unit 2, after stopping the operation of the boiler in the chamber control unit (3) to close all the valves (7) of each room again and standby; main and sub remote control, characterized in that consisting of Boiler control method by operation priority.
KR10-2001-0067727A 2001-10-31 2001-10-31 Boiler Control Device and Method by Operation Priority of Main and Sub Remote Controller KR100418051B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0067727A KR100418051B1 (en) 2001-10-31 2001-10-31 Boiler Control Device and Method by Operation Priority of Main and Sub Remote Controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0067727A KR100418051B1 (en) 2001-10-31 2001-10-31 Boiler Control Device and Method by Operation Priority of Main and Sub Remote Controller

Publications (2)

Publication Number Publication Date
KR20030035611A true KR20030035611A (en) 2003-05-09
KR100418051B1 KR100418051B1 (en) 2004-02-11

Family

ID=29567431

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0067727A KR100418051B1 (en) 2001-10-31 2001-10-31 Boiler Control Device and Method by Operation Priority of Main and Sub Remote Controller

Country Status (1)

Country Link
KR (1) KR100418051B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100418052B1 (en) * 2001-10-31 2004-02-11 린나이코리아 주식회사 Boiler Control device and Method thereof by Wrong Operation Detection of Each Room Control Valve

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950004328U (en) * 1993-07-16 1995-02-17 이철희 Multiple remote controller for boiler
JPH07293905A (en) * 1994-04-28 1995-11-10 Sanyo Electric Co Ltd Heating device
KR100196744B1 (en) * 1996-09-03 1999-06-15 송석원 Separated room heating control device
KR100293533B1 (en) * 1998-11-30 2001-09-17 강성모 Remote operation method and device of boiler
KR200210519Y1 (en) * 2000-07-26 2001-01-15 주식회사경동보일러 Multi floor unit
KR100418052B1 (en) * 2001-10-31 2004-02-11 린나이코리아 주식회사 Boiler Control device and Method thereof by Wrong Operation Detection of Each Room Control Valve

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100418052B1 (en) * 2001-10-31 2004-02-11 린나이코리아 주식회사 Boiler Control device and Method thereof by Wrong Operation Detection of Each Room Control Valve

Also Published As

Publication number Publication date
KR100418051B1 (en) 2004-02-11

Similar Documents

Publication Publication Date Title
JPH052892B2 (en)
KR100418051B1 (en) Boiler Control Device and Method by Operation Priority of Main and Sub Remote Controller
KR101476645B1 (en) Method for controlling heating temperature for each room in the heating system for each room
JP2006242409A (en) Hot water supply system
KR100418052B1 (en) Boiler Control device and Method thereof by Wrong Operation Detection of Each Room Control Valve
KR20100052887A (en) Each room heating system
TW201226808A (en) Method and system for remotely controlling gas appliance
JP2006234241A (en) Hot-water feed system
KR100489960B1 (en) Apparatus and method for switching heating by using remote controller
KR101768666B1 (en) Control panel with thermostat and hot water heating control method in simultaneous conjunction of the boiler body
KR101762698B1 (en) How to prevent malfunction due to noise, communication between the main unit and the remote control
KR20090103277A (en) Measuring method for informating on pipe-laying in each room during boiler test working
JP2001349607A (en) Data backup method for water heater and water heater
KR100390024B1 (en) Apparatus and method for controlling hot water supplying/heating of boiler by using multi-remote controller
KR100357027B1 (en) Auxiliary operation control device and method of boiler
JP4370272B2 (en) Piping construction diagnosis method for hot water supply system, hot water supply system, diagnosis device therefor, and diagnostic program
JP3928533B2 (en) Hot water system
KR100418053B1 (en) Freeze Poretection Method of Boiler Having Each Room Temperature Control Function
JPH0456212B2 (en)
KR102087214B1 (en) Overheat prevention method of boiler when controlling returnig water temperature
JP2001183008A (en) Hot water supply system
JP2001091047A (en) Hot-water supplying device for bath
JPH09280557A (en) Remote control system
JPH0735593A (en) Safety device in gas supply system
JP2001165459A (en) Hot water supply system

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130102

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20131227

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20141229

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20161228

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20180111

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20190102

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20200102

Year of fee payment: 17